BLD2019-0025L
COMMERCIAL BLDGPermit
Z�
City of Edmonds
PERM NUMBt
121 5th Ave N, Edmonds Wk,98020
BLD2019-00,2
www.edmondsw agov 425 *77,
, 10220..
Type: COMMERCIAL BLDG
Owner/ Business: PARADISE HEIGHTS HLD LLC; BLD A
Status: ISSUED
Subtype: NEW APT OR CONDO
BLDG
Parcel No: 27032500302600 Site Address: 546 PARADISE LN EDMONDS,WA 98020-4650
Applied: 1/8/2019
Subdivision:
Lot:
issued:4/22/2021
Fire Sprinklers: Yes Lot Area: 45 Zoning: RM-2.4
Final:
Valuation: $1,062,109.48 Occupancy Type: R-2/U Construction
Type: V13
Expiration Date: 4/17/2022
Code Edition: 2015 No. Stories: 3 #of Dwelling
Units: 4
Issued by: JOK
Scope of Work: PARADISE LANE - BLDG A - 4 UNIT CONDO
WA State Contractor L & I #: REGENC18911(5 City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT REGENT CONSTRUCTION 7305 SOUNDVIEW DR,
(206)930-2445
rwmichell@me.com
EDMONDS WA 98026
CONTRACTOR REGENT CONSTRUCTION, 7305 SOUNDVIEW DRIVE,
(206)930-2445
RWMICHEL1@ME.COM
INC.
EDMONDS WA 98020
1
1
OWNER PARADISE HEIGHTS HLD LLC; 24144 E. GREYSTONE LANE,
(425)750-5965
AIL.COM
BLD A
WOODWAY WA 98020
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
2020 TRANSPORTATION IMPACT
112.502.345.96.0007.00
$13,272.52
$0.00
FEE
3/12/2021: CREDIT SFR DEMO
112.502.345.86.000.00
$940.72
$0.00
B-BUILDING PLAN REVIEW FEE
D01.000.345.83.000.00
$6,210.00
$6,210.00
1/8/19
REC075241
B-STATE BUILDING CODE
001.000.237.150
$2S.00
SURCHARGE
BUILDING - ADDITIONAL REVIEW
001.000.345.83.000.00
$350.00
$350.00
9/3/20
R7437
HOURS
BUILDING - ADDITIONAL REVIEW
001.000.345.83.000.00
$400.00
$400.00
9/3/20
R7437
HOURS
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$0.00
PARK IMPACT FEE - COM ADMIN
001.000.322.10.000.00
$100.00
$0.00
PARK IMPACT FEE - MULTI FAMILY
332.100.345.85.000.00
$6,626.59
$0.00
PERMIT FEE - COMMERCIAL
D01.000.322.10.000.00
$7,482.40
$0.00
PLAN REVIEW FEE - COMMERCIAL
D01.000.345.83.000.00
$150.04
$0.00
PLANNING FEE NOT CATEGORIZED
001.000.345.81.000.00
$400.00
$400.00
9/3/20
R7437
STORMWATER GENERAL FACILITY
422.000.379.00.000.00
$1,851.02
$0.00
CHARGE MF COMM
TRANSPORTATION IMPACT ADMIN
001.000.341.82.000.00
$100.00
$0.00
FEE - MF COMM
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00
TOTALS: $38,063.29
$7,360.00
Printed: Thursday, April 22, 202111:18:12 AM 1 of 4
COMMERCIAL BLDG Permit . . . .
City of Edmonds PERMIT NUMB
121 Sth Ave N, Edmonds WA 98020 BLD2019-002S
www.edmondswa.gov / 425-771.0220
CONDITIONS
CON&Ti&� -TYPE
STATUS NOTES
49 HRS NOTICE-ENGR FINAL
FOR
48 Working hours notice is required when requesting your FINAL engineering inspection.
INFORMATION
Damage to Frontage
Applicant shall repair/replace all damage to utilities or frontage improvements in City
Improvments
right-of-way per City standards that is caused by or occurs during the permitted project.
Electrical Permit
Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
ESC REQ
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
INFORMATION
requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
Hold Harmless
officials, employees, and agents from any and all claims for damages of whatever nature,
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSP PRIOR TO BACKFILL
FOR
call for all required inspections. All work shall be inspected prior to backfill.
INFORMATION
Lot Lines Staked
Lot line stakes must be in place at the time of foundation/setback inspection.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
Occupancy
Official prior to use or occupancy of the building or structure. Check the job card for all
required City inspections including final project approval and final occupancy inspections.
OVWSD WATER LINE/METER
FOR
This property falls within the Olympic View Water and Sewer District. Contact Olympic
INFORMATION
View for specific water line and/or water meter information.
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
and for which a variance has not been specifically identified, requested and considered
by the appropriate city official in accordance with the appropriate provision of city code
or state law does not approve any items not to code specification.
PROJECT CIVIL ASBUILT
FOR
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance.
INFORMATION
Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov.
The building enclosure must be inspected by a qualified inspector in accordance with
RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter from
the inspector must be submitted to the Building Division prior to final inspection by the
RCW 64.55 BUILDING
FOR
City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction
ENCLOSURE
INFORMATION
occurs, coordinate inspection with the City Building Inspector to ensure that all required
inspections are performed. Inspection by the building enclosure inspector to meet RCW
64.55 does not substitute for required City building inspections which must be performed
by the City Building Inspector.
REQUIRED SPECIAL
FOR
SPECIAL INSPECTIONS are required for SOILS
INSPECTIONS
INFORMATION
Separate Permit Required
Separate Permit Required For: Plumbing, Mechanical, Electrical, Elevator, Fire Sprinkler,
I Fire Alarm, Fill/Grade
Printed: Thursday, April 22, 202111:18:12 AM 2 of 4
COMMERCIAL
BLDG Permit
City of Edmonds PERMIT NQMBE*�';
------
121 Sth
Ave N, Edmonds WA .98020 -0025
BLD2019
www.edmondswa.gov
/ 425.771.0220
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:00am to 6:00pm on weekdays and 10:00am and 6:DOpm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project ar)d are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
FOR
STORM COVENANT
A stormwater covenant shall be approved for recording prior to project final approval.
INFORMATION
All new, extended, re -built or relocated electrical utility and/or service shall be placed
Underground Wiring
underground.
FOR
All utilities shall be located prior to any excavation. New l�ocates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
OEM —I
MIL IIWN!
--Merurinline at: https://Inspection.MV6uildingP'er-nit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT
NOTES
DATE
B-4 DRYWALL FASTENING
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-5 INSULATION ENERGY
B-2 SLAB INSULATION
B-1 SETBACKS
B-4 INTERIOR SHEAR
X-3 BUILDING FINAL"
A-1 ENGINEERING PRECON
F-0 FIRE ADDRESS VISIBLE
F-1 FIRE DEPT INSPECTION
F-0 FIRE EXTINGUISH EXITS
X-1 FIRE FINAL
X-1 PLANNING FINAL
E-3 RET WALL DRAIN
OUTFALL
A-1 BUILDING PRECON
B-5 BLDG SPECIAL
INSPECTION
B-3 EXT GYP SHEATHING
B-3 PRE ROCK SHAFTS ETC
B FIRESTOPPING
B-4 TRASH ENCLOSURE
Printed: Thursday, April 22, 202111:18:12 AM 3 of 4
COMMERCIAL BLDG Permit
City of Edmonds PERMIT NUM64�
121 5th Ave N, Edmonds WA 98020 BLD2019-00:8
www.edmondswa.gov 425.771.0220
B-5 WSEC COMPLIANCE
REPORTS
B-7 BUIL DI NG OTHER INSP
B-3 EXT WALL SHEATHING
B-3 ROOF SHEATHING
E-3 STRM TIGHTLINE
B-3 EXTERIOR INSULATION
Printed: Thursday, April 22, 202111:18:12 AM 4 of 4
OV EDAf 15LL�4 BUILDING PERMIT
%Ail APPLICATION
Development Services
Building Division
117 121 Sth Ave N / Edmonds, WA 98020
425.771,0220
For handouts, submittal requirements, permit status and inspection
scheduling information go to: http://www.edmondswa.gov/
JOB SITE INFORMATION/LOCATION: (Wherethe work istaking place)
Job Site Address: 546 Paradise Lane
Parcel: 27032500302600
Lot /Unit/Suite #: Subdivision:
PROPERTY OWNER:
Name: Paradise Heights HLD LLC
Mailing Address: 24144 E. Greystone Lane
City/State/Zip: Woodmmy, WA 98020
Phone #: 425-750-5965
Email: jsreft@gmail.com
OWNER INSTALLATION: *If yes, read and sign*
Will work be performed by the property owner? 0 Yes 0 No
I own, reside in, or will reside in the completed structure.
This installation is being made on property that I own which is
not intended for sale, lease, rent, or exchange according to
RCW 18.27.090.
Owner Signature:
APPLICANT/ CONTACT INFORMATION:
Name of Applicant: Rob Michel
Mailing Address: 7305 Soundview Drive
City/State/Zip: Edmonds, WA 98026
Phone #: 206-930-2445
E-mail: rwmichel@nwlink.com
GENERAL CONTRACTOR: (If different from applicant)
General Contractor- Regent Construction, Inc.
Mailing Address: 7305 Soundview Dr
City/State/Zip: Edmonds, WA 98026
Phone #: 206-930-2445
E-mail: rwmichel@nvAink.com
WA STATE CONTRACTOR L & I # (CCB) & EXPIRATION DATE:
REGENC1891K5
CITY OF EDMONDS BUSINESS LICENSEM BL-010892
Permit #: 15 L'D—L
TYPE OF PERMIT (Provide
0 Accessory Structure/
Detached Garage
Details on Page 2)
0 Addition
11 Demolition
1:1 Mechanical
11 New Single Family / Duplex
El Plumbing
L1 Fire Sprinkler
11 Remodel
0 New Commercial/ Mixed Use
11 Re -Roof
El Signs
El Tank
El Tenant Improvement
11 Other
Remodel Permit fees are based on:
The value of the work performed. Indicate the value (rounded to
the nearest dollar) of all equipment, materiials, labor, overhead,
and the profit for the work indicated on this application.
Valuation:
PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION
Basement sq ft: 465 Finished X Unfinished 0
Ist Floor, sq ft:
3,852
2nd Floor, sq ft:
3,735
Garage/Carpow, sq ft:
3,060
Deck/Covered Porch/Patio:
438
her sq ft-,
PROJECT DESCRIPTION
4 unit Condominium
I certify that the information I have provided on this form/application is true,
correct and complete, and that I am the property owner or duty authorized
agent of the property owner to submit a permit application to the City of
Edmonds.
Robin W. Michel
Print Name:
Signature: IL�41 0-9-1001 -Date 111619
GENERAL COMMERCIAL DATA
Occupancy Group(s): R 1, U Occupant Load(s):
Type(s) of Construction: VA
Fire Sprinklers: Yes 91 No
WA STATE ENERGY CODE: If your project affectsthe building envelope,
mechanical systems, and/or lighting, you must complete the
appropriate WSEC forM5.
DEFERRED SUBMITTALS: All commercial building permits that will require
associated plumbing, mechanical, fire sprinkler, and/orfire alarn)
permits are applied for separately.
TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet
MECHANICAL EQUIPMENT COUNTS (New and Relocated)
BTUs Gas Elec Other QtY
A/C Unit /Compressor
Air Handler /VAV
Boiler
Dryer Duct
4
Exhaust Fans
Elec
16
Fireplace
30k
4
Furnace
Heat Pump Unit
Hydronic Heating
199k
4
Roof Top Unit (Provide eleva-
tions if a Commercial Bldg)
Other:
PLUMBING FIXTURE COUNTS (New, Relocated or re -piped)
Deffered Qty Ctty
Clothes Washer
4
Tub/ Showers
8
Dishwasher
4
Backflow Dev�ce (RPBA, DCDA, AVB)
Drinking Fountain
Pressure Reduction/ Regulator Valve
Floor Drain/Sink
Refrigerator Water Supply
4
Hose Bibs
2
Water Heater - Tankles4D N
4
Hydronic Heat
4
Water Service Line
I
Sinks
20
Other:
Toilets
8
Other:
GAS/FUEL CONNECTION COUNTS (New, Relocated or re -piped)
BTUs Qty BTUs Qty
A/C Unit
Outdoor BBQ/ Fire pit
Boiler
Stove/Range/Oven
35k
4
Dryer
25K
4
Water Heater
1199k
4
Fireplace/ Insert
30K
4
other:
Furnace Other:
MEDICAL GAS, AIR VACUUM COUNTS
(New, Relocated or re -piped)
QtY QtY
Carbon Dioxide
Nitrous Oxide
Helium
Oxygen
Medical Air
Other:
Medical - Surgical Vacuum Other:
DEMOLITION
Type of structure to be demolished:
Square footage of structure to be demolished:
AHERA Survey done? Y/N
PSCAA Case It:
Critical Areas Determination:
WStudy Required 1:1 Conditional Waiver El Waiver 11
ii&ii6iiiiii
Fill in Place El Fill Material:
Removal El
I Size of Tank (Gallons)
Critical Areas Determination:
Study Required 0 Conditional Waiver El Waiver El
G RADE/FILL/EXCAVATE
Grading: Cut 5,589 cubic yards
Fill 77 cubic yards
Cut / Fill in Critical Area: Yes 0 No El
GENERAL PROVISIONS
APPLICATIONS: Applications are valid for a maximum of 1 year.
ESLHA Applications, 2 years.
LICENSING: All contractors and subcontractors are required to be licensed
with Washington State Department of Labor & Industries and have a
current City of Edmonds Business License.
RIGHT OF WAY PERMIT
PERMIT NUMBEW''
City of Edmonds
121 5th Ave IN, Edmonds WA 98020 ENG2020-0395��
www.cityofedmonds.gov / 425.771.0220
Description: PARADISE -IMPROVEMENTS PER CIVILS WITH BLD2019-0026 ISSUED: 04/22/2021
Address: 546 PARADISE LN EDMONDS WA 98020-4650
EXPIRES: 04/23/2022
PermitType: RIGHTOFWAY Permit Subtype: MULTIFAMILY Parcel Number: 27032500302600
CONTACTS
NAME TYPE --NAIME ADDRESS P"ONE
APPLICANT REGENT CONSTRUCTION 7305 SOU N DVI EW D R, E D M 0 N DS WA 98026 (206)930-2445
CONTRACTOR REGENT CONSTRUCTION 730S SOU N DVI EW D R, E D M 0 N DS WA 98026 (206)930-2445
OWNER PARADISE HEIGHTS HLD LLC 190 W DAYTON ST STE 103, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $0.00
RIGHT OF WAY STANDARD PERMIT FEE $330.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No E-Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states helshe holds the City of Edmonds harmlessfrom ir�uries. damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmo, ids or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
DATE
Printed: Thursday, April 22, 202111:46:57 AM I of 3
AM%
RIGHT OF WAY PERMIT
City of Edmonds PERMIT NUMBER
121 5th Ave N, Edmonds WA 98020 ENG2020-0395
www.cityofedmonds.gov / 425.771.0220
CONDITIONS
�-7 7
"7
i�o
48 HRS NOTICE-ENGR FINAL
48 Working hours notice is required when requesting your FINAL engineering inspection.
it is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
ENG - SEPARATE PERMIT
WSDOT APPROVAL REQUIRED FOR SEWER RELATED WORK WITHIN EDMONDS WAY. SEWER WORK
AND/OR TRAFFIC CONTROL WITHIN IN EDMONDS WAY SHALL NOT COMMENCE UNTIL WSDOT
REQUIRED
APPROVAL HAS BEEN GIVEN AND A COPY OF SUCH PROVIDED TO THE CITY.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
ROW COMPACTION TEST
Right of way compaction tests are required per City standards.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND OR NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
UNDERGROUND WIRING
All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed underground.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPEMON TYPE DATE ULT NOTES
CQMPLIETE
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
E-7 CONCRETE SIDEWALK
E-7 CURB GUTTER
E-7 DRY UTILITY LOCATION
E-7 DWY APPROACH
E-7 FH REFLECTOR
E-7 MAILBOX LOCATION
E-7 PAVEMENT COMPAC71ON TEST
REPORT
E-7 PUBLIC ROAD
E-7 PVMT SUBGRADE
Printed: Thursday, April 22, 202111:46:57 AM 2 of 3
Printed: Thursday, April 22, 202111:46:57 AM 3 of 3
After recording return to:
City Clerk
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Document Tide(s)
Declaration of Covenant - Private Stormwater Facility
Reference Number(s) of Related Documents
N/A
Grantor(s) (Lt, First and Mddle Initial)
Paradise Heights HLD, LLC
Grantee(s) (Last, First and Mddle Initial)
City of Edmonds
Legal Description (abbreviated forin; i.e., lot, plat or section,. township, range, quarter/quarter)
SEC 25 TWP 27 RGE 03 1RT-79) BEG SE COR SW1/4 NWI14 SWIM TH W 1517T TH N TO S LN CO RD TH NWLY ALG CO RD 168.19FF T?B TH S
PLT E LN SWIM NWI/4 SW1/4 TO PT 150Fr N OF S LN SD SUB TH N88*32 OOW 260.0517T MILTO N LN ST RD 1 W TH N01*00 OOE TO S LN CO
RD TH SELY ALG SD LN TPB LESS SMY
Assessor's Property Tax Parcel/Account Number at the Time of Recording:
27032500302600
The AuditerfRecorder will rely on die Information provided on this forn3L The stalf will not read the document to verify the accuracy or
completeness of the hidexing hiformation provided herein.
DECLARATION OF COVENANT
Private Stormwater Facility
WHEREAS, the undersigned Declarant(s) have installed a stormwater facility under
Edmonds Community Development Code Chapter 18.30 known as a "low impact development
best management practices (LID BMP)" in lieu of other required more conventional stormwater
systems, as selected below:
J Permeable Pavement
Ll Rain Garden / Bioretention Cell
M Infiltration Trench
Ll Drywell
Ll Gravelless Chamber
U Other
WHEREAS, the City of Edmonds has allowed installation of the LID BMP, subject to the
execution and recording of this Declaration of Covenant; NOW, THEREFORE,
THE UNDERSIGNED DECLARANT(S), being the owners of the real property ("the
Property") located at the following address: 546 Paradise Ln
in the City of
Edmonds, Washington, and legally described on Exhibit A attached hereto and incorporated
herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of
himselflherself/themselves/itself and his/her/their/its successors and assigns, as follows:
Declarant(s) warrant that he/she/they are the owners of the property described on Exhibit
A and have the authority to impose this covenant on the property and bind all future
owners, successors, and assigns of the Declarant(s). The Declarant(s), future owners,
successors, and assigns of the Declarant(s) shall be referred to collectively as "Owners."
2. The Owners of the property described on Exhibit A agree that the property contains a
stormwater management facility called a "LID BMP," which was installed to mitigate the
stormwater quantity and quality impacts of some or all of the impervious or non-native
pervious surfaces on the property. "Low impact development" means development
conducted in a way that seeks to minimize or completely prevent alterations to the natural
hydrology of the site. Low impact development includes site planning and design to
reduce alterations of natural soil and vegetation cover, minimize impervious surfaces, and
specific practices that help to replicate natural hydrology such as permeable pavements,
green roofs, soil amendments, bioretention systems, and dispersion of runoff.
3. The Owners of the property described on Exhibit A shall maintain the size, placement,
and design of the LID BMP as depicted on the approved site plan, Exhibit B, and design
details shall be maintained and may not be changed without written approval either from
the Engineering Division of the City of Edmonds or through a future development permit
from the City of Edmonds. Chemical fertilizers and pesticides shall not be used where
LID BMP is located. . All costs of maintenance and repair shall be the sole responsibility
of the Owners.
4. The Owners of the property described on Exhibit A shall inspect LID BMPs annually for
physical defects. After major storm events, the system shall also be checked to ensure
that the overflow system is working properly. The Owners also shall maintain all LID
BMP so it functions as designed on a year-round basis.
5. The City of Edmonds is hereby granted by the Owners the right, but not the obligation, to
enter upon the property described on Exhibit A at all reasonable times for the purpose of
inspecting the private stormwater LID BMP facility. U, as the result of any such
inspection the City of Edmonds determines that the LID BMP is in disrepair, requires
maintenance or repair, or is otherwise not functioning as provided in the BMP site plan,
the City Engineer or his designee shall have the right, but not the obligation, to order the
Owners of the property described on Exhibit A to maintain or repair the same.
6. If the City of Edmonds determines that the LID BMP requires maintenance or repair
pursuant to Section 5, the City of Edmonds shall provide notice to the Owners of the
deadline within which such maintenance or repair must be completed. Said notice may
further advise that, should the violator fail to perform required maintenance or make
repairs within the established deadline, the work may be done by the city or a contractor
designated by the City Engineer and the expense thereof shall be charged to the Owners.
The City's officers, agents, employees, and contractors shall have the right, which is
hereby granted by the Owners, to enter upon the property described on Exhibit A in order
to perform such work. The Owners shall bear the cost of all work performed.
7. The Owners shall indemnify, defend and hold harmless the City of Edmonds, its officers,
officials, employees and agents from any and all claims, demands, suits, penalties, losses,
damages, judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of
or in any way resulting from the approval of the LID BMP, the installation and presence
of the LID BMP, and the acts or omissions of the Owners, their officers, employees,
contractors, and agents relating to the construction, operation and maintenance of the LID
BMPs on the property, except for the City's intentional and willful tortious acts, and
waive and release the City of Edmonds from any and all claims for damages and
injunctive relief which the Owners may themselves have now or in the future, by reason
of the construction, maintenance and operation of said LED BMPs.
8. This covenant shall run with the land and be binding upon the Declarant(s), as the owner
of the property described on Exhibit A, and on Declarant's successors and assigns as to
such property.
Dated:
DECLARANT(S):
(Signature)
(Print Name)
(Signature)
(Print Name)
State of Washington
Ss.
County of Snohomish
APPROVED:
CITY OF EDMONDS
(Signature)
(Print Name)
(Title)
On this day personally appeared before me
I Declarant(s)} to me known to be the individual, or individuals described in and who executed
the within and foregoing instrument, and acknowledged that he/she/they signed the same as
his/her/their free and voluntary act and deed, for the uses and purposes therein mentioned.
SUBSCRIBED AND SWORN before me this ----day of 9 201_.
(Signature)
(Name legibly printed or stamped)
Notary Public in and for the State of Washington.
Residing at:
My commission expires
0
RIMIT B.- SME PLAN
SD
BURDNG A
BLUING 8
WRVRATM n"CH
70'xJ'xl.5' BUMNO C
M7RA7XN 7RENCIf
84*x4.4'x?.8' PROPOSED DMW
CONIECH CB
S TORM 7D?
W-6
0 50
mmz::=
Scale 1 500
RXMIT A: LEGAL DESCRLP77ON
AW. 27032500.302600
ALL THAT POINION OF ZW SOUTH HALF OF THE SOU7HKST QUARTER OF W
NORTHNFST QUARTER OF THE SOUZHKST OUARTER OF SEC7M 24 TOKaW 27
NORTH, RAW 3 EAST WAL, IN SNOIFOM COUNTY WAS�WTOIV, L)ING NORTH OF
STATE ROAD NO. I-W AND SOUTH OF COUNTY ROAD;
EXCEPT 7W EAST 15 FEET MMOF; AS MEARM ON 7W SOUTH LIN&-
EXCEPT THE NUT 262.90 FEET OF SO SOUIHNEST QUARTER OF THE NORTHAEST
QUARTER OF THE SOU7HKST QUARIM ME4SVM ON THE' NORTH LIN&-
AW EXCEPT 71E FOLLONING DESCREM TRACT-
WGWNG AT A POWT ON THE SOUTH LK OF SAID SOUTHNEST QUARTER OF THE
NORMAUT QUARTER OF THE SOVINNEST QUARTER 15 FEET KST OF THE
SOUTHEAST CaWU 7hEREOF,
THENCE NORTH I' EAST 9a54 FEET 70 THE SOUTHERLY Lff OF COUNTY RW,
Mff NORIHMSIERL Y ALONG THE SOU MR Y LJNEE OF COUNTY ROAD 168.19 FEE7,
IMME SOUTH I' KST 71.94 FEET MORE OR LES.% 70 THE NORMAST CORVER OF
TRACT CONWM 70
OTTO E MARTEN AND NW& BY DEED UNDER RFCMW NO. 1029868,-
MM NORM W32' NEST 260.05 FEET, MORE 01? LESS, 70 W NWRM Y WE
OF STA TE ROAD I- W,
7FIENCE SOUTHEASZERt Y ALONG THE NORMX Y LWE OF W STA TE ROAD 236.05
FEET, MORE 01? LES.% TO POINT A ON THE SOUTH LINE OF SAO SURMSOM, 180
FEE'T NEST Or THE SOMEAST CORNM TFIMEO�-
TM99F SOUTH 8832' EAST 165 FEET 70 THE TRUE PONT OF BEGINMNQ
ALSO EXCEPT POR17ON CONWYED 70 THE STATE OF WA-WNGTON UNDER RECOMNG
Na 2i5966a
STUAZE IN THE COUNTY OF SNOH0MlW STATE OF WASFANG70M.
SEWER NEW MULTI FAMILY PERMIT
City of Edmonds PERMIT NUMBE
121 Sth Ave IN, Edmonds WA 98020 ENG2021-0056
www.cityofedmonds.gov / 425.771.0220
Description: PARADISE HEIGHTS-BLDG A SIDE SEWER ISSUED: 04/22/2021
Address: 546 PARADISE LN EDMONDS WA 98020-4650
EXPIRES: 04/23/2022
PermitType: SEWER NEW MULTI FAMILY Permit Subtype: Parcel Number: 27032500302600
CONTACTS
----------
NAME'T'YPE NAME ESS
CONTRACTOR REGENT CONSTRUCTION, INC. 7305 SOUNDVIEW DRIVE, EDMONDS WA 98020 (206)930-2445
OWNER PARADISE HEIGHTS HLD LLC 190 W DAYTON ST STE 103, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUW PAID
3/3/2021: Credit existing SFR
$4,417.00 $0.00
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $0.00
SEWER GENERAL FACILITY CHARGE - NEW MF
$ 11,837.56 $0.00
SIDE SEWER PERMIT - NEW MULTI -FAMILY $220.00 $0.00
REQUIREMENTS
REQUIREMENT-TVIPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a peried of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states helshe holds the City of Fdmonds harmlessfrom injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HISMER DEPUTY HAS SIGNED BELOW
DATE
Printed: Thursday, April 22, 202111:43:07 AM 1 of 2
SEWER NEW MULTI FAMILY PERMIT
City of Edmonds PERMIT NUMBER..
121 Sth Ave N, Edmonds WA 99020 ENG2021-006�
www.cityofedmonds.gov / 425.771.0220
CONDITIONS
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
HOLD HARMLESS
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
INSP PRIOR TO BACKFILL
Call for all required inspections, All work shall be inspected prior to backfill.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND OR NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
WATER AND SEWER
Maintain 10' of separation between the sanitary side sewer and the water service line.
SEPARATION
I
INSPECTIONS
-7
DATE, lRiSlIJIFT NOTES
ICOMIPLETE
X-2 ENGINEERING FINAL"
E-2 SIDE SEWER
Printed: Thursday, April 22, 202111:43:07 AM 2 of 2
SEWER NEW MULTI FAMILY PERMIT
City of Edmonds PERMIT NIJMQW-;.-.
121 5th Ave N, Edmonds WA 98020 ENG2021 56
-00
www.cityofedmonds.gov / 425.771.0220
Description: PARADISE HEIGHTS-BLDG A SIDE SEWER ISSUED: 04/22/2021
Address: 546 PARADISE LN EDMONDS WA 98020-41350
EXPIRES: 10/19/2021
PermitType: SEWER NEW MULTIFAMILY Permit Subtype: Parcel Number: 27032500302600
CONTACTS
NAME T"E NAME 0 ESS 46- k
CONTRACTOR REGENT CONSTRUCTION, INC. 7305 SOUNDVIEW DRIVE, EDMONDS WA 98020 (206)930-2445
OWNER PARADISE HEIGHTS HLD LLC 190 W DAYTON ST STE 103, EDMONDS WA 98020
FEE INFORMATION
AMOUNT PAID
3/3/2021: Credit existing SFR
$4,417.00 $0.00
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $0.00
SEWER GENERAL FACILITY CHARGE - NEW MF
$11,837.56 $0.00
SIDE SEWER PERMIT - NEW MULTI -FAMILY $220.00 $0.00
V-
REQUIREMENTS
7,
REQUIREMENITTYPIE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-30S and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
aspha It or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states helshe holds the City of Edmonds harmless from irvuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAIDANDTHE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
[Illy-II1111:11
Printed: Thursday, April 22, 202111:42:11 AM 1 of 2
SEWER
NEW MULTI FAMILY PERMIT
City of Edmonds PERMIT NUMBER
121 Sth Ave N, Edmonds WA 98020 ENG2021 -0056
www.cityofedmonds.gov / 425.771.0220
CONDITIONS
7 70 io
77 '77 77 =717-
DAMAGE TO FRONTAGE
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
IMPROVEMENTS
City right of Ways or Easements to City Standards caused by or occurring during the permitted
project.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
HOLD HARMLESS
agents from any and all claims for clamages of whatever nature, arising directly or indirectly from the
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND OR NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other'times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
UTILITY LOCATES
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
excav�tion, original locates are no longer identifiable.
WATER AND SEWER
Maintain 10' of separation between the sanitary side sewer and the water service line.
SEPARATION
INSPECTIONS
INSVIMN. TYPIIE
R it
�OATIE NOTO
COMPLETE
X-2 ENGINEERING FINAL"
E-2 SIDE SEWER
Printed: Thursday, April 22, 202111:42:11 AM 2 of 2
SEWER NEW MULTI FAMILY PERMIT
City of Edmonds PERMIT LIUMPW�
121 5th Ave N, Edmonds WA 98020 ENG2021-0056
www.cityofedmonds.gov / 425.771.0220
Description: PARADISE HEIGHTS-BLOG A SIDE SEWER ISSUED: 04/22/2021
Address: 546 PARADISE LN EDMONDS WA 98020-4650
EXPIRES: 10/19/2021
PermitType: SEWER NEW MULTIFAMILY Permit Subtype: Parcel Number: 27032500302600
CONTACTS
NAME TYPE NAME ADDRESS PHONE
CONTRACTOR REGENT CONSTRUCTION, INC. 7305 SOUNDVIEW DRIVE, EDMONDS WA 98020 (206)930-2445
OWNER PARADISE HEIGHTS HLD LLC 1.90 W DAYTON STSTE 103, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
3/3/2021: Credit existing SFR
$4,417.00 $0.00
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $0.00
SEWER GENERAL FACILITY CHARGE - NEW MF
$11,837.56 $0.00
SIDE SEWER PERMIT - NEW MULTI -FAMILY $220.00 $0.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulatiions as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states helshe holds the City of Edmonds hormlessfrom injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made agoinst the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of
granting this permit.
RELEASED
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID ANDTHE CITY ENGINEER OR H I S/HER DEPUTY HAS SIGNED BELOW
�] -0 V� , A I Z- (
DATE
Printed: Thursday, April 22, 202111:42:11 AM 1 of 2
SEWER
AQA
NEW MULTI FAMILY PERMIT
City of Edmonds PERMIT Numkj�'.
121 5th Ave N, Edmonds WA 98020 ENG2021-OOS6
www.cityofedmonds.gov / 425.771.0220
CONDITIOW
DAMAGE TO FRONTAGE
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
IMPROVEMENTS
City right of Ways or Ea�ements to City Standards caused by or occurring during the permitted
project.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
HOLD HARMLESS
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND OR NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
UTILITY LOCATES
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
excavation, original locates are no longer identifiable.
WATER AND SEWER
Maintain 10' of separation between the sanitary side sewer and the water service line.
SEPARATION
INSPECTIONS
DATE RESULT NOTES
COMPLETE
X-2 ENGINEERING FINAL"
E-2 SIDE SEWER
Printed: Thursday, April 22, 202111:42:11 AM 2 of 2
Type: FILL GRADE Owner/ Business: PARADISE HEIGHTS HLD LLC
Status: ISSUED
Subtype: COMMERCIAL FILL AND GRADE
Parcel No: 27032500302600 Site Address: 546 PARADISE LN EDMONDS,WA 98020-4650
Applied: 1/8/2019
Subdivision:
Lot:
�ssuecl: 4/22/2021
Fire Sprinklers: No Lot Area: 0 Zoning:
Final:
Valuation: $6,436.00 Occupancy Type: Construction
Type:
Expiration Date: 4/22/2022
Code Edition: 2018 No. Stories: 0 #of Dwelling
Units: 0
Issued by: JOK
Scope of Work: PARADISE LANE- CIVIL IMPROVEMENTS FOR 3 (4 UNIT) CONDO BLDGS
WA State Contractor L & I #: City of Edmonds Business License#: 602454996-003 -0001
NAME TYPE NAME ADDRESS
PHONE
EMAIL
APPLICANT REGENT CONSTRUCTION 7305 SOUNDVIEW DR,
(206)930-2445
rwmichell@me.com
EDMONDS WA 98026
CONTRACTOR REGENT CONSTRUCTION 730S SOUNDVIEW DR,
(206)930-2445
rwmichell@me.com
I EDMONDS WA 98026
OWNER PARADISE HEIGHTS HLD LLC 24144 E. GREYSTONE LANE,
(425)750-5965
MAIL.COM
WOODWAY WA 98020
FEE
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$0.00
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$660.00
$0.00
ENGINEERING INSPECTION FEE 3.3
001.000.341.82.000.00
$9,981.25
$0.00
PERCENT
ENGINEERING REVIEW FEE - OVER 3
001.000.341.82.000.00
$400.00
$400.00
9/3/20
R7437
REVIEWS
ENGINEERING REVIEW FEE - OVER 3
001.000.341.82.000.00
$300.00
$300.00
9/3/20
R7437
REVIEWS
ENGINEERING REVIEW FEE - OVER 3
001.000.341.82.000.00
$220.00
$0.00
REVIEWS
FIRE AID SIGN FABRICATION FEE
111.000.68.542.64.31.00
$100.00
$0.00
GRADING PERMIT BASE FEE
001.000.322.10.000.00
$35.00
$0.00
GRADING PERMIT FEE - CUBIC
001.000.322.10.000.00
$605.00
$0.00
YARDS
RECORDING FEE
001.000.345.89.030.00
$21S.SO
$215.50
7/14/20
R6421
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$600.00
$6DO.00
9/3/20
R7437
FEE
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$195.00
$0.00
FEE
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$130.00
$0.00
FEE
STORMWATER ENGINEER REVIEW
DOI.000.341.82.000.00
$520.00
$0.00
FEE
Printed: Thursday, April 22, 202111:29:42 AM 1 of 3
FILL GRADE Permit
City of Edmonds PERMIT NUMB
121 5th Ave N, Edmonds WA 98020 -0020
:BLD2019
www.edmondswa.gov / 425.M.0220
PTI0__N_ AMW14T PAID PAID DATE RECE IPT #
X-TECHNOLOGY FEE
001.000.321.99.100.00 1 $35.00 1 $35.00 7/14/20 R6421
TOTALS: $14,216.75 $1,550.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Damage to Frontage
Applicant shall repair/replace all damage to utilities or frontage improvements in City
Improvments
right-of-way per City standards that is caused by or occurs during the permitted project.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
Hold Harmless
officials, employees, and agents from any and all claims for damages of whatever nature,
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
Nonconforming Disclaimer
structure or site condition which is outside the scope of the permit application, regardless
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
nd for which a variance has not been specifically identified, requested and considered
y the appropriate city official in accordance with the appropriate provision of city code
r state law does not approve any items not to code specification.
The building enclosure must be inspected by a qualified inspector in accordance with
RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter from
the inspector must be submitted to the Building Division prior to final inspection by the
RCW 64.55 BUILDING
FOR
City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction
ENCLOSURE
�NFORMATION
occurs, coordinate inspection with the City Building Inspector to ensure that all required
inspections are performed. Inspection by the building enclosure inspector to meet RCW
64.55 does not substitute for required City building inspections which must be performed
by the City Building Inspector.
REQUIRED SPECIAL
FOR
SPECIAL INSPECTIONS by the Geotech are required for SOILS, including the construction
INSPECTIONS
INFORMATION
and drainage for modular block walls.
ROW COMPACT TEST
FOR
INFORMATION
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Underground Wiring
All new, extended, re -built or relocated electrical utility and/or service shall be placed
underground.
INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com
SEQID f INSPEMON TYPE7 INSPEICTOR COMPLETED RESULT NOTES
I
DATE
Printed: Thursday, April 22, 2023 11:29:42 AM 2 of 3
B-2 RETAINING WALL
FILL GRADE Permit
City of Edmonds PERMIT NUMBEW
121 Sth Ave NjdmorIds W*98020 - BLD2019-60W
www.WmtWswa.gov 425.771.0220
B-5 BLDG SPECIAL
INSPECTION
B-5 BLDG SPECIAL
INSPECTION
X-1 FIRE FINAL
X-1 PLANNING FINAL
B-7 BUILDING OTHER INSP
E-5 DRIVEWAY SLOPE
E-9 FIRE AND AID SIGN
A-1 ENGINEERING PRECON
A-1 BUILDING PRECON
B-1 SETBACKS
X-2 ENGINEERING FINAL
F-0 FIRE ADDRESS VISIBLE
F-2 FIRE DCDA
F-1 FIRE DEPT INSPECTION
F-0 FIRE EXTINGUISH EXITS
E-7 SEWER MAIN
E-7 SEWER MANHOLE
X-3 BUILDING FINAL"
E-3 RET WALL DRAIN
OUTFALL
E-3 STRM MGMT FACILITY
E-4 WATER SERVICE LINE
Printed: Thursday, April 22, 202111:29:42 AM 3 of 3
,5Lr
,>rzo q. 0D2,5'
Owner Consent Agreement
Paradise liefFh 6
', pslill), H C hereby consents to MOO Desigil, (UBI ', 00-
507-695), to act as Agent and Lead Design Professional to f'aCI!jtat'e
application for Architectural Design Board Approval, application for
building permits, and other applications for development ot (3) 4-unit
multi -family buildings at property at 546 Paradise Lane, Edmonds, WA
98020.
Michel Design will prepare appropriate documents, Provide required
drawings and retain required professionals in order to complete all
requirements with the City of Edmonds, other government dnd utility
entities to secure the applfcations. above.
J�-
Date: <. //
Signed by John S. Rettenmier, Member of Paradise fleights HLD,-LL-C
�J'��. r� ' A
, &t LTA i-A 0
JAN 0 8 20119
OEVELOPWNT SERVICES CTR.
CITY OF EDMONDS
November 15, 2019
ES-5839.01
I L
RECEIVED
4
rov 15 2019
OEVELOPMENT SERVICES GTR-
CITy OF EDMONDS
Paradise Heights, LLC
24144 East Greystone Lane
Woodway, Washington 98020
Attention: Mr. John Rettenmier
Subject: Plan Review
Proposed Multi -Family Residences
Paradise Heights
546 Paradise Lane
Edmonds, Washington
Reference- Earth Solutions NW, LLC
Geotechnical Engineering Study
ES-5839, dated March 5, 2018
Donna Breske & Associates, LLC
Civil Plans, dated November 7, 2019
BTL Engineering, P.S.
Structural Plans, dated December 21, 2018
Michel Design
Architectural Plans, dated October 30, 2019
Dear Mr. Rettenmier:
Earth
Solutions
NWLLC
Earth Solutions NW LLC
Gcotechnical Engineering, Construction
Observation/Testing and Environmental Services
)5 LD-Z-DLC1 - 00 ZS_
As requested, Earth Solutions NW, LLC (ESNW) has prepared this plan review letter for the
subject project. ESNW prepared the referenced geotechnical document for the subject project.
ESNW has reviewed the referenced plans and geotechnical report prepared for the subject
project. Based on our review, geotechnical recommendations included in the referenced report
have been incorporated into the plans.
"15365 N.E. 90th StreeL, SUile 100 1 Redwond, WA 98052 - (425) 449-4704 * FAX (425) 449-4711
Paradise Heights, LLC
November 15, 2019
ES-5839.01
Page 2
We trust this plan review letter meets your current needs. Should you have questions, or if
additional information is required, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
38
At,
Henry T. Wright, P. E.
Senior Project Engineer
cc: Michel Design
Attention: Mr. Rob Michel (Email only)
Earth Solutions NW, LLC
7 7") v" r%'T-r
ENGINEERING
19011 Wood-Sno Road NE, Suite 100
Woodinvifle, WA 98072-4436
Phone: (425) 814-8448
CITY COPY Fax: (425) 821-2120
BLMI,R.
Structural Calculations
For
Paradise Lane
Building A
December 27, 2018
Prepared by
Brian Lampe
JAN 0 8 2019
DEVELOPMENT sERvIcEs CTFL
CITY OF EDMONDS
T-� 7) 19011 Wood-Sno Road NE, Suite 100
WoodinviDe, WA 98072-4436
Phone: (425) 814-84-48
ENGINEERING Fax: (425) 821-2120
STRUCTURAL CALCULATIONS SHEET INDEX
Paradise Lane
Building A
Item Page #
Criteria
0 Design Criteria .............................................................................................................. C1.1
Gravity
* Roof Framing
KeyPlans .................................................. - ...................................................
R1.1
Beams............................................................................................................ R2.1
• Upper Floor Framing
VKey Plans .......................................................................................................
U1.1
VBeams ............................................................................................................ U2.1
• Main Floor Framing
KeyPlans ....................................................................................................
MF1.1
Beams.........................................................................................................
MF2.1
• Foundation
,/ Loading ............................................................ .............................................. F1.1
Lateral
* Forces
Criteria............................................................................................................ L1.1
SeismicBase Shear ...................................................................................... L1.2
VSeismic Weight .................................................................................... ......... L1.3
V Wnd Lateral Loads ........................................................................................ 1-1.4
-/ Vertical Distribution of Lateral Forces ........... ............................................... 1-1.6
Shear Walls/Diaphragms
V Roof [Diaphragm Forces/ Upper Floor Diaphragm Forces .......................... L2.1
VShear Wall Forces ............................................................................... ......... L2.2
-/ Shear Wall Analysis ....................................................................................... L2.3
Shear Wall/Diaphragm Capacities
V Allowable Diaphragm Stresses ..................................................................... L3.1
v,' Allowable Shear Wall Stresses ..................................................................... L3.2
V Shear Wall Anchor Bolts ............................................................................... L3.3
ShearWall Schedule ..................................................................................... L3.4
Miscellaneous
• Stud Wall Design ......................................................................................................... M1.1
• Post Design ................................................................................................................. M1.3
• Footing Design ............................................................................................................ M2.1
• Retaining Wall Design ................................................................................................ M3.1
I-IM""I
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
7N(;INEERLNG Fax: (425) 821-2120
Critefia
P 21,
ENGINEERING
Project: 548 Paradise Lane
Proiect Number: Buildina A
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
Code:
IBC 2015
Occupancy Category 11
Earthquake:
Site Class D
le = 1.00
R = 6.5
Ss = 1.264
Qo = 3.0
S, = 0.495
Cd = 4.0
P = 1.00
Wind:
Ultimate Design VVind Speed, Vlt 110 MPH
Exposure B
Topographic Factor KZT = 1-00
Soil Bearing:
2000-psf Allowable Soil Bearing Pressure
Concrete:
2500-psi Concrete Strength
Nails:
Sheathing 8d common (21/2" x 0.131
Framing 12d box (31/4" x 0. 131
Roof Framing:
Snow Load
Ground Snow, Pg
25 psf
Exposure factor, Ce
1.0
Thermal Factor, Ct
1.1
Flat Roof Snow, Pf (0.7 Ce Ct I Pg)
19 psf
Use Snow Load
25 psf
Dead Load
Roofing - Composition Shingles
2.0 psf
Sheathing - 7/16 OSB or 1/2 Ply
2.2 psf
Framing - Trusses @ 24"oc
2.5 psf
Insulation - Batt.
0.7 psf
Ceiling - 5/8 GWB (2 layers)
5.6 psf
Misc.
2.0 psf
Total
16 psf
Deflection
U360 Live Load, U240 Total Load
Floor Framing:
Live Load Residential 40 psf
Exit facilities (corridors/stairs) 100 psf
Decks 60 psf
Dead Load Finish Floor - Allowance
5.0 psf
Topping - 3/4 Gyperete
6.5 psf
Sheathing - 3/4 Plywood/Edge Gold
2.0 psf
Framing - [-Joists @ 16"oc
2.4 psf
Ceiling - 5/8 GWB (2 layers)
5.6 psf
Misc.
3.5 psf
Total
25 psf
Deflection U480 Live Load, L/240 Total Load
Wall Framing:
Dead Load Exterior 2x Stud Walls
Interior 2x Stud Walls
10 psf
8 psf
Date: 11/28/2018
Page: C1.1
/1)KSnohomish County, Washington
PDS MAP PORTAL Map Title 11/28/2018
wan�`"" I
3,333.3 0 1,666.67 3,333.3 Feet
—A
Projection: NAD-1983-StatePlane_Washington_North_FIPS_4601_Feet
Planning and Development Services, Snohomish County
41��;;Z;U�. ........
_V10am or
". Ctna .n-',d h mein and ::re,,Iy datdan, an, y of n,a,dhmtabAI ty or Itnat, A,, my pWk,tw
ponp Q.ro_5_,JnqMyDht 'mrasporsgloty�_hh of and
.07 Agra, to hold Srho,,tsh Cwn ty
banahns from and ggn,t my dm,agl, Is, C111M or Htn4hy 101ing out of any error dl,�t or ornh, I on ontad WNn N d Noy
=9hon Staw Lm, Ch. 42.56 RCW, M1,03 state and JmA tpmde, from Wwong wus, to #,(, of ndi�dh,al, �ndgd for for
roaa — th-, no oany N rn,da, of my Dat. oo,npr11.q Is. of Wd, tainad In.r.i.
Design Maps Summary Report
Page I of I
Wt= Design Maps Summary Report
M
User —Specified input
Building Code Reference Document 2012/2015 International Building Code
(which utilizes USGS hazard data available in 2008)
Site Coordinates 47.796810N, 122.37566OW
Site Soil Classification Site Class D — "Stiff Soil"
Risk Category I/II/111
G A Mk E
q 14A 710#111
Lynnwgod
E dni ondst
Mountlakeierraceo
99 Bothell,
' OQ7VAC450#4 Jndianola
PES E.f?/A TIM *Sh orefine
3 VVWC Suquamish
ol!"frORT 405
K F", " -'� T
USGS—Provided Output
Ss = 1.264 g S.r = 1.264 g S,, = 0.842 g
S, = 0.495 g S.,, = 0.745 g S,,, = 0.497 g
For information on how the SS and S1 values above have been calculated from probabilistic (risk -targeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the application and
select the "2009 NEHRP" building code reference document.
MCEa Response Spectrum
1.43 - -
I-10 - -
1. 17
0.91
07N
032
0.39
OZ.
0-13
Dirn
003 O-V 0AW OW Om IA1 Ial IAO If" 1.
Perilmd. T (WO
Design Response Spectrum
0.99 __
0.90
oill
0.72
OW
034
OAS
036
0.18
om
ODD
OM O-V 0,10 OW 02D IW i-'D 140 IW IM Zko
PwW. T (sm)
Although this information is a product of the U.S. Geological Survey, we provide no warranty, expressed or implied, as to the
accuracy of the data contained therein. This tool is not a substitute for technical subject -matter knowledge.
C1.3
https://prod02-earthquake.cr.usgs.gov/designmaps/us/summary.php?template=minimal&l... 11/28/2018
I D)
19011 Wood-Sno Road NE, Suite 100
WoodinviHe, WA 98072-4436
Phone: (425) 814-8448
ENGINEFAING Fax: (425) 821-2120
Gravity
Roof Frammg
'k.
FAPAO � S e LAI-�-
bw6r 4
P&ov- rmm,Ar
lecy F"-)
P-1 - I
19011 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 98072-4436
Phone.- 425-Rld.R449
GINEERING Fax: 425-82-1-2-120
7
20 tF
-7 1
. ............. ............ ........... ......... ........ ............ . ....... ......... ...................... ....... ..........
........... ............... . .........
!C2:- ....... Y
............... .......... ................. . ; ............. ........... ........ .........
................
'4� ........
e6�
. . . ........ ................ .... ....... ............
............ ...... ....... . .. . ........... . .................... ...........
....... ............... .............. ..... ........... ............
................. ........ .... ............ ...... . . ..... ........... ............
7
..................... . .... ............. ........... ......................... .................................. ............ ...... . ........... . ........ .................
.......................
...................... ...... ..................... .................................. . ....... . ....... . ........... . ...
...................
4;�
01.
.............. ............ ...... . ........ .... ............
. .............................. 1 ... . ............. I .................... . .... I .........
............ ............ ............ d .......... .. .......
.......... ...... w ............ ........ .... ....... ............ ................. v C ......
..................... ............. .............. ... .
Proj ect: 156 LAJ C
Project Number: eol'oezr "I"- Client:
Designed By: f!� Date:
Scale: Page: -p- 2. 1
I p I
011 A
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425 - 814 - 8448
Fax:425-821-2120
.......... ....... ........ ........ ............. ......... ......... ............. ..............
......... ..
............... . ................ .......... ........... .......
. .............. ....... ...... ........... ...... ......................
0 ...... ....... ................ .... ..... . .... . ................................. ................
x ...........
----------
2447*
...........................
................. . ........ ....... ........ .......... ..... . . . .......... .......
?0 40f F-
....... . ..... ................ .......... ........... ................ .............. ........... . ...... . .......... ................ . ....... . ...... .................... ..... .......
?A SIR
Jq4O
...... ... . .......... IlIft'r . .. ............... ....... ............. ............. ........... ........ .......... ... ...... ....... ....... ............... .. . ..... . ...
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . ..... ... .... . . . . . . . . . .. . .... . . . . .. . ..
.............. . ......
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
m
Project: rApp-p I.; Gg� L A.,,=7 Designed By: f5TL- Date:
ProjectNumber- DLD(A o& Client: Scale: Page: 12 2-
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone- 425-R14-R44R
Fax: 425-821-212C
-7
640p
.......... ..............
........ ...... . ....... . ...... .... .. ...................... : ...................... . . .. . ........ .......
..........
................
.............. ................................... ............ . ............. ................................. ......... .................
.......... ................... - ------- ------ --
--------------------- —
- ----------------- ...... ........
. ...... Ac
............... *,r—* .........
..................... ... ......... f . ................................. ............ ..................
.... . ..... ............. .......
Z41
1 ............ ............. I ...... ............ ... ........ ... ........ .......... .................................. ; ............................... .. ...... .................
........... .......
T
----------------
.................. ....... ..................... . ...... ........................... . . ... ....
............... ....................... .......... .. . . ................
........ . ....... ........ ..... ....... .... ...... ......... ........... ... .......................... ... . ....... ............. ........ ............ ...........
........... . ... ....... ............ ........ ........ ... ............. :
. . ......................... ............................... ......... . ..........
12,!
744
Project: ? hzi.-m p 1415 LAN'6 Designed By: Date:
Project Number: b L-p & )k Client: Scale: Page: IL Z 3
CV
- cq
CA) 00 OP
a C, U,
z
C)
01
I
10996
0
r
x
41S
C) C)
�o IZT
m C4
71,
all
MA I
0
Y,
.............. ....... ....... .
0
..,o
N
oil
,m, m,.3,,no,
C14 N
0
I . 13))7111.4
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Gravity
Uppef Hoor Frammig
2.r /. I
:9FORTE' "'EMBE: REPORT 2nd, 2J-01
I piec (s) 14" TJI�� 210 @ 16* OC
Gy-11 L-gth: I B` 61
All Im,aUens we memred from the WtIlde fare of left suppist (ar left —bit- d).All dhenal.. — hmlt.tal.;Da.kV Is Concepasal
Design Results
Mow 0 Loos"an
I All—ed
11—ft
LOF
Member It—tion (b,)
793 Ils 2 I1r
11340.23
Passed (70%)
!.00
!,0 D I 1 2
—
Show (Ibs)
776031/2-
1945
Passed (40%3
1 W
IJ0D'IJDH. llpmi
Moment (Ft-M)
354309 '3*
4490
Passed (79%)
1 DO
I B D + 1.0 L (All Spans)
Lke Load D04 (11n)
0.262 0 V r
OA52
Passed (LM30)
I D D + I D L (All Spana)
Total Land Dell. (in)
0.425 0 9' r
0-904
Pauved(L/511)
I JO D + I A L (Art Sows)
TJ-ko- Rating
5t
45
Passed
Dell so, alaws, LL (L/480) wI 11 (t/240).
TM:Z. B-9 (L.); T� .--. a,los —ba broaad .4' Z'./. sdwe &.1w!.th—
ft— Ed,;a B,.N (W): Bortt,, mirraearon .1u, —b.brad at IV 4"./l, I— JaloJ am —se.
A as —A widya, of the � nes ot bean ,wfomot.
Defl— ways, 1, most � oo,"ie actre, men a Aroe layer of B/32" WVarhostaw Edga� Panal (24 " Sow, lLao,g) ftt is 0— ard raW d—
Add tom! corisdarsora IV tine TIft— Rwor, lrdLW.: 5XG—oolkv.
Supports
- Bassists; -
I Loact, to Swports Obs)
�oaoi
Total
AvWbbk
Reclolood
Dewl
FL't.
I Total
350-
2.27
US-
308
493
1 301
IIKIU�Bawl
2 - Sd �dl - SPF
33V
2.2V
1,77
300
493
1 901
1 JW NBawd
WI BesJ Is Mwld to owry 12 losis VOW dw0y Wajt� lspaswg the mebor besV desq-1.
I L000non Speentr I osed) to'soa
L"Cb (Q% I , Loo)
I - J�b- (PSF) 1 0. 18 6- 1 11 1 no 1 40.0 I—owst - L�
Ar—
WeryeAntruser Notes
M"'hoo.owearronsitrase...g.flaspead—.1 b.in—d— ""' ftml,— sAahshed d.W �suael
W,— "a", or"ne wi --- 1.1saw . tha oft. 6" � me need for . dogn
P'desatnd as to —se by ft W.Ity h" 3�.Ador. ll� d.=.*f =*d" Wjdw � frisras Inobares". 0 — th. the Moil.. 1.
so -P�ll-dgqjmhBtoft)ffemtdedgvd�ythmsoftwao Prodetan—ifoottrodat
YI*`w_ ob __ &qooered Ltrbw Prodmis hm bw —i—ecl by ICC ES
tink, tod"I" roosts ESR- I M ard ESR- 317 wall ould a, —dwoe ath VolKable ASTMstarclords. Por camenc cad, �000n reoorla, VAyw�w
ped. I,— 'rarstration .. ". to eftwi-sexaser aYW*oodpo*&Ktso�mwehbrwy.
The votLett application, ins, d.91 loods, dmarsions wO mprortinfamum hietbeen samAdod byFono SaftwaraCparearx
PASSED
�fata floo,
"moe, Tyre: M.
5,.,tdngiJ,e: Raa�al
�I,IWC.de: W 2015
!)aor Matodblogy: AM
FS�Qo 1 2111/2018 10:30:16 AM
B, Forte �5* Design Engine: V7.1.1.3
BuildA.4to
b ... .. �g Page 21 of26
,,51FORTE' MEMBERREPORT 2rd, 2J-02
I piece(s) 2 x 10 Hem -Fir No. 2 @ 16" OC
Onferall Length: S'
El 2
Afilotall—amessomedf-11 i otitIld. lasto of left uPon (or left �&,rer end).All dmensons ase, hortoontal.;D—kV is Concepwal
Clewitigs, -Rmults
membw Retstron (11.)
430031/2'
911 (1.50a)
Passed (47%)
—
IIDDIIAL A119ran,)
shasor (lb2)
342 0 V 3/4'
1388
P= 22 N
D + 111 L (All Spans)
Memoir (R-1m)
815 0 4! V
1917
F_L
(43.,
D si
Live Lited Dell. (in)
OjD4604-1-
0,190
Passed (L/999+)
:�:�jj!AL(Allsp
I D, AL (All Spans,
Total Load Defl. (h)
0 D66 0 W V
0.379
T �(L/999+)
jl.C[)+I,0L(AJlSp-a)
TJ-Pro— RaUng
NJA
N/A
l3allween masna: 11 0,M) ard n Vm)
Too Edge Bratang To, —m edw — be b,woJ at 7 7' ok, I— dtalal
Beatem Edge Onsalro (W)t B mWesse, ado, m.st be brxacl at 7 7" a/c wisto �*twad ofiw�i as
A 5% a— in - ma —I �apaoty h. leae, added to — for raoaalr� —ma,
Apple.U.,al..daterot we based an t0S.
M eamposes astdon b— ded an� Jdat — -.elrd,n and",.
supports
Lood, to lkspairs, (b$)
Accoassarles,
1,;j
A=
It"Ilred
Itead
TIM]
1 woor on 9 tfit"Sr* besem
I'll
M
327
See noo, 1
2 Hartle, - 9 Ilit"SW b—
150"
KXW�
1 I.5D'
nI
313
IS-1
Dowl
L"dg I'aosolon (Slde) S—Ing (1190) (IDD)
1 otail, 16. 25.0 we
WeVerholausetrNotbut
—arad—labadofteoftsis., noor—ted.--theneasir—doir
�rlsdcilan do7wofr
oomparbl. Mth In. —.11 pr�*='ty hiZ("PJm Board, ft"'o Ponals am—Wad.1, elodis) we not dedg-I by this softev, Pro&ss, non,lachred at
"t"ohl— I-litles are di,cl-party codfled to -UM.U. farear, sorWards. VVeywhasssw emomoved Lumber ProoLitts, r,-e beer, "LoW by (CC ES
Wmal ap— 9SR- I LS3 and MR. 1387 d/a, tested in ""'dirce wid, aso,cabl a ASTM foandards, Fo, wmart code eveloaton remme, weyolhoutear
pmd- fisarease wW hIssiad. detall de, to —efterhastser.com�,-vodLets'd—Isbrary,
Ins pmL. aplivaon, sn" desq, lows, d and .4— aio,� h— been pm,� by For. So%.. opwasor
PASSED
Member Type: Nat
W".9 t.he ; ltas�dl
WItArg Code : IBC 201S
Desig, Withodeloor: ASD
rmtsso�op Jab NI- 1211 1/2018 10:30:16 AM
Forte v5 4, Design Engine; V7.1.1.3
BuildA 4te
(4 . 4.044E
6moo'—w. " me Page 22 of 26
2F2.1
CAI
16M
All
U-
.............
........................
A
�t
....... 4
.. ....
( WN
T
. ........
I
g
A
C�lC14
78
u
0
9FORTE' MEMBER REPORT 2nd, 2"3 PASSED FORTE' MEMBER REPORT 2ni 2"4 PASSED
1 piecei 3 1/2" x 14" 1.55E TimberSti LSL r_0 I I piece(s) S 1/4" x 14" 2.OE Parallarn@ PSL
Overall Length: 10* 9 112"
10-6-
AN beations we measured from she waside food of left wi for left carillever end).All dimensions we hortmorItal.prawng 15 Conceptual
zzm
I Actissal 0 L-lon
I Al"'d
I R-K
ussnrmw�---
1 5347 0 W 6-
1 5347 (1.70-1
1 P.-M f1ri
Shamir Qli
1121
!�l !6
Passed Q596�
11.0 D + 0.75 L + 0.75 S (All Spers)
M-em (Ft-b.)
F__
"go
1 6
Passed 54%
1 10 D + 0.75 L + 0.75 S (All Spore)
Laws Load D�ft. (in)
1 0.12305-5-
1 0,254
Pawed (L/992)
D + 0.75 L + 0�75 S (All Spani
Total Load Bell. gn)
1 0-24505-5-
1 0.500
1 P.Med C1.14911)
it.0
4 0 + 0.75 L + 0,75 S (AD Spans)
Delleclon Mems, LL a/400) and It �/240).
T.,zelseasi TOP oometal edge st be braced a 10- T' OA WIM detailed othavel se
-I-- Fogs 9-nD U� Be*. osimpression .4. -t be b,-d at 10'5" ,t I- detailed ath-
Supplaft
Sassari
I 1 01.)
A -Searles
Total
A.11.1il.
Resiuked
�aid
Total
I-SW.41 Si
1 $30"
4,25"
3 76"
N37
11/4"Ohnsoaril
2-1-11V
28,2
M
1 6595 ISeenoss'
Iv- Floor
Wilber
Bialdirst LaS: Res.'si
WldmgCoda: IBC MIS
Owagn Methodology: ASO
im-6-d - --ad so sam,as- asol arecry al wipavieng - - bs,N d.grad
A' h-W ai the Tled Boashill dimseral 1. �.l . me w,ft of t. -A that 1. a,ii,i - hanger
� Saw C-tor grid below for additional .1ormado, Md/. sovamenoi.
I Gisainecti Skaspi Strai Canstoactlarip
I .P- Model Sess Laingth I T.i MI
12 - Facsi Hai HLCQ412.SDS A-SDS25212 6.$DS25212 jiiMS
"ributery O.W Flo.,i an-
Lemb Loostion (Sldl Widsh (d.) (1.15)
11)4".0,6 N/A 53
I - Linhirm(PSIF) 6 25 0 �A Floor
cr'ont)
7-ifionnfloi 0 So W1 9 J/2- M/A 80.0
3-W9mmaPSF) 0 So 41099al/2' 1.
4 - UriifiawnjPi�- 0 ISO 25.0 Low If
6.0 .f
Weyeril, Sea ser fillollseas
lkws'- - M,Mda that she lWing; of id; pr�"ta will b., n .-d-. ws th==.t',dWi g, Irsed. andl bbhid! dead, i os- -s-
"'Y""i was.
'Slammed -
sSM--
se -I"
it 1 7--
7l*pr*IWapplkovaM,,lnWdeSgn loads, dmansons and �tlrl-to, hai bear pro4cad by Fvai,Sofo�MeOpwgi
1211112018 10:3016 AM
Forts v5.4, Design Engine: V7.1 1.3
P Sui . 46
Page 23 of 26
0-raff Length: 14'5 1/4*
I
14'
El p
All bcall" are measi from (he ombWe fase of left wpl (or left cartfiever md).AJI dimensions ares hortiontal.;Drassiving b conoVinal
Design Results
Allowed
Reank
L." I`=- (Plasm)
Memb� R-tion (HIS)
9754 0 14-1 1/4'
11694 15.50')
S!3`14,
1110 ?�. ; I'l; E.
She. (lb,)
8803 0 IT 9 3/4'
16342
1 (,;;;),
1.15
11.0 0 . 025 L . 0.75 S (AN Sp-)
Moment (Fit-R.)
11693 0 12' 9 1/2'
46054
I'messid (25%)
IA5
11.0 D + 0.75 L + 0.73 S (AN Spal
1.11aLoad Defl. (in)
0.073 0 8' 518-
0 342 _.Ea�d
i
(AN Spari
Deffestion altars: LL (LMSO) and TL (L/240).
TOP Edge braidne (Lu); Top onpralason edge mi,,t N bwed at 14'0/c wriess clealled otne-iss.
Botem Edge lisroong (Lu): i WIM-on edge -tb. braced! at Wo/c uriess di odnaress,
-19
Mai TVpe; M,,h Deam
Bildw V. : Real
BUldnig Code : BC 2015
Deag, Aso
Losses to Skii Obi
825
1 522
1 477
1 1024
Altharg�a,pona,lshe"rati
� Sea 0- grid below 11 addUMSi informbon andjor raq,re-
I Coansacter. Simpson Stroll
Cantsectars;
I Swoons I
Wdel 1
Tmwls
Fasehems -bei A.-,e*
I I - F.. m-, Itervar 1
js!tL7gth
1�612 270
/A
is-lod &10d
Landis
i (Sid.)
TritiWan,
Width
,rd
So)
9
FI-U�
0-00)
an-
(1,15)
comment.
7-759�lghi
5 1/4" W .' 5 Vill
-7.-r4rr,
N/A
210
0
I - Urtorm (PSF)
=4
1
-I
1.,
ED�
25.0
.0
and Floor
2 & U A No im to
12, 11 IT S
1/1" (Frons)
N/A
90.0
-
W41
3 - p6m (III
IZ 9 1/2" 0-1
N/A
2812
1398
23,,
Uked finori 213-03,
S-oort 2
4 - Poi (b)
170i
7W-
==,hat w" b I design Otan. and pubi design wil-
ad
'd . -arrentes 1-labad to the SoNer-, -Itmeardled to dr.- ass, masi for . design
as d- mined by he "sMIV hai )-i The deal grair of reodi bU der or k- 1. responseft So -. met she, di
I. , th
1*-Il= .I,, I or" " si .11 1, 1, n,,,=., d, 1111, loel).-ni " by "" *of** .1 -fecared!
p
If ad to . as I. W.:�l am_ I = Iii h-p""'
,id. tai rvoneESR-1153 Md E$R-1387 aW* baseel In scoorderce with applicsi ASTINIstandards. For mem cods .4 b- awallied by [CC U
MOdW I I eir asre and I , lost SIM debts Is refer so www w awn souser � oomMood Mad sviiii li brass. tseson na-ts, W.Yems-
7,o ProdLKt apIlonon, nNit design loach, dimensions and S=M Infonradon haws been proOded by I'Mise Software Ciparesor
liestailleflas- Opens- 4.111 12111/2018 10:30:16 AM
Forte v5.4, Design Engine: V7.1.1.3
B.Iloi
W3"a'M�"`StbllMg at P ge 24 of 26
2 F2.3
HEMBERREPORT 2r?ct 26-05
inFORTE' I piece(s) 5 1/4"x 14* 2.GE Parallam@ PSL
Oiniinall Length: 21V 4*
IVOW IT 9 1/4'
AN lowtionsare n—ed frm the wt*de face of leftmWort(or leftcandlem end�Alldknmrsions we luxtrontoll.;Orawling IsCorcephal
Deftil Res"Ift
ftuem*��
JW—d
R—k
uW
L.A C—bewmu- (saten,
Member R�tlon (#m)
165N 0 10'6 3/4'
IOD47 (5.50")
Pessed (92%)
--
IA D i LEI L (A" So—)
Sheer (lbe)
6892 0 It'll 1/2*
14210
Paseed (48%)
1 DO
I D D � 1 0 L (AX Sparr.)
Moment (r+ln)__
-IN" 0 to- 6 3/4'
4CV743
Passed (45-%)
1 W
I D 0 . 14 L (AN Spans)
LWe Load Den* (h)
0.148 0 17' 8 9/16-
0.336
Passed (LIM +)
—
ID D + 1.0 L (Alt So-,)
T.W LOW Dbfl. (h)
0.228 0 17'9 13/16'
0.672
Passed (1.1709)
—
I In D + 1A L (Ak Spans)
— al— LL kL/�) WO rL Q�—)
Top fte Braing �U): Top mWeeko,, edge — be brmed & NA" ,i, �ees detMelo�,m
B� Edge BrWrV (Lu� 13�m �eem ete —be, lbr� at 24' 4" o/z �m &tMd othiew,ii.
SUPWU
Te4al
A�Wble
I Sd well Pf
2 0*,— - OF
5M"
S.SCI
5,06-
3-SbAwdl-�
SM'
I S5V
1 2,74'
2334
137e5F2591
I 6119/-n9
Trlb.wy Dead Fl-,L�e a.—
LOS& L�— (Swe) Wkfth (0.90) (1.OD) __(LIS) C.--
9 SO (PLF) 0 . 24'4' N/A no
Y)� 14-1- M.0 40.0 2,4
�,t—(PSF) VR'4"
2 Wom (P$F) W6 37�—W 6. 25.0 40.0 9—
(".0
3 p-, (e) IU 6 3/4" (��t) N6A 825 522 4" 9"� —I,
WeteermemserNeuss
t,,lra—d-e�kJhWemhmmxw P�dWqnci�"a",lWdelqn,,km
W-1,ee— d
orem b;g
m�ftble with the d brojeci. Ac�a (Aim B�d, S=, 1=4
Viewhemmer fadibes as nirdparty MW W, —mle. ftwl—sw Engreered Lwtw Prodma � beer, &,sluamd by JOC ES
;=jV==WIT ard ESR-W and/W meeel 0 a—diince Me, 4Vuli ASTM slarclards, Fv -wrt code eIIUWM ftwh—,w
demil,mi.
