Loading...
APPROVED REVISION BLD2022-0766+Building_or_Construction_Plan+6.6.2023_9.14.59_PM+3592595CODE: INTERNATIONAL BUILDING CODE (IBC) 2018 GENERAL CONDITIONS 1. THE CONTRACTOR SHALL EXAMINE THE STRUCTURAL DRAWINGS AND SHALL NOTIFY THE STRUCTURAL ENGINEER IN WRITING OF ANY DISCREPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING WORK. 2. ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY WORK SO INVOLVED. 3. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE THE NOTES, DRAWINGS, AND/OR SPECIFICATIONS DIFFER, THE MORE STRINGENT REQUIREMENT SHALL APPLY. 4. IF A SPECIFIC DETAIL IS NOT SHOWN FOR ANY PART OF THE WORK, THE CONSTRUCTION SHALL BE THE SAME AS FOR SIMILAR WORK. 5. WORKING DIMENSIONS SHALL NOT BE SCALED FROM PLANS, SECTIONS, OR DETAILS ON THESE DRAWINGS. 6. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND THE STRUCTURAL ENGINEER OF ANY CONDITION THAT, IN HIS OPINION, MIGHT ENDANGER THE STABILITY OF THE STRUCTURE OR CAUSE DISTRESS TO THE STRUCTURE. 7. THE CONTRACTOR SHALL SUPERVISE AND DIRECT HIS WORK AND HE SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. PROVIDE ADEQUATE SHORING AND BRACING OF ALL STRUCTURAL MEMBERS DURING CONSTRUCTION. NOTIFY ENGINEER OF ALL FIELD CHANGES PRIOR TO INSTALLATION. 8. REFER TO THE ARCHITECTURAL DRAWINGS FOR INFORMATION NOT COVERED BY THESE GENERAL NOTES OR THE STRUCTURAL DRAWINGS. 9. ALL CONSTRUCTION SHALL BE DONE WITH MATERIALS, METHODS, AND WORKMANSHIP ACCEPTED AS GOOD PRACTICE BY THE CONSTRUCTION INDUSTRY AND IN CONFORMANCE WITH THE PROVISIONS OF PREVAILING CODE EDITION OF THE "INTERNATIONAL BUILDING CODE" (IBC) AND STANDARDS REFERENCED THEREIN. 10. PIPES, DUCTS, SLEEVES, OPENINGS, POCKETS, CHASES, BLOCK -OUTS, ETC., SHALL NOT BE PLACED IN SLABS, FOUNDATIONS, ETC., NOR SHALL ANY STRUCTURAL MEMBER BE CUT FOR SUCH ITEMS, UNLESS SPECIFICALLY DETAILED ON THESE STRUCTURAL DRAWINGS. 11. ALTERNATE ASSEMBLIES AND MATERIALS WILL BE CONSIDERED FOR REVIEW. ENGINEER MAY REQUEST PAYMENT FOR REVIEW. FOUNDATION 1. STRUCTURAL DESIGN COMPLIES WITH SOILS REPORT PRODUCED BY: GEO GROUP NORTHWEST INC, DATED MARCH 28, 2022 FOOTING BEARING PRESSURE: 2000 PSF LATERAL EARTH PRESSURE ON RETAINING WALLS 50 PSF 2. SUBGRADE PREPARATION, DRAINAGE PROVISIONS, AND OTHER RELEVANT SOIL CONSIDERATIONS ARE TO BE IN ACCORDANCE WITH SAID SOILS REPORT. DIMENSIONAL LUMBER, ANCHOR BOLT AND NAILING SPECIFICATIONS 1. MEET REQUIREMENTS OF PS 20-70 AND NATIONAL GRADING RULES FOR SOFTWOOD DIMENSIONAL LUMBER. BEAR STAMP OF WWPA. 2. MINIMUM DIMENSIONAL LUMBER GRADES TO BE: WALL STUDS, 2X, 3 X........ HF STUD GRADE WALL PLATES, 2X, 3X........ HF STANDARD GRADE U.N.O JOISTS, 2 X 6: ............. HF #2 JOISTS, 2 X 8 AND UP....... DF #2 BEAMS, HEADERS, 6X ........ DF #2 BEAMS, HEADERS, 4X......... DF #2, WWPA GRADING POSTS, 4X, 6X.............. DF #2 U.N.O LUMBER NOT NOTED HERE... DF #2 U.N.O 3. PROVIDE STANDARD CUT WASHERS FOR BOLT HEADS AND NUTS BEARING AGAINST WOOD. 4. ALL SILLS OR PLATES RESTING ON CONCRETE OR MASONRY THAT IS IN CONTACT WITH OR RESTING ON FOUNDATIONS SHALL BE PRESSURE -TREATED DOUGLAS FIR/ HEMFIR IN ACCORDANCE TO WITH AWPA U1 (PLANT/SHOP TREATMENT) AND M4 (FIELD TREATMENT) STANDARDS. ALL BEARING WALL PLATES SHALL HAVE 5/8" O x10" J-BOLTS PLACED AT MAXIMUM OF 9" FROM THE END OF A PLATE AND SPACED AT INTERVALS SHOWN ON THE SHEARWALL SCHEDULE (MAXIMUM 4'-0" OC SPACING). PROVIDE BP PLATE WASHER AT ALL FOUNDATION SILL PLATE ANCHOR BOLTS. PROVIDE TWO ANCHOR BOLTS MINIMUM PER SECTION OF SILL. FOR NON-SHEARWALL, PLACE ANCHORS AT 48". 5. BOLTS IN WOOD SHALL NOT BE LESS THAN 7 DIAMETERS FROM THE END AND 4 DIAMETERS FROM THE EDGE OF THE MEMBER. 6. NAILS: COMMON WIRE NAILS. NAILING IN ACCORDANCE WITH IBC TABLE 2304.9.1. 