REVIEWED BLD2022-0287+Geotechnical_Report+3.7.2022_2.24.55_PM+2722004BLD2022-0287 COBALT GE0SCIENCES March 2, 2022 Todd Echelbarger toddoechelbarger.com RECEIVED May 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RE: Limited Geotechnical Evaluation Proposed Development 21322 92nd Place West Lynnwood, Washington Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, Washington 98028 REVIEWED - CITY OF EDMONDS In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss the results of our geotechnical evaluation at the referenced site. The purpose of our evaluation was to provide recommendations for foundation design, grading, and earthwork. Site Description The site is located at 21322 92nd Place West in Edmonds, Washington. The site consists of one irregularly shaped parcel (No. 00479300000600) with a total area of o.19 acres. The property is undeveloped and vegetated with grasses, bushes, understory, and sparse trees. The site slopes downward from east to west at magnitudes of 5 to 12 percent and relief of about 15 feet. There is a short fill slope near the west property line. This slope is 40 percent in magnitude and about 6 feet in height. The site contains erosion hazard areas per City of Edmonds mapping. The site is bordered to the north, south, and west by residences, and to the east by 92nd Place West. There is a sewer line near the west property line. The proposed development includes construction of a new residence with likely daylight basement and driveway. Foundation loads are expected to be light and grading may include cuts of 8 feet or less. We have reviewed the civil plans that show that stormwater will be routed to City infrastructure. Area Geology The Geologic Map of the Edmonds East Quadrangle, indicates that the site is underlain by Vashon Glacial Till. Vashon Glacial Till includes mixtures of silt, sand, gravel, and clay in a nonsorted matrix or diamict. These deposits are typically dense below a weathered zone. These materials are typically impermeable. Soil & Groundwater Conditions As part of our evaluation, we excavated two test pits within the property, where accessible. The explorations encountered approximately 6 inches of grass and topsoil underlain by approximately 2.5 to 5 feet of loose to medium dense, silty -fine to medium grained sand trace to with gravel (Fill). This layer was underlain by 1.5 to 4.5 feet of loose to medium dense, silty -fine www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 2 of 12 Geotechnical Evaluation to medium grained sand with gravel (Weathered Glacial Till). These materials were underlain by dense to very dense, silty -fine to medium grained sand trace to with gravel (Vachon Glacial Till), which continued to the termination depths of the explorations. Groundwater was not encountered in the test pits during the exploration work. Cemented soils were observed at depth in TP-2 and we anticipate that perched groundwater will develop on the denser till at shallow depths during the wet season. Water table elevations often fluctuate over time. The groundwater level will depend on a variety of factors that may include seasonal precipitation, irrigation, land use, climatic conditions and soil permeability. Water levels at the time of the field investigation may be different from those encountered during the construction phase of the project. Erosion Hazard The Natural Resources Conservation Services (NRCS) maps for Snohomish County indicate that the property is underlain by Alderwood-Urban land complex (8 to 15 percent slopes). These soils can have a slight to moderate erosion potential when exposed. It is our opinion that soil erosion potential at this project site can be reduced through landscaping and surface water runoff control. Typically, erosion of exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with regard to site grading, is from October 31st to April 1st. Erosion control measures should be in place before the onset of wet weather. The site may be mapped within an erosion hazard area per City of Edmonds GIS. Relevant code items with discussion for erosion hazards are as follows: 23.80.o6o Development standards — General requirements. A. Alterations of geologically hazardous areas or associated buffers may only occur for activities that: 1. Will not increase the threat of the geological hazard to adjacent properties beyond predevelopment conditions; 2. Will not adversely impact other critical areas; 3. Are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than predevelopment conditions; and 4. Are certified as safe as designed and under anticipated conditions by a qualified engineer or geologist, licensed in the state of Washington. The proposed residence will not increase the threat of geologic hazards on adjacent properties, will not impact other critical areas, and are safe as designed under anticipated conditions. The level of risk due to the proposed development will be the same or lower than what is currently present provided temporary and permanent runoff is fully controlled. 