Loading...
ENG2023-0303 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NU BE City of • • . Edmonds:iENG2023-03031 www.edmondswa.gov i Description: ZIPLY - BORE FOR NEW SERVICE ISSUED: 08/23/2023 Address: 1050 5TH AVE S EDMONDS WA 98020-4064 EXPIRES: 02/23/2024 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00582000100401 wI 11-14111 a NAME TYPE NAME ADDRESS PHONE APPLICANT ARIANNE MOMMSEN 1800 41ST ST STE N-100, EVERETT WA 98230 (402)670-8384 CONTACT ZIPLY FIBER NORTHWEST, LLC 1800 41ST ST STE N-100, EVERETT WA 98230 (425)375-0838 CONTRACTOR PACIFIC CABLE CONSTRUCTION PO BOX 573, WOODINVILLE WA 98072 (425)346-2083 OWNER NORGE LLC 7F 17717 14TH AVE NW, SHORELINE WA 98177 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $378.00 $378.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 08/23/2023 Printed: Wednesday, August 23, 2023 10:59:48 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NU �!B E City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** E-7 CONCRETE SIDEWALK E-7 RESTOR LIMITS Printed: Wednesday, August 23, 2023 10:59:48 AM 2 of 2 RECEIVED Lti�y of EDdf04O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. J U N 28 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name Site Address or if no site address use Property Address at NW corner of project area: 1050 5th Ave S Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17 Point of Contact M i ke H a ka h a n Title Engineer Addressl 800 41 st St., Ste. N 100 city Everett State WA zip 98203 Phone 425-949-0230 Email mike.hakahan@ziply.com AuthorizedContractor and Agent of • note below) NameofCompany Pacific Cable Construction Contractor . During Primary Name Danielle Herrera Agent Name Danielle Herrera Title Permit Manager Title Permit Manager Mobile 425-348-7735 AddressPO Box 573 Email danielle@paccab.com city Woodinville State WA zip 98072 Secondary Name Phone 425-348-7735 Title Email danielle@paccab.com Mobile City of Edmonds Business License No: PACI FCC954PJ Email State License No: 3636CON 1096 E3 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. Type of Development ❑ Multifamily residential \,� Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) \,6 Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband provider Ziply Fiber to From MH located at 1041 5th Ave S bore under 5th Ave S approximately 60' and place a new flowerpot. Then bore south approximately 120' to an existing HH. Then continue from the new flowerpot to customer building at 1050 5th Ave S. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF I x I LF SF Parking 72 hours + I LF JxJ LF I SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: * telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will an e ui ment be added under round or above round (e. edestals, vaults, etc.)? If es, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial develo ment?4. tX Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial develo ment to an existin under round common utili s stem? 5. Does the work involve proposed additions to an aboveground utility system? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of • to be Completed • 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 11 1 How many are to be added? 