ATTACHMENT 8 PHASE 2 COMMENTS 3 ENG PLN2022-0085 PHASE II DESIGN REVIEWDate: To: From: Subject: MEMORANDUM August 10, 2023 Michele Szafran, Associate Planner Jeanie McConnell, Engineering Program Manager Bertrand Hauss, Transportation Engineer PLN2022-0085 — Design Review 611 on Main Apartments — 611 Main Street The comments provided below are based upon review of the application and documents submitted for the subject design review application. Additional information is requested from the applicant at this time. Please note, the current review is limited to a determination of feasibility and addressing major design/construction issues. Please respond to the following: Comments 1 — December 16, 2022 (Phase I) Comments 2 — April 27, 2023 (Phase I) Comments 3 — August 10, 2023 (Phase II) General Engineering Review: The following comments are provided by the Engineering Division. Please contact Jeanie directly at 425-771-0220 or by email at Jeanie.mcconnellgedmondswa.gov with any specific questions you may have regarding these comments. 1. August 10, 2023 — Comment remains for reference as civil plans still only indicate the undergrounding of power. 8/27/2023 — Thank you for revising the civil plans to show undergrounding of power along Main Street. This comment remains to provide clarification that any and all overhead facilities along the Main Street property frontage will need to be undergrounded. This includes any power and/or communication facilities. 12/16/2022 comment - Please refer to Fire Department comments regarding the requirement to underground power along Main Street property frontage. Please revise plans as needed to address this requirement. 2. ok 3. ok 4. ok 5. ok 6. August 10, 2023 — Parking stall widths have been adjusted to reflect 8'/2'. Response comment letter requests approval to have columns intrude on the 8 %' wide parking space. Please refer to the comment below. Your project may qualify for reduced parking width as provided below; however, any parking width must exclude the structural column. April 27, 2023 — Response letter states structural design is not yet complete and approval is requested to allow for structural columns to be included within parking stall dimensions. Per Edmonds Community Development Code 18.95.020, all stalls must meet the minimum width requirements exclusive of columns/poles. Please note, this code section includes provisions for a mixture of full width (8 1/2') and reduced width (8') stalls. Please review this code section for applicability to the subject project. 12/16/2022 comment - Sheet A1.02 — Confirm parking stall dimensions exclude building columns. 7. August 10, 2023 — Response comment letter states the dumpster enclosure is now 3'-4" from the edge of the alley and the dumpsters inside the enclosure have been reduced in size. Please confirm the overall dimensions of the entire dumpster enclosure are acceptable to the trash hauler. In addition, it is unclear if the dumpster enclosure location meets sight distance requirements. Please refer to City standard detail TR-590 for additional information. A convex mirror is not an approved alternative. April 27, 2023 — see comment below. 12/16/2022 comment - Site distance triangle requirements: a. Buildings; April 27, 2023 — Response letter states a convex mirror is provided to address required visibility. A convex mirror is not an approved alternative and sight lines are to be addressed with the building design. Please revise plans as needed such that the building design does not interfere with providing clear sight lines. 12/16/2022 comment - provide a site window or clear area to ensure line -of -sight exiting parking garage. b. ok 8. August 10, 2023 — Please note for future storm design, the City will request that storm system exposure to illicit discharges be minimized. Currently the storm system control structure is designed to fall within the limits of the trash enclosure. A spill from the trash receptable into the storm system could constitute an illicit discharge. Stormwater Engineer Review: No further comments Transportation Engineer Review: Comment retained for reference: A Traffic Impact Analysis Worksheet was provided and has received preliminary approval. Specific mitigation fees will be further reviewed during the building permit phase of the project.