23.80.07o Development standards — Specific hazards. A. Erosion and Landslide Hazard Areas. Activities on sites containing erosion or landslide hazards shall meet the requirements of ECDC 23.80.o6o, Development standards — General requirements, and the specific following requirements: www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 3 of 12 Geotechnical Evaluation 1. Minimum Building Setback. The minimum setback shall be the distance required to ensure the proposed structure will not be at risk from landslides for the life of the structure, considered to be 120 years, and will not cause an increased risk of landslides taking place on or off the site. A setback shall be established from all edges of landslide hazard areas. The size of the setback shall be determined by the director consistent with recommendations provided in the geotechnical report to eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in whole or part by the development, based upon review of and concurrence with a critical areas report prepared by a qualified professional; No building setback is warranted from the erosion hazard areas. These areas have very low risk and can be managed with proper TESC and BMPs. 2. Buffer Requirements. A buffer may be established with specific requirements and limitations, including but not limited to, drainage, grading, irrigation, and vegetation. Buffer requirements shall be determined by the director consistent with recommendations provided in the geotechnical report to eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in whole or part by activities within the buffer area, based upon review of and concurrence with a critical areas report prepared by a qualified professional; No buffer is required from the erosion hazard areas. We recommend that all site soils be vegetated or protected from erosion through placement of surface landscaping materials/hardscapes. 3. Alterations. Alterations of an erosion or landslide hazard area, minimum building setback and/or buffer may only occur for activities for which a hazards analysis is submitted and certifies that: a. The alteration will not increase surface water discharge or sedimentation to adjacent properties beyond predevelopment conditions; b. The alteration will not decrease slope stability on adjacent properties; and c. Such alterations will not adversely impact other critical areas; Provided earthwork activities are performed in accordance with the approved plans, all runoff is fully control, and periodic geotechnical oversight is performed, the development will not decrease slope stability on adjacent properties, will not increase surface water discharge or sedimentation beyond current levels, and will not impact other critical areas. Temporary and permanent erosion and sediment control devices should be in at all times during construction. 4. Design Standards within Erosion and Landslide Hazard Areas. Development within an erosion or landslide hazard area and/or buffer shall be designed to meet the following basic requirements unless it can be demonstrated that an alternative design that deviates from one or more of these standards provides greater long-term slope stability while meeting all other provisions of this title. The requirement for long-term slope stability shall exclude designs that require regular and periodic maintenance to maintain their level of function. The basic development design standards are: a. The proposed development shall not decrease the factor of safety for landslide occurrences below the limits of 1.5 for static conditions and 1.2 for dynamic conditions. If stability at the proposed development site is below these limits, the proposed development shall provide practicable approaches to reduce risk to human safety and improve the factor of safety for landsliding. In no case shall the existing factor of safety be reduced for the subject property or adjacent properties; www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 4 of 12 Geotechnical Evaluation b. Structures and improvements shall be clustered to avoid geologically hazardous areas and other critical areas; c. Structures and improvements shall minimize alterations to the natural contour of the slope, and foundations shall be tiered where possible to conform to existing topography; d. Structures and improvements shall be located to preserve the most critical portion of the site and its natural landforms and vegetation; e. The proposed development shall not result in greater risk or a need for increased buffers on neighboring properties; f. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over graded artificial slopes; and g. Development shall be designed to minimize impervious lot coverage; The construction will not require grading or disturbance of any slope/landslide hazard areas: however, the work may occur within the locally mapped erosion hazard areas. This work can be completed without affecting the hazard provided work is completed in a timely manner and proper erosion control measures are in place during construction and permanent landscaping is in place upon completion of the construction. The construction does not result in greater risk to the property or adjacent areas. Performed with proper erosion control and engineering controls, the proposed development does not pose a risk to critical areas or the need to increase buffers on adjacent properties. 5. Vegetation Retention. Unless otherwise provided or as part of an approved alteration, removal of vegetation from an erosion or landslide hazard area or related buffer shall be prohibited; 6. Seasonal Restriction. Clearing shall be allowed only from May 1st to October ist of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions, except that timber harvest, not including brush clearing or stump removal, may be allowed pursuant to an approved forest practice permit issued by the city of Edmonds or the Washington State Department of Natural Resources; 7. