Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED Parcel No: 00548900000302 Subdivision: 005489, 006542 Fire Sprinklers: Valuation: $550,000.00 Code Edition: 0 Site Address: 915 BROOKMERE ST EDMONDS,WA 98020-2611 Lot: 0 Lot Area: 10,454 Zoning: RS-12 Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: HAIDER- REMODEL/ADDITION M INCL P SEP WA State Contractor L & I #: HAIDEC*914DB Applied: 9/30/2022 Issued:9/12/2023 Final: Expiration Date: 9/6/2024 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ALEXANDRA IMMEL 3439 NW 62ND ST, SEATTLE WA (206)276-5761 ALEXANDRA@ALEXANDRAIMMELDESI 98107 GN.COM CONTACT ALEXANDRA IMMEL 3439 NW 62ND ST, SEATTLE WA (206)276-5761 alexandra@alexandraimmeldesign.co RESIDENTIAL DESIGN LLC 98107 m 5607 244TH ST SW, CONTRACTOR HAIDER CONSTRUCTION MOUNTLAKE TERRACE WA (206)510-5300 ron@haiderconstruction.com 98043- RONALD N\MAUREEN A 5110 194TH ST SW, LYNNWOOD OWNER HAIDER WA 98036 7DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# EIPT#1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 9/11/23 R31245 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.345.83.000.00 $50.00 $50.00 9/11/23 R31245 PUMP - 1.75 BTU OR LESS APPLIANCE VENTS 001.000.345.83.000.00 $15.00 $15.00 9/11/23 R31245 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/16/22 R24481 PER PERMIT ENGINEERING INSPECTION FEE 001.000.345.83.400.00 $1,100.00 $1,100.00 9/11/23 R31245 FAN CONNECTED TO SINGLE DUCT 001.000.345.83.000.00 $90.00 $90.00 9/11/23 R31245 FURNACE OR FIREPLACE 001.000.345.83.000.00 $30.00 $30.00 9/11/23 R31245 GAS PIPING - NEW OR LOCATED 001.000.345.83.000.00 $30.00 $30.00 9/11/23 R31245 PERMIT FEE - RESIDENTIAL 001.000.345.83.000.00 $3,750.00 $3,750.00 9/11/23 R31245 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $3,187.50 $3,187.50 11/16/22 R24481 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 9/11/23 R31245 STORMWATER ENGINEER REVIEW 001.000.345.83.400.00 $260.00 $260.00 9/11/23 R31245 FEE STORMWATER ENGINEER REVIEW 001.000.345.83.400.00 $390.00 $390.00 9/11/23 R31245 FEE STORMWATER ENGINEER REVIEW 001.000.345.83.400.00 $195.00 $195.00 9/11/23 R31245 FEE Printed: Tuesday, September 12, 2023 4:27:44 PM 1 of 5 -RESIDENTIAL BLDG PermitCity - • • • • 98020 1 . •. DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # STORMWATER ENGINEER REVIEW 001.000.345.83.400.00 $97.50 $97.50 9/11/23 R31245 FEE TOTALS: $9,291.50 $9,291.50 • • CONDITION TYPE STATUS 748 NOTES HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. CARBON MONOXIDE ALARMS SHALL BE INSTALLED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF THE BEDROOMS AND ON EACH LEVEL IN FOR CARBON MONOXIDE SYSTEMS NEW CONSTRUCTION AND IN EXISTING DWELLINGS WHEN ALTERATIONS, REPAIRS OR INFORMATION ADDITIONS REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE ADDED OR CREATED. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. Printed: Tuesday, September 12, 2023 4:27:44 PM 2 of 5 'RESIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2022-13214 lwww.edmondswa.gov FOR GAS PIPE TEST Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION FOR HOSE BIBBS Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION FOR INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com FOR LOT LINES STAKED Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT O items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. A Special Inspection agreement is required for this project. It is the owner/contractors SPECIAL INSPECTIONS FOR responsibility to ensure inspections take place and that reports are provided to the ENGINEERING INFORMATION Engineering Division on a weekly basis at Engineeringpermits@edmondswa.gov. STORM COVENANT FOR A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR TRAFFIC CONTROLS Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. • • • • •- • • • ••- • 71NSPPECTTONTYPE INSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS Printed: Tuesday, September 12, 2023 4:27:44 PM 3 of 5 'RESIDENTIAL BLDG PermitCity • • • • - Edmonds98020 1 . •. B-2 DEMO AMT VERIFICATION B-2 FND DAMPPROOFING B-2 RETAINING WALL B-2 SLAB INSULATION B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 BUILDING PRECON INSPECTOR: verify the percentage of the structure being demolished. review calculation sheet and compare to proposed work onsite. B-3 UNDERFLR FRAMING B-5 BLDG SPECIAL INSPECTION Special inspection for Epoxy B-2 FOOTINGS Special inspection for Epoxy B-2 FOUNDATION WALL Special inspection for Epoxy A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM PERVIOUS SURFACES E-3 STRM TIGHTLINE E-4 ACCESS WIDTH SLOPE E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-5 ENG SPECIAL INSPECTION Printed: Tuesday, September 12, 2023 4:27:44 PM 4 of 5 Printed: Tuesday, September 12, 2023 4:27:44 PM 5 of 5