Loading...
PLN2017-0059 REQUIRED CIVIL INSPECTIONSCONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT CLEAR VISION HOMES, INC.1123 MAPLE AVE. SW, SUITE 110 2062036222 OWNER CLEAR VISION HOMES, INC.1123 MAPLE AVE. SW, SUITE 110 4252271721 PROFESSIONAL 4 TERRANCE WILSON P.O. BOX 158 2065503189 CONDITIONS CONDITION TYPE NOTES 48 HR NOTICE FINAL 48 HOURS NOTICE IS REQUIRED WHEN REQUESTING A FINAL ENGINEERING INSPECTION. ASBUILT REQUIRED CONTRACTOR SHALL PROVIDE A PROJECT ASBUILT AT FINAL INSPECTION. SEE CITY STANDARDS FOR REQUIREMENTS. BACKFLOW PREVENTION BACKFLOW PREVENTION ASSEMBLY IS REQUIRED AND ASSEMBLY TEST REPORT. ESC REQUIRED MAINTAIN EROSION AND SEDIMENT CONTROL PER CITY STANDARDS. FRONTAGE IMPROVEMENTS Applicant shall repair or replace all damage to utilities or frontage improvements in the City right of way per City standards that is caused by or occurs during the permitted project. HOLD HARMLESS THE APPLICANT ON BEHALF OF HIS OR HER SPOUSE HEIRS ASSIGNS AND SUCCESSORS IN INTERESTS AGREES TO INDEMNIFY DEFEND AND HOLD HARMLESS THE CITY OF EDMONDS WASHINGTON ITS OFFICIALS EMPLOYEES AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE FOR THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY WAIVE OR REDUCE ANY REQUIREMENTS OF ANY CITY ORDINANCE NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION. INSPECTION PRIOR TO BACKFILL CALL FOR ALL REQUIRED INSPECTIONS. ALL WORK SHALL BE INSPECTED PRIOR TO BACKFILL. MAINTENANCE BOND A Maintenance Bond or other financial guarantee equal to 30% of the replacement cost of the landscaping shall be required prior to the issuance of a final Certificate of Occupancy.\r\r\r\r\r\r\r\r\r PERFORMANCE BOND A Performance Bond or other financial guarantee equal to 150% of the estimated cost of the landscaping shall be required prior to the issuance of any construction, grading, or building permits.\r\r \r\r\r\r\r\r SOUND OR NOISE SOUND/NOISE ORIGINATING FROM TEMPORARY CONSTRUCTION SITES AS A RESULT OF CONSTRUCTION ACTIVITY ARE EXEMPT FROM THE NOISE LIMITS OF ECC CHAPTER 5.30 ONLY DURING THE HOURS OF 7:00 AM TO 6:00 PM ON WEEKDAYS AND 10:00 AM TO 6:00 PM ON SATURDAYS, EXCLUDES SUNDAY AND FEDERAL HOLIDAYS. AT ALL OTHER TIMES THE NOISE ORIGINATING FROM CONSTRUCTION SITES/ACTIVITIES MUST COMPLY WITH THE NOISE LIMITS OF CHAPTER 5.30, UNLESS A VARIANCE HAS BEEN GRANTED PURSUANT TO ECC 5.30.120. SPECIAL INSPECTIONS ENG SPECIAL INSPECTIONS HAVE BEEN CALLED FOR ON THIS PROJECT AND ARE NOTED ON THE APPROVED CIVIL PLANS. IT IS THE OWNER AND OR CONTRACTORS RESPONSIBILITY TO ENSURE THAT REPORTS ARE PROVIDED TO THE ENGINEERING DIVISION ON A WEEKLY BASIS. UNDERGROUND UTILITY LOCATES CALL FOR LOCATES OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. Description: CLEAR VISION HOMES 2-LOT SUBDIVISION Approved: 8/6/2018 12:00:00 AM Address: 18227 80TH AVE W EDMONDS, WA 98026-5414 Parcel: 00370800101400 Printed: Tuesday, August 01, 2023 3:48:43 PM 1 of 3 SUBDIVISION City of Edmonds 121 5th Ave N, Edmonds WA 98020 www.cityofedmonds.gov / 425.771.0220 PROJECT NUMBER PLN2017-0059 Civils Issued: 8/1/2023 UNDERGROUND WIRING ALL NEW EXTENDED REBUILT OR RELOCATED ELECTRICAL UTILITY AND OR OTHER SERVICE SHALL BE PLACED UNDERGROUND. WATER SERVICE INFORMATION REFER TO CITY OF EDMONDS WATER SERVICE LINE HANDOUT FOR APPROVED PIPE MATERIALS, INSPECTIONS AND OTHER REQUIREMENTS. WATER SEWER SEPARATION MAINTAIN 10' OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE WATER SERVICE LINE. INDEMNITY The applicant has signed an application which states he/she agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. INSPECTION SCHEDULING: WWW.MYBUILDINGPERMIT.COM OR CALL 425-771-0220 INSPECTIONS INSPECTION TYPE DATE COMPLETED RESULT NOTES A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE E-2 SIDE SEWER E-3 STRM CONVEYANCE E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-4 DRIVE WIDTH SLOPE E-5 ASBUILT PROJECT E-5 FIRE AND AID SIGN E-7 UTILITY STAKE PL E-9 COMPOST AMEND X-2 ENGINEERING FINAL** P-1 PLANNING LANDSCAPE INSP E-5 ENG SPECIAL INSPECTION E-7 PVMT SUBGRADE E-7 SEWER LATERAL Printed: Tuesday, August 01, 2023 3:48:43 PM 2 of 3 SUBDIVISION City of Edmonds 121 5th Ave N, Edmonds WA 98020 www.cityofedmonds.gov / 425.771.0220 PROJECT NUMBER PLN2017-0059 Printed: Tuesday, August 01, 2023 3:48:43 PM 3 of 3 SUBDIVISION City of Edmonds 121 5th Ave N, Edmonds WA 98020 www.cityofedmonds.gov / 425.771.0220 PROJECT NUMBER PLN2017-0059