The wokiet applicabn, kVX deign look, id� arel agportinraniWor, ha,e beer, �$ckcl by Form Saft— OWav
PASSED
Sy— Fi—
ll,� TW.: Fkh
BLmd,v be! lkeil�ml
Meng Code : BC 2015
Design, Pledoklog, AM
12/11/2018 IU0:16AM
Forte v5.4, Design Engine: V7.1.1.3
BuAdA.4fe
Page 25 of 26
MEMBERREPORT 2nd, 2846
6- F 0 n T E 1 piece(s) 3 1/2" x 14" 1.55E TimberStrandS LSIL
0mrall Length: V 3"
ff r
AA bemuon, — —ed fro. 0. -Nid. f— of left Wort (or left —tk— AJAX dini—dorts — horu-itl.;Dr—ling h Conceptual
Desigm Rmulm
A�01.—kn
Alb..d
R—It
LM& Cambirealm
Mernber Reaction (lb,)
234204-
6181 (5,W)
. 1.0 L (AN So—)
shear (be)
1420 0 V7 11r
10127
+ I B L (AN Spare)
ll—ent (FI-111m)
4082 0 4- 1 11r
21840
P..m (19%):
1.0 D + Spans)
'.0 L �M
Live Lad Deff. (in)
GJD23 0 4- 1 1/2-
0.19D
Passed (L"
_
+ t (A. Spens)
Tetei—i-il -1
1 - - I -
I —
Passed G./999
Deff— �.: � (!./�) mr,l n � IM)'
Top Edo Bradr, (Lu): Top mr,,,eei- w* — be bred . VY' ,t -lees dteiled .0—i-
8— Use Bradro (W� B—. .-- edw rn� � bi . 8'3"./� �m dbe.
Sapp. Be
Lod. 1. 94V— (be)
'L.
I --
I-5ld well - SPF
Bi.�rq
2-SW.,A.SPF
55W
5 --W
1,57"
W
M
1 2343
jalo�N
F—U-
0, SO "IgN (�F) 1 0 . V 3- 1 WA I
I - U�m (PSF) I OWQ'3-(��) 1 0-6- 1 25V 1 40n I aid
hme— we— Ne Im Vmmg fl. ;xd— .0 be �� —d— wtt, Wmr— Wod.1 dg. .�. sild �bk,,hed demor, A—
�Wh— —.WY ddi- " �Mer . d. f.— se & he F,.—,e —ir..I*d . — ft rw f. . dieg.
,erwe.. se d—fred by OW aft—W hokg)—I— The dedg,w a rwd, bAder r k-3 rew..b$, %, ase,e the tftdcUss� is
—romiltil. with ft —4 p.)., �1. S� 13-4, Eld,.v Pend. erW Sh Eld,.) — —deiigred by t. f.—, ikoclixis ��ed
V"— 6.kU. — d*"" —tfld . --eble k,-y vordarle� 10,,.t— &Oneered L-ter Rod— h— bee, eW.-d b, JCC ES
,r4. mid —A r� ESR. I L53 ard L-A-1387 W. .d 1� —d— .11, isildil. ASTM —.Lwds ft — -.Je v&-yert—
W.*. PW— " b.4— dWb Ide,
V. pldm ai hi dies, I.*, d—, ard &A —A. — h— b— v.$dd by ftei Sftw- OW�
PASSED
S%yv— 1 M
V.,ber Typ.: Huh eea,n
BUdrg Jae � Reedert.1
�Idrg Cod, ; IBC 2015
Deeg, Nledvdo�ogy: ASO
12/1112018 10:30:16 AM
Forte v5.4, Design Engine: V7.1.1.3
9-, F'Ve..a. P t BuildA.4t&
(425)C'4.844C
Page 26 of 26
2F2.4
8,-18
N cl)
PL4
104
/-TA
(T6
z
if
Lo
................ I .... .....
.1 1.1 CA
....... I ..................... .... Vs-
9
9
c
0-4
a 9
Ell
10
$24
4
74
u
R;
A
SIN
A A
................... ..........
VN
11
C)
77.
I `�,-
tp,
..................................... 1.1 .......
............................... ...
ML. 'ME
1�
u
AD
44
BTL
ENGMEERING
2B- 11
M A�f k. t
V
LAf$o = 0. -24 .(LL)
L/240 =0041 (TL)
Eireq'd xlO'lb.M"
2B- 1-2,
M = 14.70 k.ft
V=
L/* = 0.
L/ 240 = 6 60 .(TL)
2
El,eqld = xlO'lb.m
1 3 �Z-x 14 LA L- I
19011 Wood-Sno Road NE, Suite 100
Woodinvifle, WA 98072-4436
Phone: 425-814-8448
Fax: 425-a2l-2120
CP
#
-1 ( )2. 11 (/)2.
;.Fx- �6OAM� STW
Tm%n
----FIOST
----PMT
(/)2. 111 ( )2. F-
STUD $Rap I STW spar
EL ffi�
POST-
LF
# 39 bo #
)2.
p
ORJUD
577MIlm"ll 11
ft*T-
Project: LN-� Designed By: 57' - Date:
ProjectNumber: Client Scale:— Ram M-1
B,� 4
A�
z "� � v
sob
40
..................
..........
I ........
.. 4
cq
149
A
T I i
0:4
E31
Fin
IR
C>
C-4
74
Cl
z
0 s!,
$A 2
P--4 P.
.,:, OD
C�
C)
0 ,, i �A �A
0
q.
14
104
ENO
m
�41
All
Ali— A4
... ................. ............
All '11
r
........... . ........ I v I ....... ....................... --I . ......
.............. I ........ ......... .................. I ...... fl, .......
.................. .... .. .......
................... ...
................................... . .......
I .......... I .................... I
—J'L—
All
All 61
All L11
All All
�_ F
Mm
C4
N
g
9
45
C11
2
4
04
w
IN
u
u
cu
w
(U
u Z
0
4-4
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERLNG Fax: (425) 821-2120
Gravity
Main Floor Framing
MEMBE: REPORT Ist, IJ-01
:WFORTE' 1 piec (s) 14" TJ1@ 210 @ 16" OC
O�erall Length: 1EW
Ire,
AN locations we measured from tho outside f-fieltseabotat (or letualliew md) AD dimensions, we hertrantid.;Drawing bCmcWWI
Design Results
&,.W -I,-
Al�ed
F
LwA Combination (�tcnr)
Meaber Resettlon (W)
773 0 3 t/2-
1003 (1.75')
1 1) D , 1.0 L (All Sports)
Shear (lbs)
77303112-
t945
1 JO 0 + I B L (All Spans)
Mornest (Ft-ba)
3443 0 9'2 1/2'
4490
1 A D + 1 D L (All Spans)
L Ile Load 130. (h)
0.248 0 9'2 1/2*
0.446
1 A D + 1 D L (AN Spans)
Total Load Dell. (h)
OA03 0 9'2 1/2'
OB92
1 j) D + IjU L (AN Spans)
T3-Pro� Rating
50
45
-1--.1-L . IL .
Top Edg,&w,g Q.,): Top mWeem at�-babacedat,vrat �Ieas dessi otn
Boo- EdW Braorq (W): Booto, mWeasar, edge seartla, Issued at W I- /, �m de!kao
A -al analysis of the ded� has � be- mfm,,d.
Deflecom wal yea 1, basad m o-poess �bn with , mij, L,mv of 23/32- Wsyarh� Edqe� Pat* �N"Sban R.&V) inane aPadl d-n.
Add dmal -ed,- fo, the R," ld,&: 5A"Gspe,, ceIrg.
Suppo
Bearift -
I -
I
[--
L��3
Awl&lbk
Reqlfmd
I -
I =
I -
I - Hangsr an 14"SM bear,
Haroar'
I
I k
798
jSe,notal
2-Stb,d,di-�F
I 55V
1 1.25"
1.�'
1 310
1 4%
806
j1lj4"M,8oad
See � 90d b6t. lo, addso,al W-M -ft laq-
Asoi Beeirg Larqdh JR�xrad BearM WabSIflwe,,
PASSED
sy- � moar
�� T� : .141 st
�IdN Ube ; Read-.1
�Idm � : 113C W15
Daegr, Nledbtd� � Aso
I Connector. Shrrapsom Sitron F'� `DaN=W Seat Length Top�llx Fa. -11. Marabar Nails acse;"
"IFE M- HWW 1 M2.%/14 2M" N/A 12�Wd 2.Sb.g�ip
F-L-
Leads LL-t", (Side) I so -log
t - J�-(PSF) 1 0
Weyerhaeuser Notes
V'swinsm-a wrarts that the mg ohmptodosis mill bein asodata -h Vkwhae- isod- �om owe anal pubi dmv values.
Wa�
P`ofe-orW m dati by ft &A-"aAnQ Meanor. Tiv desigsir of retard, Wider a �a is resbassma 0 amaxe the th 3 cafaAaam is
,o,,.obl. a, me -01 pr�)- A-" (Itm Coard, Blockirg Penelz wd So,00, Bloola) as 7ot deagred by this soNare. kostts .V...d at
�,h- fablides - Ih! 4" tai W e,abInsible fvwy standaros. ��hsa- 5wreead 4unte, Prod� hm lb� ed-bad by ICC ES
-,. E�. M antl SR. 1387 andA, easad W, -d- AV� � standards. Ft, .- dt .4u.. raeorts, Wa��
prod- I -, ad mWeam detail lefer to
1h, prodl app-, PA di Jostai d- ad �t -nfa-sbm ha,e bw woic6d by Forte Waaar, 0matt,
Fln, S-1r, Op -tar 12/12/2018 2:08:52 PM
Forte v5.4, Design Engine: V7.1.1.3
(425 1 , 11-51�e BuildA.4te
L!-` "'sa.7" "l- Page 28 of 66
MEMBERREPORT 1st, 1J-02
:9FORTE' 1 plece(s) 14" TJ1@ 560 @ 16" OC
Overall Length: 13'6 1/2'
ICY 11.
All ocanael are ra-red ft.. Uns outside 15- of left Wort (or Wift -blov., d).Al d[.-Wn. are hortmontal.;U-ing 1, Consepeal
Design Results
A-.1 9 Lotat-
All-ed
R-It
LDF
Loed, ConnibUatim (Pattean)
Meabor Reastlan (Ibs)
2129 0 10' It 314'
3455 (5.25')
Passed! (62%)
1,00
1.0 D 1 1.0 L (All Spana)
shear M')
1635 0 11' 2 1/2'
2749
Passed (59%)
1.15
1 ID D + 0.75 L . 0.75 S (All Span.)
M.-t "las)
m3"2 0 10111 3/4&
12966 --
Passed (31%)
1.15
1 D D + 0.75 L + 0.75 S (All Spain.)
Lt,a Load Coft, (in)
0.063 0 IT 8 11r
0.200
Passed
(2 "+)
-
I J) D + 0.75 L + 0.75 S (Alt Spans)
Total Load Defl. (it,)
0124 0 13' 8 1/2'
0.273
Passad (2L/526)
-
IJO D + 0.75 L + 0.75 S (PJt Spans)
TJ-Pr.- Rating
68
45
Passed
-
-.- o,-a: . e�aej are �,
�ars; Jeflaction oriteria, LL (0.2') anJ TL (2L/240).
Tal, Edoe &mrg (Lu): To ab� e,!� asait te, based at 3'5"oYs �mIaWssl od-w.
Btabb. Edge &-M (I.): Bostom .-- edge -,be b,.M at 9' 1W /� -I- d..Id od-
A *-,al wdyss,hhe deal, has � been Wfed,
Metal, m1i"s is based an o,,,poote cbm MM a *,,le a- of 23/3 2" W,,wh Ede� Pa- (N" Sw R-C) that ,,,ad ard MW d-
kut.m �dsradoaa 1. he T1Ft.- 5/8" O� oefiN.
Sapporto
1-9
L . ant. (les)
Total
I -,
I -.,-
-
I T=
I
la�VwonW�Ibaam
350"
�W'
175"j-
1
1*11e9
-112
1 Ml/.229
1S.-I
2 v Swd wall w Sm
1
1
1
At harosr -�, ths Told �no d- 1. oel . ft Mein of ft resseli thas.. �dnq ft hanger
Sm �t,, q,d bdft f, adddarW,rdor,amm War
Rwured BeaN �gdh / Wdred Des, W Lwgth with Web Stiffeners
PASSED
sy-.:n-
� TWa: 3.st
Widn, Lab; Ressi-al
wldmc,.& mw�s
0� Ved-lalo�: �D
cannector. sisups.01 Strong -Tie Comeau..
w I Seas Lanoth Tw Nallp F- Nali.
71pp--M- --o.r Vio 2M" NIA 1+10d 6- lod ab
Dead Fl-i Sn-
0)
Loads Losatlawl (9de) Bomb It's (Itoo) (1,35)
I -Ua1b-(PSF) 0.13,80" 1., 2S.0 40D
2*P*at(P.F) 34 6 U2" 1. 80.0 'W.
3 � P.1 (�) ir 6 V2" w 169.0 MID
L-911t(PLF) 11/1 11" 90.0 ".r We.
ptint (Kp)
Weyerhaeuser Notes
mi�atbla w,d, ihe -Al pl�ject. A-1. (Pi, !oard, BlokI, Psrda md Swa,, vo�,) are not desrea by this wfw&,, �ftbd m
Vasy1h-�g1rwa,1Lunibwftdxts h&,e1-ee1,asdbV1CCeS
Tht"&Ktabbl,taban, readessr, -da, drs�sa� �ortnf- ha�a bw ��d�d byr-S,Nareopeses,
J.b N-. 12112/2018 2:08:52 PM
Forte v5.4, Design Engine: V7.1.1.3
SuBdA.4te
Page 29 of 66
L - - ---
1 F2.1
MBERREPORT 19, IJ-03
:9FORTE' M"piece(s)14"TJ1@S60@16"oC
0,Inarell Length: 15' 2 1/2"
All Iticatiorreare .-.d from the .11sid,, t- of aftstemoi left candlem and).Aldimersions are hortcontal.;Drawing Is Conceptual
D,ttieign Resuills,
Ac.W (p Locatte,,
Ali-d
A -It
LDF
Load: C..b.mican (;iw-)
Metriber Reaction (Ibs)
2204 0 10- it 314m
3455 (5-25')
Passed (64%)
1 jOO
1 D D + 1.0 L (All Vans)
Shear (lbs)
1290 0 it- 2 112.
2390
Passed (54%)
1 B0
to D + I A L (All Some)
moment (Ft-bs)
-46070 10' 11 3/4'
11275
Passed (41 %)
1.00
1.0 D + I jO L (All Spans)
Use, LOW Defl. 0n)
01099 0 15, 2 11r
0,211
Passed
(2L/999+)
-
I j!) D + I D L (Alt Spans)
Total Load Dell, (h)
0.206 Cb 15'2 1/2'
-
0.423
Passed (2L/492)
-
I A D 1 1.0 L (Alt Some)
TJ-Pro- Rating
68
45
Ineased
-
--
-- critere, LL �L/48o and R Q./-)
0,ahmi; deflection cmarat LL W,60) and 1L (Z/210)
TV Edge 5,adi ltu): Top compression, now - be braced! at 14* 7'ok "ass detailed oti-arm se.
13- Edge D song (1.0. 8- comsesso, dpa - be braced! at 7 1'.A I- detailed lh-.
-228 Ita 0A . a,ppo,1 0". StrecW9 or her -traint may bn.".d.
A.- w,Jr%s,f0*d*ckhanmtIe&,Wf,�.
Supporb
I Lead. to fiksip" (11,S)
acceseneenlise
.1,ed
Dead
Snae,
Total �
I-H" innM"S�baam
/.1
.17
301�181
-5�
30�/.279
Isaances,
1; -S.dwdi -�
1
Mr,
I 3.W
tM
I 111'
I 104
M
-
laocLN
PASSED
System: 9-
l4amoe, T,,,S : 3o.
Wid�- : Rcecel
BLAdN Cocia : ]BC 203
Deana, Whoddogy: AK,
Eloc,ing Per". ar. -mi . car, . loade applied 11-4, abom, MS." the kill load I, e0ed to Ji. mente, bani dasgvd.
At heron, ,coores, he Total Searing olmsmem is aciud W h",dd, of he nained ",a wopo,1r, Me han,ar
See Conectc, Vd! below for adoi information W-Mi.keenerm.
Radirrad EcInno Laniih IRS,,,ircl 13,arm Lanoth with Web Sufferness
CoRi%eS:ti sinspon Comedian;
1k,Pp- Medal - Lange, Up �11. feace, nis". memberi,aal. aceseetariese
: - Face � Faroe, I LA to 2DO" N/A �+Wdl 6-10d Web Suriwar,
Dead
Flowl.fine
Shona,
Lands
L-lei, (01,11.)
Boating
(0-90)
(l.00)
(1,15)
C-.-
1 - Uniform (PSF)
0 to S* 2 1/2'
16"
25.0
11.1-
Lot ploor
2 - Pont (PLF)
is- 1p.
1.
90.0
Floor Wait
3 w Point (PLF)
150 iX
16'
1$7.$
awo
Acs,
4 - Point
IS101,
16'
$Do
2,d Fl- WAI
6 Poinnn")
_15' 1/2"
16
50.0
ioo�
Roof
Weyerhaeuser Notes
We"ar'-` we"arne, he
. `" -.1 d". 00. w.'-. nicated! . ha f.-. - of his sofware is - intended to d- Ih ... d for . desq,
brofin""a as datermin"d 1, he -horley ha,'g)�Sdltd- � designer f,-d, balde, or framer 1, --bl. to -. that h, ca�I.dcr,,,
comcadbl-ithth-ai
F-S,ft openew 211212018 2.,08:52 PM
Forte v5.4. Dlesign Eri V7-1.1-3
SWAYA.41is
Page 30 of 66
EMBER REPORT Ist, 1J-04
:9FORTE" mjpiece(s)14"TJ1@560@16"0C
Chearrall Length: 14'3 V2'
0
AM Istabons, we re-ed from the wtside face of left atipport (or left ceirtfleear encl).All dimensions ans horlbontal.;Dirming hCornteptual
Data. pasulit;
Ac..I 0 Locetter,
Afloliredll--
Rei
LICIF
Load: Cambinersion (P-)
Member ReactlorI (lbs)
2205 0 10-3/4'
3455 (5.25')
Passed (64%)
1.00
0 2 112 '�Z
.
Shear (to.)
1290 0 10'3 1/2"
2390
Passed (34%)
1 Do
! t
t . jl.'
M.-It
-%07 t1b 10' 3/4*
11275
Passed (41%)
1 Do
I JO D + 1,0 L (AN Spans)
Lhali.ad Defl. (in)
0JO95 0 14- 3 1/2'
0.211
Passed
(2L,999+)
-
110 D + 1.0 L (At So..)
Totell-and Dell. (h)
CIA99 0 1413 1/28
0.423
Passed (2L/510)
-
1.0 D - 1.0 L (At Spars)
TJ-Pml- Rating
69
45
Passed
Laa-m . P1.) ard � �-/-)
Ommae,,; dall- a- LL (Z-/480) and TL (2LIM).
Tot, Edge, Bracing (Lu): Top ocrmwasac,, edge rnart be braced a Ko/c oNcea dateled tithiswim
Hisesse Edge Brateno [W): Ectown, comessecr, adge mine be braced at 9' V ./c �aw &-Wd
-213 Ite, w1ift at �rt 0" Stratmg or otle, restram man, be req�nred
A sth-al maim, of the deck has not been wformad
Deffecien, S,Syss S based m concam, acto, with a � r4, IS— of 23/32" We,,lmm Edqe� Painal (N" Stan Fkato) hat is glued and nailed oloam.
Additional considerations for he �Prc� Rwv i,,dud,: 513"G� calling.
Supporb
Nearing
Lead, It, &,M-. Ube)
Total
A-11abl.
itaq.mad
Dead
-a
I 'L
I eh�j-----
T
I, tWvw or, 14" SPF bum
350"
r1e,ngeri
1.75"/-'
4f
276/-200
1 .55
1 276/-339
1
2, 9sd w!!-
550-
55V
3.50"
11N
1101
1 IN
I B94
I
PASSED
S,.. i Fl-
lelember Type
e.ldng I.Se : Residents!
Widr,; Code: 113C 2015
Deagn �dvdolooy: ASO
Daii a ass.,ni M can, W load, append dn" Store, here and cha U lead IS apPlied 0 de, marrite, being designed.
At hang, Me Tod Dearing dimensions eqal to his width of he rosterial hat 19 "Iscrong he hari
I Se, Ccrr,,ceor grid bdow for addtond, nformilo, andlor
faCiered ESrmi L.9h likeciJred Easing Length wih Web Sorf-
isectur. Slinspon Struts
P'Tie CORM I Sa,e Larigth I Top ANSI. I Face �11. -.1ber Nalb
7-Umn,"t "ar I ", W I 2W" I N/A I 14-IDd 6-lod
Dead
ft� U.
Sn-
Lamb
Locartlan (")
Spacing
(ago)
(1.00)
(1.15)
Comment.
I - uniamen(ps1c)
0 . 14'3 1/2"
16"
25.0
40JD
Readeri - U-g
2-lesimilit.1ij-
1.111/2"
16"
800
=14cor Was
3 - Pant (PLF)
14' 1 1/2"
111.
187.5
3004
Poor
4 - Pont tPLF)
14' 1 1/2
16
80.0
ard Floor WIN
5 � Point (IoU)
t4' 1 1/2"
11�
60PO
OOD
P-f
WeVertiaeuSerflatu
waments hat ch, Sam 'fle,voclix. ' rin accord- w,h WSF- od.,cldi interns dear A
Vaswes� �asaydsdwm "'he arramae related to his sefic-1, aa, r-ded 0 or.-, ma reed for . onew
MI-onal determined by 6. -[ha deagnc, .1',scono, bUlder or tarre, i-esormi to - ha1h1c caio,1.6-
comi with he -11 c,,,act. A-,. (R)m 80.d, Nodding Pares, and Sq,.h Nod,.) are n., des,,raci b, ha Proot-he -f...d at
hwelesenhei-bVICCES
xcicela ASIM standards. � -t code, heilwe-aports, VetyaheacIas
peck,ce fiter- ard-taflas. 6-1. refer to -w-fies.-corriiWoodprod-Ift.-Abrary.
'he pm&ct V. des, loads, d --. and pp- He- h- been Vomcicd b, F. te S.N... Citerancor
r.-S.Av.. I Job Net,, 12112/2018 2:08:52 PM
V. Fodev5.4, Design Eng'ne: V7.1 �1.3
BuildA.4to
31a W3
Me, Page 31 068
1 F2.2
r-IFOR-FE- 1MEMBERREPORT Tj Ist, 1.405
piece(s)14' 10560@16"OC
0�11 Length: 14'9 IQ'
All locations we measured from the outside face, of left wMat (or left cantilever end)LAII c1lonanslona we hoolewilial.;Drawng Is Conceptimi
Design Itelaults
Allowed
R—k
LoM Combination (Platterr)
Me.b. Remotion (be)
2008 0 T 2 3/46
3455(525')
Passed (58%)
�TF
1 JOO
I A D + I JD 1. (AN Sporn)
shear (lbs)
1203 0 3'
2M
Passed (So%)
I JDO
110 D + 10 1. (All Sp-.)___
Moment Ort-lbs)
-331410 V 2 3/4'
11275
Passed (3D%)
I DO
I A D + I jO L (All Spars)
Live Load Dell. On)
01058400
0.2110
Passed
(21.".)
—
I j) D + 1,11 L (Aft Sparm)
Total Load Defl. (h)
0.11000
0.323
Passed (2L/656)
—
I j) D , I D L (Alt Sp—)
T34�.- RoUng
67
45
Passed
—
--
Lar— Or— LL Q�190) arol T. Q./M),
OWhM9 dell— MWIA: I.L. (0,21 w,J T. MrW).
Too Edits Manna 0,.): Top W— dge —be braW at 1,1W 0/� Amsd�tsld.�..
B000nnEdle, arsono U): fts —be breoed . 10' 9".A unless detwed tharw[ea.
A .—A .9,. of the dx, m — son pwionneo.
Deff— angym, 1, based on bbrnpba� wto, with , -4s I— of n/32'WwsrF— Ed,e- P..I (24" S,— Reang) J,. I. &W d nsfl�d down.
Add sons! klersebre, for the T11orb— Raw, irbt.,de: SM"G�, MM+
Suppo
Imserma
I - Lemia W alvers, M.)
I , - "
I Accemls1el,
Total
Available
RG*Amd
Dual
I F�
U.
I Onew
TW
1 - Bear, - or
55D'*
1 5,50"
3.W'
W02
I =6
1 170
2178
jElodmV
2&..w
I
M
I 3W118
1 -36
Ml/.IM
[Sss—�
PASSED
S,—: Floor
NbTb. T� � Jdat
&Adng Lhe � Rftd-,d
awdrV Code : IBC WiS
Cesgn Metholoogy: AM
Ses C— Onrl bdow lor adelberad Infor—or, aAfor reqwrens.
Re;,and Bawry L"ll, / P�Laed Boarring Length -1, web Sufferee,
I c4immaclor: 69�60 S— convarldneve
SWPW M Length I Top Nall* I Faber Wk Membarl,mill.
2 - Fwa � 11� Jlro !�21. 1 NIA I 14-10d 6-rixf
Loads
Location Mid.)
Opecing
D.W
(ago)
Fl—Lk.
0.00)
Ia—
(1.15)
Comments
I - Limfic. (PSF)
OW14191n"
I'm
3,
2. Point (PLF)
2R
is"
lit I'loo, Wall
a - Point CPLF)
24
is"
mi—
Wp-
4-PoInt(PLF)—
I..
B-d Mow Wag
5 v Point (PLF)
1�
16,
100D
p1W
Weveirsimmumarmotim,
V"hae,mr warrents that in ;,vbrg ofits mdcs ml be in sobordene, with Vkffh� prd= bee,n ontene, and PL"dd dmqn k—
weverhas,mrsvressfYdWa ��wwr�mret�wftwfW,I.�lfh,wf�wsols�in�ndedwdrw�tth,n�df,,de4gn
,onpabbia, wth oh —all —j— Ab:ssanhe, IN, sold, EII&OV Perld, and Sqlmh Obli ff—dedgred by dig solosrs. Prodxts nonle-re at
Vkwd,aaaar flobbee ws� ftd-p" berbW W aostm-,U, lonasy 5tmckw&. ViewhIssslar engineered I-Lenbe, Pro&bs haa been e,*,Atd by � ES
�, tedmal soons, E�� I M and �- 0" W, reseed , aboordses, andin %Pkal, ASN inardsis. oxis e,,d,~ repore, yosi�
vbcl�r li—e n,1 klosidon clated—fer to www Mayerh—o—�weedprocILCWd000nnarellbrary,
The brb�t aWl-ron, irpIt deage lows, birrardon, ard a.poort, IMF— ha,e bw ,oOded by raw software Coarsto,
To. S.Mw.ra Op —tor job N.I., 12117J2018 2:08:52 PM
er. I -a-. Forte v5.4, Design Engine: V7.1.1.3
� Eng; r, P B ButldA. 4te
(425)CW�13
In,- I.—OttIN n. Page 32 of 66
MEMBIRRCPORT Ist, IJ-06
eFORTCE* I piece(s) 14" TJ1@ 210 @ 16" OC
Overall Length: 13� 5 1/2"
17 5 'Irr
All locations me memmeed from the Waskil, fees of left support (w left cantilever end).All dimensions are hartimbal.;Drawing Is C—WILial
Design Remottat
&.W 0 lon
Allowed
P—N
LDIF
Lem - & �blmflmn (P.—)
Msmbw Rethr, (lb.)
499 0 2 11r
1134 (2.2V)
�� 11!
1 !.��
1 �.2 . I 110 L (Art Spain.)
shear, (lb.)
512012-
1945
,�!
to D + 110 L (AN Span.)
Moment (R-11m)
1385 0 5'10 5/16'
4490
Passed (31%)
1,DO
I JD . 110 L (Alt SP—)
Unit L.&J DO. (in)
0.059 0 W2 SM'
0.301
Poland "99-)
1 —
j11OD+11DL(AftSP—)
Total Load Dell. 11113)
01086 0 Vt 1/16'
ohol
Passed (L"+)
I —
ll.OD+IJDL(AltSpms)
TJ.P,.- RaMli
64
45
Passed
I —
F-
0-h.V deflection .1-. LL (AL/490) ard 111 (21./M).
TV Edge &Wng (Lu i TV mMmulon, a* most be braosd a V I V o/c nies, eletalled ornsr,ow.
Domen Edp &—V 8— mxsesion ad, — be bwsd . 8- r .1� "— dsisled o1herwi..
A *—,sl wIVsis of the dKk has ast bom pw1b, W.
D,11.0r, smhe. 1, brand on compowas somn Wlh . drl, litsr of 23/32" Ws,,wh— Eols� PwI (N' Sba, Rbr,ij) thate �ad and nAled d—
Aftd,nal ounaderadons for he T) Pro' lits" IrKkWei 5/8" Gbaor, ce".
Supporb
5—"
1 Lwa . (11.) --------
F—
Aboalmorles
Total
Avallable
Readied
Deml
I =
I anon,
Tolsi
I - SW —11 - SPF
3,50"
22F
L7V
176
33ZJ-3
-12
508/-15
1 t/4"Rin,
2-SW.al-�
550'
SW
3.9V
599
449
M
1192
BlooldN
Rim Board is ma-ed W bm' all Wadi, IAd drocity elbow, 11, byp"M the nentw being deligned
Mdl, PwaFl .. —.ad . car, -1-da appHed olsedy b— it— enc! 0. fA lowl 1, soloed . the
—,b. beng deeq�.
Dead
Fl— U-
St —
Lee&
C..,
(I.W)
(1,13)
C--.
I Unfornn(PS9
0 - Wlysip"
3.0
QD
"s,
Ar
2 - Point (FLF)
ly 3 la,
16"
Wo
1,, Floor Wall
3 - Pont(PLif)
IT3 ur
Is'
2sk
'10.0
Zd Mbb,
4 � Pool (PLF)
tT 3 ur
W
Wk
-
floor Wall
6.Pmnt(PLF)
ly 3 1/r,
1.
Wo
1004
W
PASSED
Systs—I'Loor
I,Wnba, Type: 3d.
B,JIdrV lAe: Readerial
BUIdrqC,da: BC 2015
Dolor, Methociolbgy: Aso
W"Wrissaitypeamoblu . 1 0---
VMW— wasent, thait "waqfmP,=-ia= —� wvh====.. " stl=.
Wirnwhimeavexprenlyd9dalmeaniother w . " .1twars ,,.=
prelf—ord d—M-d by as, .4.1ehaving ""de"In The dmVW of —4, Wids, or keener N real to am— thin this caaAabori Is
eon"ble wnth theowlse prej— AcomaormOunn Board, So "Q Panels M4 Sq-h Rocks) ws not dawgneol by this oftwore. Prod— enanufooLed a
asIbaeswd�byICCe5
Forte v5.4, Design Engine: V7.1.1.3
N 12/1212018 2:08:52 PM
BuildA.4t*
Page 33 of 66
1 F2.3
igFORTE' ME"ERREPORT Ist, 1J-07
piece(s) 14"TJI@ 210 @ 16" OC
CN,erall Length: 18'4 112"
2'
a 0
AN looatlo�5 we meowmd from the outside face of left support (a left oonfliever emi).All dimmoom Ire hortrentN),;Drawina Is Corcephel
Design Results
fti-10L. I-
All...d
P_ft
LDF
LoId, Cmbhmtlm (Antlem)
Mort,or Rewhan (b,)
639 @ 3 1/2"
1005(1.75')
IP.-d(64%)
I DO
I JO D I i L (Aft Simns)
She. (Its)
692 0 15'11"
1945
1 Passed (36%)
1 M
I JD D 1 1.0 L (Ali Sp-,)
Moment (Ft-lbs)
2358 0 7'8'
4426_�
(53%)
1.00
1 ID D I i D L (Alt SP-1)
Live Load Defl. (h)
0.160 0 8'2 5/8"
O.�.M
�(L/999+)
-
1.0 D + I b L (Alt Spans)
Total Load Defl. (h)
0.224 0 8' 1/8'
0.793
1 P.,.d (L/848)
-
I D D . to L (Alt Spans)
TJ+ro- Rating
53
45
1 Passed
-
__
.1 =L, L� IL I - 1 712 LI/49"0) 21 2L /2 Q)
ToP Edo, 8mcu,g ";,:,T Me w1w"'w edW � b, laoIo It 5'3' 1/1 nleI, letsted oth�jft.
BotromEdp, �Iora (W)z Bottom �� edge m,et b, lt,� A 7' r 1/1 �em dsWd th
amlftheclbdhb�pefo,�
Supports
A-
1
.-l6b.
LI"
sn..
T...1
1 � H�or m 14' SW b-
350"
2M
4N
1 -17
6641-17
See-
2�Studwdl.SPF
I sm-
55V
70
6M
1 351
1474
Oool,Iq
PASSED
sy-.: Hoo,
PlImb. T� i
wfdrg RedlImiA
B,AdW Cool, : 23C 2015
Deaw �thdoloqy: �
S. C_ w. III- for addloonlWomIdon Iro/o, --tI.
R-d BearN L"th / RM*,d Bewmg L"th ,th Wlb Sbffwm
Connector: Tie Connectona
W Sirnp"on !!M2r Wd,l i �!.Lenqrb 1 Up N* 1. F Wl. Member wil,
1, F-�H� 1 .62,05/14 WA IMM -t-oro-p
Loods
L-10. (Md.)
(01
llt.,LW
(1,00)
I Sm.
(1.15)
lc -.-
I - Umform(PSF)
0 to 18'4 1/2"
400
ju P_
2. Port (PLF)
Ir 2 V2,.
*D*11
se .
1. rl- wdl
? Point (PLI)
*1 2 1�11
. 0
4000
2rd Float
4 PNnt (PLF �
18'2 1121,
ls
to .
3w F_ 7.0
6 - Po)nt (PLF)
w 2 1/2"
,.
. .
.
200D
Rod
Weyerhaeuser Notes
weWh.- W thIt me sMq of,. duotI MH be m MM_ r,W., �g, Incl �"dmd d-gn
W.W� 'N"'o Io "" of 0
.M.N. w.lh 1h.-Al orj IocossoO. " B-d, Blookg P.N. �dSq.- Nea.) ar.n.1d.,neol b, N.Ioftkod�.d-Itlet
'R,1 w1d1t appflo,ew, I -I Ing, oed,, olmomms W �udvmsbw hm 1-n wooded by Forte 5,few, OWIto,
12/12/2018 2:08:52 PM
Forte �5* Design Engine: V7.1.1.3
14=H,: Bu#dA.4ls
0
Page 34 of 66
MEMBER REPOFtr III, ii-M
�WFORTE' 1 piece(s) 14" TJ1@ 210 @ 16' OC
Cnrerag Length: 1 r 4 1/7
I Z - 1811, 1
An 1tlons me ed from the wtside We of left support for left �fllemr md).All dimensions Ire horizontal.;Drawing Is CmmpWM
-peag-n -P�Ulli
All -Id
R-it
MIrrher R-tin (1,,)
2074 01 r 2 114'
2565 (5.25')
EPM 2ZI)
1.00
1.0 D 1 !.0 � �All SoartI)
Sh- (11b.)
I
PM (i
(ill!
too
A) All Spans)
I'D a. .1 L(
Moment (Flk.)
2 "4'
_24'9 @ 2�
90
Passed (54%)
1.00
E0 D - I JD L (All SWI)
LW. LIM Den. (In)
O.I[Wi� 71--'
Ult
P. 1L1._.)
-
I JO D + I JD L (Alt Srmn%)
Total Lwd Dell. (1n)
0.10000
0.223
P-.d (2L/536)
-
1,0 D + to L (Alt Spms)
TJ-Pr.- Ratin,
11
45
Passed
= TL (21./M),
Top &W BmdW (Lu): Top mmoreel- edge be bmool It 6' "' 0/t �M &�Wed
Bottom Edo, smol,,g U], Boto- .-essim I,1W - be �.Iol . S' 2" ot -- dIW[Id M
� 1 or,dm, of the d,,k he, .1 l -fomed
W.U., Ir,dv kaseol or, .,post, b. w,� a Od. I- of 23M" We,�-- Edge- ParW (N' SW �I�g) th.e gf..d �d -led d-,,
Add,borW cu,,dM om, for th, �Pt,� 518" G�, mhN.
Supporu
Aoc�
Total
AWlIbl,
P�,Jrd
Dead
Srm,
I -Beem. �
550"
550"
3 50"
=3
1071
152
2 - HInger - W � t,IIm
350"
HIVVI
1.7VI--
169
412P60
.19
SI,
PASSED
Sy- F11
Mwbor Tw, 5u.
fuldr, Leo : �-d.Ui
Boldro Code: 03C 2015
CeNg, �mcdoloW: ASO
HoolOg P Ire a-meol to , o,,1, Mo,ed d4y Nbo,e to, 0 the rdt s IopHed w tl,e w-be, bong dvig-l.
At h�, ", th, ToJ �,W d,mv,son is eoW W ft �Wth of ft 1 thet, �omq the hwW
SI, �- rd b.1- At, addb.M WomnIo. �1.
9,ol 5IIm,g LVM /Requred Beamg Leroh -h wel, 54fra-s
FZWniec� �r-SbnpsooStrong-TleConnecihan
I 9�, I M.N.[ Top WIP FIoc Wls Membw PlIlis 1��
12 pacem_,�,r 1 PL62.0s/11 N/A 1�tod 2-5-V�,p iWe
Loadis
L-11- ($we)
swim;
D-d
(0,90)
Floou-
OAO)
Sm-
(1415)
com
I -Uf(PSFt
0. 014 !/2*
16'
25.0
400
R� - -9
Arm
2 P-1 (PLF)
15"
SU
ut Floor Wall
3 Polm (PLF)
Is
2250
3604
W A-
4 Pwt (PLF!
2"
"1
Wdo
2M floor wa
5 Pom (PLF)
2"
1144
6010
10010
Roof
WeVerhaeuver Not"
._1r .__ -1 ft I., h. �ookoJI, �A be i, I,oc,ow-I �ith WeMlr� Woouot deln mem, ard pubh1red dm,,
V*Y� �IINY tt� Im � �, w"-"" to the lIe of ft f.-,. -, ir-dd . dI meJ for . d.0
r-omf . d- m� It, he 1, h-g JL,.d,t.. It. dII of,-d, lt�jd, I, kamer m rII,ob1e I, IhIt thl. Aa i,
.M.N. the -,A Iro*1 -,. Am eoard, EMok,,, lae� Ind S.I,h No,*.) - deIgned by t1,1I f.- lko�t, -f-ed
W11t-1an-oWmorPm&otI �!I�NuItocbIXES
or,. k_- r4o, to
1h. P,."�t NOwdon, mput dn1,, loa*, d �q � -.,rdb, met. h- 1 p-ded by Forte If— I --
I Op..,., .1 12112/2018 2:08:52 PM
81, 1 L,,Ipl Forte v5.4, Design Eng1ne: V7.1,1.3
6TLEI, ,, S.BdA. 4te
(4251P.14- C
Page 35 of 66
1 F2.4
MEMBER REPORT Ig 113-09
in-FORTIE* 1place(s)13/4"xl4"1.55ETimberStrandOLSL
Overall Lengtli: 17 8 Ilr
AUbcztkms me mesemad from the whildi, 1ALe of laftm4Vmt(w Lfturitlever end JAM dinsenslans are hWhWtmL;Dr&WkV IsConceptLismi
Disitlign Rmmilts
M.WOL..
AJ dl
11-It
LDF
L._"�h bb Mkn (Pssteni)
Menlits RWUon (bs)
3297 0 IW It 3/4'
4091 (530' )
P.-d (at%)
-
I a D . 0.. 5 L + 0.75 S (All Spans)
_
Sh- (I.)_
2238 0 12' 4 1/2'
5823
P-d (38%)
1.15
1 J) D + 1.0 S (AN Sbard)
m.ni O�t_b.)
-.5747 0 IW 11 3/4*
U558
Pinned (46%)
1.15
1.0 D + I JO S (All Spans)
tWe Load Defl. (in)
0.113 0 ITS I1r
0.200
Psewd (2L/500)
-
I A 0 + 1.0 S (AD Sparm)
T.tA Loall DO. On)
0.213 0 IT8 I1r
0.273
Passed (2L/)N)
-
I JO 0 + I D S (AD Saws)
W.� ,.W. LL 0,%W) ,d TL OL/m).
�mg 1,0 ls; LL (0,2") ed 7L (2L/240).
T� Edge &Wng 0�1): Tcp OnVessidi edge stbe dmsd st 13'SQk
�Edp, Bl,siro (W); 8� �� dp -b.br..d .67"�k i- 6.Wd ct-les.
�MP 141ftst SV4,,snq w oes, astraiit nW beeWmd.
Suppol
Ises'"
Leh. Is (lb.)
Ac .. slies,
I
Tobst
A"limble
Reedlmd
DeW
I �
Ll"
1 Sk,sl
T�lsl
I - H.Ve - 11. SW b-
350,
1.50*
-+1
1 301/-W
-265
X1077 Isear..
2 . sd �Al - spF
5W'
SW
4.4r
IW2
1 784
1370
1 3M 190CWng
h&W su�crd, ft T"d Besir, dsm 1, edal W the Mdd, f 0,, W Ojs is �%,V the haW
Sse C� and b4- hr didd,,,al fbr-. sd/sqJ,-.
PASSED
Sysd� � Flm
1,lsr� Type � Hh 5
B,Ad(V Liss : ResidioM
BL9d,V Cds: IBC 2015
Dwr WevWo9y: ASD
Cmacclicir. SlInpistim S"4111 �� -_ - --- - __1
1 t;sms LWth 1 TWN.% 1 1- N.D. AllesiberN.11.
I Aolesdses
I - F- � Hg,, U14 21. NA 1�10,1 IS
TribLits" D-4 FlowLIW 9_.
Loadli L"I WWh (0,90) (1.00) (11.15) lc-.-
G Ssf "Igft (PLF) -3 1/?' 13, 8 In" N/A 717
1 1J,ib- (PSF) 25.0 "Oo Ist r_
2 Pmt (PLF) IT 6 IR, (R.") 1'4' 00.0 Istp-wa
3 - P.Int (b) 13,6 1/2"(F-0 N/A 169 270 2,d P_
4 Pwrt(PLF) Lys In"T-o solo 214 F_ W.11
6 pmt (lb) 13'6 1/2-n�cnt) N/A 6% 1105 2 1 C-02,
wwia&"Ww Noun
Wsw,h- ws,r" fl� de ai� f 1. �� will b.,n -� ith Vk"h- gs� -q, dis sr4 pL"*.d desi
.h- �.* clsda - � � ..r-. W-d . Ire f Liss f ft. Wlbmrs is .1 -4w . --t Ire -,d f,, *sloi
Wofess" es &Ld� by tis, �lty h&Mq jWsd,. The des" of-d, Widy o &s �dpwmlbte I, thet N, cslcLj� is
.blss th the -.1 W.J-, �ss (A- seed, Bl.*.V P..h siss S4..h 81�) are - �,pned by fts lk�d- .V-,d at
W_r-se ledisse - tj*c�pffty esried � wd, faerry sm,,issdit. Vas#�, &W-d LLwriw RIids � ser, �aftd by ICC ES
dd�dl rd EM- I W md BR. M7 "/L, swass! , sdx�d� �s, *p[ssb&s � drd",. ft md, � w", vkwhas,
,� . � l,eW . &W, Wsr
Tre w�t so0l�dm, hp� deagi, loods, d�s srcl �f� ls bse, pidd by �ts Sft,,, Cb
F'"'s,ft"op-to, J.b N 12112/2018 2:08:52 P 11
I:,- Ll- Forte �5.4, Design Engine: V7.1 1 .1
an E,-,-D. P S BuilUAL41fis
(425�v a
Page 36 of 66
MEMBERREPORT Ist, IS-10
F 0 IN 7 E I piece(s) 3 1/2* x 14" 1.55E TimberStrand@ LSL
O,insrIil Lwgth: W 2 IN*
AN bellwrs m memmi from the wiside few of left wpport (or left mUWm endJAH clrernions de, horlbvntmL;DkV Is Corimptuai
Oftlom RMIIA
Wrimber Reddlon (lb,)
5436 0 to- 11 3/4'
6161 (5.50')
Passed (66
1 A D , 1.0 S (AU So-)
Sh- (1.)
3892 0 12'4 1/2'
11646
PaMW (33%)
115
UO D + III S (AA Spans)
Moment (Fl-lb.)
-10353 0 IW It 3/4*
25116
Passed (41%)
1.1 5
11 JO D + I JO S (All Spene)
Use Load Defl. (in)
OA36 0 15'2 I1r
0.211
Pasied (2L/657)
__
lI.OD+IlDS(AfiSP..)
T.tm. - -
DmhlQ defls� lidna: LL (2L/400) " TL (21L/240J
Is, Edge, B,-,V (L.): Tq, cpreso.n do. - be b-md . IW Ll' k,"- ,vwld �iss.
Ed� Orsdro (Lu� 8� mmeosdn edge st be twads! a If 11"O/C � dWW Od
4W VIA Wift a Kos� 0'. SirsoPien a Ote, esLr4M � be �Od.
11-ft
I 9,ppsts
1.
�Ibls,
MI*W
Vessl
I -
1 -.1
I - FW - 14" SPF b-
350"
�aer�
1.50"
-224
301/�Sl
A86
301kT51
jS,,,,OW'
,-,W 1 - SPF
5-W
SM'
3.65'
1 293
1 690
2511
61M
; Nocking
V are -- . d,ry appW y - - - - . 1� .."di so " � beN dissql.
AthwW &Visad,, the TW Oesrft d-4- -A . 0. mft a ft �.l �'. �ung te hw
I S. C-d gOdbd- fx addd" lrifL,� W� re,�
PASSED
: pli
klmb� TV.; Fl,dh Bessri
WON Lis, � R-derlel
W16M Cede ! 5C X)15
,: ASD
Connector. SkvWmw ftLwp_Tl@
Commechwu
I
m-
"m 6- L-Oh Isis, NO. -"b--Il A-L,�
L)"10 2DO- N/A WINI �10,1
1�
T,W."l,
V-0
Rl-
fi.-
LoadD
VMth
(ago)
(LOD)
(1,15)
C--.
3 10". 5'2 1/2"
NIA
15.3
1 - U.,-(PSF)
0. IN 2 1/2"
1. 1.
25.0
400
Issm-
2-Unft-(PLF)
10, 141vis, 2
N/A
80.0
U,M-WAI
3.Wft-(PSF)
WOR V 2
AL 0. 42
25.0
400
7.
N/A
solo
bid F%w Wall
,6 - pont(b)
N/A
1 1229
2-
weve&assaw
-P,eh- _ d. ft dIsrV did v� will be 1, &,� �ih Wsw�wes �,dt dsdgn mi,14,d �on
.ei,eh- �ddty dWA- " #w --des Mated . ft nNive, .1se f th.ea.- 1. -Iindsded ..- ft W f� ddir
pr.fimm,i ._d by ft astrwit, h.,W Pd4d �. dido- f re-d, bUkkr d k- 1. gAe . - th. N. A- 1,
will, the -A �Wt_ A-1. Ob. Board, Bt.Lkv Pw.,4 s,,d S�ash Wk.) .. -dsd,� Is, &s, ftds. �� n-.f-.d
l,, vstnM s,,- E%- LIM � ESR4387 sl/,, bested l� -d- wilh "Ic.N. �,Idrdard,. � .i.
I 2/12/20iB 2:08:52 PM
Forte V5 4, Design Eng'ne: V7.1.1.3
mev..., P S Suildk4tss
(42flills-Wl
W., Page 37 of 66
1 F2.5
.E.... REPORT Ist, 18-11
i8FORTE' 1 plece(s) 5 114" x 14" 2.OE ParallamO PSL
Overall Length: IF 2 Irr
AN locations me measured from the outside face of left sopport (or left Millow eri dimensions So horlaotaLAMWIng la Conceptual
Design Results
�.M 0 Location
Allow
binatim,(fonlem)[Groop)
Member Reaction (69)
3870031/2'
4922 (1.50')
p (79%)
---
I ID D . 110 L (Alt sports) I I
-
shear (Ibs)
6526 0 12'4 1/2'
16342
Pa--d IQ%)
L1 5
1 A D + 0.75 L + 0.75 S (AH Spanal It I
Monerd (Ft-11,I)
-17216 0 10' 11 3/4"
46654
Panad (37%)
1.15
1 A D , 0.75 L + 0.75 S (Ali So-.) It I
1.10, Load Der. (h)
0.122 0 t5'2 1/2"
0.211
lomead (2L/832)
-
110 0 + 0.75 L + 0.75 S (Ak So-.) 11]
Total oad Defl. (it)
0.25B 0 15'2 1/2"
OA23
Pmead (2L/394)
-
" 0 + 0.75 L + 0.75 S (AftSpani 11]
-I-- LL .- an. I. L-,.
,1.11� Imls: LL M/�) aid R (21.1240).
T� Edge B,-V �..): Top con,x-mon edge -be lbmei at IWIV o/. .4-�owa� li-ai.
B-Edg. Baong (Lu), 8--omixemon do. -1 b. braoad at 14' 11- 0A �- Jtaled.it-t.,
Supporta
B."no
Loaft
&-orl.
Total
Wlabl,
RftWkvd
Dead
L,,a
I - Hani;,, - 14" � beem
3w"
I.W,
796
1�9�9
Se,��
2 - stoo .41 - SPF
SM'
5,50"
4,08"
MZ
1 2469
1 M
I I
:- in- b.9-9-1
Athmgar�-,ft TOW 11,atil�oqdehgm
, Se,,O-g1db0- lbr
PASSED
sy- � f4w
Kinov T%pe : Hier, Basin
&dd,V I.AI, : Reildmosi
Mdrq Code : IBC 201S
Q,mgn Meteddogy : Aso
Cliainei:1111,11. Sirripson, connedslat;
&pp- Model Length I Too,Nmili Face Nolk M-bm, Nalk�,
I - F- � Ha� mm.w/w -3m. 1 N/A 30,10d 10-10d
we"dMiluseirmolse
ftWh- -arranm dim 'he iding h. Wd- M11 Win -d- .� W-K- odxt dea, critefit, and Nb�#.d dimjn
.eyw�- eWeody ds:Lainm anyodw -ra,dftrelmad to ft wfwaa. � ofth, w%,, 1, noti-Jol to =t itianato for a �M
Vdationtl . d-.d by ft Tr. d.Irar of 1-d, bkIm or ffamer nsomilA. dMtth. �.Wmiori 1.
.,.bl, -h the �mal vol- �ea (Nm Wa,d, M&N P-11 andSollat, Moolm) aanot�gnml by flr� wft,,,. koLots mmn.,(�W at
weyahae- fadite, me #*d�,Iy oitfsd to sortanalle fonesyY tordards. Vkyalnom- Enonemad Lomm o"I" "" bam, eAu.W by ICC ES
on� mdWcal re,- ESR- I W and ESR-13'7 mdl� timid In �dano, i th ViNkabe, ASTM -dffd,. etea W..- raeoms, Neah-
on,d- livatn, and .*.. detal.efer to - wejen-aw coftVwwdpoducWd-rmm,IIb1xy.
The VoUt toriica�, kw dmami W �t dommon ha,e, bean wtn4del by Fat, Wware OW,w
F.n.S.ftaoa0,-I.1 I J.- 12JI212018 2:08:52 PM
?-n L.-. Forte �5.4, Design Engine: V7.1. t.3
� En"n-g BuildA.4tat
(426) 914.WC
b- Page 38 of66
:9FORTE- REPORT 1st, IB-12
piecZ) 7"x 14" 2.OE ParallarI PSL
Overall Langth: 17 9 112*
4-
AJI locations ant metaoed from lhe words fece of left support (a left aintilever end).AN climensions are hmUwtW.;DrmkV Is Conceptual
Design Resulft
Member Reattion (los)
15366 0 8'6 3/4'
16363 (5.50')
Passed (94%)
-
110 + 0.75 L , 0.75 S (AN Spam)
shwv (bs)
10039 0 9' 11 1/2'
21789
'42
I=
it
+ 0.73 L + 0.75 S (Al Sp-)
11! 2.
Moment (FbIbs)
-39298 0 8'6 3/4'
62472
F- FUZ�)
1 1 12
+ .11 L + (1.7� S (AN Spara)
Uwe L-A Dart (In)
0.210 0 12'9 Ilr
Passed (21.1484)
2.7� I.Z (Aft So")
Toml Load Defl. (in)
-
_0.211
(Aft Spans)
=d-d-= -.-IZ s. -).d'TL (2L /M).
Too 15do'llmono (LIX Too tomo,tsacn 0* mon, babraced at 12' 6- I/C L",aa detailed od-Ise,
BeramEdp8mong (W): BtW. Wase. ado, -be br-d at 12' 5' /� -I- detmed od-1-
Wb. ahculd be ilde4oadd k.m Ioh d..f ft memb. to or- r-d..
Supp"
Accemiorle.
lied
D.W
Sr-
I - It.,
I.
�
1236/-826
�26/-3193
See note I
2 - Soal �M
550"
1 S.16-
nW
I �
73�40
1M)
BIojw
to -, - - tocaeo .,� - - - - . 1- eppi. to me member bang oieq�.
Athan,,, �mm, the Tour Bamin, ohmamlon , moai W � ,ft of ft 1 thati, �v,, Ce ha�,
I � C-- gddlba- 1.1 kiftel inf-on and/or r-w.mana.
PASSED
m i
V�Wrbv Type Bwm
BUIdn; �: Readenlal
BJId,q Code : IBC 2015
DeM7, MenodoloW � ASO
I Connection. Sk"Provi S C�Mwdovv
�l W." I Sam Length Top f0illa F- W1. Menom"I"t. a-ina,
91. F- Ift. Han,,, "IA7,25/10 331" N/A li� 10d
T'llbot" D-d FI-LKI Snov,
LGIIII& Lataron, (sIda) Width (0690) (IM) (1,15) commenta
0-seff_"M(pLF) 3 112". 12- 9 In* IVA x
1 * Womrp$F) 0 . 12' 9 1/2' 111. 2. 10 0
2 - Pont (b) N/A I sdi
3�pamtaq 12'V r1-1 IM IM from! 2504,
V"h-- amen"M 0. 0. sang of 1. or� " be In -,it- .,M Wwmn- � eli on. ane Ulyad 4.0
",h-- W.WY ddi- any ot� we-. 14-d . ft .11-� Lae of th, Wome I, not noindiod . .- " -WrIlTd�0
pr.(-.W . ..Id by ft m,,m1W h.,*V juriskt- Th. �g,er of-d, boW, m t- , .,P-,.i. . - ma� a. �adddw 1.
como.fible lh d'a -10 Wqlo� A -es (Am Eo.d, Bl000ng Pae, - S.-I,, BI.&,) a not deiigi by ft, wft.-. �oJ- nvi at
VAYan,-&4-,oLuma,� �b-,M,.WbKCES
tachnieti ,.% 1153 and ESR. M7 ard/m � in apol.Ne ASTM stai � -t ooe -b.,adon rpore;, wwmra�am
pr.&- 4-mon, tnI lmollat. debiff, nel�
line pno�t appliktIon, cput dmir omb, dmanaons ano aqp�t ao�nmdm, ha,e beat pro�ided by IF- SoNare Oarato,
Not,, 12112/2018 2:08:52 PM
Forte �5.4, Design Engine: V7.1.1.3
BT� P 5 BuildA.4t@
I
,4211)[114-9641)
Page 39 of 66
1 F2.6
%9FORTE' "'EMBER REPORT 15t, 18-13
1 plece(s) 5 1/4" x 14" 2.01E Parallarl PSL
Overall Length: W 3 1W
0
E
AN locations Me measimes! train the oti few of leftsupp&t for left cardlever and).Alldleensions me horibmtal.;0rawkiii Is Concepwal
Design Results
Acmal V L-1-
All-m!
R-Is
WF
L-L Cam Jr, . salm (Patiam)
Meadow Reaction (Ibs)
11575 0 IW 3/4'
12272 S.50-)
Passed (94%)
-
1,13 D . 0 5 L . 0.75 S (AN Soon.)
Shear (b,)_
418906-8-
14211)
Passed (29%)
1 j00-
1.00 + I D L (All Spans)
Moment (Ft-les)
-12400 0 IW 3/4'
46854
Passed (26%)
1.15
1 JD D + 0.75 L + 0.75 S (All Spans)
L" Load Defl. (h)
0jDS5 0 14- 3 112-
0 2M I
Passed
(2L/999+)
-
i j) D + a.75 L . 0.75 S (Alt So.,)
T.t.1 Lead Den. (h)
0.1 to 0 14'3 IJr
GA23
Pawd (2L/856)
-
to D + 0.75 L + 0.75 S (Alt Sows)
- . - IL ) one IL jL-).
�ma,g .-I.: LL (2080) �d 11. (2LI210).
To, He. &-. 0.,): Too omxiisam doe m-lb, Mamd at 14'o/, mm &bw� oo-,im.
BefeemEdg, &,wQ (W� Was asanb, Mamd a, 14',A, iiia, deWd oth-a-
Suppia
�L
""",
Lamiii to SuMmt. Qb.)
Acce-d-
ET. -
I Awl%bM
I RNomacl
I Daml
I Fkj
I Sne,
I T-i
I Ha,,s 14- SW �
I
I LST
1 21V
1229Sk2761
IXe
%W/-2n
Siie-I
2 SbA �d SPF
I 55V
1 5.51W
1 5.19'
1 �
1 �7
1 3�
��2
PASSED
Sy,am: Fl-
�mba, : fl�h Bvim
MUM R-d-al
B,Idr; Code: M WIS
�r �dloddo� � Aso
S,,o � god Ld- 11. adchonal infismaJon ard/a,,,w-
Conowtor: Simpson Stramp-Tis Coa��om
S4,port I I Sess LmqM I Top Nall, Face Nall, Mambw Mile ��ft
I - Face � Hangs I.J55.50110 1 "., I N/A �16d 10-16d
I'libiamy
0.w
FWa,Ll,M
Sh-
Lands
Locallm, (Sid.)
Wwh
(oW)
(I.W)
(1,15)
Comomos
0 - Saff �qht (PLF)
3 1/2'. 1.'3 1/2"
N/A
23o
I - U.b-fPsF)
0-1,3 r
M,t
r
25.0
la, Floor
2. Ufidono (PSF)
0 0 14'3 11
(Bas �
y 3'
25.0
600
Dick
3. U,b,rn (PLF)
0.14 W
(F-)
N/A
soo
1. W.11
4 - uw,"(Psp)
0 to 14 3 1
ir
25o
40o
r4 Fl-
6 - Unft-(P$F)
. A41%2'
y r
25o
600
2M Od(
0 - U,Ic � (PU)
L
o 14'3 1/2"
80.0
W.11
7 - JmfDmi (P
0. 12 3 112,
SW
15.0
25.0
Roof
9 - polm (0)
41 Yrom)
NIA
721
9=2
a - PN�t (1b)
U'3 11" il-i)
13l
1.27
12/12/2018 2:08M PM
Forte f5.4, Design Engine: V7.1.1.3
SuildA. 4t&
P.ge40of66
MEMBERREPORT Ist, IB-14
9FORTE" 1piece(s)51/2"xl2*24F-V4DFGlulam
Overall Length: 14'3 1/2'
0
a 9
All locations Me measored from Me MUM, f,,e of left wpport for left mtHiMer md).All dimensions me hMizmwl.;Dfawhg Is Cionceptual
Design litesults
A -al 9 L-alm,
All-
R-N,
LDF
L-J: Camblamlon (Isiorami
Member ltemti 0W
62910 10' 3/4"
12856 (5.50')
Passed 49%)
-
111 I . - I..,,--.,
Shear (11
3257 0 1 V 3 1/2'
11660
pmew (20%)
i
1 bO
to D I t.0 L (All So-,)
Pas t4mment (Ftb,)
1889 0 T7 1/8"
26400
Passed (7%)
0(ZL/3802))
140
1 JO D + I JO L (Alt Soars)
k
NN Moment (Ft-lbs)
-1 Z184 0 9'9 1/4"
20350
P assed (60%)
1.00
1.0 D + I JO L (AN SOWS)
Live Lead Can. (n)
0.199 14' 3 1/2'
0.211
Pas" (U/Stl))
-
I JO D + 1.0 L (Alt Sows)
OA23
Passed
-
to D + I j) L (Alt Spars)
'o D
Too Edo� lsadrg (Lu): To,, oom:mtsson e1q, - b, b-ad m 14'0/c ,Fft daisied
Bottom EdX Braorq (L.� Becom edge m- bt bfacd m 14'ofic Aass �ialid �isa.
QIkal posi- - adpstad by a di- favow of 1.00 bm - cdo� aad aing "th L 7' 2 5116".
Cribcal �,sl � - d)-d by , W- facocr of I.W dat as cdeAccc! �mg I.Vth L 12'9 1/8".
N I ba ,Iirt at -n: U+ Soseemg or �, -c.nl ma, � reqI,,d.
It. aff- of pose- oi� -g.� comba, h- re, � -.W fo, �!- *UMn, d.R--.
Th. .. fild 9,A- Is a.-.d . h- 1. MV I-- at - esom of Ma boam. 1,oWl wfth room sde , as irdomaJ by ft -1-M.
Appkabl. c.1.1abon. - bmad - WS
Supports
Be."
h-1.
A�tftbl,
Re**,d
I - la�er . 12" SPF b.
W"
�W'
15V
,-,we �dl - SPF
I S50"
5 W
2 W"
I IR5,1
1 4327
6291
PASSED
s,sa. � plaor
�TW-M,Ml!aam
WON �: Res,k,id
Bi,ikJnjC.ce JIM2015
�gn �odlogr,: ASD
Ax hang, �oorcs, d,, T-W BwV d-m is eqw! w ha vmh of ka matimal Mati, �ong fia ha�
I Sw �- oddblo� for adoffiors irdome6o, MiVo, raq,re-
ConneMr. Sinspeon Stronp-Tile Con a
&.� = I his Sam Length Too, Nalls, Fae, W1, -bw�lii JA-ilai
I - P-M-1 H"ar KAW 250- "A L+ Ifol �ted
Tribsit- D Fl.-U-
Lamm Locamon (So.) .. (=, t.00,
0 - $0 W.91�s (PLF) 3 1/2' . 14'3 1/2' NA
-imh-nsSF) 0 . (15��3 11/2' 1.,., .;D
-14- v �Tcis 16W M-09
Weyethaeuser Nallses
w-'"' Zone, irat "' sang oflis vodxft �X beim �ilh WW� MociLlIdittign animis anol wlohsimso� d.g, A-
asay dadAms "atims warwta,dasoi W ft soft- �a oft-,, wftw,,i, nottntardcl te d,wmmt -� f, , dir
prdaiao,al as dau,,,� by the &Ahe,vymwng ),isclnw. T�, dosgr,is f,ocod, Wid, , ftamm i-sorsiWi, i,, - tato,,scidwimon is
Mo�t 6-e anc! mitallason �Is raf� 0 www.wewh=wrr0woodprcd,,ce,&-Iibary.
71,. "odc, apcileadc" in� �w oad�, d n-sof, Md �t mor - h- b- W.�dd by For. Soft:- OW-
SIft.1, OP$Mtll 12/1212018 2:08:52 PIA
Fofle Y5,4, Design Engine: V7.1.1.3
BvildA. Q
st, - Page 42 of 66
(.25C
1 F2.7
igFORTE- M EMBE: REPORT 111 1&15
piec (s) 3 1/2' x 14" 1.SSE TimberStraii LSL
Overall Length: 11'111 10
11'11 1/2'
El 9
All lo-tions, a .-red from the -tsdo late of left pi i LR millew eni dirmensions are hortmintal.;0rawell Is Concei
Design Results
&-10 1-
Allowed
R-1,
LOF
Load, Combirlosion (Pattern)
Member Reaction Qi
3706 0 Ili Ji
elet (5.Si
2.saed (45%)
-
I D D I 110 S (AN So-,)
_
Sheassr (Ii
_1927 0 to- 4'
11646
Passed (17%)
1.15
1 D D + 0.75 L + 0.75 S (AN Spans)
Moment ot-lins)
7014 0 6'3/16*
25116
Passed (28%)
1.15
t D D + 0.75 L + 0.75 S (AN Spans)
i Load Dell. (b)
0JO50 0 5'11 15/16*
0.282
Passed i
-
I b D + 0.75 L + 0.75 S (AN Spons)
Total Load Ciefl. (In)
0.1510 5' 1 7/8'
0.565
same (L/895)
-
I iD Es + 0.75 L + 0.75 S (All spars)
Dei alsone: LL "490) and n
Too EdDe Br� 0-.): Too connorewwon edge Isetb, bnsi as, j2' ofi�mdsswadl otherwao,
5-Idgis 51song (W): 0.- m,oew. Joe -be laosed . 12'.AL"- loosed
Supports
1
no
to &W-00-
Jai
1
A
Z�
Amassed
owed
ads,
I Tonal
I-Elesi
1.501,
17M
319
Sale
MI
12 - SUd will - SPIF
550"
1 5.50"
1 2.49"
21M
319
is,
- i Parell ar. -medl to si n, load, aoohed dwill, d- dl- ind 11. U lood I. spli to ft -ft. owns dei
P. owl . deW,,W sy tral isisnaity hawl sd�, IV. d notord, Wide, W =I-Voni . -.in., this :dWeass, I,
torroad tr�* In D
Z=d'E'.Wro=.f
bl. w,t, tire -all 1. Actessois, tmgnw� by this Wfilwars. oi mars,fatiosed at
..h- F&I ar, n,i contrail 0> asnansoa kness" standards. Winwh- Engineered! L.mber linocILKit, haws b- ealluirow b, ]CC ES
techi nations; EE'L' W Ni M-387 ind/or assess in aces,dano, with m0i AM tstanards. Fv �rrwet code volusear, recons, W"IressawI
orodi neriesive ad Issas- Oetw-fie
The om design loass. dimarems, and sow,joweason hiewbeen pdod by i sofo opwaor,
PASSED
Eiyeoni Roor
I4smoar Tte : NLoh Bsom
8,sidro ke : llesidersal
EI cods : MC .15
Dmw Mefti AM
Forte leftim, Cipwrii- 12/12/2018 2:08:52 PM
. &'. - ,,, I - Forte v5.4, Design Engine: V7.1.1.3
E_ EE , " - - SuAlti
(,1251 all -ME
Page 43 .1`66
MEMBER REPORT ftt, 18-16
i*FORTE' I piesciii 3 1/2- x 14" 1.55E TimberStranil LSL
Overall Length: IW 11 1/2'
All locations .1. .-,ad fm. 0. -t.1d. lai of left ulteort (a left cantilever Enci dimemilons We hcr�ta'L;l)rawkV 15 Conceptual
Design Results
Ai 0 Lwli
Allowed
Rai
LDF
Load, cembinsi (Parawri
Meariber R-tion (b.)
2153 0 3' 2 3/4"
12513 (5.50")
110 D 10.75 L 10.75 S (All Spers.)
Shei (lbs)
86301-101
11646
" D 10.75 L + 0.75 S (AN So-)
Moment (Ft-kis)
-2445 0 3' 2 3/4"
23116
111) D 10.75 L + 0.75 S (All Spain.)
Une Load NIL (Iri
0.02000
0.200
110 D + 0.75 L 10.75 S (Alt So-)
Total Load NH. on)
10 0
0.323
1 A D + 0.75 L + 0.75 S (Alt So-.)
TL 41
0W=h.WV is, RZ�:L�=48.oi and! 71. (2L/M).
Too EdoaBlai (L.): Top .1pressis,m stage - te Vai at 5'./� .,raws cml. tinerwil.,
fooson, Edge i (L,�. Botionn worpressim aides mi.etb, bretecl , 15' /, Am deasleof manw-,
Supports
11-ing
Los& to %�osrtss (Me)
1--a'
Awwasak
--I-
I -
I ZZ
Sri"
I
Total
11-oweari
550"
550"
1 5T
IM2
1 5%
1 475
NX
Sli
12 - SaA .4 - SPI=
SNV`
550'
1.50"
153
1 322/-W
1 -63
1 475blOO
1 Eli
Illodkingliwel-assemi so ,sr,,,no l,"AWlied dimly Ii tharn and di fiA I� Is a,,thed to ne, mander bars; dew9ned.
Tr-- Cassid li i Sh
Loods Lotatli (Sid.) Walsh (ago) (LOD) �rnwnrt.
0, so '*i (�F) 0 to 14, 111/2' N/A 03
-I . 0 to 14-11-0- 1. 1.
�U 1. 25 0 Q asi
2 - U.h- (1 0 31 1 N/A 80.0 at we
:41
3, Unem, (PSi 0 31 lip �.o QD 2nd Moor
4 - Underm ^F) 0 7 (Too) NIA 80.0 2rd dl
, I
5-unsornn(�) 0 to 7 gop) 516" Z.0 D Rof 2
weveriassuser, mote,
W"h- .- tri he saing of, o orld... will be In -d- In Wenvins- Vadt dessio We and dear will-
Wimalsessals, wiI,,sally d same an, mine -crania, rested va the sollware, law of th a isefteare I & notintarded ts, wiarnwirs, the need fo, is lesson
Professions$ as dessemired by this ii haning y1i This designer of record, Wide or termer Is responsible vo, ase- rat "s cal oJalson is
consible with tw 11 p,o)Kt aoteseoies (Rim Board, Socking liands and Slawash alocks) are not dsdla� W this soi or sdI man,listlawal a
W.wh- "ilid. ar. or"arty cei . --.We for." dardeft. Weverrass- ErVm-.d Writer trod- i twer, enslivated lo, ICC ES
,ad. tashcal IV- ESi L 153 and 11387 and)or aided In issoriente, with go calse ASTM sw4rds, For -1 codo ".t. IV-, Wismals-
toodwis and nealled. 'k.11 I.Fe, to www.."h__ mAitisawdi."Ido.manolibraryp
'r. '0., apolIcasi I" deso, Iwii d mendion, ard! asment lrimilawri haw b- nolided sy Forte Softwo, Opers.
