Loading...
REVIEWED BLD2023-0592+structural calcs 5.16.2023_7.11.46_AM+3546365RECEIVED May 16 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-0592 Structural Calculations for: REVIEWED BY CITY OF EDMONDS 22831 102nd Place West Edmunds, WA 4/06/2023 A VE� G4p'oF WASNI� O� Q 30154 /STER��y� ONAL EXPIRES JULY 18, 2024 Designed By: Craig A Vernon, PE 227 163rd Street South Spanaway, WA 98387 craigavernon@outlook.com Date: 4/06/2023 Project: Pier pile supports Applicable Codes and Specifications: 2018 International Building Code [IBC] 2018 International Residential Code [IRC] ASCE 7-10 [ASCE] 2005 NDS/ASD Wood Design Manuals [NDS] ANSI/AF&PA SDPWS-2008 Special Design Provisions for wind and seismic [AF&PA] Simpson Strong -Tie Wood Construction Connectors C-2011 [Simpson] APA Technical Topic TT-100 [APA] Risk Category: II 1.5-1 &IBC Vertical Loads: Dead Loads Live Loads Roof 15 psf 25 psf [ASCE Tbl 4-1] Floor 10 psf 40 psf [ASCE Tbl 4-1] Snow Loads Ground Snow Load, p9 25 psf [ASCE Fig 7-1] Lateral Loads: Seismic Category D [ASCETbl11.6-1] Wind Speed, V 115 mph [ASCE fig 26.5-1A,B,C] Exposure Category D [ASCE 6.5.6.3] Site Condition: Soil bearing 1500 psf Frost Depth 12 inches Lateral Loading WIND LOADS Wind loads forthe MWFRS (Main Wind -Force Resisting System) shall be determined in accordance with Chapter 26-30 of ASCE 7. Risk Category II Basic Wind Speed 135 MPH Wind Directionality Factor, Kd 0.85 Exposure Category D Topographic Factor, K,t 1.0 Enclosure Classification Enclosed design wind load shall be: walls 24 psf roof 12 psf Basic Load Combination = 0.6D+ 1.OW 1) Push piers capacity of 40 kips greatly exceeds residential footing point capacity. 2) Install piers with a spacing allowing multiple points of support. 3) 12'x12'x5Olb/sf building=7.2kip maximum point load anticipated. 10kips used for reference to stabilize and level building. [IBC 1609.1.11 [ASCE$a UM.6-1] [ASCE 26.71 [ASCE 26.81 [ASCE 26.101 Hydraulic Pier Q Optional piers to stabilize SE corner Drawing not to scale (#19) 2' +Hydraulically install a total of (17) Resistance Piers to lift north and northeast side of home. (10) piers will be installed on north side. (7) piers on east side including (4) on chimney. 0 Optional: Install (2) additional piers at SE corner to stabilize corner. No lift will be done at this corner. See #18 & #19. (#10) (#9) (#8) (#7) 12 (#6) (#5) (#4) (#3) (#2) (#1) 04/06/2023 1� A VE G4p'oF WAS p� Q 30154 �FGISTER�� ssIONAL Lin, Tyson 22831 102"d PI W, Edmonds, WA 98020 EXPIRES JULY 18, 2024 (206)755-2758 Tysonlin@kw.com