BLD2023-1045_Manufacturer_Specifications_and_Installation_Instructions_8.21.2023_10.48.25_AM_3736882NATURAI4r.S. FRVICF
I-1 IWITH
TRINITY ELECTRIC
12027 196TH ST. SW SUITE 101A I LYNNWOOD WA 198036
Exceeding Expectations
Home Owner: Brian Taylor Builder Name:
Site Address: 18115 72nd Avenue West Zone:
City: Edmonds State:
Phone: 6127900950 Zip:
" Installation Instructions
Project is to add a single port ductless heat pump to the bedroom
Indoor unit
2pN XXEX fy 0
ACCA® /'REM/ER ILER
L EN V0 ownnorvo-
lrWtlbi6CaYamsdMa® 5Zj �wE LITEow
Mnm - �IAX EKE
Plan #:
Zone 1 Job #:
WA ID:
98026 Sales Name
Outdoor unit
R1007052023073316-1
Neil Kappen
-Install an MSZ-GS09NA wall unit -Install a MUZ-GS09NA heat pump on the east wall
-Place the unit on a wall bracket
-Route the defrost drain to the gutter
Dn
NATURA4rV S AFRVIPrF
W I-1 I WITH
ELECTRIC
12027 196TH ST. SW SUITE 101A I LYNNWOOD I WA 198036
Exceeding Expectations
RInstallation Instructions
Refrigeration piping routing
-Conceal the external refrigeration piping with line hide cover
Electrical routing
-Follow the hot tub electrical to the new heat pump location inside
conduit
Q1N FNfFf�9 r ,, ��
� b
PREMIER DEALER
MNN4 _ oiannonio-
HCaMb�p Cn9ah�atlMafs Y2 ��ELIT Eon
M1brOa ��AN E'A��' W
Electrical
-Install a dedicated 240v circuit
Electrical routing
-Follow the hot tub electrical to the new heat pump location inside
conduit