Loading...
APPROVED STM ENG RESUB2 BLD2022-0287+Civil_Plan+8.19.2022_11.26.45_AM+3061784L / w \ x L` x z / J LLJ w z \ U 1 x END FENCE I x I ON LINE \ 1 0.4' / \ x 0. 7' DETAIL "A " NE 114, NE 114, SEC. 25, T, 27 N., R.03 E., W.M. 10 80111doinWa W Y SNOHOMISH COUNTY, WASHINGTON / I � � I / \ I I I i // FOUND CASED CONC. MON. W7 1-3/4" BRASS DISK & 'X" \ �•JI SITE 0.7'. VISITED 11- --/h�)'l �'�� N\ 50„ SlTl E POof I U / I" �O \J \ FOUND CASED CONC. MON. W/ \ / IN 1-3/4" BRASS DISK & 'X" CB RIM=390.00WA DOWN 0.8'. VISITED 11-29-21 / y \ IE 12" RCP(N)=386.85 \ IE 12" RCP(E)=386.90 CB RIM=392.88 IE 12" RCP(W)=390.13 \ \ / IE 8 PVC(SE)=390.38CL I cD 7- F_\ Lv / / I 1U SCALE: 1 " = 10' 10 5 0 10 20 LEGEND op EXISTING MONUMENT (AS SHOWN) //I L z GOa SECTION 1/4 CORNER NOT FOUND SECTION CORNER NOT FOUND _ // I ? FOUND REBAR/CAP OR I.P. (IRON PIPE) g (C) CALCULATED I (P) I \ I � LOT 9 PUBLIC UTILITY EASEMENT LOT 7 PER HULL & ANDERSON \ PLAT OF I ADDITION VOL. 18, PG. 41 HULL & ANDERSON OLYMPIC PLACE I ADDITION I A.F.#9002145001 i VOL. 18, PG. 41 I / S � I I SSMH SS I RIM=383.00 SS PUBLIC UTILITY EASEMENT PER HULL & ANDERSON ADDITION VOL. 18, PG. 41 i I Ss / FOUND REBAR W/CAP STAMPED '22969" SS SEVER 0.1'(W) k, 0.1'(S) OF CORNER. FENCE I POUND 1-1/4" IRON COR. 0.12'(N) & 0.5'(W) OF CORNER I / PIPE AT CORNER 0.3' 0. N 90'00'00" W 126.00' SS i _L SS m I I S 10 \\ \ \\ I I 45.0' I / I ° / I I I EX. po \ ° SHE II 15. I ' BSBL I I I II PROPOSED DRIVEW�Y G / / ° I I I I / I\ I I I \ LOT 6 l l a 8,291 SF 00479300000600 \ I I I ° a / LOT 8 \\ I I III \ PROPOSED HOUSE / , } (2, 815 SF ROOF) PLAT OF \ I I OLYMPIC PLACE \ I I I \ \ \ / ° • A.F.#9002145001 I I b \ I I UFF=395.00 / o FOUND REBAR W/CAP I I I I I o I LFF=385.50 STAMPED '22969" 0.2'(S) OF CORNER j / I W W / W W- /. I I I I I o / 0 18.0' / z UTILITY EASEMENT 25. 0' BSBLSEE \ DETAIL � / // l6,2 Qn o l / l EX. SH€D------ / 4.0' I 96.42 I \\ I / I \ FOUND REBAR W/ILLEGIBLE / I \ N 8438E I 8.7 11 CAP 0.1'(N) OF CORNER LZI-11 IF I FOUND 1-1 /4" IR N PIPE 0.1 '(N) OF 4 ° LOT 5 CORNER. FENCE 0 '(W) AT CORNER HULL & ANDERSON ADDITION I PUBLIC UTILITY EASEMENT VOL. 18, PG. 41 �- PER HULL & ANDERSON ADDITION VOL. 18, PG. 41 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. W I I I I I I L I I, I I I WPM I I I I GPM GPM - I N C/L OF R/W I I w I of I � o 0 0 I ' z Zi ai 25 EX. R/W 25' EX. R/W I I I I I I I I ' I 25.00' c ---- - -----------I I i GP,17 ASS GPM - S II I SS �- COMMON TRENCH FOR POWER, CABLE, PHONE I c6 I I , I I I I 1 I , I , I I , I , N 90'00'00" W 15.00' W W WPM � I I I I I I I I I I I I I I I I I I I I I I I I I I I I I LOT 2 HULL & ANDERSON ADDITION VOL. 18, PG. 41 - - - - - - - - - - - - - - I I I I 1 I SS SS I I a�a I I SSMH a I a RIM=396.92 I IE 8" PVC(W)=389.97 I IE 8" PVC(S)=390.07 I IE 8" PVC(E)=390.07 I a I/ GPM a / I FOUND REBAR W/CAP / STAMPED '22969" AT CORNER POW R AND DRY UTILITIES TO BE PLACED UNDERGROUND I LOT 3 HULL & ANDERSON ADDITION VOL. 18, PG. 41 L \ I � PLAT (M) MEASURED APPROVED BY PLANNING TBR TO BE REMOVED R.O. W. RIGHT-OF-WAY P.O.B. POINT OF BEGINNING Aug 29 2022 CENTERLINE Zone RS-$ Corner Flag Setbacks: Required Front E 25 25 Sides N/S 7.5/7.5 7.5/9.5 Rear W 15 - - -- - 23 ---------- Other :---------- 25 �---------- 21.28 Height HEIGHT CALCS A = 391.60 B = 391.86 C = 386.72 D = 387.35 AVERAGE GRADE = 389.38 ACTUAL HEIGHT = 410.66 +/- MAXIMUM HEIGHT = 414.38 LOT COVERAGE: 2,815 SF (33.957.) MAX ALLOWABLE. 35% LOT AREA: 8,291 SF LOT SLOPE: 2%-50% IMPERVIOUS SURFACE CALCS (SOLID SURFACES) EXISTING HOME (+) 0 SF EXISTING GARAGE (+) 0 SF EXISTING DRIVEWAY (+) 0 SF AREA TO BE REPLACED (-) 0 SF PROPOSED HOME (+) 2,815 SF PROPOSED DRIVEWAY/WALKWAY (+) 1,083 SF TOTAL NEW & REPLACED IMPERVIOUS 3,898 SF Ail, Know what's below. Call before you dig. UTILITYCONFLICTNOTE.- CAUTION. CLF CHAIN LINK FENCE WDF WOOD FENCE W.S. WATER SURFACE EOP EDGE OF PAVEMENT BOW BACK OF WALK IM CB STORM DRAIN CATCH BASIN (CB) O SD STORM DRAIN MANHOLE (SDMH) O SS SANITARY SEWER MANHOLE (SSMH) 000 SANITARY SEWER CLEAN OUT (CO) -0-p POWER POLE _0_GP GUY POLE ❑ WM WATER METER WATER VALVE WV FMB MAILBOX UTILITY POLE ANCHOR FIRE HYDRANT (2 NOZZLE) TYPE I NGPA SIGN GPM GAS PIPE MAIN WPM WATER PIPE MAIN W PROPOSED WATER PROPOSED SANITARY SEWER PROPOSED STORM DRAINAGE PROPERTY LINE X X EXISTING FENCE LINE /// /// EDGE OF PAVEMENT - - - - - - XXX EXISTING CONTOURS PROPOSED CONTOURS PRE-EXISTING DRAINAGE PATTERN P DRY UTILITIES (POWER, PHONE, AND CABLE) THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOT 4 LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND HULL & ANDERSON SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO ADDITION CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE VUL. 10, Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. 41 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS ALL DISTURBED SOILS SHALL BE SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC COMPOST AMENDED PER CITY OF INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD EDMONDS STANDARD DETAIL SD-642 OR OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING APPROVED EQUAL. COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. COMPLIES WITH APPLICABLE CITY STORMWATER CODE 08/31 /2022 TAX PARCEL #: 00479300000600 ADDRESS: 21322 92ND PL SW, EDMONDS, WA 98020 EXISTING USE: VACANT LAND PROPOSED USE: SINGLE FAMILY RESIDENTIAL BUILDING TYPE: TYPE V ZONING: RS-8 # OF UNITS: 1 FLOOR AREA: 3,400 SF - 4,400 SF FIRE SPRINKLERS: NFPA LOT AREA: 8,291 SF (0.19 ACRES) ELECTRICITY SNOHOMISH COUNTY PUD GAS PUGET SOUND ENERGY COMMUNICATIONS FRONTIER/COMCAST SEWER CITY OF EDMONDS SEWER DISTRICT WATER CITY OF EDMONDS WATER DISTRICT SCHOOLS EDMONDS DIST NO.15 FIRE DISTRICT SOUTH SNOHOMISH COUNTY FIRE & RESCUE 0811912022 N 7 d L N W E VICINITY MAP S SCALE: 1"=2000' NOTES: 215th St SW CONTRACTOR/PROPERTY OWNER SHALL CONTACT THE ENGINEERING DIVISION BY EMAIL AT EGINEERINGPERMITS@EDMONDS.GOV 2-WEEKS IN ADVANCE FOR FIRE/AID ADDRESS SIGN FABRICATION FOR THE CITY'S PUBLIC WORKS OPERATIONS AND MAINTENANCE DEPARTMENT. EQUIPMENTAND PROCEDURE METHOD OF SURVEY.• SURVEY PERFORMED BY FIELD TRAVERSE INSTRUMENTATION: LEICA TS16 ROBOTIC ELECTRONIC TOTAL STATION PRECISION: MEETS OR EXCEEDS STATE STANDARDS WAC 332-130-090 BASIS OF BEARING: THE MONUMENTED CENTERLINE OF BOWDOIN WAY, AS THE BEARING OF N 73'07'50" W. BM FOUND CASED CONC. MON. AT THE INTERSECTION OF BOW WAY & 92ND AVE. W. ELEV. = 402.67' PER GPS OBSERVATIONS DATUM : NAVD 1988 NAVD '88-3.62 = NGVD '29 (MSL) ENGINEER INSIGHT ENGINEERING COMPANY P.O. BOX 1478 EVERET; WA 98206 CONTACT. BRIAN R. KALAB, P.E. PH: (425) 303-9363 EMAIL: INFO ®I NSI GHTENGI NEERI NG. NET SURVEYOR PAC(RC COAST SURVEYS; INC P.O. BOX 13619 MILLCREEK, WA 98082 CONTACT DARREN J. RIDDLE, PLS PHONE: (425) 512-7099 FAX: (425) 357-3577 APPLICANT / OWNER ECHELBARGER HOMES INC 4001 198TH ST SW. #2 LYNNWOOD, WA 98036 PH: (425) 673-1100 EMAIL: TODD®ECHELBARGER.COM LEGAL DESCRIPTION LOT 6, HULL AND ANDERSON ADDITION, AS PER PLAT RECORDED IN VOLUME 18 OF PLATS, PAGE 41, RECORDED OF SNOHOMISH COUNTY, WASHINGTON. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. ENGINEERING DIVISION APPROVED FOR 08/22/2022 BLD202 INSIGHIQ ENGINORING C P.O. BOX - 1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFO@INSIGHTENGINEERING.NET SITE ADDRESS. 21322 92ND PL W, EDMONDS, WA 98020 R E S U B TAX ACCOUNT NO.'S: 00479300000600 Aug 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. 