PASSED
Sys- i
rilemlov T %is, Beam
Balding sse: Readerbal
Wli Code BC 2015
Dissign MethodDlogy � ASD
1.. 12/12/2018 2:08:52 PM
I &__ Foste,,t5A, Design Enigma: V7.1.1.3
an E F S BuildA.4t
Page 44 of 66
1 F2.8
vilF 0 R T E - MEMBER REPORT 131, IB-17
plece(s) 5 1/2"x 9' 24F-V4 DF Glulam
Ontrall Length: 13'
A9 locations me issnatsmed fronn the outside face of Lftstspport (a loftcantrew wil).Allollosensionams, InWItiontal.;Cravvini; IsConceinboll
Design Reaults
ft-I 0 Locssion
- Allmsel
R-11
LOF
LossfiCtimlonation(Pot
Member Reacdon (Ibm)
11408 0 2'2 3/4-
-12056 (530')
linseed (09%)
shess, (1).)
752401-3-
10057
P.-4 (75%)
IAS
to D , 1.0 S (AN Spans)
Pon Moment (Ft-Ini)
217909-5-
17078
Passed (13%)
1.15
1,0 D + I jD S (AN Some)
Neo blonsent, i7t-lb.)
-11199 0 2' 2 3/4'
13164
Passed (85%)
1.15
110 D , 1 ID S (AN Span.)
Live Load Den. (h)
0.05400
0.2DO
Passed (21/994)
-
1.0 D + 1.0 S (All sports)
TOM Load Defl. (h)
0,14400
0.223
Ptneed (2L/270)
-
1.0 0 + i.0 S (AA SP-)
Deflection .- U (L/360) ind T.
0whang dtflection ontins: LL (0.2-) aid A Wm)
Too Edge B,.ng fl..): Too .-- .60 -,be brsced s, IT /b ,is. cltoilml od-iss.
IN-Edg. &.m (L.): B... -- so,. -Ins ,sosl st 12? o/c nless slettileddwinims.
rAbced poidn,e - .1jisted by. �- Isom of 1.0) thist- ciI -W knot, L - 6' 1319'.
Uscsl neo- rmimerl, MJMd by -time facts, of 1.03 ti- P1,1sted "?,VhL - 665jr.
�w lbs, LcAlf, at �17' 6'. Str� or d. -ant me, lbs,"med.
� eff." of pcsm,s , nea- cm1w h� � been -nd for hw slWatint, deflecam.
Ti, pec, Rsd gV,, 1, siesmecl W hm Int smorg Imnintow, a the b- of the besm. Install Ith proter side w es, Irclosoci by de marv-sr.
Applksde W- en, bessid on �.
Supper"
L-ft to GlAwmes, am)
Accessorle.
Tot.1
Al.JIWlsIe
RookAred
D.W
Fkj'
I S..
1 .1
1 So.,d �Al SPF
550'
5SV
C68'
75,15
1223
1 �
I JZM
acdon,
2 SW wAl SPF
35V
3-W
1.9W
6n
-374
-11+1
1 6Xl/-l5A
Elocking
3 Stud *41 SPF
5SV
S.50-
1W
41V
W
Trbuwy Disid R-like, a-
Lemb -- (Sl&) WkIll, (0190) (IM) (I�w Commonest
0 - see Vft. JPLF) 0.31 NIA 12.0
1 - JnW.-(PSF) 0 on 2, (ft-) 11 2510
3 - Point (D) I am"T"cint) NA 1748 319 834 is.
a - porn (bl 1' 13/4" (Frork) ka 1352 593 in a- I is,
4 - Point (to) 12' 10 114'T,.,) N/A W2 so 475 ed ftom: W16,
5 - Point (lb) V13/4"O:lont) NA 9" mik
a � point (b) ix to t/4- (rcm) Nis, I i,;n MW
vje"rbmm�nofte
VA-"- .-sms " dre ..a of I. ocluclb, A be m -ceroic .1th �epsl,-sm "'T" " PLb`k" deign 4-
M-h- -enolyclisidtims my.*w -rerid. mimed . de -fin-, I-sed this -11mee-Interinso to --lmsnl for . ledi;,,
PrOfeeltired se mined bY ft aJOWItY hsAngpned- Va deigne, If d, Wicer a ftems, is nstponsel, W assre ttimths UW~ I,
onnsistlible, m�
W-1-., Wit. - lhld-c,slY -fled to -nId. foremy insindsrds. W4.1-is Engine-d L.mbat kock.. hme b- end.enel by [CC ES
-* tcinIa ns M. i M mol ER- 1387 anc/or tested h accorderce with scolksible, � somd.& code evII-con V", W"nes
P,nd,ct kilm- anl r-A - densil, Ids, . - -yem-
'ffis ,oWct W�, Innis: desp losids, dimensions arsl �t Information hm bets, pmhbd by Issue Sollnwe Operator
PASSED
Sy-m; R-
mtbe� Tpe :: � assin
BWdN Jse: Reed -I
�drqCo&; IBC W15
:al ..": I
F.n.s.ft 12/1212018 2:08:52 PM
El�., -In. Forte �5.4, Design Engine: V7.1.1.3
M Eni-ng, P BUWAAfe
(425) 01-A48
b,'n Cbft, "t Page 46 of 66
MEMBERREPORT Ist, IB-18
6FORTE' 1 pirece(s) 6 3/4" x 22 1/2" 24F-V4 DF Glulam
Overall Length: 22' 4 314"
2Z 4 314'
w 0
AN locations we measints! frorm the nurses faI of left stiptiort (or left cantilever end �All diemensiona me hatrontal.;0ranshp Is Conceptual
pesign Resulta
�..Iflltiocwtjon
Alkned
r-k
ILDF
Load Combination, (Partaim)
Member litection, (Ilbs) _
1920604-
23203 (5.50")
Pa.W (83%)
-
IDD.1111.(AgSpawks)
Shear (lb.)
1532D 0 2W 3/4'
1 E 5.7%
_ L
lD0
I I J) D + I-ot (AN Sloorm)
P.M t(Ft-1.)
101259 0 11-1 3/4'
7r316
370
.. -
P= ii, %)
1�1
JD 0 + 1,0 L (AN SP-)
Use Lm. Qn)
0.450 0 11' 2 318'
0.724
1 Passed (L/580)
-
1 1,0 D . 110 L (Alt SP..)_
11- - .1-
be brtinecl . ilr /b Lsl- coaled
Borms, Edge Bradrig (II Bobsom, onmoresson edge � be bracel a 22'5' o/c �lks,,I deWW ounnI
CIdcal poi - ckonscl � a oi- f.- of 0.91 mec - ctiWated �N lerdr, L - 21'8 3/4",
71. .11.0, of poed. .1 rwiksti,nt celber I-e - been -need fc, - cnicdatIN collection.
Suppistrip
Elsiss"I'll
I I - aw- (w
ETW
I
I Rec,,liscl
Deed
F=
T"
-=Slid
1 5W
4.55-
�l
11565
19206
01
2-Cd-1---d
SW
1 5 --W
4.42'
Pll
11675
19307
Bluddr.,;
- -- so car, no Ines, ppW dr.Uy so-e ft. moi ft Ul icen is poet to ft member b6ng desined,
0-d FII
LON& (Side) WkIth (o9o) (1.00) C-mento,
0 - so *?a. (PLFj 0 to 2214 314" WA 36.9
-719�
1 V.,c_(p5, 2214) 4 1116pp 310 10D I.Floor
( no
2 - lJnft-jF5F) 0 to V (rap) 14'3" 25.0 �a 2nd FI-
3 � UnNb-fPSFj S. . I v (T.) 11 ao VD and Pco,
4, Untorm (PSF) 11'. 16' (TW) I'll, 25.0 40D and Poor
6 - Untom(PSF) 16- so IT 6- (Tw) I'll, 25.0 4ob 2,d Fsr
B-U,&-(PSF) 14-91 25Z 40D ant! Hoor
waysomweirNeew
lVerwhissi- - "I" one Nana flm Vdxss A be 11 -d- ith Wemf- vdict dean Main. md "Ihd clean 4-
Wriartsits- e,;,w,#v dodAms any othw -wites(slassol so Its, wflb, �Iss oftris softwers is notimeross so m ft new for a oiskin
pro(Moral mdesymnsd by ft �m, hsi�,,, J-dictim. Mrs diegre, of momd, builds, c, kems, is responioble vs sos.,e thm tris cdoosoc-
.,.bi. in trI "ject. o. (Rim En,d, Scoing Pm* and Sqcsilh Rocks) cdict, mmi�lstvod a
grostdatignecl by ft sinflo,,
hissew looks. - ftdomt, nerallal . ,stasbl. fosestry sonclards. ll*yh- rested LLmom ftd,� h- been, -N.W b, KX ES
,,,k, mornsl �orc, ESR- i M sind M- t3V mWo, mast! In accordincs nd, aqpl�e ASTM onsdirds. ft -t cods inni� repms, VftmNse-
Mdmt Iteratum mol hicalsew c1coil-for in www.way��.c�y��mdpmd�/dow��ibrwy.
'me peckics sioplicticco, opA diction losidt, d resistors end ,pot a, mission hs,e ben AW by Pone soft, .. opissec,
PASSED
*%be.: R
14-be, 7�p. : Drop Been,
Mking Use I Resksimla
lkddng�: INC 2015
Coition woncdclgy: ASID
F- 5.11sin- Op.- 10N... 12M2/2018 2:08:52 PM
Forte v5.4, Design Engine: V7.1.1.3
SwIdA.4te
(4 5)(114-01018
,'-fenseabs.,ne Page 46 of 66
1 F2.9
:5JFORTE' -,LE" ""' "", ' &19
piece(s) 6 3/4" x 22 1/2" 24F-V4 DF Glulam
0�erall L-gth: 22'4'
: -- - --f -
A
27 4'
All 1-tIons - messlired from the w1dide fsee of left wipport (or left, carmle- -d).AR diineriss. are 1, C-,epwel
Design Rei
L Ion
All-d
AL-k
WF
Lw&- Comb�lon (P,,ttern)
Member P.-tion (lb,)
1782504-
23203 (5.50')
Passed (77%)
-
I j) D + 1. L (All Spans) It
--
shear (b,)
1387102-4-
26931
Pa (52%)
1.00
1 j) D + 1.0 L (All Sows) 111
P. ftniont (Ft-1.)
87467 0 9- 9 3/4'
103736
Passed (84%)
1 J00
1.0 D + 1.0 L (All Spend) U
Lko L.1d Defl. (n) --
0.383 0 to- 9 11r
0.722
1 Passed "78)
-
1.0 0 + I A L (Ali So-) (I
Total Load Dan. On)
0.603 0 10-4 5/6'
1 BB3
I Passed (L/431)
-
1.0 D + I A L (Aff Sg-) 11)
13,9�ilon amna: LL (LrAO) end M OL/2`10).
Too Ela,&-g U): Tel, .-- edge -b.br..d . 22- 4' 4 L,*-d.Ad
B.- Idge &.N (W); 8,me. Weeion edge -b.brod . 224".A .1es &-led ,h-,..
:mi. -- - ad)..d by-d.- f- of 0.911... ed.A..d.*V lr,6 L - 21'8".
Th, dl...fposdi� or -je- eenber h- - been w-"W for 0- oWWp &-floolion.
� qpolld gk�mo, -1 to hd�e ift itrong lamroams Alhebo-fdneb- limull �th wooer� mid, w ed incli-li by Me mV-
Apph�, �wtworo, � bened on �.
Supporits,
- ft-V -
Leeditosimpoinbim.)-
--
I
T..
Z..
I
I .
=
I ..
I ..
I -Ssd�dl -1X
530-
5�
4.Zr'
67Z
1 11110
1 -3N
1 170251-3N
Elocim;
2 = Cdumn Cv - -1
5SV
5.50"
2.71'
15X
I 739D
1 -252
111905/-252
jEl1dm;
BlockirgPm,�,�,�mWmw�mtol*apph,ddm*ab�#�ffdth,f,lll,WkgpkdWLv,mnb,bdngd"g�
Tril'oh"Y Died Floruft She",
L-CIN L-leei Width (ago) (11w) (1,15) comr-
0 - Sell Might (PLF) 0.22 4 INA 36.9 1
1 - unf- (PSF) 0022-4 2: 25.0 4D
owq.9r sp 12rldpi-
2 � Urdon (PSF) /4 (to) 1�4 2S.0 4010
3 - Point Qb) 993/4-Tt) 796 3M4154 -576
Wev-1- - ff- de seng ofift be in -danoe ..0,
We� 0'" = P, puu,.hk design olues,
h- -.eJ, died. �.tff -lanilei . d. LW.f r. crou-t it,. need for s deign
dialmorw w diminnned by dv a*wity h"V Nnisommo, Th. designer f,-d, bUld. or k-,# reperesde W ehm the calwisidere;
..'.N. th the -.1 sr� .Vt& .1, Do*.) - -degned by this ft Rod= nonjedigiid .
in ei��
h� foolilo an, liin`� BVirwod Lwntu Pno&c3s hine been evivaW by [CC 6
Inds "Id"Id "o-M "S". U53 and !SR-1387 and* tiebed In -d- -1, aPoloible ASTM sardircs, For curent ode "uadm repors, WeMhoeaer
or.d= itarmin, md mullgon dii refir 0 w�mwed�.con&oodpocPxm/dDw�llb,�,
Tire prodixt Mipieaton, - cidign?oficls, dmini and stmfvoem ln�e low promded by Fvw Sofi� OW&V
PASSED
S- 19-
�mb. T�; aV B-.
�Cmj i-he: Reiidimel
MldngC.&; X MIS
Nngn mied-iblogy: ASID
1211212018 2:08:52 PM
Forte v5.4, Design Engine: V7.1.1.3
90dA.4te
Page 47 of 66
MEMUER REPORT 11t, 1B-20 PASSED
igFORTE' I piece(s) 8 3/4" x 22 1/2" 24F-V4 DF Glularn
0-11 L"gth: 20' 3 1/4'
2013 1W
All locatione, are m-ed limm the witside fecs of left wpport (or left cenuleve, end).All citmensis., .0 horl-tM.;Dr-kV 11 C.-,Wel
Design Resulft
A-M 0 i-ation
Alk-d
A-k
LOF
Losdi Csobinerion (P-o) [Gi-pl-
Memiler Reaction (lbs)
23856 0 19'11 1/4'
31281 (5.50')
Passed (76%)
-
I'll, 0
Shear (lbs)
21621 0 17'11 1/4'
34781
possed (62%)
1,00
1.0 D + LD L (All Slows) IA
P. Moment (Ft -lb.)
130205 0 IT 6'
132345
lodeded (98%)
tell
�)-
t.0 0 . 110 L (Ad Spain.) [I]
Lbe Lobd Deff. (kn)
0.299 0 10'8 7/8'
01653
Passed (L/787)
jPjEv�wd
-
ID [) + I in L (AlSpone) [11
Total Leed Clell- (in)
I
n 980
(114 51
10 D + I j) L (Al Spons) [I]
NO- onten.: U OJ360) k rN0)
Tq, Woo Brwng (Lu): Top oempnnaton edg, - be b-t IT 4" ol, mim �tedl #�im
O&A Poei� - Milmoid bY a Wume I'me, of 0.90 � Ile 'SoA-1 �N length L - 19'7 1/4"
� effectl of ponidw w r"nw �fter i-e not been -li 11 � UWMN dell -on.
Th. �fied skill ........ d . h-m, -g I-.- . oe, becom of ft beem. 1-di th prope, We , .,nj� b,,h. -f-..
Appb,,M, e bW on 05.
Supports
bill
Lo.& 1. Spp- 0 !jL-T-
ie�
Anelietile
lo�mked
1
1 �j
I Sm-
I Hal
I - Co- Cp
2.%"
s"s
Bodon;
2 - Co- - ST
550"
5W"
4.19"
1131
1 Nses
Iffiedidnip
- Bleeling Pand, are -med! W om� no loed; a,ofled! dwdy eoc,e them and dhe Ul I oad,s *plied 0 d, b, bdM dedgd.
wayubseww"Ous
W�hiiis- wenis #0 " tidni; orlu; Vodida will be in icoondince ,th Weinernae- prodi deW orten, � o." iined dWqn dm.
V,An.h- eveoily disdame snvotl, ..randesnilited . ft soft-ii. LAe of th I fo,- is notmondel . I.- die need for . dei
dw ofdrz ldw.or firamer ftt
Zond.w IN= d, by the �Ity hN rg:,don
Me d, . :
s S go 5
Aco-1. R = ) - no,
I'll fts wf- oreApee, men.,f-ed
Wete+iee- ladlided, are tw6party mull"d I. nw. foresery voi YAwhaciee, Engineered Lumber Rod- lh� been e4miood bY [CC eS
-d. iednieel nt�ls 1551k� IM and! ESR� Im erdle, 1-d in -d- .1h .0,.Ne � ...dwd,. ft -, ood� e4.0-o-., W.,ed-
pn� 11- end ineullaton d-eii, reler bi
1h. pmd� pkwon, p. dmign 1�, d - erd �o,, irft - h- been 7-dd b, �. S.F�.e Ow-
sv-.:n
li T�: 13,,op8-
8,41ding �: Re.,kn.4
WUng Co& : BC MIS
Design ��Iopp; SD
F.. Op...r 12112li 2:08:52 PM
Forte v5A, Design Engine: V7.1.1,3
BWWA. 4f
m- Page48of66
1F2.10
EMBER REPORT Ist, IB-21
pilece(s) 3 1/2' x 14" 1.55E TimberStrandO LSL
Overall Length: V 4 1W
4 ire
AN locations we memoseed Inion the attracts few of ieft suppost (or K —to.— end).All finsionsions — Is Cnpht
Donlon Results
�msw 0 ooscie,
Allowed
R—k
LDF
Mendier RewtitIn (Itm)
529804-
8181 (53W)
Pas (65%)
—
1110 1 L (AN Spans)
—
Show, (1b.)
3236 0 V7 11r
10127
Passed (32%)
1 '00
11.0 D . 110 L W Sp.,)
mommtopeltm)
9379 0 4' 2 1/4'
21840
Passed (43%)
IDO
I I A D + lb L (AN SP.,)
Live Load Defl. Or)
OJD57 0 4' 2 1/4'
0.193
Passed (L/999+)
—
JI.0D.lj0L(AA$p—)
Total Load Defla (h)
0.109 0 4' 2 114m
0.365
Passed (L/846)
—
jIj0D+lJDL(AlSpars,)
IDeW" mewas LL (,/�) and A Q_/M).
Supports
8—*V
Leeds . &Vp" (M.)
Tosel
Amilsble
Reo,*W
DOM
U_
'2'7*6"4
atew
T.W
i-sotdwti$,�
550-
5,57'
3.55'
2524
105
2-Se.d.,1I-SPF
5W
550"
3M-
2524
7M
105
5:
eloam ponst, we W .
kA [.We spoked . one —.,bw b*V
TrbL"ry Deed FboL- Snow,
Lando L-1- (Md.) Width (0,90) (LOG) CLIS) cosersents
0 S.0 VotigInt (PLF� 0 S' 4 112" N/A Z.3
1 �dbnn (P$F) 0 8'4 11r
mwk) Wr 6.0 10.0 Is, F_
2 - kle0ben PLFJ 0 . T 4 V2* Croo) Wit W.0 - 1,,.jI
3 - 1.1reore (P$F) 0 . 8'4 1/2" CrW) 8'3" 25D �.o 2nol FI=
4 � Won, (PLF) 0 se a' 4 112" crip) N/A W 0 �0,esii
5 - t)nft- P�) 0 . 8! 4 42' (TW) I' L51D 25.0 R..f
Wayerhammumarmolmo,
we— 1h. ts N.V d,. _11co, *11 be in s-,donce eid, Yknwhissemor Pock� doing, twa " PL4A#.d design 4—.
V*Wh— eWessy did, ne any odw ear'sni rested %.dw ;ra, not nndd . *—, �. reed fb, . tsoW
p.h.e,,d by xhor h-9),ralictor. d.
oon,.,, sro�&.�L
ble,eth= 1 "111 ad.'
h— (Motion We ftd.P&LY WdII:. ons W"h— 5WIsionwil L� Prodwits hi- beer, —4—d by rC ES
1-al nemors, ESR- I IM ard ESR. IM anctior seed In &=ndww eitin apsteatio ASN wardonjs, Fos o,nant cools veoWdicr, reports, VkWhismae,
W.d. ew— and inotmilmi. deals Id. W
The isookst application, WPA design, 1006, slevvnew�; sest nissot Ingiornsistor, bow, pnovided by rwoe Softessa Coenstor
F,rtsS,ft,,0pwst,r
I I., "...
3..r Lw, ,
—
� E,g."—" P 5
4,26)BI,_ IG
PASSED
SVA PIM
P*.b. Type � Fkh Down
BWdng ise : Residentei
BWdng Cod, � 15C 2013
Design WOWology: AM
1 211212018 2:08:52 PM
Forte r5.4, Design Engine: V7.1.1.3
Suilo!A.Wo
Page 49 of 66
MEMBER REPORT Ist, IB-22
In] F 0 R 'r E 1 piece(s) 5 1/4" x 14" 2.OE Paraflam(& PSL
Overall Length: IV W
Ir 4 Ur
AR locations wine assawsed hom the mbde Fme of left wMert (or left contfiener end).A11 dimensions are hortsontal.;Dreeing b Conceptual
Doing* Romift
Henna. Reaction (it,)
10383 0 7' 1 3/4'
122Z
Pease (85%)
1 (A"
Shoser (Ib,)
80310 6' 6 1/2-
Passed
to ; (AH Sp.
Messwe, fft-bs)
-7093 0 7' 1 3/4"
46854
Pansed (15%)
1.15
11 j) D + 1.0 S (All Spans)
Lee Load Deft. (61)
0.021 0 to- 10 11116-1
0.207
Passed (L/999+)
—
I I J) D + I JD S (Aft SIMS)
Totallee-
- essee.: . UL—)
Top Z ...na (.): T. ..ponesion, be brad . 15 6' A,"— cleared # wense.
Bostome Edp (L.). Boston, Wess. edge — be brwed as IT 6" A �— dWw otwi.,
loses"
I I L..,J, W &WW. ab.) - - -
I --- -
Aessl.
T.t.1
Amollotol.
Pootpirsid
Dead
I -
Lh,e
I Sh—
Tatal
i Hwi en 14" SPF been,
150'.
9!1
IV
269
266/-31
N
211145
2-Sbd,m[1-SPF
4.65"
M2
762
50M
L-sowwa-sPP
550-
55r
15T
IM
312/.26
6n
2225k26
101eddro
PASSED
pt
F.A. T�; 191,*, Bewn
Wilding i-se : Rossolornal
Widing �: MC W15
Door Wtkdelgy; $%SD
Commector skywoom, Svc
owpoirt ?.Tl@ Col� I Seet Lersith I TW NWk I Face Who I MenlerINallt
I -Pwe�tswow 610 2W. 1 IVA 1+IDd &too
hosi Died Ross, U- a —
Lando Won- (am.) Wktth (0190) (I,00) 0.15) �oesre.
0 - W A" N (PLF) 3 Ur . 15'T 23o
1 - thstser (PSI) 0. 5,9, mosk) V 25o GD
2 - Unkom PLF) 0. ITS, (to) N/A 90.0 Well
3 - U,soo. PSF) o . IF 9, (Too) I ; 25o 404 ��d Fl-
4 OInone (PLF) o. IV q* (TIp) NA 00.0 Woll
and
5 unftnnff?� 0. IT 91 Cleo) J* 1510 235 D ROO(
o .
0. Point (1b) 0191 cft�) N/A 3012 1 C-13�
4.1
I
Wl,,hm — wownses ". the, seirgelloopled.- ell bs.n —donee .0 Wj=pr old pL+A*wd dosq� 4—
Vily-h— eVersilydedsione—ethw w-widesnoosed . ft ftw.. ftnowl f. . door
peofe,si,nod se dmouninsol byft �,tyh&Ang predden. 1,, det,n,, d sowl, b.Ww e, kere, nisoperoose 0 essees thetens cAaAmew, Is
eeh 0,011 PmWt. �oeo (PA, Bowd, No4hg PwIe, wd Sqsoh %�s) we not deoigned by " sawo, A,odxes nsrs,ficezed
hs�ebeaneeoitwoi
Ftcoo1esd,Pos,Wyetee
F.ne�wsop :::� .-1 12112/2018 2:08:52 PM
�,, Lwete Forte �5.4, Design Engine: V7.1.1 �3
STL Eposeng. P S BuildA.At
(42511144.9449
Page 50 of 66
1F2.11
EMBER REPORT Ist, IB-23
igFORTE' - piece(s) 5 1/4"x 14" 2.OE Parallann@ PSL
Chrerall Length: W 3'
AM locations me meakifed from the mit0de face of left support (a left cmiNever end).Afl dimendone are bmlzmtal.jXaw*V 13 Conceptual
Design Results
�I a Locomon
All-ld
Member Reoction nbs)
G99 0 4-
12272(5.50")
lo—:10%)
—
I10D I I (All Spams)
Shear (It.)
545 0 V 7 1/2-
14210
Iloa (4%)
1 JDO
I JD D + I JD I (AN Spans)
Moment fl�llle)
1567 0 4- 1 Ilr
40743
1 P.—d (4%)
IZO
I ID D + 1.0 L (All Spens)
Ike Load Den. on)
0 JD05 Q 4- 1 1/2-
1 Passed CL/999+)
—
1.0 D + I JD I (AD Spans)
Total I Den. (11)
01009 0 4- 1 Ilr
_0.190
_0.379
1 Pa.
Dell— cri— LL W,190) " R OLIM).
TcP B12eflncina 0-0 Too .-- �9. — b. bWW . 8'3".,t Linea d..Id iknme.
E—Edge B—N U): B.— �— do. —be b—d at S' r k A— d-Wod—J.,
SlIpporu
ica.
-1
A--L
I - 5� .41 - SPF
550,
5.5r
1�
404
1 495
1
Baddnp
2-S.d�ai-Vlc
SSW'
5.53'
1W
404
1 4%
1 M
I ClIdIng
Y—king P-1. — —d . an� no oikk Mpled ol-* � lh,m � ft U Wd . m,1W . ft mi� ,ing de�iq�,
D-d —I-
L—Ion. Tr= (0., (1-00 1__
0 - SO Atighl (PLF) 0.8-3- N/A Do
I - Wft-IPSF) 0 . V 3- Mck) 3' 25.0 40 0 I's, I'loo'
WeMb"WerNoto
weWreies—&—t1vt eO�ngofim�odxm�l�b�,n,cv�,thvmy,h�pmd=dmrm�owdNbfgddftgnti—
po
oan,,.bl� .1h U. —14 ,oW, �. R, Ek,d, BixkV Pands ond Sqah Block,)— notdwgvd by *ft wri— ,,octicts m.Vmuw a
'h� fad— � J*6p" ce-ofied w s-immatl, Iffft" �nd-b. Wii!Y*i� eng—ed —be Prodints K� bie, r4k—d by IOC ES
ied�,A ppono ESA. LIM � ESR- LW Wor —cl � —d— wi 0 Vpli� ASIM —.Wd. F. — code e,�~ rW—, 11"h—
riroct,ct WWni ,d nim,11A. ft*—(e, . —.��..WwocdVod.1Vd--hbr�,
� procUt M01caaw, � dollar, foads, olmeniia,, � s,l,,ort aarrodor, li� bw prold9d bY Form Sdwwe Opww
F.n. S.ft.. Op.—
Job No..
e-, —le
BIL EN" -! mg, P 5
�425) Slo -�� 8
b'o, J."nic—g
PASSED
- Hoor
"ft& T�pe: Fkh Beom
bAd,v LM: Resklental
bAcing Code: JBC 2015
Oman r,%ftdd*W: ASD
12JI212018 2:08:52 PM
Forte v5.4, Design Engine: V71.1.3
SuBdA.4te
Page 51 of 66
MEMBERREPORT Ist, IS-24
6FORTE' 1 piece(s) 3 1/2" x 14" 1.55E TinnberStrand@ LSL
Overall Length: T 1116
@ M
AN location. — .—ed ft.. the cobile face of ieft -man (or Ift contrever end).AM dirriensons me Pwtcontal.;CrmtV Is Conceptual
Design Rmuttill
Comb�lon Cri
Member R—lam, fill.)
2678 -0 4-
6-tat 5.50-
Passed (33%)
ID 0 + I JD I (All Siocirs)
shem (lb.)
1207 0 V 7 1/2--
10127
Passed (12%)
I'D 0 + 1,0 1 (AD ')
Nornent (Ft- los)
3119 0 2- 110-
21840
Passed (14%)
11 JN
I I JO D + I P I (All Sloare)
Lbe Load Den. (11.)
Ooil 0 2. it t1r
0.131
Pmeed(L/9i
—
jIaDtI.OL(AlISpanS)
Totat Loed MR. (b)
0.— 0 V , I I " -
r 1611
1AUS
Odk— cromi.: 11. (1,41110) and R 4.rNO).
TV Edge Bwmg (I,): Toil, dp mi� "xed a 5' 1 VoIc �m deWd otionne.
Bottorn Edp Brdog (L.)c BoWom amioremlon Mg, —t b. br—d . V I I" ./c "— dWd .�..
B-Ty -------
F-
I
A_10,
AWWb$,
,�Wmd
DW
Floor
I"
eocn�
Tot,
I Sd -11 SPF
550'
550"
IAD'
Sr
MZ
74
W53
Blockin,
2 Sud -11 S�
550"
550"
19W
13�
1302
74
1 —
19—
Trlb—N Deed Floor � Sk—
Lemb LA"on (") Win (0,90) (1100) (1.15) C--.
0 - SO Wt,19W tcl-F) O.S!lr IVA 153
1 - U�om(PSF) 0 . 5- It- aack) 11 25.0 Q`0 wFlao,
2-unlionni(iftF) 0.51 ll"(Tw) NA wo - Wall
3-vmffannt�) ow 5' If' crop) a, 2So 40o 2ncl 1--,
4 - U.Nom (PLF) 0 W 5' 11"NO N/A wo 2,d Will
Swv.ftim(pSF) ow S. 11- (70) V "So 25D RW
Weparfimeweer Hoke
W—m— ai t. ft —d— �Iih or. ameris and Wtoshed d�gn A—
Ifils 101.icti, . b. In
s3dowmatiinctinbino*duck—ftneodforacknoW
.d"tyh"Vjyl.kt.rr�d�g"(—�d,WW��'k—�r.o��l"—r.ft,tN"d,U.�i�
a`r`"hdW=.ft4a= =% 0i P-6 did Sci,�810*1)—dmqawdby it"wtose. ood— on-foctored
we" t 4��Z=dio` . for— sander& -0,1,lmee— EW-M L—k. Plockas h— b— �ALWad by KC ES
.,d. inclinad 14,on, ESR- 1153 end ESR-13$7 micft ixeiol in �dmce -h applk&e ASIM varicirds. Fw o—ir,c -le evid� r�ooro, "t—
Wod- fiw,�. and iv.00. cletaill,d.
�e locclict applliMcm, MPA dwW loscis, domews mio� Upp= Ora mrdon h� low WoAded by FwM Saftware Oow�
PASSED
Sy-m � III
� TW.: Fi,,,h Beern
WUN U. : R-okMA
wlolw�:Mxls
Ow.0 �ftdb, . �O
F.. S.ft— Op.— 111, "—, 1211212018 2:08:52 PM
En'- Forte v5A. Design Engine: V7.1 A.3
�-Ev�ooi BuWA.4to
J426)dt4-N4S
Page 52 of 66
1 F2.12
iMFORTE' MEMBER REPORT Ist, IB-25
1 piece(s) 3 1/2' x 14" 1.S5E TimberStrand@ LSL
Ovarall Lengft r 6-
0
AN lo,,atiers ar� -od f,,m the mtslde face of Ititsuppert (cr left candlem enel d1mmsions we horUmW.;DawkV Is Coricephis!
Chasig" Rmulls
Meatier Rmtlon (lbs)
2824 0 7- 2 1/2'
- 4725 (1.50")
Peened (60%)
-
110 D 0. 5 L + 0.75 S (All Sows)
Shear (IM)
1866 0 5- 1/2'
11646
P (16%)
1.15
1.0 D + 0.75 L . 0.75 S (Ali So.,)
Mori 0+11los)
4854 0 T9 1/4'
25116
Paseed (19%)
1.15
1.0 0 + 0.75 L + 0.75 S (All Spans)
Live Loed D.R. (in)
0.0210 3- 9 1/4'
0.172
Passed (L/999 +)
-
I Al D + 0.75 L + 0.75 S (All Sows)
Total Load Dell. (ki)
01048 0 T9 1/4*_
_0.344
P.sled (L/999 �)
-
IA D , 0.75 L , 0.75 S (AH steins)
-W e,- LI. tW) me r, ULP,o).
Te, Edplae-,; 6 1): Top dW -et be �xed le 7 3"ok Alien, deed ed ethewl
�- EdW 13,.N (W): Bere,, ce dX � be ,weel a 7 3" ,t �m JIteled th-m.
Supporu
�rg
Leedii to 91,W- (lb.)
�Ieil
letal
I ...,
I Re**.d
Deed
Sre�
Terel
55)"
1 5 50"
1 2.03"
I�
M7
Inj
746
10.
See C- 9M bd- 1. addeeel f.-. ,!/� �k-
PASSED
- A-
Vlb� Tpe � %Ih fe,I�
B.AdW 1.1be: Red-.t
BwdN Code: W X15
DeMW �eftm�; ASO
Connector: Skimplan Strine-Ifle Cianedam
smi,e, I MWO Neet Length ToloNalls Feoe �11. M-b�Nmli. J�Ieii
2 - F- �10 2M- 1011od
T'b.-V D'e'd FI-L� Sin-
Lmds Liecatim (Side) Width (0-90) (LOD) (1.15)
0 - S0 W,lgrt (PLF) 0 W 70 2 1/2" N/A 33
1 - Lhft- (PW) 0 . 7 6� (5.A) 2-6- no V.0 1. p-
2 -i.eft-(�) 0 m 7' 614 (TW) NfA m a 1. �41
3 - Urde,rn(PSF) 0 . TV (T�p) 1� "I no D � 9-
4 - Untem (PLF) 0 m 7- 6" (Top) WA 8000 ;rdl WAl
5 - LMO.-rPSF) o 0 7,6'. Crim) 111 15.0 lt�d
Weyerhaeumir Hill
W�h- ==,!r 1.11 will 11 1� -.- with W�. dem .�. acl �Ibliil delign
We'h- ed inil ,-. r.190 0 he eef- Lise.f h, flkw-, - inercledl . --art eI eeci f. I oeig,
X-fiedorml Is dl.-.d b� ly hVj,.rm1,t.n, The d.9- f-c. Wide c, k- I ul
.'p.hi. wel, th-ell
W�11- 1.1illb. . ft6_,y _Aed te ftd- -I bee, -.W bv TOC ES
�.r ESR.i33 � SR-087 I,dl/� eaum'm'm,`*v�
d-lite-1 � melliew cliell If, W w1w
Ire ��' ep0,--, p. dogr, leacii, d-. arid �, rfer-ti. h- b- pr.dd by 1W. �f- Owet-
F-111-Op- 1211212018 2 08:62 PM
F--, I Forte v5.4, Design Engine: V7.1.1.3
3TL F BlJilldA.Ate
49
Page 53 of 66
igFORTE' mtmor:RREPORT 15", 'B-26
1 plecel 3 1/2" x 14" 1.SSE TimberStrand@ LSL
Overall Length: 5� 11"
AD k-lult., are .-ed fr.. the -bilde f- f left support (m left millemir md).All dirrensinne we hmlzmtal.;Dkjg Is CoriceptItal
0mlon Results
Mieriber R-tW (be)
3530 0 5'7'
8181 (5.50')
P..W (43%)
-
110 + 0.75 L + 0.75 S (All Some)
St.. clibs)
1755 0 4' 3 1/2'
ll�
1! !�%l
!
1.15
11.0 D + 0.75 L + 0.75 S (All Some)
M...t (Ft-1.)
2694 0 4' 5 S/16"
.6
'= (114
1.15TI.0
D + 0.75 L 0.75 S (All Spaniel
Ill Defl. (n)
01006 0 3' 2 3/8'
0
1.0 D + 0.75 L 0.75 S (All So.,)
TotalLcied -A
-- -.: . (1/1.1 - ri. 14-1
Tbi, Edcoa,mm (.4 Te, edgI -et be bramdet 5' 11"o/c �m cleuded! oik-m.
51trolEdge &WN (I.): Isomm mweemor, edge -be b-ed at 5' 11" 0/c um cleteled 00-1w.
Supporlis
seer"
L-%t*&*potaVbe)
�-*.d
Dt,Id
I =
I Show,
I
ISO"
979
M2
233
I�
2-S.d.41-SW
I s.so'
1 5
2X"
2174
857
941
3992
- �ft!Ra,i,i, are aIe,,r,J W � m loads 4VId d-dy elb� dem ard the U luicl i, mpii� te Ov -ter beN disi
-- Deed FI-U- 9,-
Loill J-Iel- (51d.) Width (ago) (1.00) (I.M) cor-
0 � Sel Weate (PLF) 0.51111, N/A
225o
1 �Lrheeapwj ows, lie mlick) I, 1 "00 Let
�-Uete-11PILF), 04054 U" crw) VA W.0 IsrW.1
3-U.db-(PSFj 0 . S' I V (T�p) 1. mo "013 H.,
4 Wirt- (PLF) 0 W Sp 1141 (Top) N/A 9010 2rd Wall
5 U,,ft-(ps�) 0 . s' "', (TW V Ise �D Pof
a �rrejib) 4'9 wp-) WA int 7,16 1025 U,*ed km: 16-25,
5-2
WeValrhaeumerlillotm
ft�hiee- a-ld"thed,ing,
"other we-eireleted W the Fbe... U..fdN,-1�.ee.,jr-dIdo,- fe, d"T
The de§q..f-d,bUkl- . -'. r. this Mallow
egdedgedbythts eeft- Rcdxm -Facued a
ft.h.- section xe ri,cIparly mtfied to -& i is Weyete- g -d Lunber Pm� ce b- ewmIted by icc es
wdo be:16eel cipmet ESR-1153 and ESR-1387 andlIv tete�J,m �dlaree 10 eppliade ASYM steridees. ft eede Wy.+-
XedLII I-, �ld �Sbl debell I.F.
The Wo&Kt appill rM desq, loods, d nexsms and �t �witt,w ow, beei proAdid! by �W Seib,- Clovaex
PASSED
sy", 1 Fl
M&Ttw T�e: MI, Sem
widi �: Reeidei
WON Cede : 15C 2015
Cmq, Ver,,delogy: ASO
I 2Jl 212018 2:08:52 PM
I-, U�, Forte v5A. Design Engine: V7.1 1.3
STLE-.- �P� 8011A 4ta
(426)SWIP148"
Page 54 of 66
1 F2.13
MEMBERREPORT 14 IB-27
9FORTE* 1 piece(s) 3 1/2"x 14" 1.55E TimberStrandiSI LSL
0-111 Lerngth: 7'10 V2"
r 10 ur
AN louations me meseso-,cl hM the Wtakle fxe of left wWort (a left carttileses wd).All climenadercs we hattlontaij)rawing is Corweplasal
Desitign Rsssiailts
�..101-ocation
Allowml
stess.th
LOF
Load, Cm baslar(psatana)
Meraber Reaction (lbs)
350604-
BIEL (5.50')
1 Passed (4 3%)
-
to D + I L (AJI spans)
-
show (ba)
2059 0 V7 1/2*
lot 2V
Ito (20%)
1.00
11) D + IJO L (Ali Sports)
Mcnnert (Ft Its)
5783 0 3' 11 1/4'
21840
1 Pawed (26%)
1.00
1 Is D + 1 Z L (All Spars)
Us. Lead Dell. (it,)
0.048 0 3' 11 1/4-
0.18D
I Passed ft/999 +)
-
I JD D + I JO L (All Some)
Total Load Der! (In)
0J061 0 3' It 1/4'
0.360
1 Pasted (L/999+)
-
I JD D + I D L (All Spans)
Too
fttem Edge BImN (1-1): �tol sacm 1,191 ,t be trabaJ at 7 li" ot, �lm ed od,w
Supporu
JA,orlas
1�1
A�Iadla
Rllq.kd
I Dawl
I '
Uve
Total
1 w 5.d wall - SoF
5,50"
2.%"
1 749
2M6
ElW�
49
275ti
35M
181�'
we"e. o,—, — _ — — -11 1 Is mi"'. - - Ma— corg —a-
"W
Dead
1LtAs
LM&
L"""" (Rde)
sh,
(0.90)
1 (I.W)
Otsc7l
j2.Sa#MQht(�F)
I - U,h- (PSF)
) 4z
T
1 25.0
1 100D
WeWh— In. " U-9 dlc� ord.. w 11 be In accorclars, d, V"Instsa,av pod.' was, tm. � ,Ui*.d d.W
Way,sh_ �caslydada
.,Mble �ith th11 vjart. SlocklkV Panels wWSqash Blocks) menotdo7ed byttissofware. Prod= rawd a
hmbvsne,.IuwscIbylCCES
.rc.,
TnaproaztapO�cMw,�mp�dognloa&,d�wsr4moWtirft�mh&ebmprWdedbyFoWSo%veOWaw
PASSED
sy..: Moor
�� T,,pa: FIh Ec,ma
B.IdN Lee: Rc,!�.l
WldM Cocla : W MS
Oman, Vdselcic�: AS[)
F ... $—.1. 0pr 1 2/1212018 2;08:52 PM
�!, L.,q. Forte v5.4, Design Engine: V7.1.1 �3
ETL E,csr, PS BuildA.4te
M25) e Wo
Page 55 of 66
MEMBER REPORT IV, 18�28
:9FORTE* 1 piece(s) 6 3/4" x 22 1/2" 24F-V4 DF Glulam
C—Eill Leogth: 23' 7 1/4"
22'8 Itr
0 9
All locations we atecastoed Bonn the wattle fave of leftstopivort for left s,mvillower end).Aff dintensions me harbental.;Drawing 1, Conceptuat
oftlon Rmulb
A..altilsl.obaklan
Mlosol
At —It
LDF
L �blaattcssn (Pat—)
Member Reaction (iss)
14245 0 5 11r
2-
��26
d '1N?
, 1,3 L (All Spers.)
Them (1b.)
1335302-4-
831
+ I A L (All Spans)
Is. W...t (Ft-lbs)
G&W 0 11'9/16'
103250
Passed (86%)
1 JOB
11.0 D + I JO L (All Spans)
Use Lossol Doll. (M)
1 0.427 011-9 3116'
1 0.757
Passed V538)
jlj0D+1JDL(AIISpwa,I
Tatal. - - -
. . .......
0w'Ap.___w)_db'.W._raw al'091 d. — calotdo,w] eing kingd, I - 22'8 1/Z'.
Is, drft of I,aw at� rega caabw haaa mt lacess d la han uWasku dallacem.
The specified UkAll is acessasec! so It— strwQ a d, laccamat of d, bawn. Incull man wc ild, W as udwtad by ft rI
ApplI.M.caloth—webasaicsti,IDS.
SUPPWN
. assmop - - —
&cesssew
I
h1sallable
Respilmd
Dead
-
Total
I - IWW or, 22 IQ'� bawat
3.25"
5914
M2
1�16
S.
2 � HmW w, 22 112'�
1 5.2S'
Hwopw�
3.00
SW
W13
=_._ .—sews"Cles—eassms"as so — sa — - case — caw'.�wvsrsanwgs,
I S. C_ 9.4 bd- fis, dmwW wft— W. raw—.
PASSED
I Sy— ; Ft
Be
BUldN Uts Readmcal
WldMC.de: MC 2015
�M Madnaotalogy; ASD
C"awtor. SIMP.Q.
-IMCOMWIlm
sslPomt "I
M.M
Lentoth
911N/A
I Top Wlb
I— �Iss
Mwnbw�l.
�masorkw
I - fws,�Hwsper
Coandsaw M IN
i N/A
N/A
WA
i - F_ �_ Hcrq,,
C;onnector not b'd
I N/A
I NIA
1,41A
WA
yrl.*" Dead FI—Live
Loads Location lack) WICIth I (069D) 0.00) ans.
0 _SO MIUM (PLF) s vr so 2y r ff"/A* I
1 � unsoort (Per) 0 to Y (Top) 4DD istmoor
2 - U,*- (PSF 1 3V to 1W W ft) LB. 400 ist Ff.,
3.VM.-(P$F) 10'6"b7rr.174 ._ _o
17.1 400 MM—
I.VwI*aa(P$F) T as 174 Cftp) 400 2rdrio.,
5 � Posts (to) Ir "a"It) L�t'! 0511 as-lo
Wevab"Isellirlillob"
Wes,rhas— wannarsts ats, the shing of 10 pksaa will be In —d— whin Wepschassem Waskst stator Massie ansi aubh shed costs, A—
VAcvwb-- �.* dclsicas ary od� —arst. Islated W the software. U. of - sofisaare is not inowslect . or— ft read is, . design
pnciacconst . demanned by ft asslliann� h�V Wkcon. U. cleasq- of —.d. Wtd. .1 Iraracts, m tvapmesict. 0 assure 0. ft. WU— Is
�bls willn the 1 Prelect, Aactessorms (Pin, Board, siScsshilkek0are.Wledtiradbrh.sefibwe �.akictsi —f�edct
facifiless, are ftdv" earMad W aAMaNU:r=d' &W—cl L�alxr Prodxes hm been CAuateed by KC ES
,,rshcr dcd recent; ESR- IM " ESR-1397 .40b, wassed I. —d— Wh spoficabs. ASTMWrdmft ft eat- ropmes, W—�
crod� liscraose and nstallation deaths rder W w..wayerha%eweorJWaoIpwkt%*cu�Ibrwy.
In. IrVA desq, lowls, d rawatcra, ant sttsport irvor� have been W.V4.d IaV Fares Sofb..a QW—
F.- S� oosates, 12MM018 2:08:52 PM
Ec. Forte v5.4, Design Engine: V7.1.1.3
EMLF,�—,.P -, BujIdA.4te
(42--4-0416
I a'.. Page 56 of 66
L
1 F2.14
MEMBER REPORT 14t, 18-29
t5FORTE' 1plece(s)51/4"xl4"2.OEParallam@PSL
Ovwaill Umoh: IT 9 1/4'
ly 1W
a 9
All II we n—red ftom the wtelde face of left wmat (m left millem end).All dImensens an, hwb=tW.AakV Is ConcephW
Desiligm Re"lls
A.W*�W
AH-W
R—It
LOF
Loet. Cornblinwion (Pattwn)
menbe, Rewtie, (b.)
12987 0 13'3 3/4'
12907 (3.96')
[Pased (100%)
—
IDDII L(AUSp—)
Show (Ibs)
12839 0 12'3 3/4'
t4210
(90%)
1 DO
1.0 D + i j) L (All Spent)
Moment (Ft-111,3)
25223 0 W6 1/4'
40743
Klaa-m4 (62%)
IDO
I D D + 1.0 L (All Spans)
LIVe Load Defl. (in)
0.15907 1/8'
Passed (L/996)
1,D D + 1.0 L (AN Sp-,)
Tote! Load Defl. (h)
7: 82
0.2710 71W
_GA34
0.651
Passed (L/576)
I D D � I ID L (AM SP-1)
Dd� — LL 0,W) —1 R
T� Edp&�g (L.): Top WW� ed;e a—behr—d w 3'o/curiee 6�el� th-
8-0- F * &�W nu): B=m C�wmm be —be br—d a B' /c Lrhm, IeWed,t�i-
I
SUPPIN"
B—UV
I - Loadotelkpimmila)
[—
T-1
A-0eible
RIW*W
DOW
TOW
I H� - 14" GLB b—
PWQ.l
1,50"
1256
1 1670
1 2926
jSeer-�
2 H� en 14"PR b—
350'
HwV&I
3.95'
5316
1 7697
1 L3013
JS—�
AthmW �, ft TOW 8eeIrqdnwWm ��d Wlhl�dlh dft �Vq th.hvW
. see � grW bdm Im addlawal f�rnem =Ltr le�ke--
-bue- Deed FbwL�
Lamb L-1w, (SIde) wpm (0,90) (1.00) C—.-
0 90 V*QN (�F) 5 L/7'. 13'5 3A
I U,ftnn(ps�) 0 . Qr 9 V.,
ff.'
2 - �t (b) 11 6 W ]��041 E-�� jE-�-
Willeyemsemw Room
VAeff — d—.th hm—p,�dWgmm*oa&,dpA*ihWdem9nvLm
WI*e,lr�w— epne* dlddm � wlm -wrantle, r4ftd = We— U=of thl sof—d �$nw I—Ided w d—t ft mod fw a diagn
.nmble �All lh=0 'Y�
=. M ��4 ) - � dftqvd bY ths software, ftdc:3 nwUmc—d st
W,h— 44— - ft".'Y ewIfied . Iw—Y �ft W.YVf— &V�wl Lulbw Pd.ft h— b— *�sW b, IM ES
'. �� A -Is e9k- � M wel ESR- 1307 andl. Ixsecl 0 a—d� wi th snoIube ASrM st-0. Fa �ert code eyWuadw repons, aftyw1va—
mod- — � 0".. dew. efe,
The xcd� WOI—n, � wtip l�, dn— wd Wmt,rft� lh� baen pm4ded bV F— Sft,,, C�mw
PASSED
Sy— Ft—
Vwnb. T�; �� B—n
B,Adng �: Reeldwed
Wking Cod, DEC 205
Deson Nleftd�,W: ASO
F..Sft-open- 12112/2018 2:08:52 PM
Forte �5,4, Design Engine: V7.1.1.3
8% E,g,m-,,g P BuildA.,#e
Page 57 of 66
MEMBERREPORT lst, IB-30
,:!�7037E* 1 plece(s) 3 1/2" x 14" 1.55E TimberStrand(i) LSL
0�11 Lengft W5 1/4"
0
Allbufflongaremea-edfrom lhewtWelaceofleftwipport(w left cantilever end�All dinteroong we hmuontatpawing isConcepwal
Downs PAON(ti
�b�__
Meetw ReWtIon (11,S)
6752051/4-
6752 (2.14')
P= 1;101*)
D . 0.75 L . 0.75 S (All Spans)
!2
_
Shew (lb.)
49710 ll 7 1/4m
10127
; (7 _
io
—
I . D , I A) L (All Spans)
M—t (Ft-1.)
20679 0 V4 1/4*
218Q
Passed (95%)
1 JOO
I A D + L.0 L (AD spent)
Live Load Defl. (in)
0.3 3 0 7'4 1/4'
OA61
Pamed (L/422)
1.0 D + 1.0 L (AN Spans)
Dell— --: - 0,360) -4 TL V240)
TW Edge Brmng (Lu): TW —pn—n edge brWW e 8' 1" 014 tate, de:M�
�. Edge &adw (L.): ft.. w—. edge — be b,.ed . 14'./1 .14— deaI�d d—.I..
aewft
1 Leeft W (I-)
I . . -
I—
A1.11.1ble
Re��
;.W
I -
tw,
.
I T..
laH,nger� 14-�bean
25"
HIn,w�
2.0"
N22
IM
35N
ISee"-
2 - Po& On ne—y - —e
1 350-
350P
2.0V
1 D46
3778
974
7098
11%ne
PASSED
:pl
t4m� Type � 0,� Mwn
WIdWUs, i R-denld
wldlmc�:!W 15
D.ign Nkdd*W: �D
A, �", ftTotd OMM dn-len 11 —d b ftlidth Ifft —1 tlWS�Ilng he henge,
I S. C— Od bd- 1. Mft.W.r&— wWw -k—.
commectior. Simpson -T% commWiltm
9'ap- M.141 L-01, Tm NMb F— �Ib Mwob.Nmb I iI—,ite
I � F— � ll� �410 1: N/A 41,10d 16-lod IN—
Wayerhmiaiiier Nallat -
W"t— 6- ft "N If IM WI&M A be In axwdInce *M Wftvi-ew ��t dmigm m twa " P,0,twl d�r �11-
Vje� d�� � � .-".,,Id . ft Lae d ft --l— 1. neb-nded . I— - neel f. . deagn
p,fee0—I ft dew Mined by ft .dwity �Q �-ftUm, 'Re dea" of—J, bukk, w te,w , eep—be Io — thm � �mdmm I,
—P.bk *� the —nml on� A�Iw, (N. fb.d, ftd�ing Pwe, �4 S�eb Nd.) we — �g� by ft. �� —f—wl m,
—�",-wbMCES
the W�vpfid.Nw de,,gn 1�, d— wd �wt ft— I—e been by F— Sft— Opw—
Fln, Seftlll 0,11- 1.1, N.- 12112r2018 2:08:52 PM
Forte v5.4, Design Engine: V7.1.1.3
SuWA.4te
Page 58 of 66
1 F2.15
MEM13ER REPORT le, 16-31
�VFORTE' 1 piece(s) 5 1/4" x 14" 2.OE Parallani PSL
011 Length: 15'9"
623W
El 0 9
All boations me measured intent the of left su"t(or left centes— end).AlIdurensorm a hitnincental.;D—Ing hConcepbual
Desligin Reeinalts
AotemilialLocat"
Allowed
efult
LDF
Load,
Menter Reaction (Ibi _
1501110 12-9-
18047 0.501
P. (8`1%)
-
1,013,1 L(AdjSpars)
Shear (be)
5016 06'10 1/4*
14210
Poemed (35%)
1 DO
I j) D + I D L (Act Spane)
Moment OFt-lbs)
-8816 (01 S' 2 3/4'
40743
Prosad (22%)
1 .00
1 JO D , I JO L (Aci Some)
LWo Load Deff. gi
(10 15' 9'
0.200
Passed
(2L/999+)
-
1.0 D + I jO L (Alt Sows)
Total LOW Defl. (in)
0.053 0 9' 2'
376
Passed (1.1999.)
-
1 ID D + 1.0 L (Alt So-,)
=on-ar - — — HL .—
defledon ormeraI LL (021 OW It (2L/240).
TM Ed;w Sniong qs,�. Tolo corrioremon adr, areat be braotIl at 15'9" o/c undeat metaled ai
Boroorn Edge leseng p): 15—on otenoreltion Mile — be br— at 159" ./� LH., clateled tnarwea.
�SS311:auorftat."4
SNPP-ft
Bme'"
We& to suppefbe Obe)
me
Todd
ArmiletiL
Roolobad
Dood
U_
Soon.
tell
L � Sbud At - �F
SM.
55W
Mss�r
11.1
497
184
1
-low
"ana
2 - Calann Cap - obad
1100,
11W
5.95'
7+18
IM54
1732
21244
BoaIIN
3 - Co.— - �
1.
4,W
I SWI
gOeo
—
_
- momerop ____ . rarnirromeasappmoo .-W— -- — ea'- nope. to — -- —, —,-.
!�Wrhanmbvemr Nobw
W"Kioumr� warrants that riemmV ofiaproduda will be In accondaroo with W.WhaamaI plod-t mair craina and oubli0i ong, odues.
Wenenhavueo, ii�xefily alaclarre " o4ver wanaroce related to tre w1ware, U. of Me wftw.e 1, not ravoleal to dr.—t the need for a melon
p'.feelon" a �aaarni bv ft awliwity hatingiumuktion The destner of record, milda� or karner is rMarobe to eature that th—eaJ,bon 1,
oa'.bla .,� th—ell prapoot. Ac= ieo�4, badN Paral, and Smeadn 81�)g;notdadqfad by this seftware. �,duom norufmaured a
Woweh— ddp"i Z= We ""M W""In"" nweed Lunber lfrodcta howt been awAumed by ICC B
.notr W- M9 anel ESR-IM trallor Wd en actordbereffe wl th epoloalb. � anindarde. For —ant .b .Uatbari aparm, WrIerhaeumir
�rooiuot learmare aid Nimbellaton debah refer W —femerhommor =miwoodprodLxm/d=nmn�kbrarI.
'Tre produot apAeaden, Ingtuit domign tomb, droarvions " mvportrolornaton hoIa bean promded by �oraa Sdaware Operaw
PASSED
--moor
f4efter T� � 0WOaaw
Buldrig Lea: Itesdandual
BuddrV Caoa: OC MIS
Deeign 11�enotd.W: ASD
Fare. S.ft.r. 01., 12112/2018 2:08:52 PM
�L L,IIIP. I Forte v5.4, Design Engine: V7_11 1 3
BuWA 41*
.4-n ' !B445
page 59 or 66
:n,FORTE' MEMBER REPORT 1�t, 18-32
1 pieei 6 3/4" x 24" 24F-V4 DIF Glularn
Overall Length: 23! X
0
23'3' F1
All Ixations are neirtaured fro, the outakle face of left support (or left cantlioner wd).All dirnerelturs me IncerLIontrill.;l3rawling Is Conceptual
bealliffel Results
�bbfarlan (pairti
Namber Reaetion (Ihs)
21
1 21171(l.50
I D + t A L (All Some)
shear (be)
Im
1=
D + I B L (All Sows)
Pos 114orment (Ft-lbs)
114509 0 11' 7 7/16'
1 116784
(98,1')
1V
1.0 D + 110 L (All span')
Life Load Dell. (in)
0,452011'77116'
0.753
Pargeed (L/599)
1,0 D + I b L (All Some)
Tiatell.—W —
-
I —
I'm—ol A I— I
I . . + I . I a'.
Dtfi—n bara: LL (L/360) — TL (LIM).
Tap Edgetemong (I Too opree— adtla — be b-W. IV 7"o/c -I— deteloo Inarw
BoatterEdge Br000,; (,� Bonorn wnforeom adoe nuetbeorwed at 23' r o/c unlaes detailed atnerwim.
Ormod pteI nor— Mlu� bY I �� fi� of 0.90 trm� waf calouland Ang leni;tIn L - 22' 7�.
The effeeeta of poe— or rageove canto, � not b— —ted for ~ oecdatin, defla�lon.
Th. Tooted oda-, aeourned to In— 1. —g monabora at tno boatorn of - bown. VrIoll wlLh — We up ae domed by 6. —fiemener.
AWk&. �— are bmad an 10S.
Bearim
I Lood. 1. Suppeents (be)
I
I—aaf
Total
I A�wllabltf
I Ftmqllrad
I
'L-1Z
I ..'
I - SaW won - PSL
sm"
5so'
4,91"
ix�
210's
jr,ore
12-Studwall-PS1.
550"
550"
4.87"
Met
2
TrIbutenif
Dead
Flaiarru�
Leadat
LamItIon (Side)
Width
0`490)
(1.00)
1-
0 - Sall Weight (PLF)
0 to M, 31,
NIA
39"
1 - Unife- (PSF)
0 to 23' 3' Cnbo)
4
2-Unftno(PSF)
0 to 3' (TOP)
D
3&UnW(p3p)
v to 9-37M-7
40D
WeWhommerwarrartatinatthegirgofits, I wMbein�d�wimWftvt�prodxtdwmmtyia"PAI*�dd�gnWumi.
VWerwheauser efpremly d9dienne " other warrantles rels"d 0 line w%are, Lee of N it sotawar— not lintandawl W Waurnwint tre neW lo� a demon
profeavorw a dearmned bv tne &~ty hiefing juriselction. 71ne does- affected, builde or it— Is raparmobl. to matera, theit M �Afuladon 1,
actopecibi. wim it,' mall p,.Jw. A-1. Otino B-d, 19I.mling Parde .6 Squmn� Bloak.) an. roldmigned by orn, aafmaro. ifroducts —f.—.d at
W.Y.t— 1.100. - IrInd-paily mirdflod to eurtarade Forestry danclarch WeyerImeauter Engineered 1i Proaticts Inewobvien G%miluated by ICC ES
". tadnli. IV" ISA�1153 and MR-13117 andjor armed 1, sco."darce w,th q)NIcalbe ASTM standards. ft carrai toolumoo,worte, Viowerhommer
,,Ddwt Wareture and-tailmlan metals refer 0 wwwwoyarnammor cornAaeodpooductuldownrenWitrary.
Th. pladjet application, ." design load,, demmi Id .4port fft rnmen harwa been —,%ad by Fante Software operator
F—SafibeI—Oiwrebe, I I.b .. I
PASSED
14-ber TWa: Droo Bet.
15.11ding — : Reed —al
Buli c.1a � IBC MIS
Deeogn Madeelblogy: AM
12/1212018 2:08:52 PM
Forte v5.4, Des[gn Engine: V7.1.1.3
SuilidA.4te
Page 60 of 66
1 F2.16
EMBER REPORT Ist, IS-33
plece(s) 5 1/4* x 14" 2.GE ParallainnO PSL
Overall LsrqM: W 3"
AD locations ar. .-red Isom the Nft Face of left suppott low Ieft candiever 61d).All dimensions are horlaontel.;DrawkV Is CmwpbA
Dadjal Ranks
AchseJOLocaldon
AN...d
R-k
Member Reaction (be) -
9277 0 -P IP
0047 (5,SO')
Passaic! (51%)
1 D D + 1 L (Ali Spans)
Shea, (11,S)
9099 0 6- 7 1/2-
14210
Paitsed (64%)
1 JDO
I j) D + 1.0 L (AN Spans)
mompent t-ba)
23692 0 5'3 3/4'
40743
Passwel (58%)
1 DO
I A D + L JO L (Ali Spans)
Lt. Load Den, On)
0.066 0 5' 3 3/4-
0.253
Passed (L/999+)
-
I ID D . 110 L (All spent)
Total Load Dell, On)
DA 12 4P 5' 3 3/4'
0.379
Passes] (L/815)
-
I A D + I D L (AN Sim.)
- MWX LL k-) = N. Q-UW).
Top Edge B,� 0..): Top wMeses,, edge �b, b,,,W & S' 3- ,t � debalsc� pths�
Bossom Sow Broom (WY. Bottom ate es,stba brapod as 8'3otc L"m &MW ot,-
suppoiru
6--hv
I L-ftt.
Total
AvAbbk
Fbs%Assd
Dftd
FLWr
[�Acppasajes
I-Se,dwal-SPF
SBY'
5.5W
2.V"
23%
�2
5M
[N-
2-�dwa]-PSL
55V
5.501
2.Sr
3796
WI
9277
1�
Td.."Y
Dead
Flow�
Lon&
I. -Ion (91cle)
wwth
(QSD)
(1.00)
comsee,vo,
0 Sell ftgN (PLF)
0 . 83"
�IA
1 Aft"(PSF)
0 W 81 3PI (TV)
2. Pom0b)
5! 3 3MN (Tr-)
N/A
S427
So -
=2
weyedwislesermofts
W"Y"hes-
W_h_
dld:% -c0se -'ard. Id-d se t. Use of lr-dd . --,Me -d for . design
Wofeedcral . d--.d by o. �11, U. des� cf,-,d, b.1der cr ft- is mepme,1A. W - M. 111-alWatIon 1.
conVable Mth the paII W,,ect. A-escsa (Alm Seed, el"wq Pee, md Sqash Stocks) ars �dewqvd by this sof- prockcis r-Jacbred a
V"h-bV-dL-bvPod� hvebweatuasvdbYKCES
PASSED
;A-
Iyefter Type: D- te-
Mom � : Reedem.1
VsAdw Cools ; W nIS
Dear lAeftc1dogy: Aso
F.- S.-.1. 01-.- J.. N.I., 12/12/2018 2:08:52 PM
EI-11, L.,,P� - Forte v5,4, Design Eng;ne: V7.1,1.3
N� Eq--Q, P 3 ButidA.4tis
(425)814-We
b,_ _�.N Page 61 of 66
in 7 0 R 7 C-: - -1-MBER REPORT Ist, 1B-34
plece(s) 5 1/2" x 18" 24F-V4 DF Glulam
Overall Lengift 1r
197
All location. - .-od ft.. the ."0. lace of left Wt for left -tk- end).All dimeneast. - hortp-tL;O,-kv Is, C-.pWM
DeMpas Rakenift
Meatier Reaction (lbs)
13388 0 16-9-
16M (430')
L 1!
.0 + t j) L (AN
"1
Shear (lb.)
10426 0 13-1 1/2-
17490
P=
1100
11101) . IA L (All Span.)
P. Ji "-lbe)
53437 0 We 5/16"
58021
Passed (92%)
1.00
1 jD D + I jO L (AD spans)
Use Load D.R. (k,)
0.259 0 S'5 9/16*
0,550
Passed 0 065)
-
1.0 D + 0.75 L + 0.75 S (AN Some)
Total Lwd Deff. (111)
. 14, , .. 1 .1 tl,-
n ...
� - .- I
W- .1- 1 (V") ary! � Qjm�
TopEdQ,5,wW (W): Too cc�sae- dge �bbrsocdsr 17� oALxtm,Iks,Iodot-
SoccoynEdge Braorg (W� Bottomoemosee,n edge �brclpamd at 17'o/c-ImdkbsW otsw�se.
Cr,ccal ppObye momens olpeted by a ycl� facey of 0.98 dw - ostdapscl �W lergd, L - 16- 6'.
T,. eff- of p.4. c, regatlys camber � - been acce,,vcd for he, celdlorg dflood-
Is, emptied 9Usm 1, asewd w hme 1c, 9 Ism,yA,m st fl, becom d ft beem. recall 11th props, side �, m mdctad by ft me,,,f-
AppiI.N. dWafiomt - based . DS�
SWPPQ
Sess'"
Leask t. ----I
- ---
I
--
1
`L-W
I —
I Tate,
I � Tilmmor - SPF
4501
4 -W
SM
2258
1 14767
1�
2-Thmmor-SPF
450,
IST
6611
1527
1 14915
1�
7,111"Kery Deed Ft.. U. 9-
Lomb Wkhh (0190) (I=) 0.w)- C--.
0 - SsIf Yftht (FLF) 0. t7' N/A 14.1
I - UWc,m(PSF) 0 . 6- 6- (To,) 79" 25.0 0 0 IstFl-
77�-(PLF) 0 Up 6' 6- (Too) N/A Si Is,well
3 v ua." (p5F) 0 to 6' 6. (Top) 7 9" 25.0 4013 21d M-
4 - J�ft-(PILF] 0.6 6 . (Tw) N/A wo 24 .41
5 .0"o PSF) 9* 154 250 Rof
- U ;IA 7523 So- - IIIID
6' v 1p�o Liz te,
vmvtw�m� met"
WcYam-arse Ow ftunaditwd.- will bei-- MW.,wt- oroixt"a""'i ard pubirM
Wsyc� �ossyoiso
h- arreanyother wa-elatad. ft solo-, U. d4fteellare tIntasled . d fe, a elaegn
W.'essonal as psorned by reovd, Wide, v famor s rsepersebt, 0 "t fts cajc�.,
,.1ols .,d, he -11 W Z:P`a9:,oWf S�osh Stocks)
Wis. - ftdp-y comfisol se -sei,,abl. for-Y sps�.dl. V*Yt- BW-.d L� Prodcle - b- eyel-d by ICC eS
--d ,ipom, E%- t M arc! ESA- 1387 ard/b, tested 1� -d- me, spoicakI. ASTlyl sta-dittle, ft -.1 cock, �- reons,
pmcit,ct 1- " males,,, &Wh,,f, le,
Tne pred�cc oppicac-, V. dee,,n Iasda, d - end �Ik forms� hays b- -dd by Fy. 5.11twer. Cp-
PASSED
;H
W.bar Tgs � Orce B-
Widrg Use : 11-darolsi
BUIdnit Cod,: BC 2DIS
Desir Veftdoicgy � ASO
F.m.sft-op..., J.. N 12112/2018 2:08:52 PM
8- ",v, Fote Y5.4, Design Engine: V7.1.1.3
STL E,,,ne,r.,, P 5 BuildA 4t@
(425) 814-U48
Page 62 of 86
1 F2.17
MEMBERREPORT Ist, IB-35
igFORTE* I piece(s) 6 3/4"x 18" 24F-V4 DF Glulam
Overall Lerqlh: lln
1&3'
AN bcBtkns me -ed from dvwtWe tam of ieftwppwt (a loft cantflover ond IAN dknersions me hwbontal.Aawling IsConcepWall
Design Reaultv
AMW*L*""`"
Al-ed
R-k
LDF
L�& Combineklen C�nwn)
Member Rwtion (69)
17427, '.
