Loading...
APPROVED BLD_RESUB 2-Plans+7.21.2022CODE: INTERNATIONAL BUILDING CODE (IBC) 2018 REQUIRED? (Y/N) MATERIAL / ACTIVITY Y N 1704.2.5 Inspection of Fabricators GENERAL CONDITIONS Verify fabrication/quality control procedures 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE Y N 1705.1.1 Special Cases (work unusual in nature, including but not limited to alternative materials STRUCTURAL ENGINEER IN WRITING OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING and systems, unusual design applications, materials and systems with special manufacturer's WITH THE WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE requirements) CONDITIONS BEFORE STARTING WORK. 2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING 1705.2 Steel Construction DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL Y N 1. Fabricator and erector documents (Verify reports and certificates as listed in AISC 360, chapter ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. N, paragraph 3.2 for compliance with construction documents) Y N 2. Material verification of structural steel 3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND Y N 3. Embedments (Verify diameter, grade, type, length, embedment. See 1705.3 for anchors) TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE Y N 4. Verify member locations, braces, stiffeners, and application of joint details at each connection STRINGENT REQUIREMENT SHALL APPLY. comply with construction documents 5. Structural steel welding: 4. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION Y N a. Inspection tasks Prior to Welding (Observe, or perform for each welded joint or member, the QA SHALL BE THE SAME AS FOR SIMILAR WORK. tasks listed in AISC 360, Table N5.4-1) Y N b. Inspection tasks During Welding (Observe, or perform for each welded joint or member, the QA 5. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON tasks listed in AISC 360, Table N5.4-1) THESE DRAWINGS. Y N c. Inspection tasks After Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-3) 6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL d. Nondestructive testing (NDT) of welded joints: see Commentary ENGINEER OF ANY CONDITION THAT, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE Y N 1) Complete penetration groove welds 5/16" or greater in risk category III or IV STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE. Y N 2) Complete penetration groove welds 5/16" or greater in risk category II Y N 3) Thermally cut surfaces of access holes when material t > 2" 7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY Y N 4) Welded joints subject to fatigue when required by AISC 360, Appendix 3, Table A-3.1 RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND Y N 5) Fabricator's NDT reports when fabricator performs NDT PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS 6. Structural steel bolting: DURING CONSTRUCTION. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. Y N a. Inspection tasks Prior to Bolting (Observe, or perform tasks for each bolted connection, in accordance with QA tasks listed in AISC 360, Table N5.6-1) 8. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE Y N b.lnspection tasks During Bolting (Observe the QA tasks listed in AISC 360, Table N5.6-2) GENERAL NOTES OR THE STRUCTURAL DRAWINGS. 1) Pre -tensioned and slip -critical joints Y N a) Turn -of -nut with matching markings 9. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP Y N b) Direct tension indicator ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY AND IN CONFORMANCE WITH Y N c) Twist -off type tension control bolt THE PROVISIONS OF PREVAILING CODE EDITION OF THE "INTERNATIONAL BUILDING CODE" (IBC) Y N d) Turn -of -nut without matching markings AND STANDARDS REFERENCED THEREIN. Y N e) Calibrated wrench 2) Snug -tight joints 10. PIPES, DUCTS, SLEEVES, OPENINGS, POCKETS, CHASES, BLOCK -OUTS, ETC., SHALL NOT Y N c. Inspection tasks After Bolting (Perform tasks for each bolted connection in accordance with QA BE PLACED IN SLABS, FOUNDATIONS, ETC., NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR tasks listed in AISC 360, Table N5.6-3) SUCH ITEMS, UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS. Y N 7. Inspection of steel elements of composite construction prior to concrete placement in accordance with QA tasks listed in AISC 360, Table N6.1 11. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW. ENGINEER MAY REQUEST PAYMENT FOR REVIEW. 1705.2.2 Steel Construction Other Than Structural Steel 1. Material verification of cold -formed steel deck: FOUNDATION Y N a. Identification markings Y N b. Manufacturer's certified test reports 1. STRUCTURAL DESIGN COMPLIES WITH SOILS REPORT PRODUCED BY: 2. Connection of cold -formed steel deck to supporting structure: GEO GROUP NORTHWEST INC, DATED MARCH 28, 2022 Y Y N N a. Welding b. Other fasteners (in accordance with AISC 360,Section N6) FOOTING BEARING PRESSURE: 2000 PSF Y N 1) Verify fasteners are in conformance with approved submittal Y N 2) Verify fastener installation is in conformance with approved submittal and manufacturer's LATERAL EARTH PRESSURE ON RETAINING WALLS 50 PSF recommendations 3. Reinforcing steel 2. SUBGRADE PREPARATION, DRAINAGE PROVISIONS, AND OTHER RELEVANT SOIL Y N a. Verification of weldability of steel other than ASTM A706 CONSIDERATIONS ARE TO BE IN ACCORDANCE WITH SAID SOILS REPORT. Y N b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames, boundary elements of special concrete structural walls and shear reinforcement Y N c. Shear reinforcement Y N d. Other reinforcing steel 4. Cold -formed steel trusses spanning 60 feet or greater Y N a. Verify temporary and permanent restraint/bracing are installed in accordance with the approved truss submittal package 1705.3 Concrete Construction Y N 1. Inspection of reinforcing steel installation (see 1705.2.2 for welding) Y N 2. Inspection of prestressing steel installation Y N 3. Inspection of anchors cast in concrete where allowable loads have been increased per section 1908.5 or where strength design is used ON 4. Inspection of anchors and reinforcing steel post -installed in hardened concrete: Per research reports including verification of anchor type, anchor dimensions, hole dimensions, hole cleaning procedures, anchor spacing, edge distances, concrete minimum thickness, anchor embedment and tightening torque Y N 5. Verify use of approved design mix Y N 6. Fresh concrete sampling, perform slump and air content tests and determine temperature of concrete Y N 7. Inspection of concrete and shotcrete placement for proper application techniques Y N 8. Inspection for maintenance of specified curing temperature and techniques 9. Inspection of prestressed concrete: Y N a. Application of prestressing force Y N b. Grouting of bonded prestressing tendons in the seismic -force -resisting system 10. Erection of precast concrete members Y N a. Inspect in accordance with construction documents Y N b. Perform inspections of welding and bolting in accordance with Section 1705.2 Y N 11. Verification of in -situ concrete strength, prior to stressing of tendons in post tensioned concrete and prior to removal of shores and forms from beams and structural slabs Y N 12. Inspection of formwork for shape, lines, location and dimensions Y N 13. Concrete strength testing and verification of compliance with construction documents DIMENSIONAL LUMBER, ANCHOR BOLT AND NAILING SPECIFICATIONS 1. MEET REQUIREMENTS OF PS 20-70 AND NATIONAL GRADING RULES FOR SOFTWOOD DIMENSIONAL LUMBER. BEAR STAMP OF WWPA. 2. MINIMUM DIMENSIONAL LUMBER GRADES TO BE: WALL STUDS, 2X, 3 X........ HF STUD GRADE WALL PLATES, 2X, 3X........ HF STANDARD GRADE U.N.O JOISTS, 2 X 6: ............. HF #2 JOISTS, 2 X 8 AND UP....... DF #2 BEAMS, HEADERS, 6X ........ DF #2 BEAMS, HEADERS, 4X......... DF #2, WWPA GRADING POSTS, 4X, 6X.............. DF #2 U.N.O LUMBER NOT NOTED HERE... DF #2 U.N.O 3. PROVIDE STANDARD CUT WASHERS FOR BOLT HEADS AND NUTS BEARING AGAINST WOOD. 4. ALL SILLS OR PLATES RESTING ON CONCRETE OR MASONRY THAT IS IN CONTACT WITH OR RESTING ON FOUNDATIONS SHALL BE PRESSURE -TREATED DOUGLAS FIR/ HEMFIR IN ACCORDANCE TO WITH AWPA U1 (PLANT/SHOP TREATMENT) AND M4 (FIELD TREATMENT) STANDARDS. ALL BEARING WALL PLATES SHALL HAVE 5/8" O x10" J-BOLTS PLACED AT MAXIMUM OF 9" FROM THE END OF A PLATE AND SPACED AT INTERVALS SHOWN ON THE SHEARWALL SCHEDULE (MAXIMUM 4'-0" OC SPACING). PROVIDE BP PLATE WASHER AT ALL FOUNDATION SILL PLATE ANCHOR BOLTS. PROVIDE TWO ANCHOR BOLTS MINIMUM PER SECTION OF SILL. FOR NON-SHEARWALL, PLACE ANCHORS AT 48". 5. BOLTS IN WOOD SHALL NOT BE LESS THAN 7 DIAMETERS FROM THE END AND 4 DIAMETERS FROM THE EDGE OF THE MEMBER. 6. NAILS: COMMON WIRE NAILS. NAILING IN ACCORDANCE WITH IBC TABLE 2304.9.1. 7. PRESSURE TREATED WOOD: ALL NAILS INTO PT WOOD SHALL BE HOT DIPPED GALVANIZED PER ASTM A153 OR STAINLESS STEEL. ALL METAL CONNECTORS IN CONTACT WITH PT WOOD SHALL BE HOT DIPPED GALVANIZED AND MEET ASTM A653 CLASS G185 (1.85 OZ OF ZINC PER SQ FT MINIMUM) OR TYPE 304 / 316 STAINLESS STEEL SIMPSON Z-MAX CONNECTORS MEET THIS REQUIREMENT. FASTENERS AND CONNECTORS USED TOGETHER SHALL BE OF THE SAME TYPE (E.G. HOT DIPPED NAILS WITH HOT DIPPED HANGERS) 8. ALL LUMBER WITH A LEAST DIMENSION OF 2" (NOMINAL) SHALL BE STAMPED "SURFACE - DRY" AND SHALL HAVE A MOISTURE CONTENT WHEN SURFACED AND WHEN INSTALLED OF NO MORE THAN 19 PERCENT. LUMBER WITH A LEAST DIMENSION OF 4" (NOMINAL) OR GREATER SHALL BE STAMPED "SURFACE -GREEN" AND AIR-DRIED TO A MOISTURE CONTENT OF NOT MORE THAN 19 PERCENT PRIOR TO ITS USE IN FRAMING THE STRUCTURE. 9. NOTCHING AND BORING OF BEAMS AND JOISTS IS NOT ALLOWED WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. Notes: 1. The inspection and testing agent(s) shall be engaged by the Owner or the Owner's Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official prior to commencing work. The qualifications of the Special Inspector(s) and/or testing agencies may be subject to the approval of the Building Official and/or the Design Professional. 2. The list of Special Inspectors may be submitted as a separate document, if noted so above. 3. Special Insepctions as required by Section 1704.2.5 are not required where the fabricator is approved in accordance with IBC Section 1704.2.5.2 4. Observe on a random basis, operations need not be delayed pending these inspections. Perform these tasks for each welded joint, bolted connection, or steel element. 