92ND LOT DWG FILENAME DESIGNED BY. DATE: SCALE: JOB NO.: 211173-FINAL.DWG IDNK 02116/2022 1 "=10' 21-1173 SHEET S1 SITE PLAN of I 7 PROTECT CATEGORY. CATEGORY I DISCHARGE LOCATION: SHELL CREEK TYPE OF AREA SQ FOOTAGE STORMWATER FACILITY ROOF 2,815 TO DETENTION PIPE DRIVEWAY 988 TO DETENTION PIPE WALKWAY 95.00 TO DETENTION PIPE LAWN AND LANDSCAPE 4,393 BMP T5.13 w \ / � w w \ x / x z J w z \ U x END FENCE I x 1 I ON LINE \ 1 0.4' / \ x 0.7' DETAIL "A" I LOT 9 PUBLIC UTILITY EASEMENT PER HULL & ANDERSON PLAT OF ADDITION VOL. 18, PG. 41 LYMPIC PLACE F#9002145001 _------� SSMH SS RIM=383.00 SS I 14LF 6" PVC 0 2.71 i x I FOUND REBAR W/CAP STAMPED '22969" 0.1 '(W) & 0.1 '(S) OF CORNER. FENCE l COR. 0 .2'(N) & 0.5'(W) OF CORNER I I I I I I \ \ I J m \ x 6LF \ \ 10 P I 115.1BSBL I I \ II I I I II I I II NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. 10 804'doin wa W Y SNOHOMISH COUNTY, WASHINGTON FOUND CASED CONC. MON. W7 1-3/4" BRASS DISK & 'X" \-,A I DOWN 0.7'. VISITED 11- V' ° OF BM ° / �O\J \ FOUND CASED CONC. MON. W/ V J 1-3/4 BRASS DISK & X DOWN 0.8'. VISITED 11-29-21 CB RIM=390.00 IE 12" RCP(N)=386.85 \ IE 12" RCP(E)=386.90 CB RIM=392.88 �� / IE 386.90 (12" IN, S) IE 12" RCP(W)=390.13 \ /1* I IE 8" PVC(SE)=390.38 \ T / 44 I� / /) / I I 39�-� l o rL J/ N � I N 04 / °p / \\ cx°/ IE380.62 (6" PVC IN, S) HULL & ANDERSON (NEW SEWER LATERAL 4 ADDITION I CONNECTION PER CITY STD DTL SS-202 WITH ROMAC C1 VOL. 18, PG. 41 SADDLE OR EQUAL.) (CONTRACTOR TO FIELD VERIFY Imo. --IE'S AND CONTACT ENGINEER PUBLIC UTILITY EASEMENT //1//L ✓ / / V WITH ANY DISCREPANCIES) (IF STUB FOR FUTURE DEVELOPMENT) SEWER STUB SHALL BE LOCATED 10' INSIDE PROPERTY LINE & STAKED. PLACE 2"x4" TIMBER AT END OF SIDE SEWER STUB AND CUT TO LENGTH TO ENSURE 3 FEET EXTENDS ABOVE GRADE. PAINT TOP 18 INCHES WHITE. IN 3 INCH HIGH LETTERS, STENCIL THE NUMBER OF EVEN FEET FROM GROUND ELEVATION TO THE SEWER STUB INVERT. 8 GAUGE WIRE TO BE DOUBLE WRAPPED AROUND PIPE AND 2 x 4 STAKE AT OR ABOVE FINISHED GRADE. Z J i LOCKING CLEANOUT COVER 0 PER COE STD DTL SS-200 a o W ,..,........,. WW rz aW a N 22.5' OR 45' BEND a c) 6" TEST TEE o m 6" LATERAL SEWER SLOPE - 2% MIN TO 50% MAX 6" WYE/6" ROMAC SADDLE SEE NOTES 1 AND 2 POSSIBLE SEWER MAIN 10' - LOCATION 22.5' OR 45' BEND 6" TEST TEE 6" TEE POSSIBLE SEWER MAIN LOCATION NOTES: 1. WHEN TAPPING INTO EXISTING MAIN A ROMAC STYLE CB SADDLE SHALL BE USED. PLACEMENT OF TEE SHALL DEPEND ON DEPTH OF SEWER MAIN. AS A MINIMUM, THE TEE SHALL BE PLACED AT A 45 DEGREE ANGLE FROM PIPE SPRINGLINE. 2. IF NEW MAIN IS BEING INSTALLED OR MAIN IS BEING REPLACED, SERVICE CONNECTION TO THE MAIN SHALL BE DONE WITH A WYE. WYE SHALL BE AT A 45 DEGREE ANGLE FROM PIPE SPRINGLINE. 3. IF CONNECTING EXISTING PRIVATE SIDE SEWER TO NEW CITY LATERAL, A CONCRETE/PVC STRONGBACK FERNCO RC SERIES OR ROMAC COUPLING SHALL BE USED AND SECURED PER MFR'S INSTRUCTIONS. 4. BORING OF SERVICES WITHIN RIGHT OF WAY IS NOT ALLOWED. 5. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE GASKETED. 6. IF STUB FOR FUTURE DEVELOPMENT, USE RUBBER JOINT BISCUIT PLUG OR OTHER APPROVED WATERTIGHT PLUG. _ REVISION DATE CITY OF EDMONDS MAY 2018 NEW LATERAL SEWER PUBLIC WORKS STANDARD DEPARTMENT DETAIL Fst 1g9� APPROVED BY: R. ENGLISH SS-202 4 LATERAL SEWER DETAIL C j NOT TO SCALE STD DTL. SS-202 LOT 7 PER HULL & ANDERSON LOT c ADDITION VOL. 18, PG. 41 / SSCO# 1, RIM: 388.05 / IE 381.00 (6-PVC In S) EX. 8' SEWER / IE 381.00 (6"PVC OUT, N) SSVC INSTALL 6" CO W/ 12" CAST IRON / FOUND 1-1/4" IRON, LAMPHOLE COVER WITH 1/2" HEXPIPE AT CORNER BOLTS AT PROPERTY LINE. ( CB#2, CONTROL CATCH BASIN (CONTRACTOR TO FIELD VERIFY N 90°00'00" W 126.00' W/ SOLID LOCKING LID / LOCATION AND DEPTH OF SIDE SEWER RIM:396.75 SS STUB. MODIFY AS NECESSARY) IE 389.83 (12" IN, SW) 6" PVC S=2% MIN. ^ 392 I IE 389.83 (6" OUT, E) i S �� 94 " SD � I 6 IE: 394.5 - 7 / 45. 0' / I a DETENTION PIPE ° 1 32LF 36" ADS OR / PROPOSED STRIP 24' STRIP SSCO#2, EQUIVALENT @ 0.50% EX RIM: 388.00 DRAIN @ 0.5% MIN. �° a i a °SHE O IE 381.20 (6"PVC In S) l IE 381.20 (61PVC OUT, N)\ l PROPOSED D IVEWY / \ 14 / /CN l \ 6 l \\ \� \\ ° x I I 8,291 SF 1 394.38 l /l 4" \ 00479300000600 � � \\ FOOTING \ 4LF 4" SO ® 34.53% a a CO#1, CLEAN OUT LOT 8 \ RIM:385.00 PROPOSED HOUSE � (2,815 SF ROOF) / / ° l CB#3, W/ SOLD \ PLAT OF IE 383.00 (4" IN, E) � / �\ •l RIM:393.37 OLYMPIC PLACE 1 IE 383.00 (4" OUT, S) / / a IE 392.50 (4" A.F.#90G2145001 I I \ \ o \ 4" ROOF DRAIN I i IE: 390.02 (12" I I 11 \ @ 0.50% MIN I 11 LF 4" SD ®4.62% / w \ UFF=395.00 I CO#2, I a / c I o LFF=385.50 RIM:393.87 � G GAS GAS/ / I w I IE 393.00 (4" IN, N) w I L IE: 393.00 (4" IN, W) I / I II - / IE 393.00 (4" OUT, E) I I 1 c / I GRAVEL z / W W (2'X 1 O'X2) I I c < 00 j i ill I /1 l I I C1 I \ I PROPOSED 1-1/2" 50o POLY WATERLINEWITH TRACER WIRE18.0' Ic RESTORATI f I I WPM I I I -I -GPM • I GPM - Ln I C/L OF R/W I I w I of I � o 0 0 I N� I O z a 25 EX. R/W 25' EX. R/W CB#1, TYPE-2 48" W/ SOLID LOCKING LID RIM:396.00 I IE 389.46 (6" IN, W) IE 389.46 (12" OUT, N) 5.00' - - -- S - ---------------- ,)II 2A� / GPM f /SGPM S II SS � LOT 2 HULL & ANDERSONADDITION VOL. 18, PG. 41 FILTER FABRIC z4- V 24" MIN. - 385.00 1" DIA. @ 0% 383.00 1/2" - 3/4ASHED ROCK 382.00 GRA VEL TRENCHSECTION NOT TO SCALE LOCKING LID FINISHED GRADE 0.5 IN BELOW HIGH POINT INSIDE DETENTION PIPE 12" INLETSSSS 6" MIN. MEASURED FROM THE TOP OF THE RIM: 395.75 CONCRETE BOX OR RISER 6" RISER EL: 393.0 390.33 6" OUTLET @ 0.59, 9" MIN IE 390.25 N SCALE: 1"= 10' W E 10 5 0 10 20 LEGEND EXISTING MONUMENT (AS SHOWN) SECTION 1/4 CORNER NOT FOUND SECTION CORNER NOT FOUND FOUND REBAR/CAP OR I.P. (IRON PIPE) (C) CALCULATED (P) PLAT (M) MEASURED TBR TO BE REMOVED R.O.W. RIGHT-OF-WAY P.O.B. POINT OF BEGINNING CENTERLINE CLFCHAIN LINK FENCE WDF WOOD FENCE W.S. WATER SURFACE EOP EDGE OF PAVEMENT BOW BACK OF WALK CBSTORM DRAIN CATCH BASIN (CB) OSDSTORM DRAIN MANHOLE (SDMH) OSS SANITARY SEWER MANHOLE (SSMH) 000SANITARY SEWER CLEAN OUT (CO) �PPOWER POLE �PGUY POLE ❑ WM WATER METER >< WATER VALVE WV �MBMAILBOX UTILITY POLE ANCHOR � FIRE HYDRANT (2 NOZZLE) TYPE I NGPA SIGN GPM GAS PIPE MAIN WPM WATER PIPE MAIN PROPOSED WATER PROPOSED SANITARY SEWER PROPOSED STORM DRAINAGE PROPERTY LINE X EXISTING FENCE LINE X EDGE OF PAVEMENT - - - - - - XXXPROPOSED EXISTING CONTOURS CONTOURS PRE-EXISTING DRAINAGE PATTERN P DRY UTILITIES (POWER, PHONE, AND CABLE) GAS PROPOSED GAS LINE Ca VICINITYMAP SCALE. 1"--2000' PROJE'CTNOTE.- 215th St SW ALL INTERIOR FENCES ARE TO BE REMOVED OR RELOCATED. EQUIPMENTAND PROCEDURE'METHOD OF SURVEY.•SURVEY PERFORMED BY FIELD TRAVERSE INSTRUMENTATION: LEICA TS16 ROBOTIC ELECTRONIC TOTAL STATION PRECISION: MEETS OR EXCEEDS STATE STANDARDS WAC 332-130-090 BASIS OF BEARING: THE MONUMENTED CENTERLINE OF BOWDOIN WAY, AS THE BEARING OF N 73'07'50" W. MOUND CASED CONC. MON. AT THE INTERSECTION OF BOWDOIN WAY & 92ND AVE. W. ELEV. = 402.67' PER CPS OBSERVATIONS DATUM : NAVD 1988 NAVD '88-3.62 = NGVD '29 (MSL) ENGINEER INSIGHT ENGINEERING COMPANY P.O. BOX 1478 EVERETT WA 98206 CONTACT.• BRIAN R. KALAB, P.E. PH: (425) 303-9363 EMAIL: I NFO@I NSIGHTENGI NEERI NG. NET SURVEYOR PACIFIC COAST SURVEYS, INC. P.O. BOX 13619 MILLCREEK, WA 98082 CONTACT.' DARREN J. RIDDLE, PLS EFAX:(425) 357-3577 APPLICANT / OWNER ECHELBARGER HOMES INC 4001 198TH ST SW. #2 LYNNWOOD, WA 98036 PH: (425) 673-1100 EMAIL: TODD@ECHELBARGER.COM LEGALDESCRIPTION LOT 6, HULL AND ANDERSON ADDITION, AS PER PLAT RECORDED IN VOLUME 18 OF PLATS, PAGE 41, RECORDED OF SNOHOMISH COUNTY, WASHINGTON. