Loading...
REVIEWED RESUB 1-BLD2023-0796+Structural_Analysis_or_Calculations+7.17.2023_3.04.17_PM+3669882REVIEWED BY CITY OF EDMONDS Memorandum Swenson Say Faget STRUCTURAL ENGINEERING 206.443.6212 E) ssfengineers.com SEATTLE 2124 Third Avenue, Suite 100 Seattle, WA 98121 TACOMA 934 Broadway, Suite 100 Tacoma, WA 98402 CENTRAL WASHINGTON 414 N Pearl Street, Suite 8 Ellensburg, WA 98926 To: Brian Taylor Date: July 17, 2023 Violet Hour Productions/DBA II Viale Address: 610 5" Avenue, Suite B & C From: Dan Say PE SE Edmonds, WA 98020 dsay@ssfengineers.com Project. II Viale Tenant Improvements RE: Walk -In Cooler and Associated Live Loads As you requested, we evaluated the existing floor for a walk-in cooler and the associated allowable live load for the cooler contents. The existing building is located at 610 51" Avenue South, Suite B. We have been provided existing building drawings with as-bult information about the building structure at the walk-in cooler location. Our assessment is based upon the following: • The existing floor structure consists of 8" diameter log purlins at 24" on center with 2x6 T&G decking over. Log purlins are assumed to be Western Hemlock. • Log beams are 12" diameter logs supported by 10" diameter posts. Log beams and posts are assumed to be Western Hemlock. • The new walk-in cooler has plan dimensions of 7'-10" x 9'-9" and weighs approximately 20 psf equally distributed on the existing floor. • The positioning of the walk-in cooler is assumed to be as shown in the attached architectural drawing A2.1a. Based upon our assessment of the floor it is our professional opinion that the floor structure can support the proposed deadloads (including new walk-in cooler deadload) along with a live load of 50 psf. The location of the proposed walk-in cooler is shown on sheet A2.1a (enclosed). We are assuming that the contents for the walk-in cooler will be equally distributed over the cooler floor. Further it is our recommendation that the live load restriction of 50 psf should be conspicuously displayed at the walk-in cooler and at associated spaces adjacent to the walk-in cooler. It is important that the proposed loading limitations are strictly adhered to. A2.1a provides information related to the physical posting of this live load limitation. RESUB Jul 17 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 9111144,I:1 Brian Taylor Page 2 July 17, 2023 Please contact us if you need further information, or if you would like to discuss this memo in further detail. I 23ano p REss. � SEATTLE 2124 Third Avenue, Suite 100, Seattle, WA 98121 STRUCTURAL TACOMA 934 Broadway, Suite 100, Tacoma, WA 98402 206.443.6212 ENGINEERING CENTRAL WA 414 N Pearl Street, Suite 8, Ellensburg, WA 98926 Q+ ssfengineers.com