7. PRESSURE TREATED WOOD: ALL NAILS INTO PT WOOD SHALL BE HOT DIPPED GALVANIZED PER ASTM A153 OR STAINLESS STEEL. ALL METAL CONNECTORS IN CONTACT WITH PT WOOD SHALL BE HOT DIPPED GALVANIZED AND MEET ASTM A653 CLASS G185 (1.85 OZ OF ZINC PER SQ FT MINIMUM) OR TYPE 304 / 316 STAINLESS STEEL SIMPSON Z-MAX CONNECTORS MEET THIS REQUIREMENT. FASTENERS AND CONNECTORS USED TOGETHER SHALL BE OF THE SAME TYPE (E.G. HOT DIPPED NAILS WITH HOT DIPPED HANGERS) 8. ALL LUMBER WITH A LEAST DIMENSION OF 2" (NOMINAL) SHALL BE STAMPED "SURFACE - DRY" AND SHALL HAVE A MOISTURE CONTENT WHEN SURFACED AND WHEN INSTALLED OF NO MORE THAN 19 PERCENT. LUMBER WITH A LEAST DIMENSION OF 4" (NOMINAL) OR GREATER SHALL BE STAMPED "SURFACE -GREEN" AND AIR-DRIED TO A MOISTURE CONTENT OF NOT MORE THAN 19 PERCENT PRIOR TO ITS USE IN FRAMING THE STRUCTURE. 9. NOTCHING AND BORING OF BEAMS AND JOISTS IS NOT ALLOWED WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD. REQUIRED? (Y/N) MATERIAL / ACTIVITY EXTENT Y N 1704.2.5 Inspection of Fabricators Periodic Verify fabrication/quality control procedures Y N 1705.1.1 Special Cases (work unusual in nature, including but not limited to alternative materials and systems, unusual design applications, materials and systems with special manufacturer's requirements) 1705.2 Steel Construction Y N 1. Fabricator and erector documents (Verify reports and certificates as listed in AISC 360, chapter Each submittal N, paragraph 3.2 for compliance with construction documents) Y N 2. Material verification of structural steel Periodic Y N 3. Embedments (Verify diameter, grade, type, length, embedment. See 1705.3 for anchors) Continuous Y N 4. Verify member locations, braces, stiffeners, and application of joint details at each connection Periodic comply with construction documents 5. Structural steel welding: Y N a. Inspection tasks Prior to Welding (Observe, or perform for each welded joint or member, the QA Observe or Perform as noted (4) tasks listed in AISC 360, Table N5.4-1) Y N b. Inspection tasks During Welding (Observe, or perform for each welded joint or member, the QA Observe (4) tasks listed in AISC 360, Table N5.4-1) Y N c. Inspection tasks After Welding (Observe, or perform for each welded joint or member, the QA Observe or Perform as noted (4) tasks listed in AISC 360, Table N5.4-3) d. Nondestructive testing (NDT) of welded joints: see Commentary Y N 1) Complete penetration groove welds 5/16" or greater in risk category III or IV Periodic Y N 2) Complete penetration groove welds 5/16" or greater in risk category II Periodic Y N 3) Thermally cut surfaces of access holes when material t > 2" Periodic Y N 4) Welded joints subject to fatigue when required by AISC 360, Appendix 3, Table A-3.1 Periodic Y N 5) Fabricator's NDT reports when fabricator performs NDT Each submittal (5) 6. Structural steel bolting: Y N a. Inspection tasks Prior to Bolting (Observe, or perform tasks for each bolted connection, in Observe or Perform as noted (4) accordance with QA tasks listed in AISC 360, Table N5.6-1) Y N b.lnspection tasks During Bolting (Observe the QA tasks listed in AISC 360, Table N5.6-2) Observe (4) 1) Pre -tensioned and slip -critical joints Y N a) Turn -of -nut with matching markings Periodic Y N b) Direct tension indicator Periodic Y N c) Twist -off type tension control bolt Periodic Y N d) Turn -of -nut without matching markings Continuous Y N e) Calibrated wrench Continuous 2) Snug -tight joints Periodic Y N c. Inspection tasks After Bolting (Perform tasks for each bolted connection in accordance with QA Perform (4) tasks listed in AISC 360, Table N5.6-3) Y N 7. Inspection of steel elements of composite construction prior to concrete placement in accordance Observe or Perform as