Loading...
BLD2018-0517k 08 0 E 1),410 Al CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 77.1-0220 - FAX: (425) 771-0221 STATUS: ISSUED 09/25/2018 a- a -i &I'll, Expiration Date: 09/25/20 BUILDING PE Z Parcel No: 00513300002700 1 L) PROPERTYOWNER APPLICANT SHARON LARSEN CG ENGINEERING 9932 MARINE VIEW DR CIO DFNNISTITUS MUKILTEO, WA 98275 250 4TH AVE S STE 200 EDMONDS, WA 98020 (425) 349-1451 (425) 778-8500 LD201805 s *7 lf57;h_ TAP W —j1t&,EDM0NDS MCDOWELL NW PILE KING 18901 84TH AVE S KENT, WA 98032 LICENSE 4: MCDOWNPO I I QT EXP:09/07/2019 JOB DESCRIPTION UNDERPIN HOMETO STABILIZE FOUNDATION. REPLACE BASEMENT SLAB. FRAN41NG MODIFICATIONS TO FIRST FLOOR FRAMINQ REMOVE SEVERAL BASEMENT WALLS. * * ESLHA * * VALUATION: $95,000 PERMIT TYPE: Residential PERMIT GROUP: 04 - Alteration/Rernodel GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RET A INING WA I-L ROCK ERY: OCCUPANT GROUP: OCCUPANT LOAD: FENCE: 0 X 0 FT.) CODE: 2 015 IOTHER: ------- OT HER DESC ZONE RS-20 INUMBER OF STORIES: 0 VESTED DATE INUMBER OF DWELLING UNITS 0 �LOT #- I EXISTTNG AREA BASEMENT: 0 IST FLOOR 0 2ND FLOOR 0 PROPOSED AREA SEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3RD 1-1-OOR 0 GARAGE: 0 DECK: 0 OTHER 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER� 0 BEDROOMS: 0 BATHROOMS: 0 1BEDROOMS 0 BATHROOMS: 0 FRONT SETBACK SIDESETBACK REARSETBACK <LQUIKED: PROPOSED: �-QUIRED PROPOSED: [REQUIRED: PROPOSED: 1EIGHTAI-LOWED:0 PROPOSED:0 IREQUIRED: PROPOSED: I - 3ETBACK NOTES: foundation repair, setbacks nonconforming but no change vvith this foundation repair. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE -OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. F p "314 -- MKII 4.9-P, a , & I on = ATTENTION Released By Date IT IS UNLAWFUL TO USE OR OCCUPY A BUILDTNG OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APIPROVAL ORA CERTIFICATE OF OCCU P AN CY H AS BEEN GRANTED.UBC109/ IBCI 10/111C 110. IFIRE APPLICANT = ASSESSOR X CITY STATUS: ISSUED BLD20180517 I nspector toes tab lish method of fie i-lit verification prior to raising of house to verify Ilei- lit of house does n ot ill crease. Spec ia I inspections by the geotechnica I eng in eerhave been called for on th is project and are noted on Ill e a pproved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City oil a weekly basis. • Final approval oil a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. • Any request foralternate design. modification. variance orotheradministrative deviation (here in after -varian c e-) fi-orn adopted codes. ordinances orpolicies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval ofany plat orplan containing provisions which do not comply with city code and forwhich a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary Construction sites as a result of construction activity are exempt fi-olil tile noise limits of ECC Chapter 5.30 only during the hours of 7:00arn to 6:00pm oil weekdays and 10:00am and 6:00prn oil Saturdays, excluding Sundays and Federal Holidays. At all other times tile noise originating fi-orn construction sites/activities must comply with the noise limits ot'Chapter 5.30. unless a variance has been granted pursuant to ECC 5.30.120. • Applicant. on behalf of his or her spouse, heirs, ass igns, and successors in interests. agrees to indemnify defend and hold hamiless the City of Edmonds, Washington. its offic ials. employees. and agents fi-orn any and all claims for daillages of whatever nature. arising directly or indirectly frorn tile issuance tbr this permit. Issuance ofthis permit shall not be deeilled to nlodiA,. waive or reduce any requirements ofany City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • The encroachment permit for the Structures encroachim?, into the City right of way. shall be recorded prior to final approval of this permit. I INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRrVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT SEE ECDC 19.00.005(A)(6) i BUILDING i !ENGINEEF;UNG(425)771-0220EXT.1326 It 1. Go to: vrww. edmondswa. gov 'Building Department Inspections 12. Then: Services are now scheduled online. If you FIRE (425) 775-7720 3. Then: Perm its/Development have difficulties, please call the !4. Then- Online Permit Info 1 Building Department front desk for PUBLIC WORKS (425) 771-0235 5: If you don't have one already, create a i assistance during office hours. login (upper right hand comer) '(425) 771-0220 RECYCLING (425) 275-4801 6: Sched ile y2ur insRection When calling for an inspection please leave the following information� Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. E-Fxosion Control/Mobilization • E-Engineering Final • B-Preconstruction meeting B-Pin Piles B-Footings B-Foundation Wall B-FOLIndation Draina-e 6-73 B-Epoxy bolting • B-Slab/Footings • B-Slab Insulation • B-First Floor Framing • B-Height Verification • B-Framin • B-Building Final 21 B-Other a RETURN ADDRESS: 611 &endjl�— City of Edmonds, City Clerk IJ 121 5th Avenue North Edmonds, WA 98020 q1 COVENANT OF NOTIFICATION AND INDEMNIFICATION/HOLD HARMLESS Reference #: Grantor(s): (1) 5ftymp LAKFIJ (2)_ Additional on pg. Grantee(s): City of Edmonds Legal Description (abbreviated): Sec Twn Z+ 0 Rng 4 6' '/4 Qtr9W SW OR Lot Block Plat 7.3-00 Assessor's Tax Parcel 1D#(s): (1) - 0 0 13 -3 00 (2) Assessor's Tax Parcel 1D# not yet assigned CITY OF EDMONDS APPROVED FOR RECORDING BY:. DATE: PAGE —OF — Under the review procedures established pursuant to the State Building Code, incorporating amendments promulgated by. the City of Edmonds, and as a prerequisite to the issuance of a building permit for the construction of a residential structure and attendant facilities, the undersigned OWNERS of property do hereby covenant, stipulate and promise as follows: Packet Item # 17 1. Descr . ofSubiectftoperty, APPROVED FOR RECORDING: BY: DATE: PAGE OF I This covenant of notification and indemnificationthold harmless relates to a tract of land at the street address of IS;,Zg +50% PI W, EcAwo.�cfl, WA -9802.(, street (insert address), Edmonds Snohomish County, Washington and legally described as: TrA,I-t 29-, Me-,�,C.Aowltllle� 5Veele-.e,fc%I a ICJ , - - +-0—fLr- CICI+ fi%Cce-op Ire-cor04C04-0-% volurv-.e� 9- OF - . COV-J 'elc,fs J i-, cc.-.L� op C) L, +C, r— OF L-/w; L". -, 5to 2. Notification and Covenant of Notification. The above referenced site (hereinafter "subject site") lies within an area which has been identified by the City of Edmonds as having a potential for earth subsidence or landslide hazard. The risks associated with development of the site have been evaluated by technical consultants and engineers engaged by the applicant as a part of the process to obtain a building permit for the subject site. The results of the consultant's reports and evaluations of the risks associated with development are contained in building permit file number (insert number) on file with the City of Edmonds Building Department. Conditions, limitations, or prohibitions on development may have been imposed in accordance with the recommendations of 0 APPROVED FOR RECORDING: BY: DATE: PAGE OF the consultants in the course of permit issuance. The conditions, Hinitations, or. prohibitions may require ongoing maintenance on the part of any owner or lessee or may require modifications to the structures and earth stabilization matters in order to address future or anticipated changes in soil or other site conditions. The statements and conditions proposed by the OWMRS' geotechnical engineer, geologist, architect and/or structural engineer are hereby incorporated by reference from the contents of the file as fully as if herein set forth. Any future purchaser, lessee, lender or any other person acquiring or seeking to acquire an interest in the property is put on notice of the existence of the content of the file and the City urges review of its contents. The file may be reviewed during normal business hours or copies obtained at the Building Department, City of Edmonds, 121 5th Avenue North, Edmonds, Washington 98020. 3. Indemnification and Hold Harmless. The undersigned OWNERS hereby waive any and all liability associated with development, statng that they have fully informed themselves of all risks associated with development of the property and do therefore waive and relinquish any and all causes of action against the City of Edmonds, its officers, agents and employees arising from and out of such development. In addition, the OWNERS on behalf of themselves, their successors in interest, heirs and assignees, do hereby promise to indemnify and hold harmless the City of Edmonds, its officers, agents and employees from any loss, claim, liability or damage of any kind or nature to persons or property either on or off the site resulting from or out of earth subsidence or landslide hazard, arising from or out of the issuance of any permit(s) authorizing development of the site, or -occurring or E APPROV:ED FOR RECORDING: PP BY: DATE: PAGE OF arising out of any false, misleading, or inaccurate information provided by the OWNERS, their employees, or professional consultants in the course of issuance of the building permit. 4. %gurance Requirement. In addition to any bonding which may be required during the course of development, the Community Services Director has/has not (strike one) specifically required the maintenance of an insurance policy for public liability coverage in the amount and for the time set forth below in order to provide for the flnancial responsibilities established through the indemnification and hold harmless agreement above: 5. Covenant to Touch and Concern the Land. This covenant of notification and indemniflcation/hold harmless touches and concerns the subject tract and shall run with the land, binding, obligating and/or inuring to the benefit of future owners, heirs, successors and interests or any other person or entity acquiring an interest in property, as their interest may appear. This provision shall not be interpreted to require a mortgagor or Iender to indemnify the City except to the extent of their loss nor to obligate such persons to maintain the insurance above required. APPROVED FOR RECORDING: BY: DATE: PAGE OF I '7� DONE this Q- day of OWNER(S) By: By: By STATE OF WASIIINGTON ) ss: COUNTY OF%�5)10hoxn��k I certify that I know or have satisfactory evidence that 6AA4,0� signed this instrument and acknowledged it to be (his/her) free and voluntary act for the purposes mentioned in this instrument. .-RO)8 DATED this AZP ��- day of NOTARY PUBUC STATE OF WASHINGTON BETH ANN CAMPBELL My Appointment Expires AUGUST 25,2018 L:\TEMIP'XBUILDINGWEADOW\COVENANT NOTARY PUBLIC My commission expires: 0 11 LARSEN RESIDENCE FOUNDATION REPAIR 15729 75TH PL W EDMONDS, WA 98026 OWNER SHARON & CARL LARSEN 9832 MARINE VIEW DRIVE MUKILTEO, WA 9827S 425.349.1451 SHARON. LARSEN @FRONTIER.COM CONSULTANTS STRUCTURAL ENGINEER CG ENGINEERING 250 4TH AVE S, SUITE 200 EDMONDS, WA 98020 425.778.8SOO FAX 778.5536 CONTACT: DENNIS TITUS, PE. SE GEOTECHNICAL ENGINEER NELSON GEOTECHNICAL ASSOCIATES, INC 17311 135TH AVENUE NE A-500 WOODINVILLE, WA 98072 425.486.1659 CONTACT: LEE S. BELLAH LEGAL DESCRIPTION ALL OF TRACT 27 MEADOWDALE BEACH SUPPLEMENTAL PLAT, SNOHOMISH COUNTY, WASHINGTON. PROPERTY INFORMATION PARCEL NUMBER EX BUILDING FOOTPRINT = 1904 SQFT 00513300002700 PROPOSED BUILDING FOOTPRINT = NOT TO CHANGE SCOPE OF WORK THIS PROJECT INVOLVES THE STABILIZATION OF AN EXISTING HOME THAT HAS EXPERIENCED SOME SETTLEMENT. WILL UNDERPIN THE EXISTING FOUNDATION WITH 2" DIAMETER PIN PILES TO SUPPORT FUTURE LOADS OF THE PLANNED ADDITIONAL FLOOR. copy RECEIVED MAR o 1 2M ki - I DEVELOPMENT SERVtCES COUNTER M * '�l "' WAS ;'S M� 02126118 LARSEN RESIDENCE FOUNDATION REPAIR 15729 75TH PIL W EDMONDS, WA 98026 DATE 02/26/18 PROJECT NO. 17145.10 SCALE IENGINeeRING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 TITLE SITE PLAN DRAWN BY JCP SO.3 J CHECK17D BY NAL APPROVED BY DMT M "o Z 110 m Z., m /,.0 PLANTER R TIE:��_j 1!0-T Fn TE N87'40'31'W �6�,43 C) LA U) 0 LA 16"-, P 14 ;0 ARAGE v, ;ID V) Lyl z rrl CARA z to m IF= 107 5' 3: 14 —i m L,) Xk > Z > :E m: V) -0 rn 2 HOU ,o r- z 4 7* s DID C-) 4PICK POSTS FF�112�6' 'o /METAL FENCE 20 0 S-t5 E rn -n u 37 �v LOT 1 1, C= z Mj 'A ±20,000 --Nc c 0 H2 > U' LOT 2 IF 1 4��E ±26,811 L, GA IAG 0 2� LA� P E IF= 13 NO z j/Fl L L ELO EYI F OR ;0 A rn v 7z q1V N�74D'31'W 569.6D! qu j.1-w. r,09 8.7; 09 J�\ TI& I jja E�97.57'(12" CMP W) KEYSTONE W IE=98 46'(12" CMP E) I REMOVE REPLACE EXKT EMENT LAB ON GRADE BAS S STABILIZ EXIST FOUNDATIO 2ql -9) W1 PIPE PILES & ANCHORV KE,,-�NIE WALL 0 x Z < I 50 0 �2 5�5 F 1006 o z C�� 0 0 14�� 0 OV E QAf r CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 BUILDING APPLICATION ACCEPTANCE Monday. April 09, 2018 This Application has been accepted by the City of Edmonds for review. More information and changes may be required during this process. The review target date is: Your City Contact is: KRISTIN JOHNS Application Number: BLD20180517 Project Address: 15729 75TH PL W, EDMONDS PROPERTY OWNER APPLICANT SHARON LARSEN CG ENGINEERING 9832 MARINE VIEW DR MUKILTEO. WA 98275 (425) 349-1451 C/O DENNIS TITUS 250 4TH AVE S STE 200 EDMONDS. WA 98020 (425) 778-8500 Work Description: UNDERPIA H0.14E TO STABILIZE FOUNDATION. REPLACE BASEMENTSLAB. ** ESLAIA Outstanding Items at Time of Submittal: C 02V TRA CTOR INFO It is anticipated that the following departments Nvill be reviewing your application: Building Planning Engineering Fire Please wait to re -submit corrections until after VOL] have received comments frorn all reviewing departments. I I I FREBY ACKNO N%'I.E[)G E 111AT I II AVE R �AD T11 IS APPUCATIO N THAT 111 E INFO RMATIO N G IVEN IS CO RRECT AND IIIATI A M TH E PRO PFRTY 0 W NER, 0 R T11 E D I - LY A UTIJO RIZED AGENT 0 F THE PRO PFR-117 0 NN'NFR TO SUBMITA BUILDING POINITTAPPLICATION TO THECI[W. SIGNAWRE(OWNER OR AGENI) PRINT NAME DATF SIGNED To view up to date infornzation aboutyour application please visit the City (#'Edmonds Development Services website at hilp.11www.edmonds-wa.gov. ID015--051 City of Edmonds DEVELOPMENT SERVICES ESLHA BUILDING PERMIT APPLICATION FORM F 121 Slh Avenue N, Edmonds, WA 98020 Phone 42S.771.0220 PLEASE REFER TO THE RESIDENTIAL BUILDING CHECKLIST FOR SUBMITTAL REQUIREMENTS PROJECT ADDRESS (Street, Suite #, City State, Zip): W, Ect v� o , cA 5, tA/A 7, & Parcel #: 0 0 513 a cc 0 0 ?"t 0 Subdivision/Lot #: Project Valuation: $ 05;' coo APPLICANT: C-(V - '-'s T;�vs Phone: 4 7,5 - 3­+ 3 - 3 S-00 Fax: I 4Z5__f+3_5T3(0 Address (Street, City, State, Zip): Z 50 q' Ave, 5, 5o; fe, a 00, Elt--,J WA IWO E-Mail Address: oAt ­; S + e C�f3e­% s7, c PROPERTY OWNER: �� !� tA. akc o ^ LA r,5 e- to� Phone: 4Z5-73-101- 1451 Fax: 1 Address (Street, City, State, Zip): 9 91 Z Hc-r�llt. View 6C WAI 1919_� E-Mail Address: & CONTRACTOR:* Phone: I Fax: Address (Street, City, State, Zip): Contractor License #/Exp. Date: *Con tractor must have a valid City of Edmonds business license prior to doing work in the City� Contact the City Clerk's Office at 425.775.2525 City of Edmonds Business License #/Exp. Date: DETAIL SCOPE OF WORK: 0-%derp;' (10 V" e- f-0 57 I -At. i e- 6'v� 0(A_R0.-. lzert&cr 5ASS ;YEX2T SLAS. PROPOSED NEW SQUARE FOOTAGE FOR THIS PROJECT: Basement: sq. ft Select Basement Type: T Finished T Unfinished 1't Floor: sq. ft Garage/Carport: sq A 2nd Floor: sq. ft. Deck/Patio: sq. ft Retaining Wall: TYes No Other: sq A I declare under penalty of perjury laws that the information I have provided on this formlapplication is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submft a permit application to the City of Edmonds. Print Name: T��vt 0%1 71�qs JOwner TAgent/Other (specify): &a44par", I - Signature: Date: 4006116 Updated: 12/2017 Packet Item #4 City of Edmonds Completeness Review Pre -Application Form for Earth Subsidence Landslide Hazard Area projects Notice- This is not a Building Permit Application Form. This is Step One of a two-step process (see Earth Subsidence Landslide Hazard Area Permit Submittal Checklist for description of the complete application process) The Completeness Review is a preliminary process to determine that minimum submittal requirements have been provided for the geotechnical and critical areas elements of the Earth Subsidence Landslide Hazard Area Permit Submittal Checklist. If it is determined that additional information is required to be complete, the applicant will be notified in writing of the deficiencies and must resubmit for another completeness review (including fee of $500). This process continues until the applicant is notified in writing that the Completeness Review is accepted by the City consultant and may proceed to Step Two, Building Permit Application Submittal. Completeness Review Application for: L] New Single Family El Addition F1 interior Remodel E] Garage/Carport [] Repair E Deck F1 Fence [] Grading cVds F1 Storage/Shed Fire System (Specify) Rockery/Retaining Wall Other (St)ecifv) Description of Work: Uktaerp;^ �ot-,e- 4�o s+c,04e- Co .4,,,+; o Site Address: 16 3'ZI -� 5 #t� P I e% c- e- W, 6-d ,- o -% d 5 , LA/A �807(o Sno County Tax Account Parcel #: 0 0 51 3 3 0 0 0 0 2. + o c> PROPERTY,OWNER: 5Lcrov, L , r s c ,% Mailing Address: City: t1vicilfe'o 'I 2� -S 2- M r-;, e- V,'e, .-, b ri, V e- Phone: 3 FAX: State: WA _Zip q 8 Z -?- 5- E-Mail:- 5-Ikrro"Jc%rre-v% @Fro.Jie-r-cow., APPLICANT/CONTACT: E]Same as Property Owner INOther Fill out the following information if "Other". Name & Mailing Address: 5 T;fj5 2-5*0 S", 2-00 City: State, WA zip: 111902.0 AX: 15 55 3 �6 E-Mail: de."-'st C C.% Phone: 0 0 F 1/30/2018 Packet Item # 3 19, 10 1 �__ �_: Technical Memorandum CITY CAn 9-:9 17 2018 Vry TO: Kristin Johns, Senior Permit Coordinator City of Edmonds Development Services Department, Building Division FROM: Sean Gertz, EIT and Steven Wright, PE DATE: September 14, 2018 RE: 3 rd Geotechnical Peer Review Submittal Package for Structural Improvements in a Critical Area Larsen Residence — 15729 751h Place West Edmonds, Washington This technical memorandum summarizes the results of Landau Associates' (LAI) 3 d geotechnical peer review of the permit submittal package that was submitted to the City of Edmonds (City) for proposed structural improvements to the above -referenced residence, which is located within a critical area in Edmonds, Washington. The purpose of our geotechnical peer review is to review portions of the submittal package and assess its compliance with the City's development and building permit requirements as contained in Edmonds Community Development Code (ECDC) Chapter 19.10 for sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area (ESLHA). This review also assesses the submittal's compliance with the requirements of Chapter 23.80 of the ECDC as required or noted in Chapter 19.10. This geotechnical peer review was conducted in accordance with Task Order No. 18-04 of Landau Associates' On -Call Geotechnical and Environmental Engineering Services Agreement with the City. LAI previously completed a geotechnical peer review and a supplemental geotechnical peer review for this project and our initial and supplemental review comments are contained in technical memoranda dated April 30, 2018 and August 10, 2018, respectively. The applicant's design team has addressed these comments and prepared a revised permit application submittal. This 3 r d geotechnical peer review focuses on the applicant's most recent submittal, which includes the following information: 0 Cover letter prepared by CG Engineering, dated August 24, 2018 0 Supplemental Geotechnical Plan Review and Comment Response Letter prepared by Nelson Geotechnical Associates, Inc. (NGA), dated August 23, 2018. The following briefly reiterates LAI's review comments that are contained in our August 10, 2018 technical memorandum and states how each comment was addressed in the most recent submittal. LANDAU 14 ASSOCLATES 130 2nd Avenue South - Edmonds, Washington 98020 - (425) 778-0907 r1M Landau Associates Review Comment: The slope stability analysis performed by NGA does not appear to factor in the effect of groundwater on the stability of the slope. Our experience suggests that groundwater can impact the stability of slopes within the North Edmonds ESLHA and it is our opinion that NGA's slope stability model should consider the effect of groundwater on the stability of the slope. Response: NGA did not encounter groundwater in their explorations. It is their opinion that while perched groundwater could occur within the upper slope, it is likely minor and would not significantly impact the existing &bal stability of the slope. Review Comment: The slope stability analysis performed by NGA uses a seismic coefficient (kh) equal to 0.20. Standard of practice in limit equilibrium slope stability modeling is to use a kh value equal to one half of the peak ground acceleration (PGA). Per the online USGS Seismic Hazard Design Tool, the PGA at the site is equal to 0.543g. Response: NGA calculated seismic slope stability using a kh equal to half of the PGA (0.27) resulting in a critical slip surface with a factor of safety equal to 1.028, indicating marginally stable conditions during a seismic event. It is their opinion that the proposed stabilization measures for the residence do not reduce overall factor of safety from the existing site conditions. Additionally, the critical failure surface would need to pass through the proposed deep foundation elements, therefore the deep foundations should enhance global stability of the slope. Review Comment: NGA states that "With proper site drainage and maintenance of the drainage systems and protection of steep slopes, we would estimate that the probability offailure on the site is likely to be less than 310 percent in 25 years." If an event will never occur, its probability of occurrence is 0 (or 0 percent). If an event is absolutely certain to occur, its probability of occurrence is 1 (or 100 percent). Therefore, we do not understand what is meant by a probability of less than 310 percent. Response: NGA recognizes that this was a typographical error and has updated the probability of failure to less than 10 percent in 25 years. Based on LAI's review of the applicant's responses to the peer review comments that are presented