Engineering Permit FormOF WAY PERMIT
PERMIT NU
City •EdmondsRIGHT
98020 ENG2023-03831
www.edmondswa.gov i
Description: RIGHT OF WAY IMPROVEMENTS FOR NEW SFR ISSUED: 09/13/2023
Address: 840 DALEY ST EDMONDS WA 98020-3951
EXPIRES: 09/07/2024
rmit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00434208101000
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT PETER TANG 5603 230TH ST SW, MOUNTLAKE TERRACE WA 98043 (206)372-2584
CONTACT PINTGROUP 5603 230TH ST SW, MOUNTLAKE TERRACE WA 98043 (206)372-2584
CONTRACTOR CAREY BROTHERS ROCKERIES LLC 19622 SR 9 SE, SNOHOMISH WA 98296 (425)481-0788
OWNER PETER & JIA TANG 840 DALEY ST, EDMONDS WA 98020 (206)372-2584
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$1,512.00 $1,512.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: BAC DATE: 09/13/2023
Printed: Wednesday, September 13, 2023 11:48:02 AM 1 of 2
RIGHT OF WAY PERMIT
\ r
i
City of Edmonds
98020 ENG2023- / •
r
- 425.771.0220
%S
CONDITIONS
CONDITION TYPE
NOTES
48 HRS NOTICE-ENGR FINAL
48 Working hours notice is required when requesting your FINAL engineering inspection.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
FINAL INSPECTION
The engineering division requires 48 hours notice prior to the date of the FINAL Inspection.
SCHEDULING
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be
PROJECT CIVIL ASBUILT
submitted to Engineeringpermits@edmondswa.gov.
ROW COMPACTION TEST
Right of way compaction tests are required per City standards.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT NOTES
COMPLETE
X-2 ENGINEERING FINAL"
E-3 STRM CONVEYANCE
A-1 TESC AND MOBILIZE
E-7 CURB GUTTER
E-7 DWY APPROACH
E-7 PAVEMENT COMPACTION TEST
REPORT
E-7 PVMT SUBGRADE
E-7 RESTOR LIMITS
E-7 SEWER LATERAL
E-7 STORM CB
ENGINEERING FINAL
E-7 STORM MAIN
Printed: Wednesday, September 13, 2023 11:48:02 AM 2 of 2