Loading...
ATTACHMENT 11 PHASE 1 ENG COMMENTS 2Date: To: From: Subject: MEMORANDUM April 27, 2023 Michele Szafran, Associate Planner Jeanie McConnell, Engineering Program Manager Bertrand Hauss, Transportation Engineer PLN2022-0085 — Design Review 611 on Main Apartments — 611 Main Street The comments provided below are based upon review of the application and documents submitted for the subject design review application. Additional information is requested from the applicant at this time. Please note, the current review is limited to a determination of feasibility and addressing major design/construction issues. Please respond to the following: Comments 1 —December 16, 2022 Comments 2 — April 27, 2023 General Engineering Review: The following comments are provided by the Engineering Division. Please contact Jeanie directly at 425-771-0220 or by email at Jeanie.mcconnellgedmondswa. og_v with any specific questions you may have regarding these comments. 1. April 27, 2023 — Thank you for revising the civil plans to show undergrounding of power along Main Street. This comment remains to provide clarification that any and all overhead facilities along the Main Street property frontage will need to be undergrounded. This includes any power and/or communication facilities. 12/16/2022 comment - Please refer to Fire Department comments regarding the requirement to underground power along Main Street property frontage. Please revise plans as needed to address this requirement. 2. ok 3. ok 4. ok 5. ok 6. April 27, 2023 — Response letter states structural design is not yet complete and approval is requested to allow for structural columns to be included within parking stall dimensions. Per Edmonds Community Development Code 18.95.020, all stalls must meet the minimum width requirements exclusive of columns/poles. Please note, this code section includes provisions for a mixture of full width (8'/Z') and reduced width (8') ATTACHMENT 11 stalls. Please review this code section for applicability to the subject project. 12/16/2022 comment - Sheet A1.02 — Confirm parking stall dimensions exclude building columns. 7. April 27, 2023 — see comment below. 12/16/2022 comment - Site distance triangle requirements: a. Buildings; April 27, 2023 — Response letter states a convex mirror is provided to address required visibility. A convex mirror is not an approved alternative and sight lines are to be addressed with the building design. Please revise plans as needed such that the building design does not interfere with providing clear sight lines. 12/16/2022 comment - provide a site window or clear area to ensure line -of -sight exiting parking garage. b. ok Stormwater Engineer Review: No further comments Transportation Engineer Review: Comment retained for reference: A Traffic Impact Analysis Worksheet was provided and has received preliminary approval. Specific mitigation fees will be further reviewed during the building permit phase of the project. Approved by: l l//30/22 Transportati Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 Name of Proposed Project: 611 On Main Owner/Applicant GBH Holdings, LLC Name PO Box 1389 Street/Mailing Address Edmonds, WA 98020 City Telephone: 206.739.5400 PRELIMINARY APPROVAL ONLY U APPENDIX A p Page 1 of 2 Analysis Applicant Contact Person: Philip Frisk Name PO Box 141 Street/Mailing Address Edmonds, WA 98020 State Zip City Telephone: 206.920.3 5 54 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Kimley-Horn and Associates, Inc. Matthew Palmer Firm Name Contact Name Telephone: 425.708.8275 1. PROJECT DESCRIPTION State Zip E-mail: matt.palmer@kimley-horn.com a. Location - Street address: 611 Main Street, Edmonds, WA 98020 (Attach a vicinity map and site plan.) b. Specify existing land use: 636 SF of hair salon (shopping center 2004) and 5,058 SF of general office (2004) c. Specify proposed type and size of development: 18 multifamily low-rise apartment units and 2,600 SF of general office (# of residential units and/or square.footage of building) d. Date construction will begin and be completed: ASAP through June 2024 e. Define proposed access locations: Access for the development's garage is located off of the alley to the north, approximately 120 feet east of 6th Avenue N. HANDOUT UPDATED 03.24.2021 APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: Approximately 120 ft of clear sight to the intersection to the west and over 300 ft of clear sight distance to the east. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ® CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use Apartments General Office Shopping Center (2004) Prior Use General Office (2004) Units in Per Unit square feet, Fee Fee Rate # of dwelling, of , etc. X 18 Units = $ 4,092.36 $ 73,662.48 10.89 2,600 SF 28 314.00 0.93 $ 636 SF = X $ 591.48 1.81 5.085 SF 9,154.98 New Use Fee: $ 101,976.48 - Prior Use Fee: $ 9,746.46 = $ 92,230.02 NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, of , etc. New Use $ X ❑ NO CHANGE ❑ INDEPENDENT FEE CALCULATION MITIGATION FEE RECOMMENDATION: $ INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) $ TOTAL TRANSPORTATION IMPACT FEE $ City of Edmonds, Engineering Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 03.24.2021