in LAI's August 10, 2018 technical memorandum, it is our opinion that all of LAI's comments have been adequately addressed and that the submittal package includes the information in Sections 19.10 and 23.80 of the ECDC that is identified as being required. It should be noted that it is LAI's opinion that there are several ongoing landslide mechanisms within the project area beyond the deep seated slide mechanism that is discussed in the NGA letter dated August 23, 2018. These other landslide mechanisms could include groundwater blowout, high bluff peeloff, and sliding block failure, all of which are heavily affected by groundwater and surface water. Because the proposed residential improvements lie within the runout zone of landslides that may emanate from the adjacent slope, the existing residence could be impacted by landslides caused by Geotechnical Peer Review Larsen Residence — 15729 75th Place West 2 September 14, 2018 I 'a. Landau Associates one or more of these slide mechanisms, especially during a seismic event. However, it is LAI's opinion that the proposed stabilization measures for the residence will not increase the threat of the geological hazard to the property or adjacent properties beyond preclevelopment (i.e., before the proposed stabilization measures are implemented) conditions. This technical memorandum has been prepared for use by the City of Edmonds in evaluating the adequacy of permit submittal documents related to the proposed residential structure located at 15729 75th Place West in Edmonds, Washington. The purpose of the review was to assess the adequacy of the application documents for compliance with City requirements contained in ECDC 19.10 and conformance with conventionally accepted geotechnical engineering practices. This geotechnical peer review by Landau Associates does not lessen the requirements for the applicant's geotechnical consultant to serve as the project's Geotechnical Engineer of Record and other design professionals to prepare an appropriate design for the site conditions. We appreciate this opportunity to be of service to the City. Please contact us if you have any questions or if we may be of further service. LANDAU ASSOCIATES, INC. Sean M. Gertz, EIT Project EIT SY"- L�d Steven R. Wright, PE Principal SMG/SZW/rgm (\\EDMDATAOI\PROJECTS\074\196\R\LARSEN RESIDENCE 3RD PEER REVIEW TM.DOCXI Geotechnical Peer Review Larsen Residence — 15729 75 th Place West September 14, 2018 1 f M.W A NGA Main Office 17311 — 135" Ave NE, A-500 Woodinville, WA 98072 (425) 486-1669 - FAX (425) 481-25 10 August 23, 2018 Carl and Sharon Larsen 9832 Marine View Drive Mukilteo, Washington 98275 NELSON GEOTECHNICAL AssociATEs, INC. GEOTECHNICAL ENGINEERS & GEoLoGISTS Engineering -Geology Branch 5526 Industry Lane, #2 East Wenatchee, WA 98802 (509) 665-7696 - FAX (509) 665-7692 Supplemental Geotechnical Plan Review and Comment Response Letter Larsen Residence Foundation Repair 15729 — 75" Place West Edmonds, Washington NGA File No. 999017 Dear Mr. and Mrs. Larsen: This letter presents the results of our updated geotechnical engineering review of the plans and comment response for your residence underpinning project located at 15729 — 751 Place West in Edmonds, Washington. INTRODUCTION We previously prepared a report for this property that included recommendations for underpinning support of the existing residence dated February 28, 2018 and a plan review letter for the proposed improvements dated March 20, 2018. We also prepared an initial plan review and comment response letter dated July 25, 2018. Project plans consist of underpinning the existing residence foundations and supporting associated basement slabs -on -grade and cantilevered portions of the upper floors on driven 2- and 3-inch pin piles. Lateral loads on the eastern portion of the structure are to be restrained by helical anchors. At this time, no additional development is planned within the property. The site falls within "Zones B through D" of the North Edmonds Earth Subsidence and Landslide Hazard Area, as indicated in the report prepared by Landau Associates for the City of Edmonds. This designation requires that certain features be included (or excluded) in the design. Such features include the restriction of cuts and fills, the need for tightlining runoff into an approved system, the need to design foundations and retaining walls to withstand high lateral earth pressures and potential loss of soil beneath parts of the foundation, the need to vegetate slopes with deeply rooted drought -tolerant vegetation, and JMIRthe elimination of any and all irrigation systems. We have addressed all of these requirgm previous report. bUD2016-051-7 AUG 2 4 2018 SU= DEPARTMEN-1 UNGF E". ONDS . 1 1 4 Supplemental Geotechnical Plan Review and Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair August 23, 2018 Edmonds, Washington Page 2 PLAN REVIEW AND CONCLUSIONS We have reviewed the geotechnical aspects of the most recent plans and found the plans to be in general compliance with our recommendations as presented in our previous geotechnical report. We understand that all construction will be performed within the exiting residence footprint. The entire residence structure and any new foundations are to be supported on 2- and 3-inch diameter driven pin piles. Helical anchors are also going to be utilized to restrain lateral loads of the residence along the upper eastern side of the residence. The overall size and configuration of the anchor is to be determined by the contractor to achieve the design loads as specified on the plans. We recommend that NGA be retained to observe the installation of the pin piles and helical anchors on a full-time basis during construction. We understand that all stormwater runoff associated with this property is to be directed and tightlined to flow into the existing stormwater drainage system located within the southern portion of the property. We understand that this existing system ultimately flows out and discharges to the west of the property. Temporary erosion control measures such as silt fences along the downhill side of the residence are incorporated into the plans. In our opinion, the proposed temporary erosion control measures appear to be feasible. We do not anticipate significant excavations associated with the proposed stabilization of the residence as most of the work will be within the existing residence footprint. Any disturbed soils remaining after the proposed development should be revegetated in accordance with our previous report. Permanent erosion control measures such as compost amended soils, ground cover, and permanent seeding and planting have also been incorporated into the plans. The proposed stabilization is intended to support the existing residence structure and should not adversely impact or decrease the existing stability of the steep slope areas, neighboring properties, or critical areas; and is in compliance with the City of Edmonds Codes 23.80.060 and 23.80.070, provided our recommendations are incorporated into the proposed plans and followed during construction. We recommend that all of our recommendations provided in our previous report and letter, and this letter be strictly followed during construction. LANDAU PEER REVIEW COMMENTS AND OUR RESPONSES As a part of the City of Edmonds review of this project, Landau Associates performed a peer review of the proposed project and our previous geotechnical report in accordance with Edmonds Community Development Code Chapter 19.10. Landau Associates comments and opinions were presented in a technical memorandum dated August 10, 2018. In the following section, we summarize the relevant geotechnical concerns raised by Landau Associates, followed by our response. NELSON GEOTECHNICAL ASSOCIATES, INC. Supplemental Geotechnical Plan Review and Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair August 23, 2018 Edmonds, Washington Page 3 Comment 1: The slope stability analysis performed by NGA does not appear to factor in the effect of groundwater on the stability of the slope. Our experience suggests that groundwater can impact the stability of slopes within the North Edmonds ESLHA and it is our opinion that NGA's slope stability model should consider the effect of groundwater on the stability of the slope. Response: As a part of our previous evaluation, we did not encounter any groundwater seepage or table within our explorations performed throughout the site. We agree that groundwater within the North Edmonds ESLHA can impact the stability of the steep slopes within this area, but we did not encounter any within our previous explorations. In our opinion, some perched groundwater conditions within the upper slope area could occur but we would anticipate this condition within this site is likely minor and would not significantly impact the existing slope stability conditions within the proposed site development. Comment 2: The slope stability analysis performed by NGA uses a seismic coefficient (1a) equal to 0.20. Standard of practice in limit equilibrium slope stability modeling is to use a la, value equal to one half of the peak ground acceleration (PGA). Per the online USGS Seismic Hazard Design Tool, the PGA at the site is equal to 0.543g. Response: The site slope within the proposed development area was reanalyzed for stability along Cross Sections A- A' for the existing conditions using the computer program Slope/W, by Geo-Slope International. Slope/W is a two-dimensional, limit equilibrium slope stability program that generates random potential failure surfaces or specific failure surfaces and determines their corresponding factors of safety with respect to failure. By generating a large number of random surfaces, a critical failure surface with the minimum factor of safety can be identified. The slope stability analyses were performed using information gathered from the field explorations and soil properties were assigned to the soil layers to reasonably reflect their engineering characteristics. Stability analyses were performed localized to the areas along the cross section. Stability analyses were performed for a seismic condition for the existing conditions. Stability analyses were not performed for the proposed conditions as the proposed stabilization measures will be confined to the existing building footprint. A horizontal ground acceleration of 0.27g was used in the seismic analysis which is 0.5 of the peak ground acceleration of 0.543 as determined by the USGS Seismic Hazard Design Tool. The soil parameters used in our analysis, along with the results of the analysis, are presented in Figures 1. NELSON GEOTECHNICAL ASSOCIATES, INC. Supplemental Geotechnical Plan Review and Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair August 23, 2018 Edmonds, Washington Page 4 The critical slip surfaces for this case achieved factors of safety greater than or equal to 1.028 for the updated seismic case, indicating marginally stable conditions during a seismic event. It is also our opinion that the proposed stabilization measures for the residence do not reduce the overall factor of safety from the existing site conditions that are present with the site. As such, the critical failure surface would need to shear through the proposed deep foundation improvements for the existing residence foundation, therefore the deep foundation should enhance deep-seated stability. Comment 3: NGA states that "With proper site drainage and maintenance of the drainage systems and protection Of steep slopes, we would estimate that the probability offailure on the site is likely to be less than 310 percent in 25 years. " If an event will never occur, its probability of occurrence is 0 (or 0 percent). If an event is absolutely certain to occur, its probability of occurrence is I (or 100 percent). Therefore, we do not understand what is meant by a probability of less than 310percent. Response: This is a typographical error. This sentence should read as such "With proper site drainage and maintenance of the drainage systems and protection of steep slopes, we would estimate that the probability offailure on the site is likely to be less than 10percent in 25years. " MINIMUM RISK STATEMENT Provided that the recommendations in this letter, the geotechnical report dated February 28, 2018, the letters dated March 12, 2018 and July 25, 2018, and this letter are followed during construction, the areas disturbed by construction should remain stable. Therefore, the risk of damage to the proposed development or to adjacent properties form soil instability should be minimal, and the proposed grading and development should not increase the potential for soil movement. CLOSURE We recommend that NGA be retained to provide monitoning and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed differ from those anticipated, and to evaluate whether or not earthwork activities comply with contract plans and specifications. �$ 0=6 NELSON GEOTECHNICAL ASSOCIATES, INC. Supplemental Geotechnical Plan Review and Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair August 23, 2018 Edmonds, Washington Page 5 We appreciate the opportunity to provide service to you on this project. Please contact us if you have any questions regarding this letter or require further information. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. Lee S. Bellah, LG Project Geologist Maher A. Shebl, PE Senior Engineer LSB:MAS:dy One Figure Attached NELSON GEOTECHNICAL ASSOCIATES, INC. ,a Slope Stability Analysis- Cross Section A-A'Exisitng Seismic Conditions CD 0 (0 M orgenstern-P rice most critical surface with minimum FOS = 1.028 z � C with a seismic coefficient of ground acceleration = 0.27g 4 D Cj) Cn G) o, 0 0 Glacial Till/Advance Outwash :3 Internal Friction Angle: 36' )� CD Moist Unit Weight 130pd = D CT i� — 0 1.028 Cohesion: 0 psf Iz M CD > X C: 5' CD th '0 -a 210 210 Vj- C/) B. CD. 190 190 Vi 3 0 170 150 75th Ave SW 170 150 0 Existing n 130 Residence 130 W 110 110 C: z .0 M M ;� 90 — 90 CU z > r > Whidbey Formation > M th M 0 (3) dj— 70 — Landslide Deposits Internal Friclion Angle: 32* — 70 LU 0 Z Internal Friction Angle: 28* Moist Unit Weight: 120 pef 50 — Moist UnitWeight 110 pcf Cohesion: 1000 psf — 50 U) > M Cohesion: 0 psf Q, 0 30 critical Slip Surface — 30 C 0 0 10 — 10 00 -10 10 > -20 0102030405060708090 110 130 150 170 190 210 230 250 270 290 310 330 350 370 390 410 430 450 470 490 510 530 550 570 r Distance (Feet) z 0 0 ;U 0 NOTES: Not to scale �0 0 7 Elevations are Approximate W I �r*v A NGA Main Office 17311 — 135111 Ave NE, A-500 Woodinville, WA 98072 (425) 486-1669 - FAX (425) 481-25 10 February 28, 2018 Carl and Sharon Larsen 9832 Marine View Drive Mukilteo, Washington 98275 NELSON GEOTECHNICAL ASSOCIATES, INC. GEOTECHNICAL ENGINEERS & GEOLOGISTS Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning 15729 — 75" Place West Edmonds, Washington NGA File No. 999017 Dear Mr. and Mrs. Larsen: Engineering -Geology Branch 5526 Industry Lane, #2 East Wenatchee, WA 98802 (509) 665-7696 - FAX (509) 665-7692 RECEIVED Z i MAR 0 1 2010 DEVELOPMENT SERViCES COUNTER We are pleased to submit the attached report titled "Preliminary Geotechnical Engineering Evaluation — Larsen Property Short Plat and Residence Underpinning — 15729 - 75 th Place West — Edmonds, Washington." This report summarizes the existing surface and subsurface conditions within the project site, and provides geotechnical recommendations for design and construction of the proposed site improvements. Our services were completed in general accordance with the proposal signed by you on June 23, 2017. The site is currently occupied by an existing single-family residence and detached garage within the lower eastern portion of the property and an existing single-family residence with a daylight basement within the central portion of the property. The ground surface within the site generally slopes gently to moderately up to the east from 75 1h Place West along the western property line to the toe of a steep to very steep west -facing slope within the central portion of the property. The steep to very -steep west -facing slope ascends up to a relatively level to gently sloping bench area within the very eastern portion of the property. We were informed that the existing residence within the central portion of the property has experienced some foundation settlement throughout the years. We understand that the proposed development plan consists of underpinning the central residence foundation to mitigate potential future settlement of the structure. A detached garage is also proposed to be constructed along the eastern portion of the central residence location between the toe of the steep slope and the residence. We also understand that you wish to subdivide the existing property into three separate residential parcels. The existing residences within the western and central portion of the property would be located on two of the parcels and the upper bench area would be located on the third parcel. The upper eastern parcel will likely be developed with a new single-family residence sometime in the future. Specific development plans and stormwater handling plans were not available at the time this report was prepared. The site is mapped as part of the large historic/prehistoric Meadowdale Landslide complex area now known as the North Edmonds Earth Subsidence & Landslide Hazard Area (ESHLA). The overall property is located in the designated "Zones B through D" generally located above 750' Avenue West extending east past the top of the steep to very steep west -facing slope. This report provides information and discussion to fulfill the requirements of the City of Edmonds for construction within this area. Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Summary - Page 2 We explored the site subsurface soil conditions with four drilled soil borings on August 7, 2017. Our explorations indicated that the lower central portion of the site is underlain by undocumented fill and historic landslide debris at shallow depths, with competent native Whidbey Formation deposits at depth. The upper eastern portion of the site is underlain by competent native glacial soils at shallow depths with competent native Whidbey Formation deposits at depth. Based on our site reconnaissance and explorations, and our understanding of the proposed plans, we have concluded that the proposed short plat subdivision, central residence underpinning, central property garage construction and upper eastern lot development on this site should be feasible from a geotechnical standpoint, provided that our recommendations are incorporated into the overall design and construction of this project. We did not observe signs of recent deep-seated slope failures or earth subsidence on the property. The proposed development area appears to be relatively stable under current conditions. The recommendations presented in this report should aid in maintaining and/or improving the current stability conditions observed at the site. Due to the relatively loose nature of the undocumented fill soil and landslide debris encountered in our explorations within the lower portion of the site within the vicinity of the existing central residence, it is our opinion that the undocumented fill and landslide debris soils have likely contributed to the settlement and distress that has been observed within the central residence. Without foundation improvements, the settlement and settlement -related distress are likely to continue. To limit future potential impacts to the residence as a result of continued settlement, we recommend that all interior and exterior foundations, along with all interior slabs -on -grade be supported on driven pin piles advancing through the undocumented fill and landslide debris and terminating within the underlying native competent soils. Due to tight access constraints within portions of the residence, some of these improvements may be difficult to implement. We therefore should consult with the structural engineer and contractors on adequate stabilization measures as plans are finalized. In the attached report, we have included recommendations for pin pile foundation underpinning support. We also recommend that any new foundations and slabs associated with the proposed garage within the central property be supported on a deep foundation system consisting of driven pin piles. Due to the proposed garage being located in close proximity to the toe of the steep slope within the upper eastern portion of the property, we also recommend that the proposed garage be protected against potential slope movement on the eastern uphill side by incorporating some type of a debris wall on that side. This is further discussed in the attached report. For the proposed development within the upper eastern parcel, we recommend that any proposed structure foundations be designed to utilize conventional spread footings extending down to competent native soil or structural fill extending to these soils. We recommend that any proposed structures be set back at least 60 feet from the top of the steep east -facing slope. In the attached report, we have included recommendations for site grading, retaining walls, foundation support, and site drainage. We strongly recommend that all runoff generated within this site, including roof downspouts, driveways, yard and footing drains, and all runoff entering the property from the road or adjacent properties, be directed into the existing drainage system that is located along the southern portion of the property. No water should be infiltrated or dispersed within the site or near the site slopes. Such activity may lead to instability within the site slopes. We should be retained to review final grading and drainage plans prior to construction. We also recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning Edmonds, Washington NGA File No. 999017 February 28, 2018 Summary - Page 3 We appreciate the opportunity to provide service to you on this project. Please contact us if you have any questions regarding this report or require further information. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. Khaled M. Shawish, PE Principal Table of Contents INTRODUCTION.......................................................................................................................... I SCOPE............................................................................................................................................ 2 SITECONDITIONS ...................................................................................................................... 2 SurfaceConditions .................................................................................................................... 2 SubsurfaceConditions .............................................................................................................. 3 Hydrogeologic Conditions ..................................................................................... .................. 4 SENSITIVE AREA EVALUATION ............................................................................................ 5 SeismicHazard ......................................................................................................................... 5 ErosionHazard ......................................................................................................................... 6 Landslide Hazard/Slope Stability ............................................................................................. 6 CONCLUSIONS AND RECOMMENDATIONS ....................................................................... 7 General...................................................................................................................................... 7 Erosion Control and Slope Protection Measures .................................................................... 10 Site Preparation and Grading .................................................................................................. 11 Temporary and Permanent Slopes .......................................................................................... 12 StructureSetbacks .................................................................................................................. 12 Foundation Improvements ...................................................................................................... 12 ShallowFoundations .............................................................................................................. 14 RetainingWalls ...................................................................................................................... 15 StructuralFill .......................................................................................................................... 16 Slab -on -Grade ......................................................................................................................... 17 PavementSubgrade ................................................................................................................ 18 Site Drainage Improvements .................................................................................................. 18 USE OF THIS REPORT ............................................................................................................. 19 LIST OF FIGURES Figure I — Vicinity Map Figure 2 — Site Plan Figure 3 — Cross -Section A -A' Figure 4 — Soil Classification Chart Figures 5 through 8 — Boring Logs IVEL SON GEO TECHNICA L A SSOCIA TES, INC 16 Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning 15729 — 75' Place West Edmonds, Washington INTRODUCTION This report presents the results of our preliminary geotechnical engineering evaluation for the proposed Larsen Property Short Plat and Residence Underpinning project. The address for the site is 15729 - 75th Place West in Edmonds, Washington, as shown on the Vicinity Map in Figure 1. The purpose of the study is to explore and characterize the surface and subsurface conditions at the site and provide general geotechnical recommendations for site development and improvements. For our use in preparing this report, we have been provided with an undated, untitled boundary and topographic showing the existing site conditions. The site is currently occupied by an existing single-family residence and detached garage within the lower western portion of the property and an existing single-family residence with a daylight basement within the central portion of the property. The ground surface within the site generally slopes gently to moderately up to the east from 75" Place West along the western property line to the toe of a steep to very steep west -facing slope within the central portion of the property. The steep to very -steep west -facing slope ascends up to a relatively level to gently sloping bench area within the very eastern portion of the property. We were informed that the existing residence within the central portion of the property has experienced some foundation settlement throughout the years. We understand that the proposed development plan consists of underpinning the central residence foundation to mitigate potential future settlement of the structure. A detached garage is also proposed to be constructed along the eastern portion of the central residence location between the toe of the steep slope and the residence. We also understand that you wish to subdivide the existing property into three separate residential parcels. The existing residences within the western and central portion of the property would be located on two of the parcels and the upper bench area would be located on the third parcel. The upper eastern parcel will likely be developed with a new single-family residence sometime in the future. Stormwater plans have not been finalized at this time, but we anticipate that runoff generated on this site will be tighlined to discharge into an existing stormwater system within the southern portion of the property. The current site layout is shown on the Site Plan in Figure 2. The site is mapped as part of the large historic/prehistoric Meadowdale Landslide complex area now known as the North Edmonds Earth Subsidence & Landslide Hazard Area (ESHLA). The overall property is located in the designated "Zones B through D" generally located above 75t" Avenue West extending east past the top of the steep to very steep west -facing slope. Slide movement from the large- scale slide complex and smaller localized slides within the complex can both affect this property. This AIEL SON GEO TECHNICA L A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning Edmonds, Washington NGA File No. 999017 February 28, 2018 Page 2 report provides information and discussion to fulfill the requirements of the City of Edmonds for construction within this area. SCOPE The purpose of this study is to explore and characterize the site surface and subsurface conditions, and provide opinions and recommendations for the proposed site development. Specifically, our scope of services includes the following: I . Review available soil and geologic maps of the area. 2. Explored the subsurface soil and groundwater conditions within the site with four geotechnical borings using a limited access drill rig. The drill rig was subcontracted by NGA. 3. Map the conditions on the slope and evaluate current slope stability conditions and perform hand explorations within the steep slope area and interior portion of the central residence, as needed. 4. Perform laboratory classification and analysis of soil samples, as necessary. 5. Provide recommendations for earthwork, foundation support, and slabs -on -grade in accordance with the City standards for development in the North Edmonds ESLHA. 6. Provide recommendations for temporary and permanent slopes. 7. Provide recommendation for deep foundation support, as needed. 8. Provide recommendations for the existing residence underpinning support. 9. Provide recommendations for retaining walls. 10. Provide recommendations for subgrade preparation. 11. Provide recommendations for site drainage and erosion control. 12. Document the results of our findings, conclusions, and recommendations in a written geotechnical report. SITE CONDITIONS Surface Conditions The western and central portions of the property are generally situated on gently to moderately sloping ground above and to the east of 75t" Place West. The western portion of the property is occupied within an existing residence and detached garage, while the central portion of the property is occupied with an existing single-family residence with a daylight basement. The ground surface within the western and central portions of the property slopes gently to moderately up to the east from 75' Place West to the toe of the steep to very steep west -facing slope within the eastern portion of the property at gradients in the range of approximately 2 to 18 degrees (3 to 32 percent). A series of concrete block retaining walls are located within the sloping areas between the existing residences. The western and central portions of the property are generally vegetated with grass and landscaping plants. NEL SON GEO TECHNICA L A SSOCIA TES, INC. Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 3 From the lower central portion of the site, the ground surface slopes steeply to very steeply up to the east to a relatively level to gently sloping upper bench area at gradients in the range of 35 to 45 degrees (70 to 100 percent). The existing residence within the central portion of the site is located approximately 3 7 to 47 feet from the toe of the steep to very steep west -facing slope. The overall height of the steep slope is approximately 100 feet. The existing site conditions, site topography, and interpreted subsurface conditions are presented on Cross Sections A -A' in Figure 3. The steep slope and upper bench area are generally vegetated with dense underbrush and young to mature trees. We did not observe any surface water during our site visit on August 7, 2017. We also did not observe any groundwater emitting from the site slopes, however we were informed that water seepage on the steep slope has been observed in the past. We did not observe any indications of recent slope movement such as deep-seated landsliding, however some minor erosion and sloughing was observed within portion of the upper most part of the steep west -facing slope area. The lower western and central portion of the property is accessed via an existing asphalt driveway located along the southern portion of the property extending from 75h Place West. The upper eastern portion of the property is accessed via 72,d Avenue West. The site is bordered to the north, south and east by existing residential properties, and to the west by 75' Place West. The existing and proposed site conditions are shown on the Site Plan in Figure 2. Subsurface Conditions Geology: The geologic units for the site vicinity are shown on the Preliminau Geolojzic MqP of the Edmonds East and Edmonds West Quadranjzles, Snohomish and Kinp, Counties, Washington, by Mackey Smith (U.S.G.S., 1975). The lower western and central portion of the site is mapped as old landslides (Qols) while the upper eastern portion of the property is mapped as Esperance Sand deposits (Qe). The old landslide deposits are described as large slumps that occurred during the ablation of the Puget Lobe of the Vashon ice sheet by lowering of water -table level. The Esperance sand is described as thinly bedded sand. We generally encountered undocumented fill and granular landslide debris underlain by fine- grained silt and clay within the lower central portion of the property that we interpreted as native Whidbey Formation soils. Our explorations within the upper eastern portion of the site generally encountered native glacial till and Esperance sand soils with fine-grained sand, silt and clay soils that we interpreted as native Whidbey Formations soils. Explorations: The subsurface conditions within the site were explored on August 7, 2017 by drilling four borings using a track -mounted limited -access drill rig to depths of approximately 46.5 to 51.5 feet below the existing ground surface. The approximate locations of our explorations are shown on the Site Plan in Figure 2. A geologist from NGA was present during the explorations, examined the soils and geologic conditions encountered, obtained samples of the different soil types, and maintained logs of the borings. NEL S01V GEO TECHNICA L A SSOCIA TES, 11VC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 4 A Standard Penetration Test (SPT) was performed on each of the samples during drilling to document soil density at depth. The SPT consists of driving a 2-inch outer -diameter, split -spoon sampler 18 inches using a 140-pound hammer with a drop of 30 inches. The number of blows required to drive the sampler the final 12 inches is referred to as the "N" value and is presented on the boring logs. The N value is used to evaluate the strength and density of the deposit. The soils were visually classified in general accordance with the Unified Soil Classification System, presented in Figure 4. The logs of our borings are attached to this report and are presented as Figures 5 through 8. We present a brief summary of the subsurface conditions in the following paragraphs. For a detailed description of the subsurface conditions, the boring logs should be reviewed. Underlying the ground surface within Borings B-I and B-2 within the lower central portion of the property, we generally encountered very loose to medium dense, gray -brown to gray silty fine to medium sand with varying amounts of gravel and organics that we interpreted as surficial undocumented fill and historic granular landslide debris. Underlying the surficial undocumented fill and historic granular landslide debris in B-2 at a depth of approximately 40 feet below the ground surface, we encountered very stiff blue -gray silty with varying amounts of fine sand and clay that we interpreted as native Whidbey Formation deposits. Boring B-I was terminated within the historic granular landslide deposits at a depth of 46.5 feet below the existing ground surface, while Boring B-2 was terminated within the native fine- grained Whidbey Formation deposit at a depth of approximately 51.5 feet below the existing ground surface. Below the ground surface within Borings B-3 and B-4 within the upper eastern portion of the property generally encountered approximately 20.0 to 25.0 feet of medium dense to dense, gray to orange -brown silty fine to medium sand that we interpreted as native glacial soils. Underlying the native glacial soils in Borings B-3 and B-4, we encountered medium dense/very stiff to very dense/very hard blue -gray to gray silty fine sand and silt with varying amounts of sand that we interpreted as native Whidbey Formation Deposits. Borings B-3 and B-4 were terminated within the native fine-grained Whidbey Formation deposit at a depth of approximately 46.5 feet below the existing ground surface. Hydrologic Conditions Groundwater seepage was not encountered in our explorations. However, wet soil conditions were encountered within the upper granular soils above the fine-grained siltier soils encountered at depth. It is our opinion that any groundwater seepage encountered within the site would be perched water. Perched water occurs when surface water infiltrates through less dense, more permeable soils and accumulates on top of relatively low permeability materials. The more permeable soils on this site would consist of the granular soils found within the landslide debris and the upper native glacial soils. The low NELSON GEOTECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 5 permeability soil consists of underlying siltier soils. Perched water does not represent a regional groundwater "table" within the upper soil horizons. Perched water tends to vary spatially and is dependent upon the amount of rainfall. We would expect the amount of perched groundwater to decrease during drier times of the year and increase during wetter periods. However, due to the large area of recharge, there may be areas of seepage and wet soils on this site even in the drier times of the year. SENSITIVE AREA EVALUATION Seismic Hazard Older landslide debris and medium stiff to hard cohesive soils were encountered -underlying the site at depth within the western and central portions of the property, while medium dense/very stiff to very dense/very hard native glacial soils and Whidbey Formation deposits were encountered within the upper eastern portion of the property. Based on the 2015 International Building Code (IBC), the site conditions best fit the description for Site Class E within the lower western and central portions of the property while the site conditions best fit the description for Class D soils within the upper eastern portion of the property. Tables I and 2 below provides seismic design parameters for the site that are in conformance with the 2015 IBC, which specifies a design earthquake having a 2% probability of occurrence in 50 years (return interval of 2,475 years), and the 2008 USGS seismic hazard maps. Table 1 — 2015 IBC Seismic Design Parameters (Lower Western and Central Portions of the Site) Site Class Spectral Acceleration Spectral Acceleration Site Coefficients Design Spectral at 0.2 sec. (g) at 1.0 sec. (g) Response Ss SI Parameters Fa F, SDS SDI 77 E 1.323 0.520 0.90 2.40 0.794 0.832 Table 2 — 2015 IBC Seismic Design Parameters (Upper Eastern Portion of the Site) Site Class Spectral Acceleration Spectral Acceleration Site Coefficients Design Spectral at 0.2 sec. (g) at 1.0 sec. (g) Response Ss Si Parameters Fa F, SDS SDI D 1.324 0.521 1.00 1.500 0.883 0.521 The spectral response accelerations were obtained from the USGS Earthquake Hazards Program Interpolated Probabilistic Ground Motion website (2008 data) for the project latitude and longitude. NELSON GEO TECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 6 Hazards associated with seismic activity include liquefaction potential and amplification of ground motion. Liquefaction is caused by a rise in pore pressures in a loose, fine sand deposit beneath the groundwater table. It is our opinion that the competent glacial and fine-grained soils interpreted to underlie the site have a low potential for liquefaction or amplification of ground motion. The glacial soils interpreted to form the core of the steep slopes within the site are considered stable with respect to deep-seated slope failures. All steep slopes have the potential for shallow sloughing failures during seismic events. Such events should not significantly affect the planned development provided the foundations are designed with the recommended setback values, debris protection systems, and the slope and drainage systems are maintained as described in this report. Erosion Hazard The criteria used for determining the erosion hazard for the site soils includes soil type, slope gradient, vegetation cover, and groundwater conditions. The erosion sensitivity is related to vegetative cover and the specific surface soil types, which are related to the underlying geologic soil units. The Soil Survey of Snohomish County Area, Washington by the Soil Conservation Service (SCS), was reviewed to determine the erosion hazard of the on -site soils. The site surface soils were classified using the SCS classification system as Everett very gravelly sandy loam, 15 to 30 percent slopes within the lower western portion of the site, Alderwood-Everett gravelly sandy loams, 25 to 70 percent slopes within the central portion of the site and Alderwood-Urban land complex, 2 to 8 percent slopes within the upper eastern portion of the site. These soils are described as having a slight to high erosion hazard. It is our opinion that the site soils should have a slight to moderate hazard for erosion iin areas that are not disturbed and where vegetation cover is not removed. Landslide Hazard/Slope Stability The criteria used for the evaluation of landslide hazards include soil type, slope gradient, and groundwater conditions. The western and central portions of the site slope gently to moderately down to the west. A steep west -facing slope is located above and to the east of the existing central residence within the eastern portion of the property. Groundwater seepage was not observed on the sloping portions of the property during site visit, however we understand that groundwater seepage has been observed on the steep slope area in the past. This site and the overall site vicinity lies within a known ancient landslide area. The site and vicinity have been relatively stable for a very long period of time, and development in the area has taken place in the form of single-family residences, roadways, and underground utilities. Although the likelihood of the ancient slide to become active in the foreseeable future is very low, extreme environmental conditions NEL SON GEO TECHNICA L A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 7 coupled with inadequate human practices could, in theory, re -activate the ancient landslide. Such external factors could include severe and elongated weather events and/or significant seismic activity. The site falls within "Zones B through D" of the North Edmonds Earth Subsidence and Landslide Hazard Area Report prepared by Landau Associates for the City of Edmonds. This designation requires that certain features be included (or excluded) in the design. Such features include the restriction of cuts and fills, the need for tightlining runoff into an approved system, the need to design foundations and retaining walls to withstand high lateral earth pressures and potential loss of soil beneath parts of the foundation, the need to vegetate slopes with deeply rooted drought -tolerant vegetation, and the elimination of any and all irrigation systems. We have addressed all of these requirements in the remainder of this report. We encountered what we interpreted as older granular landslide debris to depths of about 40 feet below the existing ground surface within the lower (central) portion of the property. Medium dense/stiff undisturbed native soils were encountered below this material, which we interpret the core of the site slopes at depth to consist primarily of this relatively stable material. Potential deep-seated slide planes were reported to be up