noted (4) with QA tasks listed in AISC 360, Table N6.1 1705.2.2 Steel Construction Other Than Structural Steel 1. Material verification of cold -formed steel deck: Y N a. Identification markings Periodic Y N b. Manufacturer's certified test reports Each submittal 2. Connection of cold -formed steel deck to supporting structure: Y N a. Welding Periodic Y N b. Other fasteners (in accordance with AISC 360,Section N6) Y N 1) Verify fasteners are in conformance with approved submittal Periodic Y N 2) Verify fastener installation is in conformance with approved submittal and manufacturer's Periodic recommendations 3. Reinforcing steel Y N a. Verification of weldability of steel other than ASTM A706 Periodic Y N b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames, Continuous boundary elements of special concrete structural walls and shear reinforcement Y N c. Shear reinforcement Continuous Y N d. Other reinforcing steel Periodic 4. Cold -formed steel trusses spanning 60 feet or greater Y N a. Verify temporary and permanent restraint/bracing are installed in accordance with the approved Periodic truss submittal package 1705.3 Concrete Construction Y N 1. Inspection of reinforcing steel installation (see 1705.2.2 for welding) Periodic. Y N 2. Inspection of prestressing steel installation Periodic Y N 3. Inspection of anchors cast in concrete where allowable loads have been increased per section Continuous 1908.5 or where strength design is used ON 4. Inspection of anchors and reinforcing steel post -installed in hardened concrete: Per research Periodic or as required by the research report issued by an reports including verification of anchor type, anchor dimensions, hole dimensions, hole cleaning approved source procedures, anchor spacing, edge distances, concrete minimum thickness, anchor embedment and tightening torque Y N 5. Verify use of approved design mix Periodic Y N 6. Fresh concrete sampling, perform slump and air content tests and determine temperature of Continuous concrete Y N 7. Inspection of concrete and shotcrete placement for proper application techniques Continuous Y N 8. Inspection for maintenance of specified curing temperature and techniques Periodic 9. Inspection of prestressed concrete: Y N a. Application of prestressing force Continuous Y N b. Grouting of bonded prestressing tendons in the seismic -force -resisting system Continuous 10. Erection of precast concrete members Y N a. Inspect in accordance with construction documents In accordance with construction documents Y N b. Perform inspections of welding and bolting in accordance with Section 1705.2 In accordance with Section 1705.2 Y N 11. Verification of in -situ concrete strength, prior to stressing of tendons in post tensioned concrete Periodic and prior to removal of shores and forms from beams and structural slabs Y N 12. Inspection of formwork for shape, lines, location and dimensions Periodic Y N 13. Concrete strength testing and verification of compliance with construction documents Periodic Notes: 1. The inspection and testing agent(s) shall be engaged by the Owner or the Owner's Agent, and not by the Contractor or Subcontractor whose work is to be inspected or tested. Any conflict of interest must be disclosed to the Building Official prior to commencing work. The qualifications of the Special Inspector(s) and/or testing agencies may be subject to the approval of the Building Official and/or the Design Professional. 2. The list of Special Inspectors may be submitted as a separate document, if noted so above. 3. Special Insepctions as required by Section 1704.2.5 are not required where the fabricator is approved in accordance with IBC Section 1704.2.5.2 4. Observe on a random basis, operations need not be delayed pending these inspections. Perform these tasks for each welded joint, bolted connection, or steel element. 