6b. Does your project involve poles? If yes: x How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: x How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: %�1$'AX4 t APPLICANT PRINTED NAME: Michael Comer APPLICANT TITLE: Traffic Controll Specialist NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 6/20/2023 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 LEGEND: M 7 EXISTING MANHOLE FTMW PROPOSED TERMINAL ® EXISTING UTILITY POLE 1:9 PROPOSED NEW POLE H 71 EXISTING HANDHOLE H H PROPOSED NEW HANDHOLE [2'x3'] M H EXISTING MANHOLE EH PROPOSED NEW MANHOLE 0 EXISTING FLOWER POT ® PROPOSED NEW FLOWER POT — — — EXISTING UNDERGROUND UTILITY PROPOSED UNDERGROUND — — — — — — CONSTRUCTION [HAND DIG, BORE] EXISTING AERIAL SPAN PROPOSED AERIAL SPAN CENTER LINE PARCEL LIMITS [PROPERTY LINE] EOP EDGE OF PAVEMENT WATER LINE STORM WATER SEWER LINE ROW RIGHT OF WAY WORK DETAILS: From MH located at 1041 5th Ave S bore under 5th Ave S to 1050 5th ave S approxir,ately 60' and place a new flowerpot, Then bore south approxir tely 120' to a HH located between 1070 and 1115 5th Ave S. Then continue from new flowerpot to customer building at 1050 5th ave S. TRENCH IN UNPAVED AREA I TRENCH IN PAVED AREA I REQUIRED PAVEM114T RESTORATION BEE MILL CREEK STD. PLANS OR AS SPECIFIED SAWCUT(TYP) APPLY JOINT SEALANTPG 84-22TOTOP SURFACE RESTORA71ONAS SPECIFIED 1Y MIN. AND TACK COATTO SIDES MDUND4"MIN. —EXISTING PAVEMENT SURFACE iq SELECTOR NATIVE TREMAX.NCH uu11 SACKFI U. COMPACT TO 90%OF �. 0116657) IN UNPAVED AREA �a SENCHASNEEDEOFOR F� SHORING OR TRENCH z €f Soxm-) WHEN DEPTH 1848'ANOGRFATER !' 3' INITIAL NATIVE SACKRU_ - SELECT (MAX V ROCK) MATERIAL COMPACTED TO 96% MAX. DRY - - - DENSITY. WMAX. LOOSE UFTS GRAVEL SACKMILL FOR PIPE ZONE MIN MIN SEDDIMGPERWSDOToa3.12(3) VARIES-- MIN. DEPTH IS SPEC 9A39(31. COMPACT TO 116% MAX DRY U N3rT1' SEE NOTE 2 SELECT OR NATIVE TRENCH SAOWILLCOMPACTTO96% MAX. DRY DENSITY (PER A3TM D1557) IN PAVED AREA. PLACED IN 12" MAX LIFTS. Lat: 47.80215 RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR Long:-122.37812 ENGINEERING DIVISION ....,7TED 18/21 /202 N b Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. POTHOLE FOR ALL UTILITY A CROSSINGS I -own rr m � r _ ONE,O O Yr L A I rI O ,r < RECEIVED -� 1�' . � ` Aug f �LA4-• 02 2023 Flowerpoy Specs; -d"L Flowerpot is confirmed in the ROW CITY OFEDMONDS ❑ld Flowerpot 11' round OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING DEVELOPMENT SERVICES New Flowerpot = 11'x1l' EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY DEPARTMENT UTILITIES MAY REQUIRE A SEPERATE PERMIT. 0 ATCO COMMUNICATIONS SERVICES, LLC WWW.0tc0te1ec0m.00M 360.563.9000 708 First Street Snohomish, WA 98290 plyfiber Everett, WA 98206 CO 00 Q J 2 ?� O �0 z z CL 0 W a Y of W W Q CO Cl) DO C_ � coo o^_ o L1_ U w m w � z Q z o 6i Q z O O U O J d d LL DATE: 6.16.2023 DESIGNED BY: M. COMER ATCO CONTACT: 830.329.1982 michael.comer@atcotelecom.com SCALE: SHEET: NOT TO O' SCALE NO: 1 OF " . e'er-• �'" � �... :.. _ I �i � _- y�:.f.� _ *M.•4 . II _ KK atq�rr�`iN�l.w'c.,,.- R-''�,�5ti�c: .