ENG2023-0381 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
98020 ENG2023-0381
www.edmondswa.gov i
Description: PSE-REPLACE GAS SERVICE ISSUED: 08/18/2023
Address: 6907 160TH ST SW EDMONDS WA 98026-4537
EXPIRES: 02/18/2024
it Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00513100003712
I 11-1411 a i
W
NAME TYPE NAME ADDRESS PHONE
APPLICANT SUSAN SIDICK 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
CONTACT PUGET SOUND ENERGY 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)466-4771
OWNER 4UP-WASH LLC 6907 160TH ST SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$252.00 $252.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 08/18/2023
Printed: Friday, August 18, 2023 8:15:43 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NU �!BEJ
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
E-7 RESTOR LIMITS
Printed: Friday, August 18, 2023 8:15:43 AM 2 of 2
RECEIVED
of EpM04O�
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right-of-Wgy permit Handout E6�.
J U L 28 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General •
Project Name 109150564
Site Address or if no site address use Property Address at NW corner of project area: 690716o ST SW
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
State WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ix Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Replace gas service and cut and cap old gas service at approx io' S c/l of 16oth ST SW & 252' to 300' W c/l of 68th
AVE W (2) 3x5 paving cuts anticipated
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
1
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power 3xgas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
x
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Susan Sidick DATE: 07/26/23
APPLICANT PRINTED NAME: Susan Sidick
APPLICANT TITLE: SR Permit Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Job #:
Date:
Jurisdiction:
ROW Permit:
Est. Start Date:
Est. Duration:
109150564
6/27/23
EDMONDS
Yes
8/14/23
1-1/2 Days (12 hours)
Service Address:
City
Customer:
Customer Email:
PM / Inspector:
Site Contact Email:
6907 160TH ST SW
EDMONDS Zip: 98026
JON CHAFE Phone: 360-863-6797
Nayeli Torres Garcia Phone: 206-556-5066
Phone: 425-417-8708
Job Description
Project Scope: FROM 2" PE IP MAIN ON 160TH ST SW, INSTALL APPROX. 180' OF 1-1/8" PE SCAT SVC AND SET A630 MSA O/R.
New Construction:
Yes
RETIRE REMAINING
5/8" PE SVC AT MAIN.
Construction Method
Building Foundation Type
Slab
Septic System
Yes
PLAT Map: 164.070
ENGINEERING DIVISION
N
....'7TED --
Applicant shall repair/replace all
_ I 18/17/2023
damage to utilities or frontage
'v
improvements in City right-of-way
per city standards that is caused or
during the
6907
occurs permitted project.
Proposed 1-1/8" SVC
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
SEE ATTACHED EMAIL
REGARDING SERVICE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
o
LOCATION IN PRIVATE
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
6909
UTILITY EASEMENT
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
POTHOLE FOR
WATER MAIN
Deactivate 5/8" SVC
Water Main
00
160TH ST SW ��
� �
i
2
0
y
-
C/
m
o
�
b
I
C
Sewer
Storm
G
-- --——————
——— — — —z=�---
_ _
x
EXISTING 2" PE IP 10'S 863081
Work
Location
Size of Cut
Surface Type
10'
SOUTH
of CL
160TH ST SW
&
252'
WEST
of CL
68TH AVE W
3 X 5 X 2
A
10'
SOUTH
of CL
160TH ST SW
&
300'
WEST
of CL
168TH AVE W
3 X 5 X 2
A
of CL
&
of CL
Service Information
Street
Information
Job Type
Diameter:
-
Flaggers #:
0
Arterial:
No
Altered Residential Svc
EFV:
-
Police #:
0
TCP:
Yes
I le -In fitting
Meter:
A630 I I
Speed Limit:
0
No Parks #:
0
HDPE - 2" IPS - (DIA) 1"CTS
9999564
Meter Loc:
03 - OL
Trolley Lines:
No
Mtr Hoods #:
0
Del Press:
6" W.C.