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON HULL & ANDERSON ADEQUATE DEPTH TOENGINEERING DIVISION ADDITION PREVENT DAMAGE TO PIPENISH GRADE 395.00 (MIN) APPROVED. VOL. 18, PG. 41 93.00 392.84 CB#2 RUNOFF FROM SITE CONTROL CATCH BASINKnow what's below.32LF 36" ADS OR EQUIVALENT @ 0.50% SEE UTILITY CONFLICT NOTE.' 4"D7 IA. 1 Call before you dig.CAUTION.- IE390.00IE389.84 6" DIA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE CB#3LOCATION, DIMENSION, AND DEPTH OFALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND 12" DIA. (TYR) SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO 34' CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY DETENTION SYSTEM CATEGORY 1 WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS NOT TO SCALE SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD rvwtrc, C HtSLt, rnvivt I OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING INSIGHT ENGINEERING CO. M COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH P.O. BOX - 1478 NOTE EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX 6 INFO@ INS IGHTENGINEERING.NET 25. 0' BSBL \\ P II P P P SITE ADDRESS: 21322 92ND PL W, _ EDMONDS, WA 98020 SEE DETAIL / // l _ _ _-- _-- -- -- - -390 I J_ TAX ACCOUNT N0.'S: 00479300000600 - EX. SHAD / /10" / / N 1 4. 0' DEC/k J,g�v / // N 84°38'40" E r I FOUND 1-1 /4" IR N PIPE 0.1 '(N) OF T _CORNER. FENCE Of(W) AT CORNER I PUBLIC UTILITY EASEMENT PER HULL & ANDERSON ADDITION VOL. 18, PG. 41 I I 8.7' I 5.4' LOT 5 HULL & ANDERSON ADDITION VOL. 18. PG. 41 s FOUND REBAR W/ILLEGIBLE CAP 0.1 '(N) OF CORNER ° SSMH TYPE-2 48"0 ° RIM=396.92ORIFICE 0.5" IE 8" PVC(W)=389.97 IE 8" PVC(S)=390.07 2 CB#4-CONTROL CATCH BASIN DETAIL IE 8" PVC(E)=390.07 NOT TO SCALE 2" MIN DIA AIR VENT LOT 3 PIPE WELDED TO TANK WPM 1. A MINIMUM 3' HORIZONTAL AND 1' VERTICAL SEPARATION IS � REQUIRED FROM PRIVATELY OWNED WATER, SEWER, STORM AND DRY GPM UTILITIES (POWER, PHONE, CABLE, GAS, ETC.) P a� P 2. HOUSE SHALL BE EQUIPPED WITH FIRE SPRINKLER SYSTEM. / 3. IF RIM TO INVERT ELEVATION EXCEEDS 5-FEET THEN ATYPE-2 - - �- - - - - - - - MANHOLE WILL BE REQUIRED. / I FOUND REBAR W/CAP 4. ANY EXISTING FAILING, DAMAGED, OR NON ADA COMPLIANT / I STAMPED '22969" AT CORNER FRONTAGE IMPROVEMENTS SHALL BE REMOVED AND REPLACED AS POW R AND DRY UTILITIES TO I LOT 4 DETERMINED BY THE CITY ENGINEERING INSPECTOR. BE PLACED UNDERGROUND HULL & ANDERSON 5. UTILITY PATCHES WITH LESS THEN 20- FEET OF SEPARATION ADDITION SHALL BE COMBINED AND FULL WIDTH OR HALF WIDTH OVERLAY WILL VOL. 18, PG. 41 BE REQUIRED DEPENDING ON THE EXTENT OF THE DISTURBANCE. WHERE UTILITY PATCHES FALL ENTIRELY WITHIN ONE TRAVEL LANE, THE OVERLAY SHALL EXTEND TO THE CENTERLINE OF THE ROADWAY. WHERE UTILITY PATCHES EXTEND INTO BOTH TRAVEL LANES THEN A FULL WIDTH OVERLAY IS REQUIRED. 6. ALL FINAL RESTORATION WITHIN THE RIGHT-OF-WAY SHALL BE COMPLETED BY THE CONTRACTOR NOT THE CITY OF EDMONDS. REV. NO. I DESCRIPTION I INITIALS I DATE 0811912022 NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. 92ND LOT DWG FILENAME DESIGNED BY. DATE.- SCALE: JOB NO.: 211173-FINAL.DWG JTK 01-12-2022 1 "=10' 21-1173 SHEET STORMWATER AND Cj UTILITY PLAN °f 5 08/22/2022 BLF)2022-0287 WP I CONSTRUCTION. NE 114, NE 114, SEC. 25, T. 27 N", R.03 E., W.M. SNOHOMISH COUNTY, WASHINGTON 11I CB RIM=390.00 IE 12" RCP(N)=386.85 1E 12" RCP(E)=386.90 I CB RIM=392.88 c� 7- 9 OF PLACE 2145001 I I S ----� SSMH i RIM=383.00 I X Cn11A1n 1 LOT 8 \ PLAT OF \ 'MPIC PLACE #9002145001 PUBLIC UTILITY EASEMENT PER HULL & ANDERSON ADDITION VOL. 18, PG. 41 S s � LOT 7 HULL & ANDERSON ADDITION VOL. 18, PG. 41 PUBLIC UTILITY EASEMENT PER HULL & ANDERSON ADDITION VOL. 18, PG. 41 09 t,7� EX. SHED �S)AS A�-- 96.42' 1 \ ISFOUND REPAR W/ILLEGIBLE = + 1 8.7 CAP 0.1 '(N) OF CORNF>R/ N 84-38'40' E y 1 � T I FUND 1-1/4" IR N PIPE 0.1 '(N) OF i 5.4 ' LOT 5 CO ER. FENCE 0�'(W) AT CORNER HULL & ANDERSON - - _ ADDITION PUBLIC UTILITY EASEMENT / VOL. 18, PG. 41 L-PER HULL & ANDERSON,,- ADDITION VOL.18, PG 41 LEGEND � I NOTES: TREE TO BE REMOVED 1. ALL DISTURBED AREAS ON AND OFF SITE SHALL BE COMPOST AMENDED TO MEET REQUIREMENT OF BMP T5.13 IN THE STORMWATER MANUAL, VOL V, CHAPTER 5. _ 2. CONTRACTOR SHALL OVER EXCAVATE ALL FUTURE INFILTRATION AREAS AND OBTAIN GEOTECHNICAL APPROVAL OF THE SUB -GRADE PRIOR TO TREES TO BE PROTECTED PLACING ANY ROCK FOR INFILTRATION OR PERVIOUS PAVEMENT /~ SYSTEM. OBTAIN GEOTECHNICAL ENGINEERS WRITTEN APPROVAL PRIOR TO PLACING ANY BACKFILL MATERIAL. �Z�t UTILITYCONFLICTNOTE.• 3. TEMPORARY STOCKPILE IS TO BE COVERED WITHIN 24-HOURS. CAUTION.' 4. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY , o WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD 0-T 92iVD L OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING Know what's below. COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH f Cal before you di CONSTRUCTION. Y g /-- CONSTRUCTION STAKES/POSTS DRIVEN SECURELY INTO THE GROUND. DEVELOPER SHALL AVOID CRZ WHEN DRIVING STARES/POSTS. _ OUTSIDE OF THE CRZ • THE CRITICAL ROOT ZONE (CRZ) IS THE AREA WHERE THE TREE'S ESSENTIAL MASS OF ROOTS IS LOCATED. THE AREA SURROUNDING THE TREE AT A DISTANCE WHICH IS EQUAL TO ONE FOOT FOR EVERY INCH OF TRUNK DIAMETER AT BREAST HEIGHT (DBH) OR THE AREA OF A CIRCLE WITH RADIUS EXTENDING FROM A TREE'S TRUNK TO A POINT NO LESS THAN THE END OF A TREE'S LONGEST BRANCH. WHICHEVER IS GREATER. 1 TREE PR0, ECTIONDETAIL C2 N.T.S. i i I I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I a� I I SSMH I a RIM I IE 8" I IE 8" I IE 8" HULL I VOL. I I I I I I I I I I LOT 4 HULL & ANDERSON ADDITION VOL. 18, PG. 41 w SCALE: 1" = 10' 10 5 0 10 20 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL 0 I N NATIVE BACKFILL MATERIAL FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS WIRE MESH FENCE TO SUPPORT FILTER FABRIC I �v I BURY BOTTOM OF FILTER N MATERIAL 8" TO 12" 6' MAX NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON ALL 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ACTIVITY. EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN REVISION DATE CITY OF EDMONDS FILTER FABRIC FENCE JANUARY 2018 FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH ER-900 FILTER FABRIC FENCE FILTRATION SYSTEMS NOT TO SCALE STD DTL. El.1 v ?E FULL WIDTH TRESS/EGRESS DETAIL NOTES: O THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT-OF-WAY. O2 ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH. NOTES: 1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDRION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REWIRE PERIODIC TOP DRESSING WITH ADDIRONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 3. WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO LEAWNG THE SITE. WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN. PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS- < 1/4 ACRE 30 < 1 ACRE 50 < 3 ACRE 100 > 3 ACRE 100 • PROVIDE ATB OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL. LENGTH TO BE DETERMINED BY Cm INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN �i REVISION DATE CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 2018 ENTRANCE PUBLIC WORKS STANDARD DEPARTMENT DETAIL APPROVED BY: R. ENGLISH ER-901 STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE STD DTL. E1.2 ESC NOTES (ECDC 18.30.050) A. ESC MINIMUM REQUIREMENTS. ALL ACTIVITIES NECESSITATING A CLEARING OR GRADING PERMIT AND ALL UTILITY PROJECTS CONSISTING OF MORE THAN 500 LINEAL FEET OF TRENCH EXCAVATION SHALL BE REQUIRED TO CONTROL EROSION AND SEDIMENT DURING CONSTRUCTION AND TO PERMANENTLY STABILIZE EXPOSED SOIL RESULTING FROM CONSTRUCTION. PROJECTS INVOLVING A CRITICAL AREA MAY ALSO BE REQUIRED TO COMPLY WITH ANY COMBINATION OF THE ESC MINIMUM REQUIREMENTS. COMPLIANCE WILL BE DEMONSTRATED THROUGH THE IMPLEMENTATION OF AN APPROVED ESC PLAN. GUIDELINES FOR PREPARING ESC PLANS ARE PROVIDED IN THE MANUAL. THE PLAN MUST ADDRESS THE FOLLOWING REQUIREMENTS: 1. ESC MINIMUM REQUIREMENT - CONSTRUCTION ACCESS ROUTE. CONSTRUCTION VEHICLE ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 2. ESC MINIMUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS. ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 3. ESC MINIMUM REQUIREMENT - PROTECTION OF ADJACENT PROPERTIES. ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. 4. ESC MINIMUM REQUIREMENT - MAINTENANCE. ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. 5. ESC MINIMUM REQUIREMENT - OTHER BMPS. AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMPS TO MITIGATE THE EFFECTS OF INCREASED RUNOFF SHALL BE APPLIED. 6. EROSION AND SEDIMENT CONTROL REQUIREMENT - UNDERGROUND UTILITY CONSTRUCTION. THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING. A. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS, B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); D. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING, E. DAILY CLEANUP AND STREET MAINTENANCE. 7. ADDITIONAL ESC MINIMUM REQUIREMENTS FOR LARGER DEVELOPMENTS. ALL NEW DEVELOPMENT AND REDEVELOPMENT THAT INCLUDES LAND DISTURBING ACTIVITIES OF GREATER THAN, OR EQUAL TO, ONE ACRE IN ADDITION TO MEETING THE MINIMUM REQUIREMENTS SET FORTH ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW. 8. ESC MINIMUM REQUIREMENT - DELINEATE CLEARING AND EASEMENT LIMITS. IN THE FIELD, MARK CLEARING LIMITS AND/OR ANY EASEMENTS, SETBACKS, SENSITIVE/CRITICAL AREAS AND THE BUFFERS, TREES AND DRAINAGE COURSES. 9. ESC MINIMUM REQUIREMENT - SEDIMENT TRAPPING. PRIOR TO LEAVING THE SITE, STORM WATER RUNOFF SHALL PASS THROUGH A SEDIMENT POND OR SEDIMENT TRAP, OR OTHER APPROPRIATE BMPS. SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE EARTHEN STRUCTURES, SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO AN APPROVED TIMETABLE. 10. ESC MINIMUM REQUIREMENT - CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. IN ADDITION, SLOPES SHALL BE STABILIZED IN ACCORDANCE WITH ESC REQUIREMENT NO. 2. 11. ESC MINIMUM REQUIREMENT - CONTROLLING OFF -SITE EROSION. PROPERTIES AND WATER WAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF FROM THE PROJECT SITE. 12. ESC MINIMUM REQUIREMENT - STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS. ALL TEMPORARY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE DEVELOPED CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. 13. ESC MINIMUM REQUIREMENT - STORM DRAIN INLET PROTECTION. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 14. ESC REQUIREMENT - REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15. EROSION AND SEDIMENT CONTROL REQUIREMENT - DEWATERING CONSTRUCTION SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR SEDIMENT POND. 16. EROSION AND SEDIMENT CONTROL REQUIREMENT - CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER. 17. EROSION AND SEDIMENT CONTROL REQUIREMENT - FINANCIAL LIABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE FINANCIAL INSTRUMENTS, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN. [ORD. 3013 § 1, 19951. REV. NO. I DESCRIPTION I INITIALS I DATE 0811912022 CONSTRUCTIONSEQUENCE 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. 2. REVIEW ESC NOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL ESC MEASURES AND MAINTAIN DUST CONTROL. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. (ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENT CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED). 6. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 7. DEMOLISH EXISTING STRUCTURES. 8. CLEAR, GRUB & ROUGH GRADE REMAINDER OF SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW). 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS. 10. STABILIZE AND REVEGETATE ENTIRE SITE. 11. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. EROSION CONTROL FEATURES CAN BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. GRADING QUANTITIES. - CUT 100 Cu. Yds. FILL: 400 Cu.Yds. (GRADING QUANTITIES WERE CALCULATED USING THE LAND DEVELOPMENT DESKTOP COMPOSITE METHOD. CALCULATIONS DO NOT ACCOUNT FOR SOIL SWELLING AND SHRINKAGE) VEGETATIVE COVER BEFORE DEVELOPMENT FEW TREES AND RESIDENTIAL LANDSCAPING NEAR EXISTING HOME. AFTER DEVELOPMENT TYPICAL RESIDENTIAL LANDSCAPING !Y/1 TT mr7n 7� T.E.S.C. LEGEND TEMPORARY CONSTRUCTION ENTRANCE CATCH BASIN INSERT 1 PROTECTION (TYP.) C3 CLEARING LIMITS SILT FENCE MULCH &/OR STRAW MATTING PLASTIC COVER FLOW ARROW (EX.) ENGINEERING DIVISION APPROVED. 08/22/2022 INSIGa4 ENGINEERING CO° P.O. BOX - 1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFO@ INSIGHTENGINEERING.NET SITE ADDRESS. 21322 92ND PL W, EDMONDS, WA 98020 TAX ACCOUNT NO. 'S: 00479J00000600 NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. 92ND LOT DWG FILENAME DESIGNED BY. DATE: SCALE: JOB NO.: 211173-FINAL.DWG JTK 01-12-2022 1 "=10' 21-1173 SHEET GRADING AND TESC PLAN C2 Of 5 -0287 NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. SNOHOMISH COUNTY, WASHINGTON O O O 0 O O O O O O O O O O O O O O d.: O . O a. O a' 8 FILTERI SOCK WITH J ..a OVER FLOW HOLES (TYP) a� a .44 , o a a A CITY OF EDMONDS PUBLIC WORKS DEPARTMENT CATCH BASIN GRATE FILTER SOCK WITH OVER FLOW HOLES (TYP) CATCH BASIN NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE—THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS APPROVED BY: R. ENGLISH REVISION DATE JANUARY 2018 STANDARD D ETAI L ER-902 TEMPORARY SEDIMENT TRAP FOR CATCHBASINS N.T.S. Know what's below. Call before you dig. UTILITY CONFLICT NOTE. - CA UTION.- THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. THE 13 ELEMENTS OF TESL BMP ELEMENT J1 — MARK CLEARING LIMITS TO PROTECT ADJACENT PROPERTIES AND TO REDUCE THE AREA OF SOIL EXPOSED TO CONSTRUCTION, THE LIMITS OF CONSTRUCTION WILL BE CLEARLY MARKED BEFORE LAND —DISTURBING ACTIVITIES BEGIN. ELEMENT2 — ESTABLISH CONSTRUCTION ACCESS CONSTRUCTION ACCESS OR ACTIVITIES OCCURRING ON UNPAVED AREAS SHALL BE MINIMIZED, YET WHERE NECESSARY, ACCESS POINTS SHALL BE STABILIZED TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBLIC ROADS, AND WHEEL WASHING, STREET SWEEPING, AND STREET CLEANING SHALL BE EMPLOYED TO PREVENT SEDIMENT FROM ENTERING STATE WATERS. INSTALL THE TEMPORARY CONSTRUCTION ENTRANCE, ACCORDING TO THE APPROVED CONSTRUCTION PLANS, PRIOR TO ANY CLEARING OR GRADING ACTIVITIES. MAINTAIN UNTIL THE ACCESS ROAD IS PAVED. ELEMENT J3 — CONTROL FLOW RATES IN ORDER TO PROTECT THE PROPERTIES AND WATERWAYS DOWNSTREAM OF THE PROJECT SITE, STORMWATER DISCHARGES FROM THE SITE WILL BE CONTROLLED. IN GENERAL, DISCHARGE RATES OF STORMWATER FROM THE SITE WILL BE CONTROLLED WHERE INCREASES IN IMPERVIOUS AREA OR SOIL COMPACTION DURING CONSTRUCTION COULD LEAD TO DOWNSTREAM EROSION, OR WHERE NECESSARY TO MEET LOCAL AGENCY STORMWATER DISCHARGE REQUIREMENTS. PROPOSED TO CONTROL FLOW RATES DURING GRADING ACTIVITY. ELEMENT J4 — INSTALL SEDIMENT CONTROLS INSTALL SILT FENCING, ACCORDING TO THE APPROVED PLANS, PRIOR TO ANY CLEARING OR GRADING ACTIVITIES. MAINTAIN UNTIL ALL CONSTRUCTION ACTIVITIES ARE COMPLETED. INSTALL CATCH BASIN FILTERS, ACCORDING TO THE APPROVED CONSTRUCTION PLANS, AS CATCH BASINS BECOME OPERABLE. MAINTAIN UNTIL ALL CONSTRUCTION ACTIVITIES ARE COMPLETED. ELEMENT