Loading...
ENG2019-0407 ROW PERMITRIGHT OF WAY PERMIT PERMIT NU BE City of Edmonds 98020 NG2019-0407q www.edmondswa.gov i jA am Description: INSTALL FRONTAGE IMPROVEMENTS CONSISTENT W/ SP PLN2017-0059 ISSUED: 08/01/2023 Address: 18229 80TH AVE W EDMONDS WA 98026-5414 EXPIRES: 08/01/2024 Permit Type: RIGHT OF WAY Permit Subtype: SUBDIVISION Parcel Number: 00370800101400 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT CLEAR VISION HOMES, INC 4102 SW AUSTIN ST, SEATTLE WA 98136 (425)227-1727 CONTRACTOR CLEAR VISION HOMES INC 4102 SW AUSTIN ST, SEATTLE WA 98136 (425)277-1721 OWNER LE PHONG HUY 18229 80th Ave. W, Edmonds WA 98026 E _JL FEINFORMATION DESCRIPTION AMOUNT PAID RIGHT OF WAY STANDARD PERMIT FEE $300.00 $300.00 X-TECHNOLOGY FEE $35.00 $35.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY RELEASED BY: MAJ DATE: 08/01/2023 Printed: Tuesday, August 01, 2023 3:47:10 PM 1 of 3 RIGHT OF WAY PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE Alert Affected Properties Alert affected residents and/or businesses prior to work start. Bore Crossings Verify clear bore crossings Conform to approved plans Conform to approved working drawings and Traffic Control plan. Damage to Frontage Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per Improvements City standards that is caused by or occurs during the permitted project. ESC Required Maintain erosion & sedimentation control. Keep street clean. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and Hold Harmless agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. Inspections Call for required inspections as noted. Landscape Restoration Restore Landscape to like or better conditions. Public Utility Separation Public utilities maintain 5' separation from City Utilities. ROW Restoration Restore ROW to City standards Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on Sounds/Noise weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Traffic Control Handout Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements. Underground Utility Locates Call for locates of underground utilities prior to any excavation. Utility Patch Restoration Utility patch restoration to be in accordance with Edmonds Standard detail E2.3 019 INSPECTION TYPE DATE RESULT NOTES COMPLETE X-2 ENGINEERING FINAL** E-7 PAVEMENT COMPACTION TEST REPORT E-7 MAILBOX LOCATION E-7 TRAFFIC CTRL E-7 PVMT SUBGRADE E-7 DWY APPROACH E-7 CURB GUTTER E-7 CONCRETE SIDEWALK E-7 HYDRANT E-7 STORM MAIN Printed: Tuesday, August 01, 2023 3:47:10 PM 2 of 3 �i RIGHT OF WAY PERMIT 3 PERMIT NUMBE City of Edmonds 121 5th Ave N, Edmonds WA 98020 ENG2019-0407 �.�lk www.edmondswa.gov / 425.771.0220 E§k6 IN& A-1 ENGINEERING PRECON AND MOBILIZE SLOPEE-4 ACCESS WIDTH E-7 SEWER LATERAL E-7 SEWER MANHOLE Printed: Tuesday, August 01, 2023 3:47:10 PM 3 of 3 RECEIVED RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. ►ri rowel 111 W81MA CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A Name of Company Clear Vision Investments Franchise Ordinance No: Point of Contact Terrance Wilson Title Attorney at Law, Wilson Law Group of Washington Address 5663 W Tapps Highway E, city Bonney Lake State WA zip 98391 Phone 206 805-6238 Email TWilson@WilsonLawGroupWA.com Name of Company G LEA{L I S O1-i �kS I&JE,Primary Name P Fr Agent Name E Title I�cS Title S _ NT Mobile A.S I , — Address —L 3 Lr--- EVE S O Email zON , City lat'rrO State W k Zip Secondary NameAXL Phone a � _ s .-7 Title Email LC—9S � ok4o •��-1 Mobile City of Edmonds Business License No: Email ► A j State License No: Contractor verifies it is currently bonded V Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project (Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) The applicant is proposing to subdivide a 37,191 square foot parcel located at 18227 - 80th Avenue West into two lots (Attachments 1- 3). The site is located within the Single -Family Residential (RS-12) zone that allows lots with a minimum net area of 12,000 square feet (Attachment 12). The proposed lot layout is shown on the preliminary short plat plans (Attachment 2) and preliminary development plans (Attachment 3). Lot 1 will be created on the western portion of the property where an existing residence is proposed to be retained. Lot 2 will be created on the eastern portion of the property. The existing driveway will be removed and both lots are proposed to take access from 801h Avenue West via a new shared driveway. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 2 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. , The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. Does the utilityowner have existingoverhead infrastructure in the area of work? X 2. Will any equipment be added underground or above ground (e. edestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? 6. Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: DATE: APPLICANT PRINTED NAME: P 1F C_ I—E= APPLICANT TITLE:r�— NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021