5. NDT of welds completed in an approved fabricator's shop may be performed by that fabricator when approved by the AHJ. Refer to AISC 360, N7. CONCRETE AND REINFORCING 1. CONCRETE SHALL CONFORM TO THE INDICATED REFERENCE CODES AND STANDARDS EXCEPT AS MODIFIED BELOW: ACI-301 - "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" ACI-318 - "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" ACI-305R - "HOT WEATHER CONCRETING" ACI-306R - "COLD WEATHER CONCRETING" ACI-304 - "GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE" 2. CONCRETE MIX SPECIFICATIONS LOCATION COMP. SRENGTH W/C RATIO AIR CONTENT REMARK FOOTING 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) SLAB ON GRADE 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) FOUNDATION WALL 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) TOPPING N.A. a. TOTAL AIR CONTENT IS SPECIFIED IN THE TABLE ABOVE. AIR CONTENT TOLERANCE SHALL BE ± 1% AND SHALL BE MEASURED AT THE POINT OF PLACEMENT. (AFTER PUMPING IF APPLICABLE). ALL CONCRETE EXPOSED TO THE WEATHER SHALL HAVE AN APPROVED ADMIXTURE TO ENTRAIN AIR - 5% TOTAL AIR REQUIRED. CONCRETE THAT CAN BE SUBJECTED TO FREEZING AND THAWING DURING CONSTRUCTION SHALL BE AIR ENTRAINED. 3. PROVIDE GRADE 60 KSI (A615) FOR CONCRETE STEEL REINFORCING EXTENT REQUIRED? (Y/N) MATERIAL / ACTIVITY EXTENT Periodic 1705.4 Masonry Construction (A) Level A, B and C Quality Assurance: info@b2englneerS.COm Y N 1. Verify compliance with approved submittals Periodic (B) Level B Quality Assurance: 425-318-7047 (0) Y N 1. Verification of fm and fAAC prior to construction Periodic 425-318-0031 (C) (C) Level C Quality Assurance: Y N 1. Verification of fm and fAAC prior to construction and for every 5,000 SF during construction Periodic City Of Edmond� Y N 2. Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and Continuous grout other than self -consolidating grout, as delivered to the project site Each submittal Y N 3. Verify placement of masonry units Periodic Building Department (D) Levels B and C Quality Assurance: ------------------ ---------------- Periodic Y N 1. Verification of Slump Flow and Visual Stability Index (VSI) of self -consolidating grout as delivered Continuous Work RETAINING WALL Continuous to the project - Periodic Y N 2. Verify compliance with approved submittals Periodic r --------------------------------------------------------------------- Y N 3. Verify proportions of site -mixed mortar, grout and prestressing grout for bonded tendons Periodic Address' 1214 11 TH PL N Y N 4. Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and Periodic --------------- ---------------------- --------------- -------------------------- Observe or Perform as noted (4) anchorages Owner CHERMAK Y N 5. Verify construction of mortar joints Periodic -------- --------------------------- Observe (4) Y N 6. Verify placement of reinforcement, connectors, and prestressing tendons and anchorages Level B - Periodic ------------------------ Level C - Continuous Approved Date 9/27/2022 Observe or Perform as noted (4) Y N 7. Verify grout space prior to grouting Level B - Periodic ------===== Level C - Continuou Building Official W. W Y N 8. Verify placement of grout and prestressing grout for bonded tendons Continuous Periodic Y N 9. Verify size and location of structural masonry elements Periodic Periodic Y N 10. Verify type, size, and location of anchors, including details of anchorage of masonry to structural Level B - Periodic Permit Number BLD2022-0766 Periodic members, frames, or other construction. Level C - Continuou Periodic Y N 11. Verify welding of reinforcement (see 1705.2.2) Continuous Each submittal (5) Y N 12. Verify preparation, construction, and protestion of masonry during cold weather (temperature Periodic r ■ ■ below 40oF) or hot weather (temperature above 90oF) I 7 Observe or Perform as noted (4) Y N 13. Verify application and measurement of prestressing force Continuous Y N 14. Verify placement of AAC masonry units and construction of thin -bed mortar joints (first 5000 SF Continuous i SPECIAL INSPECTION REORT(S) AREObserve 4 of AAC mason ■ 