5. NDT of welds completed in an approved fabricator's shop may be performed by that fabricator when approved by the AHJ. Refer to AISC 360, N7. CONCRETE AND REINFORCING 1. CONCRETE SHALL CONFORM TO THE INDICATED REFERENCE CODES AND STANDARDS EXCEPT AS MODIFIED BELOW: ACI-301 - "STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE" ACI-318 - "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" ACI-305R - "HOT WEATHER CONCRETING" ACI-306R - "COLD WEATHER CONCRETING" ACI-304 - "GUIDE FOR MEASURING, MIXING, TRANSPORTING AND PLACING CONCRETE" 2. CONCRETE MIX SPECIFICATIONS LOCATION COMP. SRENGTH W/C RATIO AIR CONTENT REMARK FOOTING 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) SLAB ON GRADE 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) FOUNDATION WALL 2500 PSI (MIN. OF 5.5 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE) TOPPING N.A. a. TOTAL AIR CONTENT IS SPECIFIED IN THE TABLE ABOVE. AIR CONTENT TOLERANCE SHALL BE ± 1% AND SHALL BE MEASURED AT THE POINT OF PLACEMENT. (AFTER PUMPING IF APPLICABLE). ALL CONCRETE EXPOSED TO THE WEATHER SHALL HAVE AN APPROVED ADMIXTURE TO ENTRAIN AIR - 5% TOTAL AIR REQUIRED. CONCRETE THAT CAN BE SUBJECTED TO FREEZING AND THAWING DURING CONSTRUCTION SHALL BE AIR ENTRAINED. 3. PROVIDE GRADE 60 KSI (A615) FOR CONCRETE STEEL REINFORCING REQUIRED? (Y/N) MATERIAL / ACTIVITY 1705.4 Masonry Construction (A) Level A, B and C Quality Assurance: Y N 1. Verify compliance with approved submittals (B) Level B Quality Assurance: Y N 1. Verification of fm and fAAC prior to construction (C) Level C Quality Assurance: Y N 1. Verification of fm and fAAC prior to construction and for every 5,000 SF during construction Y N 2. Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and grout other than self -consolidating grout, as delivered to the project site Y N 3. Verify placement of masonry units (D) Levels B and C Quality Assurance: Y N 1. Verification of Slump Flow and Visual Stability Index (VSI) of self -consolidating grout as delivered to the project Y N 2. Verify compliance with approved submittals Y N 3. Verify proportions of site -mixed mortar, grout and prestressing grout for bonded tendons Y N 4. Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and anchorages Y N 5. Verify construction of mortar joints Y N 6. Verify placement of reinforcement, connectors, and prestressing tendons and anchorages Y N 7. Verify grout space prior to grouting Y N 8. Verify placement of grout and prestressing grout for bonded tendons Y N 9. Verify size and location of structural masonry elements Y N 10. Verify type, size, and location of anchors, including details of anchorage of masonry to structural members, frames, or other construction. Y N 11. Verify welding of reinforcement (see 1705.2.2) Y N 12. Verify preparation, construction, and protestion of masonry during cold weather (temperature below 40oF) or hot weather (temperature above 90oF) Y N 13. Verify application and measurement of prestressing force Y N 14. Verify placement of AAC masonry units and construction of thin -bed mortar joints (first 5000 SF of AAC masonry) Y N 15. Verify placement of AAC masonry units and construction of thin -bed mortar joints (after the first 5000 SF of AAC masonry) Y N 16. Verify properties of thin -bed mortar for AAC masonry (first 5000 SF of AAC masonry) Y N 17. Verify properties of thin -bed mortar forAAC masonry (after the first 5000 SF of AAC masonry) Y N 18. Prepare grout and mortar specimens Y N 19. Observe preparation of prisms 1705.5 Wood Construction Y N 1. Inspection of the fabrication process of wood