BLD2023-0695+CONTRACTOR BUILD INFO+6.5.2023_11.23.56_AM+3587518RECEIVED
Jun 05 2023 BLD2023-0695
CITY OF EDMONDS
DEVELOPMENT SERVICES
pasts held up in concrete & troweled for water run off. A]I pirmad steel fittings_
1 518" black steel frame gates with standard fork latches.
Tear out and removal of existing fence included. (concrete from and corner i£ gate pasts only).
'ProposaI baser on clear fence lines and dirt from pmt holes remaining on situ'
OPTION 1: U pgrade to 8ga black cha iniin k mesh, Add S 239.53 inc tax.
OPTION 2: Replace tension wire with b0ttem rail_ Add $ 1,120.19 inc tax.
OPTION 3: Add 5' of 4' tall Straight Wide Picket white vin IyI_ Add $1,009.11 ine tax_
(Includes Single gate and one utility charge_ Note: Vinyl gates will sag; n0 warranty implied)
'Options listed at cashlcheck discount pricing'
*Posts within T of marked underground utlIItles will incur an additional insurance charge of $64;post"
4" - $' rr=,exisling
2S' �40- Singly gate
Reattach txisti
14'
4S" Single gam
to nrw Faust
1
I
�1
13U" SirbglL- ga Fn
on 2 7f8" frost
T 44'
kxRd 5
Snr rgsr&w$ritWf;cx, 1'wirigvariel
�d'1z� Srr�i x WLP-- PinkN2rJ -sh
7Y
Attached is the drawing provided by the fence company. The stream is down the slope behind the 90'
fence line at the back of the property. There is a gate to the back of the property for egress and ingress.
The fence is a 6' high black chain link fence with a top and bottom rail and capped posts. We have a
whippet that can jump a 4'-5' fence so we choose the 6' option to ensure that he can't get out. We
choose chain -link to maintain the spaciousness feeling of the green space.