to 100 feet deep below ground surface within the area; kowever, we did not observe signs of recent deep-seated slope failures on the property and do not anticipate that such failures will occur during the expected life of the existing and proposed structures. Localized areas of surface instability and surface sliding can occur on steep slopes, particularly where modiFied through grading activities. Backwasting (movement of near -surface soil) through soil erosion processes or local surface slides is common to slopes, particularly where the soils are exposed to weathering. Normal surface erosion and shallow sloughing failures should be expected to continue on the steeper portions of the site, but we have provided geotechnical recommendations for deep -foundation support, debris catchment, erosion control, structure setbacks and other development considerations that should reduce the potential impact of site development on the site slopes. CONCLUSIONS AND RECOMMENDATIONS General It is our opinion, from a geotechnical standpoint, that the site should be compatible with the proposed development and improvements, provided that the geotechnical recommendations presented in this report are incorporated into project plans and followed during construction. The proposed development area appears to be relatively stable under current conditions. However, the historic landslide mapped at the site could be reactivated by extreme natural conditions and/or poor grading and/or drainage activities by other human activity in the general site vicinity. We consider this potential to be low. NELSON GEOTECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 8 In general, the site and steep slopes within the site currently appear generally stable with respect to deep- seated movement. However, the site vicinity is mapped within an older landslide complex and our explorations encountered evidence of past landslide debris and ground movement within the lower central and western portions of the property. The potential for landslide and erosion hazards within this site will greatly depend on how the site is graded and how surface water and near surface water are controlled. We recommend that site grading be kept to a minimum and that grading and site drainage plans be subjected to geotechnical engineering review prior to construction. This review would include specific stability analysis of proposed cuts and fills and would provide recommendations for accomplishing the desired grading while maintaining long-term stability. In our opinion, based on our observations and our understanding of the prevailing building conditions, the settlement and distress to the central residence is likely a result of long-term consolidation (settlement) of the relatively loose undocumented fill and landslide debris soils that were encountered in our explorations and is interpreted to underlie portions of the residence. It appears that this fill was likely placed during the initial development of this property. Due to the varying nature of the overall density of the fill encountered in our explorations, it is likely that some of the fill material was placed in a loose condition at the time of residence construction, and throughout the years has been settling under the building loads. It is likely that the foundations and slabs -on -grade will continue to experience steady settlement and subsidence under the current conditions resulting in additional distress to the foundation, slabs and utilities within the structure. To mitigate this condition, we recommend that the all exterior and interior foundations along with all slabs -on -grade affected by the ongoing settlement be supported on deep foundations consisting of driven pin piles to transfer building loads through the undocumented fill and landslide debris down to the underlying competent native soils. Lateral loads on the residence should be resisted by helical anchor tiebacks. The exact location and extent of the pin piles and helical anchor tiebacks should be determined by the structural engineer. We should be retained to discuss with the structural engineer the details of the stabilization plans. We have provided recommendations for driven pin piles and helical anchor tiebacks in the Foundation Improvements subsection of this report. We also recommend that after the pin pile and helical anchor installation is completed, the remainder of the residence be closely monitored for any signs of further distress, and additional stabilization measures be installed if signs of future distress are observed. We recommend that if a slab -on -grade is utilized in the lower portions of the proposed central residence, that the slab be designed as a structural slab and be supported on the deep foundation system. Other hard surfaces, such as paved areas or walkways that are supported on the existing soil have some risk of future settlement, cracking, and the need for maintenance. To reduce this risk, we recommend over -excavating NELSON GEO TECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 9 a minimum of two feet of the upper soil from the slab and pavement areas and replacing this material with compacted pit run or crushed rock structural fill. This recommendation is only for hard surfaces to be supported on grade and does not apply for the lower floor structural slab. Even with the recommended treatment, some settlement of the underlying loose material should be anticipated. In addition to the foundation improvements, we recommend that the drainage picture surrounding the existing central residence be improved. Such improvements should include confirming and/or implementing the placement of footing drains around the building, and routing all downspouts and runoff from all hard surfaces into a permanent discharge system. We recommend that these pipes be extended to discharge to an approved system. This is further discussed in the Drainage Improvements subsection of this report. It is also our opinion that the proposed garage development along the eastern side of the existing central residence is feasible from a geotechnical standpoint. We recommend that the foundations and slabs associated with the proposed garage structure be supported on a deep foundation system consisting of driven pin piles. We understand that the garage will be constructed along or very near the toe of the steep west -facing slope. In our opinion, this should be feasible provided the foundation walls along the upslope side of the garage be designed as recommended in this report. We recommend that the upslope portions of the garage foundation be designed as debris walls and extend a minimum of four feet above finished ground surface to protect the structure against potential failures on this slope. This is intended to provide a catcbment measure should any sloughing debris travel towards the garage during extreme weather or as a result of an earthquake. Alternatively, a separate debris protection structure or fence could be utilized. It is our opinion that the planned residence development within the upper eastern portion of the site is feasible from a geotechnical standpoint. It is also our opinion that the soils that underlie the upper eastern portion of the site and form the core of the steep west -facing slope should be stable with respect to deep- seated earth movements, due to their inherent strength and slope geometry. However, shallow failures could occur on the slopes in the loose surficial soil, especially during adverse weather or a significant seismic event. Proper structure setbacks along with erosion and drainage control measures as recommended in this report should reduce this potential. Our explorations indicated that the upper eastern portion of the site is underlain by medium dense or better native glacial soils at relatively shallow depths. The native glacial soils within the proposed upper eastern development area should provide adequate support for foundation, slab, and pavement loads. We recommend that the structures within the upper eastern portion of the site be designed utilizing shallow foundations. Footings should extend through any loose surficial soil and be keyed into the underlying competent native soils. These soils should be encountered roughly two to five feet below the existing ground surface within the planned development area, with some potential localized areas of deeper loose soils in unexplored areas of the site. To protect NELSON GEOTECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 10 the structures against potential failures on the slopes, we recommend that any proposed structures be set back at least 60 feet from the top of the steep west -facing slopes. We should be retained to review final structure locations and to observe foundation excavations prior to placing forms. The control of surface and near -surface water is very important for the long-term stability of the site and on the steeper portions of the site slopes. We highly recommend that temporary and final site grading be designed to direct surface water away from the structures and away from the site slopes. Final drainage plans have not been developed at this time, but we understand that all stormwater generated on the site will be collected in tightlines and transported into an existing stromwater system along the southern portion of the property. No water should be infiltrated or dispersed within the site- We discuss general site drainage in the Site Drainage subsection of this report. The soils encountered within our explorations are considered extremely moisture sensitive and will disturb easily when wet. We recommend that construction take place during extended periods of dry weather if possible. If construction takes place during wet weather, additional expenses and delays should be expected due to the wet conditions. Additional expenses could include the need to export on - site soil, the import of clean, granular soil for fill, and the need to place a blanket of rock spalls or crushed rock in the construction traffic areas and on exposed subgrades prior to placing structural fill or structural elements. In this report, we have also provided recommendations for drainage, erosion control, and other development considerations intended to reduce the potential impact of development on the site and the site slopes. We should be retained to review final project plans prior to construction. We also recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. Erosion Control and Slope Protection Measures The erosion hazard for the on -site soils is considered moderate to high, but the actual hazard will be dependent on how the site is graded and how water is allowed to concentrate. Best M[anagement Practices (BMPs) should be used to control erosion. Areas disturbed during construction should be protected from erosion. Erosion control measures may include diverting surface water away from the stripped or disturbed areas. Silt fences and/or slope waddles should be erected to prevent muddy water from leaving the site or flowing over the site slopes. Disturbed areas should be planted as soon as practical and the vegetation should be maintained until it is established. The erosion potential for areas not stripped of NEL SON GEO TECHNICA L A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page I I vegetation should be low to moderate. Also, irrigation systems should not be installed within the property. Protection of the site slopes should be performed as required by the City of Edmonds. Specifically, we recommend that the slopes not be disturbed or modified through placement of any fill or future structures outside the planned development areas. No additional material of any kind should be placed on any portion of sloping ground, such as excavation spoils and soil stockpiles. It may be possible for trees to be cut down and removed from the slopes as long as a mitigation plan is developed for maintaining slope stability, such as the replacement of vegetation for erosion protection. A vegetation cover should be preserved on the slopes. Replacement of vegetation should be performed in accordance with the City of Edmonds code. Under no circumstances should water be allowed to concentrate on the slopes. Any sloping areas disturbed during construction should be planted with vegetation as soon as practical to reduce the potential for erosion. Site Preparation and Grading Plans for site grading should be devised such that cuts and fills are kept to a minimum. Site preparation should consist of excavating the upper eastern residence and garage footprints down to planned elevations. Site preparation should also consist of stripping any organic topsoil and/or loose/soft soils in areas that will support foundations, slabs -on -grade, pavement, or structural fill. The stripped material should not be stockpiled within the site. If the exposed soils are loose/soft, they should be compacted to a non -yielding condition. Areas observed to pump or weave during compaction should be over -excavated and replaced with rock spalls. If significant surface water flow is encountered during construction, this flow should be diverted around areas to be developed and the exposed subgrade maintained in a semi -dry condition. In wet conditions, the exposed subgrade should not be compacted, as compaction of a wet subgrade may result in further disturbance of the soils. A layer of crushed rock may be placed over the prepared areas to protect them from further disturbance. The site soils are considered extremely moisture sensitive and will disturb easily when wet. We recommend that earthwork construction take place during periods of extended dry weather, and suspended during periods of precipitation. If work is to take place during periods of wet weather, extreme care should be taken during site preparation as to not to disturb the site soils. This can be accomplished by utilizing large excavators equipped with smooth buckets and wide tracks to complete earthwork, and diverting surface and groundwater flow away from the prepared subgrades. Also, construction traffic should not be allowed on the exposed subgrade. A blanket of rock spalls should be used in construction access areas if wet conditions are prevalent. The thickness of this rock spall layer should be based on subgrade performance at the time of construction. For planning purposes, we recommend a minimum one -foot thick layer of rock spalls. NEL SON GEO TECHNICA L A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 12 Temporary and Permanent Slopes Temporary cut slope stability is a function of many factors, including the type and consistency of soils, depth of the cut, surcharge loads adjacent to the excavation, length of time a cut remains open and the presence of surface or groundwater. It is exceedingly difficult under these variable conditions to estimate a stable, temporary, cut slope angle. Therefore, it should be the responsibility of the contractor to maintain safe slope configurations since they are continuously at the job site, able to observe the nature and condition of the cut slopes, and able to monitor the subsurface materials and groundwater conditions encountered. The following information is provided solely for the benefit of the owner and other design consultants and should not be construed to imply that Nelson Geotechnical Associates, Inc. assumes responsibility for job site safety. Job site safety is the sole responsibility of the project contractor. For planning purposes, we recommend that temporary cuts in the on -site material be no steeper than two units horizontal to one unit vertical (2H: IV). If groundwater seepage is encountered, we would expect that flatter inclinations would be necessary. We should be retained to specifically review proposed geometry for significant cuts planned on this site. We recommend that cut slopes be protected from erosion. Erosion control measures may include covering cut slopes with plastic sheeting and diverting surface water runoff away from the top of cut slopes. We do not recommend vertical slopes for cuts deeper than four feet, if worker access is necessary. We recommend that cut slope heights and inclinations conform to appropriate OSHA/WISHA regulations. Permanent cut and fill slopes should be no steeper than 3H:IV. However, flatter inclinations may be required in areas where loose soils are encountered. Permanent slopes should be covered with erosion control matting and vegetated. The vegetative cover should be maintained until established. We should specifically review all plans for grading on this project. We do not recommend placing irrigation systems near the slopes. Structure Setbacks Uncertainties related to building along steep slopes are typically addressed by the use of building setbacks. The purpose of the setback is to establish a "buffer zone" between the structure and the top and toe of the slope so that ample room is allowed for normal slope recession during a reasonable life span of the structure. In a general sense, the greater the setback distance, the lower the risk of slope failures impacting the structure. From a geological standpoint, the setback dimension is based on the slope's physical characteristics, such as slope height, surface angle, material composition, and hydrology. Other factors such as historical slope activity, rate of regression, and the type and desired life span of the development are important considerations as well. NELSON GEO TECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 13 We recommend that any proposed structures within the upper eastern portion of the. property be set back at least 60 feet from the top of the steep west -facing slope. We also understand that a proposed garage structure may be constructed along the toe of the steep west -facing slope within the central portion of the property. In our opinion, this is feasible provided that the uphill eastern side of the garage is designed as a debris catchment wall and extends a minimum of four feet above the surrounding ground surface. We should be retained to review final residence location and to observe foundation excavations prior to placing forms. Any proposed development within the setback area, should be the subject of a specific geotechnical evaluation. Under no circumstances should water be allowed to concentrate on the slopes, during or after construction. Foundation Improvements Driven Pin Piles: We recommend that all interior and exterior foundation lines along with all impacted slabs -on -grade associated with the central residence be supported on driven pin piles to transfer foundation loads to the underlying native competent native materials found below the fill and landslide debris. We also recommend that the foundations and slabs for the proposed garage associated with the central residence also be supported on deep foundations consisting of driven pin piles. Due to the limited access to the existing residence area, we anticipate that all interior areas to be underpinned will be supported on 2-inch pin piles. However, the exterior foundations and foundations for the planned garage could be supported by either 2-inch pin piles or 4-inch pin piles, if larger equipment can access these areas. We recommend that the foundations and slabs associated with the proposed garage be supported on 4-inch pin piles. We have provided recommendations for the two pin pile sizes, in this section. Our explorations did not encounter any significant debris within the existing fill or landslide debris, however there is a possibility that some obstructions within the fill may impede some of the piles. There should be contingencies in the budget and design for additional/relocated piles to replace piles that may be obstructed by debris. We also recommend that excavation equipment be available on site during pile installation so that shallow obstructions can be removed from the planned pile locations. For 2-inch diameter pipe piles driven to refusal using a hand-held, 140-pound jackhammer, we recommend a design axial compression capacity of three tons for each pile. The refusal criterion for this pile and hammer size is defined as less than one inch of movement during 60 seconds of continuous driving. We recommend using galvanized extra strong (Schedule 80) steel pipe for the 2-inch pin piles. We recommend that the four -inch pipe piles, if utilized, be driven using a tractor -mounted hydraulic hammer, with an energy rating of at least 1, 100 foot -lb. For this pile and hammer size, we recommend a design capacity of eight tons for each pile driven to refusal. The refusal criterion for this pile and hammer size is defined as less than one -inch of movement during 15 seconds of continuous driving at a rate of 550 blows per minute or higher. We recommend using galvanized schedule 40 pipe for the 4-inch pin piles. NEL SOAI GEO TECHNICA L A SSOCIA TES, INC. Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 14 Maintaining these recommendations for minimum hammer size and refusal criteria is essential for obtaining a successful outcome. Final pile depths should be expected to vary somewhat and will depend on the depth of the loose material and landslide debris, the nature of the underlying competent soils. The pin piles should penetrate a minimum of five feet into the competent native glacial soils below the fill material in order to develop the design capacity. Based on our explorations within the vicinity of the central residence, we anticipate that piles may need to be driven to a minimum depth of 50 feet below the ground surface to achieve the minimum embedment depth into the competent native soils. Piles that do not meet this minimum embedment criterion should be rejected, and replacement piles should be driven after consulting with the structural engineer regarding the new pile locations. The piles should be spaced a minimum of two feet apart to avoid a grouping effect on the piles. We should also be retained to observe pin pile installation during construction. Due to the relatively small slenderness ratio of pin piles, maintaining pin pile confinement and lateral support is essential in preventing pile buckling. The brackets and pin pile connections to the existing and proposed foundation and slabs should be designed by the structural engineer. Vertically driven pin piles do not provide meaningful lateral capacity. Due to the rigid pile support, friction between the foundation and subgrade soil should not be considered for resisting lateral pressures on this structure. We recommend that all lateral loads be resisted on the helical anchor tiebacks. Shallow Foundations For the upper eastern portion of the development, conventional shallow spread foundations should be placed on undisturbed medium dense or better native soils. Medium dense to dense soils should be encountered roughly two to five feet below the ground surface based on our explorations; however, deeper areas of loose soil may be encountered in unexplored areas of the site. Where undocumented fill or less dense soils are encountered at footing bearing elevation, the subgrade should be over -excavated to expose suitable bearing soil. Footings should extend at least 18 inches below the lowest adjacent finished ground surface for frost protection and bearing capacity considerations. Foundations should be designed in accordance with the 2015 IBC. Footing widths should be based on the anticipated loads and allowable soil bearing pressure. Water should not be allowed to accumulate in footing trenches. All loose or disturbed soil should be removed from the foundation excavation prior to placing concrete. NELSON GEOTECHNICAL ASSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 15 For foundations constructed as outlined above, we recommend an allowable design bearing pressure of not more than 2,000 pounds per square foot (psf) be used for the footing design for footings founded on the medium dense or better native soils or structural fill extending to the native competent material. The foundation bearing soil should be evaluated by a representative of NGA. We should be consulted if higher bearing pressures are needed. Current IBC guidelines should be used when considering increased allowable bearing pressure for short-term transitory wind or seismic loads. Potential foundation settlement using the recommended allowable bearing pressure is estimated to be less than one inch total and 1/2 inch differential between ad acent footings or across a distance of about 20 feet, based on our experience with similar projects. Lateral loads may be resisted by friction on the base of the footing and passive resistance against the subsurface portions of the foundation. A coefficient of friction of 0.30 may be used to calculate the base friction and should be applied to the vertical dead load only. Passive resistance may be calculated as a triangular equivalent fluid pressure distribution. An equivalent fluid density of 150 pounds per cubic foot (pcf) should be used for passive resistance design for a level ground surface adjacent to the footing. This level surface should extend a distance equal to at least three times the footing depth. These recommended values incorporate safety factors of 1.5 and 2.0 applied to the estimated ultimate vaWes for frictional and passive resistance, respectively. To achieve this value of passive resistance, the foundations should be poured "neat" against the native medium dense soils or compacted fill should be used as backfill against the front of the footing. We recommend that the upper one -foot of soil be neglected when calculating the passive resistance. Retaining Walls Final grading and development plans were not available at the time this report was prepared but retaining walls will likely be needed for the proposed development. We recommend that the uphill foundation wall for the proposed garage within the central portion of the property be extended a minimum of four feet above the finished ground surface to protect the structure against potential failures from the slope above. This is intended to provide a catchment measure should any sloughing debris travel towards the garage structure during extreme weather or as a result of an earthquake. Alternatively, a separate debris protection structure or fence could be utilized. We also recommend that no window or door openings be located on the uphill eastern side of the proposed garage within the central portion of the property. The lateral pressure acting on subsurface retaining walls is dependent on the nature and density of the soil behind the wafl, the amount of lateral wall movement which can occur as backfill is placed, wall drainage conditions, the inclination of the backfill, and other possible surcharge loads. For walls that are free to yield at the top at least one thousandth of the height of the wall (active condition), soil pressures will be less than if movement is limited by such factors as wall stiffness or bracing (at -rest condition). We NEL SON GEO TECHNICA L A SSOCIA rES, INC Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning Edmonds, Washington NGA File No. 999017 February 28, 2018 Page 16 recommend that walls supporting horizontal backfill and not subjected to hydrostatic forces be designed using a triangular earth pressure distribution equivalent to that exerted by a fluid with a density of 45 pcf for yielding (active condition) walls, and 65 pcf for non -yielding (at -rest condition) walls. If the uphill side of the proposed garage is intended to act as a debris wall, we recommend the above ground portion of the garage wall be designed to resist an active pressure of 100 pcf. These recommended lateral earth pressures are for a drained granular backfill and are based on the assumption of a maximum 2H: IV backfill inclinations and do not account for additional surcharge loads. Additional lateral earth pressures should be considered for surcharge loads acting adjacent to subsurface walls and within a distance equal to the subsurface height, of the wall. This would include the effects of surcharges such as traffic loads, floor slab and foundation loads, or other surface loads. We are available to provide consultation regarding additional loads on retaining walls during final design, if needed. The lateral pressures on walls may be resisted by friction between the foundation and subgrade soil, and by passive resistance acting on the below -grade portion of the foundation. Recommendations for frictional and passive resistance to lateral loads are presented in the Foundations subsection of this report. All wall backfill should be well compacted as outlined in the Structural Fill subsection of this report. Care should be taken to prevent the buildup of excess lateral soil pressures, due to over -compaction of the wall backfill. This can be accomplished by placing wall backfill in thin loose lifts and compacting it with small, hand -operated compactors within a distance behind the wall equal to at least one-half the height of the wall. The thickness of the loose lifts should be reduced to accommodate the lower compactive energy of the hand -operated equipment. The recommended level of compaction should still be maintained. Permanent drainage systems should be installed for retaining walls. Recommendations for these systems are found in the Subsurface Drainage subsection of this report. We recommend that we be retained to evaluate the proposed wall drain backfill material and drainage systems. Structural Fill General: Fill placed beneath foundations, pavements, and other settlement -sensitive structures, or behind retaining walls should be placed as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and standards and is monitored by an experienced geotechnical professional or soils technician. Field monitoring procedures would include the performance of a representative number of in -place density tests to document the attainment of the desired degree of relative compaction. The area to receive the fill should be prepared as outlined in the Site Preparation and Grading subsection of NEL SON GEO TECHNICA L A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 17 this report. Sloping areas to receive fill should be benched prior to fill placement. The benches should be level and at least four feet wide. Materials: Structural fill should consist of a good quality, granular soil, free of organics and other deleterious material and be well graded to a maximum size of about three inches. All-weather fill should contain no more than five -percent fines (soil finer than U.S. No. 200 sieve, based on that fraction passing the U.S. 3/4-inch sieve). We do not anticipate placement of significant volumes of structural fill for this project. The on -site soils consist of moisture -sensitive silty materials and slide debris. We recommend that the on -site material not be used as structural fill. We should be retained to evaluate the suitability of proposed structural fill materials at the time of construction. Fill Placement: Following subgrade preparation, placement of structural fill may proceed. All filling should be accomplished in uniform lifts up to eight inches thick. Each lift should be spread evenly and be thoroughly compacted prior to placement of subsequent lifts. All structural fill underlying building areas and pavement subgrade should be compacted to a minimum of 95 percent of its maximum dry density. Maximum dry density, in this report, refers to that density as determined by the ASTM D-1557 Compaction Test procedure. The moisture content of the soils to be compacted should be within about two percent of optimum so that a readily compactable condition exists. It may be necessary to over - excavate and remove wet soils in cases where drying to a compactable condition is not feasible. All compaction should be accomplished by equipment of a type and size sufficient to attain the desired degree of compaction. Slab -on -Grade As mentioned earlier, we recommend that slabs -on -grade associated with the central portion of the property be designed as a structural slab and fully supported on the deep foundation system consisting of driven pin piles. Slabs associated with the upper eastern portion of the property should be supported on subgrade soils prepared as described in the Site Preparation and Grading subsection of this report. We recommend that all floor slabs be underlain by at least six inches of free -draining gravel with less than three percent by weight of the material passing Sieve #200 for use as a capillary break. We recommend that the capillary break be hydraulically connected to the footing drain system to allow free drainage from under the slab. A suitable vapor barrier, such as heavy plastic sheeting (6-mil minimum), should be placed over the capillary break material. An additional 2-inch-thick moist sand layer may be used to cover the vapor barrier. This sand layer is optional, and is intended to be used to protect the vapor barrier membrane and to aid in curing the concrete. NELSON GEOTECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 18 Pavement Subgrade Pavement subgrade preparation should be completed as recommended in the Site Preparation and Grading and Structural Fill subsections of this report. Depending on the tolerance to pavement cracking, we recommend that the upper two feet of the existing material be removed and replaced with granular structural fill or crushed rock. The pavement subgrade should be proof -rolled with a heavy, rubber -tired piece of equipment, to identify soft or yielding areas that may require repair prior to placing any structural fill and prior to placing the pavement base course. We should be retained to observe the proof -rolling and recommend repairs prior to placement of the asphalt or hard surfaces. The pavement section should be thickened to further reduce the effects of settlement due to the landslide debris, but potential long-term cracking should still be expected. Site Drainage Improvements Surface Drainage: The finished ground surface should be graded such that stormwater is directed to an appropriate stormwater collection system. Water should not be allowed to collect in any area where footings, slabs, or retaining walls are to be constructed. Final site grades should allow for drainage away from the structure and away from the site slopes. We suggest that the finished ground be sloped at a minimum gradient of three percent, for a distance of at least 10 feet away from the structure and slopes. Surface water should be collected by permanent catch basins and drain lines, and be discharged into an appropriate discharge system. Under no circumstances should water be allowed to flow uncontrolled over the site slopes or excavation walls. Existing drains within the property should be investigated and repaired, as needed, to ensure all runoff generated on this site is routed away from the building foundation and into the approved discharge system. We recommend that all stormwater generated on the site, including roof downspouts, footing drains, pavement and yard drains, and any water flow from the road, be tightlined to the existing stormwater system within the southern portion of the site. Subsurface Drainage: If groundwater is encountered during construction, we recommend that the contractor slope the bottom of the excavations and collect water into ditches and small sump pits where the water can be pumped out of the excavations and routed into an appropriate outlet. We recommend the use of footing drains around the planned structure and behind retaining walls. Footing drains should be installed at least one -foot below planned finished floor elevation. The drains should consist of a minimum four -inch -diameter, rigid, slotted or perforated, PVC pipe surrounded by free -draining material, such as washed rock, wrapped in a filter fabric. We recommend that an 18-inch- wide zone of clean (less than three -percent fines), granular material be placed along the back of the walls above the drain. Washed rock is an acceptable drain material, or drainage composite may be used instead. NELSON GEO TECHNICAL A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation NGA File No. 999017 Larsen Property Short Plat and Residence Underpinning February 28, 2018 Edmonds, Washington Page 19 The free -draining material should extend up the wall to one -foot below the finished surface. The top foot of backfill should consist of low permeability soil placed over plastic sheeting or building paper to minimize the migration of surface water or silt into the footing drain. Footing drains should discharge into tightlines leading to an appropriate collection and discharge point with convenient cleanouts to prolong the useful life of the drains. Roof drains should not be connected to footing drains. Roof drains should also be installed around the structure. Roof drains should consist of gutters and downspouts collecting stormwater runoff from the roof. The downspouts should discharge to catch basins and 4-inch minimum diameter, rigid, PVC tightline pipes. The drains should be directed into catch basins and then into the controlled drainage system. The footing and roof drains should discharge via independent (separate) tightlines into catch basins/cleanouts leading to the stormwater system, Surface water from the driveway and yard areas should also be collected in a catch basin and tightlined separately to the storinwater system. ROXI)MV, I MWI Owl NGA has prepared this report for Mr. Carl Larsen and his agents, for use in the planning and design of the development planned on this site only. The scope of our work does not includle services related to construction safety precautions and our recommendations are not intended to direct the contractors' methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. There are possible variations in subsurface conditions between the explorations and also with time. Our report, conclusions, and interpretations should not be construed as a warranty of subsurface conditions. A contingency for unanticipated conditions should be included in the budget and schedule. We recommend that we be retained to review final project plans and provide consultation regarding specific structure placement, site grading, foundation support, and drainage. We also recommend that NGA be retained to provide monitoring and consultation services during construction to confirin that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation activities comply with contract plans and specifications. We should be contacted a minimum of one week prior to construction activities and could attend pre -construction meetings if requested. All people who own or occupy homes on or near hillsides should realize that landslide movements are always a possibility. The landowner should periodically inspect the slope, especially after a winter storrn. If distress is evident, a geotechnical engineer should be contacted for advice on remedial/preventative measures as soon as possible. The probability that landsliding will occur is substantially reduced by the NELSOAt GEOTECHNICAL A SSOCIA TES, INC. Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning Edmonds, Washington NGA File No. 999017 February 28, 2018 Page 20 proper maintenance of drainage control measures at the site (the runoff from the impervious surfaces should be led to an approved discharge point). Therefore, the homeowner should take responsibility for performing such maintenance. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering practices in effect in this area at the time this report was prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are a means to identify and reduce the inherent risks to the owner. �$ I NEL SON GEO TECHNICA L A SSOCIA TES, INC Preliminary Geotechnical Engineering Evaluation Larsen Property Short Plat and Residence Underpinning Edmonds, Washington NGA File No. 999017 February 28, 2018 Page 21 We appreciate the opportunity to provide service to you on this project. If you have any questions or require further infonnation, please call. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. Lee S. Bellah, LG Project Geologist Khaled M. Shawish, PE Principal LSB:KMS:sg Eight Figures Attached NELSON GEO TECHNICAL A SSOCIA TES, INC VICINITY MAP Not to Scale Lund,�; Guich a �;-,,,Aynnwood Treatment Edmonds, WA 164th St SW Meada�,dale Playfields Meadowdale,, Middle School *io I a 'Z Project Number NIELSON GEOTECHNICAL No. Date Revision By CK ASSOCIATES, INC. 999017 Larsen Property Short Plat --a- �NG�A 1 8/10/17 Original DPN LSB < Vicinity Map GEOTECHNICAL ENGINEERS & GEOLOGISTS (5 z Woodin in, om� East W—h� Offl� Figure 1 17311-135th A— NE, A-900 5526 ndust� La,,. #2 a I' W-dirA1e.WA9W72 E . W—.h., WA �2 2S) 4�1� , F— �1-2510 (M)) 665-76961 F— 665�7� Approximate Location of Proposed Garage Approximate Top of Slope M 0 Existing Western Garage Approximate Toe of Slope -4 Approximate 60-foot Existing Western Residence Steep Slope Setback 6 z < CD IN J 6 11 -.4 'J. U 0 z --i q �V' k"\\\\ _j LOT I WE '_�Xw r ....V w V 4 "2 �'t a$'M' 9) '_'_ �3, pw S� .4 LEGEND Property line B-1 Number and approximate location of boring A A' Approximate location of cross-section Reference: Site Plan based on an undated, untitled plan provided by CG Engineering. ?f U w Sip w In w 0 w < w Z 0 W B \s X\ 0, vi" z w AN LO T� U ; Vil 0 w 0 w so ­0.47� la, IV r.24&03(tr w 4� r­7 -141 Exr,—, EL 0 Existing Central Residence U) r- ru CL CL 2 2 0) a. r (D in M _j 0 50 100 mi�� I Scale: 1 inch = 50 feet E r,- C14 CD 0) 0) 0) LL a_ Southwest 250— 200 0 LLJ 150 a) 16 E .R 2 100 50 F-11 Approx. Main Floor Elevation: 142.1 Approx. Basement Floor Elevation: 133.4% B-3 B-4 Qw A' East Existin Existing Block Walls Centra? 35 Residence B-2 75th PI W B-1 Qols (landslide debris) ? — — — — — ? — — — QW I .... I .... I .... I .... I .... I .... I .... I .... I .... I .... J.—I .... I ... �i .... 0 5 . 0 100 150 200 250 360 35'0 40'0 450 500 55U oUV Distance (feet) Exploration Boring Designation--> B-1 " <-- SPT N-value Groundwater Le�ei _4 " 21 During Exploration 2, ?I Geologic Contact (approximate) Reference: CrossSection is based onfield measurements using a hand-held clinometer and 100-fttape measure. NOTES: 1) Stratigraphic conditions are interpolated between the explorations. Actual conditions may vary. 2) Elevations are approximate. .2 w 0 h J U) < 25. U 2,8 z 0 7: U -0j W 5t W Ld 200 0 1- C75 LLI U) X Id Z 0 W 0 in Z (n U) 3 < z 150 _1 W w z < 2 Z 1 r $ L u 100 2z 0 W 50 (L 1= ;:( o (n C .�.2 CU Q CL 2 In 2 12 Co. E Z) z 8 d) .0 0 CY) LL 2— IL UNIFIED SOIL CLASSIFICATION SYSTEM GROUP MAJOR DIVISIONS GROUPNAME SYMBOL CLEAN GW WELL -GRADED, FINE TO COARSE GRAVEL COARSE- GRAVEL GRAVEL GP POORLY -GRADED GRAVEL GRAINED MORE THAN 50 % GRAVEL GM OF COARSE FRACTION SILTY GRAVEL RETAINED ON SOILS NO, 4 SIEVE WITH FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND SAND SP POORLY GRADED SAND MORE THAN 50 % RETAINED ON MORE THAN 50 % NO. 200 SIEVE OF COARSE FRACTION SAND Sm SILTY SAND PASSES NO. 4 SIEVE WITH FINES Sc CLAYEY SAND FINE - SILT AND CLAY ML SILT INORGANIC GRAINED LIQUID LIMIT CL CLAY LESS THAN 50 % SOILS ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT INORGANIC MORE THAN 50 % PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY, FAT CLAY NO. 200 SIEVE 50 % OR MORE ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES: 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general accordance with ASTM D 2488-93. Dry - Absence of moisture, dusty, dry to the touch 2) Soil classification using laboratory tests is based on ASTM D 2488-93. Moist - Damp, but no visible water. 3) Descriptions of soil density or Wet - Visible free water or saturated, consistency are based on usually soil is obtained from interpretation of blowcount data, below water table visual appearance of soils, and/or test data. Project Number NELSON GEOTECHNICAL No. Date Revision By CK 999017 Larsen Property Short Plat Soil Classification Chart '-�% ASSOCIATES, INC. -000�NGA GEOTECHNICAL ENGINEERS & GEOLOGISTS 1 8/10/17 Onginal DPN LS6 Figure 4 W�dlnvllla We, EaM W—Chee Offlee 1731 1 -1 35th A- NE, A-500 ,5526 Industry Lane, 42 W-dinAe, WA WY72 st VV .. Whe., WA 98802 (�25� 486-1669 / Fe� 481-2510 —nele-g-tech— A 665-76961 Fs� 665-7692 BORING LOG B-1 Approximate Ground Surface Elevation: ?? Soil Profile Sample Data Penetration Resistance (Blows/foot - 0) 10 20 30 40 50 50+ 1 d) 1-- Piezometer Installation - L) Ground Water Description Z 0) CL CL 0 =1 M -E 0 :3 .2 0 .2 O_ Moisture Content .2 2 Data 0 E >1 0c, E M U (Percent - 0) 0 (Depth in Feet) U) U) 0 _J (U 10 20 30 40 5 50+1 -am _J Gray -brown, silty fine to medium sand with gravel, iron -oxide staining, and trace roots (very loose, moist) 3 5 ... .... ......... ........ ........ ......... ........ 5 -becomes dark brown 3 -becomes dark brown to gray -brown, loose -no organics 5 -becomes gray, moist to wet 7 10 .... ... ........ ........ ........ ......... .. .. .. -10 -becomes gray -brown 9 SM15 ........ ......... ... .... ........ ......... ....... -15 9 N ' 7- 20 ........ .... .... ......... ........ ......... ........ -20 -becomes gray, medium dense, wet 17 25 ..... .. ........ ........ ........ ......... ........ 25 -becomes loose with trace organics, charcoal 5 LEGEND E-1 Solid PVC Pipe concrete M Moisture Content 7— Slotted PVC Pipe Bentonite A Atterberg Limits Depth Driven and Amount Recovered G Grain -size Analysis with 2-inch O.D. Split -Spoon Sampler Monument/ Cap Native Soil DS Direct Shear to Piezometer Silica Sand PP Pocket Penetrometer Readings, tons/ft Depth Driven and Amount Recovered * Liquid Limit P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis and judgement. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. Project Number NELSON GEOTECHNICAL �NG�A No. Date Revision By CK 999017 Larsen Property Short Plat ASSOCIATES, INC. _1 Boring Log GEOTECHNICAL ENGINEERS & GEOLOGISTS W�1­11le Ofilce E111 Wllltlh� Offill 17311 '135th A— NE, A-500 5526 Ird-try Lan, #2 W.=.,WA 12 E­ W .. 1,h- WA 98902 8/10/17 Original DPN LSB Figure 5 Page 1 of 2 LU (425)4 481-2510 —nel—g-t-h.— A665-7696/Far.66W692 ---- J 0 Z BORING LOG B-1 (cont.) Soil Profile Sample Data Penetration Resistance (Blows/foot - 0) 10 20 30 40 50 50+ to Piezometer Installation - Description !E 0) 0- 0 =3 3: CL 0 2:, .2 Ground Water Data _J _L Moisture Content C) CIS _J 2 E >1 0 E to to a (Percent - 0) co 8 (Depth in Feet) 0 7a 10 20 30 40 50 50+ Orange -brown to gray -brown, silty fine to medium sand 2 with gravel, trace organics, and charcoal (very loose, wet) . .......... . -becomes gray to brown, with trace iron -oxide staining, 7 35 ........ ... ..... .................. ......... ........ -35 medium dense 17 -no organics or charcoal SM -becomes gray, with trace gravel 40 ........ ... .. ........ ... - ... ......... ........ -40 -no iron -oxide staining 20 -with trace iron -oxide staining 71 45 ........ ........ ..... ..... .. ......... ........ -45 19 Boring terminated below existing grade at 46.5 feet on 8/7117. Groundwater seepage was not encountered during drilling. 50 ........ ......... . - ..... ........ ......... ........ -50 E 55 ........ ......... ........ ......... ......... ........ -55 U. c LEGEND F­J Solid PVC Pipe concrete M Moisture Content Depth Driven and Amount Recovered Slotted PVC Pipe Bentonite A Atterberg Limits C G Grain -size Analysis with 2-inch O.D. Split -Spoon Sampler Monument/ Cap Native Soil DS Direct Shear to Piezometer Depth Driven and Amount Recovered Silica Sand PP Pocket Penetrometer Readings, tons/ft * Liquid Limit P Sample Pushed with 3-inch Shelby Tube Sampler 1� + Plastic Limit Y Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests. analysis and judgement. They are riot necessadly representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. 1-Z Project Number NELSON GEOTECHNICAL No. Date Revision By CK 999017 Larsen Property Short Plat Boring Log ASSOCIATES, INC. ---_�NGA GEOTECHNICAL ENGINEERS St GEOLOGISTS W�InvllleOfflca East Wenatchee Office 17311-135th A-- NE. A-110 5526 Ind.stry Une, #2 'i. i n=., WA �2 East Mlltct,11, WA 988C2 1 8110/17 Original OPN LSEl t- Figure 5 Page 2 of 2 (425) 48&1 Fax: 481-2510 —relsonti-tecir,.com (509 ) 665-7696 / F­ 665�7692 BORING LOG B-2 Approximate Ground Surface Elevation: ?? Soil Profile Sample Data Penetration Resistance C (Blows/foot - 0) 10 20 30 40 50 50, 1-- Piezometer Installation - U Ground Water Description !E Cn 0-0 CL 0 =) �0 3: 0 :3 CL Moisture Content .2 12 Data _J 0 E 5, 2-, o (-) E M (Percent - 0) 0 (Depth in Feet) U) U) _J a) 10 20 30 40 5 50,1 Gray -brown, silty fine to medium sand with gravel and roots (very loose to loose, moist) . .......... . 14— 4 -becomes gray with iron -oxide staining, loose 5 5 .... ... ........ ........ ........ ....... ........ 5 -no roots -becomes gray to orange -brown 6 -becomes gray with trace gravel and roots 7 10 ..... .. ........ ........ ...... - ......... .. .... -10 -becomes gray -brown 8 -becomes medium dense SM 15 ........ ........ ........ ........ ......... . -15 -no roots 11 N 20 ........ .... .... ... ........ ......... ........ -20 -becomes wet, with gravel 13 -becomes gray, with trace gravel 13 25 ........ ........... ......... ........ -25 LEGEND F-1 Solid PVC Pipe Concrete M Moisture Content F—_1 Slotted PVC Pipe Bentonite A Atterberg Limits Depth Driven and Amount Recovered G Grain -size Analysis with 2-inch O.D. Split -Spoon Sampler Monument/ Cap Native Soil DS Direct Shear Depth Driven and Amount Recovered to Piezometer Silica Sand PP Pocket Penetrometer Readings, tons/ft Liquid Limit P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis and judgement. They are not necessarly representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. Project Number NELSON GEOTECHNICAL No. Date Revision By CK 999017 Larsen Property Short Plat ASSOCIATES, "~N-G A I NC. Boring Log GEOTECHNICAL ENGINEERS & GEOLOGISTS w�i­ine om- Ead W­h� Offic, 17311 -1 3&h A- NE, A_9W 5526 Wmly L­ #2 W­dinAe, WA �72 E­ W .. t�­, WA 98W2 I WIWI, .,ural DPN LSB Figure 6 Page 1 2 of (425) 48&1669 / Fu 481-2510 t509)=7696/F­665176W BORING LOG B-2 (cont.) Soil Profile Sample Data Penetration Resistance (Blows/foot - 0) 10 20 30 40 50 50+ I I I I 1-- Piezometer Installation - C (D ?, Ground Water Description CL CL =3 3: 0 T 0 2 CL " E Moisture Content E2 Data Co o 0 E >' 0 L) E Cal co (Percent - E) 0 (Depth in Feet) C/) 0 J W 10 20 30 40 5 50-1 -,a _J Gray, silty fine to medium sand with gravel, iron -oxide 8 staining, and trace charcoal (loose, wet) -becomes medium dense -no charcoal SM 24 35 - ........ ........ . ...... ........ ......... ........ 35 40 ........ ..... .. ........ ........ ......... .. - -40 17 Gray -blue silt with fine sand (very stiff, dry) 45 ........ ........ ..... ... ........ ......... -45 ML 29 5 ........ ........ .. m .... ........ ......... ........ -50 30 Boring terminated below existing grade at 51.5 feet on 8/7/17. Groundwater seepage was not encountered during drilling. 55 ........ ........ ......... ........ ......... .. 55 LEGEND Solid PVC Pipe ES concrete M Moisture Content Slotted PVC Pipe Bentonite A Atterberg Limits r-1 Depth Driven and Amount Recovered G Grain -size Analysis with 2-inch C.D. Split -Spoon Sampler Monument/ Cap Native Soil IDS Direct Shear to Piezometer PP Pocket Penetrometer Readings, tons/ft Depth Driven and Amount Recovered Liquid Limit Silica Sand P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis and judgement. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented an this log. Project Number NELSON GEOTECHNICAL No. Date Revision By CK 999017 Larsen Property Short Plat 'A--N_ ASSOCIATES, INC. NG Boring Log GEOTECHNICAL ENGINEERS & GEOLOGISTS W,Mfnvine Offt, ElOW"CheeCiffice 17311-13511, Aw. NE, A,900 5526 Inal—y Lane, 02 Modin,fle, WA 98072 Eat Wan.td., WA 98802 1 8/10117 Original DR4 LSS Figure 6 Page 2 of 2 (�25) 48&16691 Fax: 481-2510 --l—g-t-h—, (509) 6�7696 1 Far, 665-7692 BORING LOG B-3 Approximate Ground Surface Elevation: ?? Soil Profile Sample Data Penetration Resistance (Blows/foot - 0) 10 20 30 40 50 50+ l­ (u Piezometer Installation - Ground W ater Description !E Cn 0- CL 0 :3 .0 3: 0 :3 .2 0 '2 CL S Moisture Content 2 12 Data 0 CU _J 0 E j-n q 0 E m "5. (Percent - 0) 0 (Depth in Feet) U) 0 J (U 10 20 30 40 50 50, -am _J Gray -brown to orange -brown, silty fine to medium sand with gravel, iron -oxide weathering, and trace metal/plastic (dense, moist) (ELLL) 41 L 1�rTy tTora_ngj-_brJ­wn, sili7lfiTe tj`mj_d_JuTsa­nd 'with- 5 ........ ......... ........ ........ ....... ....... 5 gravel, iron -oxide weathering, and trace roots (very 54 dense, moist) -becomes orange -brown to gray -no roots 50-6" -becomes gray, medium dense 23 10 ........ ......... ........ ........... ......... ........ -10 SM 15 ........ ......... ...... .. ........ ......... ........ -15 -no iron -oxide staining 29 -becomes gray -brown with iron -oxide staining, 32 20 ........ ......... ........... ...... ........ ........ -20 dense, wet — — — — — — — — — — — — — — — Gray silt with fine sand (very stiff, moist) — — -- — — 25 ........ ......... ........ . ....... ......... ........ -25 31 ML LEGEND F-I Solid PVC Pipe concrete M Moisture Content F_—_1 Slotted PVC Pipe Bentonite A Atterberg Limits Depth Driven and Amount Recovered G Grain -size Analysis with 2-inch O.D. Split -Spoon Sampler Monument/ Cap Native Soil DS Direct Shear to Piezometer PIP Pocket Penetrometer Readings, tonsIft Depth Driven and Amount Recovered * Liquid Limit Silica Sand P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis and judgement. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. Project Number NELSON GEOTECHNICAL No. Date Revision By CK 999017 Larsen Property Short Plat .101.*" 'A--., ASSOCIATES, INC. NG Boring Log GEOTECHNICAL ENGINEERS & GEOLOGISTS w.mi.vin. om.. E.. W..at.h_ Offl- 17311 '135th A- NE, A-500 55M kdmty L­ 02 W-din,fl.,WASM72 E� WA 98W2 1 8/10/17 Original DPN LSB Figure 7 Page 1 of 2 F.. 181-2510 —.n.l-rg­­h.­ (509) �7� 1 F­ 665-7692 BORING LOG B-3 (cont.) Soil Profile Sample Data Penetration Resistance CD .9 (Blows/foot - 0) 10 20 30 40 50 50+ I I I I Piezometer Installation - Cc: Ground Water Description :3 3: C: .2 Moisture Content Data 0. 0 Co _J 0 E 5, 0 ai 0 C) E co to 0 1 '5. (Percent E2 0 (Depth in Feet) U) 0 _J d) 10 20 30 40 50 50+ -0. _J Gray -brown, silty fine to medium sand with iron -oxide 30 41 staining (medium dense to dense, moist) :77. .7 SM 35 ........ ......... .... ............. ........ ........ -35 1 25 Gray silt with fine sand (very stiff, moist) ML — T — — — — — — — — — — 1�ray, ilty Tinesar7d viTith iron -oxide staining (dense, moist) 40 ........ ......... ........ ........ . ....... ........ -40 45 7 - SM 45 ........ ......... .............. .... .... .. ........ -45 48 Boring terminated below existing grade at 46.5 feet on 8/7/17. Groundwater seepage was not encountered during drilling. 50 ........ ......... .................. ......... ........ -50 55 ........ ......... .................. ......... ........ 55 LEGEND F-1 Solid PVC Pipe concrete M Moisture Content F_—J Slotted PVC Pipe Bentonite A Atterberg Limits Depth Driven and Amount Recovered G Grain -size Analysis Monument/ Cap with 2-inch C.D. Split -Spoon Sampler Native Soil DS Direct Shear to Piezometer PP Pocket Penetrometer Readings, tons/ft Depth Driven and Amount Recovered Liquid Limit Silica Sand P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit _Y Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis and judgement. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. Project Number NELSON GEOTIECHNICAL No. Date Revision By CK 999017 Larsen Property Short Plat ASSOCIATES, INC. -00�N- G A Boring Log GEOTECHNICAL ENGINEERS & GEOLOGISTS W-dinAll. Offlee F"t Wenatchee Office 17311-135th A— NE, A­5W 5529 Wetry Lane, #2 M.di,mh. WA 98072 e.. W.—h-, WA 98802. (42514a6_1669 , F-481-2510 ­n,1wng,­ch.corn (509) 665-76% 1 Fa.: 66�7692 1 8/10/17 Original DPN LS13 Figure 7 Page 2 of 2 BORING LOG B-4 Approximate Ground Surface Elevation: ?? Soil Profile Sample Data Penetration Resistance (Blows/foot - 0) 10 20 30 40 50 50+ 1­0 Piezometer Installation - L) d) Ground Water Description 0) CL =) M 0 :3 A 0 2 CL Moisture Content co Data 0 _J 0 E 5, E m (Percent - N) (Depth in Feet) C/) 0 15, _J Q 10 20 30 40 50 50, -am Gray -brown, silty fine to medium sand with gravel, iron -oxide staining, and trace organics (loose, moist) SM 7 ---------------------- No recovery 2 — — — — — — — — — — — — — — — Gray, silty fine to medium sand with gravel and iron -oxide weathering (dense, moist) ------- — — 41 -becomes medium dense 25 10 ........ ......... ....... ......... ........ -10 SM -becomes gray -brown 28 15 . ....... .. ........ ......... ........ -15 35 20 ........ ........ ......... .. ..... ......... ........ -20 Gray silt with fine sand (hard, moist) -interbedded with gray, silty fine to medium sand with 25 ........ ......... ......... ........ ... ..... ........ -25 gravel ML 45 LEGEND F__J Solid PVC Pipe Concrete M Moisture Content Depth Driven and Amount Recovered F—� Slotted PVC Pipe Bentonite A Atterberg Limits G Grain -size Analysis Monument/ Cap with 2-inch C.D. Split -Spoon Sampler Native Soil DS Direct Shear to Piezometer Silica Sand PP Packet Penetrometer Readings, tons/ft Depth Driven and Amount Recovered * Liquid Limit P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit Water Level T Triaxial NOTE: Subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis ard judgement. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. Project Number NELSON GEOTECHNICAL No. - Date Revision By CK 999017 Larsen Property Short Plat A--,, ASSOCIATES, INC, NG Boring Log GEOTECHNICAL ENGINEERS & GEOLOGISTS W�1­111. M­ E-1 W..M.h- Offl- 17311 -1 35th A- NE, A-500 5526 W.." L.-. #2 'Ab 12 EaV Wenatch-, WA SM2 1 8110117 Odgin.1 DPN LSB Figure 8 Page 1 of 2 �=,'IA '25) '_ �1 -2510 ­[..ng­.�­ (5091665.7� [F­�7692 1 41 BORING LOG B-4 (cont.) Soil Profile Sample Data Penetration Resistance (Blows/foot - 0) 110 210 3lo 4,0 5,0 50- 11.� 12 Piezometer Installation - Description �E Q_ 3: C 0 = 0 - --d Water Data Moisture Content to 0 E .2 = a e E C.) (Percent - 0) 2 0 (Depth in Feet) (U 10 20 30 40 5 50, -0 Gray silt with fine sand (very stiff to hard, moist) 32 35 ........ ......... .................. ..... ... ........ -35 49 -interbedded with gray, silty fine to medium sand ML 40 ........ ......... ............... .. ......... ... .... -40 53 4 ........ ......... .................. ......... ... 45 52 Boring terminated below existing grade at 46.5 feet on 8/7/17. Groundwater seepage was not encountered during drilling. 50 ........ ......... ........ ........ ......... ........ -50 E 55 ........ ......... ........ ........ ......... ........ -55 Q. t C LEGEND F__J Solid PVC Pipe Concrete M Moisture Content Depth Driven and Amount Recovered F_-1 Slotted PVC Pipe Bentonite A Afterberg Limits c G Grain -size Analysis with 2-inch O.D. Split -Spoon Sampler Monument/ Cap Native Soil DS Direct Shear to Piezometer Depth Driven and Amount Recovered Liquid Limit Silica Sand PP Pocket Penetrometer Readings, tons/ft P Sample Pushed with 3-inch Shelby Tube Sampler + Plastic Limit Water Level T Triaxial NOTE: subsurface conditions depicted represent our observations at the time and location of this exploratory hole, modified by engineering tests, analysis and judgement. They are not necessarily representative of other times and locations. We cannot accept responsibility for the use or interpretation by others of information presented on this log. Project Number NELSON GEOTECHNICAL No. Date Revision By I c CK 999017 Larsen Property Short Plat Boring Log ASSOCIATES, INC. -- �NGA GFOTECHNICAL ENGINEERS GEOLOGISTS Wo,di,�11, Offle, East vi�stchee om� R31 1 -1 35th A- NE� A,500 5526 lrd-ry L­ #2 VV. I 8110M7 odgml OPN LGB G Figure 8 Page 2 of 2 A Ea I V�­th­ WA 98W2 (425)4=1WF.t'017'251G —.1-g-t-h— s.)1665,7696/F­6�76K Z CITY CCPY SPECIAL INSPECTION AND TESTING AGREEMENT Permit #: BLD2018-0517 L1100 Z d3s Project: — Lai-sen Residence - SOILS (13NNVOS PHOP to issuance of a Pepmil, 111isform must be completed in its enfii-e& and i-eirtrued to the Ci&foj- appi-oval The conipletedfoi-in inust have Signatures qf acIcnowledgmew bjy allpal-ties. DUTIES AND RE' SPONS1BILITIES Silecial hisnection Firm and SPeCifil InsDectol-s: The Special Inspection firm of Nelson Geotechnical will perform special inspection for the following types of work �s—epara—te —forms must —besub.i-tted if more than one firm is to be employed): Pipe Pile Installation Helical Anchor Installation All individual inspectors to be employed oil this project will be WABO certified for die type of work they are to inspect, If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of die inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City, Inspection records shall include: A daily record to be maintained on site, itemizing tile inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing tile inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any um-esolved discrepancies must be detailed in the final report. Contractor: The contractor shal I provide die special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at thejobsite for the use of the special inspector and tile City inspector. The contractor shall maintain all daily inspection reports, o all parties. if� pm-� Tli rj�'-My %\edriisvr-userfs%ustipmf$%bjorb2ck\Desktop\SI Soils Larsen.doc6/1/2018 AUG 2 4 2018 BUILD:NG DEPARTMENT OfTY OF EDMONDS The special inspection functions are considered to be in addition to [lie normal inspections pci-fornied by tile City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: Tile building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector sliall be responsible for approving various stages of construction to be covered and for work to proceed, DesiLyn Professionals: Tlic architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engincer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being perforl-ned in the field. Ownew: Tile project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IRC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firrn would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORIC notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreemen� Owner: Sharon Larsen Signature. atle stab Contractor: PILp— V,JCV —Signature Arr ,11.lEng:_ Dennis Titus, PE, SE ') Special ]lisp. #A U<—] Special Insp. Agency ALff-LSbA (0-ro—rd N � LA-t- e,% S 0 ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION By: Date: %\cdnisvr-u-,erf3Nuseiprof$Nbjorback\DcsktopNSI Soils Larsmi.doc6/l/201 8 Date: 1-zv -12, Datellvv- hi L f---T- Date: -91122ht VV0 40 Critical Areas File #: C R� 10 16 0) t -2— ,91nitial Determination - $100 11 Subsequent Determination - $50 Date Received: U21) IS Date Mailed to Appli�ant: The purpose of this checklist is to enable City staff to deterrnine whether any critical areas and/or buffers are located on or adjacent to the sub�iect property. Critical areas, such as wetlands, streams and steep slopes, are ecologically sensitive or hazardous areas that are regulated to protect their functions and values. The City's critical area regulations are contained within Edmonds Community Development Code (ECDC) Chapters 23.40 through 23.90. Property Owner's Authorization P20 City of Edmonds Development Services Department Planning Division Phone: 425.771.0220 www.edmondswa.gov A property owner, or an authorized representative, must fill out the checklist, sign and date it, and submit it to the City. Staff will review the checklist, conduct a site visit, and make a determination of whether there are critical areas and/or critical area buffers on or near the site. If a "Critical Area Present" determination is issued, a report addressing the applicable critical area requirements of ECDC Chapters 23.40 through 23.90 may be required depending on the scope of the proposed activity. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection attendant to this application. The undersigned owner, and hisiher/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant, his/her/its agents or employees. -�7, ) I - SIGNATURE OF OWNER DATE 1 -?-1 Owner: - 5L%,Lro^ ? Name 1J?>32. Mrr;-%O- Street Address I-Av 1, "140 LVA 18Z9-19 City State Zip Applicant/Agent: C6 6^211neeri-10% - Name z5o 'Y" Ave 5, 5,;ie- YOO Street Address Eel &, ,As LIA Iwo City State Zip Telephone: Telephone: Emailaddress: EmailAddress: Revised on 114117 P20 - Critical Areas Checklist Page I of 2 -4 0 CA File NoS f'A (-?-- #P20 Critical Areas Checklist Site Information 1. Site Address/ Location: 45"� P1 W, E.Go-Lct5, L,/A c18c)-16 2. PropertyTax Account Number: 00513�-10000 7_+00 3. Approximate Site Size (acres or square feet): 1.53 ACEES 4. Is this site currently developed? 5A Yes El No If yes, how is the site developed? 9'5; '�0-1+i4- 1 5. Describe the general site topography. Check all that apply. • Flat to Rolling: N o slope on/ adjacent to the site or slopes generally less than 15 % (a vertical rise of 10-feet over a horizontal distance of 66-feet). • Moderate: Slopes present on/adjacent to site of more than 15% and less than 40% (a vertical rise of 10-feet over a horizontal distance of 25 to 66-feet). 29 Steep: Slopes of greater than 40% present on/adjacent to site (a vertical rise of 10-feet over a horizontal distance of less than 25-fect). 6. Have there been landslides on or near the site in the past? 0 Yes El No If yes, please describe: VFe w;F4i-% 6'5LHA 7. Site contains areas of year-round standing water? El Yes (approx. depth: CR No 8. Site contains areas of seasonal standing water? El Yes (approx. depth: X No If yes, what season(s) of the year? 9. Site is in the floodway or floodplain of a water course? El Floodway El Floodplain 10. Site contains a creek or an area where water flows across the grounds surface? El Yes IN No If yes, are flows year-round or seasonal? El Year-round El Seasonal (time of year: 11. Obvious wetland is present on site? E Yes 34 No _j� I L­% -4LA V $ V k T - N For City Staff Use Only- 1. Zoning: -10 - 3. SCS mapped soil tyy �e( : 61 ff V 057-7do/n.'rh? sirect-4 ed4t_ i-S 41dlywearl Urbe,,,, (z -e %v,.r7._At V_ - I - — 3. �itical Are# inventory or CA. map indicates Critical Area on site: PuJt4�Nkt ruse'j-1 -t- L La'?