Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED Parcel No: 00463301300303 Site Address: 23905 91ST PL W EDMONDS,WA 98026-9022 Subdivision: 010087, 004633, 007139 Lot: 0 Fire Sprinklers: Yes Lot Area: 4,600 Zoning: IRS-8 Valuation: $588,253.32 Occupancy Type: r3 Construction Type: vb Code Edition: 2018 No. Stories: 2 # of Dwelling Units: 1 Scope of Work: BRACKETT'S RESERVE -NEW SFR, PLB NOT INCL (LOT 4) WA State Contractor L & I #: PACIFRD851JB Applied: 6/2/2023 Issued:8/29/2023 Final: Expiration Date: 8/23/2024 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT RHONDA CLANCY 17921 BOTHELL EVERETT HWY (425)939-1164 RLCLANCY@DRHORTON.COM 100, BOTHELL WA 98012 CONTACT PACIFIC RIDGE - DRH LLC 17921 BOTHELL EVERETT HWY (425)939-1164 RLClancy@drhorton.com 100, BOTHELL WA 98012 17921 BOTHELL EVERETT HWY, CONTRACTOR PACIFIC RIDGE - DRH LLC BOTHELL WA 98012 17921 BOTHELL EVERETT HW OWNER PACIFIC RIDGE DRH LLC 100, BOTHELL WA 98012 •' • DESCRIPTION 7BLDRESALUE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BASED FEE 001.000.345.83.000.00 $3,945.00 $3,945.00 8/29/23 R31016 BLD - RES VALUE BASED REVIEW 001.000.345.83.000.00 $3,353.25 $3,353.25 6/7/23 R29186 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 6/7/23 R29186 PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $1,008.00 $1,008.00 8/29/23 R31016 MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 8/29/23 R31016 NEW SINGLE FAMILY MECHANICAL 001.000.345.83.000.00 $340.00 $340.00 8/29/23 R31016 SYSTEMS PARK IMPACT - RES ADMIN FEE 001.000.345.83.000.00 $60.00 $60.00 8/29/23 R31016 PARK IMPACT - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 8/29/23 R31016 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 8/29/23 R31016 -RES STORMWATER ENGINEER - REVIEW 001.000.345.83.400.00 $148.00 $148.00 8/29/23 R31016 STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $799.00 $799.00 8/29/23 R31016 CHARGE SFR UNDER 5000 TRANSPORTATION IMPACT - 001.000.345.83.400.00 $60.00 $60.00 8/29/23 R31016 ADMIN FEE - SFR TRANSPORTATION IMPACT FEE - 112.502.345.86.000.00 $6,249.14 $6,249.14 8/29/23 R31016 SFR TOTALS: $18,804.94 $18,804.94 Printed: Tuesday, August 29, 2023 12:49:49 PM 1 of 4 'RESIDENTIAL BLDG PermitCity - • • • • 121 98020 1 1.: www.edmondswa.gov CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Printed: Tuesday, August 29, 2023 12:49:49 PM 2 of 4 'RESIDENTIAL BLDG PermitCity PERMIT NUM •Edmonds www.edmondswa.gov Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. OTHER CONDITION FOR A separate permit is required for all fencing. NFORMATION FOR This property falls within the Olympic View Water and Sewer District. A permit from OVWSD SEWER LATERAL INFORMATION Olympic View is required for the sewer lateral installation. FOR This property falls within the Olympic View Water and Sewer District. A permit from OVWSD SEWER SERVICE INFORMATION Olympic View is required for the sanitary sewer installation. OVWSD WATER LINE/METER FOR This property falls within the Olympic View Water and Sewer District. Contact Olympic INFORMATION View for specific water line and/or water meter information. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 TESC AND MOBILIZE E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE E-4 STRM STUB CONNECT E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE Printed: Tuesday, August 29, 2023 12:49:49 PM 3 of 4 'RESIDENTIAL BLDG PermitCity • • • • - www.edmondswa.gov E-9 COMPOST AMEND E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL X-0 OVWSD APPROVAL A-1 BUILDING PRECON B-1 SETBACKS B-2 FND DAMPPROOFING B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Tuesday, August 29, 2023 12:49:49 PM 4 of 4