19744 14.5()'�_
Passed (88%)
-
1.0 + 0.75 L + 0.75 S (AD spans)
shear (be)
13974 0 1'10 t/2"
24685
Massed (57%)
1.15
1.0 D + 0.75 L + 0.75 S (AN Spans)
Pas Momert (Ft -la)
618510 W 2 1/11'
69764
(89%)
1 DO
I JD D + I D L (All spore)
Lke LOW Defl. CIA)
0.259 0 T4 1/8'
0.550
P.-d (1-1764)
-
I ID 1) + 0.7 5 L + 0,75 S (AN Spams)
Total Load Defl. On)
0.560 0 8'4 1/4'
0.825
Passed (L/353)
-
1.0 D + 0.75 L + 0.75 9 (An Span,)
- Orem. IL %�) Ano �
Top Edge Sn-Q 4�0 Top wmeseko, edge m-be bn�md a 17'01C �= Labeled 0�w.
B�� 'dp Bradng (Lul Bomm C�esen edge �tbs bramd a 17'o/c �Iess debsed oifimeiss,
01� p�l� - m)nW by a W� feeo, d0.96 thet - MWsbJ �g WVIh L - W6'.
Appl-ble c6o-i-ns - besed on
Supports
8-*V
L-d. . &�. M.) -
--,-
I
Total
A�fiabla
RecWIred
E�ad
I F�
Uve
I am,
T.W
I�Tnmnee-�
4M'-
3.9r
9240
5942
Nbne
2-Tn--�
450'
45T
143-
$114
673�
1 325
In73
11*rs
PASSED
S'sts- M-
ft� Tpo � Or, 0-
B,IdM Ux : Reodendal
BWd.p Coole : MC 2015
Deso Wetoddogy : ASID
-- D.6 Fheo,!.� fln-
L-� (Sele) WIddh (") (I.M) (1.15) licomments
a - seff "4DN cp�) 0 W 17P N/A Ns
1 m JnqDn(FLF) ov� Y 1pl P-) N/A 9�15 6713 LnkdT--: �02,
2 - pon, (b) y 91 (pont) N/A lW2 7" 370
3 - Pcle� (b) 3Mp'(ftcnt) N/A N6 6 1 10,
4 � Unfi,nn N/A 022.8 3 130
P�j Wfj
15�Unhnn 93/4, N/A
Vleyerliaeusawar Notes, Qiuwssassalscammw�
W,nv,h- -- MK the si&V f I. V.4,els �11 Win -d- .0 ft�lesas, and oLkAsIned deson
,dl;: he med for . deign
'�- �-""d b, ""m '* *.=f, .1
.'a as dater-ml =, hw=
p,ofess �:Ubon. �. d=of der or I-,, -�.#dlododmsonl.
.,MNe wifth the 0 pn�V�- (PJ=;2:TWVYPLds " Sqsh Blecls) so not dWI;rad by Ills sofibere. ftelk- m.1mored et
W� h- fdli'" - ft oetfid . f ses �oe .4.ond S
� � I esi , mone E 1153 snol M - 13 87 en d1v te Md I n m- omce M MWa'W' �lu t I -AS TZ==Wd 't, W== d eh=aWbOMM e �oes, lb'�Y[OhC I-E
V�wt 11- end � - debol, We, se
lhe �Od� Appl-on, V" dsdr I�, d- encl �-&, meew hene bss� W� by Fens Samens, OWee,
F.- s.ft.. 2fl2/2018 2:08:52 PM
R-L-11 Forte v5.4, Dlesign Engine: V7.1.1.3
8!1� UQ111111II P s &MA-4le
(425)01�- �8
b'- 2'-g- I Page (13 of 66
MEER REPORT Ist, IB-36
6FORTE' '1E piece(s) 6 3/4" x 19 1/2" 24F-V4 DIF Glulam
Overal Length: ir
All loodons me measned ham the wtade fm of" support (m leftcantilem end).All dimensions me hmlzontal.;DrmkV Is Conuptual
Design 1111multe
combineslon (pamem)
Musber Remdon (lbs)
1852603.
'91
12
1 jo D 0.75 L 10. 5 S (AN Span.)
Shem (lb.)
135310 15'
VW
M ILIRI)
' DO
10 D + 10 L (All Spans)
P. Wmert (Ft -lb,)
786" (P S' 7 1/2'
M23
'..(97%)
1.00
1.0 D + 1.0 L (All Somes)
Lbe Load Deft. On)
0.245 0 G'5 9/16'
0.550
1 P-W (L/810)
-
I Z D - 0.75 L + 0.75 S (AN SP-)
Tons'-dDeft On)
. I -, - - , 4
. , M
Dd- er,uei.� U 0,W) and R �JMQ).
Top EdW BrWM (Lu): Too comp� edW m be br� ot 17'o/c �= dsts� �no.
3e.. Edge &aong (Lu): S... .--. dg, - be brood . 17'./, � develed e-.
Uftd posi - noment *eed by , el,me fe- d 0.% net - cdoAse,d u0no ongth L - WV�
TN ff� of pd� � nso- c-be, � ne� been we-d f, Men cMcd,ong defl-+
T�, speo Ud gkiern I, ee� w he,s ft eteng lamnse,,ne a the beorm f It, beem. 1-11 win �� side � es inicsiml by the �f-m+
Appbc&e cWsbons e,, bsesd on WS.
Supporb
8--ft
I 944,mt. (ft)
I
Aco-Im
Total
�Alsble
Reenhed
Dead
I Eho,v
Total
I-TH'
4W'
4.W'
4,22"
W27
6749
1 �
211M
None
2VTMmnesr-�
3.96-
9439
7�2
1 3M5
W166
4ens
TrWmy
Dead
Fl- U.
W-
tands
Loesmon (ad.)
VMh
090)
(1,M)
(LIS)
comonme
0 - Sd We,glnt (PLF)
0. 17'
N/A
32,0
1 - VMom (PLF)
OW771 -1/2
T�M)
w,
M.5
6713
-1
51 is
'j
u �02,
2 - peen, (0)
8' 7 In' (rl-)
N/A
5015
2�
29-W
UnIntd IB-il,
a - J"oe- (PLF)
Fr-)
-N/A
922A
=3
360
u k-: LIM;;
- I
Walarkassumar Nato
Wemha- wsnees 96M ofite V*Wcee 10 be In �d� 110, W anomblisn d-
Lee mqnt=for e &or
M(M..w a d- W the �,cy h,4ng V,S*tW. The desow of-d, Wide o, tamer is re=-"e 0 assxe tw ft-AaMon Is
PASSED
sy- ; M
Momte, T�po � DrV seem
Buldw : Residem.1
widw cods: NBC WO
Osseo, Wleftdobgy: MD
12112/2018 2:08:52 PM
Forte �5A, Design Erfte: V7.1.1.3
Enp�.-Ij. P 5 BuildA.4te
Page 64 of 66
1 F2.18
MUERREPORT Ist, 1&37
%9FORTE' ME piece(s) 6 3/4" x 18" 24F-V4 DF Glulam
Overall Length: 1r
All i-ten, . .-,ad fron, the -teW. f- of left pport lot left contflow md).All dimeraore are hortiontal.Aawling I Concephial
Design Ittem"Its
A -I 0 Leeeelon
Allowed
It
Mentba Reat,tion (11,$)
IS772 0 3'
19744 (4.50')
1 P-1d (80%)
-
1.0 D I 110 L (All Soon,)
Sth- (b,)
13937 to IS'l 1/2'
21465
IF (65%)
1100
110 D + I At L (All Some)
Past Moanent (Ft-1.)
70004 0 9'4 7/16'
69764
Pal (100%)
1 AD
110 D - 1.0 L (All Spans)
L Ile Load Defl. on)
0.2770
0.550
P.-d (1.1715)
-
110 D . 0.75 L + 0.75 S (All Spans)
Total Load Dell. on)
, :: : I!L2'
0.585 /4.
0225
Pastel (L/338)
-
I Al 0 + 0.73 L + 0.75 S (At Some)
Nfl ton LL #,�) end TL
T�'Z, Brating (L,): TV maloneadort edut, -a, be b-d a 17' /, nele detaled othe�-
� Edge Etaing (LUX Bottom �eIdm edge, o,et be breoed at 170/c Hm Jetal ed othe.,te.
C, eel pea- - letleW bY a vd� faoe,� of 0.96 In- MWaaal �g length L - 15'6',
The df- of podd,e e, ean� hal, - been ooerteel f. �I,en odWedng leff-on.
The e-ill el Is atelotl to h-ft �n, e the �oer, of me bee,n. InsAl lth wo- l,5e W ae lncl� by ft row&
AppliwN, Awl,dm, an, bleed on MS.
Supports
see"Iry
Loa& W ALl000rt. Ob.)
- - -
T ,
[�
A,lellbl.
Fteot,,lned
Dead
Floor
U-
soo!
i
i-Ton--sw
1,50"
3,59"
ome
7564
Iss
I IPW
htene
514
�n
"itha" Dead Fl .. LI,,e Sn-
Loindis LonIllon (9d.) Widdh (aso) (1.00) (1.15) c-n-
0 - SO ft1glot ^F) 0. 1, II/A 295
I - Uneo. [�) Otell-05"(Flont) N/A 8213.0 8258 ills �--F- -IJ-D4,
7 - P,i,t (lb) 12 2" 111-) IJ/A 57911 1 l7 3257 m,,
S-- 2
Wepillmommerthates
W-himlim, W.- 6. the .211 of 1. pred- ni be 1. -d- .1 th V&-h- xoa. des, citerl. " PL6,hed dato, ek-
numed W the oft- 11 Is noe InerdW W cir- the aed for a deal
=edW
orol d b:= th"eas"' Is
lh, VCd& e0letWon, Inolt ellar toals, dalanaeo, end bw l by 1I ScIbnart Operate,
PASSED
sy- moo,
1,*� Tpe: Droo Beere
Mdn; I-Jte:
B.AdIng Code : BC NIS
Deagn Wkt�ogy: AM
F- $�tn, Op- 2tl 212018 2:08:52 PM
,,, L,,Pe Forte v5.4, Design Engine: V7.1.1.3
cm F.,o ... no 1-� StolleA.4to
(l26) 3 ". 11
--goo., , I Page 65 of 66
EMBER REPORT Ist, 1"a
%9FORTE' -, plel 4 x 10 Douglas Fir -Larch No. 2
Cnverall Length: WY
a 9
All locations ant, �red kom the mtside foo, of left wpport (w left oartliever III dimensions an, h"wt&L;Drawhg Is Conceptual
Design Results
-
an -
Merabe, Reaction (Its)
122
321111711')
Palliated (25%)
-
.0 D + 1.0 L (All Soans)
Shear (lb,)
TO
3".
37
Is
loassed (10%)
1 Do
1.0 D + III, L (AN Sows)
Worent (Ft-b,)
676 0 V7 11r
4492
psasw (15%)
1 so
+ to L (All Sparts)
it
Ll,e Load Dell. (it,)
OD02 0 V7 1/2.
0.108
Pealed (1.1999 t)
i'D D + I A L (All Soal
Total Load Defl. (In)
o_ .
lo-d eLM9+1
Defl.,tiln li- 11. (L/360) end � tf210),
Too Edge Bradna (11-4 To, --n -oa - be b-d at 3' Y'./b �I- le.W.0-ote.
Be- Edge B,-W (L.): Eto- .--. or - be -d . 3'3"./� lNm JeWd .0-se.
Appk&e dW-. ae baI on MS.
Supports
--- seloog - -
I L-H. . SL4v- (b.)
To.]
A le
L"
Dead
Floo,
LIAt
Tell
3211
So'
M2
I- _Tn SPF
I�
I 1.5a,
3m
so,t
832 -
hot
11.0111,1115
T1.6.1.-
D
((rl)
so
Flo-U-
1..)
joloorn-
013
j12-�211VA,i,"1PL1l
I - ote-l-I
1 lo3'3"(T1P)
1 7' 9"
25.0
10 D
I IstAi
we"irm"Imetir Notes
ftmh- .-- thet "' saw fielllod.. ol be In -� a, W,.t- on:okeldigronten. " �bhthed deW �al-
YiInlrhIte- ,ranJe,,Wod to 11. toftlare Use done W-11, nstinelrdd w W=t the need W deItgn,
The oeiorw,F,,00,d,WId,,r �-srsoonmb* to �thi-dflel
�baeneel,,00eolby!I)CES
p,od,m loena,ln, aral nitalaton, dealt], refil, W --embee- eont400dprod-Aloonent-lbrery,
The P1.1tet apphston, Inlm d.W load., d-ore " .4pla, lft � h- been v.1dd by F. ea Soft... ow-
PASSED
System � FI
Mernber TW, lon. Etaern
BUldng Lls, : Resdan.81
BlIcing Code : SIC MIS
D"W Vleftcology: ASC,
1211212018 2:08:52 PM
Forte v5A, Design Erg;rc V7.1.1.3
8.40.4te
,41 .64LIU
Page 66 of 66
1 F2.19
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Gravity
Lower Floor Framing
19011 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEFRING Fax: (425) 821-2120
Lateral
Forces
19011 Wood-Sno Road NE, Suite 100
WoodinviHe, WA 98072-4436
Phone: 425-814-8448
E NG1 I'-IEERIN G
Fax: 425-821-2120
548 Paradise Lane
Revision Date: 12/13/2018
Building A
Criteria
Code:
2015 IBC
Allowable Stress Design (ASD)
Seismic Design:
ASCE 7-10:12.8 Equivalent Lateral Force Procedure
Wind Design:
ASCE 7-10: Ch. 28.6 Envelope Low -Rise
Risk Category:
11 - Other Structures Table 1.5-1
Snow Importance Factor
/s = 1.00 Table 1, 5-2
Ice Importance Factor - Thickness
li = 1.00 Table 1. 5-2
Ice Importance Factor -Wind
1W = 1.00 Table 1. 5-2
Seismic Importance Factor
G = 1.00 Table 1. 5-2
Spectral Response, Short Period
Spectral Response, 1-s Period
Site Class: D
Site Coefficient
Site Coefficient
Structural Systems:
Light framed walls with shear panels
S s = 1.264 (Mapped)
S , = 0.495 (Mapped)
Fa = 1.00
Fv = 1.51
All other structural systems V TL = 6
Response Modification Coefficient R = 6.5
Overstrength Factor Qo = 3
Deflection Amplification Factor Cd = 4
Ultimate Design Wind Speed: 7V mph
Exposure to Wind: Exposure B
Topographical Factor Kz-r 1.00
v' Table 20.3-1
Table 11.4-1
Table 11.4-2
(Figs. 22-12 thru 22-16)
Table 12.2-1
Table 12.2-1
Table 12.2-1
V
v Section 26.7.3
Date: 12/13/2018
Page: L1.1
19011 Wood-Sno Road NE, Suite 100
WoodinviUe, WA 98072-4436
Phone: 425-814-8448
E NGINEERIN C Fax: 425-821-2120
548 Paradise Lane Revision Date: 12/13/2018
Building A
Roof
Geometry
Mean Roof Height
Hn
27.5 It
Roof Depth
D-Roof =
4 ft
Overhang Length
24 in
Pitch
6:12
Floor 2
Geometry
Wdth
VV3
74 ft
Length
L3
67 ft
Plate Height
H3
8 ft
Floor Depth
D3
14 in
Floor I
Geometry
Width
VV2
74 ft
Length
L2
67 ft
Plate Height
H2
9 ft
Floor Depth
D2
14 in
Basement
Geometry
Width
w1l
73 ft
Length
Ll
67 ft
Plate Height
HI
8 ft
Seismic Weight - Roof
Roof Area 4250 SF 15 psf 63,
Wall 290 LF 4 ft 10 psf 11,600#1
wall 310 LF 4 It 8 psf 9,920#1
Total 85,270#1
Seismict Weight - Floor 2
Roof Area 92 SF
15 psf
1,380#
Floor Area 3660 SF
25 psf
91,500#
Deck Area 204 SF
25 psf
5,100#
Exterior Wall (2) 290 LIF
4 ft
10 psf
11,600#
Exterior Wall (1) 290 LF
4.5 ft
10 psf
13,050#
Interior Wall (2) 310 LF
4 ft
8 psf
9,920#
Interior Wall (1) 310 LF
4.5 ft
8 psf
111,160#
Total
143,71 G#
Seismic Weight - Floor I
Roof Area 54 SF
15 psf
810#
Floor Area 3660 SF
25 psf
91,500#
Deck Area 204 SF
25 psf
5,100#
Exterior Wall (1) 290 LF
4.5 ft
10 psf
13,05(V
Exterior Wall (B) 280 LF
4 ft
10 psf
11,200#
Interior Wall (1) 310 LF
4.5 ft
8 psf
11, 160#
Interior Wall (B) 280 LF
4 It
8 psf
8,960#
Total
141,780#1
N/S Projected Area - Roof
Sloped Roof Area
345 SF
Gable/Parapet Area
45 SF
Wall Area
296 SF
EfW Projected Area - Roof
Sloped Roof Area
315 SIF
Gable/Parapet Area
45 SF
Wall Area
268 SF
N/S Projected Area - Floor 2
Sloped Roof Area
0 SF
Gable/Parapet Area
OSF
Wall Area
715.33 SF
EM Projected Area - Floor 2
Sloped Roof Area
0 SF
Gable/Parapet Area
0 SF
Wall Area
647�67 SF1
N/S Projected Area - Floor I
Sloped Roof Area OSF
Gable/Parapet Area 0 SF
Wall Area 711.33 SF
E/W Projected Area - Floor I
Sloped Roof Area 50 SF
Gable/Parapet Area OSF
Wall Area 647 . 67 SF1
Date: 12/13/2018
Page: L1.2
IT7
ENGINEE-RING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
548 Paradise Lane Revision Date: 12/13/2018
Buildin A
Redundancy, p . 1.o (Section 12.3.4)
Desim Base Shear
Sms F,,Ss (Eq. 11.4-1)
1.26
SDS % SMS (Eq. 11. 4-3)
0.84
Sml=FvS, (Eq.11.4-2)
= 0.74
SD1 = '13SM1 (Eq. 11.4-4)
= 0.50
Seismic Design Category: Structure Period and Weight:
Short Period — D
1 -Second Period -- D Ct = 0,020 Table 12.8-2
x = 0.75
Building Height (Mean R000, h, = 28ft
Approximate Fundamental Period, T, = Ct (h,,)' (Eq. 12.8-7)
T = Ta = 0.24
TL = 6 (Figs. 22-12 thru 22-16)
Calculated design base shear:
V= C, IN (Eq. 12.8-1)
SDS
CS = (TR
(Eq. 12.8-2)
e
Cs = 0.13
The total design base shear need not exceed:
(Eq. 12.8-3) (Eq. 12.8-4)
f o r T T L Cs = SD1
T (T'
e
C, = 0.32
Cs = 0.32
The total design base shear shall not be less than:
Cs = 0.044SDsi, �! 0.01
Cs = 0.04
nor where S 0.6g:
Cs = 0.5S,/(R/le)
C, = 0.00
C, = 0.13
V= 0.13W
SD1TL
for T > TL CS = T2 (TR
e
Cs = T95
(Eq. 12.8-5)
(Eq. 12.8-6)
Date: 12/13/2018
Page: L1.3
ENGINEERING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
548 Paradise Lane Revision Date: 12/13/2018
Building A
ps = A KzT PS30 1.00 Exposure B
Kzr 1.00 Mean Roof Ht hn (ft) 28 ft
a (r000 = 6.7 It
a (upper/main floor) 6.7 It
Ultimate Wind Speed 110mph
Roof Angle 27
Zone
Area
P�� (PSO
P-- (Psf)
P (Psn
Force (#)
ASD Foxe (#)
Force
ASD Force
Roof A..q
54
23.1
23.1
23.1
1238
743
858
615
Agable
27
23.1
23.1
23.1
619
371
429
257
B
54
8.3
8.3
8.3
443
266
429
257
Cwall
242
17-3
17.3
17.3
4198
2519
3878
2327
Cgable
18
17,3
17.3
17.3
315
189
291
175
D
291
7A
-7.1
7.1
2075
1245
2331
1399
Total Area
686
Total Load
8888
5333
8216
4930
Design:
9989
5333
Zone
Area
P- (Psf)
P�� (Psf)
P (PS9
Force (#)
ASO Force (#)
Force (#)
ASD Force(#)
Floor 2 Awall
130
23.1
23.1
23.1
2992
1795
2073
1244
Agable
0
231
23.1
23.1
0
0
0
0
B
0
83
8.3
8.3
0
0
0
0
Cwall
586
IT3
17.3
17.3
10146
6088
9373
5624
Cgable
0
17.3
17.3
17.3
0
0
0
0
D
0
7.1
7.1
7.1
0
Total Area
715
Total Load
-0
13138
-0
7883
11445
-0
6867
Deslqn:
33236
7M
Zone
Area
a - (PSO
V'--. (Pst)
P (Psf)
Force (9)
ASD Force (#)
Force (#)
ASD Force
Floor 1 Awall
130
23.1
211
23.1
2992
1795
2073
1244
Agable
0
23,1
23.1
23.1
0
0
a
0
B
0
8.3
8.3
8.3
0
0
0
0
Cwall
582
17.3
17.3
17.3
10077
6046
9309
5585
Cgable
0
17.3
17.3
17.3
0
0
0
0
D
7.1
7.1
7.1
0
0
0
0
Tota I Area
711
Total Load
13069
7841
11381
6829
Design:
13069
7841
Zone
Area
P- (Pst)
P-.� (Psf)
P (Psf)
Force (#)
ASD Fame (#)
Force (#)
ASO Force
Roof Awall
54
23.1
23.1
23.1
1238
743
858
515
Agable
27
23.1
23.1
23.1
619
371
429
257
B
54
8.3
8.3
8.3
443
266
429
257
Cwall
214
17.3
17.3
17.3
3713
2228
3430
2058
Cgable
18
17.3
17.3
17+3
315
189
291
175
D
261
7.1
7.1
7.1
1861
1117
2091
1255
Tota I Area
628
Total Load
8190
4914
7528
4517
Design:
8190
4914
Zone
Area
P'. (Psf)
P-- (PSO
P (Psf)
Form (#)
ASO Fame
Foxe
ASD Force
Floor 2 Awa 11
122
211
23.1
23.1
2812
M7
1947
1168
Agable
0
211
211
23.1
0
0
0
0
5
0
8.3
8.3
8.3
0
0
0
0
Cwall
526
17.3
17.3
17.3
9109
5466
8415
5049
Cgable
0
17.3
17.3
17.3
0
0
0
0
D
7A
7.1
7.1
0
0
0
Tota I Area
648
Total Load
11921
7153
10363
-0
6218
Design:
11921
7153
Zone
Area
P - (Psf)
P.- (Pat)
P (Psf)
Force (#)
ASD Force (#I
Force (#)
ASD F- (ff)
Floor 1 Awall
130
23.1
23.1
23.1
2992
1795
2073
1244
Agable
0
23.1
23.1
23.1
0
0
0
0
a
50
8.3
8.3
6.3
413
248
400
240
CVValI
518
17.3
17.3
17.3
8974
5384
8290
4974
Cgable
0
17.3
17.3
17.3
0
0
0
0
D
0
7.1
7.1
7.1
0
0
0
0
Total Area
698
Total Load
12379
7428
10763
6458
Design:
12379
7429
Date: 12/13/2018
Page: L1.4
ENGIUEE:RING
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
548 Paradise Lane Revision Date: 12/1312018
Building A
Vertical Distribution of Lateral Forces
Base Shear:
V = 48.07 kips
Shear Walls: k
F, = C v, V (Eq. 12.8-11) C YX wxhx k (Eq. 12.8-12)
Y,-j=, wihi
Diaphragms:
n n Fv. = 0.2SDsIwpx ... [Eq. 12.10 - 2] (min)
Fv, = (I Fj / I wi) (w,.,) ... [Eq. 12.10 - 1]
i=x i=x Fv,, = O_4SDsI,,wp,,... [Eq. 12.10 - 31 (max)
Stre gth Design Seismic For es (E)
Floor Level
(from base)
Height,
h�
(ft)
Story
Weight, w.
(Kips)
w.h.
(ft-Kips)
Lateral
Force,
F,,
(Kips)
Story Shear,
Y_ F,
(Kips)
Story
Moment
(ft-Kps)
Portion of
Weight at i,
Y-wi
(Kps)
Diaphragm
Force,
Fpx
(Kips)
Roof
29.3
85.27.
2501.
18.27.
18.27.
183
85
1 .2
Floor 2
1 19.3
143.71
[ 27781
20.301
38.571
9281
229
24.22
Floor 1
1 9.2
141.781
13001
9.491
48.071
13691
3711
23.89
I OW15 vV .51U.10 rups
Y-w.h. = 6579 ft-Kips
Stre gth Design Wind Forces (W)
Floor Level
(from base)
Lateral
Force
N/S, H,
-(Kips)
Story Shear
N/S, jHx
(Kips)
Lateral
Force
E/W, H),
(Kips)
Story Shear
E/W, ZH.
(Kips)
Roof
1 8.89
8.89
8.19
8.1
Floor 2
1 13.141
22.03
11.921
20.11
Floor 1
1 13.071
35.101
12.381
32.49
Seismic,
Wind MIS
Wnd E/W
[0.7E]
10.6w
10-6VIA
(kips)
(kips)
(kips)
Roof
oof
12.79
5.33
4.91
Floor 2
16.95
7.88
7.15
F 1 oor 1
loor 1
16.73
7.841
7.43
Shear Walls (ASD)
Seismic,
[0.7E]
(kips)
Wnd N/S
[0.6w]
(kipsL_
Wind ENV
[0.6W]
(kips)
Floor 2
12.79
5.33
4.91
Floor 1
1 14.21
7.88
15
715
Basementl
6.651
7.841
-7 H43
Date: 12/13/2018
Page: L1.5
1 1p,
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINEERING Fax: (425) 821-2120
Lateral
Shear WaUs/Diaphragms
E 0
ILI!011 10
too(
Q
�1.
(14 - - --- . -1
I
5, n044.4
MAO.
19011 Wood-Sno Road NE. Suite 100
Woodinville. WA 98072-4436
Phone: 425 - 814 - 8448
Fxx: 425-821-2120
49k
?3pf
soil
3?.Svt- w
13 tX- V
w p
3ol
f tw
03
�75:�-
-7
Project:
Lotoj5-
Designed By: BTL- Date:
Project Number-
Client:
- Scale:
Page: L- 2.1
I
I
N
5,1�10
A(w)
IIIII vo I v
lot -
4000
swe)
vivzi
19011 Wood-Sno Road NE. Suite 100
Woodinville, WA 98072-4436
Phorie: 425 - 814 - 8448
wAwws Fax. 425 - 821- 2120
(,,g (F-)
Proj ect: Designed By: Date:
Project Number: bt—Drq Client: Scale: Page:
190 11 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 980'72-4436
Phone: 425-814-8449
ENGME. Fax: 425-821-2120
........ . . ....... 144S
.. ......... .......... . - ............ . ........... ...........
rut
Z.Oq -7
A30
................ ............ ...... ... . ...... . ........ ...... ................ ...... ..................
.............................. .............. ............
Sr4 PuF
TM --.I
-T�
(w)
....... . ............. ..... �
........ . ............. .......... . ..... J
16t
CO
A70
.................... ...... . ...... . . ..... .............. ............ . ................
04A
AJT
'11s)
-----------
... .... ..
....... 4T
44 .................. ..... .... . ..... . . .......
. . ............ .......... .......... .............
..........
..... ....
............
;�.A-0-40 =No
L*A Fir
Project: LMe�- Designed By: 1�- Date:
Project Number: 51_DC-4 A%, Client:- . Scale: Page: L2-3
BTL
5ft7h9- VIO�A—
............... ....... ........... ...... .........
3 Sb
R.
........ .......... ......
TI.
Nei-
19011 Wood-Sno Road NE. Suite 100
Woodinville, WA 98072-4436
Phone: 425 - 814 - 8448
Fax; 425-821-2120
:cw 13 5
Q= ......
. . . . . . . . . . . . .
t
..................... ....... ....... . ...... ................ ... .............
. . . . ... . . . . . . .
........................ .............. . ................ - .... ......
5D4
............... ............ .................................................... ... .......
6*D
- r4f-S?1�614-- ..............
7( 40SO
ILA
Y
TU Lp
t
. ....... ..... - ...... ............. .. .... ..... ........ . . ......................
................... .... ......
. ....... ....... ... ....... ......... . ...........
................
Am7e)
a-m if r
Project:
LA"ff-
— DesignedBy: f5T-"- Date:
ProjectNumber:
A�-
Client:
Scale:
Page:
. .. . ............ ....... ... .......................
19011 Wood-Sno Road NE. Suite 100
W(Winville. WA 98072 -4436
Phone: 425-814-8448
F&x: 425 - 821- 2120
. ...... 7`e
CW
...........
....... .. ........ . .....................
1.7! ... ....... .. . ...........
................. . ..........
. ........ . . ............ ...........
7 ......... .......... . . ........ . ........... .................
WWI,
.......... . ...... ........................... ......... ........... ( ... 0. ........
aqwff. too;
E±1
CUY
M-4
. ........... ............ .... ........... ........... . .. ......
.......... ........... .......... ......... 4 ..........
.......... . ......
...... .. ..
0660
(7
.714
..................
........... .......... ... ............
(W) issvq_
:17
........... . is! ... .. J...
. .......... ........... ............ t ..... . ....... ....... ... .. ............
A-,O Aor..
1, A.04tT
Project: ?#AA-OI,5_a LAOJ e- Designed By: fwM Date:
Project Number: - 5t-DC-4 Ar, Client:- -Scale: Page:
. BTL
eovor#
5+10-
4
........ . ........ ... ....... .. . ........ ...........
. ........... .... ....... ............
... . .................. .........
105,
......... .......................... ..... .
y
IVA. I
........... .....
1�110 OAFr':
.......... ...... ............... ... ........... 4; .......... ......... . ......
4 f
#,Wood
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8W
Fax: 425-921-2120
uF
op)
......................... o
.... ........ .
Proj ect: FNP� I 15 LM Designed By: - fM!-- Date:
ProjectNumber: - 5L�pet Az Client: Scale: Page: L2. to
19011 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 98072-4436
ENKGMER Phwe: 425-814-8448
KG Fax: 425-821-2120
.......... . ........... .................................. . .... . .....
... ................ ........
7
...... ........... . ..... . ......... ......... ..................
..... . ....................
I�A .......... ....
. ........
LF
rw
.................. I ............ ........ .. .... ....... .. ..... . ................... .............. :,
..................
74.
.......... .............. ......... ................
..........
......... .
. ..............
....... .......... .. . ...... 4 �5-9. ........ ........ ....... .......
..........
tjo �A,
f
Project: ?#*eJ'k-OI'S5 LMe- Designed By: 5Tt-
Date:
- Page:
Project Number: - 5L�VC-4 A,,, Client: - Scale:
0
4il V-R
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072 -4436
Phom:425-814-9449
Fax: 425-921-2120
..... ......... ............... v.— ....... .............. .......... ................... .......... ... . ............ ...... ................
CA ... .................... ......
....................... . ... ... . .......................... .............................
. ........ . . .. . .................... ... ....
. . .........
................... ... ................ . ...... . ................. . . .. . ... ... . .. .. ........ .. . ..... . ... ......... . ..... ..... ....... . .. . . .. . ....... ..
IWO-
.......... ........... I .... . ... . ....... ...... . ..... ........ ......... ....... .......... .......
Q
........... ..... .......... ....... .............. .. ........... .......... ....... .. ...... ........... ..........
. ......... ....... . ........ . . .. ..... . .............. ........ ...... . .....
.... ........ ............... .......
NA
L........... .. ........... ..... ....... . ..... ...... . . ....... -f-
.. ... . ......... .... . . ....
IV
............. ... ........ . .. ...... ... ......................... ...... . .... ... .... .. V-1 ... . ............................. . ..... . . ...
0 U
Project: FAAA-0155' LOW(�— DesignedBy: —BT-(-- Date:
ProjectNumber: 5t�DGI Az Client Scale: Page: L2. -
BTL
now;-fAmEm.
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Max; 425 - 814 - 8448
Fax: 42-1-821-2120
............
................... ....... ...... .... . ........ . . . ...... e ...... ....................
...... ...... ......
6.0r)13M (Olga*
U
4L
fo r
No Op
7 ......... . ......... ............. ........ ............ . ....... . ..... ............ ............. ...
. ............. . ......... .......
abo
.......... ......
......... .... ............ r2WI4
... .. ........
211
A Pr
f t"Upvt
.......................... ... ....... .. ......... .......... . ........ ........................ . .......
........ ....... .
7— ...... .......... .......
&J Ail
377
Wh
............ ........ ............
/?7p,.p
........ .... . .. ... r-* . ............. . .................... .........................................
.. ...................
JAC" Mw:
Project: 15 Designed By: Date:
Project Number: AK Client: - - Scale: Page: L2.1
19011 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 98072-4436
Phone: (425) 814-8448
ENGINE.F,RING Fax: (425) 821-2120
Lateral
Shear WaH/Diaphragm Capacities
2015 IBC - Diaphragms (8d Nailing)
Table 4.2C Mossinal Unit Shear Capacities for Wood -Frame Diaphragms
Unblocked Wood Structural Panel DiaphragmsL"45
MMd.-
Mink-
40lbl
, "
6im 961SPd�Vld dinh-gm boudd.
. ft law
dWphf"mbK%,k,,.
avacme M
sh..Ih,M
F..w_
r-bob.
h. F-Afto
Nllw"
P-W
Twel-
w
a". c- 1 ca-s 2.
walllftl�
c- I
c�
Z3AL4
(K)
.a PLY M v
ad 1.114
5/16
2
i 330 9.0 7�0 250 4.0 4.5
3770 7.0 &0 280 40
460
0
350
390
ed 1.3M
w
5
49D 0.5 A 3w '0 4-1
'v'o
sw T 1.0 4
-UPO
1,40
SuLck" I
2
505
sw
lad 1.112
I&W
a
3
.1
10 Aw 95 10
a 9 AM I I It'
ow
M
600
310
350
5115
-
303 9.0 63 J 220 FO .
340 SS
ad IA14
33D +L 250 so 3.5
.5 __T5 "0 5-0 H ,
70 B.D 4.1 M .6 1 .
475
460
34
330
430 9,0 as 320 " 41
450 7 S 0
-Alt-
4
3M
sl,.9k,
ac
�.�Va
N 6
46D o 40
.510 z 2 1 A 3K 4.5 11
645
475
SID
-
5,32
..-A
1"
2
481 .0
536
505
510 �5 ve 1 3w 10
715
'ad 1112 AM 12
S70 'a'
1.0 i 4M so
11. 4M 8.5
75 400 70
55
SS
so I
a95
1
600
Soo
670
546 C...-
lm� ASO 111-- lq-'Y LKM ll-1
t: -1 FP�. �
k �. pinu.,
F-X'
PM.1 k.- N
d.W.
4 2.7 1 S.Ad�A fr_
CM,
1 Lq P-1 D-
F�., lW� b, . S.�,
5 -� Ad,-,
T]. W� C Speas, G-Y f klg N�*,
App-, bl.
-4
a aw-
3 OYFJ� S,"-
plaois wb. . ply 5 ply pll,� P� P� - -d C;.
.W-AW bl DpL� bl I I
c
Table 4.2A Nominal Unit Show Capacities for Wood -Frame Diaphragms
61mllea Woo Sbuchural Panel Diaph-9wa�ll
"all
M.n, Lxas
all
bo -AM L.M..
'2
.0 7 1.
21 S
w I'm Ia,
M 's
1� ls
?
j--
is
's
M.
1.31,
M
IM
IM
I Nd-� .. tab. 42,3.�-
,426 IW%,Mflk��M4271rw�
2, thn D,%Ill Fi, L-b � SWhm P
b. 4-i..d bv lllkml� th.
Pi" by *e SPMA, Gvy Adp ---
5�& G1..Yf ft ft-4 %.b. ft- d. M05 (rAk
1133A� Adj- fla. "I
w- 6- - " - It lbp
- k. qw . I % . � .1 W�i
fw doglg- 4 6� Osa " 3 piv �W-W pl�. W%M 4-pl,
5-0y P11-W F� -b - L-IL G. dW1 W x�
05
r-
C- M. r-,
jv&
",a
�V
1 . Reduction Factor= 2
2. G = 0.42 (SPF or Hem Fir)... Adjustment Factor = [1 -(0.5-10.42)] = 0.92 or 0.5 (I -Joists or Douglas Fir)... Adjustment Factor = 1.0
L3.1
2015 1 BC - Shear Wall Schedule
7/16"OSB; 0. 131 " i$i Nails; SPF or H F Studs @ 16" oc
Table 4.3A Nominal Unit Shear Capacities for Wood -Frame Shear Walls'-3-6.7
Wood -based Panale
I
SEISMIC
A
a i
WIND
t
min mun
it
Minimum
Nomina I
F stamer
a
Pe "striation
Fastener
Panel Edge
Fastener Spadpq (in.)
Panel Edge Fastener
Sheathing
Panel
in Framing
T ype Is Size
6
4
3
2
6
Sclacina fin.1
4 3
Material
!Thickness
Member or
V.
V.
I
G.
V.
G.
V.
G.
V.
V.
(in.)
Blocking
(in.)
PIQ
(hilaslin.) (Pit)
Ilklissilin.)
(Pit)
(kipal'in.)
(taff),
(killastin.)
Jplf)
IP") (plf)
(P in
kag (cammorn,
qatyrialsed box)
056
PLY
osis
PLY
039
PLY
ose
PLY
I _506
6d
�Qu
13
n'.
13
780
23
to
I=
35
22
560
1 840 1090
1430
3A,
460
19
;,q
F"',
17
920
30
20
43
24
1710
Slra,,,,eaj 41
1.3m
Bell
5111
16
17
21
6
1010
27
9
11
311,0
Q
24
"
71-
.71
i5n2
1
560
14
I I .
1.
14
1100
24
7
4W
37
2L
795
1205
15132
I�Ir2
lod
6W
22
16 1020
29
20
1330
36
22
1740
51
28
950
1430
Get
360
11
5411
1
700
14
11
.
17
;
50�
755 1 9W 260
40Q
5 6W
1
780
20
3
1 OZO
32
76
56LI
840 IM 430
44f)
17
12 W
25
15
am
31
17
AS
20
6��S_
1 14 it,
480
15
11 700
22
14
900
29
17
1 ;%Q
1 7U
42
21
670
�Kt IAO 1640
9
52�
13
to
19
13
-50
25
i 5
1 ",b,
jq
2c,
lod
6210
22
14
30
17
1200
37
J9__T
�5AO
52
23
:70
i;,u 1660 1 2;!a� i
9r3;?
_680
Is
'92L
OM
25
16
1330
33
Ill
! 740
4
22
50
1430 1 NO 2435
ply—,
Wall (garvarshad casing)
s.d,ng
506
6d
2 Sri
13
420
16
721
1 59D 77[) Dto
�dt
1,3M
ad
3ZQ
le
4 all
a
VG
22
4W
ell 87r, 1150
I
Awl (common ar
galvanized box)
shaual'ing
3a
ed
240
15
DIX
17
4W
19
60D
22
335
1 505
U5 84'�
Sri
260
2110
is
15
3W
42P
20
21)
am
540
21
22
F30
TW
23
;�
-9-
070 NO
:_ ?45%5 SOD
Git.'-d
I A
G4u.')
112
lod
370
21
550
23
720
_?4
F5
_
_:
LQ_ -4
T —
400
21
610
23
790
24
1040
26
520 1-770
. 10111 1290
1 , ICS 1 1455
Mao r.&i;;)
]a 00i misling Mail (0 127
340 40
46D IS 0
520 55
415 646 7.30
s"a th-V
I I ga. gay. moling M, 10. 12tr
A 1-14' 34' heso)
J
340
40
Alin
so
520
S5
475 645 730
I Noon,nal urensticarcapacniesshallbeadjusted and I-Itf0factorecitiont—stance. Fmgencmicamt=tlmrcquimment.s�4.3.6 I'm
Ipt..fic mquo-wins. see 4.3.7 t for wwd structurii panel slea walls, 4 3 7 2 for pan.c!cWxsd shear wails. and 4.3.1.3 for filbet1bond she&, wrOIs. Sec, Appendi. A for connsocin And bo� nail dariensims
2 Sheas sum permitted to be to"trased to values shom it fat 15/32 inch (nominvil) sheathing with same inuhris Provided (a) sluilb we W".1 . mammusis or 16 inchet en �etiur,� or (b) pausels are applied tth long
'I�wrisicii Action; studs
3 For species and ipudu of framing adle, than D.uglaii-Fir Latch or Southirm N.e. reduced wroui-I unit shiner capac,fles shall be determined by multiplyin@ the isbuL&tcd nominal unit shear "pricil) by the
SrAmific GirwityAdiustinctat Factur = (144.5-G)], where G m specific Gravity tribe ftarring lumber from the NDS (Table 12.33AL The Specific Gravity Adjustment Fairwr shall not he greater ftn 1
4 Apfurent %hess stiftess -hic, G. am baseed rel roul slip in ty.roing ith moisture content Ift. than or equal to W,*. At tons of fabrication and paawl stiffness mines tot 0eat walk, consourled with either OsH
.1 3-pi y ply-..d panel.. Wb- 4-ply or 5�ply plywoAld panels cir composite parcels am used. 0. -allics shall be proindied 1. be noulliplied by 12
Where movairm, conlem ofthe flurniAg is greater than 19% at time offahricatinn. G. vatures shall he multiplied by 0 S.
6 WItem panels me applied on both faces ofa shirsf wall and wit spacing is less than V on cenaer on either side, panel joints shall be offict to fall on difr"ent frarning mcnibci� a sho— htkiw. A;lnnati. ely. th
..cIth of the nailtd face of framing merntim shall be 3� masional or greaser at acliounrig panel edges and nails at All parsell edges shrill be luiligered.
I Galvanized nails shall be hot dipped or fternbled
1. Reduction Factor= 2
2. 16"oc studs-usevalues for 1.5/32
3. G � 0.42 (SPF or Hem Fir)... Adjustment Factor= [ 1 -(0.5-0.42)] = 0.92
Wall
Type
Blocked
Sheathing
(1) or (2)
Sides
Nail Spacing
Edge/intermediate
Framing
Sill Plate
Seismic
Capacity
h/b, = 2
Seismic
Capacity
h/b, = 3.5
Wind
Capacity
h/b, = 2
Wind
Capacity
h/bs :: 3.5
4"/12" oc,
eciside
W/ 12" oc,
ea. side
2"/12" oc,
ea. side
1180-PIf
957-plf
L3.2
El
a
2015 IBC - Shear Wall Framing Clips
Model
No.
LTypeof
Coriftecon
Fultnen
rection
ot Lo d
DF/SP
Allowable Loaft
SPF1HF
Allowable L ads
Fl orl
(1:0)
flool
(125)
(160)
Floor
(100)
Roof
(125)
(160)
A34
8-8011h
F1
395
485
515
340
415
445
F2s
395
455
455
340
390
390
E21
9-8dxl!6
Al, E
295
365
, 395
255
315
340
Ci
210
210
210
180
180
180
A35
1-31
12-8dxl 1h
A2
295
365
380
255
315
325
C2
295
365
370
255
315
320
1 D
230
230
230
200
200
200
12-8dxl 1h
F 1
595
695
695
510
600
600
1`25
595
670
670
510
575
575
LTP4
12-8dxl 1h
G
580
670
670
500
570
575
2�
H
580
600
600
500
515
515 1
LTPS
2-8dxl %
G
580
620
620
500
535
535
I
-
470470
470
1. Allowable loads are for one anchor. When anchors are installed on each side of the joist. the minimum joist thickness is 3'.
2. Some illustrations show connections that could cause cross -grain tension or bending of Vie wood during loading 0 not reinforced sufficiently. In this
case, mechanical reinforcement should be considered.
3. LTP4 can be installed over 3/8' wood structural panel sheathing with Rdx1 1/2' nails and achieve 0.72 of the listed load. or over 1/2" and achieve 0.64 of
the listed load. 8d commons will achieve 100% load.
4. -nie LTP5 may be installed over wood structural panel sheathing up to 1/2' thick using Bdxl 1/2' nails with no reduction in load.
5. Gorinectors are required on both sides to achieve F2 loads in both directions.
6. NAILS: Bdxl 1/2 = 0.131' dia. x 1 1;2' long. See c!�E7' z��'
.
Wall
Type
P1-6U
Capacity
144-pif (E)
A35 Capacity
600#
A35 Spacing
50" oc
LTP5 Capacity
535#
U;15 Spacing
44" oc
PI-6
240-pif (E)
600#
30" oc
535#
26" oc
PI-4
350-pif (E)
600#
20" oc
535#
18" oc
PI-3
450-pif (E)
600#
16" oc
535#
14" oc
P1-2
820-olf (W)
600#
81/2 " 0 C
535#
71/2" oc
P2-4
700-pif (E)
600#
10" oc
535#
LTP5 18" oc +
A35 18" oc
P2-3
900-pif (E)
600#
8" oc
535#
LTP5 15" oc +
A35 15" oc
P2-2
1640-plf (W)
600#
I
2 rows 8%" oc
I
535 #
I
LTP5 8" oc +
A35 8" oc
L3.3
2015 IBC - Shear Wall Bolts
Table 121E BOLTS: Refemc* Latlaral Design Values, Z, for Single Shear AL 7
(two member) co"Noctioust."', L
for sawn lumber or SCL to concrete
Thicl—
t
E*
Q.
3:
E E
E
E o
ua 0
2
u)
o
in
1 Lf '.
Lu 'o
r
82
zN Z.L
ZN Z_L
Z.L
ZL
Z,
11.
D
IM
in.
I in.
lbs� Ibs
Itis M
Its lbs
lbs lbs.
Abs M
1/2
S90 340
590 340
S50 310
W 290
530 290
518
860 420
850 410
810 350
800 330
780 320
1-1/2
_V4
1200 460
1190 4SO
1130 370
1120 360
1100 360
16M SEND
ISO 4M
13W 4110
im 3M
law 3"
i
low 640
17W SM
168D 440
wo 4M
14W 00
1J2
618
M :1100
910 490
M
900 480
M7 320
W 400
M
8W 380
SM 346
810 370
1-3/4
3/4
1230 540
1220 530
1160 430
1140 420
1120 410
6.0
7/8
1630 Sao
1610 570
1540 470
1520 460
1490 430
and
—
I
2M 630
29M 1110
IM 610
IM 490
1710 470
ia
TM 4110
IFM
Mo 3M
aw 340
am 30
greater
518
1070 540
1060 530
980 480
%0 470
940 4W
2- V2
3/4
1400 710
1380 700
1290 620
1270 600
1240 Sao
7/8
1790 830
1770 810
1660 680
1640 660
1600 610
I
OW
2M SM
2MO M�
2M 71010
2M .,Me
470
?M
'4140
�Awb%.
411111
im:Lill
3-1/2
314
1650 781)
1640 770
1540 680
1610
10
410 660
11
718
2100 9W
2070 960
1910 870
1890
840 am
1
2560 110D
21,20 1180
2340 1020
2310
226D 950
1. Tabulated lateral designvalues, Z, for bolted connections shall be multiplied by all applicable adjustment factors (see Table 11.3-1).
2. Tabulated lateral design values, Z, are for "full -body diameter" bolts (see Appendix Table L 1) with bolt bending yield strength,
F_ of45,000 psi.
3. Tabulated lateral design values, Z, are based on dowel bearing strength, IF,, of 7,500 psi for concrete with minamum f,'=2,500 psi.
4. Six inch anchor embedment assumed.
1. CD = 1 �60
Allowable Lueds
Modellia,
BID Sim
I
Sides Top
SDC C�v
WimiadSUCAM,
I
SDCC-F-
ZandSUCA&B,
I I F? Upidl F, F2
Uplift F1
F2
UPON
F1
Pi
STANDARD INSTALLATION - Attacbed to DF/SP S41 Plate
MASA or MASAP
2,4 ' M
.3'IWI'6 6-10WIV-.1 920 1515 10% 745 1235.10451 7B5 7515
910
660
1235
765
3X4. 34
5-10dxl'/, 4-1001161650 1215 725 550 1020 725 1 495 1215
725
415
1020
640
ONE LES UP INSTALLATION - ANKhed to DF/SP Sill Plate
MASAo,MASAP
M 24
.6.IOdXt'A.3-l0dXV/,J 785 ' LOGS - 995 660 845 , 995 595 1005
965
5M
845
BID
3434
7-100 Y, 2-106-IAI — 815 — — 685 — — 815
—
685
TWO LEGS UP liSTALLATION -Attacheidto DF/SPSifl Plate and Rimboard
MASAorMASAP
2M.24
9�401111 A — 810 1150 900 740 965 755 1 665 1150
660
5W
M
550
DOUBLE ?a INSTALLATION - Attached to DFISP Sill Plate
MASA or MASAP Old 24. ON 2a6 5-10dIXIM, 240dxl'/�l 875 fO75 785 735 9DO 785 1 660 1075
785
555
900
785
STANDARD INSTALLATION - Attached 10 Hem Fit Sill Plate
ttASAP
2,4 �6
3.100V4, 6-10dx I jr�,
1 790 1305 940 640 1060 NO 675 12,35
M
570
19t�
660
�44 16
5-lodxl,/, 4-10nixi"A
560 1045 625 475 875 625 425 11144
6255
355
87--
5501
ONE LEG UP INSTALLATION
- Attached to Hem Fit Sill Plarle and HFiSPF Stud
MASA a, MASAP
20 24
.6-10dxl','. 3-IO&I'l 675 965 855 565 725 855
510 865
I
830
430
725
695
3a4'3x6
7.,Odxl'x, 2.10dxl,,, I — 700 — — 590 —
— 700
—
—
590
—
T* 0 LEGS UP MSTALLATION -Hem FirSWI Plate and HFSPF
Remboarill
MASA ot MASAP
2.4� 24
9-10d.1 ". — 1 700 990 775 635 830 650 1 570 990
565
480
830
475
DOUBLE 2z INSTALLATION - Attached to Hem Fit Sill Plate
MASA or MASAP DbI M. Otil 2xE 5 - 100 1 -,'� 2-10dW-11 750 925 675 630 775 675 1 660 925
675
555
775
6775
t iA-' C). — k,d. V'. -d d,,�?,%r �aci� CC, —i CO - 1.61'11 N. ih�
?,'-SA 'AAZAP ',,,a 1-
- E4� -�at.
Wall
Type
Pl-6U
Capacity
144-plf (E)
Sill
Plate
2x
Single 5/8"40
Bolt Capacity
1376#
5/8"4) Anchor
Bolt Spacing
60" oc
MASAP Anchor
Capacity
1060#
MASAP Anchor
Spacing
60" oc
P 1-6
240-plf (E)
2x
1376#
60" oc
1060#
52" oc
P 1-4
350-plf (E)
2x
1376#
46" oc
1060#
36" oc
P 1-3
450-pff (E)
2x
1376#
36" oc
1060#
28" oc
PI-2
820-pif (W)
2x
1376#
20" oc
1305#
19" 0C
P2-4
700-plf (E)
3x
1712#
28" oc
875#
15" 0C
P2-3
900-pif (E)
3x
1712#
22" oc
875#
11 " 0C
P2-2
1640-plf (W)
3x
1712#
12" oc
1045#
71/2" oc
L3.4
Ilia
It I r I v v
de
dr-
1 604 0
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: (425) 814-8448
I N I-ERI'\:(' , Fax: (425) 821-2120
Miscellaneous
19011 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 98072-4436
Phone: 425-814-8448,
ENG=ERING Fax: 425-821-2120
Stud Wall Design
Based on 2015 NDS Combined axial and bending formula:
[fjF,'j" + fb/Fb'[l-(fjF,;E)l < 1 in which: F-E = 0.822(Emin')/(Vd)2
Wall: Exterior Walls
No Fire Rating
M
SPF Stud
Wall Height:
Desired Stud Spacing:
Design Axial Dead Load:
Design Axial Live Load:
Design Axial Snow Load:
Design Lateral Pressure (0.6W)
Deflection Criteria:
L/
STUD CHECK
1,/d
<
50
OK
D+0.6W (CD = 1.60)
[f,lF,]2 + fb/Fb'[1 -(fjFcE)l =
0.32
<
I
OK
fjF,E + (fb/FbE)2 =
0.00
<
I
OK
D+0351-+015(0.6"+0�75S (CD = 1.60)
[fjFr'12 + f,/Fb'll -(fdF.E)l =
0.45
<
I
OK
fjF,E2 + (fb/FbE)2 =
0.00
<
1
OK
D+0.75L+0.75S (CD = 1.15)
fjFe'=
0.48
<
1
OK
D+L (CE) = 1.0)
fctFc'=
0.43
<
1
OK
Deflection (No Increase for Load Duration):
Defl: U 240 = 0.45
0.12
<
0.45
OK
oc
PLATE CRUSHING CHECK'
Checks Crushing for Stud Spacing'
No Stress Increase for Load Duration
Hem Fir Plates: fe/Fcj' = 0.58 < I
OK
IDouglas Fir Plates: fjFc_L' = 0.38 < 1
OK
' Plate must also be checked for bending.
2 Check on crushing only applies to stud spacing. Joists above
must also be checked for crushing effect on plate.
Also, no stress increase is allowed due to load duration.
9 ft
16 in oc
700 plf
800 plf
700 plf
15 psf
240
Date: 12/14/2016
Page: M1.1
19011 Wood-Sno Road NE, Suite 100
BTL Woodinville, WA 98072-4436
Phone: 425-814-8448,
ENGINEERING Fax: 425-821-2120
Stud Wall Design
Based on 2015 NDS Combined axial and bending formula:
[fc/F.']' + ft)/Fb11-(fdF.E)] in which: F�E 0.822(Emin')/(Vd)2
Wall: Interior Walls Wall Height: 9 ft
Desired Stud Spacing: 16 in oc
No Fire Rating Design Axial Dead Load: 400 plf
2A
Design Axial Live Load: 800 plf
Design Axial Snow Load:
SPF Stud 0 plf
Design Lateral Pressure (0.6W): 5 psf
Deflection Criteria: L/ 240
STUD CHECK
1jd
<
50
OK
D+0.6W (CD = 1.60)
[fjFc'12 + fb/Fb'11 -(fjF.E)] =
0.35
<
I
OK
fdFcE2 + (fb/FbE)2 =
0.00
<
1
OK
D+0.75L+0.75(0.6W)+0.75S (CD = 1.60)
[fjF.'f+ fb/Fb'11-(fjFCE)1 =
0.96
<
1
OK
fjl=�E2 + (fb/FbE)2 =
0.00
<
1
OK
D+0.75L+0.75S (CD = 1.15)
fdF.'=
0.75
<
1
OK
D+L (CD = 1 -0)
fjFc'
0.92
<
1
OK
Deflection (No Increase for Load Duration):
Defl: U 240 = 0.45
0.15
<
0.45
OK
oc
PLATE CRUSHING CHECK'
Checks Crushing for Stud Spacing4
No Stress Increase for Load Duration
Hem Fir Plates: fjF._L'= 0.50 < 1
OK
IDouglas Fir Plates: fdF._L' = 0.33 < 1
OK
1 Plate must also be checked for bending.
2 Check on crushing only applies to stud spacing. Joists above
must also be checked for crushing effect on plate.
Also, no stress increase is allowed due to load duration.
Date: 12/14/2016
Page: M1.2
IBTLN
ENG=ERING
2015 NDS
3.7-SOLID COLUMNS and 15.3-BUILT-UP
COLUMNS
Solid Column
Fc =
800 psi
Visually graded lumber (Dimensional) VI
CD =
1.00
No Fire Rating
cm=
1.00
Hem- Fir Stud
C,
1.00
CF=
1.00
F,'= F,* Cp
F,* = F, CD CM CI CF
Fc.� = 800 psi
cp= 0.743
594 psi :1
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
E.j. =
440 ksi
E.in'=
440 ksi
I =
9.0 ft
d =
5 1/2 in
K� =
1.0
4 =
108.0 in
Vd =
19.6
I+ (F,,l + F
� IF� �F,-
Cp =Kf 2c 2c c
FcE = 938
C = 0.8
Kf = 1.0
STUD
HF Plate Crushina
(1)
2x6
4904
3341
(2)
2x6
9807
6683
(3)
2x6
14711
10024
(4)
2x6
19614
13365
(5)
2x6
24518
16706
F,E = 0. 822 E rritf
(Ild ) 2
DF Plate Crushing
5156
10313
15469
20625
25781
Date: 12/14/2016
Page: M1.3
BTLI
ENGMEERING
2015 NDS
3.7-SOLID COLUMNS and 15.3-BUILT-UP
COLUMNS
Solid Column
Fc
800 psi
Visually graded lumber (Dimensional) V!,
CD=
1.00
No Fire Rating
cm=
1.00
Hem -Fir Stud
ct=
1.00
CF=
1.00
F,'= F, Cp
F,* = F, CD CM C, CF
F, = 800 psi
cp = 0.416
Fc' 333 psi
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
E.in =
440 ksi
E,nin I =
440 ksi
I =
9.0 ft
d=
3 1/2 in
Ke =
1.0
=
108.0 M,
I�d =
30.9
F
+1 "El Ir III/
Cp =Kf IF� / F,
2c 2c c
FcE = 380
0. 822 E rrid
FcE
2
C = 0.8
Kf = 1.0
STUD
HF Plate Crushing
DF Plate Crushing
(1) 2x4
1746
2126
3281
(2) 2x4
3492
4253
6563
(3) 2x4
5237
6379
9844
(4) 2x4
6983
8505
13125
(5) 2x4
8729
10631
16406
Date: 12/14/2016
Page: M1.4
1 19011 Wood-Sno Road NE, Suite 100
'B!TL Woodinvifle, WA 98072-4436
Phone: 425-814-8448
ENGINEERING Fax: 425-821-2120
Project: Continuous Strip Footing I BC Section 13.3.2: One-way shallow foundations
18" wide x 8!'thick
Footing width, B = 18 in
Footing Thickness, t 8 in
Stem Wall width, C 8 in
Stem Wall Height = 24 in
Normalweiqht
2500 psi
Uncoated
f, 40000 psi
Longintudinal Reinforcement:
(2) #4
-
Bar Diameter =
0.500 in
Bar Area =
0.20 in 2
A� =
0.40 in 2
Cover: 3 in
Stem Wall Reinforcement:
#4 @ 24 "oc 'Straight Dowels
Bar Diameter
0.500 in
Bar Area
0.20 in 2
A�
0.00 in 2
Cover: 3 in
bw
12 in (per ft)
d
4.75 in
Footing + Stem Wall Weight - Weight of Displaced Soil
240 plf
One-way shear, no shear reinforcement
[22.5.5.11 V, 2A r '-,d 5700 # per foot length
-4 Jc 0
[22.5.10.11 V, OVc C VC
V, = qubw 2 d) -4 qu — B C
qu 51300 psf b. 2
Max Uniform Load on Stem 76950 plf [Ultimate]
48094 plf [Service)
Moment
122.2.1.11 M, = A,fy(d — a12) 0.000 k-ft per foot length
Strip footing
V
0 =
0.75
0.90
u IP n B C 2
qubw 04—L
2(PM.
a =
A,fy
0.85f,b
0.00 in
C
MU 2
Ifu — B C 2
(L_� —1; )
qu
NO MOMENT
Max Uniform Load on Stem
12000 plf
[Uftimate]
7500 plf
[Service]
Development of Reinforcement-
[25.4.2.3] 1d=(T30--�LY—'Pt*`0'\db
N/A
AT- (cb+Ktr)
fc'
OK
k db 1)
Allowable Soil Bearing Pressure
1600 Psf
2000 pst
2600 psf
3000 psf
3600 psf
4000 psf
Max Uniform Load, Soil
2010 plf
2760 plf
3510 plf
4260 plf
5010 plf
5760 plf
Max Uniform Load, Shear
48094 plf
48094 plf
48094 pff
48094 plf
48094 plf
48094 plf
Max Uniform Load, Moment
7500 plf
7500 plf
7500 plf
7500 plf
7500 plf
7500 plf
Max Uniforrn Load (Service)
2010 pif
2760 plf
3610 plif
4260 pff
6010 pif
6760 plf
Max Uniforna Load (Ultiniate)
3216 plf
"16 plf
5616 PlIf
6816 Plf
8016 pif
9216 plIf
Max Point Load (Service)
16080 #
22080 #
28080 #
U080 #
40080 #
46080 #
Max Point Load (Ultirnate)
26728 #
36328 #
1 44928 #
64628 #
64128 #
73728 #
Date: 3/19/2018
Page: M2.1
19011 Wood-Sno Road NE, Suite 100
'BTIa Woodinvffle, WA 98072-4436
Phone: 425-814-8448
ENGINEERING Fax: 425-821-2120
Project: Typical Footing
Footing: 18" x 18" x 8" thick
Footing
B = 1.50ft
t = 8 in
Reinforcement R = (2) #4
As, = 0.40 in 2
d = 4.25 in Cover 3 in
Column C, = 3.50 in C2 = 3.50 in
Materials f'c = 2500 psi Normalweight A= 1.00
fy = 40000 psi Uncoated Oe = 1 .00
Net Footing Weight
PFTG = 0.06 k
Soil Pressure:
PAsD = q.B'2 — PFTG —
One-way shear 0 = 0.75
V, = 2AJBd 7.65 k
V. 15 ov, ov, 5.74 k
V. = quB B — C2 _ d) -+ qu = 0 V,
_2 fB — C�
B � —2 d)
qu = 10392 psf or
Two-way shear 0 = 0.75
[22.6.5.2(a)] v, = 4A-VIT =
[22.6.5.2(b)] v, = ( 2 + ±fl) A
122.6.5.2(c)] v, = 2 + 1--) A�f_,'
bo
130h0d fooft
Vu = quB (B — C1. — d) -+ qu = 0 V,
k_27 B C
B( —_2 1—d)
10392 psf Pu = q.B 2 23383 #
200 psi <--3
300 psi '6 = 1.00
ax = 40
374 psi bo = 2(Cl+d)+2(C2+d)
31
V. 15 0VC Ovc = Ovcbod 19.76 k
Vu = qu[B2 — (Cl + d)(C2 + d)] -4 qu 0 VC
[B2 — (Cl + d)(C2 + d)]
qu = 10782 psf P. = quB 2 24260 #
Moment. 0 = 0.90
M. = A.,fy(d — a/2) =
5.4 k-ft
a = A,fyl(0.85f, B) =
0.42 in
mu:5 0m, OM,
4.8 k-ft
(B _ CZ)2
q.B 20M,
2 Ifu —
M" =
2 B((B
— C2)/2 )2
qu = 17712 psf
or
Development of Reinforcement:
' fy 04�101
Id =
(TO A'1f_C' ( Cb + Kt,
db
4 in
Adjusted
Soil Bearing Pressure
1500 psf
Max Load (lbs), SoH
3315
Max Load (lbs), One -Way Shear
14614
Max Load (lbs), Two -Way Shear
15162
Max Load (lbs), Moment
24908
Max Load (ASD)
3315
Max Load (Factored)
5304
q.B B C
M, N21-1) Ifu 20M, )2
2 B((B — C,)12
17712 psf P,, = quB2 39853 #
.4 in available OK
3000 psf 3500 psf 4000 psf
2000 psf F2500 psf
4440
5565
6690
7815
8940
14614
14614
14614
14614
14614
15162
15162
15162
15162
15162
24908
24908
24908
24908
24908
4440
5565
6690
7815
8940
7104
1 8904
1 10704
12504
14304
Date: 3/19/2018
Page: M2.2
19011 Wood-Sno Road NE, Suite 100
Woodinvifle, WA 98072-4436
Phone: 425-814-8448
E NGINEERIN G Fax: 425-821-2120
Project: Typical Footing
Footing: 24" x 24" x 8" thick
t
Footing B = 2.00ft
t = 8 in
Reinforcement R = (2) #4 vi
As, = 0.40 in 2
d = 4.25 in Cover: 3 in
Column C, = 3.50 in C2 = 3.50 in
Materials F, = 2500 psi Normalweight A= 1.00
f y = 40000 psi . Uncoated 1.00
Net Footing Weight
P�7-G = 0.11 k
Soil Pressure:
PAsD = qaBI — PFTG
ImWed fooft
One-way shear 0 = 0.75
V, = 2AJBd 10.20 k
V, :5 ov, ov" 7.65 k
Vu = quB tB — C2 _ d) - qu = 0 V'
�72— B C
B (IZ2--1 — d)
Vu=quB(B—C—d -4 qu= 0VC
—2 B C
B (---2—a — d)
qu = 5649 psf or
5649 psf Pu quB 2
22597 #
Two-way shear 0 = 0.75
[22.6.5.2(a)] vc = 4A�Tcl =
200 psi 4�n
[22.6.5.2(b)] vc = 2 + A�f—c'
300 psi '6
1.00
a,=
40
(22.6.5.2(c)] vc = 2 + d) AJ—C'
374 psi bo
2(Cl+d)+2(C2+d)
bo
31
VU 15 0VC OVc = ovcbod
19.76 k
Vu = qu[B2 — (Cl + d)(C2 + d)] - qu
0 VC
[B2 — (CI + d)(C2 + d)]
qu = 5516 psf
Pu = q,B 2
22063 #
Moment 0 = 0.90
M,,, A,fy(d — a/2) = 5.5 k-ft
a = A, fy/(0.85f c B) = 0.31 in
M, 0m, OM, 4.9 k-ft
(L:2:�
quB B C
t ) 2 OM,
quB B C
(LiN
20M,
MU = - I Ilu —
2 B((B — C2)/2)2
MU = '4U
2
B((B — C,)12 )2
qu = 6732 psf or
6732 psf Pu = quB 2
26929 #
Development of Reinforcement
fy q)tlp2lp'
d ( T3O )db 7 in
A.,ff--t (cb + Kt,
C
...7 in available OK
k db Adjusted
Soil Bearing Pressure 1500 psf
2000 psf 2500 psf 3000 psf
3500 psf 4000 pst
Max Load (lbs), Soil 5893
7893 9893 11893
13893 15893
Max Load (lbs), One -Way Shear 14123
14123 14123 14123
14123 14123
Max Load (lbs), Two -Way Shear 13789
13789 13789 13789
13789 13789
Max Load (lbs), Moment 16830
16830 16830 16830
16830 16830
Max Load (ASD) 5893
7893 9893 11893
12710 12710
Max Load (Factored) 9429
12629 1 15829 19029
20337 20337
Date: 3/19/2018
Page: M2.3
Uff
ENGINEERING
Project: Typical Footing
Footing: 30" x 30" x 8" thick
Footing B = 2.50 ft
t = 8 in
Reinforcement R = (3) #4
A,, = 0.60 in 2
d = 4.25 in Cover 3 in
Column C , = 3.50 in C2 = 3.50 in
Materials f', = 2500 psi Normalweight 1.00
fy = 40000 psi Uncoated Oe = 1 .00
Net Footing Weight
PFTG = 0.17 k
Soil Pressure:
PAsD = qaBI — PFTG
19011 Wood-Sno Road NE, Suite 100
Woodinvffle, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
1801%ded koft
One-way shear 0 = 0.75
V, = 2AJBd 12.75 k
V. :5 0 V.� ov, 9.56 k
fB — C2 0 V,
B — C,
0 V'
Vu = q.B — d -4 qu =
_2 B C
B (1�2�1 d)
V. =
quB d) --- q.