structural elements and assemblies in accordance with Section 1704.2.5 Y N 2. For high -load diaphragms, verify grade and thickness of structural panel sheathing agree with approved building plans Y N 3. For high -load diaphragms, verify nominal size of framing members at adjoining panel edges, nail or staple diameter and length, number of fastener lines, and that spacing between fasteners in each line and at edge margins agree with approved building plans Y N 4. Metal -plate -connected wood trusses spanning 60 feet or greater: verify temporary and permanent restraint/bracing are installed in accordance with the approved truss submittal package 1705.6 Soils 1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Y N 2. Verify excavations are extended to proper depth and have reached proper material. Y N 3. Perform classification and testing of controlled fill materials. Y N 4. Verify use of proper materials, densities, and lift thicknesses during placement and compaction of Y N controlled fill 5. Prior to placement of controlled fill, observe subgrade and verify that site has been prepared Y N properly 1705.7 Driven Deep Foundations Y N 1. Verify element materials, sizes and lengths comply with requirements Y N 2. Determine capacities of test elements and conduct additional load tests, as required Y N 3. Observe driving operations and maintain complete and accurate records for each element Y N 4. Verify placement locations and plumbness, confirm type and size of hammer, record number of blows per foot of penetration, determine required penetrations to achieve design capacity, record tip and butt elevations and document any damage to foundation element Y N 5. For steel elements, perform additional inspections per Section 1705.2 Y N 6. For concrete elements and concrete -filled elements, perform additional inspections per Section 1705.3 Y N 7. For specialty elements, perform additional inspections as determined by the registered design professional in responsible charge Y N 8. Perform additional inspections and tests in accordance with the construction documents 1705.8 Cast -in -Place Deep Foundations Y N 1.Observe drilling operations and maintain complete and accurate records for each element Y N 2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if applicable), lengths, embedment into bedrock (if applicable) and adequate end -bearing strata capacity. Record concrete or grout volumes Y N 3. For concrete elements, perform additional inspections in accordance with Section 1705.3 Y N 4. Perform additional inspections and tests in accordance with the construction documents 1705.9 Helical Pile Foundations Y N 1. Verify installation equipment, pile dimensions, tip elevations, final depth, final installation torque and other data as required. Y N 2. Perform additional inspections and tests in accordance with the construction documents 1705.10.1 Structural Wood Special Inspections For Wind Resistance Y N 1. Inspection of field gluing operations of elements of the main windforce-resisting system Y N 2. Inspection of nailing, bolting, anchoring and other fastening of components within the main windforce-resisting system 1705.10.2 Cold -formed Steel Special Inspections For Wind Resistance Y N 1.Inspection during welding operations of elements of the main windforce-resisting system Y N 2.Inspections for screw attachment, bolting, anchoring and other fastening of components within the main windforce-resisting system 1705.10.3 Wind -resisting Components Y N 1. Roof cladding Y N 2. Wall cladding Y N 1705.11.1 Structural Steel Special Inspections for Seismic Resistance Inspection of structural steel in accordance with AISC 341 Y N 1705.11.2 Structural Wood Special Inspections for