ENG2023-0371 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
98020 ENG2023-0371
www.edmondswa.gov i
Description: PUD - INSTALL NEW PIED FOR DEVELOPMENT ISSUED: 08/23/2023
Address: 7606 206TH ST SW EDMONDS WA 98026-6860
EXPIRES: 02/23/2024
it Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00614300000605
I 11-14111 a i
W
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353
OWNER DAMIAN KONASIEWICZ 7606 206TH ST SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$252.00 $252.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 08/23/2023
Printed: Wednesday, August 23, 2023 12:18:54 PM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUMBE3
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
Printed: Wednesday, August 23, 2023 12:18:54 PM 2 of 2
RECEIVED
of EpM04O�
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right-of-Wgy permit Handout E6�.
JUL 19 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General •
Project Name SEC'D PED INSTALL - WO: 100116828
Site Address or if no site address use Property Address at NW corner of project area: 7606 206TH ST SW
Associated Permits: BLD PLN ENG
Owner and Entity Holding
Name of Company SNOHOMISH COUNTY PUD Franchise Ordinance No: N/A
Point of Contact
Title
Address PO Bo 1107
City EVERETT
State WA
Zip 98206-1107
Phone
Email PERMITS@SNOPUD.COM
Contractor and Authorized Agent of Owner
Name of Company SAME AS ABOVE
(see note below)
Contractor Contacts During Construction
Primary Name N/A
Agent Name
Title
Title
Mobile
Address
Email
City
State
Zip
Secondary Name
Phone
Title
Email
Mobile
City of Edmonds Business License No: N/A
Email
State License No: 313-005-741
X Contractor verifies it is currently bonded
x Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
r5 Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
r5 Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
SCOPE OF WORK: Intercept existing secondary riser to place a new pedestal for 7606 206th ST SW. There will be 10 feet of soft
surface ground disturbance in the ROW. PUD will be trenchinq 2 feet deep to place conduit for the new pedestal.
LOCATION: NW corner of 7606 206th ST SW property
LANE DIRECTION: Closing eastbound lane of 206th ST SW for 4 hours between 9AM - 3PM.
PEDESTRIAN ACCESS: No Pedestrian detour needed.
TRAFFIC CONTROL PLAN: Included.
TREE TRIMMING: Not required.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
N/A LF
x
N/A LF
N/A SF
N/A
Alley 72 hours +
N/A LF
x
N/A LF
N/A SF
N/A
Parking 72 hours +
N/A LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable z power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe: PEDESTAL
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
X
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 11 1 How many are to be added? 10
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area? 1
What is the height of the existing poles? 45'
How many poles are to be removed? Q
Are additional poles to be laced? NO
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all
permit fees.
APPLICANT SIGNATURE: a ()��_z DATE: 7/18/2023
APPLICANT PRINTED NAME: CHRISTIAN CHAVEZ
APPLICANT TITLE: ASSISTANT DESIGNER
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING improvements in City right-of-way
Aug 11 2023 ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY per city standards that is caused or
UTILITIES MAY REQUIRE A SEPERATE PERMIT. OWNER/CONTRACTOR IS RESP AtW&CEriFO� permitted project.
EVELOPMENTSERVICES EROSION CONTROL AND D RAINAG�
-10 11111HJVId3d
� DEPARTMENT Ol 310d M3N
310d M3N
03AOW38 38 01-310d ONIlSIX3 X
310d ONIlSIX3 O
W-0i90Z W-909L W-"9 8Z9L
0MI-L£ I
16 6
ZV86
90
Z59£ OOi Z MC
Ej 1 IN ERINGP�VI6
7TED
18/22/2 2
W-109
W-919L
1090Z
681-ZI MS
06L6
H190Z
MS 1S H19OZ 909L 30 83N800 MN 3H1 NO 03d M3N 3H1 ONV
ZV26 :11d N33M138 30V Id 3XV1 A INO 111M 30NV88n1S10 ONnodo
03d M3N O1N1 133diS 3H1 SSOHOV 03d ONUSIX3 0333
S6V8 V4831-9 (h) 11`d1SNI
03d M3N 01 OAS 0VZ/0Z1 301AO8d 01 Z991-001 :HV4JX 01 NN00
03d M3N 01 83SId NI Xdl NINON OW 30 ,09 Nnd
ZV26:11d NO 83SId 0,03S ONUSIX3 1d33831NI
03XV1S Sd Zt,86 =11d 30 HlnoS ,O[ 03d 01 11V1SN1
ZV26 :11d
1N3W332iOd 310d d1HS83NMO 1NIOr ONV (S)1N3W3380V 1N3WH0dlld 310d 318` O11dd`d H11M