Traffic Signal:
Bus Stop:
No
SNO YRD -Snohomish
0 >
Bollards:
ADA Ramps #:
0
Route #'s:
I
RECEIVED
J U L 28 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Torres Garcia, Nayeli
From: PSE Batch Administrator SAP Support <BAT_ADM@PSE.COM>
Sent: Friday, August 11, 2023 12:39 PM RESU B
To: Torres Garcia, Nayeli
Cc: LaBarge, Breanna Aug 14 2023
Subject: FWD: R/W Release WO# 109150564 / FL# RW-131465 CITY E
DEVELOPMM ENTTSSERVI ERVICES
DEPARTMENT
Nayeli Torres Garcia,
The R/W release details have been entered into the SAP R/W notification # 011953658 as follows:
"Parcel connects to the ROW 160th ST SW where the main is located and service is sourced from. There is a dedicated
easement for utilities in the EAST 25', of the SOUTH 99' of said parcel which is also a shared driveway. PM confirmed gas
service is being installed in the East 25' of the shared driveway. Rights are sufficent for work to be performed and
released to construction."
If you have any questions, please let me know. Otherwise, this job is released to construction.
Thank you.
Breanna LaBarge
1
TEMPORARY TRAFFIC CONTROL PLAN
NO PARKING SIGN MUST BE
PLACED 72 HOURS IN ADVANCE
OF SCHEDULED WORK DATE
1 a 3x=
I Do
I
IRESIDENT(S) WILL BE INFORMED OF
1 TEMPORARY DRIVEWAY CLOSURE
I 6907
I
1
I
I
I O
I
i;-OZJ
2:1010 dSN1 ONNAANI N� A110 A9
1
a 1 2]919a 3g Ol S11W1� N ed O1S92]
9
160TH ST SW
ay46uunpsin000 100' 100' 100' •��
piepuels Rlio jed
Al sluawanadwi
I
kln of @Bewep
leys lueoilddV = A
moo
O] I> =A�
!MO
Notes:
lid 1. All signs and spacing to conform to the MUTCD
10
and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and shall
not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m
8. Work area will be 10' SCL of 160th St SW & 252', 300'
WCL of 68th Ave W.
9. If used, place NO -PARK signs 72 hours in
advance of the day that the work is to be done.
\./ b'L-067M
W20-4
BE PREPARED
TO STOP
LEGEND
®
WORK PIT
®
28" TRAFFIC CONE
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
SIGN LOCATION
RIGHT OF WAY
ROW
WORK AREA
OCHEVRON
ARROW BOARD
UNIFORMED
POLICE OFFICER
FLAGGER
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
20
25
POSTED SPEED (MPH)
30 35 40 45 50
55 60 65 70
10
70
105
150
205
270
475
500
550
-
-
-
11
75
115
165
225
295
495
550
605
660
-
-
12
80
125
180
245
320
540
600
660
720
780
840
SIGN SPACING
MPH
.'x"
60/65
1000,
45/55
500'
35/40
350'
30
200'
25
1 100'
CHANNELIZATION
DEVICE SPACING
MPH
TAPER
TANGENT
55/70
40
80
30
60
E35/45
25/30
20
40
<V3Hb
o NaoM
avow
of
of
]A
W20-7A
100,
r ZOZ/
G20-2
iE
PUGET
Designer:
SOUND
Ina Ustemchuk
ENERGY
425-398-6063
ina.ustemchuk@pse.com
Project Address:
6907 160th St SW, Edmonds,
WA
160TH ST SW
BE
�
PREPARED
To
STOP
ROAD
o�
WORK
AHEAD
RECEIVED
J U L 28 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Puget Sound Energy REV
Traffic Control Supervisor:
Card No. 012928
C nd No 0129
07/25/2023
0
Card
°��kP°ed
utem@nro
Job #
(425)4246063
514266803
Page 1 OF 2
TEMPORARY TRAFFIC CONTROL PLAN
NO PARKING SIGN MUST BE
PLACED 72 HOURS IN ADVANCE
OF SCHEDULED WORK DATE
r Op=
RESIDENT(S) WILL BE INFORMED OF
I TEMPORARY DRIVEWAY CLOSURE
6907
I
I�
O
I
Z-OZJ
1 Y
K
O
Wp
rr
160TH ST SW
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and shall
not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m
8. Work area will be 10' NCL of 160th St SW & 300' WCL of
68th Ave W.
