Building Permit_1FAMILY HOME Permit
City of Edmonds
PERMIT NUM
EdmondsADULT
98020BLD2023-0351
www.edmondswa.gov
Type: ADULT FAMILY
Subtype: AFH ADDITION -REMODEL
Status: ISSUED
HOME
Parcel No: 00434700000100
Site Address: 9137 186TH PL SW EDMONDS,WA 98026-5749
Applied: 3/21/2023
Subdivision: 004347, 004346, 006820 Lot: 0
Issued: 8/21/2023
Fire Sprinklers:
Lot Area: Zoning:
Final:
Valuation: $5,000.00
Occupancy Type: Construction Type:
Expiration Date: 8/15/2024
Code Edition: 0
No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: BOANCA- REMODEL / COMPIANCE FOR NEW ADULT FAMILY HOME
WA State Contractor L & I #:
NAME TYPE
NAME
ADDRESS
r
PHONE
EMAIL
APPLICANT
CARMELO LAVISTE
216 NE 175TH STREET,
(206)683-2395
BONGNL@HOTMAIL.COM
SHORELINE WA 98155
CONTACT
CNL DESIGN
216 NE 175TH STREET,
(206)683-2395
bongnl@hotmail.com
SHORELINE WA 98155
PROPERTY OWNER
CONTRACTOR
EXEMPTION TAKEN
9137 186TH PL SW, EDMONDS
OWNER
IOANA BOANCA
WA 98026
FEE INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
3/29/23
R27411
PERMIT
PERMIT FEE - RESIDENTIAL
001.000.345.83.000.00
$217.00
$217.00
8/21/23
R30827
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$184.45
$184.45
3/29/23
R27411
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
8/21/23
R30827
RES
TOTALS: $452.95
$452.95
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, August 21, 2023 12:29:26 PM 1 of 2
-ADULT FAMILY HOME • _
rmit
-
City of • • •
98020 1 1
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
10 PIM
[as 0 0 9
W PWVMTTRV—nff��
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT 7NOTES
X-1 FIRE FINAL
B-3 UNDERFLR FRAMING
B-6 AFH COMPLIANCE
X-3 BUILDING FINAL"
B-2 FOOTINGS
No Plumbing and Mechanical permits associated with
this permit.
Printed: Monday, August 21, 2023 12:29:26 PM 2 of 2