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from an erosion or landslide hazard area shall be prohibited except as follows: a. Conveyed via continuous storm pipe downslope to a point where there are no erosion hazard areas downstream from the discharge; b. Discharged at flow durations matching predeveloped conditions, with adequate energy dissipation, into existing channels that previously conveyed storm water runoff in the predeveloped state; or c. Dispersed discharge upslope of the steep slope onto a low -gradient, undisturbed buffer demonstrated to be adequate to infiltrate all surface and storm water runoff, and where it can be demonstrated that such discharge will not increase the saturation of the slope; and We concur with the above code items and have no additional comments at this time. www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 5 of 12 Geotechnical Evaluation Seismic Hazard The overall subsurface profile corresponds to a Site Class D as defined by Table 1613.5.2 of the International Building Code (IBC). A Site Class D applies to an overall profile consisting of stiff/medium dense soils within the upper ioo feet. We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program Website to obtain values for Ss, S,, FQ, and F,,. The USGS website includes the most updated published data on seismic conditions. The following tables provide seismic parameters from the USGS web site with referenced parameters from ASCE 7-io and 7-16. Seismic Design Parameters (ASCE 7-10) Site Spectral Spectral Site Design Spectral Design Class Acceleration Acceleration Coefficients Response Parameters PGA at 0.2 sec. (g) at i.o sec. (g) Fa Fv SDS SD, D 1.269 0.496 1.0 1.504 o.846 0.498 0.514 Seismic Design Parameters (ASCE 7-16) Site Spectral Spectral Site Design Spectral Design Class Acceleration Acceleration Coefficients Response Parameters PGA at 0.2 sec. (g) at l.o sec. (g) Fa Fv SDS SD, D 1.283 0.451 1.0 Null o.856 Null 0.546 Additional seismic considerations include liquefaction potential and amplification of ground motions by soft/loose soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table. The site has a low likelihood of liquefaction. For items listed as "Null' see Section 11.4.8 of the ASCE. Conclusions and Recommendations General The site is underlain by fill and weathered and unweathered Vashon Glacial Till. The proposed residential structure may be supported on a shallow foundation system bearing on medium dense or firmer native soils or on structural fill placed on the native soils. Local overexcavation or recompaction of loose weathered native soils may be necessary depending on the proposed elevations and locations of the new footings. Overexcavation of any fill is required. Note that the fill is mostly present near the west property line and likely decreases to nil to the east, where the residence will be located. www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 6 of 12 Geotechnical Evaluation Infiltration is not feasible due to the presence of fill, restrictive layers, and variable slopes that would direct runoff to the west and potentially into the adjacent residences. We anticipate that direct or perforated connection to City infrastructure will be utilized. We can provide additional information if other systems are being considered or proposed. Note a drywell for footing drains west of the residence is suitable. Site Preparation Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic -rich soil and fill. Based on observations from the site investigation program, it is anticipated that the stripping depth will be 6 to 12 inches. Deeper excavations will be necessary in areas of existing foundation systems and in any areas underlain by undocumented fill. The native soils consist of silty -sand with gravel. Most of the native soils may be used as structural fill provided they achieve compaction requirements and are within 3 percent of the optimum moisture. Some of these soils may only be suitable for use as fill during the summer months, as they will be above the optimum moisture levels in their current state. These soils are variably moisture sensitive and may degrade during periods of wet weather and under equipment traffic. Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum of 95 percent of the modified proctor maximum dry density, as determined by the ASTM D 1557 test method. Temporary Excavations Based on our understanding of the project, we anticipate that the grading could include local cuts on the order of approximately 8 feet or less for foundation and utility placement. Temporary excavations should be sloped no steeper than 1.5H:1V (Horizontal:Vertical) in loose native soils and fill, 1H:1V in medium dense native soils and 3/4H:1V in dense to very dense native soils if encountered in deeper excavations. If an excavation is subject to heavy vibration or surcharge loads, we recommend that the excavations be sloped no steeper than 2H:1V, where room permits. Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N, Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified person during construction activities and the inspections should be documented in daily reports. The contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope erosion during construction. Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the slopes should be closely monitored until the permanent retaining systems or slope configurations are complete. Materials should not be stored or equipment operated within 10 feet of the top of any temporary cut slope. Soil conditions may not be completely known from the geotechnical investigation. In the case of temporary cuts, the existing soil conditions may not be completely revealed until the excavation work exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be made. Soil and groundwater conditions can be highly variable. www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 7 of 12 Geotechnical Evaluation Scheduling for soil work will need to be adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines can be met. If any variations or undesirable conditions are encountered during construction, we should be notified so that supplemental recommendations can be made. If room constraints or groundwater conditions do not permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring systems may be required. The contractor should be responsible for developing temporary shoring systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review temporary shoring designs prior to installation, to verify the suitability of the proposed systems. Foundation Design The proposed residence may be supported on a shallow spread footing foundation system bearing on undisturbed dense or firmer native soils or on properly compacted structural fill placed on the suitable native soils. Any undocumented fill and/or loose native soils should be removed and replaced with structural fill below foundation elements. Structural fill below footings should consist of clean angular rock 5/8 to 4 inches in size. It may be feasible to recompact loose outwash soils in lieu of overexcavation and replacement. We should verify soil conditions during foundation excavation work. For shallow foundation support, we recommend widths of at least 16 and 24 inches, respectively, for continuous wall and isolated column footings supporting the proposed structure. Provided that the footings are supported as recommended above, a net allowable bearing pressure of 2,500 pounds per square foot (psf) may be used for design. A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be inspected to verify that the foundations will bear on suitable material. Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth of 12 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. If constructed as recommended, the total foundation settlement is not expected to exceed 1 inch. Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings, should be less than 1/2 inch. This translates to an angular distortion of 0.002. Most settlement is expected to occur during construction, as the loads are applied. However, additional post -construction settlement may occur if the foundation soils are flooded or saturated. All footing excavations should be observed by a qualified geotechnical consultant. Resistance to lateral footing displacement can be determined using an allowable friction factor of 0.4o acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can also be developed using an allowable equivalent fluid passive pressure of 225 pounds per cubic foot (pcf) acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior areas). The frictional and passive resistance of the soil may be combined without reduction in determining the total lateral resistance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Any extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing excavations, should be removed prior to placing concrete. The potential for wetting or drying of the bearing materials can be reduced by pouring concrete as soon as possible after www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 8 of 12 Geotechnical Evaluation completing the footing excavation and evaluating the bearing surface by the geotechnical engineer or his representative. Concrete Retaining Walls The following table, titled Wall Design Criteria, presents the recommended soil related design parameters for retaining walls with a level backslope. Contact Cobalt if an alternate retaining wall system is used. This has been included for basement walls. Wall Design Criteria "At -rest" Conditions (Lateral Earth Pressure — EFD+) 55 pcf (Equivalent Fluid Density) "Active" Conditions (Lateral Earth Pressure — EFD+) 35 pcf (Equivalent Fluid Density) Seismic Increase for "At -rest" Conditions (Lateral Earth Pressure) 21H* (Uniform Distribution) 1 in 2,500 year event Seismic Increase for "At -rest" Conditions (Lateral Earth Pressure) 14H* (Uniform Distribution) 1 in 500 year event Seismic Increase for "Active" Conditions (Lateral Earth Pressure) 7H* (Uniform Distribution) Passive Earth Pressure on Low Side of Wall (Allowable, includes F.S. = 1.5) Neglect upper 2 feet, then 250 pcf EFD+ Soil -Footing Coefficient of Sliding Friction (Allowable; includes F.S. = 1.5) 0.40 *H is the height of the wall; Increase based on one in 500 year seismic event (10 percent probability of being exceeded in 50 years), +EFD — Equivalent Fluid Density The stated lateral earth pressures do not include the effects of hydrostatic pressure generated by water accumulation behind the retaining walls. Uniform horizontal lateral active and at -rest pressures on