Building Permit_1Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00705100000500
Subdivision: 007051, 005489
Fire Sprinklers:
Valuation: $250,000.00
Code Edition: 0
Site Address: 1102 12TH AVE N EDMONDS,WA 98020-2512
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: EDDY- REMODEL, M INCL P SEP
Applied: 5/26/2023
Issued: 6/30/2023
Final:
Expiration Date: 6/24/2024
Issued by: BAC
I WA State Contractor L & I #: HOMEGGC805LK I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
1102 12TH AVE N, EDMONDS
APPLICANT
MICHELE E TTEE EDDY
MSSPIFFS150@GMAIL.COM
WA 98020
1102 12TH AVE N, EDMONDS
CONTACT
MICHELE E TTEE EDDY
MSSPIFFS150@GMAIL.COM
WA 98020
CONTRACTOR
Home Good Construction LLC
8021 181st PL SW, EDMONDS
(206)375-2233
johnny@homegoodconstruction.com
WA 98026
1102 12TH AVE N, EDMONDS
OWNER
MICHELE E TTEE EDDY
MSSPIFFS150@GMAIL.COM
WA 98020
PRIOR
WESTERN ENTERPRISES LLC
21108 LOCUST WAY,
(206)561 2512
davidsweetenjr@yahoo.com
CONTRACTOR
LYNNWOOD WA 98043A
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
APPLIANCE VENT
001.000.345.83.000.00
$51.00
$51.00
6/29/23
R29647
BLD - RES VALUE BASED FEE
001.000.345.83.000.00
$2,000.00
$2,000.00
6/29/23
R29647
BLD - RES VALUE BASED REVIEW
001.000.345.83.000.00
$1,700.00
$1,700.00
5/30/23
R28879
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
5/30/23
R28879
PERMIT
FAN CONNECTED TO A SINGLE
001.000.345.83.000.00
$34.00
$34.00
6/29/23
R29647
DUCT
FURNACE OR FIREPLACE
001.000.345.83.000.00
$34.00
$34.00
6/29/23
R29647
MECHANICAL BASE PERMIT FEE
001.000.322.10.000.00
$57.00
$57.00
6/29/23
R29647
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
6/29/23
R29647
RES
TOTALS: $3,927.50
$3,927.50
"1111117•
•
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, September 12, 2023 11:45:46 AM 1 of 2
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1 .
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
A-1 BUILDING PRECON
B-2 FOOTINGS
B-3 GAS PIPING TEST
B-3 UNDERFLR FRAMING
B-4 FRAMING
B-4 SHOWER PAN
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-3 MECH ROUGH IN
Original Mech Contractor only did the first part of the
install. See attachments for details.
Printed: Tuesday, September 12, 2023 11:45:46 AM 2 of 2