Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED Parcel No: 00517700002300 Subdivision: 005177 Fire Sprinklers: Valuation: $157,568.32 Code Edition: 2018 Site Address: 18703 79TH PL W EDMONDS,WA 98026-5815 Lot: 0 Lot Area: Occupancy Type: r3 No. Stories: 2 Scope of Work: TAYLOR-ADU AND SHOP/OFFICE, PLB NOT INCL Zoning: Construction Type: vb # of Dwelling Units: 1 Applied: 10/12/2021 Issued:8/14/2023 Final: Expiration Date:8/8/2024 Issued by: BAC I WA State Contractor L & I #: CANYOPE8000J I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT VINCENT SESSA 418 201ST PLACE SW, (425)681-9611 VINCE@SESSACORP.COM LYNNWOOD WA 98036 CONTACT SESSA ENGINEERING 418 201ST PLACE SW, (425)681-9611 vince@sessacorp.com SERVICES LLC LYNNWOOD WA 98036 1523 132nd ST SE Suite C-330, CONTRACTOR Canyon Park Enterprises, LLC EVERETT WA 98208 OWNER DANIEL E & CATHERINE 18703 79TH PL W, EDMONDS (425)681-9611 TAYLOR WA 98026 ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 17DESCRIPTION BASEFEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 8/12/23 R30678 PERMITS AIR HANDLERS - 10,000 CFM OR 001.000.345.83.000.00 $30.00 $30.00 8/12/23 R30678 LESS APPLIANCE VENTS 001.000.345.83.000.00 $30.00 $30.00 8/12/23 R30678 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/12/23 R30678 PER PERMIT ENGINEERING INSPECTION FEE 001.000.345.83.400.00 $220.00 $220.00 8/12/23 R30678 FAN CONNECTED TO SINGLE DUCT 001.000.345.83.000.00 $45.00 $45.00 8/12/23 R30678 FURNACE OR FIREPLACE 001.000.345.83.000.00 $30.00 $30.00 8/12/23 R30678 GAS PIPING - NEW OR LOCATED 001.000.345.83.000.00 $30.00 $30.00 8/12/23 R30678 PERMIT FEE - RESIDENTIAL 001.000.345.83.000.00 $1,448.00 $1,448.00 8/12/23 R30678 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,230.80 $1,230.80 10/13/21 R15299 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 8/12/23 R30678 TOTALS: $3,160.30 $3,160.30 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, August 14, 2023 8:37:44 AM 1 of 4 'RESIDENTIAL BLDG PermitCity - • • • • EL 98020 1 1 • www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Printed: Monday, August 14, 2023 8:37:44 AM 2 of 4 : Permit LM City •Edmonds- 98020 1 1 • www.edmondswa.gov • Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". • • • . .- • • . •.- • INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS B-2 FIND DAMPPROOFING B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 BUILDING PRECON INSPECTOR: Applicant to provide specifications of the listed and tested assembly to building inspector prior to cover inspection. reconfirm this with the applicant. Note on cover sheet and on sheet A-1. A-1 TESC AND MOBILIZE E-3 STRM TIGHTLINE Printed: Monday, August 14, 2023 8:37:44 AM 3 of 4 Printed: Monday, August 14, 2023 8:37:44 AM 4 of 4