2
B
B ( 2 C' — d)
qu 3974 psf or
3974 psf
Pu q.BI
24838 #
Two-way shear. 0 = 0.75
[22.6.5.2(a)] vc = 4AZZ =
200 psi
<--3
[22.6.5.2(b)] vc = 2 + A�f_c'
300 psi
16
1.00
ax=
40
[22.6.5.2(c)] vc = 2 + A�f_c'
374 psi
bo
2(Cl+d)+2(C2+d)
bo
31
VU 5 0 VC OVc = (Pvcbod
19.76 k
V. = qu[B7 — (Cl + d)(C2 + d)] - q.
0 VC
[B2 — (CI +
d)(C2 + d)]
qu = 3388 psf
P, q,B2
21176 #
Moment 0 = 0.90
M. = A,fy(d — a/2) = 8.1 k-ft
a = A,, fy/(0.85f c B) = 0.38 in
MU!5 OM. OM, 7.3 k-ft
B C 2
q.B ':Z)
(" —2-- 20M,,
B C 2
2:-'a
q.B " : ' )
20M,,
— qu
2 B((B — C;!)12)'
MU I Ifu
2
)2
B((B — CI)12
qu = 4797 psf or
4797 psf
P, = q,B2
29984 #
Development of Reinforcement:
fy 'P��Peo'
) d, 10in
(T30
A'If—C, (Cb + Ktr
...10 in
available OK
Soil Bearing Pressure 1500 psf
2000 psf
2500 psf 3000 psf
3500 psf 4000 psf
Max Load (lbs), Soil 9208
12333
15458 18583
21708 24833
Max Load (lbs), One -Way Shear 15524
15524
15524 15524
15524 15524
Max Load (lbs), Two -Way Shear 13235
13235
13235 13235
13235 13235
Max Load (lbs), Moment 18740
18740
18740 18740
18740 18740
Max Load (ASD) 9208
12333
13235 13235
13235 13235
Max Load (Factored) 14733
19733
1 21176 21176
21176 21176
Date: 3/19/2018
Page: M2.4
19011 Wood-Sno Road NE, Suite 100
WoodinviHe, WA 98072-4436
Phone: 425-814-8448
ENGINEERING Fax: 425-821-2120
Project: Typical Footing
Footing: 36" x 36" x 12" thick
t
Footing B = 3.00ft
t = 12 in >1
Reinforcement R = (3) #4
As, = 0.60 in 2 ft~ f0oung
d = 8.25 in Cover: 3 in
Column C , = 5.50 in C2 = 5.50 in
Materials F, = 2500 psi Normalweight 1.00
f y = 40000 psi Uncoated 1.00
Net Footing Weight
PFTr, = 0.36 k
Soil Pressure:
PA5D = qaB' — PFTG
One-way shear 0 = 0,75
V,, = 2AJBd 29.70 k
Vu 15; 0 V, OV, 22.28 k
Vu = quB B — Cz — d) - q. = 0 Vc
2 B C
B (La2-'-Z — d)
qu = 7128 psf or
Two-way shear. 0 = 0.75
122.6.5.2(a)] vc = VOC,
[22.6.5.2(b)] v,= 2+±
fl ) A �f—c'
lax d —,
[22.6.5.2(c)] vc= 2+ t' C
. )4f
Vu = q.B ( B 2 C, — d) -+ qu B 0VC
B ( 2 C'— d)
7128 psf Pu = quB1 64152 #
200 psi �n
300 psi '6 = 1.00
a), = 40
400 psi bo = 2(Cl+d)+2(C2+d)
55
VU 5 0 VC (pVc = ipvcbod 68.06 k
0 VC
Vu = qu[B2 — (Cl + d)(C2 + d)] qu = [B2 — (Cl + d)(C2 + d)]
qu = 8854 psf Pu = quB2 79687 #
Moment: 0 = 0.90
M,,, = A,fy(d — a/2) =
16.2 k-ft
a = A,fy/(0.85f cB) =
0.31 in
M." :5 om"' OM,
14.6 k-ft
B C ) 2
quB (� _2
20M,,
MU �fu —
2 B((B — C2)/2 )2
qu 6013 psf
or
Development of Reinforcement,
fy TPOPe*s
Id =
0 — db
(T3 A,.Ifc' (Cb + Ktr
))
12 in
k db
Soil Bearing Pressure
1500 psf
Max Load (lbs), Soil
13140
Max Load (lbs), One -Way Shear
40095
Max Load (lbs), Two -Way Shear
49805
Max Load (lbs), Moment
33825
Max Load (ASD)
13140
Max Load (Factored)
21024
q.B B C
MU (LZ2-a) nu 20M, )2
2 B((B — C,)12
6013 psf Pu = q,B' 54121 #
... 12 in available OK
2000 psf 12500 pst 1 3000 psf
17640
22140
26640
40095
40095
40095
49805
49805
49805
33825
33825
33825
17640
22140
26640
28224 1
35424
42624
3500 psf
4000 psf
31140
35640
40095
40095
49805
49805
33825
33825
31140
33825
49824
54121
Date: 3/19/2018
Page: M2.5
19011 Wood-Sno Road NE, Suite 100
WoodinviUe, WA 98072-4436
Phone: 425-814-8448
E NGIrqEERIK C Fax: 425-821-2120
Project: Typical Footing
Footing: 42" x 42" x 12" thick
t
Footing B = 3.50ft
t = 12 in
Reinforcement R = (4) #4 v
As, = 0.80 in 2
d = 8.25 in
Column C, = 5.50 in
Materials f', = 2500 psi Normalweight
f y = 40000 psi I Uncoated
Net Footing Weight
PFrG = 0,49 k
Soil Pressure:
PAsD = q.BI — PFTG
One-way shear 0 = 0.75
V,, = 2,14f,Bd 34.65 k
V, :5 OV, OV, 25.99 k
Vu = quB B — C2 _ d) 4 qu = 0 V,
( _2 B C
B (IZ211 — d)
qu = 5606 psf or
Two-way shear 0 = 0.75
[22.6.5.2(a)] vc = 4A-A—C, =
[22.6.5.2(b)] vc = (2 + ±fl) A�f—c'
[22.6.5.2(c)] v, 2 + L--' I r.—C' =
b, ) 'VJC
Cover: 3 in
C2 = 5.50 in
V
1,00
1.00
V. = q.B (B C, — d) -+ qu 0 V,
B(B 2C'—d)
5606 psf Pu = quB2 68677 #
200 psi <n
300 psi fl = 1.00
ax = 40
400 psi bo = 2(Cl+d)+2(C2+d)
55
VU !!9 0 VC ov, = .0vcbod 68.06 k
Vu = qu[B 2 0 VC
— (Cl + d)(C2 + d)] q. = [B2 — (CI + d)(C2 + d)]
qu = 6223 psf P, = q,, B2 76233#
Moment. 0 = 0.90
M,, = A,fy(d — a/2) =
21.5 k-ft
a = A , fy/(0.85f , B) =
0.36 in
MU 15 om" OM,
19.4 k-ft
L
quB B C
(LZ2 a)
20M,,
MU qu )2
2 B((B — C,)12
qu = 4785 psf
or
Development of Reinforcement:
fy PtP,.,P,
Id =
( T3
0 —
Aj'(Cb + Ktr
))
dI,
12 in
k db
Soil Bearing Pressure
1500 psf
Max Load (lbs), Soil
17885
Max Load (lbs), One -Way Shear
42923
Max Load (lbs), Two -Way Shear
47646
Max Load (lbs), Moment
36639
Max Load (ASD)
17886
Max Load (Factored)
28616
quB B C
MU = (L.:2—"1) '4U 20M,, )2
4785 psf 2 P,, = quB 2 B((B — CJ12
58622 #
... 15 in available OK
2000 psf 12500 psf 1 3000 psf 3600 psf 4000 psf
24010
30135
36260
42385
48510
42923
42923
42923
42923
42923
47646
47646
47646
47646
47646
36639
36639
36639
36639
36639
24010
30136
36260
36639
36639
38416
1 48216
58016
58622
58622
Date: 3/19/2018
Page: M2.6
ENGINEERING
Project: Typical Footing
Footing: 48" x 48" x 12" thick
Footing B = 4.00 ft
t = 12 in
Reinforcement R = (5) #4
A,, = 1.00 in 2
d = 8.25 in Cover: 3 in
Column C , = 5.50 in C2 = 5.50 in
Materials f'� = 2500 psi Normalweight A= 1.00
fy = 40000 psi . Uncoated Oe = 1 .00
Net Footing Weight
PFTG = 0.64 k
Soil Pressure:
PAsD = q.B 2 — PFTG
One-way shear
0 = 0.75
V, = 2Alf,Bd
39.60 k
V, 15 0 V, OV,
29.70 k
V. = q.B (B — C2 — d)
4 qu = 0 V,
B (1B C
:2�—'z — d)
qu
= 4644 psf or
Two-way shear
0 = 0.75
[22.6.5.2(a)] vc =
4A r--"
VIC
[22.6.5.2(b)] vc=
2+±
', ) A �f_c'
[22.6.5.2(c)] vc
2 + a,--' )A �f_c'
,)
19011 Wood-Sno Road NE, Suite 100
Woodinville, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
V. = q.R B — C, — d) , qu = OVc
2 B C
B (� �2 — d)
4644 psf Pu = quB2 74298 #
200 psi 4�n
300 psi 6 = 1.00
a), = 40
400 psi bo = 2(Cl+d)+2(C2+d)
55
V. 15 .0 VC (pvc = (pvcbod 68.06 k
V. = qu[B2 — (Cl + d)(C2 + d)] qu = 0VC
[B2 — (Cl + d)(C2 + d)]
qu = 4634 psf Pu = q,B2 74147 #
Moment 0 = 0.90
M,, = A,fy(d — a/2) =
26.8 k-ft
a = A,fyl(0.85f,B) =
0.39 in
M" 15 om" OM,
24.2 k-ft
quB B C
20M,,
M. qu
2 B((B
)2
— C2)/2
qu 3853 psf
or
Development of Reinforcement
fy OtOeO,
Id =
(73
0 A �f—c, ( Cb + Ktr )
db
12 in
Soil Bearing Pressure
1500 Psf
Max Load (lbs), Soil
23360
Max Load (lbs), One -Way Shear
46436
Max Load (lbs), Two -Way Shear
46342
Max Load (lbs), Moment
38525
Max Load (AS D)
23360
Max Load (Factored)
37376
q,,B B C
M. lu 20M, )2
2 B((B — C,)12
3853 psf P. quB2 61640 #
1 Bin available OK
2000 psf F2500 psfl 3000 psf 3500 psf 4000 psf
31360
39360
47360
55360
63360
46436
46436
46436
46436
46436
46342
46342
46342
46342
46342
38525
38525
38525
38525
38525
31360
38525
38525
38525
38525
60176
1 61640
61640
61640
61640
Date: 3/19/2018
Page: M2.7
ENGINEERING
Project: Typical Footing
Footing: 60" x 60" x 15" thick
Footing
B = 5.00 ft
t = 15 in
Reinforcement
R = (6) #4 v
As, = 1.20 in 2
d = 11.25 in
Column
C, = 8.00 in
Materials
f', = 2500 psi Normalweight
fy = 40000 psi Uncoated
Net Footing Weight
PFTG =
1.25 k
Soil Pressure:
PAsD = q.BI
- PFTG
One-way shear 0 = 0.75
V, = 2Aff,Bd 67.50 k
V, 15; 0 V, OV, 50.63 k
V. = q.B B - C7. _ d) -* qu = 0 VC
2 B C
B (!a2 -'-I - d)
qu = 5116 psf or
Two-way shear. 0 = 0.75
[22.6.5.2(a)) vc = 4A�f_,' =
[22.6.5.2(b)] v, = (2 + ±fl) A�f_,'
[22.6.5.2(c)] vc = 2 + c,-'
" ) A�f_c'
19011 Wood-Sno Road NE, Suite 100
WoodinviUe, WA 98072-4436
Phone: 425-814-8448
Fax: 425-821-2120
t
Isokled J1006V
Cover: 3 in
C2 = 8.00 in
A= 1.00
Oe = 1 .00
V. = q.B (B —_2C' - d qu = 0 VI
B ( R _-2 C I- d)
5116 psf Pu = quB 2 = 127895 #
200 psi <--3
300 psi 6 = 1.00
a), = 40
392 psi bo = 2(Cl+d)+2(C2+d)
77
VU 15; 0 VC Ovc = q5vcbod 129.94 k
V. = q.[B2 - (Cl + d)(C2 + d)] qu = 0VC
[B2 - (Cl + d)(C2 + d)] 2
qu = 5794 psf P. = quB 144847 #
Moment 0 = 0.90
M. = A,fy(d - a/2) = 44.2 k-ft
a = A,fyl(0.85f,B) = 0.38 in
M" 15 om" OM. = 39.8 k-ft
quB ("B J C 2
_29
20M,
B C
quB (—
20M,,
MU
MU
2__1)2
1
2
B((B - C2)/2)2
2
lu
B((B - CJ/2)2
qu 3393
psf or
3393 psf
&
= quB 2
84829 #
Development of Reinforcement
fy ot?peos
Id __ db
12 in
... 23 in
available
OK
(TO A,rfc' (Cb + Kt,
Soil Bearing Pressure
1500 psf
2000 psf
2500 psf
3000 psf
3500 psf 4000 psf
Max Load (lbs), Soil
36250
48750
61250
73750
86250
98750
Max Load (lbs), One -Way Shear
79934
79934
79934
79934
79934
79934
Max Load (lbs), Two -Way Shear
90530
90530
90530
90530
90530
90530
Max Load (lbs), Moment
53018
53018
53018
53018
53018
53018
Max Load (ASD)
36250
48750
53018
53018
53018
53018
Max Load (Factored)
58000
78000
84829
84829
84829
84829
Date: 12/27/2018
Page: M2.8
7� 7
L .1 Lei
ENGINEERING
W..�'Q� WA "M
150 -011- EQ
APO'L rOf' 5AK
41 P%tOVIOt MRM-ORAININ& MATEMIAL
AS A='P SY draMCHNICAL ENO'R
lt ALL 1111oVt (ILL -AR)
V-61 MIN
FS t -
Wall Height H = 10.00 it
Soil Depth C Low End, d = 1.50ft
Low End Length, B,,w = 2.50ft
High End Length, Bhigh = 1.50 it
Footing Thickness, if = 12 In
Wall Thickness, tw = 8 in
Slope of High Soil, 0 = 0 deg
#4 & Smaller Steel Yield Strength, fy = 40 ksi
#5 & Larger Steel Yield Strength, 1, = 60 ksl
Concrete Compressive Strength, t,'� 2500 psi
Footing Dowels #6 V
Wall Vertical Steel #6
Wall Horizontal Steel vs V
Top Footing Steel, #4 V
Longitudinal Footing Steel #4 V
Deflection Control, p fyflc'= 0.1180
Cover at Footing Dowels, cd_,, = 1.50
Cover at Wall, Cwg - 3.63
Cover at Top of Footing, c,,, = 1.50
Cover at Bottom of Footing, Cba = 3.00
b = 12 In
d�a � 4.000 In
ci�.t, = 6.125 in
df_ting � 10.250 In
Friction Coefficient C Base, 9b = 0.35
Friction Coefficient @Wall, = 0.00
Effective Friction Angle, = 20 deg
Weight of Soil, W, = 115 pcf
Weight of Concrete, Wc = 150 pcf
Allowable Sol] Bearing Pressure, q �j = 2500 psf
Active Lateral Earth Pressure, P. = 35 pcf
At -Rest Lateral Earth Pressure, p = 0 pcf
Passive Earth Pressure, p = 300 pcf
Constant Wall Pressure, PL = 0 Psi
Depth of ConstantWall Pressure, dL = 11,50 it
Uniform Surcharge, w = 0 psi
Wall Axial Load, P. = 0.25 kK
Wall Shear Load, Vw = 0.00 kV
Wall Moment Load, M. = 0.00 k-Mft
13 SF kxk.W V
10 ft Retainina Wall
"'so"CO
Down from
l4inh-Fnd-ttill
Ourflern,
Ultimate
tft-Afitl
Minimum
No
Required
p
Maximum
p-
Required A,
(101t)
Vertical Bar Spacing
1/2 H
2.5
258
0.0015
O�0003
0,0146
O� 14
#6 18 In oc
'AH
5
1767
0.0015
O�0022
0.0145
0.21
#6 18 In oc
Y.H
7.5
5400
O�0015
0,0074
O�0145
0.71
#6 7 In oc
H
10
12033
- 0=115
0.0070
0.0145
0.67
#6 Q 8 In oc
Mu = 1.utz + 1.bH
Vertical Reinforcement:
Minimum p = 0.0012 for bars notlargerthan #5 and yield strength not lessthan 60 ksi
Minimum p = 0.0015 for all other bars
Maximum p = 0.75pb
pb - 0.85f,71, P, 187.000/(87,000 + f,)]
p, = 0.85 - 0.05 1(f,- 4000YI000] 2: 0.65
P1 � 0.925
Horizontal Reinforcement:
Minimum p = O.DO20 for bars not larger than #5 and yield strength not less than 6D ksi
Minimum p = 0.0026 for ail other bars
Horizontal Bar Spacing
pmj� = 0.0020
#5 @ 18 in oc,
Footing Reinforcement:
Horizontal Bar Spacing
5F ?" Indw p = 0.0033
service #4 @ 9 in oc,
service
ultimate
ultimate
ultimate
Seismic Pressure - 6 x H psi
Seismic Pressure = 60 pst
ChOCA Overturning at Too (ASD)
MMSAQ (11.014) = 8468 ft-Wft
M,.,In, (0.7E) = 3630 ft-#M
FS against overturning (H):
FS against overturning (H + 0, 7E):
ChOO Sliding (ASD)
Fcwmg (I.OH)= 1750NIt
F-Mng (O-7E) = 420 #/it
FS against sliding (H):
FS against sliding (H + 0.7E):
Foundation Pre"uree
EM. = 6311 11411t
EV = 4312 Wift
d = EMdZV
d = 1.46 ft
e = 0.87 it
I = 81114
Pa = VJA + Ve(B/2)/I
P. = 1957 pet
M�, = 14769 114AM
1.7 OK
1.6 OKfor Selsmicw/4/3 Increase
(Friction) Frosistno = 1509 A/ft
(Passive) F = 338 *it
1,5 OK
1.6 OK for Seismic wl4r3 Increase
P� = V/A - Ve(B12)/I
Pb = 0 pst
M3.1
BTIL
ENGINEERING
15=Nmw-� �P�'S�3
7�11
AVP'L TOP BAR
6k - -
Ito, X . *-MOV19M I-REE-CORAINNS 1`4ATERIAL
RV
AS REOD &Y' 6eOTECHNICN. SNO'K
it
KALL COVER (C�XARJI
R
FOOTIMS, COVER (CLEAR)
1'-6* MIN
Wall Height H = 8.00 it
Soil Depth @ Low End, d = 1.50 ft
Low End Length, Sim = 2.00 it
High End Length. Bhigh = 1,25 ft
Footing Thickness. tf = 12 in
Wall Thickness, t. = 8 In
Slope of High Sol[, 0 = 0 deg
#4 & Smaller Steel Yield Strength, fy = 40 ks!
#5 & Larger Steel Yield Strength, f. = 60 ksl
Concrete Compressive Strength, fc'= 2500 psi
Footing Dowels #5 V
Wall Vertical Steel es V
Wall Horizontal Steel -s �1
Top Footing Steel 04 V
Longitudinal Footing Steel #4
Deflection Control, p fM,'= 0,180
Cover at Footing Dowels, cd_l = 1.50
Cover at Wall, c.., = 3.69
Cover atTop of Footing, c,op= 1.50
Cover at Bottom of Footing, C.t = 3.00
b = 12 in
dw.� = 4.000 in
dd-111 = 6.188 In
dfm, = 10. 250 In
8 ft Retaining Wall
Location
Down from
Ultimate
Minimum
P-
Required
P
Maximum
P-
Required A,
(in 2/ft)
Vertical Bar Spacing
%H
2
ill
O�0012
0.0001
0.0145
0.12
#5 Q 18 in oc
%H
4
861
O�0012
0.0011
0.0145
0.12
#5 18 in oc
1/4 H
6
2700
0,0012
0.0035
O�0145
0.33
#5 11 in oc
H
8
6075
0.0012
O�0033
0.0145
031
#5 @ 11 In oc
Mu = 11�ut + 1.bm
Vertical Reinforcement:
Minimum p = 0.0012 for bars not larger than #5 and yield strength not less than 60 ksl
Minimum p = 0.0015 for all other bars
Maximum p = 0.75Pb
pb = 0.85f,/ty P, [87.000/(87,000 + fy)]
p, = 0.85 - 0.05 1(f,' - 4000)/10001 a 0.65
01 = 0.925
Friction Coefficient @ Base, I% = 0.35
1-5 SF IrKidd Horizontal Reinforcement:
Friction Coefficient@ Wall, N = 0.00
Minimum p = 0.0020 for bars not larger than #5 and yield strength not less than 60 ksl
Effective Friction Angle, � = 20 deg
Minimum p = 0.0025 for all other bars
Horizontal Bar Spacing
Weight of Soil, W � = 115 pcf
p.,n = 0.0020
Weight of Concrete, W, = 150 pcf
#5 @ 18 in cc
Allowable Soil Bearing Pressure, q ej, = 2500 psf
Active Lateral Earth Pressure, p. = 35 pcf
Footing Reinforcement;
At -Rest Lateral Earth Pressure, p = 0 pcf
Horizontal Bar Spacing
Passive Earth Pressure. p = 300 pcf
'SF Not WIuded
p = 0.0016
Constant Wall Pressure, P L = 0 PSf
service
#4 @ 18 In cc
Depth ofConstantWall Pressure, d L = 11,50 ft
Uniform Surcharge, w = 0 psf
service
Check Overturning at Too (ASD)
Wall Axial Load, P. = 0,25 kIf
ultimate
M-1.9 (11.014) = 4667 ft-#Ift
M,.,v�g 8830 ft4tft
Wall Shear Load, V, = 0.00 kj
ultimate
Mmsing (0.7E) = 1944 ft-#tft
Wall Moment Load, Mw = 0.00 k-ftfft
ultimate
FS against overturning (H):
11 OK
FS against overturning (H + 0.7E):
1 �8 OK for Seismic wl 4/3 Increase
Seismic Pressure = 6 x H psf
Seismic Pressure =
48 psf
Check Sliding (ASD)
F_,�,�g (I -OH)= 1120#tft
(Friction) F_j,,w,, = 1118 4/ft
F__g (0-71E) = 269 #/it
(Passive) F_isti, = 338 #/it
FS against sliding (H):
1.8 CK
FS against sliding (H + 0.7E):
1.9 OK for Seismic w/ 4/3 Increase
Foundation Pressures
EM. = 4164 ft-#/R
EV = 3195 #/ft
d = EM�IZV
d = 1.30 It
a = 0.66ft
1 = 5 ft4
Pa = V/A + Ve(B/2)/l
Pb = V/A - Ve(B/2)/l
P. = 1635 psf
P, = 0 psf
M3.2
ENGINEERING
�5= NXW..d�c`� P111 1�1 3
APP'L TOP MAR
V-6" MIN
,I PRONAEM MtM-D"ININ6 HATISMAL
'14 AS fWOV &*'( 6120TEC-04NICAL ENO'llt
VOALL CO%MR (C-LEAR)
6 ft Retaining Wall
Location
-
Down from
ki,h Fnd fill
ivi .1. '
ultimate
fft-fifif�
Minimum
P-
Required
P
Maximum
-
Required A,
Vertical Bar Spacing
%H
1.5
27
O�0016
0.0000
0,0252
0.14
#4 Q 16 In oc
%H
3
324
0�0015
0,0006
0.0252
OA4
#4 16 In oc
3/*H
4.5
1080
O�0015
0.0020
0.0252
0.19
#4 12 In oc
H
6
2484
0.0015
0,0019
0.0252
0.18
#4 13 In oc
Mu = 1.ut + IAJH
Vertical Reinforcement:
i C�VVER (CLEAR) Minimum p = 0.0012 for bars not larger than #5 and yield strength riot less than 60 ksl
Minimum p = 0.0015 for all other bars
Maximum p = 0.75N
pb = 0.85f,'If, P, 187,0001(87,000 + f,)]
p, = 0.85 - 0.05 J(f,' - 4000YI0001 a 0.65
ploO.925
Wall Height H = 6.00 ft
frfton Coefficient @ Base, p. = 0.35
I.S sF kxWW v j Horizontal Reinforcement:
Soil Depth @ Low End, d = 1.50 it
Friction Coefficient (a Wall, ja� = 0.00
Minimum p = 0.0020 for bars not larger than $5 and yield strength riot less than 60 ksl
Low End Length, B. = 1.50 ft
Effective Friction Angle, 0 = 20 deg
Minimum p = 0.0025 for all other bars
High End Length, B�O = 0.75 ft
Horizontal Bar Spacing
Footing Thickness, it = 12 In
Weight of Soil, W � = 115 pcf
p.. = 0.0020
Wall Thickness, tw = 8 In
Weight of Concrete, Wc = 150 pcf
#5 @ 18 In oc
Slope of High Soil, 0 = 0 deg
Allowable Soil Bearing Pressure, qN, = 2500 psi
#4 & Smaller Steel Yield Strength, f, = 40 ksl
#5 & Larger Steel Yield Strength, f. = 60 ksi
Concrete Compressive Strength, f,'= 2500 psi
Footing Dowels #4
Wall Vertical Steel
Wall Horizontal Steel. 05
I
Top Footing Steel, #4
Longitudinal Footing Steel #4
Deflection Control, p V,'= 0.180
Cover at Footing Dowels, 1.50
Cover atWall. cwl = 3.75
Cover at Top of Footing, ct,p = 1.50
Cover at Bottom of Footing, cm = 3.00
b = 12 In
d.a = 4,000 In
cld-11� = 6.250 In
dt�ain, = 10.250 In
Active Lateral Earth Pressure, p. � 35 pcT
At -Rest Lateral Earth Pressure, p = 0 pcf
Passive Earth Pressure, p = 300 pcf
Constant Wall Pressure, P L = 0 PSI
Depth of Constant Wall Pressure, c1L = 11.50 it
Uniform Surcharge, w = D psf
Wall Axial Load, P. = 0,25 k1f
Wall Shear Load, V� = D.00 k1
Wall Moment Load, M. = 0.00 k-Wft
Footing Reinforcement:
Horizontal Bar Spacing
jSFN,AWd.W
p = 0.0007
service
#4 @ 18 In oc
service
Check Overturning at Too (ASD)
ultimate
M,_, (I.OH) = 2205 ft-#tft
ultimate
M_, (01E) = 882 ft4Yft
ultimate
FS against overturning (H):
FS against overtumIng (H + 0.7E):
Seismic Pressure = 6 x H PSI
Seismic Pressure = 36 psi
Check Sliding (ASO)
Fc_,, (1.OH) = 630 #tft
F,.u,,, (07E) = 151 Ot
FS against sliding (H):
FS against sliding (H + 0.7E):
Foundation Pressures
EM, = 1780 ft-#tft
EV = 2034 Xft
d = EMWEV
d = 0.87 ft
e = 0.58 it
I = 2 ft4
P. = V/A + Ve(B/2)11
P. = 1535 psf
M'..'.0 = 3985 ft-*ft
1�8 OK
1.7 OK for Seismic w/ 4/3 Increase
(Friction) F 712 #flt
(Passive) 338 #/ft
2.2 CK
2.4 OK for Seismic W/ 4/3 increase
Pb = V/A - Ve(B/2yl
Pb = 0 psf
M3.3
El 7 � L EOf '? 4, ISO
ENGINEERING
AS REO 0 BY 61150TIXHNICAL. V46'R
104ALL C4%101t (CLOAN
it
FOOTI" COVER (C4ZAW
1'-4&' MIN
R-5-,
(2)^4-/
Wall Height H = 5.00 ft
Friction Coefficient C Base, ilt,= 0.35 I.S SIF U.*.W j
Soil Depth Q Low End, d = 1.50ft
Friction Coefficient Q Wall, 0.00
Low End Length, Bw = 1.00 ft
Effective Friction Angle, 20 deg
High End Length, %0 = 0.75 ft
Footing Thickness, tf = 12 in
Weight of Soil, W 115 pcf
Wall Thickness, t. = 8 In
Weight ofConcrete, Wc = 160 pcf
Slope of High Soil, 0 = 0 deg
Allowable SoU Bearing Pressure, q d, = 2500 psf
#4 & Smaller Steel Yield Strength, fy = 40 ksl
#6 & Larger Steel Yield Strength, fy = 60 ksl
Concrete Compressive Strength, fc'= 2500 psi
Footing Dowels #4 V
Wall Vertical Steel 14 W
Wall Horizontal Steel ps W
Top Footing Steel #4 V
Longitudinal Footing Steel #4 V
Deflection Control, p fV?,' = 0.180
Cover at Footing Dowels, c�j = 1.50
Cover at Wail, c.. = 3.75
Cover at Top of Footing, c,,p = 1.50
Cover at Bottom of Footing, c. = 3.00
b = 12 In
d-ii 2 4.000 In
d,_.,, = 6.250 In
clrw�o = 10.250 In
Active Lateral Earth Pressure, p. = 35 pcf
At -Rest Lateral Earth Pressure, p = 0 pcf
Passive Earth Pressure, p - 300 pcf
SF Ift, Ind-W
Constant Wall Pressure, PL = 0 P91'
service
Depth of Constant Wall Pressure, d L � 11-50ft
Uniform Surcharge, w = 0 psf
service
Wall Axial Load, P. - 0.25 kff
ultimate
Wall Shear Load, V. = 0.00 kit
ultimate
Wall Moment Load, M� = 0,00 k-tltft
ultimate
Seismic Pressure = 6 x H lost
Seismic Pressure -
30 lost
5 ft Retaininci Wall
Location
� -1-
Down from
Ultimate
Minimum
Pm
Required
P
Maximum
P-
Required A,
((Ort)
Vertical Bar Spacing
%H
1.25
4
0.0015
0.0000
0.0252
0,14
#4 16 In oc
'AH
2.5
166
U015
0.0003
0.0252
0.14
#4 16 In oc
% H
3.75
591
0.0015
O�0011
0.0252
Q14
#4 16 In oc
H
- 5 ____
_1392
0.00 1 5
acia 11
0.0252
0.14
#4 16 In oc
Mu = 1.ut + 1.brl
Vertical Reinforcement:
Minimum p = 0.0012 for bars notlarger than #5 and yield strength not less than 60 ksl
Minimum p = 0.0015 for all other bars
Maximum p = 0.75pb -
pb = 0.85fc'tfv P, [87,000/(87,000 + fy)]
p, = 0.85 - 0.05 [(fc'- 4000)110001 �t 0.65
Pi = 0.925
Horizontal Reinforcement:
Minimum p = 0.0020 for bars not larger than #5 and yield strength not less than 60 ksi
Minimum p = 0.0025 for all other bars
Horizontal Bar Spacing
pm�, = 0.0020
#5 C 18 In oc
Footing Reinforcement:
Horizontal Bar Spacing
p = 0.0004
#4 a 18 In oc
Check Overturning at Toe (ASD)
M-Mg (1.01-1) = 1385 ft-#/ft
M�,j, (0.7E) = 540 ft4ht
FS against overturning (H):
FS against overturning (H + 0�71E):
Check SlAding (ASD)
F_I�g (1, OH) � 438 */ft
F_�I�g (0.7E) = 105 #/ft
FS against sliding (H):
FS against sliding (H + 0.7E):
Foundation Pressures
ZM� = 1184 ft-#/ft
EV - 1703 #/ft
d = EMdTV
d = 0.70 ft
a = 0.51 ft
I = 1 ft4
P. = V/A + Ve(B/2)/l
P. = 1603 psf
Mr.Wng � 2569 ft-#tft
1.9 CK
1.8 OK for Seismic wi 4/3 Increase
(Friction) Fr��ing = 596 #fit
(Passive) F-t��, = 338 #/ft
2.8 OK
3.0 OK for Seismic W/ 413 Increase
Pb = VIA - Ve(B/2)11
P, = 0 pal
M3.4
lit
Vd
Eailh
Solutions
NWLLC
44,
�Vj
k
7,2
—low
v
jo4
ink,
_ -%A%_
0
PREPARED FOR
PARADISE HEIGHTS, LLC
March 5, 2018
Samuel E. Suruda, G.I.T.
Staff Geologist
Henry T. Wright, P.E.
Senior Project Engineer
Kyle R. Campbell, P.E.
Principal Engineer
GEOTECHNICAL ENGINEERING STUDY
PROPOSED MULTI -FAMILY RESIDENCES
546 PARADISE LANE
EDMONDS, WASHINGTON
ES-5839
Earth Solutions NW, LLC
1805 — 136t" Place Northeast, Suite 201
Bellevue, Washington 98005
Phone: 425-449-47041 Fax: 425-449-4711
www.earthsolutionsnw.com
0
a a
Geolechnincal Engineeping Repopt
Geotechnical Sepvices Ape Performed top
Specific Pupposes,, Pepsons, mid Ppolects
Geotechnical engineers structure their services to meet the specific needs of
their clients. A geotechnical engineering study conducted for a civil engi-
neef may not fulfill the needs of a construction contractor or even another
civil engineer. Because each geotechnical engineering study is unique, each
geotechnical engineering report is unique, prepared solelyfor the client. No
one except you should rely on your geotechnical engineering report without
first conferring with the geotechnical engineer who prepared it. And no one
— notevenyou —should apply the report for any purpose or project
except the one originally contemplated.
Read the Full Report:
Serious problems have occurred because those relying on a geotechnical
engineering report did not read it alL Do not rely on an executive summary
Do not read selected elements only.
A Geotechnical Engineering He opt Is Based an
A Unique Set of Ppoject-Speciric Factops
Geotechnical engineers consider a number of unique, project -specific fac-
tors when establishing the scope of a study. Typical factors include: the
client's goals, objectives, and risk management preferences; the general
nature of the structure involved, its size, and configuration; the location of
the structure on the site; and other planned or existing site improvements,
such as access roads, paFkIng lots, and underground utilities. Unless the
geotechnical engineer who conducted the study specifically indicates oth-
erwise, do not rely on a geotechnical engineering report that was:
• not prepared for you,
• not prepared for your project,
• not prepared for the specific site explored, or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical
engineering report include those that affect:
the function of the proposed structure, as when it's changed from a
parking garage to an office building, or from a light industrial plant
to a refrigerated warehouse,
• elevation, configuration, location, orientation, or weight of the
proposed structure,
• composition of the design team, or
,P project ownership.
As a general rule, always inform your geotechnical engineer of project
changes —even minor ones —and request an assessment of their impact.
Geotechnical engineers cannot accept responsibility or liability for problems
that occur because their reports do not consider developments of which
they were nat informed
Subsurface Conditions Can Change
A geotechnical engineering report is based on conditions that existed at
the time the study was performed. Do not rely on a geot6chnical engineer-
ing reportwhose adequacy may have been affected by: the passage of
time; by man-made events, such as construction on or adjacent to the site;
or by natural events, such as floods, earthquakes, or groundwater fluctua-
tions- Always contact the geotechnical engineer before applying the report
to determine it it is still reliable. A minor amount of additional testing or
analysis could prevent major problems.
Most Geotechnical Findings Are Professional
Opinions
Site exploration identifies subsurface conditions only at those points where
subsurface tests are conducted or samples are taken. Geotechnical engi-
neers review field and laboratory data and then apply their professional
judgment to render an opinion about subsurface conditions throughout the
site, Actual subsurface conditions may differ --sometimes significantly —
from those indicated in your report. Retaining the geotechnical engineer
who developed your report to provide construction observation is the
most effective method of managing the risks associated with unanticipated
conditions.
A Repopt's Recommendations Ape NotFinal
Do not overrely on the construction recommendations included in your
report. Those recommendations are not final, because geotechnical engi-
neers develop them principally from judgment and opinion. Geotechnical
engineers can finalize their recommendations only by observing actual
subsurface conditions revealed during construction. The geotechnical
engineer who developedyour report cannotassume responsibility or
liability for the report's recommendations if that engineer does not perform
construction observation.
A Geotechnical Engineering Report Is Subject to
MisinUrpretation
Other design team members' misinterpretation of geotechnical engineering
reports has resulted in costly problems. Lower that risk by having your geo-
technical engineer confer with appropriate member,,, of the design team after
submitting the report. Also retain your geotechnical engineer to review perti-
nent elements of the design team's plans and specifications. Contractors can
also misinterpret a geotechnical engineering report. Reduce that risk by
having your geotechnicall engineer participate in prebid and preconstruction
conferences, and by providing construction observation.
Do Not Redraw the FAgIneep's Logs
Geotechnical engineers prepare final boring and testing logs based upon
their interpretation of field logs and laboratory data. To prevent errors or
omissions, the logs included in a geotechnical engineering report should
never be redrawn for inclusion in architectural or other design drawings.
Only photographic or electronic reproduction is acceptable, but recognize
that separating logs from the report can elevate risk
Give Contractors a Complete Report and
Guidance
Some owners and design professionals mistakenly believe they can make
contractors liable for unanticipated subsurface conditions by limiting what
they provide for bid preparation. To help prevent costly problems, give con-
tractors the complete geotechnical engineering report, but preface it with a
clearly written letter of transmittal. In that letter, advise contractors that the
report was not prepared for purposes of bid development and that the
report's accuracy is limited; encourage them to confer with the geotechnical
engineer who prepared the report (a modest fee may be required) and/or to
conduct additional study to obtain the specific types of information they
need or prefer. A prebid conference can also be valuable. Be sure contrac-
tors have sufficient time to perform additional study. Only then might you
be in a position to give contractors the best information available to you,
while requiring them to at least share some of the financial responsibilities
stemming from unanticipated conditions.
Read Responsibility Provisions Closely
Some clients, design professionals, and contractors do not recognize that
geotechnical engineering is far less exact than other engineering disci-
plines. This lack of understanding has created unrealistic expectations that
have led to disappointments, claims, and disputes. To help reduce the risk
of such outcomes, geotechnical engineers commonly include a variety of
explanatory provisions in their reports. Sometimes labeled "limitations"
many of these provisions indicate where geotechnical engineers' responsi-
bilities begin and end, to help others recognize their own responsibilities
and risks. Read these provisions closely. Ask questions. Your geotechnical
engineer should respond fully and frankly.
GeDenVille0nmental Concerns Ape Not Covered
The equipment, techniques, and personnel used to perform a geo6nviron-
mental study differ significantly from those used to perform a geotechnical
study. For that reason, a geotechnical engineering report does not usually
relate any geoenvironmental findings, conclusions, or recommendations;
e.g., about the likelihood of encountering underground storage tanks or
regulated contaminants- Unanticipated environmental problems have led
to numerous project failures. It you have not yet obtained your own geoen-
vironmental information, ask your geotechnical consultant for risk man-
agement guidance. Do not rely on an environmental report prepared for
someone else.
Obtain Professional Assistance To Deal with Mold
Diverse strategies can be applied during building design, construction,
operation, and maintenance to prevent significant amounts of mold from
growing on indoor surfaces. To be effective, all such strategies should be
devised for the express purpose of mold prevention, integrated into a com-
prehensive plan, and executed with diligent oversight by a professional
mold prevention consultant. Because just a small amount of water or
moisture can lead to the development of severe mold infestations, a num-
ber of mold prevention strategies focus on keeping building surfaces dry.
While groundwater, water infiltration, and similar issues may have been
addressed as part of the geotechniGal engineering study whose findings
are conveyed iff-this report, the geotechnical engineer in charge of this
project is not a mold prevention consultant; none of the services per-
formed in connection with the geotechnical engineer's study
were designed or conducted for the purpose of mold preven-
tion. Proper implementation of the recommendations conveyed
in this report will not of itself he sufficient to prevent mold from
growing in or an the structure involved.
Rely,, on Your ASFE-Membep Geotechnclal
Engmeep for Additional Assistance
Membership in ASFE/The Best People on Earth exposes geotechnical
engineers to a wide array of risk management techniques that can be of
genuine benefit for everyone involved with a construction project. Confer
with you ASFE-member geotechnical engineer for more information.
ASFE
The BeSt F0008 on Earth
8811 Colesville Road/Suite G106, Silver Spring, MID 20910
Telephone: 301/565-2733 Facsimile: 301/589-2017
e-mail: info@asfe,org www.asfe.org
Copyright 2GO4 by ASAE, Inc. Duplication, reproduction, or copying of this document in whole or in part, by any means whatsoever is strictly prohibited, except with ASM;
specific written permission. Excerpting, quoting, or otherwise extracting wording from this document Is permitted only with the express written permission ofASF� and only for
purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geotechnical engineering report. Any other
firm, individual, or other entity that so uses this document without being an ASFE member could be committing negligent or intentional (fraudulent) misrepresentation.
11GEH06045.0M
March 5, 2018
ES-5839
Paradise Heights, LLG
24144 East Greystone Lane
Woodway, Washington 98020
Attention'. Mr. John Rettenmier
Dear Mr. Rettenmier:
' Earth
art'
Solutions
lut'ons
NWLI.0
L Nw,.
Earth Solutions NW LLC
• Geotechnical Engineering
• Construction Monitoring
• Environmental Sciences
Earth Solutions NW, LLC (ESNW) is pleased to present this report titled "Geotechnical
Engineering Study, Proposed Multi -Family Residences, 546 Paradise Lane, Edmonds,
Washington". Based on the results of our study, construction of the proposed multi -family
residential structures at the subject site is feasible from a geotechnical standpoint.
The proposed residential structures can be supported on a conventional foundation system
bearing on competent native soil, recompacted native soil, or structural fill. Competent native
soils, suitable for support of foundations, should be encountered beginning at a depth of roughly
two feet below existing grades across the majority of the site. Slab -on -grade floors should be
supported on dense native soil, re -compacted native soil, or structural fill. Where loose, organic
or other unsuitable materials are encountered at or below the footing subgrade elevation, the
material should be removed and replaced with structural fill, as necessary.
This report provides a geologically hazardous areas assessment, and recommendations for
foundation subgrade preparation, foundation and retaining wall design parameters, drainage, the
suitability of the on -site soils for use as structural fill, and other geotechnical recommendations.
The opportunity to be of service to you is appreciated. If you have any questions regarding the
content of this geotechnical engineering study, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
S muel E. Suruda, G.I.T.
Staff Geologist
'18D5 - 136th Place N.E,, Suite 201 0 Bellevue, WA 98005 0 (425) 449-4704 9 FAX (425) 449-4711
Table of Contents
ES-5839
PAGE
INTRODUCTION.......................................................................
General..........................................................................
Proiect Description ..........................................................
SITE CONDITIONS .................................................................... 2
Surface........................................................................... 2
Subsurface...................................................................... 2
Geologic Setting ..................................................... 2
Groundwater.......................................................... 3
Geoloalcal Hazards Assessment ........................................ 3
Slope Reconnaissance ............................................ 3
Erosion Hazard Areas ............................................... 3
Landslide Hazard Areas ........................................... 4
Mapping of Geologically Hazardous Areas ................ 5
Special Study and Report Requirements ................... 5
Development Standards (General Requirements) ....... 7
Development Standards (Specific Hazards) ............... 7
Analysis of Proposal ............................................... 9
DISCUSSION AND RECOMMENDATIONS ..................................... 9
General...........................................................................
9
Site Preparation and Earthwork .........................................
9
Temporary Erosion Control .............................................
10
In -Situ Soils .......................................................................
10
StructuralFill .....................................................................
10
Excavations and Slopes ...........................................
11
Foundations....................................................................
11
Seismic Considerations ......................... ..............................
12
Slab -On -Grade Floors .......................................................
12
Retainina Walls ...............................................................
12
Drainage.........................................................................
13
Infiltration Evaluation ..............................................
13
Low Impact Development .........................................
14
Utility Trench Support and Backfill .....................................
15
Pavement Sections ...........................................................
15
LIMITATIONS............................................................................ 15
Additional Services .......................................................... 15
Earth Solutions NW, LLC
U
Table of Contents
Continued
ES-5839
GRAPHICS
Plate I Vicinity Map
Plate 2 Test Pit Location Plan
Plate 3 Retaining Wall Drainage Detail
Plate 4 Footing Drain Detail
APPENDICES
Appendix A Subsurface Exploration
Test Pit Logs
Appendix B Laboratory Test Results
Earth Solutions NW, LLC
GEOTECHNICAL ENGINEERING STUDY
PROPOSED MULTI -FAMILY RESIDENCES
546 PARADISE LANE
EDMONDS, WASHINGTON
ES-5839
INTRODUCTION
General
This geotechnical engineering study was prepared for the three proposed multi -family residential
structures to be constructed at 546 Paradise Lane in Edmonds, Washington. To complete the
scope of services detailed in our proposal PES-5839 dated January 17, 2018 we performed the
following:
• Subsurface exploration and characterization of soil and groundwater conditions by way of
test pits excavated at accessible areas of the site;
• Laboratory testing of soil samples obtained during subsurface exploration;
• An infiltration evaluation based on observed soil conditions and the results of a Small-
scale Pilot Infiltration Test (PIT);
• Geotechnical engineering analyses, and;
• Preparation of this report.
The following documents and resources were reviewed as part of our report preparation:
• Preliminary Drainage and Plot Plan, prepared by Michel Construction, Inc., dated July 3,
2008;
• Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangle,
Washington, prepared by James P. Minard, dated 1983;
• Department of Ecology Stormwater Management Manual for Western Washington,
Volume III Hydrologic Analysis and Flow Control BMPs, dated August 2012;
• Edmonds City Code, Chapter 23.80 (Geologically Hazardous Areas), and;
• Online Web Soil Survey (WSS) resource provided by United States Department of
Agriculture (USDA), Natural Resources Conservation Services.
Proiect Description
Based on the site plan provided to us, the existing single-family residential structure and garage
will be demolished and three new multi -family residential structures will be constructed. We
anticipate grading activities will primarily include cuts to establish the planned building alignments
and roadway improvements. Based on the existing grades, we estimate cuts to establish building
pad and foundation subgrade elevations will be on the order of up to four feet. Site improvements
will also include underground utility installations.
Earth Solutions NW, LLC
Paradise Heights, LLC ES-5839
March 5, 2018 Page 2
At the time this report was prepared, specific building load values were not available. However,
we anticipate the proposed residential structures will consist of relatively lightly loaded wood
framing supported on conventional foundations. Based on our experience with similar
developments, we estimate wall loads on the order of one to two kips per linear foot and slab -on -
grade loading of 150 pounds per square foot (psf).
If the above design assumptions are incorrect or change, ESNW should be contacted to review
the recommendations in this report. ESNW should review the final design to verify the
geotechnical recommendations provided in this report have been incorporated into the plans.
SITE CONDITIONS
Surface
The subject site is located at 546 Paradise Lane in Edmonds, Washington, as illustrated on the
Vicinity Map (Plate 1). The site consists of one residential tax parcel (Snohomish County parcel
number 27032500302600) totaling approximately 0.91 acres of land area. The property is
currently developed with a single-family residence and associated improvements. The majority
of the site is relatively level with a steep slope descending on the north side of the property
adjacent to Paradise Lane and gentle slope descending to the east for the driveway adjacent to
Paradise Lane. Based on site observation and available topographic data, the steep slope
descending to the north has a slope gradient in excess of 40 percent and elevation change of up
to about 12 feet; the steep slope extends beyond the property. Vegetation within the steep slope
area consists of large trees and ivy groundcover. The subject site is bordered to the west by an
easement for Edmonds Way, to the east and north by Paradise Lane, and to the south by a
residential property. The Test Pit Location Plan (Plate 2) illustrates the approximate limits of the
property.
Subsurface
As part of the subsurface exploration, four test pits were excavated in accessible portions of the
site for purposes of assessing soil and groundwater conditions. The test pits were advanced to
a maximum depth of approximately nine feet below existing grade. Please refer to the test pit
logs provided in Appendix A for a more detailed description of the subsurface conditions.
Soil conditions observed at test pit locations consisted of medium dense poorly graded sand
(Unified Soil Classification System: SP) outwash deposits. Overall soil relative density increased
with depth. Approximately nine feet below ground surface (bgs), dense to very dense silty sand
with gravel glacial till was observed (USCS: SM). The glacial till was observed to be weakly
cemented and exhibited iron oxide staining.
Geologic Seffing
According to the referenced geologic map, the subject site is underlain by advance outwash (Qva)
deposits. Soil conditions observed at the test pit locations were generally consistent with outwash
deposits.
According to the referenced NRCS soil survey, the subject site consists of Everett series soils.
Everett series soils are classified as outwash deposits and are consistent with observations made
in the field.
Earth Solutions NW, LLC
Paradise Heights, LLC
March 5, 2018
Groundwater
ES-5839
Page 3
No groundwater seepage was observed during our fieldwork on January 7, 2018. Groundwater
seepage rates and elevations fluctuate depending on many factors, including precipitation
duration and intensity, the time of year, and soil conditions. In general, groundwater elevations
and flow rates are higher during the winter, spring and early summer months.
Geological Hazards Assessment
As part of this geotechnical engineering study, the referenced chapter of the Edmonds City Code
(ECC) was reviewed. Per the ECC requirements, the following topics related to development
plans and site conditions are addressed.
Slope Reconnaissance
During our fieldwork, we performed a visual slope reconnaissance of the steep slope area. The
main focus of our reconnaissance was to identify signs of instability or erosion hazards along the
site slopes. The typical instability indicators include features such as head scarps, tension
cracks, hummocky terrain, groundwater seeps along the surface and erosion features such as
gulleys and rills. During the slope reconnaissance, no signs of erosion or slope instability were
observed. The slope is vegetated with large trees and ivy groundcover. In general, based on
the slope reconnaissance, stability of the sloped areas within and adjacent to the property can
be characterized as good.
Erosion Hazard Areas — ECC 23.80.020.A.
With respect to erosion hazard areas, section 23.80.020 of the ECC defines erosion hazards as
.1 at least those areas identified by the U.S. Department of Agriculture's Natural Resources
Conservation Service as having a "moderate to severe", "severe", or "very severe" rill and inter -
rill erosion hazard. Erosion hazard areas are also those areas impacted by shoreland and/or
stream bank erosion. Within the city of Edmonds, erosion hazard areas include.-
1. Those areas of the city of Edmonds containing soils that may experience severe to
very severe erosion hazard. This group of soils includes, but is not limited to, the
following when they occur on slopes of 15 percent or greater:
a. Alderwood soils (15 to 25 percent slopes);
b. Alderwood/Evereft series (25 to 70 percent slopes), and;
c. Everett series (115 to 25 percent slopes).
2. Coastal and stream erosion areas which are subject to the impacts from lateral erosion
related to moving water such as stream channel migration and shoreline retreat;
3. Any area with slopes of 15 percent or greater and impermeable soils interbedded with
granular soils and springs or ground water seepage, and;
4. Areas with significant visible evidence of ground water seepage, and which also
include existing landslide deposits regardless of slope.
Earth Solutions NW, LLC
Paradise Heights, LLC
March 5, 2018
ES-5839
Page 4
The on -site soils are generally consistent with Everett series soils. Based on the ECC definition,
the steep slope areas within and adjacent to the property classify as erosion hazard areas.
Construction of the proposed engineered retaining wall is expected to be sufficient for adequately
managing and mitigating the erosion potential for this project.
Landslide Hazard Areas — ECC 23.80.020.B.
With respect to landslide hazard areas, section 23.80.020 of the ECC defines landslide hazard
areas as "areas potentially subject to landslides based on a combination of geologic, topographic,
and hydrologic factors. They include areas susceptible because of any combination of soil, slope
(gradient), slope aspect, structure, hydrology, or other factors. Within the city of Edmonds,
landslide hazard areas specifically include:
1. Areas of ancient or historic failures in Edmonds which include all areas within the earth
subsidence and landslide hazard area as identified in the 1979 report of Robert Lowe
Associates and amended by the 1985 report of GeoEngineers, Inc., and further
discussed in the 2007 report by Landau Associates,
2. Coastal areas mapped as class U (unstable), UOS (unstable old slides) and URS
(unstable recent slides) in the Department of Ecology Washington coastal atlas;
3. Areas designated as quaternary slumps, earthflows, mudflows, or landslides on maps
published by the United States Geological Survey or Washington State Department of
Natural Resources;
4. Any slope of 40 percent or steeper that exceeds a vertical height of 10 feet over a 25-
foot horizontal run. Except for rockeries that have been engineered and approved by
the engineer as having been built according to the engineered design, all other
modified slopes (including slopes where there are breaks in slopes) meeting overall
average steepness and height criteria should be considered potential landslide hazard
areas,
5. Any slope with all three of the following characteristics:
a. Slopes steeper than 15 percent;
b. Hillsides intersecting geologic contacts with relatively permeable sediment
overlying a relatively impermeable sediment, and;
c. Springs or ground water seepage.
6. Any area potentially unstable as a result of rapid stream incision or stream bank
erosion;
7. Any area located on an alluvial fan, presently subject to, or potentially subject to,
inundation by debris flow or deposition of stream -transported sediments, and;
8. Any slopes that have been modified by past development activity that still meet the
slope criteria.
Earth Solutions NK LLC
Paradise Heights, LLC ES-5839
March 5, 2018 Page 5
Based on site observation and the referenced topographic survey, a north -descending steep
slope with gradient in excess of 40 percent is located to north of the subject property; based on
site observations, the steep slope area was likely over steepened by historic excavations made
to construct Paradise Lane. Per the above definition of landslide hazard areas, the steep slope
to the north of the subject property classifies as a potential landslide hazard area based on a
slope gradient of 40 percent or steeper with a vertical relief of 10 feet or more. The overall stability
of the site can be characterized as good and it is our opinion that the potential landslide hazard
for the slope to the north of the site can be considered very low. Additionally, we understand
grading for the proposed development will include construction of engineered retaining walls that
will effectively eliminate the steep slope hazard.
Mapping of Geologically Hazardous Areas — ECC 23.80.030
Review of available geologically hazardous areas mapping did not reveal geologically hazardous
areas within or immediately adjacent to the subject site.
Special Study and Report Requirements — ECC 23.80.050
A. This geotechnical engineering study and geological hazards assessment was completed
by a professional engineer licensed in the state of Washington with experience analyzing
geologic hazards throughout the Puget Sound region.
B. 1. The project area includes the subject site as delineated in the referenced preliminary
plans.
2. No further geologically hazardous areas are located within 200 feet of the property or
will be affected by construction on the property.
C. This geological hazards assessment included a field investigation and an assessment of
geologic hazards. This geotechnical report has been prepared, stamped, and signed by
a qualified professional.
I . It is our opinion the level of analysis completed for this geological hazards assessment
is appropriate for the scale and scope of the project and scale of the geological hazard
areas present.
2. A discussion of all geologically hazardous areas on the site and any geologically
hazardous areas off site potentially impacted by the proposed project is provided in
this report.
3. Based on the results of our study and on -site observations, the proposed project will
not decrease slope stability or pose an unreasonable threat to persons or property
either on or off site. These conclusions are based on the current conditions of the
slope in question and proposed replacement of the slope with an engineered retaining
wall,
4. This geological hazard assessment is provided as adequate information to comply with
requirements of ECC geological hazards.
5. This geotechnical report generally follows the guidelines set forth in the Washington
State Department of Licensing Guidelines for Preparing Engineering Geology Reports
in Washington (2006).
Earth Solutions NW, LLC
Paradise Heights, LLC
March 5, 2018
ES-5839
Page 6
6. It is our opinion a landslide hazard minimum building setback is not necessary, and
erosion hazard mitigation recommendations are provided in this report.
D. We are not aware of a previous study completed for the subject site.
E. The mitigation recommendations include permanent solutions, such as construction of
engineered retaining walls within the slope area in question and erosion control
recommendations.
F This geological hazards assessment and geotechnical engineering study should be
reviewed as part of the overall submittal package.
1. Please refer to preliminary plans prepared by Michel Construction, Inc. for the site plan.
a. The height of the slopes and slope gradients are discussed in this report and
displayed within the preliminary plans.
b. Springs, seeps, or other surface expressions of groundwater were not observed on
or within 200 feet of the project area.
c. No surface water runoff features were observed during our site visits.
2. a. Vegetative cover across the landslide hazard areas generally consists of non-native
groundcover (i.e. ivy), shrubs, and large trees.
b. Subsurface conditions are described in the Subsurface section of this report.
c. Surface and groundwater conditions are discussed in previous sections of this
report. Roughly two and one-half feet of fill was observed in TP-3. Based on current
conditions and elevation changes present, it is evident that some degree of land
modification has occurred within and adjacent to the potential landslide hazard
areas. The potential landslide hazard areas were likely artificially steepened by
excavations completed during construction of Paradise Lane. Local natural
topography was likely more of a gradual consistent slope.
d. The slopes within and adjacent to the subject site generally exhibit good overall
stability.
e. The slopes within and adjacent to the subject site are not characterized as bluffs
and we do not anticipate a retreat of the slopes to occur.
Based on the sand soils present on the site and no indications of groundwater, we
would anticipate the run -out hazard of landslide debris to be confined to a distance
of up to half the height of slope away from the toe. If such a landslide occurred,
impacts of run -out on downslope properties or right-of-way would likely consist of a
few feet of landslide debris covering the ground adjacent to the toe of the slope.
Repair of the slide would likely require cleanup of debris and engineered
reconstruction of the slope and/or construction of an engineered retaining wall at
the toe of the slope; construction of the proposed engineered retaining wall will
effectively mitigate this potential. It should be noted, based on the results of our
study, likelihood of such a landslide event occurring adjacent to the subject site is
very low and the proposed project will not increase the likelihood.
Earth Solutions NW, LLC
I
Paradise Heights, LLC
March 5, 2018
ES-5839
Page 7
g. We believe this report meets the criteria of a critical areas report to a degree
adequate with respect to the severity of the steep slope hazard.
h. Recommendations for building siting limitations are provided in this report.
Proposed surface and subsurface drainage includes collecting surface water from
impermeable surfaces and directing them to infiltration systems located along the
eastern side of the site. The proposed drainage design is engineered and located
in a manner which utilizes the native sand soils and minimizes impacts to sloped
areas. The site soils are susceptible to erosion if exposed to surface water runoff
without the implementation of BMP measures. However, typical temporary and
permanent BMP measures will effectively mitigate the erosion potential.
3. This geotechnical engineering study was prepared by a licensed engineer.
a. Geotechnical design parameters are provided within this report.
b. Drainage and subdrainage recommendations are provided within this report.
c. Earthwork recommendations are provided within this report.
d. Recommendations for mitigation of adverse site conditions are provided within
this report, as necessary.
G. It is our opinion the site erosion hazard areas should be considered stable.
H. Based on the results of our study, the site does not contain any seismic hazard areas.
Development Standards (General Requirements) — ECC 23.80.060
Based on the results of our geological hazards assessment, the proposed project will not increase
the threat of the geological hazard to adjacent properties beyond predevelopment conditions, the
proposed project will not adversely impact other critical areas, the proposed project is designed
so that the hazard to the project is eliminated or mitigated to a level equal to or less than
predevelopment conditions, and the project is certified as safe as designed under anticipated
conditions.
Development Standards (Specific Hazards) — ECC 23.80.070
A. 1. We believe that with the construction of the engineered retaining wall adjacent to
Paradise Lane at the toe of the slope hazard area, any structure placed atop the wall
will not be at risk for landslides for the design life of the structure.
2. Based on the results of our study, it is our opinion that a buffer is not necessary for the
landslide hazard areas. The proposed project will include reducing the overall height
of the landslide hazard area as well as construction of engineered retaining walls in
the slope area.
Earth Solutions NW, LLC
Paradise Heights, LLC
March 5, 2018
ES-5839
Page 8
3. The proposed project will include construction of engineered retaining walls within the
slope hazard area, effectively removing any permanent hazard found on site. The
alteration will include establishing permanent erosion control and drainage measures
at the top of the landslide and erosion hazard areas. Provided the recommendations
in this report and subsequent geotechnical recommendations are incorporated into
the design and construction of the project, the proposed alteration will not increase
surface water discharge or sedimentation to adjacent properties beyond
predevelopment conditions, will not decrease slope stability on adjacent properties,
and such alterations will not adversely impact other critical areas.
4. a. As part of this geological hazards assessment, we assessed the current slope
conditions and consider them to be stable in their current condition and
configuration. We do not feel it is necessary to perform full slope stability analysis
within the landslide hazard, as construction of engineered retaining walls will
mitigate the hazard area prior to foundation loading and construction; however, an
ESNW representative should be on -site during wall construction to observe
changes to the steep slope area.
b. It is our opinion that the structures and improvements have been located and
engineered in a manner which sufficiently mitigates impacts to geologically
hazardous areas; ESNW should review any plan changes.
c. Historic development of Paradise Lane likely altered the natural contour of the
slopes. The proposed project will construct an engineered retaining wall within the
slope area, effectively eliminating any slope hazard.
d. The structures and improvements have been located and engineered in a manner
that effectively eliminates the most critical portions of the site by proposing
engineered retaining walls to replace the artificially steepened slopes.
e. The proposed development will not result in greater risk or a need for increased
buffers on neighboring properties.
f. Based on our study, building setback are not necessary.
5. We did not observe vegetation within the subject site which should be retained to
maintain site and slope stability.
6. It is our opinion that this site should not be restricted to seasonal clearing and grading
work. This opinion is based on the relatively small scope of the project and
predominantly sandy soils, which are not as moisture sensitive as glacial till, of the
geological hazard areas.
7. We are not aware of proposed point discharges.
Earth Solutions NW, LLC
Paradise Heights, LLC
March 5, 2018
Analysis of Proposal
ES-5839
Page 9
The proposed development will involve demolition of the existing single-family residential
structure and construction of three new multi -family residential structures. Based on the
referenced site plans, the grading will involve minor cuts to establish level building pad areas; we
understand that an engineered retaining wall will be constructed at the base of the slope hazard
area adjacent to Paradise Lane at the north edge of the site. The proposed project will eliminate
the slope hazard area without creating any new geological hazards adjacent to the property.
These determinations are based on the relatively small extent of the previously modified steeply
sioped areas, stable nature of the site soils, and the construction of an engineered wall to retain
the site grades.
DISCUSSION AND RECOMMENDATIONS
General
Based on the results of our study, construction of the proposed residential structures at the
subject site is feasible from a geotechnical standpoint. The primary geotechnical considerations
associated with the proposed development include foundation support, temporary excavations,
retaining walls, infiltration and drainage, and the suitability of the on -site soils for use as structural
fill.
The proposed residential structures can be supported on a conventional foundation system
bearing on competent native soil, recompacted native soil, or structural fill. Competent soils
suitable for support of foundations should be encountered beginning at a depth of roughly two
feet below existing grades across the majority of the site. Slab -on -grade floors should be
supported on dense native soil, re -compacted native soil, or structural fill. Where loose, organic
or other unsuitable materials are encountered at or below the footing subgrade elevation, the
material should be removed and replaced with structural fill, as necessary.
This study has been prepared for the exclusive use of Paradise Heights, LLC and their
representatives. No warranty, expressed or implied, is made. This study has been prepared in
a manner consistent with the level of care and skill ordinarily exercised by other members of the
profession currently practicing under similar conditions in this area.
Site Preparation and Earthwork
Based on the referenced site plans and given the existing topography, we anticipate grading for
the project will involve Guts of up to about four feet to establish building pad and foundation
subgrade alignments. Silt fencing and temporary erosion control measures should be placed
along the perimeter of the site prior to beginning grading activities.
Earth Solutions NW, LLC
Paradise Heights, LLC ES-5839
March 5, 2018 Page 10
Temporary Erosion Control
Temporary construction entrances, consisting of at least six inches of quarry spalls, can be
considered in order to minimize off -site soil tracking and to provide a temporary road surface. Silt
fences should be placed along the margins of the property. Interceptor swales and a temporary
sediment pond may be necessary for control of surface water during construction. Erosion control
measures should conform to the Washington State Department of Ecology (DOE) and City of
Edmonds standards.
In -Situ Soils
From a geotechnical standpoint, the soils encountered at the test pit locations are generally
suitable for use as structural fill. However, successful use of the on -site soils will largely be
dictated by the moisture content of the soils at the time of placement and compaction. The site
soils were generally in a damp condition at the time of the exploration on January 7, 2018.
Based on the conditions encountered during our fieldwork, the site soils generally have a low
sensitivity to moisture. During periods of dry weather, the on -site soils should generally be
suitable for use as structural fill, provided the moisture content is at or near the optimum level at
the time of placement. If the on -site soils cannot be successfully compacted, the use of an
imported soil may be necessary. Imported soil intended for use as structural fill should consist of
a well -graded granular soil with a moisture content that is at or near the optimum level. During
wet weather conditions, imported soil intended for use as structural fill should consist of a well -
graded granular soil with a fines content of 5 percent or less defined as the percent passing the
Number 200 sieve, based on the minus three-quarter inch fraction.
Structural Fill
Structural fill is defined as compacted soil placed in foundation, slab -on -grade, and roadway
areas. Fills placed to construct permanent slopes and throughout retaining wall and utility trench
backfill areas are also considered structural fill. Soils placed in structural areas should be placed
in loose lifts of 12 inches or less and compacted to a relative compaction of 95 percent, based
on the laboratory maximum dry density as determined by the Modified Proctor Method (ASTM D-
1557). For soil placed in utility trenches underlying structural areas, compaction requirements
are dictated by the local city, county, or utility district, and in general are specified as 95 percent
relative compaction.
Earth Solutions NK LLC
Paradise Heights, LLC ES-5839
March 5, 2018 Page 11
Excavations and Slopes
The native soils encountered in the upper approximately nine feet of the test pit locations consist
of poorly graded sands in a dense condition. Temporary slopes within this layer should maintain
a gradient of no steeper than 1HAV. If groundwater is present within acute the minimum gradient
of a slope should be increased to 1.5HAV. The presence of perched groundwater may cause
caving of the temporary slopes due to hydrostatic pressure. ESNW should observe site
excavations to confirm the soil type and allowable slope inclination are appropriate for the soil
exposed by the excavation. If the recommended temporary slope inclination cannot be achieved,
temporary shoring may be necessary to support excavations.
Permanent slopes should maintain a gradient of 2H: 1 V, or flatter, and should be planted with
vegetation to enhance stability and to minimize erosion. A representative of ESNW should
observe temporary and permanent slopes to confirm the slope inclinations are suitable for the
exposed soil conditions, and to provide additional excavation and slope recommendations, as
necessary.
Foundabons
The proposed residential structures can be supported on a conventional foundation system
bearing on competent native soil, recompacted native soil, or structural fill. Competent soils
suitable for support of foundations should be encountered beginning at a depth of roughly two
feet below existing grades across the majority of the site. Where loose, organic or other
unsuitable materials are encountered at or below the footing subgrade elevation, the material
should be removed and replaced with structural fill, as necessary.
Provided the structures will be supported as described above, the following parameters can be
used for design of the new foundations:
* Allowable soil bearing capacity 2,500 psf
* Passive earth pressure 300 pcf (equivalent fluid)
0 Coefficient of friction 0.40
A one-third increase in the allowable soil bearing capacity can be assumed for short-term wind
and seismic loading conditions.
With structural loading as expected, total settlement in the range of one inch is anticipated, with
differential settlement of about one-half inch. The majority of the settlements should occur during
construction, as dead loads are applied.
Earth Solutions NK LLC
Paradise Heights, LLC
March 5, 2018
Seismic Considerations
ES-5839
Page 12
The 2015 IBC recognizes ASCE for seismic site class definitions. If the project will be permitted
under the 2015 IBC, in accordance with Table 20.3-1 of ASCE, Minimum Design Loads for
Buildings and Other Structures, Site Class D, should be used for design.
In our opinion, the site is not susceptible to liquefaction. The soil relative density and the absence
of an established shallow groundwater table are the primary bases for this opinion.
Slab -On -Grade Floors
Slab -on -grade floors should be supported on a firm and unyielding subgrade consisting of
competent native soil or at least 12 inches of 'Structural fill. Unstable or yielding areas of the
subgrade should be recompacted or overexcavated and replaced with suitable structural fill prior
to construction of the slab. A capillary break consisting of a minimum of four inches of free -
draining crushed rock or gravel should be placed below the slab. The free -draining material
should have a fines content of 5 percent or less defined as the percent passing the Number 200
sieve, based on the minus three-quarters inch fraction. In areas where slab moisture is
undesirable, installation of a vapor barrier below the slab should be considered. If used, the
vapor barrier should consist of a material specifically designed to function as a vapor barrier and
should be installed in accordance with the manufacturer's specifications.
Retaining Walls
Engineered retaining walls are proposed to eliminate the slope within the slope hazard area. The
following parameters can be used for retaining wall design:
* Active earth pressure (yielding condition)
9 At -rest earth pressure (restrained condition)
a Traffic surcharge (passenger vehicles)
* Passive earth pressure
* Coefficient of friction
9 Seismic surcharge
*Where H equals retained height
35 pcf
55 pcf
70 psf (rectangular distribution)
300 pcf
0.40
6H*
Where sloping or other surcharge conditions will be present, supplement recommendations and
design earth pressure values should be provided by ESNW. Drainage should be provided behind
retaining walls such that hydrostatic pressures do not develop. If drainage is not provided,
hydrostatic pressures should be included in the wall design.
Earth Solutions NW, LLC
Paradise Heights, LLC ES-5839
March 5, 2018 Page 13
Retaining walls should be backfilled with free -draining material that extends along the height of
the wall, and a distance of at least 18 inches behind the wall. The upper one foot of the wall
backfill can consist of a less permeable soil, if desired. A perforated drain pipe should be placed
along the base of the wall, and should be connected to an approved discharge location. A typical
retaining wall drainage detail is provided as Plate 3.
Draina-ge
Groundwater seepage was not observed during our fieldwork on January 7, 2018. Groundwater
seepage is possible in site excavations, particularly in the winter, spring and early summer
months. Temporary measures to control groundwater seepage and surface water runoff during
construction will likely involve passive elements such as interceptor trenches and sumps, as
necessary. Surface water should not be allowed to runoff over sloped areas and should not be
allowed to pond near the top of sloped areas or retaining structures.
Surface grades must be designed to direct water away from buildings. The grade adjacent to
buildings should be sloped away from the buildings at a gradient of at least 2 percent for a
horizontal distance of four feet or more as setbacks allow. In our opinion, perimeter footing drains
should be installed at or below the invert of the building footings. A typical footing drain detail is
provided on Plate 4 of this report.