J5 — STABILIZE SOILS EXPOSED AND UN —WORKED SOILS SHALL BE STABILIZED WITH THE APPLICATION OF EFFECTIVE BMPS TO PREVENT EROSION THROUGHOUT THE LIFE OF THE PROJECT. APPLY TEMPORARY HYDRO —SEED TO EXPOSED AND UN —WORKED SOILS, ACCORDING TO THE APPROVED CONSTRUCTION PLANS, AS NEEDED TO PREVENT EROSION DURING SITE GRADING. APPLY PERMANENT HYDRO —SEED TO AREAS AT FINAL GRADE AS SITE GRADING IS COMPLETED. APPLY MULCHING TO EXPOSED AND UN —WORKED SOILS, ACCORDING TO THE APPROVED CONSTRUCTION PLANS, AS NEEDED TO PREVENT EROSION DURING SITE GRADING. MAINTAIN UNTIL SITE GRADING IS COMPLETED AND PERMANENT HYDRO —SEED IS APPLIED. COVER STOCKPILES WITH PLASTIC SHEETING, ACCORDING TO THE APPROVED CONSTRUCTION PLANS, AS NEEDED TO PREVENT EROSION DURING SITE GRADING. MAINTAIN UNTIL STOCKPILES ARE REMOVED FROM SITE. ELEMENT J6 — PROTECT SLOPES ALL CUT AND FILL SLOPES WILL BE DESIGNED, CONSTRUCTED, AND PROTECTED IN A MANNER THAN MINIMIZES EROSION. SLOPES WILL BE PROTECTED BY PLASTIC COVERING, MULCHING, AND EXISTING VEGETATION. ELEMENT J7 — PROTECT DRAIN INLETS ALL STORM DRAIN INLETS AND CULVERTS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED TO PREVENT UNFILTERED OR UNTREATED WATER FROM ENTERING THE DRAINAGE CONVEYANCE SYSTEM. HOWEVER, THE PRIORITY IS TO KEEP ALL ACCESS ROADS CLEAN OF SEDIMENT AND KEEP STREET WASH WATER SEPARATE FROM ENTERING STORM DRAINS UNTIL TREATMENT CAN BE PROVIDED. INLET PROTECTION IS PROPOSED FOR ALL CATCH BASINS WITH OPEN GRATES. ELEMENT 18 — STABILIZE CHANNELS AND OUTLETS WHERE SITE RUNOFF IS TO BE CONVEYED IN CHANNELS OR DISCHARGED TO A STREAM OR SOME OTHER NATURAL DRAINAGE POINT, EFFORTS WILL BE TAKEN TO PREVENT DOWNSTREAM EROSION. NO CHANNELS ARE PROPOSED, AND NO OUTFALLS ARE PROPOSED THAT WOULD REQUIRE STABILIZATION. ALL ON —SITE FLOWS WILL BE DIRECTED TO A CLOSED CONVEYANCE SYSTEM ELEMENT J9 — CONTROL POLLUTANTS ALL POLLUTANTS, INCLUDING WASTE MATERIALS AND DEMOLITION DEBRIS, THAT OCCUR ONSITE SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWATER. GOOD HOUSEKEEPING AND PREVENTATIVE MEASURES WILL BE TAKEN TO ENSURE THAT THE SITE WILL BE KEPT CLEAN, WELL —ORGANIZED, AND FREE OF DEBRIS. ELEMENT J10 — CONTROL DEWATERING THERE WILL BE NO DEWATERING EXPECTED AS PART OF THIS PROPOSAL. IF DEWATERING OCCURS, BAKER TANKS WILL BE USED FOR DEWATERING. ELEMENT J11 — MAINTAIN BMPS ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH EACH PARTICULAR BMPS SPECIFICATIONS. VISUAL MONITORING OF THE BMPS WILL BE CONDUCTED AT LEAST ONCE EVERY CALENDAR WEEK AND WITHIN 24 HOURS OF ANY RAINFALL EVENT THAT CAUSES A DISCHARGE FROM THE SITE. IF THE SITE BECOMES INACTIVE, AND IS TEMPORARILY STABILIZED, THE INSPECTION FREQUENCY WILL BE REDUCED TO ONCE EVERY MONTH. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER THE FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. DISTURBED SOIL RESULTING FROM REMOVAL OF BMPS OR VEGETATION SHALL BE PERMANENTLY STABILIZED. ELEMENT J12 — MANAGE THE PROJECT EROSION AND SEDIMENT CONTROL BMPS FOR THIS PROJECT HAVE BEEN DESIGNED BASED ON THE FOLLOWING PRINCIPLES: DESIGN THE PROJECT TO FIT THE EXISTING TOPOGRAPHY, SOILS, AND DRAINAGE PATTERNS, EMPHASIZE EROSION CONTROL RATHER THAN SEDIMENT CONTROL; MINIMIZE THE EXTENT AND DURATION OF THE AREA EXPOSED; KEEP RUNOFF VELOCITIES LOW; RETAIN SEDIMENT ON SITE, • THOROUGHLY MONITOR SITE AND MAINTAIN ALL ESC MEASURES AND SCHEDULE MAJOR EARTHWORK DURING THE DRY SEASON. THE SWPPP SHALL BE MODIFIED AS NECESSARY TO INCLUDE ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. REVISIONS TO THE SWPPP SHALL BE COMPLETED WITHIN SEVEN (7) DAYS FOLLOWING THE INSPECTION. ►��►�r����:zjr�.��•r��rr��rr.�m�rr�:a�r►rrrH��rrm��iram►�r.»� FROM ROOFS AND OTHER HARD SURFACES PROTECT ONSITE STORMWATER BMPS FROM ROOFS AND OTHER HARD SURFACES: STOCKPILE EXISTING TOPSOIL PER SOIL AMENDMENT CALCULATION PER BMP T5.13. COVER STOCKPILE WITH PLASTIC COVERING TO PREVENT EROSION. HIGH VISIBILITY FENCE SHALL BE PLACED AROUND THE AREA PROPOSED FOR GRAVEL TRENCH TO PREVENT COMPACTION OF THE SOIL. (BMP C 103) THE AREA OF THE GRAVEL TRENCH SHALL BE OVER EXCAVATED AND OBTAIN GEOTECHNICAL APPROVAL OF THE SUBGRADE CONDITION AND INFILTRATION RATE PRIOR TO INSTALLATION. REV. NO. I DESCRIPTION I INITIALS I DATE 0811912022 ENGINEERING DIVISION APPROVED, 08/22/2022 INSIGHT ENGINEERING CO. P.O. BOX - 1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFO@ INS IGHTENGINEERING.NET SITE ADDRESS. 21322 92ND PL W, EDMONDS, WA 98020 TAX ACCOUNT NO.'S: 00479300000600 NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. 92ND LOT DWG FILENAME DESIGNED BY. DATE: SCALE: JOB NO.: 211173—FINAL.DWG I JTK 01-12-2022 1 "=10' 21-1173 SHEET C3 GRADING AND TESC of NOTES AND DETAILS 5 BLp2022-0287 NE 114, NE 114, SEC. 25, T. 27 N,, R.03 E., W.M. GENERAL NOTES: SNOHOMISH COUNTY, WASHINGTON 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: CURRENT INTERNATIONAL BUILDING CODE (IBC) MECHANICAL PLUG TRAFFIC RATED, UNDISTURBED PLANTS UNDISTURBED TURF (LAWN) - 2019 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION CIRCULAR LOCKING (SEE NOTE 1) AREAS (SEE NOTE 1) - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) EXTEND CLEANOUT 2" ABOVE CAST VALVE BOX PER PIPE ALLOWANCES DESIGN PONDING ELEVATION ASPHALT/ MANUFACTURER 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED CONCRETE RECOMMENDATIONS, UNDISTURBED UNDISTURBED OTHERWISE MAXIMUM OR PER PLAN PIPE MATERIAL SEE NOTES 1 AND 2 0" �I �,hTURF/LAWN/LANDSCAPE INSIDE DIAMETER NATIVE VEGETATION 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4" STREAM BED COBBLES REINFORCED OR 12" PER WSDOT 9-03.11(2)4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY PLAIN CONCRETE DESIGN PONDING cr UNDISTURBED NATIVE SOIL //\//\//\//\//\//\ \//\//\//\//\//\// UNDISTURBED NATIVE SOIL ELEVATION j\\\\\\\j\\\\\j/� 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL METAL PIPE 15" ��\'/\/�\/�\j\\j�\\ �j�\//\\j\\/�\,/\\/% ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND SEE APPLICABLE STANDARD DETAILS ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING FRAME AND GRATE CPSSP* 12" 8gO c�C \\\\/\/\\�/v/// OCCUPANCY/FINAL PROJECT APPROVAL. (WSDOT STD SPEC 9-05.20) OOQQO 0o o _ \ \, \ \ 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. SOLID WALL PVC i,_- I I N MECHANICAL PLUG (WSDOT STD SPEC 9-05.12.(1)) 15" - 0 PTI O N 1 - N 0 DISTURBANCE 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR -III I I I I OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS hr PROFILE WALL PVC - - = ADD VALVE BOX PLANTING BEDS TURF ( LAWN) AREAS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO WSDOT STD SPEC 9-05.12(2)) - EXTENSION OR SOIL FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS O ( 15" III -III -I III -I PIPE AS NECESSARY IIII �IIi�illDill� (lhll�hii^all PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING TO ACCOMMODATE POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE �' dp, * CORRUGATED POLYETHYLENE _ 2" ORGANIC MULCH /���� GRASS: SEED OR SOD S� STORM SEWER PIPE III I I I �� O.D. OF RISER PIPE/�/�i�/���/� 0" - EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT r - =1 I� I 1=1 I M I I -I I I� 1 I 1=1 11=1 11=1 11=1 1=1 1=1 I ARISE. 