Seismic Resistance Y N 1. Inspection of field gluing operations of elements of the seismic -force resisting system 2. Inspection of nailing, bolting, anchoring and other fastening of components within the seismic - force -resisting system 1705.11.3 Cold -formed Steel Light -Frame Construction Special Inspections for Seismic Y N Resistance Y N 1. Inspection during welding operations of elements of the seismic -force -resisting system 2. Inspections for screw attachment, bolting, anchoring and other fastening of components within the seismic -force -resisting system STRUCTURAL AND MISCELLANEOUS STEEL STEEL MEMBERS, HARDWARE, FASTENERS SHALL BE HOT DIPPED GALVANIZED OR EPDXY PAINTED PER ARCHITECT REQUIREMENTS. ALL CUT, REPAIRED AND EXPOSED SURFACE SHALL BE PAINTED WITH (2) COAT OF 95% ZINC RICH PAINT PER ASTM A780. COLOR TO MATCH EXISTING. STEEL SHALL CONFORM TO THE FOLLOWING STANDARDS: TUBE COLUMNS: ASTM A500, GRADE B (Fy = 46 KSI) WIDE FLANGE COLUMNS / BEAMS: ASTM 572 GR50 STEEL PIPE: SCHEDULE 40, CONFORMING TO ASTM A53, TYPE E OR S, GRADE B (Fy = 35 KSI.) ALL OTHER STEEL: ASTM A36 (Fy = 36 KSI) OR ASTM A992 BOLTS: ASTM A307 (WOOD/STEEL CONN) BOLTS: ASTM A325/A490 WITH LOCK WASHERS (STEEL/STEEL AND STEEL/CONC CONN) ANCHOR BOLTS: ASTM A307 (WOOD FRAMING) ANCHOR BOLTS: ASTM A325 (STEEL FRAMING) ALL SLIP CRITICAL CONNECTIONS SHALL BE ASTM A325 BOLTS AND SHALL BE ENGINEER -APPROVED, SELF -LOAD INDICATING TYPES, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. STRUCTURAL STEEL WELDING CONFORM TO THE AWS CODES D1.1 AND D1.3, AND USE ONLY CERTIFIED WELDERS. WELDS NOT SPECIFIED ARE TO BE 1/4" CONTINUOUS FILLET MINIMUM. INCREASE WELD SIZE TO AWS MINIMUM SIZES, BASED ON PLATE THICKNESS. USE DRY E70 ELECTRODES. ALL WELDING SHALL CONFORM TO THE AWS CODES, AND SHALL BE BY CERTIFIED WELDERS. WELDS NOT SPECIFIED SHALL BE 1/4" CONTINUOUS FILLET MINIMUM. USE DRY E70 ELECTRODES. WA9=1►119 Periodic Periodic Periodic■�■�■�■�■�■�■�■�■�, Continuous I Periodic 'SPECIAL INSPECTIONS REPORT(S) ARE IREQUIRD FOR THIS PERMIT: Continuous 11. SOIIS Periodic Periodic Periodic■�■�■�■�■�■�■�■�■�■ Periodic info@b2engineers.com 425-318-7047 (0) 425-318-0031 (C) ■ ■ NI ■ I ■ I ■ I ■ ■ r Level B - Periodic ALL WORK SUBJECT APPROVED Level C - Continuous TO FIELD PLANS MUST E Level B - Periodic INSPECTION FOR Level C - Continuous CODE COMPLIANCE ON JOB SITE Continuous Periodic Level B - Periodic Level C - Continuous REVISED PLAN APPROVED Continuous Periodic CITY OF EDMONDS BUILDING DIVISION Continuous P07LOWMLOL el� Continuous BUILDING OFFICIAL Level B - Periodic Jun 21 2023 Level C - Continuous APPROVED DATE Continuous Level B - Periodic Level C - Continuous Level B- Periodic ■�■�■�■�■�■�■�■�■�■ ■, Level C - Continuous Level B - Periodic I Level C - Continuous ■ I This the Periodic revised set of plans replaces entire approved set of plans dated 9/27/2022. Periodic � ■ I Periodic ■ Periodic Periodic Periodic Periodic Continuous Periodic Continuous Continuous Continuous Continuous See Section 1705.2 See Section 1705.3 In accordance with construction documents In accordance with construction documents Continuous Continuous See Section 1705.3 In accordance with construction documents Continuous In accordance with construction documents Continuous Periodic Periodic Periodic Periodic Periodic In accordance with AISC 341 Continuous Periodic Periodic Periodic DRAWING LIST SHEET NUMBER S-0 SHEET NAME GENERAL NOTES AND SPECIFICATIONS ISSUE DATE 06-06-23 S-1 SITE PLAN 06-06-23 S-2 ENCROACHMENT SITE PLAN 06-06-23 S-3 MANHOLE SITE PLAN 06-06-23 S-4 FRAMING PLANS AND DETAILS 06-06-23 Grand total: 5 BLD2022-0766 OF WAS • N t f Q- �.Sj �'QG AL ENG 43789 1SS13/ONG\ �ONAL E HOWARD CHERMAK RETAINING WALL 1214 11 TH PLACE NORTH, EDMONDS, WA 98020 REVISION Jun 07 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWING INFO ISSUE DATE 06-06-23 ISSUED FOR PERMIT PROJECT N0. 