Loading...
APPROVED PLN RESUB 2 - PLN2017-0059 NATIVE VEGETATION PLANEXISTING VEGETATION LEGENDEXISTING DECIDUOUS TREE TO BERETAINEDEXISTING CLUSTER OF DECIDUOUSTREES TO BE RETAINEDEXISTING PROPERTYBOUNDARYEXISTING SPLIT RAIL FENCETO BE MAINTAINEDNEW SPLIT RAIL FENCE.MATCH EXISTINGEXISTING WATER METER TOBE MAINTAINEDEXISTING SPLIT RAIL FENCETO BE MAINTAINEDMATCHLINE - SEE SHEET L-2 EXISTING PROPERTYBOUNDARYPROPOSED PROPERTY BOUNDARYPROPOSED HOMEEXISTING EVERGREEN TREE TO BERETAINEDBOUNDARY FOR PROPOSED NATIVEVEGETATION MANAGEMENT AREAINSTALL NEW TOPSOIL TOBRING GRADE UP TOAPPROXIMATELY SAMEHEIGHT AS DRIVEWAYRETAIN EXISTING THIMBLEBERRY(Rubus parviflorus)REMOVE EXISTING LAWNWOODCHIP MULCH ONLY WITHINA 5' RADIUS AREA AROUND BASEOF EXISTING TREES THAT ARETO BE RETAINED. THIS IS TOAVOID DISTURBING TREE ROOTSWITHIN NATIVE VEGETATIONMGNT AREA, DECONSOLIDATEEXISTING COMPACTED SOILSWHERE THEY'VE BEEN DRIVENONNATIVE VEGETATION AREA:TOTAL SQUARE FEET (LOTS 1 & 2): 37,191MINIMUM 30% NATIVE VEGETATION AREA REQUIRED:37,191 SQ FT x 30% = 11,157 SQ FT REQ'DNATIVE VEGETATION AREA PROVIDE: 11,157 SQ FTRETAIN EXISTING NATIVEDECIDUOUS TREESTREE RETENTION NOTES:ALL EXISTING TREES WITHIN THE NATIVEVEGETATION MANAGEMENT AREA ARE TOBE RETAINED.TREE PROTECTION FENCING. SEEDETAIL THIS SETTREE INFORMATION SOURCE: LANKTREE SURVEY DATED 9-6-2018WITH ADDITIONAL VEGETATION NOTED BY LANDSCAPE ARCHITECTDURING SEPTEMBER 2018 SITE VISITHZHZInPInPHZHZOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGOGsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfsfEHEHEHEHEHEHEHEHEHEHEHEHbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrOGInPbhrbhrbhrbhrbhrbhrbhrbhrsfsfsfEHEHEHEHEHOGOGOGOGOGOGOGOGOGOGsfReceived June 22, 2023APPROVED BY PLANNINGJun 26 2023 EXISTING VEGETATION LEGENDEXISTING DECIDUOUS TREE TO BERETAINEDEXISTING CLUSTER OF DECIDUOUSTREES TO BE RETAINEDPROPOSED DRYWELL. SEE CIVILENGINEERING SETMATCHLINE - SEE SHEET L-1 EXISTING PROPERTY BOUNDARYPROPOSED HOMEEXISTING EVERGREEN TREE TO BERETAINEDBOUNDARY FOR PROPOSED NATIVEVEGETATION MANAGEMENT AREAEXISTING PROPERTYBOUNDARYEXISTING ROCKERYEXISTING SANITARY SEWER CLEAN-OUTPROPOSED ROCKERY. SEE CIVILENGINEERING SETPROPOSED DISPERSION TRENCH.SEE CIVIL ENGINEERING SETPROPOSED 27'x100' STORMWATEROVERLAND FLOW AREA. SEE CIVILENGINEERING SETREMOVE IVY FROM ALL TREESWITHIN NATIVE VEGETATION MNGTAREAREMOVE IVY FROM ALL TREESWITHIN NATIVE VEGETATION MNGTAREAEXISTING FENCERETAIN EXISTING SWORD FERN (Polystichum munitum)ADJUST LOCATIONS OF PROPOSED PLANTSTO AVOID DISTURBING EXISTING PLANTSRETAIN EXISTING