9. If used, place NO -PARK signs 72 hours in
advance of the day that the work is to be done.
HL-6ZM
BE PREPARED
TO STOP
LEGEND
®
WORK PIT
®
28" TRAFFIC CONE
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
SIGN LOCATION
RIGHT OF WAY
ROW
WORK AREA
OCHEVRON
ARROW BOARD
UNIFORMED
POLICE OFFICER
FLAGGER
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
20
25
POSTED SPEED (MPH)
30 35 40 45 50
55 60 65 70
10
70
105
150
205
270
475
500
550
-
-
-
11
75
115
165
225
295
495
550
605
660
-
-
12
80
125
180
245
320
540
600
660
720
780
840
SIGN SPACING
MPH
.'X"
60/65
1000,
45/55
500'
35/40
350'
30
200'
25
1 100'
CHANNELIZATION
DEVICE SPACING
MPH
TAPER
TANGENT
55/70
40
80
35/45
30
60
25/30
20
40
^� )idom I
OVOJ
dO1S o
01
03aVd3ad
38
0
o
1011
77AA
r ]
I
100,
PUGET
Designer:
SOUND
Ina Ustemchuk
ENERGY
425-398-6063
ina.ustemchuk@pse.com
Project Address:
6907 160th St SW, Edmonds,
WA
160TH ST SW
TO
STOP
ROAD
WORK N
HEAD
RECEIVED
J U L 28 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Puget Sound Energy REV
Traffic Control Supervisor:
Ina Card N01t,Noo. 012928
07/25/2023 0
Card
°��kP°ed
utem@nro
Job #
(425)4246063
514266803
Page 2 OF 2
CITY OF EDMONDS M BuildingPermit.com
Right -of -Way Application #1353553 - 109150564
Applicant
First Name Last Name Company Name
Susan Sidick Puget Sound Energy
Number Street Apartment or Suite Number E-mail Address
1660 Park Lane susan.sidick@pse.com
City State Zip Phone Number Extension
Burlington WA 98233 (425) 457-6353
Contractor
Company Name
PUGET SOUND ENERGY INC
Number Street Apartment or Suite Number
1660 Park Lane
City State Zip Phone Number Extension
Burlington WA 98233 (425) 457-6353
State License Number License Expiration Date UBI # E-mail Address
PUGETSE032J 1 3/20/2024 179n 1 M55 susan.sidick@pse.com
Project Location
Number Street Floor Number Suite or Room Number
6907 160TH ST SW
City Zip Code County Parcel Number
EDMONDS 98026 00513100003712
Associated Building Permit Number Tenant Name
109150564
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
4UP-WASH LLC
Number Street Apartment or Suite Number
6907 160TH ST SW
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 7/26/2023 Submitted By: Susan Sidick
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1353553 - 109150564
Project Contact
Company Name: Puget Sound Energy
Name: Susan Sidick Email: susan.sidick@pse.com
Address: 1660 Park Lane Phone #: (425) 457-6353
Burlington WA 98233
Project Type
Utility Purveyor
Activity Type
Utility Work
Scope of Work
Disturbance of Surface
Project Name: 109150564
Description of Work: Replace gas service and cut and cap old gas service at approx 10, S c/I of 160th ST SW
& 252 to 300 W c/I of 68th AVE W (2) 3x5 paving cuts anticipated
Project Details
Project Information
Job Number
109150564
Page 2 of 2