the retaining walls from vertical surcharges behind the wall may be calculated using active and at -rest lateral earth pressure coefficients of 0.3 and 0.5, respectively. A soil unit weight Of 125 pcf may be used to calculate vertical earth surcharges. To reduce the potential for the buildup of water pressure against the walls, continuous footing drains (with cleanouts) should be provided at the bases of the walls. The footing drains should consist of a minimum 4-inch diameter perforated pipe, sloped to drain, with perforations placed down and enveloped by a minimum 6 inches of pea gravel in all directions. The backfill adjacent to and extending a lateral distance behind the walls at least 2 feet should consist of free -draining granular material. All free draining backfill should contain less than 3 percent fines (passing the U.S. Standard No. 200 Sieve) based upon the fraction passing the U.S. Standard No. 4 Sieve with at least 30 percent of the material being retained on the U.S. Standard No. 4 Sieve. The primary purpose of the free -draining material is the reduction of hydrostatic pressure. Some potential for the moisture to contact the back face of the wall may exist, even with treatment, which may require that more extensive waterproofing be specified for walls, which require interior moisture sensitive finishes. www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 9 of 12 Geotechnical Evaluation We recommend that the backfill be compacted to at least go percent of the maximum dry density based on ASTM Test Method D1557. In place density tests should be performed to verify adequate compaction. Soil compactors place transient surcharges on the backfill. Consequently, only light hand operated equipment is recommended within 3 feet of walls so that excessive stress is not imposed on the walls. Slab -on -Grade We recommend that the upper 18 inches of the existing native soils within slab areas be re - compacted to at least 95 percent of the modified proctor (ASTM D1557 Test Method). Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers. The American Concrete Institutes ACI 36oR-o6 Design of Slabs on Grade and ACI 302.1R-04 Guide for Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor slab detailing. Slabs on grade may be designed using a coefficient of subgrade reaction of 210 pounds per cubic inch (pci) assuming the slab -on -grade base course is underlain by structural fill placed and compacted as outlined above. A 4- to 6-inch-thick capillary break layer should be placed over the prepared subgrade. This material should consist of pea gravel or 5/8 inch clean angular rock. A perimeter drainage system is recommended unless interior slab areas are elevated a minimum Of 12 inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4-inch diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non -woven geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter drainage system should discharge by gravity flow to a suitable stormwater system. Exterior grades surrounding buildings should be sloped at a minimum of one percent to facilitate surface water flow away from the building and preferably with a relatively impermeable surface cover immediately adjacent to the building. Stormwater Management Feasibility The site is underlain by fill and thin weathered glacial till over dense glacial till. The dense glacial till acts as an aquitard, reducing vertical infiltration of stormwater to near zero. Infiltration is not feasible due to the presence of fill, restrictive layers, and variable slopes that would direct runoff to the west and potentially into the adjacent residences. We understand that roof runoff will be directed into City infrastructure. Note that a drywell for footing drains west of the residence is suitable. Erosion and Sediment Control Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented, and these measures should be in general accordance www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page io of 12 Geotechnical Evaluation with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site: • Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BMP's), grading activities can be completed during the wet season (generally October through April). • All site work should be completed and stabilized as quickly as possible. • Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. • Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. Utilities Utility trenches should be excavated according to accepted engineering practices following OSHA (Occupational Safety and Health Administration) standards, by a contractor experienced in such work. The contractor is responsible for the safety of open trenches. Traffic and vibration adjacent to trench walls should be reduced; cyclic wetting and drying of excavation side slopes should be avoided. Depending upon the location and depth of some utility trenches, groundwater flow into open excavations could be experienced, especially during or shortly following periods of precipitation. In general, silty and sandy soils were encountered at shallow depths in the explorations at this site. These soils have low cohesion and density and will have a tendency to cave or slough in excavations. Shoring or sloping back trench sidewalls is required within these soils in excavations greater than 4 feet deep. All utility trench backfill should consist of imported structural fill or suitable