THIMBLEBERRY(Rubus parviflorus) AND SWORD FERN(Polystichum munitum)RETAIN EXISTING THIMBLEBERRY(Rubus parviflorus), ELDERBERRY (Sambucus)RED HUCKLEBERRY (Vaccinium parvifolium)ADJUST LOCATIONS OF PROPOSED PLANTSTO AVOID DISTURBING EXISTING PLANTSWOODCHIP MULCH ONLY WITHINA 5' RADIUS AREA AROUND BASEOF EXISTING TREES THAT ARETO BE RETAINED. THIS IS TOAVOID DISTURBING TREE ROOTSTREE PROTECTION FENCING. SEEDETAIL THIS SETTREE INFORMATION SOURCE: LANKTREE SURVEY DATED 9-6-2018WITH ADDITIONAL VEGETATION NOTED BY LANDSCAPE ARCHITECTDURING SEPTEMBER 2018 SITE VISITInPInPInPInPInPInPInPInPOSOSOSOSOSOGOGOGOGOGOGOGOGbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrInPInPInPbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrbhrOGOGOGOGOGOGOGOGOGOGOGbhrSSSSSSSSSSSSSOGOGOGOGOGOGOGbhrbhrbhrbhrOGOGOGsfEHbhrInPHZOSSReceived June 22, 2023 TREE PROTECTION DETAILTREE PRESERVATION NOTES1. THE DRIPLINE OF PROTECTED TREES SHALL BE MARKED PRIOR TO CLEARING ANDGRADING ACTIVITIES.2. 3" OF COMPOSTED WOODCHIPS SHALL BE PLACED WITHIN THE DRIPLINE OF ALLRETAINED TREES.3. TREE PROTECTION FENCING SHALL BE PURCHASED IN CONTINUOUS ROLLS ANDCUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARENECESSARY, FENCING SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POSTWITH MIN. 6" OVERLAP, AND SECURELY FASTEN BOTH ENDS TO THE POST.4. THE TREE PROTECTION FENCE SHALL BE INSTALLED AND MAINTAINED A MINIMUMOF 3' BEYOND THE OUTER EDGE OF THE DRIPLINE FOR ALL PROTECTED TREES.FENCING SHALL COMPLETELY SURROUND THE REQUIRED TREE PROTECTION AREA.FENCING SHALL REMAIN IN PLACE UNTIL THE CITY AUTHORIZES THE REMOVAL ORISSUES A FINAL CERTIFICATE OF OCCUPANCY, WHICHEVER OCCURS FIRST.5. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY LANDDISTURBANCE ACTIVITIES.6. NO STORAGE OF MATERIALS OR EQUIPMENT WITHIN THE CRITICAL DRIPLINE ISALLOWED. DURING DEVELOPMENT, NO PERSON SHALL ATTACH ANY OBJECT TO ANYDESIGNATED FOR PROTECTION.7. REPLACE/REPAIR PROTECTIVE FENCING AS REQUIRED.8. GRADE SHALL NOT BE FILLED OR CUT WITHIN THE DRIPLINE OF ANY TREEDESIGNATED TO REMAIN WITHOUT PRIOR REVIEW BY THE CITY'S QUALIFIED TREEPROTECTION PROFESSIONAL AND ADVANCE, WRITTEN APPROVAL FROM THEDIRECTOR.9. TO THE GREATEST EXTENT PRACTICAL, UTILITY TRENCHES SHALL BE LOCATEDOUTSIDE OF THE ROOT PROTECTION ZONE OF TREES TO BE RETAINED. BORING ORTUNNELING UNDER THE DRIPLINE MAY BE CONSIDERED AN ALTERNATIVE, BUT SHALLREQUIRED THE ADVANCE, WRITTEN APPROVAL OF THE DIRECTOR.10. TREES AND OTHER VEGETATION TO BE RETAINED SHALL BE PROTECTED FROMEROSION AND SEDIMENTATION.Received June 22, 2023