Loading...
BLD2023-1045_Manufacturer_Specifications_and_Installation_Instructions_8.21.2023_10.48.25_AM_3736882NATURAI4r.S. FRVICF I-1 IWITH TRINITY ELECTRIC 12027 196TH ST. SW SUITE 101A I LYNNWOOD WA 198036 Exceeding Expectations Home Owner: Brian Taylor Builder Name: Site Address: 18115 72nd Avenue West Zone: City: Edmonds State: Phone: 6127900950 Zip: " Installation Instructions Project is to add a single port ductless heat pump to the bedroom Indoor unit 2pN XXEX fy 0 ACCA® /'REM/ER ILER L EN V0 ownnorvo- lrWtlbi6CaYamsdMa® 5Zj �wE LITEow Mnm - �IAX EKE Plan #: Zone 1 Job #: WA ID: 98026 Sales Name Outdoor unit R1007052023073316-1 Neil Kappen -Install an MSZ-GS09NA wall unit -Install a MUZ-GS09NA heat pump on the east wall -Place the unit on a wall bracket -Route the defrost drain to the gutter Dn NATURA4rV S AFRVIPrF W I-1 I WITH ELECTRIC 12027 196TH ST. SW SUITE 101A I LYNNWOOD I WA 198036 Exceeding Expectations RInstallation Instructions Refrigeration piping routing -Conceal the external refrigeration piping with line hide cover Electrical routing -Follow the hot tub electrical to the new heat pump location inside conduit Q1N FNfFf�9 r ,, �� � b PREMIER DEALER MNN4 _ oiannonio- HCaMb�p Cn9ah�atlMafs Y2 ��ELIT Eon M1brOa ��AN E'A��' W Electrical -Install a dedicated 240v circuit Electrical routing -Follow the hot tub electrical to the new heat pump location inside conduit