5 --- - I I�I�I 1=11 1-Ti�l�=1 I 11=111=1 1=1 1=1III=1 1=1TI " SOIL TIGHT 45' BEND_ III I CLEANOUT COVER IN -II=III-III-III=III-III III=JI=III=III-III-IIII I=11 2", 4 , 6", OR 12" I -I I I I -III- - 11=I =III=III=III=III=III 11=III-III=III-III-III=III 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION WYE 1 PAVED AREA 3" OF COMPOST -III-III-III-III-III-III III=III=III-III-III-III- 1.75" OF COMPOST INCORPORATED SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. ;III -III -II III- INCORPORATED INTO 5" OF -III-III-III=III-III= =III=III=III=III=III=III INTO 6.25" OF SITE SOIL (TOTAL SOIL TIGHT =III=III=III-III=III=11 III-III=III-III-III=III=11 NOTES: _ - LAWN/ NDS PRO SERIES VALVE SITE SOIL (TOTAL AMENDED I11Ei11=111�11-111�11-III II-III-III-III-III=III=III AMENDED DEPTH OF 9.5", FOR A 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S COUPLER LANDSCAPE BOX WITH LOCKING DEPTH OF 9.5", FOR A-II�II-III�II-III�I III-III-III-III=111�11=11 SETTLED DEPTH OF 8") REPRESENTATIVE OF ANY DISCREPANCIES. I I� I �111-11-I I I� I =1 I 11=1 11=1 11=1 11=1 I I=1 =1 COVER, OR EQUAL, SEE SETTLED DEPTH OF 8")-11�111=IIH1I=III�II III=III=III=III=III=III=11 1. CATCH BASINS SHALL BE CONSTRUCTED IN ACCORDANCE UNDERDRAIN PIPE, 6" (MIN) NOTES 1 AND 2. III=11�111=III=III=III=III 11�11=III=III=III=III-III 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. RISER SECTION -WR -II�III-III-III III=III g III -III III -III III-III=11 WITH WSDOT STANDARD SPECIFICATION 9-05.50(3). PER PLANS �� =''�_''"I -' -i SUBSOIL SCARIFIED 4" BELOW 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH + ' SUBSOIL SCARIFIED 4" BELOW 2. AS AN ACCEPTABLE ALTERNATIVE TO REBAR, WELDED WIRE �/'� I � � / ' '/ �/ ��i _� COMPOST AMENDED LAYER \\\-;\�� \\. �� \/\\� -' COMPOST AMENDED LAYER THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. FABRIC HAVING A MIN. AREA OF 0.12 SQUARE INCHES PER is 12" BELOW SOIL SURFACE Mi FOOT MAY BE USED. WELDED WIRE FABRIC SHALL COMPLY I (12" BELOW SOIL SURFACE) ; j j\\`,./\\�\\/ j\/\\�\ i. ( ) 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. Cam' /j: TO ASTM A497 (AASHTO M 221). WIRE FABRIC SHALL NOT �. �1�.,�, �i i l l - \ \ \ \ \ \ 12" \ �A\,�A,wA�� BE PLACED IN KNOCKOUTS. /%�///��//\/// j// / �/, 4" (MIN) o�� �Q�� - 13. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED OPTION 2 AMEND I N PLACE O R STOCKPILE AND AMEND ' STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND 3. APPLY NON -SHRINK GROUT TO INSIDE AND OUTSIDE OF REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. ALL JOINTS, RINGS, RISERS AND FRAMES. PLUG OR CONTINUED UNDERDRAIN CRUSHED SURFACING GENERAL NOTES: CONNECTION TOP COURSE (CSTC) MECHANICAL PLUG PLANTING BEDS TURF (LAWN) AREAS 14. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR 4. ROUND KNOCKOUTS MAY BE ON ALL 4 SIDES, WITH MAX CLEANOUT PER WSDOT 9-03.9(3) SHALL 1. AREAS E FE DISTURBANCE EXISTING SITE FEATURES. v OIL SHALL BE DNCED AND EXISTING wSHAPE. ETER F 20". KNOCKOUTS MAY BE EITHER ROUND OR (SHOWN WITHIN BOR TENTION FACILITY) CLEANOUT COVER IN 2" ORGANIC ///, p" ORASODSEED pR0 ECTEDFROMEGETATION AND SCONSTRUCTION 15. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN � N LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. ■ 5. THE MAX DEPTH FROM THE FINISHED GRADE TO THE LANDSCAPE AREA 11=IIII 'Ill III -1-III''=11I-III-II-III-111 IMPACTS. 1=1=1 H 1=1=1 1=III=1 I -I I PIPE INVERT IS 5-0". GENERAL NOTES : 16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS s" IMPORTED II-111�1�111=III�II=1 id 11=III=111=111=III=III 2. To MEASURE SETTLED DEPTH, 1. CLEANOUT PIPE SHALL BE SAME SIZE AND MATERIAL AS UNDERDRAIN PIPE. II=III �I I I�-III I�-11�I=I IC-III=III 6" IMPORTED WATER SOIL SUFFICIENTLY TO OTHERWISE APPROVED BY THE ENGINEER. 6. THE TAPER ON THE SIDES OF THE PRECAST BASE SECTION TOPSOIL MIX TOPSOIL MIX FULLY SATURATE WITHOUT AND RISER SECTION SHALL NOT EXCEED 1/2"/FT. 2. CLEANOUT SHALL BE INSTALLED TO ALLOW FOR MAINTENANCE ACCESS TO ALL PIPES. (COMPACTED II-III-II-11��111E1IEEE III 1=111=III=III=1I II1=III ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM I� I=1 1=1 1=1 1=1 I -III (COMPACTED CAUSING EROSION. 17. DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. DEPTH) I=1 I1=1 I=1 �I I I� �I I H 1=1 I -III -I I1=1-III DEPTH) 3. ALL FITTINGS SHALL BE SOIL TIGHT. -III-I-III-III-1 6" III=1il-1-III=III-III=III 7. CATCH BASIN FRAME AND GRATE SHALL BE IN ACCORDANCE _ 3. COMPOST SHALL MEET SPEC. REQUIREMENTS IN THE 2017 18. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE WITH STANDARD SPECIFICATIONS. MATING SURFACES SHALL 4. CLEANOUT RISER TOP SHALL BE LOCATED OUTSIDE OF PONDING AREAS WHERE POSSIBLE. 1= Il ij.; II=, ,r/ �I- � I' �1= BE FINISHED TO ASSURE NON -ROCKING FIT WITH ANY SUBSOIL IS � l 1 " I�. j 11,</\�' II _ 1I EDMONDS STORMWATER DRAWINGS. COVER POSITION. NOTES: SCARIFIED 6" ?I I j/�`\j\/� _�\� (I L SUBSOIL IS ADDENDUM (CHECKLIST 7). SCARIFIED 6" 19. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR RECONSTRUCTION (MEASUREMENT AT THE TOP OF THE BASE) BELOW ��. PRECAST BASE SECTION 8• VERTICAL EDGE OF RISER SHALL NOT BE MORE THAN 2' 1. CLEANOUT COVER TO BE LOCKING WITH ALLEN HEAD BOLT, MARKED "DRAIN CLEANOUT," IMPORTED %/ /\//. F% //j = '!�//��' BELOW 4. COMPACTION OF TOPSOIL (WHERE CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS FROM VERTICAL EDGE OF CATCH BASIN WALL. \\ �\ \\/\\, IMPORTED REQUIRED TO BE TO 85%(MAX) "CLEANOUT," "CO3" OR SIMILAR. TOPSOIL MIX�� TOPSOIL MIX ) ( 20. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION OF THE MAXIMUM DRY DENSITY 2. TRAFFIC RATED LID REQUIRED IN AREAS WITH VEHICULAR LOADING. PER MODIFIED PROCTOR TEST AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. OPTION 3 - IMPORT TOPSOIL (ASTM D1557). 21. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED REVISION DATE REVISION SION DATWITHOUT PRIOR APPROVAL. CITY OF EDMONDS CATCH BASIN TYPE I - - JANUARY 2018 S T 0 R M DRAINAGE D E EMB R 20 E7 POST S T CONSTRUCTION N S T R U C T I 0 N SOIL I L DE EREVIM BER 20 E7 22. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. CITY OF EDMONDS CLEANOUT CITY OF EDMONDS QUALITY AND DEPTH 23. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. PUBLIC WORKS STANDARD PUBLIC WORKS STANDARD PUBLIC WORKS STANDARD DEPARTMENT DETAIL DEPARTMENT DETAIL DEPARTMENT DETAIL 24. FINISH GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET Est . 18° APPROVED BY: R. ENGLISH S D - 303 Fs t�Is 9° APPROVED BY: R. ENGLISH S D - 619 FS 9� APPROVED BY: S D - 642 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, f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w OF THE AUTHORITIES GOVERNING SAID UTILITIES. z J z 28. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED TO CONCSTRUCTION WORK SHALL BE REPLACED AT CONTRACTOR'S EXPENSE AND PROPERTY INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. LINE O RESIDENCE q- w 29. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM R.O.W. CLEANOUT m FINISHED GRADE DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND AND CITY. WITH 45' 30. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE 2' CAPD AND I I UTILITIES. CLEANOUT (MAX) 31. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. (TYP) I METER SUPPLIED I °' - BY CITY L I i 32. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. NOT TO EXCEED 100' BETWEEN CLEANOUTS I I - - -� I I 33. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. CLEANOUT (WYE WITH CAP I I BALL VALVE p �� _ _ _ _ _ G I I H AND CLEANOUT COVER) AND w \ CONCRETE LEVELING COLLAR � I I \ I I DOWNSPOUT SEE NOCKIINOTE 3 COVER DOWNSPOUT EXTENDS \ 2" INTO ADAPTOR 12"t FINISHED GRADE A BITUTHENE 3000 � � END OF PIPER GRIPPER PLUG I I I I WATERPROOFING a (CHERNE 27061 OR APPROVED I I �\ /� I I SYSTEM EQUAL) Li C a_ U _ _ �L�, C Li - PROVIDE ADAPTER TO T WATER TIGHT CAP DIRECTION _:3 CONNECT DOWNSPOUT OF FLOW TO 4" PVC • ENGINEERING DIVISION RISER LEVELING COLLAR WATER A D J TO YARDTIGHTLINDRAIN • 45' 45' SEE NOTE 4 MAIN \ \ APPROVED, F �//\ / 12" PVC SLEEVE 6" RISER \//\\//\\\ \\\// \\\/ Know what's below. 