ENG COMPACTION REPORT SEWER TRENCHEarth Solutions NWLLC 15365 NE 9011h Street, Suite 100 FIELD REPORT Vol Redmond, WA 98052 Main (425) 449-4704 1 Fax (425) 449-4711 esnw.com Project No. 8707.00 Page 1 of 2 Report ID 8707.00 E 02032023 Date Fri 2/3/2023 weather Cloudy, 40°F Arrival/Departure Time(s) 9:55 - 10:25 Travel Time (hr) 0.75 Project Name Solomon SFR Location 1400 - 9th Ave N, Edmonds ESNW Rep. & Phone Greg Buzitis, (206) 488-4151 Client Info/Contact Genet Solomon General Contractor Info/Contact Leif Helleren Construction Inc. I Leif Helleran General Contractor Info/Contact Reviewed By LAC VZ__ HTWW Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep. was onsite to observe the installation of the dispersion trench onsite and to observe and test the sewer line backfill. Dispersion trench observations: Upon arrival, ESNW rep. observed the grading contractors had excavated the dispersion trench to a depth of -3.5' below subgrade, with scarified sandy/gravelly material at the bottom of the trench. The contractor is preparing to place geotextile filter fabric. ESNW rep. observed that the contractor had installed the perforated drain pipe and embedded it in the sandy/gravel material and is preparing to backfill the area. Sewer observations: While onsite, ESNW rep. observed the contractor has installed side sewer pipes and a small manhole in a shallow trench in the road onsite. ESNW rep. observed the contractor installed the sewer pipes and embedded them in pea gravel. ESNW rep. observed the contractor preparing to place native soil as backfill in the trench line and use a large hoe -pack to thoroughly compact the material. ESNW rep. took compaction tests in the backfill around the manhole while onsite. While onsite, ESNW rep. also collected a sample of the backfill material for laboratory proctor analysis. Compaction results: ESNW rep. took compaction tests in the sewer line backfill after it was placed and compacted. Density test results indicate adequate compaction of at least 95% at the tested locations. The locations of these tests are approximately shown on the attached plans. ESNW rep. will return when requested. Report ID 8707.00 E 02032023 Page 2 of 2 Reference Maximum Test Test % of Test Location Elevation Proctor Dry Density Moisture Dry Density MDD (Pcf) (%) (Pcf) Sewer Manhole Near Road SG 1 129.6 4.9 127.2 98 itio sp A=90.25' RESOOCE EL-94,i 3,324 $1. NE (ROOF) Approx. location of tests in the sewer backfill 115 N AI)N T-2 LL (LWT) 7 WAMR ffArm BY Ono Um" SIAWX 4- — -7--7 --- W I V06W COAMIC SVCWKIXI 'C0'W (owmi — — UL A9* WIE—, TOP Mar f NW AND E 802' W —PU—W W W W %ki— -,7- . f f ,� MAW W saw dw SSW MP am a EASEM 2021OW SLOPE FOR nLLs msw RM 81001, V rELEPHM EASIMW RM &"4?W234 W W - W 50.0 Earth Solutions NW. LLC