on site soils. Utility trench backfill placed in or adjacent to buildings and exterior slabs should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. The upper 5 feet of utility trench backfill placed in pavement areas should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Below 5 feet, utility trench backfill in pavement areas should be compacted to at least 90 percent of the maximum dry density based on ASTM Test Method D1557. Pipe bedding should be in accordance with the pipe manufacturer's recommendations. The contractor is responsible for removing all water -sensitive soils from the trenches regardless of the backfill location and compaction requirements. Depending on the depth and location of the proposed utilities, we anticipate the need to re -compact existing fill soils below the utility structures and pipes. The contractor should use appropriate equipment and methods to avoid damage to the utilities and/or structures during fill placement and compaction procedures. www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page ii of 12 Geotechnical Evaluation CLOSURE This report was prepared for the exclusive use of Todd Echelbarger and his appointed consultants. Any use of this report or the material contained herein by third parties, or for other than the intended purpose, should first be approved in writing by Cobalt Geosciences, LLC. The recommendations contained in this report are based on assumed continuity of soils with those of our test holes, and assumed structural loads. Cobalt Geosciences should be provided with final architectural and civil drawings when they become available in order that we may review our design recommendations and advise of any revisions, if necessary. Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the responsibility of Todd Echelbarger who is identified as "the Client" within the Statement of General Conditions, and its agents to review the conditions and to notify Cobalt Geosciences should any of these not be satisfied. Sincerely, Cobalt Geosciences, LLC 54896 3/2/2022 Phil Haberman, PE, LG, LEG Principal `c 2513 Q Sed Gea PHIL P HABEIW,�J www.cobaltgeo.com (2o6) 331-1097 March 2, 2022 Page 12 of 12 Geotechnical Evaluation Statement of General Conditions USE OF THIS REPORT: This report has been prepared for the sole benefit of the Client or its agent and may not be used by any third party without the express written consent of Cobalt Geosciences and the Client. Any use which a third party makes of this report is the responsibility of such third parry. BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are in accordance with Cobalt Geosciences present understanding of the site specific project as described by the Client. The applicability of these is restricted to the site conditions encountered at the time of the investigation or study. If the proposed site specific project differs or is modified from what is described in this report or if the site conditions are altered, this report is no longer valid unless Cobalt Geosciences is requested by the Client to review and revise the report to reflect the differing or modified project specifics and/or the altered site conditions. STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in accordance with the normally accepted standard of care in the state of execution for the specific professional service provided to the Client. No other warranty is made. INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and statements regarding their condition, made in this report are based on site conditions encountered by Cobalt Geosciences at the time of the work and at the specific testing and/or sampling locations. Classifications and statements of condition have been made in accordance with normally accepted practices which are judgmental in nature; no specific description should be considered exact, but rather reflective of the anticipated material behavior. Extrapolation of in situ conditions can only be made to some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock and groundwater conditions as influenced by geological processes, construction activity, and site use. VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be encountered that are different from those described in this report or encountered at the test locations, Cobalt Geosciences must be notified immediately to assess if the varying or unexpected conditions are substantial and if reassessments of the report conclusions or recommendations are required. Cobalt Geosciences will not be responsible to any party for damages incurred as a result of failing to notify Cobalt Geosciences that differing site or sub -surface conditions are present upon becoming aware of such conditions. PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications should be reviewed by Cobalt Geosciences, sufficiently ahead of initiating the next project stage (property acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated project specifics and that the contents of this report have been properly interpreted. Specialty quality assurance services (field observations and testing) during construction are a necessary part of the evaluation of sub -subsurface conditions and site preparation works. Site work relating to the recommendations included in this report should only be carried out in the presence of a qualified geotechnical engineer; Cobalt Geosciences cannot be responsible for