5() ) Y N 15. Verify placment of AAC masonry units and construction of thin -bed mortar joints (after the first Level B - Periodic REQUIRED FOR THIS PERMIT. I P oF wasy�gS,A/ Periodic 5000 SF of AAC masonry) Level C - Continuous �; o Periodic Y N 16. Verify properties of thin -bed mortar for AAC masonry (first 5000 SF of AAC masonry) Continuous 11. SOILS 2 Periodic Y N 17. Verify properties of thin -bed mortar forAAC masonry (after the first 5000 SF of AAC masonry) Level B - Periodic Continuous Level C - Continuous ■ `� ■ r Continuous Y N 18. Prepare grout and mortar specimens Level B -Periodic ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Periodic Level C - Continuous -po �GCT 43789 Perform (4) Y N 19. Observe preparation of prisms Level C - Continuous us ALL WORK SUBJECT APPROVED S�ONAL TO FIELD Observe or Perform as noted (4) 1705.5 Wood Construction INSPECTION FOR PLANS MUST BE Y N 1. Inspection of the fabrication process of wood structural elements and assemblies in accordance Periodic CODE COMPLIANCE ON JOB SITE with Section 1704.2.5 Y N 2. For high -load diaphragms, verify grade and thickness of structural panel sheathing agree with Periodic approved building plans Periodic Y N 3. For high -load diaphragms, verify nominal size of framing members at adjoining panel edges, nail Periodic Each submittal or staple diameter and length, number of fastener lines, and that spacing between fasteners in each line and at edge margins agree with approved building plans Periodic Y N 4. Metal -plate -connected wood trusses spanning 60 feet or greater: verify temporary and permanent Periodic restraint/bracing are installed in accordance with the approved truss submittal package Periodic H OWARD Periodic 1705.E Soils 1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Cj H E R MAK Y N 2. Verify excavations are extended to proper depth and have reached proper material. Periodic Periodic Y N 3. Perform classification and testing of controlled fill materials. Periodic Continuous Y N 4. Verify use of proper materials, densities, and lift thicknesses during placement and compaction of Periodic RETAINING WALL Y N controlled fill Continuous Continuous 5. Prior to placement of controlled fill, observe subgrade and verify that site has been prepared Periodic Y N properly Periodic Periodic 1705.7 Driven Deep Foundations Y N 1. Verify element materials, sizes and lengths comply with requirements Continuous Y N 2. Determine capacities of test elements and conduct additional load tests, as required Continuous Y N 3. Observe driving operations and maintain complete and accurate records for each element Continuous Periodic. Y N 4. Verify placement locations and plumbness, confirm type and size of hammer, record number of Continuous 1214 11 TH PLACE Periodic blows per foot of penetration, determine required penetrations to achieve design capacity, record tip Continuous and butt elevations and document any damage to foundation element /� Y N 5. For steel elements, perform additional inspections per Section 1705.2 See Section 1705.2 NORTH, EDMONDS, WP Periodic or as required by the research report issued by an Y N 6. For concrete elements and concrete -filled elements, perform additional inspections per Section See Section 1705.3 �VQ020 approved source 1705.3 Y N 7. For specialty elements, perform additional inspections as determined by the registered design In accordance with construction documents professional in responsible charge Periodic Y N 8. Perform additional inspections and tests in accordance with the construction documents In accordance with construction documents Continuous 1705.8 Cast -in -Place Deep Foundations Continuous Y N 1.Observe drilling operations and maintain complete and accurate records for each element Continuous Periodic Y N 2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if Continuous applicable), lengths, embedment into bedrock (if applicable) and adequate end -bearing strata Continuous capacity. Record concrete or grout volumes Continuous Y N 3. For concrete elements, perform additional inspections in accordance with Section 1705.3 See Section 1705.3 RES U B Y N 4. Perform additional inspections and tests in accordance with the construction documents In accordance with construction documents In accordance with construction documents Jul 21 2022 In accordance with Section 1705.2 1705.9 Helical Pile Foundations CITY OF EDMONDS Periodic Y N 1. Verify installation equipment, pile dimensions, tip elevations, final depth, final installation torque Continuous DEVELOPMENT SERVICES and other data as required. DEPARTMENT Periodic Y N 2. Perform additional inspections and tests in accordance with the construction documents In accordance with construction documents Periodic 1705.10.1 Structural Wood Special Inspections For Wind Resistance Y N 1. Inspection of field gluing operations of elements of the main windforce-resisting system Continuous Y N 2. Inspection of nailing, bolting, anchoring and other fastening of components within the main Periodic windforce-resisting system 1705.10.2 Cold -formed Steel Special Inspections For Wind Resistance DRAWING INFO Y N 1.Inspection during welding operations of elements of the main windforce-resisting system Periodic Y N 2.Inspections for screw attachment, bolting, anchoring and other fastening of components within the Periodic main windforce-resisting system 1705.10.3 Wind -resisting Components ISSUE DATE 07-20-22 Y N 1. Roof cladding Periodic Y N 2. Wall cladding Periodic ISSUED FOR PERMIT Y N 1705.11.1 Structural Steel Special Inspections for Seismic Resistance In accordance with AISC 341 Inspection of structural steel in accordance with AISC 341 PROJECT NO.22090 1705.11.2 Structural Wood Special Inspections for Seismic Resistance Y N 1. Inspection of field gluing operations of elements of the seismic -force resisting system Continuous ENGINEER BB Y N 2. Inspection of nailing, bolting, anchoring and other fastening of components within the seismic- Periodic force -resisting system REVISION SCHEDULE 1705.11.3 Cold -formed Steel Light -Frame Construction Special Inspections for Seismic Y N Resistance Periodic NO. DATE DESCRIPTIOI Y N 1. Inspection during welding operations of elements of the seismic -force -resisting system Periodic 2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the seismic -force -resisting system STRUCTURAL AND MISCELLANEOUS STEEL STEEL MEMBERS, HARDWARE, FASTENERS SHALL BE HOT DIPPED GALVANIZED OR EPDXY PAINTED PER ARCHITECT REQUIREMENTS. ALL CUT, REPAIRED AND EXPOSED SURFACE SHALL BE PAINTED WITH (2) COAT OF 95% ZINC RICH PAINT PER ASTM A780. COLOR TO MATCH EXISTING. STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS: TUBE COLUMNS: ASTM A500, GRADE B (Fy = 46 KSI) WIDE FLANGE COLUMNS / BEAMS: ASTM 572 GR50 STEEL PIPE: SCHEDULE 40, CONFORMING TO ASTM A53, TYPE E OR S, GRADE B (Fy = 35 KSI.) ALL OTHER STEEL: ASTM A36 (Fy = 36 KSI) OR ASTM A992 BOLTS: ASTM A307 (WOOD/STEEL CONN) BOLTS: ASTM A325/A490 WITH LOCK WASHERS (STEEL/STEEL AND STEEL/CONC CONN) ANCHOR BOLTS: ASTM A307 (WOOD FRAMING) ANCHOR BOLTS: ASTM A325 (STEEL FRAMING) ALL SLIP CRITICAL CONNECTIONS SHALL BE ASTM A325 BOLTS AND SHALL BE ENGINEER -APPROVED, SELF -LOAD INDICATING TYPES, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. STRUCTURAL STEEL WELDING CONFORM TO THE AWS CODES D1.1 AND D1.3, AND USE ONLY CERTIFIED WELDERS. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. INCREASE WELD SIZE TO AWS MINIMUM SIZES, BASED ON PLATE THICKNESS. USE DRY E70 ELECTRODES. ALL WELDING SHALL CONFORM TO THE AWS CODES, AND SHALL BE BY CERTIFIED WELDERS. WELDS NOT SPECIFIED SHALL BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. DRAWING LIST SHEET NUMBER S-0 SHEET NAME GENERAL NOTES AND SPECIFICATIONS ISSUE DATE 07-20-22 S-1 FRAMING PLANS AND DETAILS 07-20-22 S-1A GENERAL NOTES AND SITE PLAN 07-20-22 Grand total: 3 CODE: INTERNATIONAL BUILDING CODE (IBC) 2018 GENERAL CONDITIONS 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL ENGINEER IN WRITING OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING WORK. 2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. 3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE STRINGENT REQUIREMENT SHALL APPLY. 4. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION SHALL BE THE SAME AS FOR SIMILAR WORK. 5. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE DRAWINGS. 6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CONDITION THAT, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE. 7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. 8. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES OR THE STRUCTURAL DRAWINGS. 9. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY AND IN CONFORMANCE WITH THE PROVISIONS OF PREVAILING CODE EDITION OF THE "INTERNATIONAL BUILDING CODE" (IBC) AND STANDARDS REFERENCED THEREIN. 10. PIPES, DUCTS, SLEEVES, OPENINGS, POCKETS, CHASES, BLOCK -OUTS, ETC., SHALL NOT BE PLACED IN SLABS, FOUNDATIONS, ETC., NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR SUCH ITEMS, UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS. 11. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW. ENGINEER MAY REQUEST PAYMENT FOR REVIEW. FOUNDATION 1. STRUCTURAL DESIGN COMPLIES WITH SOILS REPORT PRODUCED BY: GEO GROUP NORTHWEST INC, DATED MARCH 28, 2022 FOOTING BEARING PRESSURE: 2000 PSF LATERAL EARTH PRESSURE ON RETAINING WALLS 50 PSF 2. SUBGRADE PREPARATION, DRAINAGE PROVISIONS, AND OTHER RELEVANT SOIL CONSIDERATIONS ARE TO BE IN ACCORDANCE WITH SAID SOILS REPORT. CONCRETE AND REINFORCING 1 2 CONCRETE SHALL CONFORM TO THE INDICATED REFERENCE CODES AND STANDARDS EXCEPT AS MODIFIED BELOW: ACI-301 - "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" ACI-318 - "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" ACI-305R - "HOT WEATHER CONCRETING" ACI-306R - "COLD WEATHER CONCRETING' ACI-304 - "GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE" CONCRETE MIX SPECIFICATIONS LOCATION COMP. SRENGTH W/C RATIO AIR CONTENT REMARK FOOTING 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) SLAB ON GRADE 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) FOUNDATION WALL 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) TOPPING N.A. a. TOTAL AIR CONTENT IS SPECIFIED IN THE TABLE ABOVE. AIR CONTENT TOLERANCE SHALL BE ± 1 % AND SHALL BE MEASURED AT THE POINT OF PLACEMENT. (AFTER PUMPING IF APPLICABLE). ALL CONCRETE EXPOSED TO THE WEATHER SHALL HAVE AN APPROVED ADMIXTURE TO ENTRAIN AIR - 5% TOTAL AIR REQUIRED. CONCRETE THAT CAN BE SUBJECTED TO FREEZING AND THAWING DURING CONSTRUCTION SHALL BE AIR ENTRAINED. 3. PROVIDE GRADE 60 KSI (A615) FOR CONCRETE STEEL REINFORCING PROPERTY OWNER: CHERMAK HOWARD AND JUDITH PROPERTY ADDRESS: 1214 11TH PL NE, EDMONDS, WA 98020 PARCEL NO.: 00606600001600 LEGAL DESCRIPTION: VIEWLAND HEIGHTS BLK 000 D-00 - LOT 16 PROJECT DESCRIPTION: CONSTRUCTING NEW CONCRETE RETAINING WALL IN SLOPED TERRAIN IN REAR -YARD I L SITE PLAN 1/8" = 1'-0" - - - - - - - - - - REAR -YARD SETBACK o, Bq of WAS S • 2 43789 '.