1N31SISN00 38 01 NO11dbO1S38 IVNI3 ONV 310d 30 IVAOW38 'S3111'llln 30 83JSNVHI
Z8vZ-vv�- Zv
# 1130 S,80N3
# '131 S,NON3
LZi 3SVHd 9Z1—ZL 'ON IIn0NI0
Add NOIIVISBns
]Iva
03INIHd 31V0
03AOHddV
:UIN-dJ-d I
5V-ggt 30Vd dVW NOI1V001
'ON N30N0 3OIA83S
'ON 1dI303N
OIVd 3IV0
S Ina 1V101
3Sn 1NIOf
4d
SIO
NIM
00 sI0
SIO
S
S
S
dine-sv
NIaW
ON ■ S3A ❑
ONIIH9I1 111211S
S
S IIWN3d
°N
31V0 11VO 3NO ❑
s 11nVA
ONIOOVlJ ❑ 30HN0V8 ❑
S33j sno1NVII13SIW
NOIv001 and ❑ WINI 33NI ❑
ANVON0o3S ❑
S1Nivmi pia j '1SN03-12ld
310d 330 3NV1
A8VW18d ❑
01 WON.
/WM JO 1H9IN NI >iNOM
ONIMNIIS ]�Od
3=, Se7'1j b
ONIIH9I1 111?11S
❑
A1VO '8 AIdIZ 3NO8 1NIOf ❑
1�
AIVO 8 A1dIZ HONIK 1NIOr ElSP7
333 0ISV8
#Ndr El
SIOV1NO3 1\1911210J
1VId 0Nno0I IGI\I1
03SV313N 31VO
S 33J 01SV8
ONno01021101\lf1 /,�IV0NOOIS
038In03N ION ■ 0381n03N ❑
S= So
S1NIW]SVI
oN n3l
S 333 o1SV8
❑
AiIo ❑
1VION3WW00 ❑
A1Nn00 ❑
IVIIN30ISIN ❑
ONno0 I IGI\I 1 J, IVINI�Id
3IV1S ❑
$ 3�Od 'ANOO/N313W
WINI 33NI ❑
(031NVN0 ]IV() S1IVM1d
S=,
S 13J 01SVO
(S3ION 33S) S3A ❑ ON ■
SN0IIV10IA OSIN
0V3H2�3A0 J,2�VON003S
'ON 03l
1VION3WW00 ❑
lV1IN301S3N ❑
OVIH�IIA0 )\�IVWI�Id
ON ❑ S3A H Q ll s l � I
NVNINOJ
03131dW00 NNOM 31VO
31vos ' ayol MN Ol
NMiVN0 ZO1M31SVNON MdINVO
0900 NOIIVN3dO Z3AVHO N33NION3 HOJ Q3d 0,03S ANOM NO3 NOSVIN
8Z89«00L N30NO £ZOZ/M/L 31VO t, �J LZ 1 6L Sti/L3S Zt,86 'ON 310d
V3NV (100MNN/.� S(INOWOA MS 1S H190Z 909L NOIIV00l
AINnoD HSIWOHONS 30 1'ON 10INISIO kiiiiln 0118nd o
a
V0101-4 - Secondary Rectangular Pedestals
Revision 3
Mar 14, 2012
C.U.
Description
Load Rating
Oty
MID
V0101
Pedestal, Sec Small 13"W x 24"L x 15"H
Incidental Non -Vehicular Traffic
1
776015
V0102
Pedestal, Sec Large 17"W x 30"L x 18"H
Incidental Non -Vehicular Traffic
1
776031
V0103
Pedestal, Sec Small 13' W x 24"L x 18"H Polymer Concrete
Occasional Heavy Vehicle Traffic
(See Note 2)
1
1000086
V0104
Pedestal, Sec X-Large 24"W x 36"L x 18"H Polymer Concrete
Occasional Heavy Vehicle Traffic
(See Note 2)
1
775992
of Eoo CITY OF EDMO S
d PLAN REVIEW COMMENTS
-------------
ENGINEERING DIVISION
(425) 771-0220
hst. 1890
City Website: www.edmondswa„s(aX„N3NI2Wd30
`7 3S 1N3WdM3A34
SONOW03 d0 A110
£ZOZ [ [ bny
DATE: August 8, 2023 9 n S 3 N
TO: Snohomish County PUD
permits@snopud.com
FROM: Natalie Griggs, Engineering Technician
en ing eeringpermits u,edmondswa. oovv
RE: Application #: ENG2023-0371
Address: 7606 206"' St SW
Project Description: Install New Pedestal
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents through
www.MyBuildingPermit.com.
SITE PLAN
1) The scope of work is unclear. Please revise the plans to address the following:
a. Clearly show where any ground -disturbing work will occur.
b. Show if there is an existing conduit where connecting to the existing pedestal
across the street or if this will need to be trenched or bored.