Infiltration Evaluation
We understand drywells, trenches or other methods will be utilized for on -site infiltration. For
design, the long-term infiltration rate was evaluated using a Small-scale Pilot Infiltration Test (PIT)
completed at a depth of three feet in TP-3. Based on consistent nature of the upper outwash
soils, it is our opinion one PIT is sufficient; once infiltration depths and locations are determined,
we should reevaluate the need for additional testing. Table 3.3.1 of the referenced DOE Manual
provides criteria for estimating the long4erm infiltration rate based on measured rates and
applicable correction factors. The following long term infiltration rate was calculated using the
following equation and correction factors:
K design rate = K measured rate X C FT
9 Measured infiltration rate Kmeasured = 120 in/hr
0 Site variability; number of locations tested CFv = 0.33
e Test method Ut = 0.50
* Degree of influent control to prevent siltation Urn = 0.90
* Total correction factor CFT =0.15
Calculated Long Term Infiltration Rate* TP-3 = 18 in/hr
Ter Stormwater Management Manual for Western Washington, August, 2012. Chapter 3.3.4
Earth Solutions NK LLC
Paradise Heights, LLC
March 5, 2018
ES-5839
Page 14
We recommend the proposed infiltration systems be located with a setback of at least 25 feet
from the top of slope hazard area (and proposed retaining wall upon completion) to the north of
the subject site. The geotechnical engineer should observe the excavations for the proposed
infiltration systems to confirm soil conditions at the time of construction. We recommend an
emergency overflow provision be included in the infiltration system design. If an overflow is not
incorporated, we recommend reducing the design infiltration rate by half.
Low Impact Development
The following table provides our evaluation and recommendations regarding low impact
development BMPs for the proposed project:
BMP
Viable?
UmWons or
t
Infessiblifty Crfterla
Lowns and Landscaped Areas
T5.13: Post -construction soil quality
'Yes
Considered infeasible on slopes of 33 percent or
and depth (Volume V, Chapter
greater.
Roofs
T5.30: Dispersion is not recommended near the
T5.30: Full dispersion (Volume V,
Yes*
slope hazard area/proposed retaining wall of the
Chapter 5)
site.
T5.10A, A design infiltration of 18 inches per
T5.1 OA.- Downspout full infiltration
Yes
hour should be used for preliminary design.
systems (Volume III, Chapter 3)
Must be setback at least 25 feet from proposed
retaining wall.
A design infiltration of 18 inches per hour should
Bioretention (Volume V, Chapter 7)
Yes
be used for design. Must be setback at least 25
feet from proposed retaining wall.
T5. I OR Downspout dispersion
Yes*
Dispersion is not recommended near the slope
systems (Volume 111, Chapter 3)
hazard area/proposed retaining wall of the site.
T5.10C: Perforated stub -out
Yes
No limitations.
connections (Volume III, Chapter 3)
Other H aces
Prd $urf
T5.30: Full dispersion (Volume V,
Yes*
Dispersion is not recommended near the slope
Chapter 5)
hazard area/proposed retaining wall of the site.
Near -surface soils generally have a higher fines
T5.15: Permeable pavement (Volume
content and a design infiltration rate of 4.5 inch
V, Chapter 5)
Yes
per hour should be used for design of permeable
pavement. Must be setback at least 25 feet from
proposed retaining wall.
A design infiltration of 18 inches per hour should
Bioretention (Volume V, Chapter 7)
Yes
be used for design. Must be setback at least 25
feet from proposed retaining wall-
T5.12: Sheet flow dispersion
T5.1 1: Concentrated flow dispersion
Yes*
Dispersion is not recommended near the slope
(Volume V, Chapter 5)
1
hazard area/proposed retaining wall of the site.
W dispersion is utilized all downspout areas should maintain at least a 25-foot buffer from the proposed
retaining wall area. Dispersion is recommended to lead south or east boundaries of the site property
where site topography is relatively level.
Earth Solutions NW, LLC
Paradise Heights, LLC
March 5, 2018
Utility Trench Support and Backfill
ES-5839
Page 15
In our opinion, the soils observed at the test pit locations are generally suitable for support of
utilities. In general, the soils observed at the test pit locations may not be suitable for use as
structural backfill in the utility trench excavations, unless the soil is at or near the optimum
moisture content at the time of placement and compaction. Moisture conditioning of the soils
may be necessary at some locations prior to use as structural fill. Utility trench backfill should be
placed and compacted to the specifications of structural fill provided in this report, or to the
applicable requirements of the City of Edmonds.
Pavement Sections
The performance of site pavements is largely related to the condition of the underlying subgrade.
To ensure adequate pavement performance, the subgrade should be in a firm and unyielding
condition when subjected to proofrolling with a loaded dump truck. Structural fill in pavement
areas should be compacted to the specifications detailed in the Site Preparation and Earthwork
section of this report. It is possible that soft, wet, or otherwise unsuitable subgrade areas may
still exist after base grading activities. Areas of unsuitable or yielding subgrade conditions may
require remedial measures such as overexcavation and replacement with structural fill or thicker
crushed rock sections prior to pavement.
For relatively lightly loaded pavements subjected to automobiles and occasional truck traffic, the
following sections can be considered for preliminary design:
Two inches of hot mix asphalt (HMA) placed over four inches of crushed rock base (CRB),
or;
0 Two inches of HMA placed over three inches of asphalt treated base (ATB).
The HMA, CRIB and ATB materials should conform to WSDOT specifications.
LIMITATIONS
The recommendations and conclusions provided in this geotechnical engineering study are
professional opinions consistent with the level of care and skill that is typical of other members in
the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test
locations may exist, and may not become evident until construction. ESNW should reevaluate
the conclusions in this geotechnical engineering study if variations are encountered.
Additional Services
ESNW should have an opportunity to review the final design with respect to the geotechnical
recommendations provided in this report. ESNW should also be retained to provide testing and
consultation services during construction.
Earth Solutions NW, LLC
ST
I WW
Irc I
A0 so
Pt
5r Im
0z"
RL
13
PL
46" 7-7
oft
A-10
je
IF= I—i"' i� I — a , A
'Y W
A.
q6'
I , I I , � I -WI
23
"We i S
-'T
-T" A
ZI jkI
P0
-3 Ell!
`2
Id,
w�c
loll !107H
"i r-s-
14L
II -Oqe 4710 4: Z SIX
nt
Reference.- NORTH
Snohomish County, Washington
Map 454
By The Thomas Guide
Rand McNally Vicinity Map
32nd Edition 546 Paradise Lane
Edmonds, Washington
NOTE: This plate may contain areas of color. ESNVV cannot be
responsible for any subsequent misi n terpreta bon of the information Drwn. CAM Date 02/13/2018 P roj. No. 5839
resulting from black & white reproductions of this plate.
Checked SES Date Feb. 2 18 Plate 1
BuildingA TP-2
Buil g B
\\TP-31 Building
LEGEND
TP-1 Approximate Location of
ESNW Test Pit, Proj. No. NORTH
ES-5839, Feb. 2018
AN
Subject Site
Proposed Building
Existing Building
(To be Removed) NOT - TO - SCALE
NOTE: The graphics shown on this plate are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and / or proposed site features. The information illustrated
is largely based on data provided by the client at the time of our
study� ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
18" Min.
0 0 0 0 0 0 0 U 0
00 0 0 C(:) 0 0 b
0 0 0 co 0 0
0 0 � 0.0. 000
0 00 0 0 cp. 0 00 0
0, 0 0 0 a
0 '7
0 0 0 0 0 .. 0 L 0*0
0 0 0 V0 6
00 '0 0 0 0
0 0 —0 0
00 0. 0 . 0
0 .0 0
0. 00 0 :0
. 00 0.0 130 (Z
d' 0 . 0 0 0 o . 0
oo .0 0 0 0
00 0 1 . 00
o 0 0
o o . 0
o 0 0. .
.0o 0o o 00 . .
oo 00 . .0
.0 00 - 0-
o
00 0 -0 0 0
o .0. . .
o 0 0 . 08
0 0 c9 o
0oo o o 0.
a o 0 Oo%
0 . o-.
0 0 0 goop,
NOTES:
Free -draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing No. 4 sieve should be
25 to 75 percent.
9 Sheet Drain may be feasible in lieu
of Free -draining Backfill, per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1 -inch
Drain Rock.
LEGEND:
000 0
0 .0 Free -draining Structural Backfill
1-inch Drain Rock
Structural
Fill
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12" of less permeable, suftable
soil. Slope away from building.
LEGEND:
Surface Seal: native soil or
other low -permeability material.
1-inch Drain Rock
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
LL Earth
4 1 �- z , ��r. T 1
Solutions
Nwil-C Z
FOOTING DRAIN DETAIL
546 Paradise Lane
Edmonds, Washington
Drwn. CAM Date 02/13/2018IProj. No. 5839
Checked SES I Date Feb. 2018 1 Plate 4 1
Appendix A
Subsurface Exploration
ES-5839
The subsurface conditions at the site were explored by excavating two test pits at the approximate
locations illustrated on Plate 2 of this report. The test pit logs are provided in this Appendix. The
subsurface exploration was completed on February 7, 2018. The test pits were excavated to a
maximum depth of nine feet below existing grades.
Logs of the test pits advanced by ESNW are presented in Appendix A. The final logs represent
the interpretations of the field logs and the results of laboratory analyses. The stratification lines
on the logs represent the approximate boundaries between soil types. In actuality, the transitions
may be more gradual.
Earth Solutions NW, LLC
Earth Solutions NWLLC
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS
SYMBOLS
TYPICAL
DESCRIPTIONS
LETTER
GRAVEL
AND
CLEAN
GRAVELS
GW
WELL -GRADED GRAVELS. GRAVEL -
SAND MIXTURES, LITTLE OR NO
FINES
GRAVELLY
SOILS
(LITTLE OR NO FINES)
GP
POORLY -GRADED GRAVELS.
GRAVEL - SAND MIXTURES, LITTLE
OR NO FINES
COARSE
GRAINED
SOILS
MORE THAN 50%
OF COARSE
FRACTION
GRAVELS WITH
FINES
GM
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
RETAINED ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
GC
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
MORE THAN 50%
OF MATMAL IS
SAND
AND
CLEAN SANDS
.........
..........
SW
WELL -GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
LARGER THAN
SANDY
NO. 200 SIEVE
SIZE
SOILS
(LITTLE OR NO FINES)
x
SP
POORLY -GRADED SANDS,
GRAVELLY SAND, LITTLE OR NO
FINES
SANDS WITH
FINES
SM
SILTY SANDS, SAND - SILT
MIXTURES
MORE THAN50%
OF COARSE
FRACTION
PASSING ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
sc
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLAST`ICITY
FINE
GRAINED
SOILS
SILTS
LIQUID LIMIT
AND LESS THAN 50
CLAYS
CL
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY
CLAYS, LEAN CLAYS
OL
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN
NO. 200 SIEVE
MH
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SILTY SOILS
SIZE
SILTS LIQUID LIMIT
AND GREATER THAN 50
CLAYS
CH
114ORGANIC CLAYS OF HIGH
PLASTICITY
OH
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
HIGHLY ORGANIC SOILS
PT
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil classifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
Earth Solutions NW TEST PIT NUMBER TP-1
1 &)5 - 136th Place N.E., Suite 201
Bellevue, Washington 98005 PAGE I OF 1
Telephone: 425-449-47()4
Fax: 425-449-4711
PROJECT NUMBER ES-5839 PROJECT NAME 546 Paradise Lane
DATE STARTED - 2f7/18 — COMPLETED 2/7/18 GROUND ELEVATION 265 ft TEST PIT SIZ_E
EXCAVATION CONTRACTOR NW Excavatinq GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION
LOGGEDBY SES CHECKED BY HTW AT END OF EXCAVATION
NOTES Depth of Tor)soil & Sod 6" AFTER EXCAVATION
W
a-
�w
W
(6
2
w
uj
_j
TESTS
(j
C6
X (9
0
MATERIAL DESCRIPTION
(L
2z
0
TPSL
0.5 TOPSOIL 264.5
Brown poorly graded SAND with gravel, medium dense, damp
MC = 4.20%
-becomes gray
-caving from 2'to BOH
MC = 3.60%
MC = 4.00%
SP
-becomes dense
MC = 9.20%
-becomes moist 256.0
Test pit terminated at 9.0 feet below existing grade. No groundwater encountered during
excavation. Caving observed from 2.0 feet to BOH.
Bottom of test pit at 9.0 feet.
I,-
Earth Solutions NW TEST PIT NUMBER TP-2
1805 - 136th Place KE., Sufte 201
Bellevue, Washington 98005 PAGE I OF I
Telephone: 425-449-4704
Fax: 425-449-4711
PROJECT NUMBER ES-5839 PROJECT NAME 546 Paradise Lane
DATE STARTED - 217/18 — COMPLETED 2t7118 GROUND ELEVATION 265 ft TEST PIT SIZE
EXCAVATION CONTRACTOR NW.Excavating GROUND WATER LEVELS:
EXCAVATION METHOD AT 71ME OF EXCAVATION
LOGGED BY SES CHECKED BY HTW AT END OF EXCAVATION
NOTES Depth of Topsoil & Sod 3": grass AFTER EXCAVATION
W
a.
LU —
2
:)
TESTS
6
CL
MATERIAL DESCRIPTION
z
0
—SL
Brown poorly graded SAND with sift and gravel, medium dense, damp
MC = 8.60%
Fines = 5.00%
[USDA Classification: very gravelly coarse SAND]
SP-
MC = 3.50%
SM
-becomes gray
5—
MC = 140%
5.5 259-5
Test pit terminated at 5.5 feet below existing grade. No groundwater encountered during
excavation. No caving observed,
Bottom of test pit at 5.5 feet.
Uj
0
Earth Solutions NW TEST PIT NUMBER TP-3
180.5 - 136th Place N.E., Suite 201
Bellevue, Washington 98005 PAGE I OF 1
Telephone: 425-449-4704
low
Fax: 425-449-4711
PROJECT NUMBER ES-5839 PROJECT NAME W Paradise Lane
DATESTARTED 2f7118 COMPLETED 217118 GROUND ELEVATION 265 ft TEST PIT SIZE
EXCAVATION CONTRACTOR NW Excavatinq GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION
LOGGED BY SES CHECKED BY HTW AT END OF EXCAVATION
NOTES Surface Conditions: grass AFTER EXCAVATION
3:
�_
>_
I'_ W
Ul rn
a i?
._
TESTS
0
MATERIAL DESCRIPTION
C)
2 z
0
Brown poorly graded SAND, medium dense, damp (Fill)
SP
MC 3.60%
-caving to 8' 2625
Gray poorly graded SAND with gravel, medium dense, damp
-infiltration test at 3'
5
P
S SP
MC = 10.60%
Fines = 3.70%
[USDA Classification: very gravelly coarse SAND]
8.0 -water from infiltration test mounding on till layer, groundwater seepage at 8' 257.0
Sm
Gray silty $AND with gravel, dense, damp (Unweathered rill) 26&S
MC = 11.20%
Test pit terminated at 8.5 feet below existing grade. Groundwater seepage encountered
at 8.0 feet during excavation. Caving observed from 2.0 to 8.0 feet.
Bottom of test pit at 8.5 feet.
Earth Solutions NW TEST PIT NUMBER TP4
1805 - 136th Place N.E., Suite 201
Bellevue, Washington 9W5 PAGE I OF I
Telephone: 425-449-4704
Fax: 425-449-4711
PROJECT NUMBER ES-5839 PROJECT NAME 546 Paradise Lane
DATE STARTED - 2f711 8 - COMPLETED 2/7/18 GROUND ELEVATION 265 ft TEST PIT SIZE
EXCAVATION CONTRACTOR NW Excavatina GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION
LOGGEDBY SES CHECKED BY. HTW AT END OF EXCAVATION
NOTES Depth of Topsoil & Sod 12": duff AFTER EXCAVATION —
W
(L
:C
JL-
�m
iu�
0
X
(L
ui g
_j 2
a.
TESTS
MATERIAL DESCRIPTION
g
n
z
(3
0
Dark brown TOPSOIL, roots to 2'
TPSL,,
284.0
Brown poorly graded SAND with gravel, medium dense, damp
MC = 3.90%
-caving to 8!
-becomes gray
-
MC = 3.90%
SP
5-
8.0 257.0
Gray silly SAND with gravel, dense to very dense, damp (Unweathered Till)
MC = 11.20%
SM
119.0
-moderately cemented 256.0
Fines = 18.50%
-NfUy�SD�ACIesslllcation: gravelly loamy SAND)
Test pit terminated at 9.0 ket below existing grade. No groundwater encountered during
excavation. Caving observed from 2.0 to 8.0 feet
Bottom of test pit at 9.0 feet.
A .
Appendix B
Laboratory Test Results
ES-5839
Earth Solutions NW, LLC
Cilllh
solut , '"WI&
j I .
Report Distribution
ES-5839
EMAIL ONLY Paradise Heights, LLC
24144 East Greystone Lane
Woodway, Washington 98020
Attention: Mr. John Reftenmier
Earth Solutions NW, LLC
PERMITTING & DEVELOPMENT
ENGINEERING
D I V 15 10 N
121 5th Avenue N
P: 425.771,0220
www,edmondswa.gov
Name of Proposed Project:
546 Paradise Lane APPENDIX A
Page I of 2
Transportation Impact Analysis RESUB
Mar 02 2021
Worksheet CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Paradise Heights
Owner/Applicant Applicant Contact Person:
Paradise Hts HLD, LLC Rob Michel
Name Name
24144 E Greystone Lane 7305 Soundview Drivie
Street/Mailing Address Street/Mailing Address
Woodway, WA 98020 Edmonds, WA 98026
city State Zip City State
Telephone: 425-750-5965 Telephone: 206-930-2445
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Finn Name
Telephone:
Contact Name
E-mail:
1. PROJECT DESCRIPTION
a. Location - Street address: 546 Paradise Lane
b. Specify existing land use:
SF
Zip
Attach a vicinity map and site plan.)
c. Specify proposed type and size of development: 4unit condo
(# of residential units andlor squarefootage of building)
d. Date construction will begin and be completed: 4/21-4/23
e. Define proposed access locations: 546 Paradise Lane
APPENDIX B
Page 4 of 4
RESUB
7. MITIGATION RECOMMENDATIONS Mar 02 2021
CITY OF EDMONDS
State recommended measures and fees required to mitigate project specific traffic impacqVELOPMENT SERVICES
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified DEPARTMENT
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
V CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
ITE Land Use Category
Per Unit
Fee Rate
New Use
230 - Condominium
Q318.13
$3,18.1
§§JQ.Z2 I
Prior Use
210 - Single Family
� .
Q�
Units in
square feet,
# of dwelling,
vfv, etc.
X 1 4 1 �
X1 I I :
$840.72 F77124-31.80
3.6
New Use Fee: $ 13,272.52 Prior Use Fee: 2,8? F1 = I a I . I
71 NEW DEVELOPMENT
Per Unit
ITE Land Use Category
Fee Rate
New Use
OTHER
Units in
square feet,
# of dwelling,
vfh, etc.
X1 I �
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
March 12, 2021
City of Edmonds, Engineering Division Approval Date
5 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
EX: CATCH BASIN TYPE I
RIM= 243.86 —
NOTE:
5EE CIVIL PLANO UNDER PERMIT #
13020190026 FOP GPAOING,
51TE IMPPOVEMEMNT5, UTILITIE5,
RETAINING WALL5, ETC.
NOTE:
5EE CIVIL PLANO UNDER PERMIT #
151-0201900265 FOP GRADING,
51TE IMPPOVEMEMNT5, LITILITIE5,
RETAINING WALLO, ETC.
APPROVED BY PLANNING
fg���2/1�1/2021
LINE KEY
EXISTING STRUCTU 5
----- EXISTING GRADE
PROPOSED GRADE
ROOF OVERHANG
----- FIST FLOOR LINE
INCLUDING DECKS
PEDESTRIAN
PATHWAY
LOT COVERAGE
I 4X BLD A = 4,500.50 SQ. FT.
14X BLD B = 4,367.25 SQ. FT.
54X BLD C = 3,957.40 SQ. FT.
TOTAL SQ. FT. = 12,441.90 SQ. FT.
LOT COVERAGE = 12,441.90/30,013.29 SOFT. 41%
IMPERVIOUS
BUILDING (WI EAVES) = 13,877.63 SQ. FT.
DRIVEWAY = 10,197.29 SQ. FT.
TOTAL = 24,074.92 SQ. FT.
PARKING REQUIREMENTS
(4) 2 BED 1.8X4 = 7.20
(8) 3 BED 2X8 = 16
TOTAL REQ = 24 SPOTS
ACTUAL = 24 SPOTS
546 A PARADISE
A. 256.7'
B. 265.4'
C ' 266.8'
D1. 266.8 + D2 266
AVE GRADE = 264.34'
5SO B PARADISE
A. 265.40'
B. 264.90'
C. 267.80'
D. 267.1'
AVE GRADE = 266.30'
5 54 C PARADIS
A. 266.1'
B. 263.6'
C. 269.4.
D. 268.00'
AVE GRADE = 266.78
ALLOWABLE OPENING ANALYSIS
PER TABLE 705.8
7-10'= 10% ALLOWA13LE AREA
202 (EAST WALL): 609.84 50, FT. X.10
60.96 SaFT. UNPROTECTED WINDOW OPENING ALLOWED.
ACTUAL UNPROTECTED WINDOW OPENING = 59.755Q. FT.
302 (EA5T WALL): 544.50 50, FT. X.10
54.45 5aFt UNPROTECTED WINDOW OPENING ALLOWED.
ACTUAL UNPROTECTED WINDOW OPENING = 55.75 50, FT
FIRE SEPARATION 016TANCE: 5 TO LE55 THAN 10
DEGREE OF OPENING PROTECTION: UNPROTECTED.
NON 5PRINKLEKED 10%
ENGINEERING DIVISION
APPROVED AS NOTED
2/10/2021
Refer to civil construction plans under
fill/grade permit BLD2019-0026 for
Engineering Requirements.
ENG2021-0056 - sewer permit
BLD2019-0025
RESUB
Jan 05 2021
—F—NDS
D—
P L - D" T.
SCALE: 1" = 20'-0"
CD
00
a,
0
LO
C14
x
cc
0
C,
LU
C'*J
0 0
Z
0
<
00
0
_j
UJI
<
U
0CM,
<
r)
CL
7"
0
0
73;
r)
LU
0
C)
C) Ly
U LQ
M
z Ce
D <
I
ry) 0
1-1 LL
I . 1. . � . -- .
1.4.21
LLI
L/I FH
0
EX: CATCH BASIN TYPE 1
M
iRI�F= 243.86 241.76
IL L30X
INN
2" CON
LOC t
1%;
A'?N
lb
V �J4 417
CONNECT
7
P F
00 DRA 16
TO T10HILINE - ---- - --------
18 A�
BUILDIN(i A 15
9
PROPOSED 4 UNIT
"I tww", :19 CE#1
-------- 10 E �7 -
20
8
24 23 ------ rRENCH DRAIN—
BUI LDI NG
--------- 20.bO'
PRCT1P6SED 4
14 - --------------
-- ----------- --------
t ----------
k --------
13 r
3
12 zLj. u u 5
4 -----
BUILDING-9--- - ----- -
-PROPOSED 4 UNI ENTRANCE*2
01
NOTE:
5EE CIVIL FLAN5 UNDER FE
j
E51.020190026 FOP GIRAPIN6,
5ITE IMPROVEMEMNT5, UTILITIEC7,
jr,
RETAINING WALL5, ETC.
A&
EXISTING LANDSCAPING t-
ON HWY ROW PROPERTY
APPROVED BY PLANNING
PLANTING SCHEDUL
0 AZELEA: 5 GALLON
10 SEMPERVIRENS/
ITALIAN CYPRUSS: 6�10'
M _'UCA - ER=A.A/
N CK
.UNTA ': V-12'
PINUS NIGRA /AUSTRIAN PINE: 6'-12'
W-ACER CIRCINATUM/VINE MAPLE: W-10'
ORNUS KOUSA/ KOUSA
DOGWOOD: W-10'
GINKO B[LOBA'PRINCETON
SENTRY'P.S MAIDEN HAR"fr-10'
C
V BURNIUM DAVIDII/ DAVID
V:BURNIUM 2 GALLON
BERBERIS THUN. / ROYAL
SURGANDY BARBERRY: I GALLON
HOSTA: I CALLON
PHORMIUM TENAX RUBRUM
NEW ZEALAND FLAX: 5 GALLON
RHODADENDRON/ 'UNIQUE: 24"-30"
CHOISYA TERNATA/
MEXICAN ORANGE: 5 GALLON
PRUNUS LAUROCERASUS/
OTnD WYKEN: 5 CALLON
VINCA MINOR: 4" POTS/ 24" D.C.
LAWN
ARCTOSTAPHYLOS UVA-URSI/
KINNIKINNICK: 4" POTS/ 24�'O.C.
CISTUS SALVIFOLIUS I SAGELEAF
ROCKROSE: I GALLON/24" D.C.
IRRIGATION CONTROL PANEL
IIIIIgBIIIIIII 4'CEDAR FENCE ith ARBOR
NOTE:
PLANT SIZE, SPACIN &QUANTITIES
PER ECDC 20.13.015
LIGHTING SCHEDUL
20 WATT MAX LED PORCH LIGHT
HEIGHT: 7'-0"
STYLE: 7" TEXTURED BLACK WALL LATERN
P6087-313OK99DI
BY: PROGRESS LIGHTING
NOTE:
GARBAGE AND RECYCLE CONTAINERS TO BE
LOCATED INSIDE GARAGE AREA FOR EACH
UNIT.
ENGINEERING DIVISION
APPROVED AS NOTED
t" 2/10/2021
Refer to civil construction plans under
fill/grade permit BLD2019-0026 for
Engineering Requirements.
BLD20219-0025
RESUB
Jan 05 2021
CITY-13MONDS
n—D-ENT SERVI—
DE_TMENT
0 F..q
546 PARADISE LN
BLDG A
0 0
LU
Z
0
I
0
<
LU
00
cy)
V)
0
<
<
ln:�
<
Vi
0
a-
Z
0
LU
V)
0
0 Lu
U V)
0
Z:)
ryo
___10
ry-)
1__� U_
PRINTED:
1.4.21
I
00
a,
C)
x
0
P.
SCALE: I" — 20'-0"
CALC. LOCATION PER SNOHO.
Co. DATA BASE FROM TIES TO
SW SEC. CDR. AND S 1/4 CDR. HWY. CENTERUNE P.C.
L_70+10.63 CALC.S 0.14� W OF LINE
2
i77.22's
',X
R-5116116
A =3'2�'08-
C. BEARING S 80'28!2e E
CORD 30.39,
OFND
�bo ASPH. W
RIM 243.72
IE 12* N 2 52
41 5
CB RIM 242.81 l2e! OR
254
CA
21
45
- ---------
0)<
R=955."
C. BEARING N 31'OSIO"
CORD 1OIZ91'
r
MH 2_298 -
JE = APPROX 8.75'
BELOWRIA, EL
265.4
/*
2
266-
FOUND SURFACE MON'S
'J4
.4
p
RE18AR
a
0
6
21 '�4
364 CB RIM 247.3
'262 ------- 2 -
6zs �
- - - - - - - - - - 264--_:_�
2,2
:__j
-
26U
---------------------
26rll!l
302N � FT
#546
0.6514 ACikEs*
S
W/BSMT_
162..
26&9
Q"A,7
211 167.5
R=835.94*
C. BEARING N 40-32,oS-,W
CORD 177."13'
267.0
CALC POSITION PER MOWS
IN PEAT OF BODINE NE COFL.OF THE
SW 1/4, NW 1/4, SW 1/4
FOUND 2 " DOMED
BRASS DISK DWN 0.6
NORTH LINE OF THE SOUTH 1/2 CALC' 0. 2V WEST OF
OF THE SIN 1/4, NW 1/4, SIN 1/4 SECTION 1/64TH LINE
s smllg��.
3'3
56
op,
L,245.$V w r�
R-448.84'
Q BEARING N 6019`09' W
D 242.85*
�262
26
L�44 .26
% 1=446..4!
A=5*40'
\Ll. BEAR13N2G".Il 42'.1'41- W
CORD 44.25
266
LOT
BOL.
ASPH. _'16
ARAGE 6.
H
2-61-
26U
FND 1/2 EBAR__�
W/.A' &112,Z,.4
N
C Rd
CB RIM 255.60
GRAPHIC SCALE
CII RIM 255*10
30 0 15 30 60 120
IN FEET
I iNcH - 30 Fr.
N ai742'00- W 6573�
MON 'B" FOUND MON. 106TH AVE W
& 228TH ST SW CALC. 0.08' N OF LINE
658.49' CALC
SE88-361 47.
S 88*36*4 4* 2631-03' CALC. GROUND SNOHO. DATA 13ASE
FOUND 2� PIPE MON. IN CASE
OWN 08' STA. L-80+77.02 PT
NOTE:
"g,
2" BRASS
DISK WIX OWN 0.35'
'A
LOT
A
ui
15' 04
SE CDR. OF THE SW 1/4, NW 1/4, SW 1/4
MON. 'B' FOUND MON. 10M AVE W
& 228TH ST SW CALC. 0. 08! N OF LINE
-N
ar-1,111UN IINIULA
S 25 T 27 N, R 3 E, W.M.,
SNOHOM;SH COUNTY, WASHINGTON.
LEGAL DESCRIPTION: APN: 27032500302600
ALL THAT PORTION OF THE SOUTH HALF OF THE SOUTHWEST QUARTER OF THE
NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27
NORTH, RANGE 3 EAST, W.M., IN SNOHOMISH COUNTY, WASHINGTON, LYING NORTH OF
STATE ROAD NO. 1-W AND SOUTH OF COUNTY ROAD;
EXCEPT THE EAST 15 FEET THEREOF, AS MEASURED ON THE SOUTH LINE;
EXCEPT THE WEST 262.90 FEET OF SAID SOUTHWEST QUARTER OF THE NORTHWEST
QUARTER OF THE SOUTHWEST QUARTER, MEASURED ON THE NORTH LINE;
AND EXCEPT THE FOLLOWING DESCRIBED TRACT.
BEGINNING AT A POINT ON THE SOUTH LINE OF SAID SOUTHWEST QUARTER OF THE
NORTHWEST QUARTER OF THE SOUTHWEST QUARTER 15 FEET WEST OF THE
SOUTHEAST CORNER THEREOF;
THENCE NORTH 1* EAST 95.54 FEET TO THE SOUTHERLY LINE OF COUNTY ROAD;
THENCE NORTHWESTERLY ALONG THE SOUTHERLY LINE OF COUNTY ROAD 168.19
FEET,
THENCE SOUTH 1* WEST 71.94 FEET, MORE OR LESS, TO THE NORTHEAST CORNER OF
TRACTCONVEYED TO
OTTO E. MARTEN AND WIFE, BY DEED UNDER RECORDING NO. 1029868;
THENCE NORTH 8832' WEST 260.05 FEET, MORE OR LESS, TO THE NORTHERLY LINE
OF STATE ROAD 1-W;
THENCE SOUTHEASTERLY ALONG THE NORTHERLY LINE OF SAID STATE ROAD 236.05
FEET, MORE OR LESS, TO POINT A ON THE SOUTH LINE OF SAID SUBDIVISION, 180
FEET WEST OF THE SOUTHEAST CORNER THEREOF;
THENCE SOUTH 88*32' EAST 165 FEET TO THE TRUE POINT OF BEGINNING;
ALSO EXCEPT PORTION CONVEYED TO THE STATE OF WASHINGTON UNDER RECORDING
NO. 2159660.
SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON
LEGEND
3" BRASS SURFACE MONUMENT
MONUMENT IN CASE
FOUND 1/2- REBAR NTH CAP LS
x
FOUND BRASS TACK IN LEAD
0
ELECTRIC METER / VAULT
_9_
FIRE HYDRANT
13
GAS METER
Ill
GAS VALVE
c
GUYANCHOR
HOSE B[S
LIGHT
MAIL BOX
MONITOR WELL
0
STORM CATCH BASIN
-0-
UTILITY POLE
UTILITY POLE WITH LIGHT & DROP
VALVE
WATER METER
ASPH
ASPHALT
CALC
CALCULATED
DW
DRIVEWAY
F.0
FLOW CONTROL PIPE
G
GAS
IE
INVERT ELEVATION
MEAS.
MEASURED
SO
STORM DRAIN
W
WATER
DECIDUOUS OR ORNAMENTAL EVERGREEN TREE
TRUE EXTENT OF CANOPY NOT SHOWN
CONIFEROU TREE
TRUE EXTEST OF CANOPY NOT SHOWN
20�O
VA
SPOT ELE TION IS LOCATED AT THE DECIMAL POINT
OF ELEVAT10N UNLESS NOTED WITH LEADER OR X
-77777
BUILDING LINE
X_
CHAINLINK FENCE
#
WOOD FENCE
LAND SURVEYOR'S CERTIFICAT
EQUIPMENT AND PROCEDURES
REFERENCE SURVEYS SEE RECORDERS -AUDITORS FILE NUMBERS
THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY
DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE SURVEY RECORDING
ACT AT THE REQUEST OF ROB MICHAEL IN AUGUEST, 2018.
ALL MEASUREMENTS WERE MADE WITH AN LEICA T-16 ELECTRONIC TOTAL STATION NTH A ONE
SECOND HORIZONTAL AND VERTICAL DISPLAY AND MANUFACTURES STANDARD POINTING DEVIATION
OF FIVE SECONDS AND AN ELECTRONIC DISTANCE MEASUREMENT DEVICE 'NTH A STANDARD
DEVIATION OF 3MM± 3PPM, AND CHC X900 RTK CPS.
201102105003, 201110275004, PLAT OF PARADISE LANE VOL 21 PG 71, PLAT OF BODINE
VOL 35 PG 69 & 70, AND W.S.D.O.T. SR 104 MP 24.45 TO MP 25.81 EDMONDS FERRY
TERMINAL TO 5TH AVE.
UNDERGROUND UTILITIES:
FOUND REBAR LS 21364 N 0.36' & W 1.0' OF 6ALC. CORNER
RECERVED
GU CERTIFICATE NO. 29539
FIELD TRAVERSE METHOD IN COMPLIANCE NTH W.A.C. 332-130-090
ALL POINTS INDICATED FOUND WERE VISITED IN 9 -2017 UNLESS OTHERWISE NOTED.
SEWER CITY OF EDMONDS 425-771-0220
OLYMIPIC VIEW WATER 425-774-7769
FOUND REBAR LS 21364 N 0.37' & E 3.13' OF'CALC. CORNER
CITY COPY JAN 08 N19
FOUND 1/2- PIPE N 0.39' & E 0.68' OF CALC. CORNER SERVICES GTFL
13 LDZO I ci ct)zs- CITY OF EDMONDS
<M
REVISIONS
DESIGNED BY RG
GENERAL NOTES
-
GREENE LAND SURVEYING! BOUNDARY AND TOPOGRAPHIC SURVEY
7408 f64TH ST S17 OF
A LYNN7000, 17A. 98087 546 PARADISE LANE, EDMONDS, INA 98020
FOR
..�EVELOPMENT
JOB NO.
2018.40
DRAWING NO.
18-40PARA
'Lf. 0
z
2953
L LPtk\'
DRAWN BY
HORIZONTAL DATUM: (BASIS OF BEARINGS) S 8836'47" E ALONG THE SOUTH LINE OF THE
SOUTH WEST 1/4 SECTION 25 TOWNSHIP 27 NORTH, RANGE 3 EAST. MEASURED NTH GPS
R.T.K.
VERTICAL DATUM: NAVO 1988 PER ON SITE OPUS SOLUTION.
DATE PRIN70
9/14/2018 1:25:36 PM
SCALE 1" = 20'
PHONE (206) 498-0979
PARADISE HEIGHTS HLD LLC
SHEET OF
F.B. NO. DATA-C
1.1"ARCEL: ALL THAT PORTION OF THE 5 HALF OF THE 5WQUARTEKOF THE NWQUARTEP OF: THE 5WOUARTER OF SECTION 25, TOWNSHIP 27 N, FANqE
3 E, WM, LYING N OF STATE RD NO. 1-11 & 5 OF COUNTY RE), EXCEPT THEE 16THEREOF, AS MEASURED ON THEO UNIE.EXCEPT W 262-40' OF SAID SIN
QUARTER OF THE NW QUARTER OR THE SIM QUARTER, MEASURED ON THE N LINE, & EXCEPT THE FOLLOWING DESCPJ13ED TRACT: 13EGINNING AT A POINT
ON THE 5 LINE OF SAID SIN QUARTER OF THE NW QUARTER OF THE 5W QUARTER 16W OF SE CORNER THEREOF, THENCE N TE 95.54 TO THE SOUTHERLY LINE OF
COUNTY KP, THENCE NW ALONG THE 5OUTHEKIY LINE OF COUNTY RD 16519', THENCE 6, 1- IN 87-94?. MORE OR LESS, TO THE NE CORNER OF THAKCT CONVEYED TO
OTTO E. MARTEN & WIFE, BY DEEP UNDER AUDITOR-5 FILE NO. 1029&68-, THENCE N 58-32'W 200.05'MOPE OR LESS. TO THE NORTHERLY LINE OF STATE RD I-W,
THENCE SOUTHEASTERLY ALONG THE NORTHERLY S LINE OF SAID 51.115DIVISION, 180'W OF THE 5E COKNER THEREOF. THENCE 5 88-3Z E le5'10 THE TRUE POINT
OF BEGINNING; ALSO EXCEPT PORTION COVEKYED TO THE STATE OF WA UNDER AUDITOW6 FILE #2159660. 51TUATE IN THE COUNTY OF SNOHOMISH, STATE OF WA.
la.EASEMENT5: NIA.
2. PROPERTY TAX ACCOUNT NUMBER.- 27032500302600.
3. VICINITY MAP (SEE THIS PAGE).
4. NEW CONOTPUCTION FOP A 3-510KY, 4 UNIT BUILDING AT 646 A FAKADI5E LANE EDMONDS, WASHINGTON 98020.
5. OWNEK-. J5KETWGMAIL.COM PARADISE HEIGHTS HOL LI-C, 24114 E. GKEY5TONE LANE, WOODWAY WA. 98020
6. CONTKACTOr: ROD MICHEL 206-930-2445 PEFENT CONOTRUCTION, INC. KFGENCIa9lK5 7305 SOUNVVIEW DRIVE EDMONDS, Wk 98026
7. CONSTRUCTION DRAWING: MICHEL DE61GN - ROB MICHEL 20r.-950-2445
6. 5TKUCTUPAL ENGINEER: OKIAN LAMPE, PE., S.E. 15TL ENGINEERING DKIAN.LAMPEODTLENG.NET
9. CIVIL ENGINEEK.- DONNA L. DRE5KE, PE., S.E. 6621 POSTER SLOUGH PP SNOHOMISH, WA. 915290 354-9980.
10. GEOTECHNICAL ENGINEEK: EARTH SOLUTIONS NW, LI-C lW5-136TH PL NE, #200 BELLEVUE, WA. 98005 425-449-4704
11. LEAP PE51GN PKOFE5SIONAIJCONTACT PERSON: ROD MICHEL 206-9W-2445.
12. ZONING:. KM 2.4,30,015.29 5aFT LOT SIZE, 45% LOT COVERAGE = 13,505-95 ea F-E
13. PROPOSED LOT COVERAGE = 5,851.50/30.015.29 = 1276.
14. 15T FLOOR = GARAGE 201:4,37.96 SQ. FT GARAGE 202:549.15 50. FT., GARAGE 501: 992.10, 5a FT, GARAGE 502:971.06 Sa FT:
COMMON SPACE: 574.19 50. FT. TOTAL: 3,624.50 5Q. FT. -
15. PROPOSED 2NO FLOOR = 201: (LIV) 1.559.15 Sa FT(DECK) 112.00 50, FT., 202: (LIV) 1,&73.99 60. FT. (PECK) 91.00 50, FT.,
COMMON AREA 185ZG Sa FT. TOTAL: 3,651.50 50, FT.
16. PPOP06ED 3RD FLOOR = 501: (LIV) 1,557.85 SO. FT. (PECK) 112.00 50, FT, 302: (LIV) 5C. FT. (PECK) 91.00 5a FT.,
COMMON SPACE: 186.72 Sa FT., TOTAL- 5,754.7560, FT.
17. WIND EXPOSURE 15, SEISMIC ZONE P, SOIL: 2500 FOR
13. OCCUPANCY. GROUP I, CATEGORY 2, & GROUP U, CONSTRUCTION TYPEVIr.
19. THIS 15UILDING 15 TYPE V13 CONSTRUCTION. ALL BEARING WALLS, NON-15EAKING WALLS, PARTITIONS, FLOOR -CEILINGS,
KOOF-CEILING5, SHAFT ENCLOSURES, & INPIVIDUAL COLUMNS & BEAMS MUST BE PROTECTED TO T-HOUP FIRE RESISTIVE CONSTRUCTION
IN ACCORDANCE W1 113C CHO. 6&7.
3.0, LAZING U VALUE VERTICAL =.25U (WSEC CREPIT 111, 1) VALUE OR BETTER, OVEKHEAP U VALUE =.50, CEILING K VALUE--49, WALL R VALUE=21, FLOOR INSULATION K-380"EC CREDIT It, 1), SLAB K VALUE=K-10
MAN UAL WINDOW VENTS W1EXHAU5T FAN OR TIMER IN LAUN PRY ROOM
22. COM FLY WITH 2015 I5CjMCIFGC� IFC, UPC, ALL WITH STATE AMEN PMENT5,20115 WC3EC, 2015 W[AQ (WAC 51-13), ECDC-CURKENT EDITION.
25. LOT SLOPE = 7% E-W.
24. CA FILE NUMBER: CKA20170212
25. 5ErA FILE NUMBER: FLN20180025 01,15
26. AD13 NUM5Er, FLNZOI&0025
27. REZONE NUMDEK: R-2007-26.
28. SET BACKS: STREET 16 (1), SIDE 10' (2) BACK 16 (1).
29. PARKING SPOTS KEQUIREP: 8, PROPOSED: 43, ONE MUST 15E HANDICAP ACCESSIBLE.
30. ANY NEW G.E. ELECTRIC DRYER VENT PEP, MFG SPECS. PKOVIPE SPECS ON 51TE FOP INSPECTOR TO VEKIFY VENT LENGHT.
31. INTERIOR WATERFLOW ALARM NOTIFICATION PEP IDC 904.11.2.2
32. FIKE ALAKM SYSTEM PEQUIKEP, CENTRAL 5TAnON SERVICE FOP 5PKINKLEI?JFIKE ALARM MONITORING.
33. NFPA-13K SPRINKLER SYSTEM PEaD ON ALL 3 FLOORS OF BUILDING PEP IBC 504 INCLUDING GARAGE (NFFA, 13K).
34. HANDICAP RAMPS W1 5LOPE5 OF 1:20 OR GREATER SHALL HAVE HANDKAIL5 AND EDGE PROTECTION PER ICC/AN6I A117.1 ' (2009 EDITION).
55. SPECIAL INSPECTIONS HAVE BEEN CALLED FOP ON TH[SPROJECT&AKE NOTED ON THE APPROVED CONGT9TJChON-FWH6'-&�ULOING
FEKMIT. IT 15 THE OWNER WOK CONTRACTORS FE5PONSIDLTY TO A55UFE THAT PEPORT5 ARE PROVIDED TO THE CITY INA TIMELY
MANNEK. 13E APVI5EP--IF SPECIAL INSPECTION REPORTS AKE NOT FORTHCOMING, THE 13UILPING OFFICIALS MAY 156UE A STOP WORK
OKDEF & NO CITY INSPECTIONS WILL BE PROVIDED UNTIL SUCH TIME AS THE PEPOKTING AGENCY HAS COMPLIED & KEPOKT5 ARE
REVIEWED & APPROVED 15Y THE CITY.
30, SPECIAL INSPECTION PEaD:
37. SEPERATE PERMIT KEat):
3b. FLAME SPREAD FOR ENCL05ED VEK11CAL EXITWAY5 0-25 CLASS A. OTHER EXITWAY5 2&75 CLASS 15, ROOMS OR AREAS 76-200 CLAC 5 C.
39. PROIDE F&T STOPS PEP 113C. 714.
40. SITE DENCHMAKK. KIM OF EXISTING CATCH 15ASIN #5 IN THE RIGHT OF WAY OF PAPAP15E LANE ELEVAAON: 243.&G
41. VER11CAL DATUM: W.C.C.S. SURVEY CONTROL PATADA515-POINT ID: 2067 FOUND MAG NAIL W/ SNOHOMISH COUNTY TAG ELEVATION: 192.96'
42. MAX HEIGHT-30', MEASURED FROM AVERAGE ELEVATION OF UNDISTURBED SOIL AT COPNEF5 OF EXTENDED BUILDING KECrANGLE,
SUBJECT TO FIELD CHECK BY BUILDING DEPARTMENT.
43. TRANSIT SHALL BE SET UP FOR INSPECTOR AT FRAMING INSPECTION TO CHECK HEIGHT OF STRUCTURE.
44, LOT LINE & SETBACK STAKES MUST 15E IN PLACE AT TIME OF FOUNDATION INSPECTION.
45. APPKE55 NUMBERS (12" HEIGHT ON APPK CONTRASTING BACKGROUND) SHALL BE FOOTED PLAINLY V15115LE & LEGII3Lff?OM STREET OR
ROAD FRONTING PROPERTY
40. PROVIDE PIKE E5TINGU15HERS , PEP NFPA 6TANPAPP 10-1.
47. ALL NEW EXTENDED, RE-DUILT OR KELOCATED ELECTRICAL UTILITY& OR SERVICE SHALL BE PLACED UNDERGPOUND.
45. ACCEPTA13LE TIGHTLINE MATERIAL 5CH 40 PVC OR EQUIV 5PR 34, (A5TM 03TM 03034).
49. ANYKFOUESTFOP MODIFICATION,VARIANCE OROTHER ADMINISTRATIVE DEVIATION (HEKEINAFTEFVAPIANCE) MU5T5E5?ECIFICALIY
CALLED OUT& IDENTIFIED. APPROVAL OF: ANY PLAT OR PLAN CONTAINING PROVISIONS WHICH 00 NOT colvirtYwnl-i CITY CODE &
FOR WHICH A VARIANCE HAS 140T 15EEN SPECIFICALLY IDENTIFIED, FE-QUE5TED & CONSIPEFED 15Y THE-APPROPKIATE CITY OFFICAL IN
ACCORDANCE WITHE APPROPRIATE PROVISION OF CITY CODE OR STATE LAW DOES NOT APPROVE ANY ITEMS NOT TO CODE,
SPECIFICATION.
60. COORDINATE WITH FIRE DEPT. FOR LOCK 15OX AUTHORIZATION & INSTALL
51. SPECIFY TIMBER SPECIES AND GRADE OF ALL LUMBER, PLYWOOD INDEX FOR ALL SHEATHING, MATERIAL SPECIFICATIONS AND NAILING SCHEDULES
SEE SHEET 51
E52. ELEVATOR EQUIP. ROOM 13TU/HK = 6,108
COOLING PATE = (1.08X(46)) = 1.08X41ro = 49.6,5 The elevator equipment manufacturer
FAN CFM = 81043/49.66 = 165 shall specify the appropriate venting system
55. BY TIME OF FINAL INSPECTION, DOCUMENTS MUST BE SUBMITTED VEKIFING THAT CONDOS HAVE 13EEN FECOKDED WITH SNOHOMISH for the elevator machine mom
COUNTY OR SUBMIT COMPLETE APPLICATION FOR LOT CONSOLIDATION.
to Comply
54. PLAN CHECK A with IBC 3005.2
55. BUILPING PERMIT NUM13ER:)000(-)(X EXR XX20
-0
oUILDING INFO.
COVER SHEET:
PI VICINITY MAP
FLOOR AREA SUMMARY
PROJECT INFORMATION
P2 PLOT
LI LANDSCAPE PLAN
ARCHITECTURAL:
A1.1-2 ELEVATIONS
A2 119T FLOOR PLAN
A3 2ND FLOOR PLAN
A4 5RP FLOOR PLAN
A5-O DETAILS
A7 ROOF PLAN
STRUCTURAL DRAWINGS:
5 PAGES
13UILPING ENCLOSURE:
13151�
OUILDING ANALY515
OCCUPANCY. KZU
CONSTRUCTION TYPE: V-5
ALLOWABLE HEIGHT (NFPA 15K)k 60'
ALLOWABLE STORIES: 3 STORIES
ALLOWA13LE FLOOR AREA: 7,000 50. FT.
ALLOWABLE BUILDING AREA
7,000 50, FT. X 5 STORIES -
21,000 50, Fr.
ACTUAL HEIGHT 5i-i"
ACTUAL 3 STORIES
ACTUAL AKEA:,
IOT FLOOR: 5,524.50 5Q -ff
2ND FLOOF:,3,551.50 50. FT.
3PD FL60P: 3,734.75 BaFT
ACTUAL 15UILDING AREA: 11,110.75 50, FT.
lb
EFI But GEWE PElln
P-iPtive compliance is based on Table R402.1.1 with the following andifications:
Venical fenestration U = 0.25
Wall R-21 plus R-4 ci
Fluor R-3
Baseman wall R-21 int plus R-5 ci
Slab an grade R- 10 licrinicam and under entire Slab
Below grade Slab R- 10 perimeter and under entire Slab
or
Co. liance based on Section R402.1.4: Red �c a �Tomj UA b 15V.
2a
AIR LEAKAGE CONTROL AND --FN I VEN RLATION 2a:
Compliameebacrod-R402.4.1.2h Reduce the tested ail leakage to 3.0 air changes per
himr-inturn
mail
All whole house ventilation requirements � determined by Section M1507.3 ofthe
Interma .. a[ Residnalid Code shall be met with a high officiency fan (mazinsurn 0.35
wato/ofic), not interlocked with the furnace fan. Ventilation systems using a furnace
including an ECM motor are allowed, provided that they = controlled toplate, at low
speed in ventilation only made.
To quali6qo claim this credit, the building permit drawings shall specify the option
being selected and shall specify the maniffirman tested building air leakage and shall
how list system.
EFFICIENT WATER HEATING 5a:
All showerhead and kitchen sink faucets installed in the house shall be mitedut 1.75
GPM or less. All other lavatury faucets shall be rated at 1.0 GPM or linra-
To qualify to claim this credit, the building permit drawings shall specify the option
being selected and shall specify the mmimum fiew rates for all showorlicads, kitchen
sink faucets, and other lavatory fimcce.
5.
EFFICIENT WATER HEATING 5.:
Water heating system shall include mus of the following:
Gas, propaine or oil water heater with a minimum EF OfO.91
or
Soler water heating Supplementing a minimum standard water heater. Solar water
heating will Ima,ide a rated minimum sa,ings 1785 therms or 2000 kWh based on the
Sole, Rating and Certification Corporation (SRCC) Annual Performance ofOG-300
Collated Sol. Water Heating Systems.
or
Electric head pump water heater with a minimum EF 0172.0 and meeting the Standards of
NEEA's Northern Climate Specificati ... for Hent Pump Water Hasters.
To qualify to claim this credit, the building p=it dinaMnits shall specify the option
being selected and shall Specify the water heater equipment type and the minimum
I
equipment efficiency and, for sola, water heating systems, the calculation ofthe
minimum energy savines.
Separate Permit Required for:
Plumbing, Mechanical, Electrical,
Elevator, Fire Sprinkler, Fill/Grade
Special Inspectio s Reouired
By the Geotechnical Engineer
--Grading/Soils/Drainage
--Foofing bearing capacity
The building enclosure must be
inspected by a qualified inspector.
See permit conditions.
Survey required for building
setbacks and building height
0 Waln Elevator rit4ftem
Otato Labor& ft*udrWt
Owl Eltectrical
Pmscripfive Energy Code Compliance for AM Climate Zones in Washington
FrQW(hro'st-
1309 Can- Todd E.h�lba,
This pirojectwill use Vie requirements of the P .... rlptiv. Path tel- and Incorporate Via
the minimum values Ilsted. In addition, based on file size of the structure. file appropriate
number of additional credits am checked as chosen by file penuft applicant.
Awhoaz.d Repma.m.ti- M.
All CV
ate Zones
R-Valu.'
LY-Favtor'
Farta,buidim U-Facme
Wa
skylight U-Faclor
ria
Glazed Fenemnstion SHGCP
n1a
rthi
Cellinr�
49J
0026
Wood F-Wall-
M ... Wall R-Vadlij.'
21?21'
0-056
Floor
IV,
1,821-Grad.W.11- A24*A
A
hit' R-Vahta & Depth
10, W
41"Wis I
oh dwallini unit In a "BidemIlW�""'Ing shall empty with sufficient Ptl-. franaTiVil. R4061- a to the
lowing minimum number .1 -cl
t Small DwetlIng Unit: 1.5 credits
Dwelling units less than ISDO square feet ta conditioned floor area w1th less than 300 Square feet of fenestration au�
Additions to tuasting bnLdln that Ore, greater than 600 square feet of heartsel floor area but less than 15W square
feet.
'L Medlum DmIling Unit- 3.6 credit.
All diielling units Mat iuO net Included In dl or 43 ftereption: ChweAng units Serving R-2 occupancies shall mqulre
2.6 crealt..
1, Large Dwelling Unit: 4.8 credits
Dwelling units exceeding 500) square fe�t oficarAllored floor area.
111I 'Jol
)WAY
1xigionclutin'ti"
ree�
, D.-I 0%
Viachu-tt R6
3:
us
no
ic
Ad-
0
-7
ZZ
Z
W
LU
Z
OC:
J�
!>: <
co-
w LU
0. %r
Z
LL 0
0
Z
<
W
in
cc
U.
W LL
> 0
CD
W 1.
cc Cr I
0 .
M 0
0 CI 3�.
0 0
<
IL 0
0- -1
<C0
kvMky (if Edmonds BuUding Deprime
zV, PRO12D PLAN
GITY COPY
MAR 0 li 2020
VICINITY MAP N
Z
2
U)
Z
R
CD
Cq
C)
00
0
�4
"
L
U
0
Lr)
REVISIONS:
1.16.19
6.24.19
11.4.19
A5PHAI
HORIZONTAL SIDING WHERE SHOWN
CEDAR SHINGLE 51DING WHERE SHOWN
VERTICAL 51PING WHERE SHOWN
42'HIGH HANDRAIL WHERE SHOWN
LEDGE510NEVENEEK INSTALL PER MFP. 5PEC5
m Imilmi limillm
EXISTIN jQFAQE
--------------------
11111 11111
EAST ELEVAT10"N
SCALE: 1/4" =1'-O"
ROOF PUCH
6/12 PITCH
z
ROOFOVERHANGS
ALAIN ROOF: 2'-D"
BLIMP OUT DErAIIS: f-o"
un
LIGHTING REQUIKEMENT
SECTION 404-ELECTRICAL POWER & LIGHTING SYSTEMS
!
404.1 LIGHTING: A MINIMUM OF 757. OF ALL
LUMINARIES SHALL 15E HIGH EFFICACY LUMINARIES
Av INFLITKATION
PERFORM 15UILPING AIR LEAKAGE TEST (SLOWER POOP
TEST IN ACCORDANCE TO W5EC
PROVIDE DUCT 5EALU15G AFFUDAVIT (IF APPLICADLE)
ALL HOT WATER PIFE5 IN UNHEATED SPACES MUST
E5E INSULATED WITH4k-4 INSULATION PEP-E&4&W5EC
5EC403.5Z I— I
I. -I cq
=
00
;4 al�
0
Lr)
14
MAX HEIGHT: 294.5W
G)
—
ACT HEIGHT: 293,57,
2NP FLOOR-- 251.5'
'
5T FLOOR: 271.4,V.
1.14.19
REVISIONS:
2.28.19
6.24.19
Ela
10.30.19
9.23.20
--- -----------
L,4AYE
GRADE: 264.34'
LA13: 262.4,V
-IFR-INTED-
9.73.20,
RESUB
Sep 28 2020
DEPART-T
ASPHAL COME 5HINGLE5 ON 15# FE
CEDAR SHINGLE 510ING WHERE 5H(
HORIZONTAL SIDING WHERE SHOWN
YEPTICAL SIDING WHERE SHOWN
4Z'HIGH HANDRAIL
LEOGE5TONE VENEER INSTALL PEP
SOUTH ELEVATI
SCALE: 1/4" =i'-d'
ROOF PITCH
6/12 PITCH
ROOF OVERHANGS
AWN ROOF: 2'-0"
2
BUMP OUT DETAILS:
'.4
-IGHTING REQUIREMENT-
u
3ECTION 404-ELECTKICAL POWER & LIGHTING 5Y5TEM5
104.1 LIGHTING: A MINIMUM OF 75% OF ALL
-UMINAPIES, SHALL 5E HIGH EFFICACY LUMINARIES
�[K INFLITRATION
'ERFOKM 15UILPING AIR LEAKAGE TEST (SLOWER POOP
rE5T IN ACCOPPANCE TO WSEC
'KOVIDE DUCT SEALU5G AFFUDAVIT (IF APFLICAIXE)
\LL HOT WATER PIPE& IN UNHEATED SRACE5 MUST
5E INSULATED WITH" INSULATION PEP, QQlaW5EC
5EC403.5,3 I— I F2.751
R-3
C14
00
ol�
U
C) z
C)
0
Lr)
u
PT
REVISIONS:
2.28.19
6.24.19
10.30.19
9.23.20
9.23.20
RESUB
Sep 28 2020
.1111011INT SEIV
.11A.—I
At
In
ID
75'
112"
THR!SHOUP PER ISO 110+'
_C Al -09,402
, 171
13EVE-ED NO STEEPER THE 1:2
- - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - -
-
2 HOUR WALL
- -
1-HR
u
STORAGE 302 2 HOUR WALL
UNHEATED AREA E
HEAT40MINJEMP
PER 5a FT. MAX
Ic
WAC 427.4
IZ20-1-AMP
LECTKICAL VEHICLE CHARGING
15,
11'2-1/Z' 55-1/2"
211-1/2"
�\7
bO.22 ft'
-------------- -----
AM131ENT AIR TEMPERATURE AND
MIPITY IN THE MACHINE ROOM
HU BE KEGULATFPIAA50CFM
To
FAN PER MFG. RECOMMENDATION5
PER 113C 3005.2 1
45 M N W1 SELF
CLOSING HINGE
HR MACHINE RM
TYR
TyF TyF'
re
1-HR
Ail*
u
Tyr
I0, ---- 7DF -------- 7
ro_'� I �T
'/W/
PAINTED ACCESS
AOILE
;;t
,.A MIN W1 SELF
ING H"GE GARAGE 302
-----------------------------------------
L
002 W, r 11
HIIN
Wl EL
LEVAjM
------------------ w__ A
x
WAC 4Z7.4
208124OV40AMI
ELECTRICAL VEHICLE CHARGING
v
11114274
_V__
ELECTRICAL VEHICLE CHARGING
1-HR
GOMINW15EUF
C IIV:E
ASE
3
GARAGE 201
---------------------
I I
2 HOUR WALL
C4
913Z
-------------------
I-HR
>1
U)
H
TYR
Tyll Tyr
H E: 0.81'
I : V4
:u
F
1- R
----------
GARAGE 301
16068, OV HEAD DOOR
Z/
THRESHOLD RE' , fl3C 1104-,
ICZA117.1-0),402
IlZ BEVELED NO STEFEK THEN 1:2
STAIR
Nr CARPET
5'
211-1/2"
Tyr
T
90 MIN W15ELF CLOSING HINGE
--------------------------
7
j
TYR
UNHEATED AREA ELECTRIC
N TEMF I WATT
PE 50. MAX
X4
5070
-HR
IZ7-1/2"
10,51,
1/1
U
GARAGE 202
I
TYR Typ
Q ts
----
------ --------
V�
7(
51vro"
Z- THREf'HOLIPPERIDC1104-,
[CC A117.1-09,402
I/Z'DEVELED 140 STEEPER THEN le
Tyr
--- ----------
2020 202
,V7-11Z' 23�' 4)7-1/2" �7' \_SIlNONDOOK
I I I "FIrE SYSTEM
I I CONTrOL!'
j
=1 2X6 0 16- 0,C. STUD WALL Wl R-21 INS UL.
(2)2X4 0 16' O.C� I" AIR SPACE
I HK METAL STUD WALL (AFTER ELEV INSTALL)
=1 2X4 0 16"O.C.
2XG 0 16" O.C. PLUMBING WALL
WOODCOLUMN
OA PROVIDE CUTS PE AIR FOR FUKN. & WATER HEATER
1p
(RELIEF MUST VENT TO OUTSIDE (NOT GARAGE)
22)W'AMC ACCESS (W' MIN. VEIZT. CLEARANCE
WEATHEPSTIZIr & INSUL. TO K-49
"NOE)aT'rIGN
120V5MKOErW/DATTi5AcKup(INTEKCONNECTEP)
FIRE PETECTOK INTERCONNECTED
4(" EMERGENCY LIGHTING W/15ATT 13ACKUP
INDICATES ILLUMINATED EATrIGNr W1 DATT DACKUF'
CONTORLJOINTS
BARRIER FREE DIRECTIONAL I.NAGE LOCATION
FUTURE GRAS SAKE: PROADE 13LOCKING
ZM HORIZONTAL CENTEKLINE P0511014 = 3&'FROM
FLOOR PER ICC/ANSI 609 .4
Ig CARBON MONOXIDE PETECIOF
rEKIKC515
ALL UNITS ARE To 15E TYl`E VP'UNITIS
FIER [CC-AN51 A117-1 SECTION 1004.
INSTALL SOLID Z< MOCKING FOR
FURTURE GRA1313AR5 IN ALL VATHIKOOM5
CLEAR FLOOF5 AREAS APE INDICATED
IN THE TYPE "OP'5ATHFOOMS AND KITCHEN
CERTIFICATE WILL DE POSTED IN FURNACE (OR
OTHER APPROVED AREA) WITH THE FOLLOWING
INFORMATION: K-VLAUNES, U-VALUESKESULT5
FROM DUCT SYSTEM TEST AIR LEAKAGE TESTING,
RESULTS FROM 13UIPLING ENCELOPE AIR LEAKAGE TESTING,
TYPES AND EFFICIENCIES OF HEATING, COOLING, AND
SERVICE WATER HEATING EQUIPMENT PER K401.3
DUCTS ARE REQUIRED TO DE INSULATED TO A
MINIMUM OF K-43 PER r4O3Z.1
THE DWELLING 15 REQUIRE[) TO 13E TESTED & VERIFIED AS
HAVING AN AIR LEAKAGE PATE NOT EXCEEDING 3 AIR
CHANGES PEP HOUR PER R402A1 I
MECHANICAL DUCTS ARE REQUIRED TO 13E SEAL TESTED
IN ACCORDANCE WITH 403.5.2 TE5nNG TO COMPLY WITH WSU
K5-35.
EXTERIOR HEADERS APE REQUIRED TO 13E INSULATED WITH
A MIN. OF P-10 INSULATION.
COPNEP-5 OF STUD WALL$ APE REQUIRE[) TO 13E FULLY
INSULATED.
N
IST FLOGIR'll-LAN
SCALE: 1/4" = l'-O"
GARAGE 201:437.96 SQ. FT.
GARAGE 202:549.13 SQ. FT.
GARAGE 301:992.16 SQ. Fr.
GARAGE 302:971.06 SQ. FT.
COMMON AREA: 574.19 SO. FT
-135' HEAT DETECTOR 0 SPRINKLER HEAPS -PRO01
FRESH AIR THROUGH 4�' DUCT -EXAU5T FAN TO
MAINTAIN A MAX. TEMROF 90- &VENT To OUTSIDE
IN
AS KFaP DY MFG rPEC5
:UNHEATEP 5FACE-CONTINOU5 KIM 0 FLOORS.
INSTALLATION OF ADDITIONAL ELFYATOR DOORS r HALL
NOT VIOLATE LISTINGS OF ELEVATOR (TYR)
MECHANICAL CHASES
-CONTINUOUS KIM 0 FLOOR.
SPRINKLER ROOM
-FIRE ALARM CONKOL PANEL IN SPRINKLER ROOM W1
CENTRAL STATION 5EKVICE MONITORING
-ANNUNCIATOR IN LOB15Y
-MAINTAIN KEqP I HK STAIRS ENCLOU5UKE6 & MIN &-8'
HEADROOM 0 STAIRS -ELECTRIC HEAT 40 MIN:rEMP 1 WATT
PER 'a FT. UNHEATED SPACE -STAIR 13ACKING FOR HAND
I
RAIL -CONTINUOUS KIM 0 FLOOR -15ACEMENT STAIR -
RISE =S-51"RUN = 11" ALL OTHER STAIRS. RISE = 6.7Z'
�U CLEARANCE FIPEFFA-CE-W/ DIRECT
VENT
FACT)KY 15UILT FIKEPLCE SHALL BE INSTALLED PER
MANUFACTUPEK's SPECS AND SHALL HAVE
AFFROAL LA13EL ATTACHED
518" TYPE'W. GINS TO ROOF 5HEATING
FIREPLACES & STOVES MUST BE PGE
CERTIFIED & LABELED AS SUITABLE
FOR USE PUKING A FIRST STAGE BURN
DAN.
PROVIDE ONE OPENADLE ESCAPE WINDOW IN 5ArEMENT
& IN EACH SLEEPING ROOM MEETING ALL THE
FOLLOWING REQUIREMENTS:
1. AN OPENA5LE AREA OF NOT LE55 THEN 5.7 Barr.
? A MIN. CLEAR HEIGHT OF 24j'
3. A MIN. CLEAR WIDTH OF 27'
4. FINISHED BILL HEIGHT OF NOT MORE THAN 4,V'ADOVE
THE FINISH FLOOR.
5. ALL WINDOWS TO INCLUDE FRESH AIR VENTS OR METERED
FPF_'H AIR SUPPLY 0 FURNACE
SALL NNDOW5 & DOOF_' , HAVING ACCESS TO EXTERIOR OR
UNHEATED TO BE SEALED PER SEC. 402,4.1.1(WAC)
KECECEED LIGHTING TO BE Ic RATED
ALL TYPE WDECK SURFACES TO BE NO MORE THANN'
5ELOWINTEK[OKFLOOK LEVEL
-ALL TYFE"W'FRONT DOORS TO BE Z-10"MIN. & ALL DOOR
THKE6HOLV5 CANNOT EXCEED 1/Z'FEK 404
-ALL DWELLINGS MUST 15E TTPE D, OFT. D
.ALL KEUUIKEP DOOR HARDWARE TO MEET 15C CHAPTER 11
& EXITING PER 101O.W.11
IMC
TYPE 13ORLYENTCONNECrOFZ51ZEaDONFUEL-13UKNING
A I
IANCE 51ACE5
PrL 0 IN '=NG SYSTEM
HYDR NIC
APPROVAL BY THE WATER SURVEYOR DOES NOT
RELIEVE THE CUSTOMER OF THE RESPONSIDLITYTO
COMPLY W1 THE REQUIREMENTS OF OTHER AGENCIES
HAVING JURISDICTION. APPROVAL OF THIS PLAN POES
NOT VEST THE BUILDING OR PLUMBING SINCE FUTURE
CHANGES IN THE CUSTOMERS WATER USE MAY
INCREASE THE ASSESSMENT RISK & THE SURVEYORS
PROTECTION REQUIREMENTS.
DUILPING INSPECTORS MUST 0135EKVE A HYDROSTATIC TEST
-TEST. 100 PSI WATER PFE55UKE OR 1-1/2 TIMES THE
OPERATING PRESSURF-WHICHEVEKISGREATEIR MIN30
MINUTES TEST.
-PIPING EM13EPPEP IN CONCRETE MUST BE PRESSURE
TESTED PRIOR TO POURING OF CONCRETE AND 15E MAINTAINED
DURING PLACEMENT
- GARAGE HEADROOM TO 13E MIN. OF 7-0" CLEARANCE
FROM ALL PIPES, SPRINKLER HEADS, DUCTS, BEAMS, &
INBULAAON, ETC.
-MIN. H 'OOM CLEARANCE OF T-W 15 KE(7D IN ALL
EADr
HADMAL SPACES. & 7-C'[r KECrD ELSEWHERE
-LOCATION OF EMERGENCY LIGHTING SHALL BE APPROVED
BY FIRE MARSHAL
-PEC!D MHEEL STOP 0 ALL PAIWNG STALLS
-EXHAUCT OUTLETS TO BE A MIN. OF V-01' FROM 13UILPING
OPENING5 & I0`-C"FKOM SUPPLY AIR INLETS (rM.
-DOUDUE CHECK VALVE INSPECTION PEaP SY CITY CK055
CONNECTION CONTROL r PECIALIST PRIOR TO HYDRD STATIC
TEST OF FIRE SPRINKLER SYSTEM.