�0'cl.` CT BRA L ENGNG� SS/ONAL E H OWARD CH ERMAK RETAINING WALL 1214 11 TH PLACE NORTH, EDMONDS, WA 98020 RESUB Jul 21 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWING INFO ISSUE DATE 07-20-22 ISSUED FOR PERMIT PROJECT NO.22090 ENGINEER BB GENERAL NOTES AND SITE PLAN S.1 Copyright b2 Structural Engineers 2008 S12 S 2 mt 70' - 0" +/- CONTRACTOR TO FIELD VERIFY HEIGHT OF RETAINING SOIL J ALONG CONCRETE WALL FOR REQUIRED WALL HEIGHT Q .0 Z 0 LL + ILL] O7 M Z) 1 0 a) _ 0 Z v7 X LU 0 H 4 EXISTING GARAGE U 0 Bq OF WAS S • °2 43789 '.�0'cl.` CT BRA L ENGNG� SS/ONAL E FOUNDATION 1/4'= 1'-0" H OWARD CH ERMAK RETAINING WALL III 12" TOP COMPACTED AND RELATIVELY IMPERMEABLE SOIL PER GEOTECH REPORT 1214 11 TH PLACE 1:1 SOIL SLOPE NORTH, EDMONDS, WA L - 98020 12" TOP COMPACTED AND RELATIVELY 6' SOIL SIDE IMPERMEABLE SOIL PER GEOTECH REPORT 2" CLR 1:1 SOIL SLOPE wzz- -I 1/2" VERTICAL DRAIN MAT RESUB a . OR OTHER APPROVED 6' — SOIL SIDE PRODUCTS PER GEOTECH Jul 21 2022 — - RECOMMENDATIONS CITY OFEDMONDS a ° DEVELOPMENT SERVICES 2" CLR d • DEPARTMENT #4 AT 16" E.W. �o x r , . 1/2" VERTICAL DRAIN MAT _ OR OTHER APPROVED:;I 6' g PRODUCTS PER GEOTECH m RECOMMENDATIONS #4 AT 16" E.W. a• III DRAWING INFO (DRAIN GRAVEL ISSUE DATE 07-20-22 � DRAIN GRAVEL III WRAPPED IN FABRICS WRAPPED IN FABRICS T -(3) #4 a % (SEE GEOTECH RECOMMENDATIONS PER — #4 AT 16" E.W. ,a a � (SEE GEOTECH RECOMMENDATIONS PER ISSUED FOR PERMIT w — w III - NOTES ON S-1) o a. ° = d III r a d 2 ,a4 , PROJECT NO.22090 - e y �� 4 f1� PVC DRAIN PIPE - o 0 Z - d° e _ — °,- e• a a, 4"O PVC DRAIN PIPE a o , ENGINEER BB —#4 AT 16" U III III III III III ``' IL. PREPARATIONS PER NOTES ON S-1 IMPORTANT NOTES ON FOUNDATION: NO. DATE DESCRIPTIOP SOI PREPARATIONS PER NOTES ON S-1 III III III III III ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS MIN. OF MEDIUM DENSE NATIVE 91, 91. 1' - 9" 9" SOIL OR COMPACTED STRUCTURAL FILL (NO SOFT OR ORGANIC MATERIALS). GEOTECHNICAL ENGINEER MAY BE REQUIRED TO ASSESS EXISTING SOIL CONDITIONS. 1'-6" 2'-6" PER GEOTECH RECOMMENDATIONS: Detail 1 Detail 2 1. THE TOP 12 INCHES OF THE FILL BEHIND THE WALL SHOULD CONSIST OF COMPACTED AND RELATIVELY IMPERMEABLE SOIL. THE BACKFILL IN AREAS ADJACENT TO CONCRETE 1" = 1'-O" RETAINING WALL SHOULD BE COMPACTED WITH HANDHELD EQUIPMENT (SUCH AS A JUMPING JACK). HEAVY COMPACTING MACHINES SHOULD NOT BE ALLOWED WITHIN A HORIZONTAL DISTANCE TO THE WALL EQUIVALENT TO ONE HALF OF THE WALL HEIGHT, UNLESS THE WALL IS DESIGNED TO ACCOMMODATE THE ADDED SURCHARGE. 2. FINAL SITE GRADES SHOULD DIRECT SURFACE WATER AWAY FROM PROPOSED RETAINING WALL. SUBSURFACE DRAINS SHOULD BE INSTALLED ALONGSIDE THE PROPOSED RETAINING WALL. THE DRAIN SHOULD CONSIST OF A 4-INCH MINIMUM DIAMETER, PERFORATED, RIGID PVC DRAIN PIPE LAID AT THE BOTTOM OF THE WALL, WITH THE PERFORATIONS FACING DOWNWARD. THE DRAIN ROCK AND PIPE SHOULD EACH BE WRAPPED IN A LAYER OF GEOTEXTILE FABRIC OR EQUIVALENT. THE DRAIN LINE SHOULD BE SLOPED AT SUFFICIENT GRADIENT TO GENERATE FLOW TOWARD AN FRAMING PLANS APPROPRIATE STORMWATER DISCHARGE LOCATION OR COLLECTION SYSTEM. 3. TO PREVENT BUILDUP OF HYDROSTATIC PRESSURE BEHIND CONVENTIONAL RETAINING AND DETAILS WALLS, A VERTICAL DRAIN EXTENDING FROM FINISHED SURFACE GRADE DOWN TO THE FOOTING DRAIN SHOULD BE INSTALLED. IN ADDITION, IT IS RECOMMENDED THAT A PRISM OF CLEAN, GRANULAR, FREE DRAINING STRUCTURAL BACKFILL MATERIAL AT LEAST 12 INCHES WIDE BE BACKFILLED AGAINST THE MATTED WALL. ULEGEND AND NOTES C_� 1 /4 = 1 -0 V Copyright b2 Structural Engineers 2008