22090 ENGINEER BB REVISION SCHEDULE NO. DATE I DESCRIPTION GENERAL NOTES AND SPECIFICATIONS S-0 Copyright b2 Structural Engineers 2008 a I PROPERTY LINE I I' I I I 35,_Off +, I FRONT -YARD S Ua - - - - - - - - - - - - - - - - Q 00 y a. � a ,. a PROPERTY LINE EXISTING w GRAVEL + w I - cf) I Co Q I' LL PROPERTY LINE N Q U) SITE PLAN 3/1611= 11-011 PROPERTY LINE 6" CONC. WALL '-6' OTIP D _L 611 FOOTING z Q ry ry w 0 w n 0 _1 U) z r� �/ / X w _25' _ 6„ +/_ REAR -YARD SETBACK I �I I I I I I I I PROPERTY OWNER: CHERMAK HOWARD AND JUDITH PROPERTY ADDRESS: 1214 11TH PL NE, EDMONDS, WA 98020 PARCEL NO.: 00606600001600 CITY OF EDMONDS EASEMENT #1748010: EAST 35' O F LOT 16 LEGAL DESCRIPTION: VIEWLAND HEIGHTS BLK 000 D-00 - LOT 16 PROJECT DESCRIPTION: CONSTRUCTING NEW CONCRETE RETAINING WALL IN SLOPED TERRAIN IN REAR -YARD ENGINEERING DIVISION APPROVED AS NOTED 06/21/2023 ***REVISION TO HEIGHT OF WALL ONLY. SEE PLANS APPROVED ON 9/21/2022 FOR ENGINEERING REQUIREMENTS. *** APPROVED BY PLANNING 4rxa� d2,y,-" Jun 23 2023 *CUT WALL. APPROVED FOR REVISION TO HEIGHT OF WALL ONLY. info@b2engineers.com 425-318-7047 (0) 425-318-0031 (C) #♦ Q �OF WAgy \�r 2 Q- �fj PG 43789 �. �c\TURALENG\G\�� �SS/ONAL EN� H OWARD CHERMAK RETAINING WALL 1214 11 TH PLACE NORTH, EDMONDS, WA 98020 REVISION Jun 07 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWING INFO ISSUE DATE 06-06-23 ISSUED FOR PERMIT PROJECT NO. 22090 ENGINEER BB SITE PLAN S.1 Copyright b2 Structural Engineers 2008 EXISTING RESIDENCE Yi DECK U 00 = w U) � o PROPERTY LINE N ry w_ 0 SEWER STUD TO - CITY SEWER MAIN EASEMENT #1748010 35'-0" -25' - 6„ +/_ REAR -YARD SETBACK PROPERTY OWNER: C H E RMAK H OWARD AND JUDITH PROPERTY ADDRFZS. 1214 11TH EDMONDS PARCEL NO.: i— 7 A 98020 06600001600 CITY OF EDMONDS EASEMENT #1748010: EAST 35' OF LOT 1 E LEGAL DESCRIPTION: VIEWLAND HEIGHTS BLK 000 D-00 - LOT 16 PROJECT DESCRIPTION: CONSTRUCTING NEW CONCRETE RETAINING WALL IN SLOPED TERRAIN IN REAR -YARD ***THIS PLAN SHEET IS BEING REVIEWED AND APPROVED UNDER A SEPARATE ENCROACHMENT PERMIT.*** info engineers.com -318-7047 (Q ) r 425-318-0031 (C) R Q`' of wAsy IS� (P� Q 43789 cTURALENGNG\C��G �p'c SS/pNAL E H OWARD CH ERMAK RETAINING WALL 1214 11 TH PLACE NORTH, EDMONDS, WA 98020 REVISION Jun 07 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWING INFO ISSUE DATE 06-06-23 ISSUED FOR PERMIT PROJECT NO. 22090 ENGINEER BB REVISION SCHEDULE NO. I DATE I DESCRIPTION ENCROACHMENT SITE PLAN V E OACHMENT SITE PLAN 1611 6" = 1 '-0" S-2 Copyright b2 Structural Engineers 2008 80' - 0" +/- IMPORTANT NOTES ON FOUNDATION: 1 2 S-4 S-4 CONTRACTOR TO FIELD VERIFY HEIGHT OF RETAINING SOIL FOR REQUIRED WALL HEIGHT r� AND FOOTING SIZE c ° _ - - - , a a - as - °- _ d - ' n FOUNDATION PLAN 1 /4" = 1'-0" 0'-6" 1:1 SOIL SLOPE - _ 1'-0" EXISTING FOUNDATION TO REMAIN I 1:1 SOIL SLOPE -� 12" TOP COMPACTED _ 1�f AND RELATIVELY IMPERMEABLE SOIL PER GEOTECH REPORT 0'- 6" H,-2" CLR d - - ----2 CLR ,- 1/2" VERTICAL DRAIN MAT #4 AT 12" OR OTHER APPROVED E.W. - PRODUCTS PER GEOTECH a. a RECOMMENDATIONS M °d DRAIN GRAVEL WRAPPED a IN FABRICS PER GEOTECH w RECOMMENDATIONS PER NOTES ON S-1 of Ili 4'01PVC 0' - 91- DRAIN PIPE (2)-#5 LONG BARS i� SOIL PREPARATIONS PER — -1'- 6" NOTES ON S-1 Detail 1 1 If = 1'-0" EXTENDED 24" INTO THE FOOTING (T & B) n STEP FOOTING DETAIL 1/2" = 1'-0" 0 EXISTING RESIDENCE TO REMAIN 12" TOP COMPACTED AND RELATIVELY IMPERMEABLE SOIL PER GEOTECH REPORT 1/2" VERTICAL DRAIN MAT #4 AT 12" - OR OTHER APPROVED E.W. - PRODUCTS PER GEOTECH #4 AT - RECOMMENDATIONS 12" E.W. Q - a01a.1.7_11IM RI 1. STRUCTURAL