2) Please show all City utilities on the site plan. Please refer to the City's GIS Map and
revise the plans accordingly.
a. Please verify that the pedestal and any conduits from the pole to the pedestal are
at least 5' away from all City utilities and appurtenances.
b. If a new conduit is proposed to cross 206th, confirm that it is at least 5' away from
any City catch basins, manholes, valves, etc.
3) Please show all private services (water, sewer, storm) that are adjacent to the proposed
pedestal.
a. It appears that this pedestal is proposed near the 6" sewer cleanout at the property
line. Please confirm the pedestal will be at least 5' away from the sewer cleanout.
1)
a) There will only be ground disturbance between the pole referenced as PLI: 9842 and the new pedestal to
be placed on the NW corner of the 7606 206th St SW property, as shown in the sketch.
b) There will be no trenching or boring across 206th.
2)
a) The new pedestal and conduit will be not be placed in the direction of City utilities.
b) There will not be any new conduit placed across 206th.
3)
a) The new pedestal is farther then 5' away from the sewer cleanout.
LANE CLOSURE ON A TWO-LANE ROAD
(TWO FLAGGER OPERATION)
*>x-
ONE
W20-1
W20-4
W3-4W2
zx
00
00
N V�
x
G20-2 ROAEND
D WORK
48'' x 24''
(OPTIONAL)
RECEIVED
J U L 19 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
U
L_
O
O
H-
Q0
O
48'' x 24''
i END G20-2
ROAD WORK
x (OPTIONAL)
0
0
..
� zx
w
Q o0
Lno
GENERAL NOTES:
ENGINEERING DIVISION 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD.
.,7TED
2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND
p(I� 18/22/2023 DATES (OPTIONAL).
3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD
Zz- CONDITIONS.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK.
5. ALL SIGNS MINIMUM 48'' X 48'',UNLESS OTHERWISE SPECIFIED.
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING 6. CHANNELIZATION DEVICES ARE 2811 REFLECTIVE CONES. SEE TABLE 1
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY FOR SPACING DISTANCES.
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
SIGN SPACING
= X
FREEWAYS & EXPRESSWAYS
55-70
MPH
1500'+
RURAL HIGHWAYS
60-65
MPH
800'+
RURAL ROADS
45-55
MPH
500'+
RURAL ROADS & URBAN ARTERIALS
35-40
MPH
350'+
RURAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
25-30
MPH
200'+ (2)
URBAN STREETS
25
MPH OR LESS
100'+ (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
x occurs during the permitted project.
•
s 0� W20-7A
W20-7B
x
ONE LANE BE
s ROAD W 2 0- 4 PREPARED
AHEAD TO STOP
x
ROAD
i WORK W20-1
AHEAD
THIS PLAN MAY BE MIRRORED FOR
OPPOSITE SIDE OF ROADWAY USING
SAME SIGNS AND SPACING.
YES ❑ NO ❑ INITIAL
7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
BUTTER DATA
LONGITUDINAL BUTTER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH (FEET)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROES AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 LBS.
HOST VEHICLE WEIGHT
> 22,000 LBS.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100'
123'
172'
74'
100'
150'
II_1:��i1
CHANNEEIZATION DEVICE
SPACING (FEET)
MPH
TAPER
TANGENT
50-65
10 TO 20
80
35-45
10 TO 20
60
25-30
10 TO 20
40
���_Nin:
•
CHANNELIZING DEVICE
r
FLAGGING STATION
PORTABLE SIGN AND SUPPORT
�®
WORK VEHICLE WITH FLASHING
LIGHT
WORK AREA
RECEIVED
J U L 19 2023
CITY OF EDMONDS
CITY OF EDMONDS M BuildingPermit.com
DEVELOPMENT
Right-o �av°A�prAcation #1349120 - 100116828 -Secondary Ped Install
Applicant
First Name Last Name Company Name
Moe Matthews Snohomish County PUD
Number Street Apartment or Suite Number E-mail Address
PO Box 1107 permits@snopud.com
City State Zip Phone Number Extension
Everett WA 98206 (425) 783-5681
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
7606 206TH ST SW
City Zip Code County Parcel Number
EDMONDS 98026 00614300000605
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Damian Konasiewicz
Number Street Apartment or Suite Number
7606 206TH ST SW
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 7/19/2023 Submitted By: Moe Matthews
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1349120 - 100116828 - Secondary Ped Install
Project Contact
Company Name: Snohomish County PUD
Name: Moe Matthews Email: permits@snopud.com
Address: PO Box 1107 Phone #: (425) 783-5681
Everett WA 98206
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 100116828 - Secondary Ped Install
Description of PUD to intercept existing secondary riser to install a new pedestal. There will be 10 ft of soft
Work: surface ground disturbance in ROW. PUD will be trenching 2 feet deep to place conduit for
pedestal. closing the eastbound lane of 206th ST SW for approx 4 hrs.
Project Details
Project Information
Job Number
100116828
Page 2 of 2