Loading...
Building PermitType: FENCE Subtype: RESIDENTIAL FENCE I Status: ISSUED Parcel No: 00513100009500 Site Address: 16630 74TH PL W EDMONDS,WA 98026-5116 Subdivision: SP S-47-76, 005131, SP 5-23-86 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: WEIS- FENCE WA State Contractor L & I #: Applied: 7/15/2023 Issued: 8/28/2023 Final: Expiration Date: 2/24/2024 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JAMES WEIS 16630 74TH PL W, EDMONDS (203)313-1313 EDMONDS@JAMESWEIS.COM WA 98026 CONTACT JAMES WEIS 16630 74TH PL W, EDMONDS (203)313-1313 edmonds@jamesweis.com WA 98026 CONTRACTOR OWNER OWNER JAMES WEIS 16630 74TH PL W, EDMONDS (203)313-1313 WA 98026 MIL 10 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BLD - PERMIT BASE FEE 001.000.322.10.000.00 $100.00 $100.00 8/15/23 R30706 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 8/15/23 R30706 PERMIT FENCE 001.000.345.83.000.00 $26.00 $26.00 8/15/23 R30706 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 8/15/23 R30706 RES TOTALS: $177.50 $177.50 7CONDITION TYPE STATUS NOTES It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR NO INSPECTIONS REQUIRED. NEEDED PERMIT/REVIEW BECAUSE OF CRITICAL AREA. INSPECTIONS INFORMATION PLACEMENT AS SHOWN ON SITE PLAN IS APPROVED. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Printed: Monday, August 28, 2023 2:05:49 PM 1 of 2 Printed: Monday, August 28, 2023 2:05:49 PM 2 of 2