Type: RESIDENTIAL BLDG
Owner/ Business: TIEL AND DESIREE RIISE Status: ISSUED
Subtype: ADDITION
Parcel No: 00567700001102
Site Address: 18504 82ND AVE W EDMONDS,WA 98026-5823
Applied: 8/29/2019
Subdivision: SP S-92-80, 005677 Lot:
Issued: 4/14/2020
Fire Sprinklers: No
Lot Area: 35 Zoning: RS-10
Final:
Valuation: $150,000.00
Occupancy Type: SFR/IRC Construction Type: VB
Expiration Date: 4/15/2021
Code Edition: 2015
No. Stories: 1 # of Dwelling Units: 1
Issued by: JOK
Scope of Work: ADD 1062 SF. RE -WORK INTERIOR LIVING SPACE. NEW ROOF STRUCTU
WA State Contractor L & I #: RAINCCR8230D City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME ADDRESS PHONE EMAIL
APPLICANT TIEL AND DESIREE RIISE 18504 82ND AVE W, EDMONDS (206)979-5756 DESIREERIIE@GMAIL.COM
WA 98026
CONTRACTOR RAIN CITY REMODELING 8501 224TH ST SW, EDMONDS (206)356-6107
WA 98026
OWNER TIEL AND DESIREE RIISE 18504 82ND AVE W, EDMONDS (206)979-5756 DESIREERIIE@GMAIL.COM
WA 98026
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE RECEIPT #
B-BUILDING PERMIT FEE
001.000.322.10.000.00
$1,400.00
$1,400.00
4/7/20
R4806
B-BUILDING PLAN REVIEW FEE
001.000.345.83.000.00
$1,105.00
$1,105.00
8/29/19
REC077305
B-MECHANICAL PERMIT FEE
001.000.322.10.000.00
$150.00
$150.00
4/7/20
R4806
B-PLUMBING PERMIT FEE
001.000.322.10.000.00
$268.00
$268.00
4/7/20
R4806
B-STATE BUILDING CODE
001.000.237.150
$6.50
$6.50
4/7/20
R4806
SURCHARGE
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
1 $200.00
$200.00
1 4/7/20
1R4806
X-CREDIT CARD TRANSACTION FEE
001.000.341.43.100.00
$33.15
$33.15
8/29/19
REC077305
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00
$35.00
4/7/20
R4806
TOTALS: $3,197.65 $3,197.65
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
officials, employees, and agents from any and all claims for damages of whatever nature,
Hold Harmless
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Final approval on a project or final occupancy approval must be granted by the Building
Occupancy
Official prior to use or occupancy of the building or structure. Check the job card for all
required City inspections including final project approval and final occupancy inspections.
Printed: Tuesday, April 14, 2020 7:52:30 AM 1 of 2
'SIDENTIAL BLDG PermitCity
PERMITNUM
• • • •
•:i 1 D8
www.edmondswa.gov•
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
and for which a variance has not been specifically identified, requested and considered by
the appropriate city official in accordance with the appropriate provision of city code or
state law does not approve any items not to code specification.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
IRU
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-2 FOOTINGS
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-4 FRAMING
B-5 INSULATION ENERGY
B-2 ROOF TEAR OFF
A-1 BUILDING PRECON
B-4 INTERIOR SHEAR
X-3 BUILDING FINAL"
B-7 BUILDING OTHER INSP
X-2 ENGINEERING FINAL
A-1 TESC AND MOBILIZE