��� ,2F .., ,c�N � '+'.. � • - - r q�'� .fir x`4-*�,� � �> ,a �, , . - All 168636 Overhead view 01 ++ �r��~ a in •� �,� mT r - 73 r O ■ 71, Milir 1071 ` ~1070 fir' RECEIVED JUN 28 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) Pine tG pine St a > Pine Street Playfield Rich Rana Loan Officer NMLS 120146, Home.._ Forsyth Ln ?rlach CaG1strK.lCtlanP Irlc ip Fir PI 6 M plevine Community ry �- C1 CID OIL �laa s f SC Q C7 WORK AREA Fir St Flir PJ Onlyinc.cnm 3 Only place zo market Equipment • Selling... cn Elm St I Puget P,'-wver Was 104 VICINITY MAP J" I pine a CID co Ei„ l P1 RECEIVED Aug 02 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT dt, O ATCO COMMUNICATIONS SERVICES. LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 ziPIy fiber Everett, WA 98206 z m 00 co aS a O o c?i> U ~ 0 O LL M W W C/i I W Q F- LLJ CD LO LLJ o = Cn W i U LU W m � o z Q z ui U U O 2 Q Z 0� 0� O J_ iL d J LL DATE: 8.1.2023 REVIEWED BY: K. BUXTON WSTCS# 013250 DESIGNED BY: M. COMER ATCO CONTACT: 830.329.1982 michael.comer@atcotelecom.com SCALE: SHEET: NOT TO U SCALE NO: 1 OF 3 LEGEND: 0 SIGNALIZED INTERSECTION OCONE (CANDLESTICK) TYPE III BARRICADE WORKTRUCK WORK ZONE LIMITS OWE WARNING SIGN ARROW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR SIDEWALK PARKING SIP* E f W20-1 N TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP SIGN LEGEND: W3-4 ROAD ONE LANE WORK ROAD AHEAD AHEAD W20-1 W20-4 W20-7A AR-217 P❑TH❑LING IS REQUIRED FOR ALL UTILITY CR❑SSING IN THE ROW 5TH AVE S 50' - 100' (25 MPH) ONE —LANE, TWO WAY TRAFFIC TAPER DRIVEWAY DRIVEWAY SI DEWA WRIVEW YSIDEWAL _ F SIDEWALK SIDEWAL PARK. PARK A6 11' MIN. e ° • • • o O f On _ PARKIN W20-7A AR-217 �W20-4 50' — 100' X X X O E—LANE, TWO WAY TRAFFIC TAPER Applicant shall repair/replace all OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING damage to utilities or frontage improvements in City right-of-way ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY per city standards that is caused or UTILITIES MAY REQUIRE A SEPERATE PERMIT. occurs during the permitted project. BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' DEWALK SIDEWALK PHASE 1 WORK DETAILS: Qi From MH located at 1041 5th Ave S bore under 5th Ave S to 1050 5th ave S approximately 60' and place a new flowerpot. Then bore south approximately 120' to a HH located between 1070 and 1115 5th Ave S, Then continue from new flowerpot to customer building at 1050 5th ave S. w SPOTTER NEEDED FOR PEDESTRIAN w TRAFFIC AND DRIVEWAY ACCESS, C❑NSTRUCTI❑N TO PLACE NO PARKING SIGNS 72 HOURS PRI❑R TO START WORK W20-7A,� W20-4�s I W20- SIDEWALK a z ENGINEERING DIVISION DTED @(I 18/21 /2022 AR-217 RKIN SIDEWALK WORK 5TH AVE S MH AREA (25 MPH) 1 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE NOTE: MON. - FRI. = 7:00am TO 4:00pm CHANNELIZATION DEVICE SPACING (feet) MPH F TAPER 7 TANGENT 50/70 40 1 80 35/45 30 60 25/30 20 40 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' SIDEWALK SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. O ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 ziPylfiber Everett, WA 98206 00 < z J O C Z U 0 U ~ 0 co w w 12 LU a M CD O0 LO o ^� z O U U w cii w LL— LL— m z a U Q U z O w z � EL � a U o � LL DATE: &1,2023 REVIEWED BY: K. BUXTON WSTCS# 013250 DESIGNED BY: M. COMER ATCO CONTACT: 830.329.1982 michael.comer0atcotelecom.com SCALE: SHEET: =5C 02 NO: 2OF3 LEGEND: USIGNALIZED INTERSECTION OCONE (CANDLESTICK) TYPE III BARRICADE WORKTRUCK WORK ZONE LIMITS OWE WARNING SIGN ARROW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) SIGN LEGEND: W3-4 ROAD ONE LANE WORK ROAD AHEAD AHEAD W20- , W20-4 W20-7A AR-217 P❑TH❑LING IS REQUIRED FOR ALL UTILITY CR❑SSING IN THE ROW 5TH AVE S (25 MPH) DRIVEWAY SIDEWALK VG•� • • • AR-21•/ • • 8>> F OT 0 1 SIDEWALK 4 W20-7A DRIVEWAY 50' — 100' X X ONE —LANE, TWO WAY'V__ TRAFFIC TAPER G)\\ DRIVEWAY 11' MIN.