Loading...
Building Permit 2020'SIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity •:i 1 D8 wwWA.edmondswa.gov ww Type: RESIDENTIAL BLDG Owner/ Business: TIEL AND DESIREE RIISE Status: ISSUED Subtype: ADDITION Parcel No: 00567700001102 Site Address: 18504 82ND AVE W EDMONDS,WA 98026-5823 Applied: 8/29/2019 Subdivision: SP S-92-80, 005677 Lot: Issued: 4/14/2020 Fire Sprinklers: No Lot Area: 35 Zoning: RS-10 Final: Valuation: $150,000.00 Occupancy Type: SFR/IRC Construction Type: VB Expiration Date: 4/15/2021 Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 1 Issued by: JOK Scope of Work: ADD 1062 SF. RE -WORK INTERIOR LIVING SPACE. NEW ROOF STRUCTU WA State Contractor L & I #: RAINCCR8230D City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT TIEL AND DESIREE RIISE 18504 82ND AVE W, EDMONDS (206)979-5756 DESIREERIIE@GMAIL.COM WA 98026 CONTRACTOR RAIN CITY REMODELING 8501 224TH ST SW, EDMONDS (206)356-6107 WA 98026 OWNER TIEL AND DESIREE RIISE 18504 82ND AVE W, EDMONDS (206)979-5756 DESIREERIIE@GMAIL.COM WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # B-BUILDING PERMIT FEE 001.000.322.10.000.00 $1,400.00 $1,400.00 4/7/20 R4806 B-BUILDING PLAN REVIEW FEE 001.000.345.83.000.00 $1,105.00 $1,105.00 8/29/19 REC077305 B-MECHANICAL PERMIT FEE 001.000.322.10.000.00 $150.00 $150.00 4/7/20 R4806 B-PLUMBING PERMIT FEE 001.000.322.10.000.00 $268.00 $268.00 4/7/20 R4806 B-STATE BUILDING CODE 001.000.237.150 $6.50 $6.50 4/7/20 R4806 SURCHARGE ENGINEERING INSPECTION FEE 001.000.341.82.000.00 1 $200.00 $200.00 1 4/7/20 1R4806 X-CREDIT CARD TRANSACTION FEE 001.000.341.43.100.00 $33.15 $33.15 8/29/19 REC077305 X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 $35.00 4/7/20 R4806 TOTALS: $3,197.65 $3,197.65 CONDITIONS CONDITION TYPE STATUS NOTES Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, Hold Harmless arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Printed: Tuesday, April 14, 2020 7:52:30 AM 1 of 2 'SIDENTIAL BLDG PermitCity PERMITNUM • • • • •:i 1 D8 www.edmondswa.gov• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. IRU COMPLETED SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-2 FOOTINGS B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-4 FRAMING B-5 INSULATION ENERGY B-2 ROOF TEAR OFF A-1 BUILDING PRECON B-4 INTERIOR SHEAR X-3 BUILDING FINAL" B-7 BUILDING OTHER INSP X-2 ENGINEERING FINAL A-1 TESC AND MOBILIZE Printed: Tuesday, April 14, 2020 7:52:30 AM 2 of 2