4" OR 6" SIDE SEWER MATERIAL LIST: �i\\j\\j /\\j\�j\\j\\j\� Call before you dig. 08/22/2022 6" WYE AND 6" CITY STUB 45' BEND A ALL 1" SERVICES TO BE TYPE "K" SOFT COPPER TUBING \ \\ \\ GENERAL CLEANOUT DETAIL \/\/� UTILITYCONFLICTNOTE. OB 1" BALL CORP. STOP WITH CC THREAD INLET AND COPPER (CTS) GRIP OUTLET (FORD OR MUELLER) C DUAL PURPOSE UNION / // // // CAUTION.' 4" OR 6" O \ /\\/\\ \/\\/\\" THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE 12" LOCKING COVER SIDE SEWER CLEANOUT DETAIL OD MIPT X CTS GRIP BALL VALVE CURB STOP EQUAL TO FORD B84-444Q FOR 1 " /\�/// ///��/ LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SEE NOTE 3 AT PROPERTY LINE/CITY EASEMENT WHEN REPLACING EXISTING SERVICES: 1" METER SETTER WITH ANGLE BALL METER VALVE 15" HIGH WITH DUAL �j \\ \\/\ \\/� SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND � E 3 z O PURPOSE UNIONS ON INLET AND OUTLET, HORIZONTAL IN HORIZONTAL, OUTLET EQUAL TO FORD VB74-15W-1 1-44 \\/\ \\ \\ \/\ \\ SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO Uj w W LEVELING COLLAR NOTES: WHEN PLACING NEW SERVICES: USE SAME AS ABOVE AND ADD A SINGLE CHECK, EQUAL TO FORD VBH74-15W-11-44//\ / //\//\ \ PROVIDE FITTINGS CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE j oa N SEE NOTE 4 F 1 " CC TAP SERVICE SADDLE EQUAL TO ROMAC 101 S \\/\\ \' /\\/\\/\\ �� 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT O/\/\/\/ / / / / / / /\/\/\ \/\/\/ AS NECESSARY a a ASPHALT SURFACE 1. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE // // // / / / / / / / / / / / /, LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY GASKETED. IN OIN PAVED EAREASAARMORSOCAST3A 001924 46PCXI12 TH BOXTW/ IA 00196969 RCII LIDRON COVER AND CAST IRON READER DOOR; \'\\\\j\j \�j\j\\�\\\\\/ SHOWN ONWHETHER �HENOT E PLANS AREEXIST. BASEDLOCATIONS ON THE UNVESAID RIFIEDUTILITIES PUBLIC BL 2022-0287 12"f 2. PIPE SLOPE TO BE 2% MIN AND UP TO 50% MAX. OH FOR VACANT LOT (FUTURE USE) LOCATION MARKED WITH PAINTED 2" X 4" STAKE WITH "WATER" STENCILED ON IT \\\\�\�\//\\�\\��\��\�j�\\/�\\ 4" PERF. PIPE SURROUNDED INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD INSIGHT ENGINEERING CO. '\ /� / BY 1 C.F. DRAIN ROCK PER OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING 3. SEWER CLEANOUT COVER TO BE EAST JORDAN IRON WORKS OI 14 GA. VINYL COATED WIRE TRACER (TAPED TO PLASTIC PIPE EVERY 10') TO BE GROUNDED AT METER AND HOUSE LINEAL FOOT COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH P.O. BOX - 1478 1 FOOT LONG 12" PVC PRODUCT #00366102 STAR PIPE COSP48L OR APPROVED O SCHEDULE 40 3/4" OR 1" PLUG, REMOVE WHEN CONNECTION IS MADE TO CUSTOMER LINE WITH COMPRESSION FITTING 6 ROOF/FOOTING DRAIN DETAIL CONSTRUCTION. EVERETT, WA 98206 SLEEVE EQUAL. NOT TO SCALE 425 303-9363 (425 303-9362 FAX OK WATER SERVICE TO HOUSE, INSTALLED BY OWNER/CONTRACTOR (PER PLUMBING CODE) C4 6" RISER END OF PIPE GRIPPER 4. LEVELING COLLAR SHALL BE CONSTRUCTED AS FOLLOWS: INFO@INSIGHTENGINEERING.NET PLUG CHERNE 270261 OL PROPERTY OWNER RESPONSIBLE FOR PURCHASING 3/4" OR 1" METER THROUGH THE CITY AT DEVELOPMENT SERVICES ( IN ROADWAYS PER COE STD DWG GU-424 DEPARTMENT; CITY WILL SUPPLY AND INSTALL METER AFTER PURCHASE; IF USING 3/4" METER, CONTRACTOR WILL OR APPROVED EQUAL) PROVIDE REDUCERS SITE ADDRESS. 21322 92ND PL W, TYPICAL CLEANOUT • IN SIDEWALK/LANDSCAPED AREAS, EITHER 24N24"xC' OM BACK SIDE OF METER BOX SHALL BE SET AT THE PROPERTY LINE UNLESS APPROVED BY THE CITY ENGINEER. EDMONDS, WA 98020 DEEP CONCRETE COLLAR OR 24" DIAMETER x 6" DEEP METER BOXES SHALL NOT BE SET IN DRIVEWAY AREAS UNLESS TRAFFIC RATED BOX IS APPROVED BY CITY ENGINEER. UNDER ASPHALT OR CONCRETE TAX ACCOUNT N0.'S: 00479300000600 CONCRETE COLLAR REVISION DATE REV. NO. DESCRIPTION INITIALS DATE REVISION DATE 1 " WATER SERVICE JANUARY 2021 JANUARY 2018 CITY OF EDMONDS 1� CITY OF EDMONDS Pueuc WORKS (FOR 3/4 & R. SEWER CLEANOUT DETAILS 1 METERS) STANDARD o1-C NE PUBLIC WORKS STANDARD DEPARTMENT DETAIL DEPARTMENT DETAIL 92ND LOT �� FS t , 18gI3 APPROVED BY: R. ENGLISH WA- �q _ Fs t j-, APPROVED BY: R. ENGLISH SS -ZOO DWG FILENAME DESIGNED BY DATE: SCALE: JOB NO.: q w 0 S T V�ti ��� 211173-FINAL.DWG JTK 01-12-2022 1 "=10' 21-1173 4 SEWER CLEANOUT DETAIL 5 WATER SERVICE INSTALLATION srI0 AL ��' SHEET C4 NOT TO SCALE STD DTL. SS-200 C4 NOT TO SCALE STD DTL. WA-130 08 19 2022 GENERAL NOTES AND DETAILS Co 5 NE 114, NE 114, SEC. 25, T. 27 X. R.03 E., W.M. SNOHOMISH COUNTY, WASHINGTON TREE PROTECTION DURING I I I I I I I I I I I I I I I � I / I / I I \ I I \ LOT 9 PUBLIC UTILITY EASEMENT LOT 7 \ \ cps PER HULL & ANDERSON \ PLAT OF I ADDITION VOL. 18, PG. 41 HULL & ANDERSON OLYMPIC PLACE I ADDITION A.F.#9002145001 I VOL. 18, PG. 41 --------- --- - SSMH SS RIM=383.00 SS PUBLIC UTILITY EASEMENT PER HULL & ANDERSON ADDITION VOL. 18, PG. 41 X ice-----�� CL FOUND REBAR W/CAP STAMPED '22969" vC SEWER 0.1 '(W) �& 0.1 '(S) OF CORNER. �SS EkCE l / FOUND 1-1/4" IRON / I COR. 0.12'(N) & 0.5'(W) OF CORNER \ I / PIPE AT CORNER 0.3' o. N 90'00'00" W 126.00' SS F \ SF SF SF SF i SS � C 45.0' I I I // I #,3 \ II 15. I / LOT 6 8,291 SF A, / I I / \ 00479300000600 PROPOSED HOUSE LOT 8 \ _ ► - I, (2,815 SF ROOF) PLAT OF OLYMPIC PLACE A.F.#9002145001 I PL \ / I Q) I LL. HEMP. STOCKPILE ARFA J I/ 00 MU II I I r0 a ca I I I I I I I I I I I I I I I 11�d� Zi 25EX. R/W i 25' EX. R/W I I I I I I ' i 25.00' �I / GPM I GPM - S �I ss \ I 06 TEMP. \ \ CONSTRUCTION \ \ \ ENTRANCE \ ( a I - _ _ - - - - - - - �2Q, \ \0'00'00" W FOUND RES \W/C \ \ \ l 'GAS '22.9f9 GA < 'GAS GAS GAS \ < I W 0.2 (S) OF CORNI� \ \\ I W W \I W CQMM N TRENCH FOR PQWE , CABLE, P ONE p wPM I ss i 25.0' BSBL \ / P - \�I ` P / GPM EX. S- / � / N 84 �8 4 E J" \ F UNL, 1-1/4" IRq PIPE 0-1=(N} -01 / CO EIS FENCE 0+(W) A�ORNERi / \ \ PUBLIC UTILITY EASEM / \ PER HULL & ANDERSON,, \ I ` ,9QDL01`LV9k.1� PG 41 I Know what's below. Call before you dig. UTILITY CONFLICTNOTE.- CAUTION.• THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE 1-800-424-5555 POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT WITH INSIGHT ENGINEERING COMPANY TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. IS- I. 8.7 1 5.4' 42 \ \ \ - - la _ _ - - / / I FOUND REBAR W/CAP 96. I \ I / / I STAMPED '22969" AT COR OUND REBAR W/ILLEGIBLE CAP 0.1 ' N OF CORN POW R AND DRY UTILITIES TO I \ \ 11 y \ () BE Pbj� � UNDERGROUND I \\\ LOT 5 PROPOSED 6' \ \ HULL & ANDERSON INCENSE CEDAR \ ADDITION / \eft-. PG. 41 I # SPECIES DBH CSD 1 WESTERN RED CEDAR (THUJA PLICATA) 103" 44' 2 FLOWERING CHERRY (PRUNUS SERRULATA) 10" 22' 3 WILLOW (SALIX BABYLONICA) loll 16' CONDITIONNOTES DOUBLE TRUNKS. GENERALLY GOOD CONDITION AND HEALTH. LOCATED WITHIIN THE RIGHT-OF-WAY. SPECIFIED LOD IS 24'FOR ABOVE GROUND FEATURES TO PROTECT THE CROWN AND FOR BELOW GROUND IMPACTS THE LOD IS 15'TO PROTECT THE ROOT PLATE. I d� I I I I I I I I I I I I I I I I i I LOT 2 HULL & ANDERSON ADDITION VOL. 18. PG. 41 U w SCALE: F = 10' 10 5 0 10 20 I TREEPROTECTIONNOTES.