APPROVED ENG Transportation Impact AnalysisAPPENDIX A
Ok F r�r Page 1 of 2
o
Transportation Impact Analysis
Worksheet
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
Name of Proposed Project: FRANCES CENTER
Owner/Applicant
THOM SULLIVAN - CITY OF EDMONDS
Name
121 5TH AVE N
Applicant Contact Person:
Name
Street/Mailing Address Street/Mailing Address
EDMONDS, WA 98020
City State zip City
Telephone: 425-760-3334 Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name Contact Name
Telephone: E-mail:
1. PROJECT DESCRIPTION
a. Location - Street address: NO CHANGE PROPOSED
b. Specify existing land use: CLASSROOMS
State zip
(Attach a vicinity map and site plan.)
c. Specify proposed type and size of development: OFFICE SPACE FOR CITY STAFF
(# of residential units andlor square footage of building)
d. Date construction will begin and be completed: ASAP
e. Define proposed access locations: NO CHANGE PROPOSED
HANDOUT UPDATED 09.02.2021
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: NO CHANGE PROPOSED
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
ITE Land Use Category
New Use
I Prior Use I
Units in
Per Unit square feet,
Fee Rate # of dwelling,
vfb. etc.
$ X
$ X
New Use Fee: $ - Prior Use Fee: $
$ '
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X —
X NO CHANGE
❑ INDEPENDENT FEE CALCULATION
Fee
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
o�xs� 8/1/2022
City of Edmo.. , ..s...,,....s -.Sion Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 09.02.2021