�� PARKING SIDEW4 DRIVEW/ MH PHASE 2 WORK DETAILS: Qi From MH located at 1041 5th Ave S bore under 5th Ave S to 1050 5th ave S approximately 60' and place a new flowerpot. Then bore south approximately 120' to a HH located between 1070 and 1115 5th Ave S, Then continue from new flowerpot to customer building at 1050 5th ave S. w SPOTTER NEEDED FOR PEDESTRIAN w TRAFFIC AND DRIVEWAY ACCESS, C❑NSTRUCTI❑N TO PLACE NO PARKING SIGNS 72 HOURS PRI❑R TO START WORK 50' — 100' BONE —LANE, TWO WA X___Ai TRAFFIC TAPER AW20-7 M PARKING • » • • • AR-217 TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' NOTE: MON. - FRI. = 7:00am TO 4:00pm SIDEWALK y1rr:MR192110161 PARKING (25 MPH) Y J a I w `W20-4 X o / Cal C� `W20-1 X w CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 35/45 30 1 60 25/30 20 1 40 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' a z SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. O ATCO COMMUNICATIONS SERVICES, LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 ziPylfiber Everett, WA 98206 CD M < 3:J z (0 O U) z U D U ~ 0 co W cn W co W a M CD OCD LO O z U U w cii w LL m Z 0 U Q U Z O n / LLj L� g z Of a � a ULU o ILL DATE: &1,2023 REVIEWED BY: K. BUXTON WSTCS# 013250 DESIGNED BY: M. COMER ATCO CONTACT: 830.329.1982 michael.comer0atcotelecom.com SCALE: SHEET: =5C 03 NO: 3 OF 3 RECEIVED CITY OF EDMONDS Right -of -Way Application #1335511 - 168636 J U N 28 2023 MyBuildingPermit.com CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Arianne Mommsen Ziply Fiber Northwest, LLC Number Street Apartment or Suite Number E-mail Address 1800 41st St Ste N-100 Arianne.mommsen@ziply.com City State Zip Phone Number Extension Everett WA 98230 (402) 670-8384 Contractor Company Name PACIFIC CABLE CONSTRUCTION INC Number Street Apartment or Suite Number PO Box 573 City State Zip Phone Number Extension Woodinville WA 98072 4253487735 (206) 730-5945 State License Number License Expiration Date UBI # E-mail Address PACIFCC954PJ 10/21/2023 FDD5877Dq LUKE@PACCAB.COM Project Location Number Street Floor Number Suite or Room Number 1050 5TH AVE S City Zip Code County Parcel Number EDMONDS 98020 00582000100401 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name NORGE LLC Number Street Apartment or Suite Number 17717 14TH AVE NW City State Zip SHORELINE WA 98177 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 6/27/2023 Submitted By: Arianne Mommsen Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1335511 - 168636 Project Contact Company Name: Ziply Fiber Northwest, LLC Name: Donavon LaFleur Email: Donavon.Lafleur@ziply.com Address: 1800 41 st St Ste N-100 Phone #: (425) 375-0838 Everett WA 98230 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: 168636 Description of From MH located at 1041 5th Ave S bore under 5th Ave s approximately 60' and place a new Work: flowerpot. Then bore south approximately 120 to a HH located between 1070 and 1115 5th Ave S. Then continue from the new flowerpot to customer building at 1050 5ht Ave S. Project Details Project Information Job Number 168636 Page 2 of 2