DESIGN COMPLIES WITH SOILS REPORT PRODUCED BY: GEO GROUP NORTHWEST INC, DATED MARCH 28, 2022 FOOTING BEARING PRESSURE: 2000 PSF LATERAL EARTH PRESSURE ON RETAINING WALLS: 50 PSF 2. SUBGRADE PREPARATION, DRAINAGE PROVISIONS, AND OTHER RELEVANT SOIL CONSIDERATIONS ARE TO BE IN ACCORDANCE WITH SAID SOILS REPORT ALL FOOTINGS SHALL BEAR ON SUITABLE SOIL SUCH AS MIN. OF MEDIUM DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL (NO SOFT OR ORGANIC MATERIALS). GEOTECHNICAL ENGINEER MAY BE REQUIRED TO ASSESS EXISTING SOIL CONDITIONS. PER GEOTECH RECOMMENDATIONS: 1. THE TOP 12 INCHES OF THE FILL BEHIND THE WALL SHOULD CONSIST OF COMPACTED AND RELATIVELY IMPERMEABLE SOIL. THE BACKFILL IN AREAS ADJACENT TO CONCRETE RETAINING WALL SHOULD BE COMPACTED WITH HANDHELD EQUIPMENT (SUCH AS A JUMPING JACK). HEAVY COMPACTING MACHINES SHOULD NOT BE ALLOWED WITHIN A HORIZONTAL DISTANCE TO THE WALL EQUIVALENT TO ONE HALF OF THE WALL HEIGHT, UNLESS THE WALL IS DESIGNED TO ACCOMMODATE THE ADDED SURCHARGE. 2. FINAL SITE GRADES SHOULD DIRECT SURFACE WATER AWAY FROM PROPOSED RETAINING WALL. SUBSURFACE DRAINS SHOULD BE INSTALLED ALONGSIDE THE PROPOSED RETAINING WALL. THE DRAIN SHOULD CONSIST OF A 4-INCH MINIMUM DIAMETER, PERFORATED, RIGID PVC DRAIN PIPE LAID AT THE BOTTOM OF THE WALL, WITH THE PERFORATIONS FACING DOWNWARD. THE DRAIN ROCK AND PIPE SHOULD EACH BE WRAPPED IN A LAYER OF GEOTEXTILE FABRIC OR EQUIVALENT. THE DRAIN LINE SHOULD BE SLOPED AT SUFFICIENT GRADIENT TO GENERATE FLOW TOWARD AN APPROPRIATE STORMWATER DISCHARGE LOCATION OR COLLECTION SYSTEM. 3. TO PREVENT BUILDUP OF HYDROSTATIC PRESSURE BEHIND CONVENTIONAL RETAINING WALLS, A VERTICAL DRAIN EXTENDING FROM FINISHED SURFACE GRADE DOWN TO THE FOOTING DRAIN SHOULD BE INSTALLED. IN ADDITION, IT IS RECOMMENDED THAT A PRISM OF CLEAN, GRANULAR, FREE DRAINING STRUCTURAL BACKFILL MATERIAL AT LEAST 12 INCHES WIDE BE BACKFILLED AGAINST THE MATTED WALL. 0 LEGEND AND NOTES 1 /4" = 1'-0" I 1:1 SOIL SLOPE 12" TOP COMPACTED AND RELATIVELY IMPERMEABLE SOIL PER GEOTECH REPORT 0'-6" 2" CLR d 1/2" VERTICAL DRAIN MAT OR OTHER APPROVED - PRODUCTS PER GEOTECH 9 RECOMMENDATIONS 8 - d o AT 12" E.W. - — ad - DRAIN GRAVEL WRAPPED — IN FABRICS PER GEOTECH wRECOMMENDATIONS PER #5 AT 12" p _ NOTES ON S-1 E.W. 'd -00- d ° ' ®; ° ` RETAINING WALL — DRAIN GRAVEL WRAPPED o 1- 0 =o I_ DRAINAGE SHALL _ ��'_'0�� _ IN FABRICS PER GEOTECH NOT DISCHARGE j w _ RECOMMENDATIONS PER - — NOTES ON S-1 ° TO SEWER OR o0 p 1' - 9° o' - 9° 4°� Pvc DRAIN PIPE ONSITE DETENTION uo SYSTEM. VERIFY �SOIL PREPARATIONS WITH CITY NOTES ON S-1 INSPECTOR THAT RETAINING WALL DRAINAGE III �� ��� �� III III III III DISCHARGES TO AN APPROVED Detail 2 LOCATION. 3/4" = 1'-0" I - -4"QJ PVC DRAIN PIPE I I _SOIL PREPARATIONS -PER NOTES ON S-1 - PROVIDE 8"X12" SHEAR KEY WITH #4 BENT BAR AT 12" O.C. AND (1) #4 LONG BAR I III--7-III III II II ___7 ®i I ENGINEERING DIVISION APPROVED AS NOTED 06/21 /2023 MANHOLE LID COVER 100 FT °.' cd ° e TYPE II PRECAST MANHOLE O n ° 4 d _� O - SEWER LINE TO - SEWER LINE TO SEWER 1214 11TH PL N MAIN (NORTH) O 4' - 0„ a EXISTING O 92.5 FT — 92.4 FT 6" PVC \ \ 8" PVC d - aa, MANHOLE WILL ° 4' 4 NEED TO BE CHANNEL. NO CATCH. info@b2engineers.com 425-318-7047 (0) 425-318-0031 (C) Q`' OF wary i 2 �fj LPG 43789 �c cTURALENGNG��`G '9S/ONAL E H OWARD CH ERMAK RETAINING WALL 1214 11 TH PLACE NORTH, EDMONDS, WA 98020 REVISION Jun 07 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWING INFO MANHOLE TO BE INSTALLED PER Detail 3 MANHOLE ELEVATION CITY STANDARD DETAIL GU-421 r:nnTlnlr_ QPInIP - �X; AT 19" U 3/4" = 1'-0" U 3/4" = 1'-0" ISSUE DATE 06-06-23 ry ISSUED FOR PERMIT U ih PROJECT NO. 22090 ENGINEER BB FRAMING PLANS AND DETAILS S-4 Copyright b2 Structural Engineers 2008