Loading...
Building Permit 2020•M MERCIAL BLDG PermitCity PERMITNUM 1[798020 • • • • 121 5th Ave N, Edmonds WA 1 1 1 -. •. Type: COMMERCIAL BLDG Owner/ Business: MAIN STREET COMMONS LLC Status: ISSUED Subtype: NEW COMMERCIAL BLDG Parcel No: 00434212001700 Site Address: 558 MAIN ST EDMONDS,WA 98020 Applied: 5/9/2019 Subdivision: Lot: Issued: 12/9/2020 Fire Sprinklers: Yes Lot Area: 0 Zoning: BD1 Final: Valuation: $787,179.17 Occupancy Type: A2/A3 Construction Type: VB Expiration Date: 12/4/2021 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 0 Issued by: NED Scope of Work: MAIN ST. COMMONS- PHASE 2 - EAST NEW 2 STORY BLDG WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS.Ida j NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DIMARCO ARCHITECTURE 1319 E HOWELL ST, SEATTLE WA (206)355-6795 ARCHITECT@ICLOUD.COM 98122 CONTRACTOR WILCOX CONSTRUCTION, 234 5TH AVE S, EDMONDS WA (425)774-4185 Mmcisaac@wilcoxconstruction.com INC. 98020-3425 9525 AIRPORT WAY, OWNER MAIN STREET COMMONS LLC SNOHOMISH WA 98296 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# 2020 TRANSPORTATION IMPACT 112.502.345.86.000.00 $25,356.80 $25,356.80 12/9/20 R9018 FEE B-BUILDING PERMIT FEE 001.000.322.10.000.00 $5,818.00 $5,818.00 12/9/20 R9018 B-BUILDING PLAN REVIEW FEE 001.000.345.83.000.00 $4,861.00 $4,861.00 5/14/19 REC076324 B-STATE BUILDING CODE 001.000.237.150 $25.00 $25.00 12/9/20 R9018 SURCHARGE PARK IMPACT FEE - COM ADMIN 001.000.322.10.000.00 $100.00 $100.00 12/9/20 R9018 PARK IMPACT FEE - NON 332.100.345.85.000.00 $7,584.40 $7,584.40 12/9/20 R9018 RESIDENTIAL SQFT TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $100.00 $100.00 12/9/20 R9018 FEE - MF COMM X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 $35.00 12/9/20 R9018 TOTALS: $43,880.20 $43,880.20 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Hours notice is required when requesting your FINAL engineering inspection. NFORMATION Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION Printed: Wednesday, December 09, 2020 11:59:56 AM 1 of 3 •MMERCIAL BLDG Permit PERMIT NU City of Edmonds . ••0i 1 1 1 ww.edmondswa.gov ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its Hold Harmless officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. OTHER FOR INFORMATION Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. FOR Separate Permit Required For: Tenant Improvements, Plumbing, HVAC, Electrical, SEPARATE PERMIT REQUIRED INFORMATION Elevator, Fire Alarm, Fire Sprinkler Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved construction plans. It is the owner and or contractors responsibility to ensure that reports are provided to the City on a weekly basis. SPECIAL INSPECTION BUILDING FOR SPECIAL INSPECTIONS ARE REQUIRED FOR: DIVISION INFORMATION SOILS; STRUCTURAL: Concrete, Bolts in Concrete, Structural Masonry, Structural Steel & Welding, Lateral Wood. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION FOR All new extended rebuilt or relocated electrical utility and/or service shall be placed UNDERGROUND WIRING INFORMATION underground. INSPECTIONS - Schedule Online at: https://Inspection.MVBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON B-1 SETBACKS Printed: Wednesday, December 09, 2020 11:59:56 AM 2 of 3 Permit City •EdmondsPERMIT- - NUM •:� i 1 1 1 . •. 1.0220 11177 IE7 B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 ROOF SHEATHING B-4 CEILING GRID B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4TRASH ENCLOSURE B-5 BLDG SPECIAL INSPECTION B-5 CROSS CONN FINAL B-5 INSULATION ENERGY B-5 WSEC COMPLIANCE REPORTS B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" X-2 ENGINEERING FINAL E-4 WATER SERVICE LINE Printed: Wednesday, December 09, 2020 11:59:56 AM 3 of 3