site work carried out without being present. www.cobaltgeo.com (2o6) 331-1097 Approximate TP_ Test Pit Location Sno. Co GIs Map Proposed Residence 21322 92nd Place West Edmonds, Washington SITE MAP FIGURE i N A Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeoPgmail.com Slab on Grade Basement or Shallow Foundation Wall 12" Free Draining Backfill and/or Drainage Mat Attached to Wall Backfill Soils Compacted per Geotechnical Report 4" Diameter Perforated Pipe --�� H Native Soils Benched as Required Filter Fabric Over Rock (Mirafi 14oN) 3//4" Washed Rock or Clean Angular Rock Not to Scale Cobalt Geosciences, LLC PO Box 1792 Typical Foundation Drain Detail North Bend, WA 9So45 COBALTAttachment (2o6) 331-1097 GEOSCIENCLI-Swww.cobaltgeo.com philocobaltgeo.com Unified Soil Classification System (USCS) MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION GW Clean Gravels Well -graded gravels, gravels, gravel -sand mixtures, little or no fines Gravels (more than 50% (less than 5% _ GP fines) Poorly graded gravels, gravel -sand mixtures, little or no fines COARSE GRAINED SOILS of coarse fraction retained on No. 4 sieve) GM Gravels with Fines (more than 12% GC fines) Silty gravels, gravel -sand -silt mixtures Clayey gravels, gravel -sand -clay mixtures (more than 50% retained on ;°e sw Clean Sands Well -graded sands, gravelly sands, little or no fines No. 200 sieve) Sands (50% or more of coarse fraction (less than 5% SP fines) Poorly graded sand, gravelly sands, little or no fines passes the No. 4 sieve) sM Sands with Fines Silty sands, sand -silt mixtures (more than 12% sc fines) Clayey sands, sand -clay mixtures ML Inorganic silts of low to medium plasticity, sandy silts, gravelly silts, FINE GRAINED SOILS (50% or more Silts and Clays (liquid limit less than 50) Inorganic cL or clayey silts with slight plasticity Inorganic clays of low to medium plasticity, gravelly clays, sandy clays silty clays, lean clays oL Organic Organic silts and organic silty clays of low plasticity passes the MH Inorganic silts, micaceous or diatomaceous fine sands or silty soils, No. 200 sieve) Silts and Clays (liquid limit 50 or more) Inorganic CH elastic silt Inorganic clays of medium to high plasticity, sandy fat clay, or gravelly fat clay OH Organic Organic clays of medium to high plasticity, organic silts HIGHLY ORGANIC SOILS primarily organic matter, dark in color, PT and organic odor Peat, humus, swamp soils with high organic content (ASTM D4427) 1 Classification of Soil Constituents 1 MAJOR constituents compose more than 50 percent, by weight, of the soil. Major constituents are capitalized (i.e., SAND). Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by "slightly" compose 5 to 12 percent of the soil (i.e., slightly silty SAND). Trace constituents compose o to 5 percent of the soil (i.e., slightly silty SAND, trace gravel). Relative Density (Coarse Grained Soils) Consistency (Fine Grained Soils) N, SPT, Relative N, SPT, Relative Blows/FT Density Blows/FT Consistency 0-4 Very loose Under 2 Very soft 4 -10 Loose 2-4 Soft 10 - 30 Medium dense 4-8 Medium stiff 30 - 50 Dense 8 -15 Stiff Over 50 Very dense 15 - 30 Very stiff Over 3o Hard Grain Size Definitions Description Sieve Number and/or Size Fines <#200 (0.08 mm) Sand -Fine #200 to #40 (0.08 to 0.4 mm) -Medium #40 to #10 (0.4 to 2 MM) -Coarse #10 to #4 (2 to 5 mm) Gravel -Fine #4 to 3/4 inch (5 to 19 mm) -Coarse 3/4 to 3 inches (19 to 76 mm) Cobbles 3 to 12 inches (75 to 305 mm) Boulders >12 inches (305 mm) Moisture Content Definitions Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA98028 Soil Classification Chart Figure C1 (206) 331-1097 _ www.cobalt eg o.com cobaltgeo(d-) gmail.com Test Pit TP-1 Date: November 3, 2021 Depth: 10' Groundwater: None Contractor: Client provided Elevation: Logged By: PH Checked By: SC -- o> o Moisture Content (%) N JO -0 Plastic 1 Liquid U E Limit Limit L � L Material Description o ? o DCP Equivalent N-Value G 0 10 20 30 40 50 R __ To.P oilation ________________________________ 1 SM Loose to medium dense, silty -fine to medium grained sand with gravel l dark yellowish brown to grayish brown, moist. 2 (Fill) 3 4 5 ------ 6 ---- X. --- SM --------------------------------------------- Medium dense to dense, silty -fine to medium grained sand with grave , grayish brown, moist. (Glacial Till) 8 9 18 End of Test Pit 10' Test Pit TP-2 Date: November 3, 2021 Depth: 8' Groundwater: None Contractor: Client provided Elevation: Logged By: PH Checked By: SC — 0 0) o Moisture Content (%) JO U -0 T U Plastic 1 Liquid Limit Limit Material Description DCP Equivalent N-Value o 6 ? o G 0 10 20 30 40 5 -- Topsoilv_egetation -------------------------------- SM 1 Loose to medium dense, silty -fine to medium grained sand with gravel dark yellowish brown to grayish brown, moist. 2 (Fill) —.3 ----------- •:.'• -- --------------------------------------------- SM Medium dense, silty -fine to medium grained sand with gravel, 4 yellowish brown to grayish brown, moist. (Weathered Glacial Till) 5 --6 ----------- --- --------------------------------------------- SM Dense to very dense, silty -fine to medium grained sand with gravel, 7 grayish brown, moist. (Glacial Till) End of Test Pit 8' 9 10 Cobalt Geosciences, LLC Proposed Residence P.O. Box 82243 COBALT21322 92nd Place West Test Pit Kenmore, WA 98028 (2o6) 331-1097 F Edmonds, Washington Logs www.cobaltgeo.com cobaltgeoPgmail.com