APPROVED PLN ENG RESUB1 BLD2022-1685+SITE PLAN +1.11.2023_6.24.55_PM+3310212BLD2022-1685
Nvd
J VN
j36
Spain~ �..z,•.-h�
gal°, 5 i c�� or
-PM CL, 4 oo6175cc=1 o0
Beres
±e cR 1cwl4J i lcos -
A 's
H
APPROVED BY PLANNING
an 13 2023
ENGINEERING DIVISION
__ - .._.. JTED
000/�<_ (/„ ii/12/202?
Few NO VEHICLE ACCESS TO
BACKYARD PERMITTED
,�-WITH THIS PERMIT.
wTnrJ�� 11 �o
NO STORMWATER MANAGEMENT SYSTEM
REQUIRED AT THIS TIME. IF NEW AND/OR
REPLACED IMPERVIOUS SURFACE EQUALS
2000SQFT OR GREATER, A STORMWATER
MANAGMEMENT SYSTEM MAY BE REQUIRED
PER CITY CODES AND STANDARDS
R
R f.G+yi�. Zone S-8 Corner IY Flag
Lr Setbacks: Required Actual
Front 25' 42'
'
/ Applicant shall repair/replace all Sides 7.5' 12'W
damage to utilities orfrontage 15'
mpcityementas in th right-of-way
}'} i pcer curs utana rtls mamis caused or ` + (I � �� '� C Rear _ _
�! a tl ring the per ltetl project. (/.�.1('�� FI f _ _ C� `p
J !7 ' r / Other 2
C, OWNER/CONTRACTOR IS RESPONSIBLE FOR L + ���' q,+ Height yJ ex.
EROSION CONTROL AND DRAINAGE �1+
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING [ -b RESUB
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY �-()� 51�G� Jan 12 2023
UTILITIES MAY REQUIRE A SEPERATE PERMIT. a -PAR-N. a