- ACCE55 TO DOU15LE CHECK VALVE MUST 13E WITHIN 51
ABOVE FIN15HEV FLOOR OR A WMOl' MIN PLATFORM
MUST BE INSTALLED FOR ACCE59
-WALLS SEPARATING DWELLING UNITS FROM COMMON
AREAS (STAIR ENCLOSURES. ELEVATOR SHAFT, ETC) MUST
HAVE AN STC OF 50 OR MO
.SMOKE & DRAFT - ASSEMBLIES IN LOBBY. I-HK AREAS &
ELEVATOK51 ENTRY LOCATIONS $11ALL HAVE A FIRE
PROTECTION RATING OF NOT LESS THANWMIN. & 13EAK AN
APPROVED LABEL IDENTIFING THE RATING OF THE
ASSEMBLY FOLLOWED 15Y THE LETTER'V. ODORS SHALL
13E MAINTAINED 5ELF-CL05ING OF BE AUTOMA11C CLOSING
15Y ACTIYATION OF A SMOKE DETECTOR
ADDITIONAL PLUMBING REQUIREMENTS:
-MAIN DUILPIN65HUT-OFF KEaPON WATER SUPPLY LINE.
-PRE5 LIKE REDUCTION VALVE ON MAIN WATER SUPPLY LINE
KEqP BY CITY CODE
-EXPANSION TANK REaD ON EACH HOT WATER Tkiqr�
-VENT HOT WATER TANK KELIFF VALVE DIRECTLY TO THE
OUT61PE
-HOTWATERHEATER MUST BE 5EI5MICALY ANCHORED
OR STRAPPED 0 POINTS WITHIN THE LIPPER 1/5 & LOWER 1/3
OF ITS VERTICAL DIMENSION. 0 THE LOWER POINT AMIN,
DISTANCE OF 4" MUST BE MAINTAINED ABOVE THE
CONTROLS Wt THE STRAPPING
-?KOIVIPE INDIVIDUAL SHUTOFFS FOR EACH UNIT
:1" AIKOAP KE(XD ON DISHWAH5HER
ALL SHOWERS HEADS TO 15E EQUIrMD WITH FLOW CONTROL
DEVICE TO LIMIT FLOW TO 1.75 GPM
INSULATION PER 2015 WSEC EEC 403B.3.
RIESUB
MAR 0 4 2020
��MZT%�s
z
z
00
6'
Lr)
1.14.19
6.24.19
10.30.19
3.4.20
TOTAL: 3,524.50 SQ. FT
I N
I �I:
b)
I N
I �N
F
TYPE "b"
16,
55-1/2"
WSEC CREDIT 5. (.5 '.d�)
TRITON BONE BY KOHLER (FAUCET)
K-WMO-4AKL-CF 1.0 GFM
E5
LIV
CARPET UNIT 201
U
n
1-Hk FLOOP/CEILING OCGUFANCY
SEPARATION FE(ZO
TEFZMIrrENT WHOLE HOUSE VENTILATION
N#1 IN 7
ING E`NAUS FA & FRESH AIR INLETS. IMC 405.&.6
5"
ALL HABrIABLEM50U. RE IREOUTDOOF AIR INLETS
,2=r 0% RUN TIME IN EACI 4 EG.EII1
RUN TIME FACTOR I -HOUR C
G, 165TUII�
lug"7 1 L
-
70 CFM WHOLE
WSEC CUDIT 0 N #4 (I,mdIt) &
ELECT.TA KLEC5HOTWATEr,
HEATER (W/MIN EFF OF,95)
WATER SUPPLY FOP HYPRONIC HEATERS
3YDEACON/MOR EANDMIXINGVALVE
FOR HOTNATER SUPPLY TO EACH UNIT
MBED
CARPET
16
SHOWER HEAD 1.75 GrM
TRITON DOWE 13Y �OHLER (FAUCE
K-
PC REINFOAME(NA
FOR GRAS 5
GRAS BAR HT W'M]N- �U'MAX
A13OVE FLOOR
VEFTICLA SPAE5 BAR
39 FL, .1
18"
BATHROOM PER [CC 1004.11.3
ONE 15ATHING FACILITY THAT
5 ON AN ACCES5115LE ROUTE
5 IREQU KEE) TO COMPY WITH
ornow!b" PROVIDE
REINFORCEMENT FOP FUTURE
INSTALLATION OF GPA1313AK5 WATER
CLOSET, LAVATORY. AND 15ATHTU13
w
1016,
77"
12Y w
v 1. ZVI 37-1/Z' 94-1/2" 29" *N' 415.. 29"
lull, 211"
2660
CIA
v
DUCT. HOOP 'D
0-
7
DN CLEA�
C PET
!CLEAR LIV
F CARFET
�SFACE
(13
UNIT 202
5. 2T I-HIR FLOOF/CEILING OCCUPANCY
SEPARATION IREal?
KIJ- - -
V 0
V 1) FIRESTOPPING REOD AT FIRE RESICTANT WALL FOR
R� TYP "MKITCHEN�rli ELECTRICAL, MECHANICAL& PLUMBING ELEMENTS
ICC 1004.12 j PEP, IBC 714.1
WX
77' 1 67" 24-1/2". 5`1`
ENTRY
CARPET
CLE R SeACE I
I
E.C.
Nt Ej
2'b" 65-1/2" 21
BATH
11_� TILE 17
BED #2
CARPET
11 W-01.ii
rgrr-
1
L
0 Mm 11
11M
11.1
go! we 00111
L -1 vw
Ulm:,
... .......
nw.I.0
CARPET
WSEC CREDIT
ELECT. TANKLESS HOT WATER
HEATER (W/MIN EFF OF.95)
WATER SUPPLY FOR HYDRONIC HEATERS
BY DEACON/MO 'PISANI) MIXING VALVE
r
FOP HOTWATEK SUPPLY TO EACH UNIT
BATH
TILE
0 CFM
170 C
HOU FA
LAUNDRYL
I- -TIL
1 CLEAR SPACE
-----------------
W.I.C.
.3-
MBED
CARPET
14�
D
EECK
GAS 5T[
1[5 ELA51`0�
5050
IEPIC DECK
ID R
2660
DIN
CARPET
6. 1 w I 2-l"
KIT
HARDWOOD
TYP "A" KITCHEN PEP ib
ICC 1004.12
4
CLEAR
5FACE
X.
f I
W5EC CFEDIT 5a (.5 cmdIts)
GROHE26117COFARBORN
CHOWERHEAPI.75GPM
TRITON BOWE BY KOHLER (FAUCET)
K-80OT70-4AKL-CP 1.0 GPM
El
ce
1_z
BED #2
CARPET
<
r
- ---------------
C4
HOUr VE..N LrI11EXHAUCT "t
FANS & FRESH AIR INLETS
IMG 403.&.0 ALL HABITABLE ROOMS
WILL REQUIRE OUTDOOR AIR INLETS
RUN TIME FACTOR 2 = 50% RUN TIME
IN EACH 4-HOUK SEGMENT.
Tyr
BED #3
CARPET us
<
REMOVABLE VANITY *
NO CAD. UNDER SINK
ALL-ING FOP A
FORWARD APrPOACH
69.1 1 691.
67-1/2"
GRAD DAR HT 38" MAX
ABOVE FLOOR
VERTICLA GRAB BAR
16, MIN. IN LENGTH
46. MAX A15OVE FLOOR
v
w
5`1 1
M 2XG 0 16- D.C. STUD WALL W/ R-21 1145UL.
(2)2X4 016- O.C., V AIR SPACE
I HP METAL STUD WALL (AFTER ELEV INSTALL)
2X4 0 I&'O.C.
2X6 0 16- D.C. PLUMBING WALL
WOODCOLUMN .
OA PROVIDE OUTSIDE AIR FOR FURN. & WATER HEATER
(RELIEF MUSTVENT TO OUTSIDE (NOT GARAGE)
22'-,W ATTIC ACCESS (50" MIN. VERT. CLEARANCE
,',,IWEATHEIZSTKIP & INSUL TO K-49
"NO EXIr'5IGN
12ovemKDETwA5Al'rBACKUI'(INTERCONNECFED)
FIRE DETECTOKINTEKOCINNECTED
4(91 EMERGENCY LIGHTING, wA3ATT BACKUP
INDICATES ILLUMINATED EXIT SIGNS W1 15ATT BACKUP
CONTOKL JOINTS
BARRIER FREE DIRECTIONAL SIGNAGE LOCATION
FUTURE GRAB BARS: PROVIDE BLOCKING
P7/2 HORIZONTAL CENTEKLINE POSTION = 55" FROM
FLOOR PER ICCIAN51 609.4
Ej CARBON MONOXIDE DETECTOR
PER IRC 515
ALL UNITS APE TO 51E TYPE 15" UNITIS
PEP ICC-AN51 A117-1 5ECTI
INSTALL SOLID 2X 13LOCKING FOP
FURTURE GRAE5 DAP5 IN ALL DATHFOOM5
WSEC CREDIT Ba (.5 croditio) CLEAR FLOORS AREAS APE INDICATED
TRMN 130WE BY KOHLER (FAUCET)
K-&00170-4AKL-CP 1,0 GPM IN THE TYPE "b"BATHPOOM5 AND KITCHEN
CERTIFICATE WILL BE POSTED IN FURNACE (OR
OTHER APPROVED AREA) WITH THE FOLLOWING
INFORMATION: K-VLAUNE5. U-VALUESPE5ULT5
FROM DUCT SYSTEM TEST AIR LEAKAGE TESTING,
RESULTS FROM BUIPLING ENCELOPE AIR LEAKAGE TESTING,
TYPES AND EFFICIENCIES OF HEATING, COOLING, AND
SERVICE WATER HEATING EQUIPMENT PER R401.3
DUCTS ARE REQUIRED TO 13E INSULATED TO A
MINIMUM OF F-b PEP K403.3.1
; ;THE DWELLING 15 REQUIRED TO 15E TESTED & VERIFIED AS
HAVING AN AIR LEAKAGE RATE NOT EXCEEDING 5 AIR
CHANCES PEP HOUR PER F402Al_.___
MECHANICAL DUCTS ARE REQUIRED TO 15E SEAL TESTED
IN ACCORDANCE WITH 405.52 TESTING TO COMPLY WITH W5U
F5_33.
EXTERIOR, HEADERS APE REQUIRED TO BE INSULATED WITH
A MIN. OF P-10 INSULATION,
CORNERS OF STUD WALL9 ARE REQUIRED TO 13E FULLY
INSULATED.
HATCHED AREAS
50 LOCATIONS
FOR REINFORCMENT3
FOR GRAB SAKE, (TYP)
GFAB 15AP HT 33" MIN-46"MAX
ABOVE FLOOR
VE CLA GRAD BAR
18"MIN. IN LENGTH
39'-41" MAX ABOVE FLOOR
I ALLOWABLE OPENING ANALYSIS
PEP TA13LE 705.a
7-10'= 10% ALLOWABLE AREA
202 (EAST WALL): 609.84 50. FT. X.10
60.98 5O.FT UNPROTECTED WINDOW OPENING ALLOWED.
ACTUAL UNPROTECTED WINDOW OPENING = 59.75SQ. FT.
FIRE SEPARATION DISTANCE 6 TO LESS THAN 10
DEGREE OF OPENING PROTECTION: UNPROTECTED,
NON SPRINKLEIZED 1014
MBATH-, WSEC CREDIT Ba (.5 awdito)
GROHE 2611700 FAIRE50PN
T11 F SHOWER HEAD 1.75 GPM
50 CFM TRITON BOWE 13Y KOHLER (FAUCET)
--fl .. E K-80OT70-4AKL-CP 1.0 GPM
2'9" 127-1/2"
ELEVATOR EQUIPMENT ROOM
-155- HEAT DETECTOR 0,5PPINKLEF HEAFS -PROVIVE
FRESH AIR THROUGH 4!' DUCT -EXAU5T FAN TO
MAINTAIN A MAX. TEMP. OF 90- &VENT TO OUTSIDE
IK
AS KEaP 13Y MFG SPECS
ELEVATOR NOTES
:UNHEATED 511ACE-CONTINOU5 RIM 0 FLOORS.
INSTALLATION OF ADDITIONAL ELEVATOR POORS SHALL
NOT VIOLATE LISTINGS OF ELEVATOR TM
MECHANICAL CHA5E6
-CONTINUOUS, RIM 9D FLOOR
SPRINKLER ROOM
-FIRE ALARM CONROL PANEL IN SPRINKLER ROOM W/
CENTRAL STATION SERVICE MONITORING
ANNUNCIATOK IN LOBBY
STAJR NOTES
-MAINTAIN REaD 1 HIP STAIRS ENCLOUSUFZE5 & MIN 6-&'
HEADROOM 0 STAIRS -ELECTRIC HEAT40 MINSEMP I WATT
PEP Sa FT. UNHEATED SPACE -STAIR 13ACKING FOP, HAND
?AIL -CONTINUOUS, RIM 0 FLOOR -BASEMENT STAIR.
R15E = 6.51" RUN = IT' ALL OTHER STAIRS: RISE = 6.7Z'
FIREPLACE NOTES
ICY CLEARANCE FIREPLACE W/ DIRECT
VENT
FACTORY BUILT FIREPLCE SHALL BE INSTALLED PEP
MANUFACTUFZEF�5 SPEC5 AND SHALL HAVE
AFPROAL LABEL ATTACHED
5/8" TYPE'r GWI3 TO ROOF 5HEATING
FIREPLACES & 5TOVE5 MUST 15E D.O.E
CERTIFIED & LABELED AS SUITABLE
FIRSTSTAG
FOR USE DURING A E BURN
DAN.
IC
PROVIDE ONE OPENABLE ESCAPE WINPOW IN BASEMENT
& IN EACH SLEEPING ROOM MEETING ALL THE
FOLLOMNG REQUIREMENTS:
1. AN OPENADLE AREA OF NOT LESS THEN 5.7 50.FT.
2. A MIN. CLEAR HEIGHT OF 2,V'
5. A MIN. CLEAR WIDTH OF 20"
4. FIN16HED SILL HEIGHT OF NOT MORE THAN 4-VADOVE
THE FIN15H FLOCK
5. ALL WINDOW5 TO INCLUDE FRESH AIR VENTS OR METERED
FRESH AIR SUPPLY 0 FURNACE
GALL WINDOWS & DOORS HAVING ACCESS TO EXTERIOR OR
UNHEATED TO BE SEALED PER SEC. 402.4.1.1(WAC)
RECE55EP LIGHTING TO 13E IC RATED
ALL TYPE "B" DECK SURFACES TO BE NO MORE THAN 4P
BELOW INTERIOR FLOOR LEVEL
-ALL TYPE -113-1 FRONT DOORS TO BE Z-191 MIN. & ALL DOOR
THRESHOLDS CANNOT EXCEED M" PEP 404
:ALL DWELLINGS MUST BE TYPE D, OPT B
ALL REQUIRED DOOR HARDWARE TO MEET 115C CHAPTER 11
6, EXITING PEP 1010.1.9.1
ImC
TTFE B OR L VENT CONmEcToP5 PEaD ON FUEL-DUPNING
APPLIANCE IN UNHEATED SPACES
HYDRONIC HEATING SYSTEM
APPROVAL BY THE WATER SURVEYOR DOES NOT
RELIEVE THE CUSTOMER OF THE RE5PONSIBLITY TO
COMPLY W/ THE REQUIREMENTS OF OTHER AGENCIES
HAVING JURISDICTION. APPROVAL OF IF115 PLAN DOES
NOT VEST THE BUILDING OR PLUMBING SINCE FUTURE
CHANGES IN THE CUSTOMERS WATER USE MAY
INCREASE THE A55ESSMENT RISK & THE SURVEYORS
PROTECTION REQUIREMENTS.
IMC. CHAPTER 12
13UILVINO N51PECTORS MUST OBSERVE A HYDROSTATIC TEST
ON THE HOT WATER SUPPLY LINES & THE PANEL SYS rEM.
-TEST. 100 1`51 WATER PKE55UFZE OR 1-1/2 TIMES THE
OPERnNG PPE6SUFF, WHICHEVER 15 GREATER. MIN W
MINUTES TEST.
-PIPING EMBEDDED IN CONCRETE MUST BE PRESSURE
TESTED PRIOR TO POURING OF CONCRETE AND BE MAINTAINED
DURING PLACEMENT.
- GARAGE HEADROOM TO BE MIN. OF 7-O"CLEAKANCE
FROM ALL PIPES. SPRINKLER HEAD5, DUCTS. SEAMS, &
INSULAIIONL ETC,
-MIN. HEADROOM CLEARANCE OF 7-615 KEaD IN ALL
HA15T,AL SPACES. & T-OPIS 'EQD ELSEWHERE
P
-LOCATION 01 EMERGENCY LIGHTING SHALL BE APPROVED
BYFIREMAIR5 AL
-REaP WHEEL STOP 0 ALL PARKING 5TALL5
-EXHAUST OUTLETS TO BE A MIN. OF V-01- FROM BUILDING
OPENINGS & 10"0" FROM SUPPLY AIR INLETS (TYP).
-DOUBLE CHECK VALVE INSPECTION KEaP BY CITY GROSS
CONNECTION CONTROL SPECIALIST PRIOR TO HYPRO STATIC
TEST OF FIRE SPRINKLER SYSTEM.
- ACCESS TO DOUBLE CHECK VALVE MUST 15E WITHIN 9
ABOVE FINISHED FLOOR OR A 30"0" MIN PLATFORM
MUST BE INSTALLED FOR ArCF55
-WALLS, SEPARATING DWELLING UNITS FROM COMMON
AREAS (STAR ENCLOSURES, ELEVATOR 5HAFr, ETC) MUST
HAVE AN SIC OF 50 OR MORE
-SMOKE & CRAFT - ASSEMBLIES IN LOBBY I-HK AREAS &
ELEVATORS/ ENTRY LOCATIONS SHALL HAVE A FIFE
PROTECTION RATING OF NOT LESS THAN 50 MIN. & BEAR AN
APPROVED LABEL IDENTIFING THE RATING OF THE
A55EMDLY FOLLOWED 15Y THE LETrEK"5". DOOFZ55HALL
15E MAINTAINED 5ELF-CLOSING OR BE AUTOMATIC CLOSING
15Y ACnVA1ON OF A SMOKE DETECTOR
ADDITIONAL FLUM13ING REQUIREMENTS:
-MAIN BUILDING SHUT-OFF REaP ON WATER SUPPLY LINE,
PRE55UPE REDUCTION VALVE ON MAIN WATER SUPPLY LINE
REaP 13Y CITY COPE
:EXPANSION TANK REOT? ON EACH HOT WATER TANK.
VENT HOT WATER TANK RELIEF VALVE DIRECTLY TO THE
OUT51DE
-HOT WATER HEATEK MUST BE 5E15MICALLYANICHOREP
OR STRAPPED 0 POINTS WITHIN THE UPPER 1/3 & LOWER 1/3
OF ITS VERTICAL DIMENSION. 0 THE LOWER POINT. A MIN.
DISTANCE OF 4?'MU5T BE MAINTAINED A13OVE THE
CONTROLS W/ THE 5TFAPPING
:PKOIVlPE INDIVIDUAL SHUTOFFS FOR EACH UNIT
1" AIRGAP. REOID ON PISWAH9HER
-ALL SHOWERS HEAPS TO BE EQUIPPED WITH FLOW CONTROL
DEVICE TO LIMIT FLOW TO 1.75 GPM
-A K SWITCH FOP DISPOSAL IN SINK
-ALL HOTWATEK PIPES MUST BE INSULATED WITH K-5
INSULATION PER 2015 WSEC SEC 403,5Z
z
II-� ,
MIA
Z
cuI.
19 An
c)
C:)
zW oo
U
C
1.4.19
REVISIONS:
1.14.19
6.24.19
10.30.19
6.16.20
9.23.20
PRINTED:
RESUB 9.23.20
Sep 28 2020
-o-moNm
N D-PMENTSE-
). "i
2NTUFLn'__"R PLAN
%Ju I I -
SCALE: 1/4" Y-O"
201: (LIV) 1589.15 SQ. Fr., (DECK) 112 SQ. Fr. = 1,701.15 SQ. FT.
202: (LXV) 1873.99 SQ. FT., (DECK) 91.00 SQ. FT. = 1,964.99 SQ. FT.
CONMON AREA: 195.36 SQ. FT.
TOTAL = 3 851.50 SQ. Fr. m
MUM
n
;4-
81
1019.1
C STUD
WSEC CREDIT OPTION #4 (1 �,mllt) & 5� (IE
ELECT TANKLE55 HOT WATER
' M -
_
HEATER ( WIMIN EFF OF 95)
' :_RON
H EM
ATER SUPMY FOR HYDRONIC HEATERS
W w T UMy OR
BY DEACON/MORKRICAND MIXING VALVE
CC . VE
FOR HOTWATER SUPPLY TO EACH UNIT
, . TER ,
z
MBED
CARPET
P
16
1A
wSE"R5Pn75aT5crRMj-
TRITON t5OWE BY KOHLER (FAUCET)
HAjCHEV At �EAS
FOR REIN MENT5
Fop
GRAS I AM (TYP)
GRAS BAR HT W'MIN- �6' MAX
ABOVE FIX )R
VERTICLA 3RAD BAR
lv'M[N. It LENGTH
39",41" M X ABOVE P.
. 5.
TYPE '131'
13ATHFOOM PER ICC 1004.11.3
ONE 15ATHING FACILITY THAT
:5 ON AN ACCE591BLE ROUTE
0 KEQU F 0 TO COMPY WITH
OPTION'!ITPROVIDE
REINFORCEMENT FOR FUTURE
INSTALLATION OF GRAB SAKS WATER
CLOSE-� LAVATORY, AND BATHTUB
K-80OT70-4AI
GRCHE 261170
SHOWER HEAC
77'
12' 13,
46-1/2" Z311 L 3191, 1 1 319.1 1. 25" 4�8"
----------------------
---- ------------
6"PIA
PuCTjHOOD EN
4036 SUPER
WSSCCRfDIT5.
..........
TRITON DC WE By KOHLER (FAUCET)
K-aOOT7C 4AKL-CP 1.0 GPM
LIV DIN
CARPET UNIT 301 CARPET
1-HP FLOOP/CEILING OCCUPANCY
SEPARATION REaD
� OPTION M; INTEKMITTENTWHOLE HOUCd VENTILATION
w
5050 1-1 20E50
DE'�CK
LIV E Kl� ;�cr.
CARPET GAS 5TUJ I
. nogn. 1 lork
CLEAF 2
5FACF 4EAR
-SPACE
DIN
UNIT 302 CARPET
1-HP FLOOK/CEILING OCCUPANCY
5EPAPATION KEaP
FIKE5TOrPING REDD AT FIRE RESI-IWALL FOR
ELECrg[CALMECHANICAI.&FLUMD114G ELEMENTS
KIT PER, IVC 714.1
r ='' 60' TYP PETAIL CIAG APPLIES
E. tE A OPTION #1: INTERMITTENTWHOLE TO THE ENTIRE
HOUS VENnl_AnON U61NO EXHAUST CEILING OF UNIT 302
FAN &FRE5HARINLEIS
IMC405.8 ALLHADITADLEROOM5
............
WILLK UIREOUTPOORAIRINLET5
RUNTIM FACfM2=50%RUNTIME WSECCREDITS.(.B��U)
IN EACH *HOUR SEGMENT. TRITON SOME BY KOHLER (FAUCET)
K-8O0T7O4AKL-Crl.O GPM
ZV Z13" 4Z-1/2!' 7' 4
NTRY]
CAPPET --EN
E OR
" 0 v KrF---
HARDWOOD
TYP "B" KITCHEN PEP
12 '6 b 1 CLEAR
V [CC 1004.12
SPACE
L
4 E ELECTRIC RELEASE
GO MIN W1 SELF CLOSING
------- 7-7
11 -will
-IT-
WSEC CREDIT 51 (.5 j") Hill 170 C WH
GKOHE Z611700 FAIRBORN
ENTERED
0
Ar SHOWER HEAD 1.� GPM
A':
50 CFM 1-fiR AUNI
V�
TRITON IOWE BY KOHLER (I WCET)
X"Ry
36,6,& N1.1
STA
�:T K-aoovo�AKL-cp Lo Grk CAFFET I"
CAPPET
----------------
: - - - -
8111. 4!
BED #2
CARPET
14"MAX SILL HEIGHT
4 5 0 5LII
O.Y.
- - - - - - - - - - - - - - - - - - - - - - --
I CLEA
- - -
Mal
29"
VIl"
6
6.
w
91
WSEC CREDIT OPTION #4 (1 dlit) & B. (1.5 -dit)
ELECT. TANKLE55 HOTWATER
HEATER
, (W�MIN EFF OF.95)
WATER SUPPLY FOR HYDFONIC HEATERS
BY DEACON/MORK 5ANP MIXING VALVE
FOR HOTIVATER SUPPLY TO EACH UNIT
(n
BED #2
CAPPET
W5EC CREDIT 5. IS di�)
GKOHE 2611700 FAIROORN
SHOWER HEAD 1.75 GPM
T T
RITON BOWE BY KOHLER (FAUCET)
t,VK-5O0T7O,4AKL-CP
_S LO GPM
W.I.C.
APPET
BED #3
71- CAPPET
REMOVABLE VANITY
NO CAB. UNDER SINK
ALLOWING FOR A
FORWARD APPROACH
L__j
MBED
to w 15)
CARPET a)
4!
44" MAX SILL HEIGHT
11.6, 14� 1
KAD VAR HT 38" MAX
A50VE FLOOR
c_
VEKTICLA GRAD 13AR
10" MIN. IN LENGTH
48"MAX ABOVE FLOOR
MF w
52
ME
E
D
HATCHED AREAS
50 LOCATIONS
FOR PEINFORCMENT5
FOR GRAD BARG (TYl')
GRAB DAR HT 35" MIN-46"MAX
A13OVE FLOOR
VERnCLA GRAS BAR
76"MIN. IN LENGTH
39'-41" MAX ABOVE FLOOR
WSECCREDIT5a(bmMU)
GROHE 2611700 FAIPE50PN
SHOWER HEAD 1.75 GPM
TRITON BOWE BY KOHLER (FAUCET)
K-80OT70-4AKL-CP 1.0 GPM
M 2X6 0 16- D.C. STOP WALL Wl R-21 INSUL;
(2)2X41 0 16' O.C.. I" AIR SPACE
1 HIZ METAL STUD WALL (AFTER ELEV. INSTALL)
ZX4 0 IG'O.C.
M 0 16" D.C. PtUMDING WALL
WOODCOLUMN
CIA rROADE OUTSIDE AIR FOP FURN. & WATER HEATER
(RELIEF MUSTVENT TO OUT51DE (NOT GARAGE)
2Z)ZO" ArnC ACCESS (30" MIN. VERT. CLEARANCE
WEATHER
CTKIP&INOUL. MP-49
"NOEX11"SIGN
l2GV5MKVETWIDATT5ACKUP(INTEFCONNEcrED)
FIRE DETECTOR INTERCONNECTED
EMERGENCY LIGHTING WIDATT BACKUP
INDICATES ILLUMINATE[) EXIT SIGNS W/ BATT 15ACKUP
CONTOKL JOINTS
BAR.El FREE DIIECTIORAL C-AGE LOCATION
FUTURE GRAB BARE: PROVIDE 13LOCKING
V7/-2 HORIZZONTAL CENTEKLINE P05TTON 35"FROM
FLOOR PEP ]CC/AN51609.4
El CAK13ON MONOXIDE DETECTOR
PER IPC 515
ALL UNITS ARE TO BE TYPE "13P'UNIT16
PEP ICC-AN51 A117-1 SECTION 1004.
INSTALL SOLID 2X 13LOCKING FOP
FURTLIKE GRAS SAPS IN ALL 15ATHPOOM5
CLEAR FLOORS AREAS ARE INDICATED
IN THE TYPE "B" BATHROOMS AND KITCHEN
CERTIFICATE WILL 13E POSTED IN FURNACE (OF
OTHER APPROVED AREA) WITH THE FOLLOWING
INFORMATION: P-VLAUNE5, U-VALUE5,PESULTS
FROM DUCT SYSTEM TEST AIR LEAKAGE TESTING,
RESULTS FROM 13UIDLING ENCELOPE AIR LEAKAGE TESTING,
TYPES AND EFFICIENCIES OF HEAnNG, COOLING, AND
SERVICE WATER HEATING EQUIPMENT PEP F401.3
DUCT'S ARE REQUIRED TO BE INSULATED TO A
MINIMUM OF P-8 PEP R4,05.5.1
THE DWELLING IS REQUIRE[) TO 13E TESTED &VERIFIED AS
HAVING AN AIR LEAKAGE PATE NOT EXCEEDING 3 AIR
CHANGES PEP HOUK PEP K4024.1
MECHANICAL PUCT5 AKE REQUIRED TO BE 5EAL TESTED
IN ACCORDANCE WITH 403.5.2 TESTING TO COMPLY WITH W5U
F5-33.
EXTERIOR HEADEK5 APE REQUIRED TO 15E INSULATED WITH
A MIN. OF F-10 INSULATION.
COPNER5 OF STUD WALLS APE REQUIRED TO 15E FULLY
INSULATED.
ALLOWABLE OPENING ANALYSIS
PER TABLE 705.5
7-10'= 10% ALLOWABLE AREA
302 (EAST WALL): 544.50 CO. FT X.10
54-45 SQ.Fl� UNPROTECTED WINDOW OPENING ALLOWED.
ACTUAL UNPROTECTED WINDOW OPENING= 53.75 50, FT.
FIFE SEPARATION P15TANCE: 5 TO LE55 THAN 10
DEGREE OF OPENING PROTECTION: UNPROTECTED,
NON OPKINKLEPED 10%
ELEVATOR EQUIPMENT ROOM
-135' HEAT DETECTOR 0 SPRINKLER HEAFS -PROVIDE
RESH AIR THROUGH 4!'DUCT -EX&U5T FAN TO
MAINTAIN A MAX. TEMP. OF 90' &VENT TO OUTSIDE
AS Mal? BY MFG SPECS
ELEVATOR NOTES
:UNHEATED 5PACE-CONTINOIJ5 KIM 0 FLOORS.
INSTALLATION OF ADDITIONAL ELEVATOR DOORS SHALL
NOT VIOLATE LISTINGS OF ELEVAIOR (TYP)
MECHANICAL CHASES
-CONTINUOUS RIM 0 FLOOR.
SIPRINKLER ROOM
-FIRE ALARM CONMOL PANEL IN SPRINKLER KOOM W1
CENTRAL STATION SEIZIACE MONITORING
-ANNUNCIATOR IN LOBBY
STAIR NOTES
-MAINTAIN PEaV I HR STAIRS ENCLOUSURE5 & MIN 6-8.
HEADROOM 0 STAIRS -ELECTRIC HEAT 40 MINJEMPI WATT
PEP SO. FT. UNHEATED SPACE -STAIR BACKING FOP HAND
RAIL -CONTINUOUS RIM 0 FLOOR. -13ASEMENT 5TAIK.
RISE = 6.81" RUN = 11" ALL OTHER STAIRS: RISE = 6.72"
FIREPLACE NOTES
IC CLEARANCE FIREPLACE Wl DIRECT
VENT
FACTOKYOUILT FIREPI-CE SHALL BE INSTALLED PEP,
MANUFACTUREW5 SPECS AND SHALL HAVE
APPROAL LABEL ATTACHED
51FTYPE ")('CM TO ROOF 5HEATING
FIREPLACES & STOVES MUST DE D.O.E
CERTIFIED & LA15ELED AD SUITABLE
FOR USE DURING A FIRST STAGE DURN
DAN.
PROVIDE ONE OPENADUE ESCAPE WINDOW IN 15ASEMENT
& IN EACH SLEEPING ROOM MEETING ALL THE
FOLLOWING REQUIREMENTS:
1. AN orENABLE AREA OF NOT LESS THEN 5.7 SaFT
2. A MIN. CLEAR HEIGHT OF 2#'
3. A MIN. CLEAR WIDTH OF 29-
4. FINISHED SILL HEIGHT OF NOT MORE THAN 4#'ABOVE
THE FIN15H FLOOR
5. ALL WINDOWS TO INCLUDE FRESH AIR VENT6 OR METERED
FRESH AIR SUPPLY 0 FURNACE
GALL WINDOWS & DOOM HAVING ACCESS TO EXTERIOR OR
UNHEATED TO BE SEALED PEP, SEC. 402.4.1.1(WAC)
PECE55ED LIGHTING TO BE IC RATED
ALL TYPE "W DECK SURFACES TO BE NO MORE THANV'
BELOW INTERIOR FLOCK LEVEL
-ALL TYPE "B"FRONT 1) ORS TO 13E 2`10"MIN. & ALL DOOR
THRESHOLDS CANNOT EXCEED 112" PER 404
:ALL DWELLINGS MUST BE TYPE 13, OFT. 5
ALL REQUIRED DOOR HARDWARE TO MEET DC CHAPTEK 11
& EXITING PER 1010.1.9.1
IMC
TYPE 15 OR L VENT CONNECTOM REaO ON FLIEL-BURNING,
APPLIANCE IN UNHEATED SPACES
HYDRONIC HEATING SYSTEM
APPROVAL BYTHEINATER15LIRMYOR DOES NO`r
RELIEVE THE CUSTOMER OF THE RE5?ONSISLITYTO
COMPLY Wl THE REQUIREMENTS OF OTHER AGENCIES
HAVING JURISDICTION. APPROVAL OF TH15 PLAN DOES
NOT VEST THE BUILDING OR PLUMBING SINCE FUTURE
CHANGES IN THE CUSTOMERS WATER USE MAY
INCREASE THE ASSESSMENT RISK & THE SURVEYORS
PROTECTION REQUIREMENTS.
IMC. CHAPTER 12
BUILDING INSPECTORS MUST OBSERVE A HYDROSTATIC TEST
ON THE HOT WATER SUPPLY LINES & THE PANEL SYSTEM.
-TEST. 100 PBI WATER PRESSURE OR 1-1/2 TIMES THE
OPERATING PRESSURE, WHICHEVER 15 GREATER. MIN 30
MINUTES TEST.
-PIPING EMBEDDED IN CONCRETE MUST DE PRE55UFZE
TESTED PIZIOK TO POURING OF CONCRETE AND 15E MAINTAINED
DURING PLACEMENT.
- GARAGE HEADROOM TO BE MIN. OF T-O"CUFARANCE
FROM ALL PIPES, SPRINKLER HEADS, DUCTS, BEAMS, &
11,15ULAMON, ETC, I
-MIN. HEADROOM CLEARANCE OF 7-6'16 RECrD IN ALL
HADITAL SPACES, & 7_a, 15 REGID ELSEWHERE
-LOCATION OF EMEWE14CY LIGHTING SHALL BE APPROVED
BY FIRE MARSHAL
-REQD WHEEL STOP 0 ALL PARKING STALLS
-EXHAUST OUTLETS TO 13E A MIN. OF V-01' FROM BUILDING
OPENINGS & 101-o" FROM SUPPLY AIR INLETS OYF).
-DOUBLE CHECK VALVE INSPECTION REaV DY CITY CP055
CONNECTION CONTROL 5PECIAL15T PRIOR TO HYDRO 51AT[C
TEST OF FIRE SPRINKLER SYSTEM.
- ACCE55 TO DOUBLE CHECK VALVE MUST BE WITHIN 9
ABOVE FINISHED FLOOR OR A 30"00" MIN PLATFORM
MUST 15E INSTALLED FOR ACCESS
-WALLS SEPARATING DWELLING UNITS FROM COMMON
AREAS (STAIR ENCLOSURES, ELEVATOR SHAFT; ETC) MUST
HAVE AN STC OF 60 OR MORE
-SMOKE & CRAFT - ASSEMBLIES IN LODBY. 1-HR AREAS &
ELEVATORS/ ENTRY LOCATIONS SHALL HAVE A FIRE
PROTECTION RATING OF NOT LESS THAN E50 MIN. & BEAK AN
AF'F'Fj)WP LABEL IDENTIFING THE RATING OF THE
A55EMDLY FOLLOWED BY THE LETTER "0". COOKS SHALL
13E MAINTAINED 5ELF-CLOSING OR BE AUTOMATIC CL05ING
By ACnVAnON OF A SMOKE DMCTOR
ADPITIONAL FLUM15ING REQUIREMENTS:
:MAIN 13UILVING SHUT-OFF RECrD ON WATER SUPPLY LINE.
PRESSURE REDUCTION YALYE ON MAIN WATER SUPPLY LINE
IZEaP 15Y CITY COPE
-EXPANSION TANK KEaD ON EACH HOT WATER TANK.
-VENT HOT WATEK TANK RELIEF VALVE DIRECTLY TO THE
OUTSIDE
-HCrr WATER HEATER MUST BE 5EISMICALLY ANCHORED
0 ' 5TRAFFED 0 POINTS WITHIN THE UPPER 1/3 & LOWER 113
P
OF ITS VERTICAL DIMENSION. 0 THE LOWER POINT. A MIN.
P15TANCE OF #'MUST 15E MAINTAINED ABOVE THE
CONTROLS W/ THE 5TKAPFING
-PROVIDE INDIVIDUAL 5HUTOFF6 FOR EACH UNIT
-I" AIPGAP RE90 ON 019HWAH5HEr
-ALL SHOWERS HEADS TO BE EQUIPPED MTH FLOW CONTROL
DEVICE TO LIMIT FLOW TO 1.75 GPM
-AIR SWITCH FOR DISPOSAL IN SINK
-ALL HOIWATE PI
K PESMU5TDEIN5UL
INSULATION PER 2015 MEC SEC 403.5.3
SCALE: 1/4�! = l'-O"
301: (LIV) 1587.85 SQ. FF., (DECK) 112.00 SQ. FT. = 1,598.85 SQ. FF.
302: (LJV) 1858.18 SQ. FT., (DECK) 91.00 SQ. Ff. = 1,949.18 SQ. Fr.
COMMON AREA: 186.72 SQ. Fr.
TOTAL = 3,734.75 SQ. FF. RESUB
Sep 28 2020
CFE-S
I
till
2
t_j c)
C-4
C)
00
U
90
u
U)
0
r4
REVISIONS:
1.14.19
6.24.19
10.30.19
6.16.20
9.23.20
PRINTED:
9.23.20
/7% /FN /TN
��j w w mw
2X PLATE
TY? FLOOR CONST,
CARPET & 1/2" IZEDONP PAD
16d 0 61 O.C..
31W'T&C, 5U5FI OOR
P-30 INSULATION
ad a V O.C..
TJI PER FRAMING PLAN
LSL RIM JOIST
101
518"G.W.15.
(2) KOW5 TOE NAILS
lad 0 61 O.C.
2X JOIST
(2) 2X TOP PLATE
1/Z'0515
NAILING REP . EP TO
F-21 INSULATION
SHEAR WALL SCHED.
MT,YP NON -SW @ EXT. WALL
\1�11 =I -u
TYPICAL ROOF CONSTRUCTION
COMP051TION ROOFING IN ACCORDANCE
WITH 113C TABLE 1505.1,15 L5 FELT
7/16'0515 ROOF DIAPHRAGM, U.N.C. —
2X ENGINEERED TKU55
ad a 61 D.C.
2X SOLID '
OLKO.W/Vt<
HOLES AS PEQ���
7/16'0515 - FOP NAILING
REFEP TO SHEAR
&ALL OCHED.
BLOW ATTIC IN5ULATIOI,
R - 49 FLAME SPREAD
NOT TO EXCEED 25 AND
SMOKE DENSITY NOT TO
EXCEED 450 IN ATTIC
USE APPROVED
iNSULATION 15AFFLE
W1 V MIN. AIKSMACE
ABOVE INOULATON
H-I OR EQUAL 0
EACH TIZU55 PEP
'SHEARWALL SCHP.
5/8" GW15,(2-LAYEP
5/8" GM IF 1-HOUR
ri
ALL STAIRWALLS BLOCKED
VERT. & HORIZ. III) IO'O.C. �EXTENP
HANDRAIL
6' PRIVATE
AOTE: HANDRAIL MUST-
TE U 'T'
�T
: IZ PU13LIC TOP
BE 34�'TO 36' MAX. 6
5 M
2':
1 PUBLIC 130TTOM
FE515T 200# LOAD
R I
AND RETURN OR CONT.
FEK 115C 16607.1.1 z
/ .; _ . ,_
I IIW'- 001A� CONT �D
(2) - 2X HEADER W1
W1 I I/Z'CLR. F ALL
LEDGER OR JST. HGR5.
"
4 THRUST 15LOCK
TH - p
FOP CARRIAGE SUPPORT
"\
) _ 26 '
:2 (3) - 2XI2 STRINGERS
(3
HU52124
EA. SIDE & O.0
di
.
TREA1
b 2� 1/4!'-2" DIA.
IR NOSING TO 13E
z
z
OUNDED & SLIP RESTA114T
I
<
'S."
5/8"TYPE 1)? GYP. 131).
0 AREAS ACCE55113LE
UNDER 5TAfPS
2X4 FIPEDLOCr 0 MlOrt
OF EA. STAR PUN
STRINGER 0 WALL
STAIR SECTION
w
SCALE: 3/4"= 1' - (r
TYPICAL ROOF CONSTRUCTION
15LOW ATTIC
INSULATION
K - 49 FLAME
POSITION ROOFING IN ACCORDANCE
n0 N 00
:
SPREAD NOT TO
115C TA15LE 1505.1,15 L13 FELT
BL
EXCEED 25 AND
�'0513 ROOF DIAPHRAGM, U.N.O.
' W
SMOKE DENSITY
ENGINEERED TRUSS
NOT TO EXCEED
6, O.0
0 )C
450 IN AMC
USE APPROVED
SOLID
INSULATION 13AFFLE
0 T
W1 I" MIN. AIRSPACE
E�IAS FEC.
A13OVE INSULATION
5/8"GIN15, (2-LAYEK
5/&'GWD If 1-HOUP
com
WITH
7/1
2X
811
2x
BL
HOL
A-,'
5H
SCHEDULE
7116" 0515 - FOR NAILING
REFER TO CHEAP
5/8'. Gm WALL SCHEP.
(2) 2X05 TOP Pt I
5/6, OW15
(2) 2xr, Tor rL
�M TRUSS @ EXT. WALL TYR Q TRUSS @ EXT. SW
\11ir SCALE: 3/4" = Y- V' _ w SCALE: 3/4" = Y- 0"
LAI,
& 161 a,
A 5
ACCE55IDLE
FAKING 5IGN
ACCES515LE
MAKING 5TALL
WAC 1107
1701 111ILT-11 1001 6y5T1115
.��A
jkA;I.,
T
=AT_
"A
FLA5HING DETAIL FO MODIFIED
PIN
T
�A
T FLASHING DETAIL FOR E.P.D.M. OR
'y S LI N r L E.
_,. 0�� __
FAST U—y No M= 019MM9=
,0,,W,,MV0_VM,,V— III NWA 5
/-u\ 2" ROOF DRAINS
JW 1VhK1UUUbQ.kl.XUUFAEtA
SCALE: N.S.
A
Z< PLAI--
lad 0 01 O.C. TJ( PER FRAMING PLAN
5/6, G.W.D.
(2) 2X TOP PLATE
4-L
t*-PN'INT. NON -BEARING WALL
J015T 5FACE FOP FIRE
WALLr WM _
BOTTOM PLATE
,1-3/4"MI-7/&'
TIMBEK5TKANP
RIM(comnNUOU5
MOCKING TO
MAINTAIN
CONKNuny)
DOUBLE Tor
PLATE
50- TYPE 'r
GMA W1 MIN. FIKE
TAPE (I LAYEK 0
ClAIR & 2 LAYEF5
0 ELEVATOK)
IN FLOOr
DOTTOM PLATE
nMl3Er5TRANP
RIM(CONnNUOU5
13LOCrING TO
MAINTAIN
CONTINUITY
DOUBLETOP
PLATE
I HK WALL
I LAKER 5/&'
TKPE'r GRA
W1 MIN. FIKE TAPE
I H CEILING
STANDARD 'OFFSET
/-vVIRE BARRIER BLOCKING
NO1E! FULL WIDTH BLOCKING NOSCALE
15 REaD AT ALL SHAFT &
STAR ENCLOSURE WALL5
FLOOR
STRucnON
INKLER PIPE III VOID
VE INSULATION
)LATION PEP 15C
PANT 5FIZINKEP
(PRY)
SPRINKLER
t-Q-N@ GARAGE CEILING
w =LE
�AP 15Y
9 coNn
NALL
NG
/w-\ SHAFT TERMINATION
SCALE: 3/4- = 7=
E
THROUGH PENETPAnON5 & MEMBPAN ��)
PENTRATIONS SHALL 13E PROTECTED IN
ACCORDANCE W1 113C 714.1
Fe.Ad.Fl,
fb, pIpm z
U-)
U
.-I
DEFEPPEDC,U15MITTAL
,�21RE STOP @ PIPE PENIT.
SPRINKLER
1/2!'OW5 DRAFT STOP
0 PARTY WALL
LOCATE TRU55 OVER PARTY
WALL. TRUSS TO 5EPE5IGN
FOP ADDITONAL LOAD OF 110
GWI5 AND TO HAVE 2X4 15ACKING
0 249 O.C.
518" GWD TYPEX
51&'GWI3 TYPE "X'
RE51LIENT CHAN14EL
OVER Z<4 STUDS 0
loll D.C.
Pli INsaknoN
PARTY WALL
FIFE5TOPS PEO a la
INTEKvAI,5 ALONG
STA0,0EFED PAM WALLS
TRUSS @
/x-\DRAFT STOP
5ULATION PER 16C
rNTING MATERIAL
)OF FRAMING
ro SPRINKLER HEAP
TENTING
C14
g
00
zz
U)
Lr)
.4
.24.19
0.30.19
RESUB
NOV 12 2019
GPICKETFPAMING
VENT AS PEa
50LUDaTAFT`ElI LASS'U'ROOF
11, IN 1Z'MIM FOR OVE 1/Zl MY
CKIMT DRAINAGE
Del 0 61, O.C.
— _\ I l_'. ___ _1�1 ONE HOUR EXtEPIOP WALL
FLOOR -CEILING SYSTEMS, WOOD FRAMED
rGA F—ILIE # VVP 5510')1 R-49 INI GA FILE NO WIF 8105-F]PE TEST WP 5510
GAFILENO.FC6011 PROPRIETARY' I F'OUR 1111 STC
STC55-59 RE ll..UNR T
D 14OUSI MOD STFLUITURUIU. PANELS Gypsum
HOUR F.R. FIX—ORTOPPI 4 RESUENTCROUNNELS, GLASS FIBER UNIT 2X6 FRAMING
OR LOWE FILL INSULATION, GYPSUM IMULLBOARD o.c.
ROOF -CEILING SYSTEMS 1 LAYER OF K-21 INSULATION
lyp d,WWl[ 1W o.c. G I- W. I- I I IWIY on I HOUR
'd GA FILE NO. IRC 2602 GENERIC 5/5" TYPE `X'GYPSUM
-1 8' -ell—I Pill, Of FIRE
1,,g 4,Oushl 3' b�,,dft,,d,ofehdPI,t. RaliohtftnntlsaRplIad8tfl9hl""gI WOOD TRUSSES, GYPSUM WA 2X4 50LID L NG WALL130APD
1w -P �ph III wh "I' T_ B MWI Emi X Mium mill— 6PIPI,A1 W Nht tlW t.MRh, N' 13EVEL TOP 5 0 N 112NOSB PER 5W SCHEDULE
App.. Wing With 1 111 T W., IS d—N.— .c. III S.' 1. B CONTINUE OWD ENTIRE
I —I st 1,h, WnB. th 11I NITI —I.1, Iql T� E vW'I" 3 P.f WsUftMhJmgy;,aurn,Nthaorb mappli�,tdght��gil�b�111,W�l�Ty�W
GYPSUM WALLBOARD, WOOD STUDS R.T.Wh: LI.R1319,05INKINSE). ,Sd,WIlI12' oc LENGTH OF TRU55
.Wnt . Q E., Nn — 1. ;UI
BASE LAYER ll#'OYF5UM WALLBOARD GINNomEtI
APPLIED PARALLEL TO EACH SIDE OF Mubfi.r.ppl. IS dgh-B., b I.. WE, III WUhWl,.Wd nq ih.k ULDWilignt.570 to—EI With W nalli, Apph,pems R,hfWlrO 2 LAYERS 5/6"
,,II Thhl: _`)T�%Qul
UbLE RON OF 2X4 WOOD STUDS 16" O-C- ST. TWO .1. 11— p- EWW lI J -IN— II _o GWD TYPE'X'
SHANK, 1/#' .P_YBMPWL.�.rtRPPIhq-.—r'lePh,F nlMq It d RALLoTIG-DE.— H
ANDI I/Z'AFARTW/4d COATED NAIL51 110'LONG,0.099' 2=2
HEADS. 12" O.C. FACE LAYER 1/2"TYPE X GYPSUM WALLBOARD, Wit.n.— lrI .91— — W-1. 1-ppl.d . I., ETC 66 —1 RALOTO 4-ZI 51MPSON A34 012" O.C..
WiU.M'j'u"I (S2.,IW (2 PEP JOIST SPACES) EXTERIOR SURFACE Wl 3/4!'DROP SIDING OVER 1/2"
VENEER BASE OF VINYL FACED GYPSUM BOARD LAMINATED I-r.)RAILOTOM.
TO BASE LAYER IPAPALLEL TO 5TUD5 W1 318" RIBBONS OF ADHE51VE 161" PROPRIETARY GYPSUM COMPONENTS 41�: A,prRA.CWlIhg W1 (5) 8� X 1 IIIV' NAILS GYPSUM SHEATHING ON Z'X*'WOOP STUDS AT
O.C. & 5d COATED NAILS 13/4!' LONG, O.O99'5HANK, I/W� HEADS, 16" O.C. UMShWG,,M,,Nily VISIAE—IS.—FIRECODE&C (64-1 5Pd EACH LEG 16"ON CENTER, INTERIOR SURFACE TFEATMENT AS
c.. G,phRrh I... MOM-10,VM3 I'l—k FM PC 172.272: REQUIRED FOP 1-HOUP-RATED SITEPIOF OR INTERIOR
TO TOP & BOTTOM PLATES. 4d FINISH NAILS 11/2" LONG, 0.07Z'SHANr, UEVEUROChRIB,,dFlUrdWl.yhWrt ITS, &B-98 ZX4�'WOOD 5TUD PARTITIONS. GYPSUM SHEATHING
0.1055" HEADS, 0 45 DECREES ANGLE 16" O.C. HORIZONTALLY. 24'O.C. NAILED NTH 1-3/4�' BY Noil GUAGE DY 7116" HEAD
VERTICALLY SOUND TESTED W/ 1112" MINERAL FIBER IN 5TUI? SPACE. GALVANIZED NAILS AT 5" O.C. SIDING NAILED WITH 7d
STAGGER BASE LAYER JOINTS 10" O.C. & FACE JOINTS 21V'O.C. EACH GALVANIZED SMOOTH 13OX NAILS.
LAYER & SIDES. (LOAD-DEARING) I TRUSS @
1 HR PARTY WALL rt--� 1 HOUR FLOOR & CEILING 1 HOUR ROOF-CEILNG DRAFT STOP (PERR) 1 HOUR EXT. WALL
w ONE HOUR INTERIOR WALL
TEST UL DES 327
D PLATE
LATION
PEPPLAN
ILATIO14
)PENING
INSULATED HEADER
Nw NO SCAIX
ALUMINUM PPE-MANUF. FAIL
MUST FE515T 200# LOAD
AND 601 LOAD
TEMPERED GLA55 PANEL
r//Z�5-1/2" X PLATE Wl (2) 11Z'
PIA. BOLTS INTO 15EAM
MUST PE61ST 50# PEP Sa FT. LOAD
WOOD BEAM PER PLAN
3/4)'EXr. FLY. SLOPE 1/4�71`00'r TO
OUTSIDE W1 ELA5TOMEPIC COAT
2X SLEEPERS POP 5LorE
SIMPSON C52200" STRAP 0 ALT J015T
J015T FIN156 W1 SOFFIT DOAPP, PVA 5EAL, &
r iu
-I
SEE 1 HOUR FLOOR/CEILING SYSTEMS
DETAIL FOR DECK CONSTRUCTION
RAILING @BEAM TST PERP
SCALE: 1/2" = l'-O"
2X65TUDWALL
WELDED
ANCHOR BOLTS
WIPE MESH
PEP SHEAR WALL
SCHEDULE
. . . . . . . . .1
(1) #4 CONT.
#4 0 0O.C.
ON MI
POLY
01
4!' G L
BASE
W/
6xox#IO W.W.M.
MIN
*'FOO'nNG DRAIN
(2) #4 CONT,
FOOTING
@ EXT. G-DOOR
SCALE: 31V=1'-O"
2X6 FRAMING (GA FILE # WP 3605
0 16" O.C. I STIC 30-34
R21 INSULATION IN HOUR F.R.
E)CrEPIOP WALL i
5/8"TYPE "X'GYPOUM
WALLE50APD
WOOD COLUMN WITH GYPSUM WRAP
GYPSUM WALLBOARD, WOOD STUDS
ONE LAYER 5/6' TYPE X PLAIN OF
PKEPECOPATEP GYPSUM WALLBOARD,
WATER RESISTANT 15ACKEK 13OAKP 09
VENEER BASE APPLIED PARALLEL WITH OR AT RIGHT
ANGLES TO EACH 51DE OF A 2X4 WOOD STUDS 16" o.c.
Wl Bel COATED NAIL5.1-718" LONG, 0.0111*
HEADS, 7'o.c. JOINTS OF SQUARE EDGE. 15EVEL EDGE
OF PPEPECOFATED WALLE30APP MAY 15E LEFT EXPOSED.
STAGGER JOINTS EACH SIDE.
(LOAD-DEARING)
WOOD COLUMN EXCEEDS WF 3605 PER ASTM E119
1 HR WALLCOLUMN
ALUMINUM PPE-MANUF RAIL
MUST KE515T 200# LOAD
AND 50#/L.F. LOAD
TEMPEPEP GLASS PANEL
3-1/2" X &I1Z'X 3116� PLATE W1 (2) 10
DIA. BOLTS INTO 13EAM ,
MUST RESIST 50# PEP 50, FT. LOAD
WOOD BEAM PEP PLAN
5/4!'EXT. FLY. SLOPE I/*7FOOT TO
A OUT51DE W1 ELA5TOMEFIC COAT
2X 9LEEPEP5 FOR SLOPE
PROVIDE 2X 15LOCKING 2 DAYS
11�111_5[MP'5011 C52200" 5TFAP 0 ALT JOIST
W/ SOFFIT DOAPP, PvA SEAL, &
SEE 1 HOUR FLOOR/CEILING SYSTEMS
DETAIL FOR DECK CONSTRUCTION
RAILING @ BEAM JST PARA
SCALE: 1/2" = Y-0"
2X6 FRAMING
016"o.c. 'GA ZFILE# WP �3605
TIC 30-34
�Sl HOUR F.R.
FJ0513 WALL SHEATHING
PER 5W SCHEDULE
518" TYPE 'X'GYP5UM
WALL130APP
SUM WALLBOARD, WOOD STUDS
NE LAYER 5/8"TYPE X PLAIN OR
O GYPSUM WALLBOARD, WATER PE515TANT
15ACKER BOARD OR VENEER BASE APPLIED PARALLEL WITH
Or AT RIGHT ANGLES TO EACH 51PE OF A 2X4 WOOD STUDS
16"o.c. W1 Od COATED NAIL5.1-7/6'LONG, 0.0915" SHANK, 114,
HEADS, 7'o.c. JOINTS OF SQUARE EDGE, 13EVEL EDGE OF
FFEPECOFATEO WALLBOARD MAY BE LEFT EXPOSED. STAGGER
JOINTS EACH SIDE. (LOAP-13EAFING)
R2/U, S2/U
1H FIRE SEPARATION
NO SCALE
EXTERIOR 9HEATING
1/2" GYPSUM L30APP
(2) LAYERS 2" RIDGIP INSULATION
INSULATED EXTEPIOK WALL
INSULATED CORNER STUD
NO SCALE
IP2" OYP 13D. OVER
6113"SHEETFOCK.
2X6 STU D5 0 IS" O.C,
2.x 6TUO5 0161, O.C.
R-21 IN51.UATIO"
DEAPINGWALL
112'0513 5HI PEP
SW5CHEDULE
(2)#4HORZ,CONT. BAR
12X6 PT SILL FIL Wi A.B.
FEF. GEN. NOTES, U.O."
2X PT. BILL PL,
Wl IIZ'X 10.5"A.B. 0
4I-Ol' D.C. U.N.O. -
#4 V E RT BAR 6 32" 0
5 ILICONE CAULK BEAL
REFER TO SHEAF
5CHED.
EXTEPIORSLAD
THERMALBREAK
4"CONG. ELA
)N
OXOA OXI 0 W., �11.1% N
cl MIL V.13. ON
.............. .............
4j'GRA EL FILL
(2) #5 OAKS, CON]
M
..........
X.:
. X-.-.::*l*.:
GONC_ SLAB OVER
MIL POLY
GRANULAR FILL
'j
4P
P-10 INSULATION (24P)
BEAR ON FIFM
FER FLAN
�LAB
UNDISTURBED 501L
ry-� INSUL. SLAB FI. ru-� THICKEND SLAB
V7 SCALE: 3/4"Wil'
2X6 FRAMING
016"o.c.
/2" GLASS F115EP MIN.
515" TYPE "X" GYPSUM
WALLBOARD
PE51LIENT CHANNEL
FIFE SIDE
GYPSUM WALLBOARD. CLASS FIBER, WOOD STUDS
ONE LAYER 518" TYPE X GYPSUM WALLBOARD OR
VENEER 13ASE APPLIED AT FIGHT ANGLE TO RESILIENT
CHANNELS 8"o.c. W1 V TYPE 5 DRYWALL 5GPEW5.
END JOINTS 15ACK15LOCKEP WITH FESIL. CHANNELS.
RESILIENT CHANNELS ATTACHED AT RIGHT ANGLES TO 2X4 WOOD STUDS
16" o.c. WITH Wl 1-1/,V'TYPE 5 DRYWALL SCREWS.
ON OPP091TE 51PE:
ONE LAYER 5/8"TYPE X GYPSUM WALL50AP0 OR GYPSUM VENEER BASE
APPLIED AT FIGHT ANGLES TO 5TUD5 W1 6d COATED NAII-5.1-7/8"LONG,
0.0915" SHANK, 15A6 HEADS 7'o.G.
STAGGER END JCINT5 24"ox. EACH SIDE BOUND TESTED W1 3-1/2'
GLA55 FIBER INSULATION. (LOAD-DEARING)
R2/R2, R2/U, R2/S2
�LlH FIRE SEPARATION
mv SCALE: N.S.
GYP-CRETE BOUND
13APPIOP
TONGUE & GROOVE
O.S.D.
TFU55 JOIST
5/5" IYP "I
....... ..... ....... ...
..........
LINER CONTINUOUS
RESILIENT CHANNEL
5/6'GYP5UM DRYWALL
LNED J015T 13AYS FOP DUCTS, FANS, LIGHTS,
ETC.
DETAIL
rp�LOOR
(11) SIDING PER PLAN
(10) 15# FELT
.
.
................
.. .........................
;
- (9) HEAD FLASHING Z METAL 0
................
EXPOSE[) WINDOW
....................
...........
(4) 49 MIN MI 5ELF-HEAL
..........
PAPER OF, EQUAL
SHEATHING
(2) WINDOW FRAME
(3) MOISTOP STICKY SELF -HEAL OR
HEAP
EQUAL 15UTTED TO WINDOW AND
6' MIN OVER WINDOW FACTNI
(7) 15# FELT
JAM13
(6) TRIM
(11) 51PING PER PLAN
(15) CAULK
WINDOW NA[L
TOP EDGE LONEK FELT
FLANGE
Z SILL
fl?�?!LE.L! FAFEF, WRAP
WINDOW BEFORE
LW, 1.-. L L AT I...
(5) 50# FELT
OVER FI INI 131
UNDER JAMB FELT
(1l'SIDING FER PLAN
TYR EXPLODED
L�WINDOW FLASHING
W NUMBEF5 INDICATE ORDER OF APPLICATION
PER PLANS
� CEILING PER PLANS
IV, DUCT
2 X FRAME
I LAYER GYPSUM WALL130APP
TYPE'T'FIFE TAPED MIN.
1H DUCT
SOFFIT PROTECTION
rw
ADHERED VENEER SHALL BE ELDORADO STONE OR EQUAL.
EXTERIOR WALL 5UPFACE5 SHALL 13E COVERED W1 A MIN. OF
ONE LAYER OF A WATEP-PE515TIVE BARRIER COMPI.YING W1
THE REQUIREMENTS OF THE APPLICA13LE CODE. GALVANIZED
EXPANDED DIAMOND MESH METAL LATH COMP[.YING Wl
ASTM C547. Wl A MIN. WEIGHT OF 2.5 L13ND2 (1.4 KG/MI SHALL
15E ATTACHED TO STUDS SPACED lro" ON CENTER W1 GALCANIZED
ROOFING NAILS. THE NAILS SHALL 13E SPACED 6" ON CENTER
VERTICALLY & SHALL HAVE SUFFICIENT LENGTH TO PENETRATE
INTO THE STUDS A MN OF 1". A MIN 1/2" THICK SCRATCH COAT OF
TYPE 5 OR TYPE N PORTLAND CEMENT MORTAR COMPLYING W!
A5TMI C270 SHALL BE APPLIED TO THE METAL LATH AND SHALL
GUPE FOR A MIN. OF 4,5 HOUF5. THE STIONE55HALL 15E ADHEFED
TO THE CUFED SCRATCH COAT W1 A NOMINAL 12' THICK BEP OF
TYPE 5 OR TYPE N MORTAR. JOINTS BETWEEN THE STONES SHALL
13E GROUTED.
SHEAF STRENGTH 50 P51 MIN.
���DHERED VENEER SPECS
4Xr. CEDAR
4M. CEDAR
4X6 CEDAR
4X6 CEPA
4 X6 P
�EDA
F
1,0 1,
z
2
II ROOF ANGLE BRACE
Mw
C)
FLO OR IN
Z c)
2X BLOCKING 00
ADJACENT
ROOMS 1 HOUR FLOOP-CEILING
A55EM13LY(TYP) 0
2X n15LXKIN'GO' 61
CORRIPOP WOOD <�
ADJACENT 05 P� Z
ROOMS U
ADJACENT
/' (D
ROOMS
IRE-PE515TIVE ?ROTCnON
1H FIRE PARTITION
CONSTRUCTION
NOSCALE
IWO HOUR INTERIOR WALL
LL DES U301
2X6 FRAMING SIC 52
0 16' O.G.
/2" GLA55 F15EP MIN.
5IGYf-,UM
U
E_
0
;1�
RESUB
Sep 28 2020
" I. ..... "
DEVELOPMENTEER—S
DEPARTMENT
REVISIONS:
6.24.19
HIENEE,
10.30.19
SUM WALLBOARD, GLASS FIBER, WOOD STUDS
3.4.20
TWO LAYER 516" TYPE X GYPSUM WALLBOARD OR
9.23.20
13ASE APPLIED AT RIGHT ANGLE TO RESILIENT
CHANNELS 8'o.G. W/ 1" TYPE 5 DRYWALL 5GPEW5.
END JOINTS DACK15LOCKED WITH PE51L. CHANNELS.
RE51LIENT CHANNELS ATTACHED AT RIGHT ANGLES TO 2X4WOOD STUDS
16'oz. WITH W1 I-IIW'TYPE 6 DRYWALL 5CFEW5,
ON OPPOSITE SIDE:
PRINTED:
TWO LAYER 5/8" TYPE X GYPSUM WALL130APD OF GYPSUM VENEER BASE
APPLIED AT RIGHT ANGLES TO STUDS W1 6d COATED NAIL5,1-7/&'LONG,
9.23.20
0.0916" SHANK� 15116 HEADS 7'o.c.
STAGGER END JOINTS 24�'ox. EACH SIDE SOUND TESTED W1 3-1/Z'
GLASS F113EP INSULATION. (LOAD-DEARING)
/-jc-�R2/R2, R2/U, R2/S2
%W2H FIRE SEPARATION
SCALE: N.S.
ELEVATOR VENTILATION OCHED
ATTIC VENTILATION FREaD 5.5 O.F.1100 5.F. AREA = a3.6912,9 X 144 = 4155% 5.1. KEal)
16'X16" POOF JACK 0 230 5.1. / EACH PROVIDE I JACKS = 230 5.1.
13UT MIN OF 3 S.F X 144 = 4,32 5.1, PROVIDED 2 JACKS = 460 5J.
VENTILATION VENTILATION
A171C VENTILATION KEQ'D I 5.FJ3OO 5A. AREA = 3754.75/300 X 144 = 1792.6a 5J. IREap
FAVE5 2a2.00 L.F. X 4.7 SO IN/LFQ3RD BLOCK W/ (5) 2" HOLE ) = 1525.40 9.1. = 747.
16'X161ROOF JACK 230 5.1. / EACH PROVIDE 7 JACK5 = 1,610.00 6.1. = 907.
Or FIDOE VENT a 24 5.1./LINEAL FOOT PROVIDE 581 = 78%
ROOF DRAIN CALCS
594.60 (POOF AREA) 1500 50, FT. (v- ROOF DRAIN)= AO(l PFAIN)
e4a.00 (poor AREA) IWO 5a FT. (YROOF DRAIN) =.4,3 (I DRAIN)
521.11 (ROOF AREA) / 1500 Sa FT. (V' FOOF DRAIN) =.35 (1 DRAIN)
0 5XN'DOWN 6FOUT5
Of St. by B EST MATE R IALS 91 Ph: 800-474-7570 1 wvvw.BestMateeals.com I Email: Sales@BestMaterials.co
m
Z165
ZURN8.3181213] DIAMETER COMBINATION MAIN ROOF & SPECIFICATION SHEET
. OVERFLOW DRAIN W/ LOW SILHOUETTE DOMES TAG
& DOUBLE TOP -SET' DECK PLATE
X 1(i
_21. 21--
.-T
,A
42� [114] 1 1
J1 4-,O.�
1/4�71'51LOPE
�_
—A '
Ij
'i�7 �,
07 [178]
�]
0.112 PITCH 30 YEA
[2`1541
A
Approx.
D.—Op.n
ENGINEEPJNGSPECIFICATION:ZURNZ166
P Si
fps m1n.[mm)
wt.
I
Ares,
I I
8-3ffl"1213mm]lDiamtermofdrECinandovaffmdmin,Dwa-CostedeBst
e. [kal
Sq. In. [4
iron bodies with combination membrane
fiBshing clamNgravel guards.
2.3.4i.-I.76.1021_1_��6119.]__A3p
L _j
71
double ToIpSet� deck plate, and law s 11houatt.
cast iran domes.
OPTIONS (Chaddspecffi/ appmpflata apt—)
PIPESIZE
(Spedfy.!�.Aylp.)
OUTLET
'E'BODY HT. DIM.
2,3 - 4161,76,102]
IC Inside Caulk
3-71819
2[61i
P Threaded
2-7tI6 IS:i
3[7.
IF Threaded
2-N4 [70]
4[1021
IP Threaded
3 [7G]
2 3 4 t5l: 7
NH No -Hub
4 [1021
:,1,
2:3:4 [6, 7: 02]
NL N—Lo.
3-13!16 197]
PREFIXES
_ Z D'C'C' :.:.dyWAh Dom. (4-1/4 [1081D
... Height)-
_ZA D.C.C.. ody�Wjth Aluminum Dome (4-114 11081 Dome Height)
SUFFIXES
-AR Acid Resistant Epoxy Coated Finish
_E State Extension I th' 4 [25 thrulO21 (Specify HL)
C
-G
_SC Secondary Clamping Collar
-SS Stahl.. Sisal Mesh Screen 0 Dome
_TC N—L..T..t Cap Gask.t(2.3.4 [151� 76.1021 NLBtt.. 0.11.t.nly�
-VP V-daliPronfSecured7op
— XJ Vertical Expansion Joint (Ste Z190)
_-84 Stainless Steel Perforated Gravel Guard
— -85 Stainless Steel Perforated Extension
R.9.1.1y �.I�h�d p.6fi.d. BUY NOW HERE: hhp,
O—q. OF..".. � OR- J
U — P063�ft., 4118: 09f2w2al?
h C—d. I Z W-fl,. V.11,d C
M. No. 137812
P,.d,ID4g_No. Z165
RE3UM
MAR 0 4 2020
Ax
Z
U
0
U
0
1.-�
R
00
z C;*N
U) U-)
z
8
L0
U
14.19
24.19
ROOFPLAN
SCALE: 1/4" = Y-0"
GENERAL STRUCTURAL NOTES:
CRITERIA:
1.1 All Materials. workmanship, design, and construction shall confomn to the drawings, specIfloations, and the International Building Code (IBC), 2015 Edition.