- I I THE LIMIT OF DISTURBANCE (LOD) FOR ALL TREES ARE SET OUTSIDE THE DRIPLINES FOR ABOVE GROUND FEATURES TO PROVIDE PROTECTION FOR THE CROWNS. FOR TREE #1, BECAUSE THE DRIP LINE IS SO BROAD, THERE IS A SECOND LOD FOR BELOW GROUND FEATURES SET A LOCATION TO PROTECT THE ROOT PLATE. I I ANY WORK WITHIN THE LOD IS TO BE DONE BY HAND. / ANY ROOTS DAMAGED WITHIN THE LOD AS LARGE AS 1/2-ARE TO BE HAND CUT. NO CROWN REDUCTION PRUNING. ANY PRUNING TO RAISE THE CROWN IS TO BE DONE BY HAND I 1 PRIOR TO DEVELOPMENT ACTIVITY OR INITIATING TREE REMOVAL ON THE SITE, VEGETATED AREAS, INDIVIDUAL TREES AND SOIL TO BE PRESERVED IN ACCORDANCE WITH ECDC 23.10.060(B) SHALL SS BE PROTECTED FROM POTENTIALLY DAMAGING ACTIVITIES PURSUANT TO THE FOLLOWING STANDARDS: A. PRECONSTRUCTION MEETING REQUIRED. PRIOR TO THE COMMENCEMENT OF ANY PERMITTED CLEARING AND GRADING ACTIVITY, A PRECONSTRUCTION MEETING SHALL BE HELD ON SITE WITH a I THE PERMITTEE AND APPROPRIATE CITY STAFF. THE PROJECT SITE SHALL BE MARKED IN THE FIELD AS FOLLOWS: I SSMH 1. THE EXTENT OF CLEARING AND GRADING TO OCCUR; I a RIM=396.92 2. DELINEATION AND PROTECTION OF ANY CRITICAL AREAS AND CRITICAL AREA BUFFERS WITH I IE 8" PVC(W)=389.97 CLEARING LIMIT FENCING; I IE 8" PVC(S)=390.07 J. FLAGGING OF TREES TO BE REMOVED AND TAGS ON TREES TO BE RETAINED; AND I IE 8" PVC(E)=390.07 4. PROPERTY LINES. B. PLACING MATERIALS NEAR TREES. NO PERSON MAY CONDUCT ANY ACTIVITY WITHIN THE PROTECTED AREA OF ANY TREE DESIGNATED TO REMAIN, INCLUDING, BUT NOT LIMITED TO, I a OPERATING OR PARKING EQUIPMENT, PLACING SOLVENTS, STORING BUILDING MATERIAL OR STOCKPILING ANY MATERIALS, OR DUMPING CONCRETE WASHOUT OR OTHER CHEMICALS. DURING LOT 3 CONSTRUCTION, NO PERSON SHALL ATTACH ANY OBJECT TO ANY TREE DESIGNATED FOR PROTECTION. HULL & ANDERSON C. PROTECTIVE BARRIER. BEFORE DEVELOPMENT, LAND CLEARING, GRADING, FILLING OR ANY LAND ADDITION ALTERATION, THE APPLICANT SHALL: VOL. 18, PG. 41 1. ERECT AND MAINTAIN READILY VISIBLE TEMPORARY PROTECTIVE TREE FENCING ALONG THE LIMITS OF DISTURBANCE WHICH COMPLETELY SURROUNDS THE PROTECTED AREA OF ALL RETAINED TREES, GROUPS OF TREES, VEGETATION AND NATIVE SOIL. TREE PROTECTIVE FENCING SHALL BE A MINIMUM HEIGHT OF THREE FEET, VISIBLE AND OF DURABLE CONSTRUCTION; ORANGE POLYETHYLENE LAMINAR FENCING IS ACCEPTABLE. 2. INSTALL HIGHLY VISIBLE SIGNS SPACED NO FURTHER THAN 15 FEET APART ALONG THE ENTIRETY OF THE PROTECTIVE TREE FENCING. SAID SIGN MUST BE APPROVED BY THE DIRECTOR AND SHALL STATE, AT A MINIMUM, "TREE AND SOIL PROTECTION AREA, ENTRANCE I PROHIBITED,"AND PROVIDE THE CITY PHONE NUMBER FOR CODE ENFORCEMENT TO REPORT VIOLATIONS. J. PROHIBIT EXCAVATION OR COMPACTION OF SOIL OR OTHER POTENTIALLY DAMAGING ACTIVITIES WITHIN THE BARRIERS; PROVIDED, THAT THE DIRECTOR MAY ALLOW SUCH ACTIVITIES APPROVED BY A QUALIFIED PROFESSIONAL AND UNDER THE SUPERVISION OF A QUALIFIED PROFESSIONAL RETAINED AND PAID FOR BY THE APPLICANT. 4. MAINTAIN THE PROTECTIVE BARRIERS IN PLACE FOR THE DURATION OF THE PROJECT UNTIL THE DIRECTOR AUTHORIZES THEIR REMOVAL. 5. ENSURE THAT ANY APPROVED LANDSCAPING DONE IN THE PROTECTED ZONE SUBSEQUENT TO THE REMOVAL OF THE BARRIERS SHALL BE ACCOMPLISHED WITH MACHINERY FROM OUTSIDE THE I PROTECTED ZONE OR BY HAND. Q 6. LIMIT THE TIME PERIOD THAT THE CRITICAL ROOT ZONE IS COVERED BY MULCH, PLYWOOD, I STEEL PLATES OR SIMILAR MATERIALS, OR BY LIGHT SOILS, TO PROTECT THE TREE'S CRITICAL I ROOT ZONE. 7. IN ADDITION TO THE ABOVE, THE DIRECTOR MAY REQUIRE THE FOLLOWING: A. IF EQUIPMENT IS AUTHORIZED TO OPERATE WITHIN THE PROTECTED ZONE, THE SOIL AND CRITICAL ROOT ZONE OF A TREE MUST BE COVERED WITH MULCH TO A DEPTH OF AT LEAST SIX INCHES OR WITH PLYWOOD, STEEL PLATES OR SIMILAR MATERIAL IN ORDER TO PROTECT ROOTS � AND SOIL FROM DAMAGE CAUSED BY HEAVY EQUIPMENT. B. MINIMIZE ROOT DAMAGE BY HAND -EXCAVATING A TWO -FOOT -DEEP TRENCH, AT EDGE OF CRITICAL ROOT ZONE, TO CLEANLY SEVER THE ROOTS OF TREES TO BE RETAINED. NEVER RIP OR SHRED ROOTS WITH HEAVY EQUIPMENT. C. CORRECTIVE PRUNING PERFORMED ON PROTECTED TREES IN ORDER TO AVOID DAMAGE FROM MACHINERY OR BUILDING ACTIVITY. D. MAINTENANCE OF TREES THROUGHOUT CONSTRUCTION PERIOD BY WATERING AND FERTILIZING. D. GRADE. NER 1. THE GRADE SHALL NOT BE ELEVATED OR REDUCED WITHIN THE CRITICAL ROOT ZONE OF LOT 4 TREES TO BE PRESERVED WITHOUT THE DIRECTOR'S AUTHORIZATION BASED ON RECOMMENDATIONS FROM A QUALIFIED PROFESSIONAL. THE DIRECTOR MAY ALLOW COVERAGE OF HULL & ANDERSON UP TO ONE-HALF OF THE AREA OF THE TREE'S CRITICAL ROOT ZONE WITH LIGHT SOILS (NO ADDITION CLAY) TO THE MINIMUM DEPTH NECESSARY TO CARRY OUT GRADING OR LANDSCAPING PLANS, IF VOL. 18, PG. 41 IT WILL NOT IMPERIL THE SURVIVAL OF THE TREE. AERATION DEVICES MAY BE REQUIRED TO ENSURE THE TREE'S SURVIVAL. 2. IF THE GRADE ADJACENT TO A PRESERVED TREE IS RAISED SUCH THAT IT COULD SLOUGH OR ERODE INTO THE TREE'S CRITICAL ROOT ZONE, IT SHALL BE PERMANENTLY STABILIZED TO PREVENT SOIL EROSION AND SUFFOCATION OF THE ROOTS. 3. THE APPLICANT SHALL NOT INSTALL AN IMPERVIOUS SURFACE WITHIN THE CRITICAL ROOT ZONE OF ANY TREE TO BE RETAINED WITHOUT THE AUTHORIZATION OF THE DIRECTOR. THE DIRECTOR MAY REQUIRE SPECIFIC CONSTRUCTION METHODS AND/OR USE OF AERATION DEVICES TO ENSURE THE TREE'S SURVIVAL AND TO MINIMIZE THE POTENTIAL FOR ROOT -INDUCED DAMAGE TO THE IMPERVIOUS SURFACE. 4. TO THE GREATEST EXTENT PRACTICAL, UTILITY TRENCHES SHALL BE LOCATED OUTSIDE OF THE CRITICAL ROOT ZONE OF TREES TO BE RETAINED. THE DIRECTOR MAY REQUIRE THAT UTILITIES BE TUNNELED UNDER THE ROOTS OF TREES TO BE RETAINED IF THE DIRECTOR DETERMINES THAT TRENCHING WOULD SIGNIFICANTLY REDUCE THE CHANCES OF THE TREE'S SURVIVAL. 5. TREES AND OTHER VEGETATION TO BE RETAINED SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION. CLEARING OPERATIONS SHALL BE CONDUCTED SO AS TO EXPOSE THE SMALLEST PRACTICAL AREA OF SOIL TO EROSION FOR THE LEAST POSSIBLE TIME. TO CONTROL EROSION, IT IS ENCOURAGED THAT SHRUBS, GROUND COVER AND STUMPS BE MAINTAINED ON THE INDIVIDUAL LOTS, WHERE FEASIBLE. GOOD CONDITION AND HEALTH. YOUNG AND VIGOROUS. TO BE RETAINED. SPECIFIED LOD IS 12' TO PROTECT THE CROWN AND ROOTS. GOOD CONDITION AND HEALTH. YOUNG AND VIGOROUS. TO BE RETAINED. SPECIFIED LOD IS 10' TO PROTECT THE CROWN AND ROOTS. CONSTRUCTION CHAIN -LINK FENCE OR ORANGE PLASTIC FENCE FASTENED TO STEEL STAKES/POSTS DRIVEN SECURELY INTO THE GROUND. DEVELOPER SHALL AVOID CRZ WHEN DRIVING STAKES/POSTS. *CRITICAL ROOT ZONE (CRZ) D n � Q p QQ�a TREE PROTECTION AREA, ENTRANCE PROHIBITED REPORT VIOLATIONS TO CITY OF KENMORE AT 425-398-8900. vQ 3 FEET I EXISTING SIGNIFICANT \� I TREE > I INSTALL AT - I LOCATION AS SHOWN ON I PLANS 3 INCHES OF COMPOSTED J WOODCHIPS REQUIRED WITHIN THE CRZ. FENCING 3-FEET OUTSIDE OF THE CRZ * THE CRITICAL ROOT ZONE (CRZ) IS THE AREA WHERE THE TREE'S ESSENTIAL MASS OF ROOTS IS LOCATED. THE AREA SURROUNDING THE TREE AT A DISTANCE WHICH IS EQUAL TO ONE FOOT FOR EVERY INCH OF TRUNK DIAMETER AT BREAST HEIGHT (DBH) OR THE AREA OF A CIRCLE WITH RADIUS EXTENDING FROM A TREE'S TRUNK TO A POINT NO LESS THAN THE END OF A TREE'S LONGEST BRANCH, WHICHEVER IS GREATER. 1 TREE PROTECTIONDETAIL CZ N.T.S. REV. NO. I DESCRIPTION I INITIALS I DATE 0811912022 T T1/`/7117T1 LIMIT OF DISTURBANCE (LOD) I / CRITICAL ROOT ZONE (CRZ) i 1/2 CRITICAL ROOT ZONE (CRZ) TREE TO BE REMOVED 1 i � M TREES TO BE PROTECTED C2 TREE TO BE ADDED CITY OF EDMONDS APPROVED FOR CONSTR UCTION FOR: , PUBLIC WORKS DIRECTOR DATE INSIGa4 ENGINEERING COo P.O. BOX - 1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFO@ INSIGHTENGINEERING.NET SITE ADDRESS. 21322 92ND PL W, EDMONDS, WA 98020 TAX ACCOUNT NO. 'S: 00479300000600 NE 114, NE 114, SEC. 25, T. 27 N., R.03 E., W.M. 92ND LOT DWG FILENAME DESIGNED BY. DATE: SCALE: JOB NO.: 211173-FINAL.DWG JTK 01-12-2022 1 "=10' 1 21-1173 SHEET TREE RETENTION PLAN C5 of 5 BLID2022-0287