1.2 Design Loading Criteria
T n 1 -1- � fh. - 'f Is
Live Loads (in accordance w1th ISC Table 1607.1)
Occupancy or Use
Uniform Live
Load
Concentrated
Live Load
Notes
Floor, Residential
40-psf
Balconies & Decks
60-psf
1,5 x Occupancy Load
Uninhabitable attic, with storage
20-psf
Concurrent with Snow Loads
Unimbitable attic, Without storage
10-psif
Non -concurrent with Snow Loads
Handrails and Guards
200-lbs
Any point, any direction (ASCE 7-10, Section 4.5.1)
Wind Design Data
ASCE 7-10, Chapter 28: Simplified Envelope Procedure
Seismic Design Data
ASIDE 7-10, Section 12.11: Equivalent Lateral Force Procedure
Ultimate Design Wind Speed (3-sec gust), Vu,
Nominal Wind Speed, V..d
110-mph
Risk Category
Seismic Importance Factor, Is
1.0
Risk Category
Mapped Spect. Accel., Short Period, So
Mapped Spect. Acrel., 1-Sec, S,
1.264
0.495
Wind Exposure
B
I Internal Pressure Coefficient
NIA I
Site Class
D
Exterior Components and Cladding
25-psf
Spectral Response Cooff., Short Period, Sao
Spectral Response Coeff., 1 -Sao, SDI
0.842
0.497
Topographical Factor, K�
1.001
Seismic Design Category
D
Snow Loads
(ASCE 7-10, Chapter?)
eismic-Force-Resistance System
Ply. Shear Walls
esp n a Modification Factor, R
6.5
Ground Snow Load, P.
25-psf
_�Slsmlo Response Coefficient, CS
0.13
Flat Roof Snow Load, Pf = 0.7 C, Ct is pg
Sri= Exposure Factor, C.
Snow Load Importance Factor, 1,
Thermal Factor, Ct
1.0
1 * 0
1.2
25-psf
Design Bas
48.07 kips
See Drawings for Additional Loading Criteria.
1.3 Structural Drawings shall be used In conjunction with all other project documents for bidding and construction. Contractor shall verify dimensions and
Conditions for compatibility and shall notify architect of all discrepancies prior to consitnictlon.
1.4 Contractor shall provide Temporary Bracing for the structure and structural components until all final Connections have been Completed in accordance with
the drawings.
1.5 Contractor shall be responsible for all safety precautions and the methods, techniques, sequences or procedures required to perform the work.
1.6 Contractor -initiated changes shall be submitted In writing to the Architect and Structural Engineer for approval prior to fabrication or construction. Changes
shown on shop drawings only will not satisfy this requirement.
1.7 Drawings Indicate general and typloal details of construction. Where conditions am not specifically Indicated but am of similar character to details shown,
similar details of construction shall be used, subject to review and approval by the Architect and the Structural Engineer.
1.8 All structural systems composed of components to be field erected shall be supervised by the Supplier during manufacturing, delivery, handling, storage and
erection In accordance with Instructions prepared by the Supplier.
GEOTECHNICAL
2.1 Allowable Sall Pressure, Lateral Earth Pressure, and Soil Profile Type am assumed and therefore must be verified. If soils am found to be other than
assumed, notify the Structural Engineer for possible foundation redesign. Footings shall bear on fin, undisturbed earth at least I B" below adjacent finished
grade. Unless otherwise noted, footings shall be centered below columns or Wells above. Backfill behind all mtal�fihg walls with free draining, granular fill and
provide for subsurface drainage.
Gootechnical Properties
Soil Site Class
D
Allowable Soil Bearing Pressure
2500-psf
Active Lateral Earth Pressure (Restrained
60-pcf
Active Lateral Earth Pressure (Unrestrained)
35-pcf
Seismic Lateral Earth Pressure
6H-psf
Passive Lateral Earth Pressure
300-pef
Base Friction Coefficient
0.35
CONCRETE:
3.1 Concrete shall be mixed, proportioned, conveyed and placed in accordance with IBC Chapter 19 and ACI 318-14. Mix shall be proportioned to produce a
slump of 5n or less. All concrete with surfaces exposed to standing water shall be air -entrained with an air -content conforming to ACI 318-14 Table 4.2.1.
rqffh h-H - iRr R.Mori 1904.1. shall be as follows:
Type or Location of Concrete Constru Ion
(Moderate Exposure)
Min. 28-Day Compressive Strength, fc
Interior Slabs -on -Grade
2500-p.1
Footings, Basement Walls, Foundaflon/Stem Walls
3000-psi'
specified compressive strengin (T,)SPeC1T1oSgu1maUub
Strength of Concrete is 2500-pid, therefore, strength tests am not required. Provided concrete Mix
tickets verifying strength specifications.
32 Reinforcing Steel shall wnform to ASTM A615-12 and the following:
r !re
Steel Grade
b.�7ncl larger
Grade 60, fy = 60,000-ps!
#4 bar and smaller
Grade 40, fy = 40,000-ps!
Woman Wine --abric Shan comorm to Ab i m � i u- i o
3.3 Reinforcing Steel shall be detailed (including hooks and bonds) in accordance with ACI 318-14. Lap all continuous reinforcement (#5 and smaller) 40 bar
diameters or 2'-0" minimum. Provide comer bars at all wall and footing intersections. Lap comer bars (#5 and smaller) 40 bar diameters or 2'.0" minimum.
Laps aF larger here shall be made In accordance with ACI 318-14, Class B. Lap adjacent mats of welded wine fabric a minimum of 8" at sides and ends.
No here partially embedded in hardened concrete shall be field bent unless otherwise noted on the drawings or appra ved by the structural engineer.
3.4 Concrete Protection (cover) for Reinforcing Steel shall be as follows:
Condition
Clear Cover
Footings and Unformed Surfaces cast against and permanently exposed to Earth
T'
Formed Surfaces "posed to Earth or Weather (#6 bars or larger)
2"
Formed Surfaces exposed to Earth or Weather (#5 bars or smaller)
Slabs and Walls, interior face (#11 bars and smaller)
Y4"
Column Ties or Spirals and Beam Stirrups
I IV
WOOD:
6.1 Framing Lumber shall be kiln dried or MC-1 9, and graded and marked In conformance With WCUB Standam Grading Rules for West Coast Lumber No. 17.
Unless otherwise noted, furnish to the following minimum standards:
Member Use
Size
Species
Grade
Studs
2., 3x
Hem -Fir or SPF
STU5
Joists/Rafters
2x, 3x
Hem -Fir
No. 2
Plates/Misc.
2x, 3x
Hem -Fir
No. 2
Beams
4x
Douglas Fir -Larch
No. 2
Posts
4x
Douglas Fir -Larch
No. 2
Timber, Beams
fix & Larger
Douglas Fir -Larch
No 2
Timber, Posts
fix & Larger
I Douglas Fir-Lor
6.2 Glued Laminated Members shall be fabricated In conformance with ASTM and AITC Standards. Each member shall bear an AITC Identification Mark and
shall be accompanied by an AITC certificate of conformance. Furnish to the following minimum standards:
IMember Use I Combination species Fb.+ _�P��X I Fvic I Ex
I Beams 124F.V4 DF/DF 2400-psi 11850-psi 1 650-ps! 1 265-ps! I 1800-ksi I
Camber all glularn beams to 3,500' radius, unless otherwise noted. Glued laminated members exposed to
weather or moisture shall be treated with an approved preservative.
6.3 Engineered Wood shown on the drawings are based on product manufactured by Weyerhaeuser ln accordance with ICC Report No. ES ESR-11387.
Alternate manufacturers may be used subject to review and approval by the Architect and Structural Engineer. All hangem and other hardware not shown
shall be designed and supplied by the Joist Manufacturer. Each piece shall bear a stamp or stannips.noting the name and plant number of the manufacturer,
the grade, the ICC report number, and the quality control agency. Furnish to the following minimum standards:
Member Use
Product
Fb
Fc,
Fv
E
Beams
1.55E Laminated Strand Lumber (LSL)
2325-psl
800-ps!
310-psi
1550-ks!
Beams
2.01E Laminated Veneer Lumber (LVL)
2600-psi
750-psi
285-ps!
2000-k S!
Beams
2.01E Parallel Strand Lumber (PSQ
2900-ps!
750-psi
290-psi
2000-lksl
Rim Boards
Laminated Strand Lumber (LSQ
1700-ps!
680-ps!
400-ps!
1300-ks!
6.4 Engineered Wood I -Joists shown on the drawings am based on joists manufactured by Weyerhaeuser In accordance with ICC Report No. ES ESR-1 153.
Alternate Engineered Wood I -Joists manufacturers may be used subject to review and approval by the Architect and Structural Engineer,
6.5 Prefabricated Connector Plate Wood Trusses shall be designed by the manufacturer in accordance with To 1.2007 for the spans and conditions shown on
the drawings. Wood trusses shall utilize approved connector plates (MITEK, ITW or other approved Truss Plate Manufacturer).
Unless otherwise noted, loading shall be as follows:
Roof Truss Design LoadIng
Member
Uniform Load
Top Chord Snow Load
25-psf
Top Chord Wind Load (Uplift)
15-psf
Top Chord Dead Load
7-psf
Bottom Chord Live Load
10-psr
16-_�nn Chord Dead Load
5-psf
Submit shop drawings and design calculations prior to fabrication. Submitted documents shall bear the stamp and signature of a registered Professional
Engineer, State of Washington. Truss design drawings shall Include, at a minimum. the following:
A. Slope or Depth, Span and Spacing
B. Location of all Joints and Support Locations
C. Number of Plies if greater than one
D. Required Bearing Widths
E. Design Loads and Locations: Include Top and Bottom Chord Live and Dead Loads. Girder Loads, and Environmental Loads (Seismic, Wind, Snow, etc.)
F. Other Lateral Loads, including Dreg StriA Loads
G. Adjustments to Wood and Metal Connector Plate Design Value for Conditions of Us.
H. Maximum Reaction Form and Direction (Including Maximum Uplift)
1. Metal-Cornector-Plate Type, Size, Thickness, and Location
J. Size Species and Grade for each Member
K. Tmss-to-Triiss Connections and Truss Field Assembly Requirements
L. Calculated Span -to -Deflection Ratio and maximum Vertical and Horizontal Deflection for Live and Total Loads
M. Maximum Axial Tension and Compression Forces In each Truss Member
N. Required Permanent Individual Truss Member Restraint Location and the Method and Details of Restraint Bracing to be used
0. Placement Layout including Bearing Points, Intersections, Hips. Valleys, etc.
P. Tnuss-to�Truss and Truss -to -Beam Connection Details and Hardware
6.6 Roof, Floor & Wall Sheathing shall be APA Rated, Exterior or Exposure 1 Plywood or 0813 manufactured under the provisions of Voluntary Product
Standards DOC PS-1 or DOC PS-2, or APA PRP-1 08 Performance Standards and Policies for Structural Use Panels. See Drawings for thickness, span
rating, and nailing requirements. Unless otherwise noted, wall sheathing shall be %" (nominal) with Span Rating of 24/0. Glue floor sheathing to .11
supporting members with adhesive conforming to APA Specification AFG-01.
6.7 Wood members shall be protected against decay and termites in accordance with IBC Section 2304.12. 1 Where required, members shall be naturally durable
species or shall be treated with waterbome preservatives wood In accordance with American Wood Prolection Association specification AWPA Ul. Members
shall be clearly labeled.
6.8 Timber Connectors shall be "Strang -Tien by Simpson Company, as specified in their current Catalog. Provide number and Size of fasteners as specified by
manufacturer, Connectors shall be Installed in accordance with the manufacturers Instructions. Where oonnector straps connect two members, center Strap
on joint and provide nurn bar and size of fasteners as specified by manufacturer, with equal number andsize of fasteners in each member,
Alternate hardware manufacturers, such as USP Connectors, may be substituted for items shown provided they have ICC approval for equal or greater load
capacities. All Joist hangers and other hardware shall be compatible in size with specified framing members. See Hanger Conversion Table for pro -approved
hanger substitutions.
Timber Connectors and their fasteners shall be protected from corrosion In accordance with manufacturers recommendation and AWPA Ul.
6.9 Dowel-Tvoo Fasteners (Bolts, Lag Screws, Wood Screws and Nails) shall conform to Sections 1 land 12 of the ANSI/AWC NDS-2015.
Dinved Type Fastener
Grade
Installation
Bolts
ASTM A307
ANSIIAWC NDS-2015 Section 12.1.3
Hole = Bolt 0 + (1/32"to 1116")
Washer @ Bolt Head and @ Nut
All-Thread/Threaded Rod
ASTM P1554
ANSI/AWC NDS-2015 Section 12.1.3
Hole = Rod 0 + (1132" to 11111TI
Washer @ Each Nut
Lag Screws
ASTM A307
ANSI/AWC NDS-2016 Section 12.1.4
Lead Hole = 0.5 x Shank 0; Shank Hole Shank 0
Washer@ Lag Head I
Wood Screws
ANSI/AWC NDS-2015 Section 12.1.5
Pilot Hole = 0.76 x Root 0 (Unless Self-BorIng)
Nails
ASTM F1667
ANSI/AWC NDS-2015 Section 12.1.6
Avoid Overdriving or Underdriving; Avoid Wood Spilling
Toenails 30', 1/3 Nail Length from Joint
Nails scissolflad an the drawinas shall be as follows:
Nail Use
Penny Weight
Grade
Framing Nails
12d Box
0.13l"0x3Y4"
FS�eerllhing Nails
18d Common
10.l3l'0x2W
6.10 All Metal Fasteners shall be protected train corrosion in acoorclancewith AWPAUI.
WOOD Continued).
6.11 Wood Framing Notes: The following apply unless otherwise noted on the drawings:
A. All wood framing details shall be constructed to the minimum standards of the IBC. Nailing not specified on the drawings shall conform to ISO Table
2304.101 or ICC ES ESR-11539. Coordinate the size and location of all openings with Mechanical and Architectural Drawings.
B. Wall Framing: Stud wall size and spacing shall be in accordance with the plan notes. Two studs minimum shall be provided at the ends of all Wells, at
each side of all openings, and at the ends of all beams and reactors. All stud bearing Wells on mod framing shall have their lower mod plates attached
to framing or concrete below per P1 .6 of the shear wall schedule.
C. Individual members of Built -Up stud posts shall be nailed to each other with framing nails @ 12"oc, staggered. Individual members of Built -Up joist
beams shall be nailed to each other with framing nails @ 12"oc, staggered.
D. Solid blocking for wood columns shall be provided through floom to supports below.
E. Floor and Roof Framing: Provide solid blocking at all bearing points. Toenail joists to supports with two framing nails. Attach timber joists to flush
headers or beams with metal joist hangers in accordance with notes above.
F. Roof and floor sheathing shall be laid up with grain perpendicular to supports and nailed per plan notes. Allow 1/8" spacing at all panel edges and ends
of floor and roof sheathing. Provide approved panel edge clips centered between joists/trusses at unblocked roof sheathing edges. All floor sheathing
edges shall have approved tong ue-and-groove joints. Toenail blocking to supports with framing nails @ 12"oc. At blocked floor and roof diaphragms.
provide flat 2x blocking at all unframed panel edges and nail with edge nailing specified.
QUALITY ASSURANCE:
7.1 Standard Inspections shall be In accordance with IBC Section 110.
Special Inspection shall be in accordance with ISO Section 1704.
7.2 Structural Observation Is not required.
Hanger Conversion Table
TYPE
I.I.ON STRONG IE
PRODUCTO
.1 CON CTORS
PRODUCT#
HOUDOWN
HOU2.SD85.5
PHD2A
HOLDOWN
H 114�13D!35.5
PHD4A
HOLDOWN
DUS-SOS5.5
PHD&A
HOLDOWN
HDUS.SDS5.5
PHOS
HOUDOWN
STHD14
STAD14
HOLDOWN
STHD14RJ
STAD14FU
.otbc,,�
LT.Ie-T7 w/ 11 "Y"
PLATE WASH'ER
STRAP
MST48
KST248
STRAP
KST216
STRAP
ST6224
KST224
STRAP
CS16
RS150
STRAP
MASA I MASAP
FA4
STRAP
CMSTC16
CMSM16
TIES
LGT2
UJGT2
TIES
LTP4
MP4F
TIES
LTPS
MP6F
TIES
A34
MP34
TIES
A35
MPAI
TIES
H1
RT15
TIES
H2.5
RT7
TIES
H2SA
POSTCAP
UPCXZ
PB..6TZ
POSTOAP
LCE4
PBES74
POSTCAP
EPC-
EPCM.
POSTCAP
CCQ.SDSES
KCCQxx
POST CAP
ECCQxxSDS6.6
KECCO.
POST CAP
ACX
Pas.
POST BASE
Pa.
WE.
POST BASE
_U_
PAU_
POST BASE
AISA.
PA.E
DRAG ST��
HTS30C
HTW30C
DRAG STRUT
HTS30
HTW30
DRAG STRUT
OSC5
DSC4
HANGER
Lus.
JUS.
HANGER
IUS-
THP.
HANGER
ITrxx
THO.
HANGER
HU.1HUCxx
H�IHD.IIF
.HANGER
Met.
THF.
HANGER
HUS.
HUS.
�j I
'01
t3
0
Z Z
Z
c
.4
12128/2018
REVISIONS:
4/29/2019
PRINTED:
4/29/2019
�E US �GENERAL
STRUCrURAL
JUN �7 2019 NOTES
BLDG A
T..
41'-0"
24'-0"
Z
ie
—is
- - - - - - - - - - - - - - - - - - - - - - -
,
- - - - - - - - - - - - - - - - - - - - - - - - - - - -
--
— — — — — — — — - 7 -7�— 7T T7
40
�:A A
PIRI
7
2
�"A
A�.
zA -I-
7A A.,
Z2
�4'
z
4. ':"'1
HDU.5
r
HDUS
Z
r1l, MIT H
q.
T�
A. ;'4
J,
4
Wly
4
4::. '*2
7mll�.�L. �t\j,
HDUS
1.4
51, STEM TYP
W.
T.O. KALL ivw LN
,
PY.P !NTMO?, ,
PER
— — — — — — — — — — — — — --- — — 4
1
T,�
h"
FOUNDATION PLAN NOTES:
I . Slalb-on-Gra de Shall be 4- thick with RXG W1.4xWl.4 WWM at ceri u.o.n sia-b-shal =be
poured over base soil in
7
prepared accordance with the Geotechnical Report. see
Architectural Dravvings for Slab Elevation, Depression, and Slope requirements.
2. For additional crack control Provide C-lat—flon/Controf Joint in Slab per Architectural
Drawings. Areas shall be approklmately square and 400�f or less. See 17IS3.2.
it
Ln
3. B ftom of Footings shall be set on competent, prulper�y compacted gearing Soil below Frost
Do
apth.
4,
T
otor shal I
The Contra I determ ne actual footing alevations based on flnel grades and site
conditions. Consult with the Geotechnical Engineer as required.
4
4. Anchor Bolts for Exterior Stud Wells shall be in accordance with P1-6 of the shear Wall
Schedule of 1/S3.1, u.o.n.
:C�
12/28/2018
.4'
LEGEND
R I VI S 10 -S:
4/29/2019 Zj�,
L
ETAlLCAU1..T
4
s.
z
ANCHORBOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF l/S3.1
AIR
.11B..-.R.A.E PER 1. NOTE I
FOUNDATION WALL AND FOOTING
T.O.
(T111P
KALL V-6" SEARING OR SHEAR WALL ABOVE
EXTERIoR)
PRINTED:
4/29/2019
1.STA..VE
FOOTING CALL -OUT SEE 13/S3.2
JUN 2
7 2019
STM'i
FOUNDATION
PLAN
FOUNDATION FRAMINS,
REFERENCE ELEVATION T-W =
PLAN o 1 2 4 a
262AIV
BLDG A]
T..
K
Z
C51&x48" TOP
PLATE SPLICE 0)
40
4- -4" 11
it M /
it ?21
go li 6,Ls (r)
757
ce
El! r
4,
gill
&4;14 Ik (7)
HHU55.5/10 I
W4�
slim 1-1
2X'10
'I'
:4
15
1101
Y�
I
ILIS2.06/14
d 5,(:
IF
20
HSUS.410�
T. I
—
t
—4
J L- 11 .11, 1)
aE
4, P
I .
5v2xl4 1-51- (F)
'7.25/10
97�=.= L'
L
- .. — ..
...
-
...
HISS
-,.J
V2" CA
U1
-TX14 P51- (F)
14" rJI- 10
A
z
.10111111111 K
14LILO
5Y2x14 1-51- (F)
II KIO 0"—,
14 TJ 960
oll
-ki
12
14 5/10
kL
4 &.5
Is— loll
61
14 1 L (F)
IS
5v2xl4
L9L (P)
4
ir
LL=:jj
i
U14 H
&A
lid
0
Yl
9
-10
'\-U4[0 14 LI L
-1
III='
, A )_2
FLOOR FRAMING PLAN NOTES:
T. -71230FU�Fathmg shall a 48124 ON. Sheathing to .11
15 Hi
Framing Members andbBlocklng below with adhesive corriorm S
bmingt.A.P.A. pacification
AFG,01. Fasten Sheathing to Framing with WSNTL2LS S. or Screws (#B x 2-) or
-It
�If
T-PT-�
1"OxZS�Nalls
'a$ 6 "001
10,00
'0, \eo
Woe
(), rop
V
At
.4480tolr other Sheathing Nailing requirements.
T.
joists
2. Floor :hh:�� be 1 1%'TJI 210 @ 16-oc, u.o,n.
Drock Joists be P.T.'200 @ 16"oe, u.o,n.
=31i
3. Allowance has been made for 1)2'Gypcmte Floor Topping.
KNEE BRACE
,U41 0
WAIL FRA INGN
M LAN NOTES'
&x&
BEHINIZI
4. Exterior .. I . U5.—.rWIr1pm P1-6 with 2x6 Studs@ 16"oo. u.o.n.
Interior Walls shall be 2x4 Studs@ Iff'oc, u,o.n.
Dernising Wells shall be (2) wall with 1" Air Spam. Each wall shalt be 2.4 Studs (III 161-oc,
....n.
Uf14 HOR I
i
Where adjacent Shear Walls am In contact, together 14183.1. See 1/S3.1 for
4 TJI 561� %x14 LSL (r-)—_j,
oti III ; � . — .
—
nail studs per
special stud requirements at Shear Wall types P1-3, P1-2, P2-4, P2-3, and P2-2.
U410 W Yel
:, a 11411, u,—, 11 DIIIII 111SIA,
ST117IFENERS (TYP
Built-up Stud Groups in Walls supporting Beams, Posts or Girder Tr —es abm shall be (2)
Studs, u.o.n. See General Structural Notes for fst,ning requirom-N.
1212812018
REVISIONS:
0 Tit 560 JO15T5)
4/29/2019
=;TL
z�l
V--
VW4 LSL (F)
2xaalb"o
KALL TH15 LINE
LEGEND
I
15/4xl4 LEL RIM
DETAIL CAL1.UT
PRINTED:
SHEAR WALL BELOW PER SCHEDULE OF 1/S3.1
4/29/2019____
BEARING OR SHEAR WALL BELOW
E I BEARING OR SHEAR WALL ABOVE
1�1
MROUB
1.. E. JUIi,
27 2019
1st FLOOR
-W
rM&TISN'r
15t FLOOR FRAMIN&
PLAN
0 1 2 4 a 16
7 Qr
T..
HUi 10
(-DTTIZ BEAM-
dQ1
(ZMAYJ
TO -RIM
CSIbx4&"
6
95.
F.T. &xI2
-1 SLB HDR
RIM-TO-BBAM
HD I —
—HDR—
HOR
H12K
HUi-t
14 L
P.T. 2xIO—
I
(ZMAX)
P.T. 4xIO '7'
'1Z
TTI; BE
I
T522 QOIST-TO-RIV)
m riz $E
H12K
.14 JI 0
PEP 16/55.5
H/ 6x6 BEHIND
0
P.T. 2xIO
of
A
016"Oc
L�(Um=
I
14
BL' r
z
z 1010
XIO
TT�'
%x14 LSL (F) PIM
0
-4 R
r,
1- �'
OR
1
HU612
KNEE BRACE
HUd 410
P.9 1' 1
4 LSL
4
616,06
—5Y4X
R 16/55.5
0 AX)
B -1
Ibx4b"
1 �:--4 —
F,
71-
I; P5L F)
A/ bxb BEHIND
IWO
Al
s
T-1
Sim 9
� '-:', M-TO
- +'
J015T)
---
'<A1
.1
4
Y4
%pc14 L M RIM
I
AVOLJOISTALI&N
IL
Vil ELEVATOR KALL======.
-JILIL OJ11
r�
VY
BL�'6-TO
S/
Q111
1—�—PER
KNEE 5RAr,
16/55.5
A/ 6X6 BEHIND
14 LSL
4
0
Ck
—=HDR
FLOOR FRAMING PLAN NOTES:
1. Floor Sheatinhig shall be "he
(Pan.
—HDR-
panRating4W all
g to
Framing Members and Blooldin ba&l=G with a'dghesive con mning'OVA ,=n
'4
AFG-01. Fasten Sheathing to Framing WSNTL2LS Subiloor Scraws (#8 x 2-) or
with
0.131"0 x 2,Y2" Nails follows:
as
0
IFF�a2 ..
�2ngg! FMeld
Itioundanes, Slow
IS
KNEE BRACE
See Drawthas for other Sheathing Nailing requirements.
FER I&IS5.5
6X6 BEHIND
2. FloorJo�! is shall be ll%"TJI 210 @ 16�co, —n.
DeckJoists shall be P.T. 2xl0Q 1(yoc, u.o,n.
'Azze\"
3. Allawance has been made for %2" Gypcmb, Floor Topping.
pq
&
WALL FRAMING PLAN NOTES:
T Exterior Walls be Shear Wall
55.9
shall type P1"w'tha6Studa@ 16"w, u.o.n.
interior Wails shall be 2A Studs @ 16'oc, u.o.n
(TYF)
Demis'ng Walls shall be (2) wall with 1" Air Spam. Each wall shall be 2x4 Stud, @ 16--oc,
=Af I I
u.o.n.
KNEE BRAGE
PER 16/95.5
Where adjacent Shear Walls am In contact, nail stud. together per 141S3.1. Sea I/S3.1 for
H/ ii BEHIND
speclial stud requirements at Shear Wall types P1-3, P1�2. P24, P2-3, and P2-2.
5. Headers shall be 4x8, u.o.n. See Detail 19/S3.1.
6. Built-up Stud Groups In Walls supporting Beams, Posts or Girder Trusses abo,e shall be (2
Studs, u.o.n. See General Structural Notes for fastening requirements.
12/28/2018
REVISIONS:
4/29/2019
(TYF)
LEGEND
DR
DETAIL CALL -OUT
rF1--X-1 SHEAR WALL BELOW PER SCHEDULE OF 1/S3.1
A
BEARING OR SHEAR WALL BELOW
PRINTED:
E I BEARING OR SHEAR WALL ABOVE
4/29/2019
1..T.ELOW
U 0
JUN 2
7 2019
2nd FLOOR
2nd
FLOOR FRAMINIS5
FLAN
0 1 2 4 8 16
...............
FRAMING
PLAN
T..
K
(r.o. &RvEpt)
53 TS.
-+41:?R—
T522
TO -TOP PLATE)
-HDP— _HVR_
mov"
E
q'IRM IM/11
150 PLIF
/71
It to
TRU
FILE I
L. 11
OR H
;b
16
Z.,
—J�
C.Ks-
&iRvEfZ PROF
rz
IRDER TRU�5
2 5ZUAT;B)�
Trl'12-TOF
:11
5.
IVROMLE 0
X0110
___A___1
A- J
.0
GIRD
Z44
L)
1�
FL
Z 1� 55 PROFILE I�
/ 11 1 it
21
-1777
I
I
z
-
i 1�51` 11
11 TRUW PRO Q6._1
N
I
U
MONO &IRP
TKUSSP 5.1
7'
It
T522 (STRJJT-
iU
TO -TOP PLATE)
JAOKS
'0
NO ql
A
4,
1rRq THrW
lu
J 01<9
GIRDER TRSS PROFILE 4
TRU55 ROF�IE 5.4
T522 (5TRUT —
�7
TO -TOP PLATE)
T
ROOF FRAMING PLAN NOTES:
TRU55 FILE 5.
177RUofsheathin6ihall be %' thick (Panel Span Rating 32116)_1077e —th
ck(PaneISpan
Rating24/16)]. Fastan Sheathing to Framing with 0.13 -OxZX" Nails aefollows:
1
U1
LEE:
11
41
PAt
Unframed Panel Edge, provide PSCA Framing Clips centered between each Framing
Member. See Drawings for other Sheathing Nailing
14�
requiraments.
2. Re Framing shall be Connect Plate Trusses @2,Voc, u.on. Refer to General Structural
0
TRU55 PROFILE 2z
3. Trusses marked Strut shall be designed to accommodate the indicated loads and
cenneclions.
L
W\
4. Overframing Members shall be 20 @ 24"oc. Post down to Framing Members below w/ 2x4
@ 46"oc, staggered.
55 PROFILE S.1—
S. Provide solid Flat Blocking at all Valleys. Fasten Sheathing to Blocking In accordance with
A.
LL
Hl' 'ROr LE 2 (2_1L
No.. 1
WALL FRAMING PLAN NOTES:
a or ass ar a be - 6 tuds 16 , u.o.n.
I It
Int.ft,W.Ilastall b.2.4 Stud.@ 16'..,, o.n.
=ing Walls shall be (2) wall with V Air Spam. Each wall hall be 2x4 Studa@ lWoc,
12/28/2018
REVISIONS:
Where adjacent Shear Walls am In contact, nail studs together per 14/S3.1. See 1/83.1 for
special stud requirements at Shear Wall types P1 -3. PI -2. P2-4, P2.3, and P2-2.
RUSS FILE 1
(Tyr) j %D
7. Headers shall be 4x8, u.o.n. See Detail 19/33.1.
A
4/29/2019 Zj�
d)
8. Built-up Stud Groups In Walls supporting Beams, Posts or Girder True— above shall be (2)
Studs, u.o.n. See General Structural Notes for fastening requirements.
LEGEND
A
>
ETAIL —1.11T
FIFF—T SHEAR WALL BELOW PER SCHEDULE OF 1 IS3.1
BEARING OR SHEAR WALL BELOW
BELOW
10.
RESUIS
JUN
2 7 2019
ROOF
ROOF FRAMIN& PLAN
1 2 4 a I&
FRAMING
PLAN
T..
T-O.,
ClaL
12 12 12
12 1
!,F 16 ]b 12 12
4 & 4r— 12
!k
N 4V4" 44
12�
14'-0"
TRUSS PROFILE I TRUSS PROFILE 4 TRUSS FROrILE 8 TRUSS PROFILE 11
r--=l z 1
12 4 12
STUB FOR &RDER Z:zI
25 -6
PROFILE 5.1 PROFILE
z
TRU55 PROFILE 2 TRUSS TRUSS 12
T-O" 51-111,
12 12' 12 12
4 411 12 1 �4 4 4
C)
4'4" F
-z
=p fSTU5 FOR FLUSH BEAM STUB FOR ClIRVER STUB FOR (SIPOER
'TU15 FOR C'RVE
ir 211' -4V2
—25, -b..
TRUSS PROFILE 5.1 TRUSS PROFILE 5.2 TRUSS PROFILE 11
4 �—'2 12
STUB FOR. GIRDER STUB FOR CSIRVIER fSTUB FOR FLUSH SCAM TUB FOR &IRVER
— - 1 1�
I.-W
TRUSS PROFILE 5,2 TRUSS PROFILE 6.1 TRUSS PROFILE 12.1
-T-O" S.-W. 1. "1 2 0 SIS.. T-01.
11 12 12 12 12 12 12
--icl i
�cl - 11 �l 4
�14
6EK
rw,�
-
STUB FOR GIRDER STUB FOR GIRDER
25'-1"— 2q*-442"
MRIJ55 PROFILE 5.5 TRUSS PROFILE 6.2 TRUSS PROFILE 12.2
12 12 1
12 -,4 4
4 4F 4— 12
12/28/2018
REVISIONS:
4/29/2019 Al
�k zz"
TRUSS PROFILE TRUSS PROFILE -1 TRUSS PROFILE 15 TRU55 PROEILE 14
5
-Ti, 20
-_ 14T4 r'—: 12 12
PRINTED:
4/29/2019
12 4 4
6
21�W2"—
RMUM
ROOF
TRU55 PROFILE 15 JUN
27 2019
TRUSS
PROFILES
'09
MPAR
BLDG A
TOP PLATE PER 15/55.1 12d a Woa
MACE NAIL PER 1/55.1 5HEAR NALL 5CHEPULE
CRIPPLE STUDS TO a SHEAR AALLS)
MATCH NALL STUDS (IN ACCORDANCE A/ ANSI/AP4PA SDPWS-2015 SECTION 4.3)
E
CRI LE
L
4
53- i
M '0
STUD
-T
IF
IF
\-TOP
LESS T14AN 24"
CHORD SPLICE
E30TTOM CHORI;' SPLICE�
PER
HEADER FER PLAN
—ADVIL FULL
2x HEADER a OPENING HEIGHT STUD
IAV(Z 12d TOENAILS
MIN. 5ETAEEN V-L'CES—�
EA. END STUD5 PER PLAN
FASTENED TOGETHER
LOCATE SPLICE a CENTERILINE
A/12d o b1loc,
OF VERT. STUP, TYP.
[0)2x U.O.NJ
20
z--PANIkILIN6..---
PLAN (AHtflt UG��UK�)
PACE RAILIN6 PER
SHEAR NALL SCHEDULE
J- I
PANEL EDGE NAILING �,V DONN AND ADDL
PER SHEAR KALL STUD PER PLAN
SCHEDULE (AHERE OCZURS)
FACE NAILING PER
STUDS PER FLAN--' SHEAR NALL SCHEDULE
STRAP HOLD DOAN PER
PLAN (INHERE OCCURS)
FACE NAILING PER
PANEL EDGE NAILING SHEAR KALL SCHEDULE
PEP, SHEAR AALL
SCHEDULE
*HOLP
DOAN AND ADD-L
STU12 PER PLAN
(AHERE OCOURS)
STU115 PER PLAN:
(D
MINIMUM AIDTH or
KA LED PA4rz OF
PRA26 a ADJOINING
ANCHOR.&SE To
SEISMIC
AND
PANEL
PANEL EDGES
CONCRETE
CAPACITY'
C.APAC.Irr
NALL
EDGE
KJOSILL
FACE
FRAMINS
h1b 2
h/b 2
LT -UP
ANCHOR
MUDSILL
TTM
SHEATHING
NAILING
MEMBER
MEMBER
PLATE
NAILING
CLIPS
BOLTS
ANCHORS
h1b 35
h1b 3.5
PI-6
I SIDE
6`0c,
2x
2X
2x
(Voc'
ASS a 50"oc.
or
%"41 0 bo"or
MASAP & 52"oc-
240-pl?
240-plf
LTP5 a 26"oc
lq4-pl?
1-14-plf
PI-4
1 SIDE
4"or,
2x
2x
2x
41oa
A35 a 20110c
or
%"Oe4b"oa
MASAP9S&"oa
950-ple
550-plf
LTPS a la"06
264-pif
254-plf
PI-S
I SIDE
5110�
Bx
(2)2x
2x
5"06
A55 a I( Vo�
or
%110 a 56"or
MASAF a 26"ca
450-plf
450-plf
LTM a 14"oa
566-plf
566-plf
PI-2
1 SIDE
2"oa
Bx
(2)2x
2x
21,06
ASS a 517"-o—c
or
%"41 a 20"oe.
MASAP a I-l"oo
540-pip
620-PIP
I
I
LTPS 8 -11`2"04
4'76-plf
6-1-1-pif
F2-4
EA. SIDE
4"o�
5x
(2)2x
5x
(2) RONS
A55 a Wo�
and
%114, a 25"oa
MASAP 0 15"oc
*100-ple
'700-PIP
LTF5 a Wo�
1
568-PIP
sea-pl?
1
P2-5
EA. SIDE
5110a
5x
(2)2x
5x
(2) RO AS,
9 15"oe,
A55and
9/J'41 0 22"o�
MASAP 0 11"oo
cqOO if
'155;f
-100-pif
'755-pif
Woo
LTP5 a Vor
P2-2
EA. SIM
2"or
5x
(2)2x
5x
(2) ROAS,
ASS @ 6" O'�
ond
W-p 0 12"oc.
MASAP a -A"oe.
I
"I'S01--lp
2"oe,
LTI-s-96"oc.
5HEAR NALL SCHEDULE NOTES
WW095 or %2" PLYNOOZ? SHEATHING OR Sim& EXCEPT GROUP 5 SPECIES. MINIMUM PANEL SPAN RATING or- (24/o). PANELS SHALL
NOT BE LESS THAN 4-XV, EXCEPT AT BOUNDARIES AND CHANGES IN FRAMING. ALL EDGES OF ALL PANELS SHALL BE SUPPORTED BY
FASTENED TO FRAMING MEMBERS OR BLOCKING. (SECTION 4.5.'r.1.1)
PANEL EDGE RAILING APPLIES TO ALL SHEATHING PANEL EDGES. NAIL SHEATHING TO INTERMEDIATE FRAMING MEMBERS V41TH SHEATHING
NAILS 6 12"oc. MAXIMUM STUD SPACING SHALL BE 16"oc. SHEATHING NAILS SHALL BE 0.15PIP x 2&'. PLYNOOD EDGE NAILING SHALL BE
STAGGERED. RAILS SHALL BE LOCATED AT LEAST %" FROM THE PANEL EDGES. (SECTION 43.1.12. 4 SECTION
INTERMEDIATE
MIN KAI
jPANEL EDGE NAILMS FM
MIN SCHEDULE (STAGGERED)
THE MINIMUM NOMINAL AIDTH OF THE NAILED FACE Or FRAMING AND BLOOKIN& AT ADJOINING PANEL EDGES SHALL BE AS INDirAl-Ep IN
THE SCHEDULE. (SECTION 4.5.114)
SINSLE MEMBER (FLATME)
PER
STUDS PER PLAN S-IUIl, PLATE ISLOOKINO,
14 RIM OR'OTHER PER (9)
MtAMNO MEMBER
(2)2x STUD - NAIL ---
SHEATHING TO E��H
or V
Z2x STU12 - NAIL NTHIN6 MEMBER N1 HALF OF
I I I I I W,
TO EACH MEMBER A/ HALF Or �11--(2)2x STUv, - NAIL SHEATHING SHEATHING NAILS MIN ADJOINING MIN
SHEATHING NAILS TO EACH MEMBER A/ HALF OF SOLID 5LOCKII LON PANEL EDSE5
SHEATHING NAILS BUILT-W STUDS BUILT-UP mrhgm
STRAP HOLD DOAN PER —AN STRAP HOLD DONN ----\ , 11 ..
ARAPPED AROUN12 BEAM - PER PLAN NAIL (9) PER
NAIL 57RAP OVER SHEATHING STRAP HOLD DOM STRAP OVER STUD, PLATE, BLOCKING,
NIRAPPED AROUND BEAM - RIM OR OTHER
NAIL STRAP OVER SHEATHING SHEATHING FRAMINS, MEMBER 5
50LID BLOCKIN& BELON
BUILT -Up STUDS ---- ----------- - - - - -
V, ----- -----------------
---------------- — ---- — ---- ------------ 2 2
W"
------ ---------------- ------ MIN ADJOINING
BEAM PER I -LAN PANEL EDGES MAIN
STU,
5TU�
MIN
FACE NAILING APPLIES TO CONDITIONS AHERE FRAMING NAILS CAN BE STRAIGHT DRIVEN THRU FIRST MEMBER AND PENETRATE
----------------- MEMBER MINIMUM OF V2". FRAMING NAILS SHALL BE 0.151"0 x 0.151"OX5" NAILS MA-e BE USED AHEN STITCHING TOGETHER (2)2x
MEMBERS AITH NO SPACERS.
AT ADJOINING PANEL EDGES AHERE SHEATHING CANNOT LAP ON SINGLE MEMBER AND FA/-E NAILING CANNOT BE ACCOMPLISHED,
FRAMING CLIPS SHALL BE USED TO FA517EN BUILT-UP MEMBERS.
BEAM MR PLAN
-Z
(2)2x S`W - NAIL SHEATHING
TO EACH MEMBER W HALF OF
SHEATHING NAILS 5
I I LAP RIM OPTION LAP PLATE OPTION
HDU HOLD DOAN PER PLAN
K/ Wo ALL -THREAD W @ ANCHOR BOLTS EMBEDMENT SHALL BE '7", U.O.N. ALL ANCHORS SHALL HAVE S" x 5" x 0.22-r" PLATE INASHEIRS. PLATE AASHER SHALL
NLT 0 AA5HER EXTEND TO AITHIN)�" OF THE EDGE OF THE BOTTOM PLATE ON THE SIDE INITH SHEATHING. IF SHEATHINS is ON BOTH SIDES or THE NALL,
I I STAGGER THE ANCHOR BOLTS, AS REOUIRED, SO THAT HALF OF THE PLATE AA5HI ARE AITHINY." OF THE r=pr.F or THE BOTTOM
ANCHOR BOLTS MR I/Sa.1 PLATE ON EACH SIDE. HOLE IN PLATE AASHERS MAI( BE DIAISONALLI' SLOIlE . (SECTION 4.5.6.4.5)
I I ALTERNATIVELT', SIMPSON STRONG TIE MUDSILL ANCHORS SHALL BE INSTALLED IN ACCORDANCE P41TH MANUFACTURES PROCEDURES AND
STEM KALL FIER ESR-2555.
FOUNDATION PLAN ANCHOR BOLT OPTION MUDELL ANCHOR OPTION
)VI MAX
N NSNO.2211'
SNO.2211'
I -LATE 1006HERS,
'4
CONCRETE 517EM CONCRETE STEM
m:
NALL PER PLAN NALL PEP PLAN
P.T. tUOSILL P.T. MUD51LL RESUB
JUN 27 2(
FL MUZISILL ANCHOR
(ANCHOR BOLTS) PER SCHEDULE -&L" WOW,
�TRAP LOCAT 0
I -LAN
I
PANEL EDGE ILINS
FULL HEIGHT
0916x5b" STRAPS P
V------------ �(-"'��--Y-OVE—RS:FATHINZ
r:�:l I z i
C:)
00
z z
12128/2018
REVISIONS:
4129/2019
PRINTED:
4 1
RLATERAL
11 DETAILS I
BLDG A
TOP REINF. PER
PLAN
BURKE "KEYED KOLD" JOINT - SLAB ON &R,4DF Ya" x VY CONT PPZMOLDED
STOP REINFORCING " �L PLAN MASTIC, JOW STRIP OR
OF EACH SWEI SAA-,CUT
-x
4 4.
.4
Tr 11-
PREPARE B,7.11;1 JILA17� CUT ALTERNA
OR. AS SPECIFIED D'f' AIRES AT JO PREPARE BASE PER PLAN 4
ECIFIED BY
SEOTEC,HNIrAL ENSINEER SEOTECHNICAL ENGINEER
APP'L VERT. REINF.
CONSTRUCTION JOINT CONTROL JOINT 4 .1 4.
20 CRACK CONTROL
CORNER BARS TO 5'-0" MIK
" O`ZLNLF.,
(ALT. .00".
INTERMEDIATE :7)
LC_
SIZE
REINFOR4,11,16
DETAIL
REPIZ-11C.
36" aq x 12' thick
(504 EA. KAY
BOTTOM
-
NFLAN
4,211 sq x *12" thick
(4)#4 EA. HAY
BOTTOM
-
�R
46" aq x 12" thick
(5) #4 EA
-
60" sq x 15" thick
'j—
_
(0#4 x 56" DI 0
�ADVITIONAL VERT. ACONORETE HALLS M ZORMAL FOOTING
BAR a CORNER AND FOOTINGS 51-0 A./ REINFOROINC,
DIP'L BARS TO
MATCH NORMAL
\-NO j REINFORCING
RMAL FOOTING
INS
REINFORC, �1��INE
OF F-D!XCAVATION
14
15
CORNER BARB 12
STEF IN FOOTIN6 11
POST PER F-LAN-------
2x STUD HALL PER
POST BASE PER
PLAN "'j E"LDFR9
2x PT PLATE
IAIER BARRIER
A.13.'s N STANDARD
5TYqN HOOD AND
12"4) PLINTH V4/
",-%"0
KASHER5 o&O"oa
#4 TOP
BASI:-:
(5)1*4 VERT 4
05X'1�7TIES a 12"or
SLAB -ON -SR ADE
#4, TOP
SLAB-ON-ORAVE
T
IVEAAr PER ARr-H'L
PER PLAN
N
PER I -LAN
x
X—
X
I
/---#4 @ 24"or, HO I RZ.
I
I
I
>1 X
T�
FOOTING PER PLAN
RREINF. PER PLAN
*k4x J DOilIEL5 a
-OMPA07 STRUUGTIURAL
24"oe, (ALT. HOOKS)
FILL
JT
(2)#4, E3077071�
FOOTING AN12 REINF.—/
PER 1/55.1
bcl
-Pb--
-
--bq-
STUD HALL PER PLAN
SHEATHING PER 1/55.1
SEE 2/55.2 a HOOD
SHEAR HALLS
PANEL EDGE NAILING
.01
NOTES1
PER 1/53.1
2xr, P.T. PLATE
W
1. FROVICIE MISC. METALS AND
2x STUD HALL PER PLAN-
//-5HEATHIN&
#3 TOP
T.O.NALL
EMBEDS AS REG'D Blo
EL. m 5�6"
ELEVATOR MFR.
A.B.' A/ PLATE AA5HER5
x X
2, REFER TO 5/55,2 FOR
2x FT PLATE
PlI 1
#5 @ Woc, HORI
J"
A
SUMP PIT DETAIL.
PANEL EDGE NAILING
M a 15"oa, VERT.
(2)#4 xil-OR.40
S. PROVIDE CORNER BARS PER
ALTERNATE HOOKS
5
A.B.'. W PLATE
MHER
(.2) 5112E5
GENERAL STRUrTURAL NOTES.
SLAB ON-6R.AVE
#4, TOP
KASHERS PEP 1/55.1
ov,
\--4
x -r6R4O
PEP, PLAN
SLAB-01,1-5RADE -
PER PLAN
il�
b
#4x L @ O"oc, VERT., 16"oc.
I ..
(2)#4 x E)
CENT. (EMBEDT'
X X
>s
INTO PIT SLAB) —
-]
I
2
—A5 REOV FOR FORMNORK
a 2!
Fl-r�VATOR PIT -
#4 a 12"aa, HORIZ.
#4x J DO]VIEL5
d I I
=1 .1
1 R
SUE
SLAB PER 5/55.2
24"oc (ALT. HOOKW
AN
Y
(2)05
JU
4 2 7 2019
W04, BOTTOM___-",
Ll.
�ffl
§,F%9=68R�
'qj
L HAr
(2)#4 x EA.
#15 a 16"ca, EA. AAf
2
mm
z
z
1.4
1212812018
REVISIONS:
4/29/2019
PRINTED:
4/29/2019 11
DETAILS
BLDG A
-
-tA- DIAPHRAGM BOUNDARY
IL y4'
T.
NAILING
(TIMBER SOREN
PER AR
2x4 BLOOKINS-,,
SIMPSON STRON6-TIE) bx8 BEAM PER PLAN
H/ WSDAH2-110006
�HANPRAIL5
2x4 BEVELED LEDGER
A/ (2) 12d 9 Woe,
(TIM5ER-HEX SCREN
FACENAIL PER 11991
SIMPSON STRONS-TIIE)
zT,.barLoK TLOK6
TO KNEE BRACE
DIAPHPASMI SOUR DAR
EA.TRUSS
NAILING
ALT, to HI
SHEATHINS
SLOPE PER
SHEATHING PER I -LAN
FE:F FL AN
ARCATL
-
ME�m
SHEATHING SLOPE PER
SL
A4"H7LPER
PER PLAN ARCWL -
SHEATHING PER PLAN
5111, &x6 BEAM - LET P
DIAPHRAGM BOUNDARY
INTO BACK PLATE
NAILIN&
.JOISTS I ER PLAN
J OISTS
A I &xC7 KICKER - LET I" INTO
MONP TRU55ES PER PLAN -
BEAM 4 BACK PLATE W
HANGER MR PLAN
HANGE'
'7LA7
N
JOISTS PER PLAN HOLD BACK TOP CHORD
(2)SVNHI-100005 EA. END
1
A" L9L BLOCKING,
ILAN7
JOISTS PER I -LAN
FOR LED61ER, EXTEND
Wr--. PER PLAN
TRUE PER
(TIMBER -HEX SOREN5 by
P.T. 2XIO LEDGER
'.T .2xI,
.11
\_5EAM PER PLAN
HANGERS PER PLAN BOTTOM CHORD
PLAN
SIMPSON 5TROW-TIE)
04'" L5L RIM BOARD
YV(2) Rom
SONS225001213
HANGERS PER PLAN
FLUSH BEAM PER PLAN HAN&ER PER TRUS5 MFR
HI CLIP EA. TRUSS
2x FULL DEPTH BLOCKING
(SEE GENERAL STRUCTURAL
SX6 BACK PLATE H/
COW. TOP PLATE
oWoo, STAGGERED
NOTES FOR REQUIREMENTS
SDAH1,160OVID a Woe,
(SPLICE PER 16/95.1)
o TREATED NOOD)
BEAM PER PLAN
(TIM5ER-HEX SOREN5 by
SIMPSON STRON(5-TIE)
SEE 11553
bx6 IN STUD WALL BEHIN12
FOR CALL-OUT5
IN COMMON
20
1-7
BACKPLATE
1
IR r= PER
bq
bq
STUD NALL PER I'LAN
:,I--
z 00
PIAPHRAGM BOUNDARY
__DIAPHRA6M BOUNDARY
r
06".6
NAILING
NAILING
FACENAIL PER 1/55.1
rACr:NAIL PER 1/55.1
12d @(Vo�
DIAP 6
/__PANEL
UNDARY NAILING
EDGE NAILING
5HE-ATHIN& R PLAN
SHEATHING PER PLAN-\
SHEATHING SLOPE PER
.Allr,llL
PER PLAN AROHL
c�
�X=
'--EXTEND &NB TO I
EXTEN0,6NE
17
F rL
UNDER5 DE OF FLOOR
SHT& AT EA. J015T
SHTS AT CA. JOIST
�ViXI4
PER PLAN-/
\-HANGER5
JOISTS PER
\-HANGERS
J015TS PER PLAN
RI
5V2x14 L5L M
BAY PER AROHL
Bljx14 L5L KIM
BAY PER APZH'L
JOISTS FIER PLAN HAN.,SER PER PLAN
BOARD
5Y2x14 L5L 13LOOKINS
LSL BLOCKING
FLUSH BEAM PER I'LAN PER I -LAN
FLUSH BEAM PER PLAN PER PLAN
a EA. -1015T BAY
EA J IST BAY
FLUSH BEAM PER PLAN P.T. 2xIO LEP&ER
LTF5 @ 45"oc
PER AROH'L
LTP5 @ 45"oc
XH L
N/(2) ROYe
2-LAYERS GAB PER
2-LAYIER5 (S-M PER
SDA92250005
PLAN NOTES 4 ARCHIL
, CL"
FLAT FRAMIN& OILIP5
PLAN NOTES 4 APZH'L
\-SHEAR
olVor, STAGGERED
PER 1/95.1
NALL SHEATHING
PER 1/55.1
STUD HALL 14
S= NALL 13
12
PER PLAN
PEP. PLAN
R SPACE PER ARCH
AIR SPACE PER ARCHL
STUD NALL PER PLAN
g STUP KALL PER PLAN
SHEAR NA.-L SHEATHING
DIAPHRAGM BOUNDARY
MR 1/55.1
FACENAIL PER /e5.1 -bq-
NAILING
u
4r
DIAPHRAGM BOUNDARY
NAILINS
121APHRAC-M E30UNDARY
SQUASH 5LK'S UNDER
NAILING
POSTSYBUILT UP STUDS
I2.d ob"oa
12d sb"oc
FACERAIL PER 1/55.1
(MATC44 ARtAJ
FAOENAdL PER 1/55.1
1241 @6"od
SHEATHING PER PLAN
/-FANEL EDGE NAILING
PANEL E06E NAILING
JOISTS PER P LAN-\
SHEATHING PER PLAN
SHEAR NALL EDGE HAILINS
SPLICE SHEATHING
�11.14
EXTEND 6N5 TO
UNDERSIDE OF FLOOR
\�%X14
JOST5 Fl-_R PLAN
LSL, ljl�.
tv4xl4 LSL RIM
SH-Ar
SHEAR nALL EDGE NAILING
BEAM PER PLAN
SHT& AT EA. JOIST
BAY PER ARCH L
HANGERS FER PLAN
HANGERS PER PLAN
V4`XI4 L5L EILOCKIN&_,_�l
SHEAR AALL
L EDGE NAILING
JOISTS PER P
-LAN
\-HEAVER
BLOCKING a EA.
SEAM PER PLAN
BEAM PER PLAN
FRAMING, OLIF5
IP4"XI4 L5L RIM 50ARO
PER PLAN
FRAMING CLIF5 PER 1/55.1
JOIST BAY PER AROHL
\-.'-LAYERS
PER 1/55.1 HEADER FER PLAN
(N
(NHERE OCCURS)
(AHERE OCCURS)
CONTINUOUS TOP PLATE
6M PER
PLAN NOTES $ APZHL
CONT, TOP PLATE
(SPLICE PER 15/55.1)
2x STUD NALL PER PLAN
(SPLICE PER 15/55.1) 2 STUD HALL PER PLAN
--\-,HEA7H[Nr.
x
PER 1/55-1
SEE 1/55.1
SHEATHIN& PER 1/53.1
FOR CALL -OUTS
IN COMMON
-7
12/28/2018
SHEAR NALL EDGE NAILING
SHEAR NALL EDGE NAILING
SEAM PER I -LAN
DIAPHRAGM BOUNDARY
NAILING
bq
REVISIONS:
4/29/2019 Al
DIAPHRAGM BOUNDARY
DIAPHRAGM BOUNDARY
SMASH 5LK'S UNDER
SQUASH 5LK'G UNDER
NAILINO
NAILING
P05T5 AND BUILT UP
POSTS AND BUILT UP
STUDS ABOVE (MATCH
SQUASH ELK UNDER
FACENAIL PER 1/55.1
FRAMING OLIF5 PER
1/55. SIDES) DIAPHRAGM BOUNDARY
I (ALT.
SlU05 A50VE (MATCH
FACENAIL PER 1/55.1
SIZE ABOVE)
FAOENAIL PER 1/95.1
P
POSTS/DUILT'Cu' STUDS
DIAPHRAGM BOUNDARY
ILIN&
51ZE ABOVE)
(MATCH AREA)
NAILINC,
SHEATHINS NAILS 6 4"oa�
2� 14 LSL RIM
SHEATHING, NAILS a 4"o�
SHEATHING PER PLAN�\
V4".14 LSL BLOCKING
SHEATHING PER PLAN-\
SHEATHING-\
'HEAr
SHEAR NALL EDGE NAILING
SHEATHING-\
SHEATHING PER PLAN-\
PER PLAN
PER PLAN
SPLICE SHEATHING
PRINTED:
4/29/2019
FRAMING OLIF5 PER 1/55.1
FRAMING CLIPS PER 1/55.1
JOISTS PER I -LAN
"'�-12d TOENAILS a (Voc.
JOISTS PER PLAN FACE NAIL PER 1/55.1
J015TS PER PLAN
HEA
514EAR NALL EDGE NAILING
S r
JOISTS PER PLAN
a SHEAR AALL5
I
JOISTS PE PLAN-/
p
"""-HMAPM
FRAMING CLIPS MR 1150.1 '�__HEAPER
JOIST SLOCKINS
L6
J015T BLOCKING
FRAMING OLIPS
PER PLAN
`JB
@
VWX14 L 5L RIM BOARD
\\"ADFR
PER I/S5.1 PER PLAN
(NHERE OCCURS)
40"oc
KNK LSL RIM BOJAR-D
ADER PER PLAN
PER PLAN
@SHEAR KALLS "-ERE 000iRs)
CONT. TOP PLATE
(SPLIar PER la/r
IY4"XI4 LSL RIM 50JAR-D�\
HEADER PER PLAN J
H r
JN 2 7 20*19
(AHERE OrrUR5)
CONTINUOUS TOP PLATE
(AHERE OrlrlUR5)
CONT. TOP PLATE
2x STUD NALL PER I'LAN
(NHE
(AHERE OCCURS)
SLN
xpaMRW
FLOOR
(SPLICE PER
2x STUD NALL PER PLAN
CONT. TOP PLATE
(SPLICE PER I)
2x STUD NALL PER PLAN
STUD NALL PER PLAN
(SPLICE PER 6/95.1)
SHEATHING PER 1/55.1
\-. "
2x STUD NALL FER PLAN
x S
FRAMING
SHEATHING PER 1/95.1
SHEATHING PER 1/59.1
o SHEAR nALL5
CONT. TOP PLATE
E
DETAILS
SHEATHING PER 1163.1 -
o 5WAR KALLS
(SPLICE PER 15/55.0
SHEATHING PER 1/55.1
HE
BLDG A
9HEATHIN15 PER PLAN� ///-IIIAPHRACIM BOUNDARY
SHEATHING PER PLAN DIAFHRA(9m BOUNDARY NAILINe
NAILINC,
FRAMINS CLIPS F R 1/55.1 Al: 55 W VERT.
�—AVD'L TRU55 OVER AALL M STUDS a 24"oG
STUDS PER ARCH'L
PANEL EDGE NAILIN6
pqTRUSSES PER PLAN TRUSSES PEP. PLAN lL '�'�HEADER PER PLAN
12d TOENAILS 0 6"oo '-5HIEATHIN& PER 1155.1 -- (AHERE OCCURS)
2x 97UD KALLL PER I -LAN CONTINUOUS TOP PLATE STUD AALL PER PLAN
S.N.B. PER ARCHL (SPLICE PER SHEATHINE, PER 1/55.1
20 pt- AR NALL) o SHEAR AALLS
5HEATHIN6 PER PLAN DIAPHRASM LTF4 a ALT, BLOCKS W
vy S DIAPHRA6M BOUNDARY
VALLEY OVERFRAMINS BOUNDARY 0.191"41 x NAIL NAILING
PER TRUSS WR. NAILIN6 5HFATHIN6 PER PLAN
2x4 ELOOKINC,
11-2X4 BLOCKIN5
IN)>, 2x4 OUTRI&SER-15 0 2'-O"o6
2X4 OUTRierIER-S
a" a 2'-O"oc m DROPPED TOP CHORD END
a 5'-O"OC H/ A54 TRUSS H/ 5TUD5 0 24"oa
PANEL ED(5E NAILIN6 EACH END VESIeN FOR 15psf KIND LOAD
(5)12d TOENAILS
DROPPED TOP CHORD PANEL EDSE NAILIN6
END TRUSS A/ STUDS
SHEATHING, PER PLAN--� Q 24"oc DESIr5N FOR
15p.f ININD LOAD TRUSSES PER PLAN 12d TOENAILS 11 6"o,
(:22yYx&'-O" ACCESS HOLE) 12d TOENAILS a W'o� �HEAIMR PER PLAN
TRUSSES PER PLAN CONTINUOUS TOI (INHERE OCCURS)
(SPLICE PER 195/55.1)
HANOERS PER TRUSS MPR \-HEADER PER PLAN 7 *1
GIRDER TRUSSES PER PLAN (INHERE OCCURS) 2x STUD AALL FER PLAN
--2x STUD K4LL
2X4 BLKC, a 4a"06 PER PLAN 5HEATHINe PEP. 1/55.1
A/ (5)12.1 TOENAILS @ SHEAR NALLS
a EA. END SHEATHIN(5 PER 1/55.1
CONTINUOUS TOP PLATE 'q I a SHEAR YJALL5 12 11
(SPLICE PER
20, -50,
SHEATHIN6 PER PLAN -111APHPASM BOUNDARY
//// NAILINr. SHEATHIN(9 PER I -LAN
TRUSS BLOCKING- - zTI"barLOK TLOKJ§p
EA. SPACE EA. TRU55
c 61-T. to HI
FRAMINO CLIPS PER 1/55.1 DIAPHRAeM BOUNDARY
KAILIN6
TRUSSES PER PLAN TRUSSES PER PLAN
EA
Lor
'r
Ur
4
TL 0
r
6
_A'
NAILI
5 AN
L
�HEADER PEP. PLAN HI CLIP EA. TTRU55 2x4 VENTED BLOCKIN6
(AHERE OCCURS) W 12d TOENAILS 0 Woo
'OU T L
CONTINUOUS TOP PLATEE
L
F
0
CONTINU US TOP PLATEV ---_2x STUD MLL PER PLAN (SPLICE PER 5/55.1) PANEL ED61E NAILIN(S
(SPLICEOPER 15/55.1) '--�5HFATHIN& PER 1/55.1 HEADER PER PLAN . 2x STUD NALL PER PLAN
a SHEAR AALL5 (AHERE OCCURS)
SHEATHIN PEP 1/95.1
& SHEAR KALL5
12/28/2018
REVISIONS:
4/29/2019
PRINTED:
4/29/2019
RESUB ROOF
JU� 2 7 2019 FRAMING
DETAILS
BLDG A
106E 15115 OR
)THEP PPOJEC
HEAD FLASHING
TPAPEP AND DUIPLING
PER PETAIL5
NON -FLANGE PROJECTIONS
ADHERED VENEER SHALL DE ELDORADO STONE OR EQUAL.
EXTERIOR WALL SURFACES SHALL 13E COVERED W1 A MIN. OF
ONE LAYER OF A WATEK-KE515TIVE DAPKIEK COMPILYING W1
THE REQUIREMENTS OF THE APPLICA13LE CODE. GALYANIZED
EXPANDED DIAMOND ME5H METAL LATH COMPLYING W1
A5TM C&47, W1 A MIN. WEIGHT OF 2.5 LI51YD2 (1.4 KG/M2), SHALL
15E ATTACHED TO STUDS SPACED 16"ON CENTER W1 GALCANIZED
ROOFING NAILS. THE NAILS SHALL 15E SPACED 6" ON CENTER
VERTICALLY & SHALL HAVE SUFFICIENT LENGTH TO PENETRATE
INTO THE STUDS A MN OF V. A MIN 1/2" THICK SCRATCH COAT OF
TYPE 5 OR TYPE N PORTLAND CEMENT MORTAR COMPLYING W1
A5TM C270 SHALL DE APPLIED TO THE METAL LATH AND SHALL
CURE FOP A MIN. OF 46 HOURS. THE STONES SHALL 5E APHEFED
TO THE CUPED SCRATCH WATWIA NOMINAL 1.2" THICK15EDOF
TYPE 5 OF TYPE N MORTAR. JOINT$ 13ETWEEN THE STONES SHALL
13E GROUTED.
SHEAR STRENGTH 50 PEI MIN.
ADHERED VENEER SIDING
MIN OVERLAP 0 ALL
VERTGALJOINTO
INrTALL W MIN. GRADE D BUIDLING
PAPER WEATHER130ARP FASHION
STARnNO FROM THE BOTTOM
,UILDING PAPER INSTALLATION
STEP 1: IN51ALL ONE PIECE DOOR F'AN
OF MEMEDFANE FLA5HING AT THRESHOLD
(ONE PIECE POOR PANO TO BE USED WITH 5LA13
MEMEMANEFLASHING
UNDER DOOR FAN
DOOR
FLASHING INSTALLATION
1Y P111 11 A-
A.
IE
FLASHING DETAIL FOR MODIFIED
rIN
�l 511E�m W.—
A1 E� U.-
AL-1=1
T FLASHING DFLAIL FOR E.?.DwMa DR
16 �11= =1 "I =TUTII� N �0 r5l i8m.—I
-I 1Y FA.1.11,yl I I .1TI
3" ROOF DRAINS
1405.17.2 HORIZONTAL LAP SIPING.
LAP SIDING 5HALL 15E LAPPED A MIN. OF 1-11W'&
5HALL HAVE THE EN05 5EALEP WCAULKING,
COVERED W1 AN H-5ECnON JOINT COVER OR LOCATED
OVER A STRIP OF FLASHING. LAP SIDING COUR5ES
SHALL DE PERMITTED TO 13E INSTALLED W/ THE
FASTENER HEADS EXrOOED OR CONCEALED, ACCORDING
TO APPROVED MANUFACTUREPS'IN5TFUMN. CAULK
ALL SUITT JOINTS.
HARDIPLANK SIDING
INOTALL SO MIN GRAPE P BUILDING
PAPER WEATHEP130AFD FASHION
STARTING FORM THE 50TTOM
P , o-o O�F PAFTEP:
)o 0
'0 0 _
L
LOIN EP
P N� ,
P
'13
PLACEI3UI 13EHIIND
)F�
990 'AFTE
f�COF KAFTEP
<Z LEAVE 1/4" GAF
-]!A�.�EN FA5CIA
P WAtb—___
ROOF TO WALL
OF CAULK THAT RETURNS UPTHEJAMI5V'A5SUPE
THE THRESHOLD If, SEALED
DOOR /
FLASHING INSTALLATION
6'HOPIZONTAL SIDING W1 &'FE%
2X3 7'FLA5HING W1 PKIP EDGE
CAULK ALL JOINTS
2)(12 DELLY 15AND
TYPICAL ?ENiTRAnON:
DRYER DUCT
OVERSIZE HOLE 1" MAX.
CAULK ALL OPENING5
BELLYBAND/ PENIT.
SCREEN,
IL CAP W1 DRIP EDGE.
IL WALL FLASHING,
EATING CONTRACTOR
?DOF TO WALL FLA5HING
CHIMNEY/ CHASE TERM.
INSTALL 60 MIN GPAOE 1) DUILPING
PAPER WEATHEPBOARP FASHION
STAFnt���m
----------
WATER FLOW
R SPACE
-OVE
5HING,V'UPWALL
FLA5HING
AKIEKTAPE
OF FLA5HING
P
KICK OUT FLASHING
11,15TALLOO MIN GRAPE D DUILPING
PAPER WEATHEP130ARD FA5HION
STARTING FORM THE 130TTOM 15UILPING PAPER
--tW
4ZQL4TAL WALL TO
ROOF FLASHING OVER
PLACE STEP FLASHING
COIRNERFLACHING
OVER INOIDECOPNEP
WALL
WALL
ONE PIECE FL NG
WATER FIL
0 IN51DE NER
E)TEND POOF PAPER
UPTHESIDEOFTHE
WALL A MIN. OF 6'
ROOF @ INSIDE CORNER
PLACE STEP FLAS114G OVER
OUTSIDECORNER
ONEFIF.1 11
OUTSIDE CORN
I,--FLAF 1ILII1PING PAPER -
FLOW
3EHIND ROOF PAITEI
LVIATIEF
KE UEAVEI/4�'GAP-
DETWEEN FASCIA
FASCIA ANPWACL
ROOF T WAL RAKE
5TEP 5: PLACE TRIP WITH CAULK DEHIND
STEP 6: PLACE '7FLA5HING ON TOP OF
TKIM-F EP DETAIL ON DI-WNPOWIPOOK HEAD TRIM"
5TEP4. ATTA�F
OVER FRAME 8
LAP OVER SILL
DOOR /
FLASHING INSTALLATION
FASCIA
_-2XW.W_ROOF PAPER
UP THE SIDE OF THE
WALL A MIN. OF 6"
[%TALL 60 ""' GRA — U = JL*4��
FWEK WEATHER15OAKD FA5H ON
5AKTING FORM THE WUOM
M DETAIL E
ROCIF @ OUTSIDE CORNER
APEP MU5T LAP SHINGLE
5TYLE FASHION OVER "Z'FLACHING
11,15TALL 60 MIN GRADE P DUILPING
PAPER WEATHEPL30ARD FASHION
STARTING FORM THE 130TTOM
12" WIDE CORNER WRAP
ATIN51DE&OUTSIPE
FLASHING CORNERS CONT FROM
)F_PF MUST FON. TO EAVE
DOOR
FLASHING INSTALLATION
Note: 60 MIN FAFEK OK WEATHEK 5MART DUILDING WRAII
Nfl@N 1PIERFORMANCIE MMIDION IFLMNOW
W Dead Sealant
(Molstop Sealano
U-1
11h
moislop
Comer Shield
2
Head Flashing
E-Z SeaM
z
z
Bld A
SP/ Flash Sill Window
M06FWP FF 3 Ja mb Flashing
Jamb Flashing
(Moistop
Weather -Resistive
es'
Ba ffier
(Makmp Nor
malseep nan
E-zseao
Oumho Tex*, Fa
or WeatheSZ
W
Cq
00
6,
U
"o
C)
L0
Third Party Independent Inspector:
Construction Consultants of Washington, LLC
40 Lake Bellevue, Suite 100
Bellevue, WA 98005
(425)709-6100 Diane Glenn
6530 REGISTERED
RCHITECT
ERIC GEDN
S STT
ON
TATE O�OFWASH ON
"The undersigned has provided building
enclosure documents that in my professional
judgment are appropriate to satisfy the
requiremenls of RCW 64.55.005 through 64.55.090."
k @!�z 11-15-2019
Eric Geiney, Archite�_V Pate
tt, cw. A RESUB
,Oupz o\o, -oD25 MAR 0 LI 2020
CITY COPY -ATIMMr
U
REVISIONS:
11.14.19