_cL,r(f 4. Site within designated North Edmonds Earth Subsidence and Landslide Hazard Area (ESHLA)? DETERMINATION CRITIgAL AREAS PRESENT WAIVER Reviewed by: Date: Z­ 12 Revised on 114117 P20 - Critical Areas Checklist Page 2 of 2 A E D File No: Citp of ebmolibE; Applicant: I S9,11 Affidavit of Earth Subsidence Landslide Hazard Area Permit 0 T,� /2- 6tate of lVaOinatan Countp of 6nobomi3%b ATF13Av IT OF K307-1c-e- ,,�Xo^-J Z. 1,44,5441 being first duty swom, on oath, deposes and says: That on the Ab 0- day of 20J L the site located at /�5,7,,? q q.5-4±- pL _)q was posted as prescribed by Ordinance No. 3632 on the subject property. This posting begins on on the day the City accepts the Permit Application for review and shall rernain until building occupancy is granted. . Signed: Signed: Subscribed and sworn to before me this ��ay of 20.)9. NOTARY PUBUC STATE OF WASHINGTON P -inted Name: BETH ANN CAMPBELL My Appointment Expires 'N otary Public in and for the State of Washington, residing at AUGUST 25,'2018 01 `5� A Alk A 1W! -,A . ) / I A My commission expires: 0, Packet Item # 16 f . ftr� Technical Memorandum �79T-_- 20 18 000-3 TO: Linda Thornquist, Senior Permit Coordinator City of Edmonds Development Services Department, Building DivisiRIECEIVED FROM: Sean M. Gertz, EIT and Steven R. Wright, PE APR 0 3" 2018 DATE: April 2, 2018 DEVELOPMENT SERVICES RE: Completeness Review COUNTER Submittal Package for Earth Subsidence and Landslide Hazard Area Larsen Residence — 15729 75th Place West Edmonds, Washington This technical memorandum provides our assessment of the completeness of the permit submittal package submitted to the City of Edmonds (City) for the Larsen Residence within the Earth Subsidence and Landslide Hazard Area (ESLHA) of North Edmonds. This completeness review was accomplished in accordance with Task Order No. 18-01 of Landau Associates' On -Call Geotechnical and Environmental Engineering Services Agreement with the City. The completeness review performed by Landau Associates is not intended to be a thorough review of the permit submittal package; instead, it is intended to be a cursory review to assess whether the submittal appears to contain the necessary information in order to complete a geotechnical peer review in accordance with Edmonds Community Development Code (ECDC) Chapter 19.10. As a guide in assessing the completeness of the permit submittal package for the Larsen Residence, we referred to the ESLHA Permit Submittal Checklist provided by the City. Our cursory review did not identify any missing items that are required under ECDC 19.10. Of course, once the more detailed geotechnical peer review is underway, there may be specific items within the submitted documents that need to be clarified or addressed in order to complete the geotechnical peer review. Please contact us if you have any questions regarding this completeness review and when you are ready for us to commence our geotechnical peer review. LANDAu L4 ASSOCIATES 130 2nd Avenue South - Edmonds, Washington 98020 * (425) 778-0907 ft- Landau Associates LANDAU ASSOCIATES, INC. Sean M. Gertz, EIT Senior Staff Geotechnical EIT SY/'--UVd Steven R. Wright, PE Principal SMG/SZW/rgrn Completeness Review Larsen Residence — 15729 75th Place West April2,2018 V Technical Memorandum TO: Linda Thornquist, Senior Permit Coordinator City of Edmonds Development Services Department, Building Division FROM: Sean Gertz, EIT and Steven Wright, PE DATE: April 30, 2018 SCANNED RE: Geotechnical Peer Review APR ,:o 2a Submittal Package for Structural Improvements in a Critical Area Larsen Residence — 15729 75th Place West Edmonds, Washington This technical memorandum summarizes the results of our geotechnical peer review of the permit submittal package that was submitted to the City of Edmonds (City) for proposed structural improvements to the above referenced residence, which is located within a critical area in Edmonds, Washington. The purpose of our geotechnical peer review is to review portions of the submittal package and assess its compliance with the City's development and building permit requirements as contained in Edmonds Community Development Code (ECDC) Chapter 19.10 for sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area (ESLHA). This review also assesses the submittal's compliance with the requirements of Chapter 23.80 of the ECDC as required or noted in Chapter 19.10. This geotechnical peer review was accomplished in accordance with Task Order No. 18-02 of Landau Associates' On -Call Geotechnical and Environmental Engineering Services Agreement with the City. We reviewed the following information forwarded by the City: • Completeness Review Pre -Application Form for Earth Subsidence Landslide Hazard Area projects, stamped Received March 1, 2018 • Affidavit of "Notice of Application posted at Job Site" (signed by Applicant/Owner), dated February 26, 2018 • Applicant/Owner Covenant to Notify and Hold Harmless, dated February 26, 2018 • Structural Engineer Declaration, prepared by CG Engineering on February 26, 2018 • Lead Design Professional Designation and Statement and Geotechnical Hazard Identificatio n/Decla ration, prepared by CG Engineering on February 26, 2018 • Geotechnical Hazard I cle ntification/Decla ration and Mitigation Statement of Risk from Geotechnical Engineer, prepared by Nelson Geotechnical Associates, Inc. on March 20, 2018 • Applicant/Owner Liability and Landslide Acknowledgment, dated February 26, 2018 • Structural Design Calculations (stamped by Structural Engineer), prepared by CG Engineering on March 1, 2018 • Critical Area Determination (CRA20180012), stamped Received March 1, 2018 14 LANDAU ASSOCLkTES 130 2nd Avenue South - Edmonds, Washington 98020 - (425) 778-0907 Landau Associates • North Edmonds Earth Subsidence and Landslide Hazard Areas Map with signed signatory block, dated February 26, 2018 • Vicinity Map, prepared by CG Engineering on February 26, 2018 • Topographical Map and Survey, prepared by A.S.P.I. Land Surveying and Planning on February 14,2018 • Preliminary Geotechnical Engineering Evaluation (stamped by Geotechnical Engineer), prepared by Nelson Geotechnical Associates, Inc. on February 28, 2018 • Building Construction Plans (stamped by Engineer), prepared by CG Engineering on February 21,2018. Based on our review of the information that was submitted, it is our opinion that the geotechnical report that was prepared and submitted for this project provides a good discussion of site conditions and risks, and provides geotechnical recommendations that appear to be appropriate for design. In addition, the report appears to adequately document existing site conditions based upon field reconnaissance and subsurface explorations, and acknowledges the presence of, and adequately evaluates, seismic, erosion and landslide hazards on the property. The submittal package that we reviewed includes the majority of the information in Sections 19.10 and 23.80 of the ECDC that is identified as being required. However, wefound thefollowing deficiencies in the information that was submitted: The vicinity map does not identify existing conditions such as known landslide masses, debris flows, or mud flows on or near the site. 0 The topographic survey does not show distances to existing habitable structures on or near the site, as required in ECDC 19.10.030(D). 0 The applicant did not submit a separate topographical drawing showing proposed grade contours at 2-foot intervals, as required in ECDC 19.10.030(E.7). 0 The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not provide analysis of the rate of retreat of the bluff nor an estimate of the percent risk of landslide area expansion that recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event, as required in ECDC 19.10.030(H.6) and ECDC 23.80.050(F.2.e). The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not describe public and private sewage disposal systems, as required in ECDC 23.80.050(F.2.c). The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not consider the run -out hazard of landslide debris and/or the impacts of landslide run -out on downslope properties, as required in ECDC 23.80.050(F.2.f). The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not adequately assess the stability of the slope, as required in ECDC 23.80.050(F.2.g). The geotechnical engineer should confirm the stability of the slope through modeling or numerical analysis and present the results in the geotechnical report. Geotechnical Peer Review Larsen Residence — 15729 751h pl W 2 April 30, 2018 I 1P Landau Associates 0 The applicant did not submit documentation of required bonds, frozen funds, or adequate instrument of credit, nor did they submit a copy of the contractor's general public liability insurance, as required by ECDC 19.10.030(J). This technical memorandum has been prepared for use by the City in evaluating the adequacy of permit submittal documents related to the proposed structural improvements to the residence at 15729 75' Place West in Edmonds, Washington. The focus of this review was the geotechnical aspects of the application. The purpose of the review was to assess the adequacy of the application documents for compliance with City requirements contained in ECDC 19.10, ECDC 23.80, and conformance with conventionally accepted geotechnical engineering practices. This geotechnical peer review by Landau Associates does not lessen the requirements for the applicant's geotechnical consultant to serve as the project's Geotechnical Engineer of Record and other design professionals to prepare an appropriate design for the site conditions. We appreciate this opportunity to be of service to the City. Please contact us if you have any questions or if we may be of further service. LANDAU ASSOCIATES, INC. r\ Sean Gertz, EIT Senior Staff Geotechnical EIT SY/1- L�d Steven R. Wright, PE Principal SMG/SZW/rgm [\\E DM DATA01\PROJECTS\074\19 6\R\P E E R R EVI EW-TM. D0CXJ Geotechnical Peer Review Larsen Residence — 15729 75th pl W 3 April 30, 2018 IIENGINEERING February 26, 2018 Sharon Larsen 9832 Marine View Dr Mukilteo, WA 98275 civil & structural engineering & planning ECEWED MAR 0 1 Subject: Larsen Residence, 15729 751h Place, Edmonds, WA 98026 Structural Engineer Declaration, Job #17145 Dear Mrs. Larsen, DEVELOPMENT SERVICES COUNTER This letter is to inform you that our office has reviewed the geotechnical report from Nelson Geotechnical Associates, Inc. No. 999017 dated September 29, 2017, and understands its recommendations. The report indicates that the lot is in an area subject to landslide risk. It is impossible to guarantee future slope stability, regardless of how well it is investigated or engineered, and risks are always associated with construction in a known hazard area. Among these risks is the possibility of the loss or damage to your property and life, as well as the property and life of neighbors, public and private, due to soil failure. Because of the unpredictable nature and wet condition of soils, owners must assume the responsibility for risks of building and living in this known hazardous area. The reports, recommendations, opinions, designs, and specifications associated with this project are professional opinions only and are not to be construed as a warranty, expressed or implied, against loss or damage. DECLARATION STATEMENT To the best of our knowledge and understanding, the building plans submitted with the permit application substantially incorporate the above -mentioned reports' recommendations. We have reviewed the geotechnical reports, understand its recommendations, have explained to the owner the risk of loss due to slides on the site, and have incorporated into the design the recommendations of the report and established measures to reduce the potential risk of injury or damage that might be caused by any earth movement predicted in the report. Thank you, CG Engineering X* Dennis Titus, PE, SE Project Manager 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com L�_% RECERVED MAR 0 i 2613 DEVELOPNITNT SERVICES APPLICANT/OWNER LIABILITY & LANDSLIDE ACKNOWLEDGEMENf OUNTER Subject: Larsen Residence, 15729 75h Place W, Edmonds, WA 98026 This statement confirms that the accuracy of all permit submittal information is war -ranted by the applicant/owner (Sharon Larsen) in a form which relieves the City and its staff from any liability associated with reliance on such permit application submittals. My application may reference the reports of prior public consultants to the City; however all conclusions shall be those of me, Sharon Larsen, and my design professionals. Further, 1, Sharon Larsen, understand and accept the risk of developing in an area with potential unstable soils and understand the required temporary and permanent erosion control and site maintenance issues associated with specific geologic hazards or conditions of the site that may affect slope stability over time. I will advise, in writing, any prospective purchasers of the site, or any prospective lessees of structures on the site, of the slide potential and on -going maintenance issues of the area and on the property. STATE OF WASHINGTON COUNTY OF 6��heml'-A'h %5)14ZOA I Being first duly sworn, says: I am the owner/applicant or the representative for the above named; I have read the foregoing statement, know the contents thereof, and believe the same to be true. C' �11 Signature ofowne-k7applicant or representative SUBSCRIBED AND SWORN TO before me this g&�-day of 20 Signature - NOTARY PUBLIC in and for the State of Washin on NOTARY PUBUC 9t T STATE OF WASHINGTON PrintName: AA0J 0_AkAAex6-t(_ 7B�ETH ANN CAMPBELL My Appointment Expires Residingin AUGUST 25 2018 My commission expires: 08/,q�� 1A0)8- ENGINEERING February 26, 2018 Sharon Larsen 9832 Marine View Dr Mukilteo, WA 98275 civil & structural engineering & planning Subject: Larsen Residence, 15729 75h Place W, Edmonds, WA 98026 Lead Design Professional, Job #17145 Dear Mrs. Larsen, RECEIVED �,t,-�R 2 120 18 DEVELOPMENT SERVICES r- D COUN Ln This letter is to inform you that CG Engineering will act as the Lead Design Professional for your project throughout the permit process. As the lead design professional, we will act a liaison between the city and the other design professionals to incorporate their recommendations into the plans and submittal package. DECLARATION STATEMENT We have reviewed the geotechnical report from Nelson Geotechnical Associates, Inc. No. 999017 dated September 29, 2017, and understand its recommendations. To the best of our knowledge and understanding, we have incorporated these recommendations into the design to reduce the potential risk of injury or damage from earth movement predicted in the report. Thank you, CG Engineering Dennis Titus, PE, SE Project Manager -kSJS All of VV4& 45901 4- 7 L 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com 156TH STSW z r-4 t; I, 158TH ST SW > &L 00 ko Ln 160TH ST SW z C4 P 41 fn VICINITY MAP NTS, * = PROJECT SITE C 11-N omy MAR 0 12510 DEVELOPMENT SERVIICES COUNTER 02126118 LARSEN RESIDENCE FOUNDATION REPAIR 15729 75TH PL W EDMONDS, WA 98026 DATE 02/26/18 SHEET PROJECT NO. 17145.10 ENGINIEEIERING SCALE 250 4TH AVE. S., SUITE 200 EDMONDS , WASHINGTON 9BO20 PHONE (425) 778-8500 FAX (425) 778-55 3 6 TITLE SITE PLAN DRAWN BY JCP SO.4 CHECKED BY NAL APPROVED BY DMT PLOT DATE: 2/23/18 FILE NAME: SO.4 NELSON GEOTECHNICAL -9 f�� A AssociATEs, INC. NUA GEOTECHNICAL ENGINEERS & GEOLOGISTS Main Office rngineering-Geology Branch 17311 13.511 Ave NE, A-500 5520 Industry Unc, #Q Woodinville,WA 98072 RECEIVED East Wenatchee, WA 98802 (425) 486-1669, FAX (425) 481-25 10 (509) 665-7696 - FAX (509) 665-7692 MAR 2 12018 March 20, 2018 Carl and Sharon Larsen 9832 Marine View Drive Mukilteo, Washington 98275 OEVELOPMENT SERVICES COUNTER Geotechnical Plan Review and Hazard Identification/Declaration Letter Larsen Residence Foundation Repair 15729 — 75" Place West Edmonds, Washington NGA File No. 999017 Dear Mr. and Mrs. Larsen: This letter presents the results of our updated geotechnical engineering review of the plans for your residence project located at 15729 — 75h Place West in Edmonds, Washington. INTRODUCTION Project plans consist of underpinning the existing residence foundations and supporting associated basement slabs -on -grade and cantilevered portions of the upper floors on driven 2- and 3-inch pin piles. Lateral loads on the eastern portion of the structure are to be restrained by helical anchors. At this time, no additional development is planned within the property. We previously prepared a report for this property that included recommendations for underpinning support of the existing residence dated February 28, 2018. The site falls within "Zones B through D" of the North Edmonds Earth Subsidence and Landslide Hazard Area Report prepared by Landau Associates for the City of Edmonds. This designation requires that certain features be included (or excluded) in the design. Such features include the restriction of cuts and fills, the need for tightlining runoff into an approved system, the need to design foundations and retaining walls to withstand high lateral earth pressures and potential loss of soil beneath parts of the foundation, the need to vegetate slopes with deeply rooted drought -tolerant vegetation, and the elimination of any and all irrigation systems. We have addressed all of these requirements in our previous report. Geotechnical Plan Review Letter Larsen Residence Foundation Repair Edmonds, Washington NGA File No. 999017 March 20, 2018 Page 2 PLAN REVIEW AND CONCLUSIONS We have reviewed the geotechnical aspects of the most recent plans and found the plans to be in general compliance with our recommendations as presented in our previous geotechnical report. We understand that all construction will be perfon-ned within the exiting residence footprint. The entire residence structure and any new foundations are to be supported on 2- and 3-inch diameter driven pin piles. In our previous report, we did not provide load carrying capacities and driving criteria for 3-inch diameter pin piles. We recommend that the three-inch pipe piles be utilized and should be driven using a tractor - mounted hydraulic hammer, with an energy rating of at least 1,100 foot -lb. For this pile and hammer size, we recommend a design capacity of six tons for each pile driven to refusal. The refusal criterion for this pile and hammer size is defined as less than one -inch of movement during 15 seconds of continuous driving at a rate of 550 blows per minute or higher. We recommend using galvanized schedule 40 pipe for the 3-inch pin piles. Maintaining these recommendations for minimum hammer size and refusal criteria is essential for obtaining a successful outcome. Helical anchors are also going to be utilized to restrain lateral loads of the residence along the upper eastern side of the residence. The overall size and configuration of the anchor is to be determined by the contractor to achieve the design loads as specified on the plans. We recommend that NGA be retained to observe the installation of the pin piles and helical anchors on a full-time basis during construction. We understand that all stormwater runoff associated with this property is to be directed and tightlined to flow into the existing stormwater drainage system located within the southern portion of the property. We understand that this existing system ultimately flows out and discharges to the west of the property. Temporary erosion control measures such as silt fences along the downhill side of the residence are incorporated into the plans. In our opinion, the proposed temporary erosion control measures appear to be feasible. We do not anticipate significant excavations associated with the proposed development as most of the work will be within the existing residence footprint. Any disturbed soils remaining after the proposed development should be revegetated in accordance with our previous report. Permanent erosion control measures such as compost amended soils, ground cover, and permanent seeding and planting have also been incorporated into the plans. We recommend that all of our recommendations provided in our previous report, and this letter be strictly followed during construction. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Plan Review Letter NGA File No. 999017 Larsen Residence Foundation Repair March 20, 2018 Edmonds, Washington Page 3 As discussed in our previous report, this site and the overall site vicinity lie within a known ancient landslide area. The site and vicinity have been relatively stable for a very long period of time, and development in the area has taken place in the form of single-family residences, roads, parks, retaining walls and underground utilities. Although the likelihood of the ancient slide to become active in the foreseeable future is very low, extreme environmental conditions coupled with inadequate human practices could, in theory, re -activate the ancient landslide. Such external factors could include severe and prolonged weather events and/or significant seismic activity. With proper site drainage and maintenance of the drainage systems and protection of steep slopes, we would estimate that the probability of failure on the subject site is likely to be less than 30 percent in 25 years. The proposed residence improvements do not increase this potential. MINIMUM RISK STATEMENT Provided that the recommendations in this letter, the geotechnical report dated February 28, 2018 are followed during construction, the areas disturbed by construction should remain stable. Therefore, the risk of damage to the proposed development or to adjacent properties form soil instability should be minimal, and the proposed grading and development should not increase the potential for soil movement. CLOSURE We recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork activities comply with contract plans and specifications. � I NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Plan Review Letter Larsen Residence Foundation Repair Edmonds, Washington NGA File No. 999017 March 20, 2018 Page 4 We appreciate the opportunity to provide service to you on this project. Please contact us if you have any questions regarding this letter or require further information. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. Lee S. Bellah, LG Project Geologist Khaled M. Shawish, PE Principal LSB:KMS:dy NELSON GEOTECHNICAL ASSOCIATES, INC. RECEIVED 04 0 12018 DEVELOPMENT SERVICES COUNTER or --4f T North Edmonds --4 Earth Subsidence and Landslide Hazard Areas Map srre ij Leclen North Edmonds Earth Subsidence and 17. Landslide Hazard Area r —1 80020 B-1 and ECDC 19-10) (See ECDC 23 (Nota: Boundaries are the approximate extent of previous landsliding-, hazards are present J J. -4— adjacent to the landslide boundaries) 7T Steep Slope Areas� Slow of 401% or steeper and with a vertical refiet of ten (10) ft or more (See ECDC 23-80-020 B-2) 'W Minimum buffer equal to the height of the steep slope or 50 feet, whichever 41 J is greater (see ECDC 23.80.070 A.1) C2(The buffer she is the minimum buffer /1 adjacent to the —North Edmonds Subsidence and Landslide Hazard Area; a similar bee, would apply to steep sl F. ope areas, 77 but is not shown on this map for clarity) 4 7 k 2 ft Topographic Contour Vertical datum: NAVD88 :7 r F7 Parcel A 01 mapavdedbyL d�As—t�l (May 2M) A-d pb.w- City of Edmonds TW.g.pK—d —rdMp.bP..dk8dWkVd d Edmnd. (F�b�=y 27 2W51 tom UDAR dm: '27. 2WS) ;4 W Packet Item # 6 Pursuant to Edmonds Community Development Code Chapter 19.10 sites designated within or near the North Edmonds Earth Subsidence and Landslide Hazard Area shall be designated on this map which indicates areas of earth subsidence and landslide hazards in excess of normal allowances. In order to designate the subject project development site locaied at -T 7-1 PI VV Edmonds, Washington, the following maps, surveys or other noted itemsbelow were used: Geotechnical Report Prepared by Aswe-,Je-5, Ine— Land Survey Prepared by "I certify under penalty of perjury that the site location designation has been made to the best of my knowledge and belief, following an investigation of all information and documentation -in my possession� as well as reasonably obtainable information in the possession of others, including public agencies. Any information which would tend to designate a differing location for the site is attached as a part ofmy designation as well as all information upon which I reasonably relied." SitePlottedby Date. ;�/Z'61ht S �d Date th i, /I it igni Title .T ED File No:. Citp of V'F1bM011b'q Applicant: 9 Affidavit of Earth Subsidence Landslide Hazard Area Pennit 4kate of lVagbington ) 150. countp of offobomWb being first duly swom, on oath, deposes and says: That on the the site located at ,21'L& 0 day of 20jJ 1�5'72 I 1-6-4t- A _QA L Id.) , Lq, --�, �IA ftDo was posted as prescribed by Ordinance No. 3632 on the subject property. This posting begins on on the day the City accepts the Permit Application for review and shall remain until building occupancy is granted Signed:_-'O/� Signed: Subscribed and sworn to before me this A&tay of &&LZ49(4 20J-9. NOTARY PUBUC z STATE OF WASHINGTON P -inted Name- A�Q)J fi-402P ,6L- L BETH ANN CAMPBELL My Appointment Expires "Is otary Public in and for the State of Washington, residing at AUGUST 25,'2018 WA Mycommissionexpires: ORIA-"�-IAO)k -- Packet Iten! # 16 13 NELSON GEOTECHNICAL N I f�! A AssociATEs, INC. GA GEOTECHNICAL ENGINEERS & GEoLoGISTS Main Office Engineering-Gcology Branch 17311 — 135" Ave NE, A-500 5526 Industry Lane, #2 Woodinville, WA 98072 East Wenatchee, WA 98802 (425) 486-1669 - FAX (425) 481-25 10 (509) 665-7696, FAX (509) 665-7692 July 25, 2018 Carl and Sharon Larsen 9832 Marine View Drive Mukilteo, Washington 98275 Geotechnical Plan Review and Comment Response Letter Larsen Residence Foundation Repair 15729 — 75" Place West Edmonds, Washington NGA File No. 999017 Dear Mr. and Mrs. Larsen: This letter presents the results of our updated geotechnical engineering review of the plans and comment response for your residence underpinning project located at 15729 — 75' Place West in Edmonds, Washington. INTRODUCTION We previously prepared a report for this property that included recommendations for underpinning support of the existing residence dated February 28, 2018 and a plan review letter for the proposed improvements dated March 20, 2018. Project plans consist of underpinning the existing residence foundations and supporting associated basement slabs -on -grade and cantilevered portions of the upper floors on driven 2- and 3-inch pin piles. Lateral loads on the eastern portion of the structure are to be restrained by helical anchors. At this time, no additional development is planned within the property. The site falls within "Zones B through D" of the North Edmonds Earth Subsidence and Landslide Hazard Area Report prepared by Landau Associates for the City of Edmonds. This designation requires that certain features be included (or excluded) in the design. Such features include the restriction of cuts and fills, the need for tightlining runoff into an approved system, the need to design foundations and retaining walls to withstand high lateral earth pressures and potential loss of soil beneath parts of the foundation, the need to vegetate slopes with deeply rooted drought -tolerant vegetation, and the elimination of any and all irrigation systems. We have addressed all of these requireme 1;3)iF* n previous report. JUL 2 b 2018 BUNWNG DEPARTM, �ENT D -2 0 1 OFEDMONDS Geotechnical Plan Review and Peer Review Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair July 25, 2018 Edmonds, Washington Page 2 PLAN REVIEW AND CONCLUSIONS We have reviewed the geotechnical aspects of the most recent plans and found the plans to be in general compliance with our recommendations as presented in our previous geotechnical report. We understand that all construction will be performed within the exiting residence footprint. The entire residence structure and any new foundations are to be supported on 2- and 3-inch diameter driven pin piles. Helical anchors are also going to be utilized to restrain lateral loads of the residence along the upper eastern side of the residence. The overall size and configuration of the anchor is to be determined by the contractor to achieve the design loads as specified on the plans. We recommend that NGA be retained to observe the installation of the pin piles and helical anchors on a full-time basis during construction. We understand that all stormwater runoff associated with this property is to be directed and tightlined to flow into the existing stormwater drainage system located within the southern portion of the property. We understand that this existing system ultimately flows out and discharges to the west of the property. Temporary erosion control measures such as silt fences along the downhill side of the residence are incorporated into the plans. In our opinion, the proposed temporary erosion control measures appear to be feasible. We do not anticipate significant excavations associated with the proposed stabilization of the residence as most of the work will be within the existing residence footprint. Any disturbed soils remaining after the proposed development should be revegetated in accordance with our previous report. Permanent erosion control measures such as compost amended soils, ground cover, and permanent seeding and planting have also been incorporated into the plans. The proposed stabilization is intended to support the existing residence structure and should not adversely impact or decrease the existing stability of the steep slope areas, neighboring properties, or critical areas; and is in compliance with the City of Edmonds Codes 23.80.060 and 23.80.070, provided our recommendations are incorporated into the proposed plans and followed during construction. We recommend that all of our recommendations provided in our previous report and letter, and this letter be strictly followed during construction. LANDAU PEER REVIEW COMMENTS AND OUR RESPONSES As a part of the City of Edmonds review of this project, Landau Associates performed a peer review of the proposed project and our previous geotechnical report in accordance with Edmonds Community Development Code Chapter 19.10. Landau Associates comments and opinions were presented in a technical memorandum dated April 30, 2018. In the following section, we summarize the relevant geotechnical concerns raised by Landau Associates, followed by our response. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Plan Review and Peer Review Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair July 25, 2018 Edmonds, Washington Page 3 Comment 1: The vicinity map does not identify existing conditions such as known landslide masses, debris flows, or mudflows on or near the site. Response: The known historical landslide area has been shown on the most recent plans generated by CG Engineering. We were unable to find documentation on any known debris flows or mud flows within the immediate vicinity of the property. Comment 4: The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not provide analysis of the rate of retreat of the bluff nor an estimate of the percent risk of landslide area expansion that recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event, as required in ECDC 19.10.030(H.6) andECDC 23.80.050(F.2.e). Response: As discussed in our previous report, this site and the overall site vicinity lie within a known ancient landslide area. The site and vicinity have been relatively stable for a very long period of time, and development in the area has taken place in the forrn of single-family residences, roads, parks, retaining walls and underground utilities. Although the likelihood of the ancient slide to become active in the foreseeable future is very low, extreme environmental conditions coupled with inadequate human practices could, in theory, re -activate the ancient landslide. Such external factors could include severe and prolonged weather events and/or significant seismic activity. With proper site drainage and maintenance of the drainage systems and protection of steep slopes, we would estimate that the probability of failure on the subject site is likely to be less than 3 10 percent in 25 years. The proposed improvements do not increase this potential. As we did not observe any indications of recent significant erosion or landsliding within the property, we estimate that rate of retreat of the bluff and slopes within the site is on the order of approximately one inch per year or less. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Plan Review and Peer Review Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair July 25, 2018 Edmonds, Washington Page 4 Comment 5: The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not describe public andprivate sewage disposal systems, as required in ECDC 23.80.050(F.2.c). Response: Based on review of the City of Edmonds GIS website and our site observations, existing stormwater and sewer utility pipelines extend down the steep slope area from the upper eastern portion of the site and then travel along the southern edge of the property and ultimately into the main utility lines within 75' Place West immediately west of the subject property. Sewer from the existing residence is already directed to flow into the existing sewer line. All stormwater associated with the existing residence is also proposed to be directed to flow into the existing stormwater pipe. Comment 6: The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not consider the run -out hazard of landslide debris andlor the impacts of landslide run -out on downslope properties, as required in ECDC 23.80.050(F.2.fi. Response: Due to the gently sloping nature of the lower western and central portions of the property along with the fact that approximately 300 feet of level ground is located between the base of the steep west -facing slope within the eastern portion of the property and any down slope properties, it is our opinion that potential adverse impacts to downslope properties as a result of landslide debris runout is low. It is also our opinion that the proposed development does not increase this potential. Comment 7: The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not adequately assess the stability of the slope, as required in ECDC 23.80.050(F.2.g). The geotechnical engineer should confirm the stability of the slope through modeling or numerical analysis and present the results in the geotechnical report. Response: The site slope within the proposed development area was analyzed for stability along Cross Sections A- A' for the existing conditions using the computer program Slope[W, by Geo-Slope International. Slope/W is a two-dimensional, limit equilibrium slope stability program that generates random potential failure surfaces or specific failure surfaces and determines their corresponding factors of safety with respect to failure. By generating a large number of random surfaces, a critical failure surface with the minimum factor of safety can be identified. NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Plan Review and Peer Review Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair July 25, 2018 Edmonds, Washington Page 5 The slope stability analyses were performed using information gathered from the field explorations and soil properties were assigned to the soil layers to reasonably reflect their engineering characteristics. Stability analyses were performed localized to the areas along the cross section. Stability analyses were performed for non-seisn-& and seismic conditions for the existing conditions. Stability analyses were not perfonned for the proposed conditions as the proposed stabilization measures will be confined to the existing building footprint. A peak ground acceleration of 0.20g was used in the seismic analyses. The soil parameters used in our analyses, along with the results of the analyses, are presented in Figures I and 2. The critical slip surfaces for this case achieved factors of safety greater than or equal to 1.53 and 1. 12 for the static and seismic cases, respectively indicating relatively stable conditions. It is also our opinion that the proposed stabilization measures for the residence do not reduce the overall factor of safety from the existing site conditions that are present with the site. MINIMUM RISK STATEMENT Provided that the recommendations in this letter, the geotechnical report dated February 28, 2018, the letter dated March 12, 2018 and this letter are followed during construction, the areas disturbed by construction should remain stable. Therefore, the risk of damage to the proposed development or to adjacent properties form soil instability should be minimal, and the proposed grading and development should not increase the potential for soil movement. CLOSURE We recommend that NGA be retained to provide monitoring and consultation services during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes should the conditions revealed during the work differ from those anticipated, and to evaluate whether or not earthwork activities comply with contract plans and specifications. nersire NELSON GEOTECHNICAL ASSOCIATES, INC. Geotechnical Plan Review and Peer Review Comment Response Letter NGA File No. 999017 Larsen Residence Foundation Repair July 25, 20 18 Edmonds, Washington Page 6 We appreciate the opportunity to provide service to you on this project. Please contact us if you have any questions regarding this letter or require further information. Sincerely, NELSON GEOTECHNICAL ASSOCIATES, INC. e 0i VV as hi Nob 0 1 2883 A Lee S. Bellah, LG Project Geologist Khaled M. Shawish, PE Principal LSB:KMS:dy Two Figures Attached NELSON GEOTECHNICAL ASSOCIATES, INC. -';' Slope Stability Analysis- Cross Section A -A' Exisitng Static Conditions 0. 71 (0 T Cc - (0 0 CD Morgenstern -Price most critical surface with minimum FOS 1.53 C> z (D C: 3 0- CD C/) (n (D 5- Cn -0 CD (D CD Glacial Till/Advance Outwash 0 5' Ln. -5 CL Internal Friction Angle: 36' > ID Moist Unit Weight: 130pcf CD 53 Cohesion: 0 psf > M C a ID 210 210 Ln. (a 2. cn 190 190 170 150 75th Ave SW 170 150 Z MO z 4- Existing m 130 Residence 130 110 110 > z 0 0 r rFj M co 90 — 90 z > r > Whidbey Formation > 0 (n W 0 Q) i1j 70 — andslide Deposits Internal Friction Angle: 32' — 70 -T in 0 Z Internal Friction Angle: 28* Moist Unit Weight: 120 pcf W 2 L 50 — Moist Unit Weight: 110 pcf Cohesion: 1000 psf — 50 2 > M -4 0 30 Cohesion: 0 psf Critical Slip Surface 30 M -1 U) M 1H rq 0 10 10 0 IT I 39" (n 0 -10 10 k— g -4 > -20 0 10 20 30 40 50 60 70 80 90 110 130 150 170 190 210 230 250 270 290 310 330 350 370 390 410 430 450 470 490 510 530 550 570 r Distance (Feet) P 0 X 12- 5, (D < 9L Y), 0 Cn M NOTES: Not to scale 0 cn Elevations are Approximate -n CD jo 0�w " Slope Stability Analysis- Cross Section A-AExisitng Seismic Conditions 12. co CD (0 0 (0 Morgenstern -Price most critical surface with minimum FOS = 1.12 CD z r - - --- with- a -seismic coefficient f-grcyund-a�acele-ration----O-.-20g— ­4 3 [ 1 Cn Cn (n (D CD > M CD > X. C CL :3 CD Cc - (n VV Cn 2.2. (n M 3.(Q M 0 z z > r z M M� z > r in (1) (P 0 M 0 Z 2 , in > M -4 0 M -j 0 r 0 n > (n r z Z! 9L 0 150 — 75th Ave SW — 150 Existing Q) 0) 130 — Residence — 130 LL LL 110 — — 110 C: 0 .0 co 90 — z7v Z5 > Whidbey Formation > Q) 70 — Landslide Deposits Internal Friction Angle: 32* — 70 LU Internal Friction Angle: 28' Moist Unit Weight: 120 pcf LU LL Moist Unit Weight: 110 pcf Cohesion: 1000 psf 50 — 0 — 50 Cohesion: 0 psf 30 — Critical Slip Surface _ 30 10 — — 10 -10 LL 11 -10 -20 0 102030405060708090 110 130 150 170 190 210 230 250 270 290 310 330 350 370 390 410 430 450 470 490 510 530 550 570 Distance (Feet) NOTES: Not to scale Elevations are Approximate ENGINEERING 250 4th Ave S Ste 200 Edmonds, WA 98020 Phone: (425) 778-8500 Fax: (425) 778-5536 civil &structural engineering & planning aECEPIED IT6 ttm., 0 1- t i D�V�Lopvv.a SERNAGES CoUNTER STRUCTURAL CALCULATIONS Larser Residence Foundation Repair 2832 Marine View Drive Mukilteo, WA 98275 0310112018 CG Project No.: 17145.10 Proiect Location 9832 Marine View Drive Mukilteo, WA 98275 Proiect Description This project involves a two-story wood framed home. The owner is interested in adding a third story to a section of the house and removing some wall section. New beams and posts along with new footings will be designed to support the existing and proposed loads. 3" diameter piles will be installed under the existing and proposed footings to acheive proper bearing capacity. Scope of Work Provide structural calculations and drawings in accordance with current building code. Basis of Design Dead Loads Roof 15 psf Floor 12 psf Live Loads Floor 40 psf Snow 25 psf Piling Criteria 3" diameter pin piles with 12,000 lb capacity to be used (per Nelson Geotechnical Associates, Inc) Description By NAL Date 1/19/2018 Checked Date Project Summary ENGINEERING Scale NTS Sheet No. 250 4th Ave South Project Job No. Suite 200 Edmonds, WA 98020 Larsen Residence 17145.10 Gravity loadin Dead Load: Roof - Roofing (asphalt shingles) 2.5 psf 1/2" sheathing 1.6 trusses @24" oc 2.9 Ceiling (Ilayer5/8" gyp) 2.8 Insulation 1.2 Misc. 1.5 MEP 1.0 Total 13.5 psf ig' es-F Floor: Flooring 2.0 psf 3/4" ply 2.3 2xlO@16"o.c. 2.8 Insulation 1.2 Misc. 1.5 ITotal 9.8 p S f V rV 17- '0 v Ir Exterior Walls: 96 plf Interior Walls: 64 plf Snow Load: 25 psf Floor Live Load: Living Space 40 psf CMDescription ENGINEERING Gravity loads By NAL Date 10/18/17 Checked Date Scale SheetNo. 250 4th Ave South Suite 200 Project Larsen Residence Job No. 17145.10 Edmonds, WA 98020 eah + ib2f -is nv t" S, 'D SL (.� (60, 31I.q (55,7"4- q'ss + 4;60 SL `4 -', vv OL LL T7 u,9" Ll z 5 -96o el b-- 110 1- 0 '53 + Llglg pjr) A 'Z 00h zgh -t ni 11 ICE OIJ-098 + vU.] (-Jl,p gob 4 1,11) 1-7 nq did 0, Zq *aQ, :j I i O'lh 4 5-zh -S g-S) 1'.) 0 W-7 r,97,h + L z �s -II Is. Inq b V 4 t %1 0011) UIJ Qlh f 5-112 k:jlj O-m- +Olt) n� -%a oyz + + QSX) C -P o ',a,g & 53-110 c 8) 3 - I I >a 9 _S 7 r.->o ao, 5 & �Jjd 4 e'zh) n, ns ne �(C,,'AV 1T L-6 Di 1 . . . ..... . .............. ... . ....... . .. . ........... . ............... Hr --4/ . .. . ...... IF L 10;4 1 �1111- p4) . . . .......... ........... . ...... . ..... ...... ......... .. ........... ............... . ............... b Taws IT. . . . . ... ...... Ls to ............... ............... . .. ..... .. . .. . . . ............... ...... . .......... . ... ............ .......... . . ......... ............. .................. ....... ......... .......... .... ....... ...... ... . .......... . .............. -4— ......... .. ..... . . ..... . ........... ... ....... ........... ...... ... . ........... ... ..... . .... .... ------ ......... . ................. ......... . .... 00 x (12-1 pc 12, .. . ........ ...... ...... .. ....... . . . . . . ...... . ............ ......... . .. . ............... ...... .............. .... . . . . ....... . ........... . .... ................ . .... . . ....... .. ............. . .. . ..... L.-.- Sri! Gr-WoCA IXG ........... ... ....... . ........ t ................... ...... .. . . . . ... . .. I ................. ... ........ ........ ... —7 ....... ...... - - - ------ J1501 .............. ..... ........ . .. ................. ............ . ........ — . . . . . ....... ................. .......... ........ . ......... 1-77F —1 LL lei .......... . .... . . .. . .. . ......... . ... . ....... .. ......... . ... . ... . .......... . ....... 4 ..... . . ........ ........ ............. ................. . . . ........... . ............ ....... . ................. ............. . Title Block Line I You can change this area using the'Seffings' menu item and then using the 'Printing & Title Block" selection. Project Title: Engineer: Project Descr: Project ID: Title Block Line 6 Printed: 17 JAN 2018,10:22AM File = R,\_2017 Prqects\17145 Larsen Residence\_StructuraPEngineedng\Larsen_Key-Plan.ec6 General Beam Analysis ENERCALC, INC. 1983-2017, Build:10.17.8.29,Ver.10.17.8.29 Description : Wwall-2 General Beam Properties Elastic Modulus 29,000.0 ks! Span #1 Span Length = 13.0 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A 4 Span #2 Span Length = 26.0 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A 4 D(O.120,0.0) ID(0.0,0.120)t, XP -X- - - - Span 13.0 ft Span 26.0 ft . ............ . . Applied Loads Service loads entered. Load Factors will be applied for calculations. Loads on all spans. Uniform Load on ALL spans: D = 0.0960 k/ft, Tributary Width = 1.0 ft Varyinq Uniform Load: D(S,E) = 0.0-4.120 k/ft, Extent = 0.0 ->> 19.50 ft Varyinq Uniform Load : D(S,E) = 0.120-4.0 k/ft, Extent = 19.50 ->> 39.0 ft DESIGN SUMMARY Maximum Bending 10. 883 k-ft Maximum Shear= 2.815 k Load Combination +D+H Load Combination +D+H Location of maximum on span 13.000ft Location of maximum on span 13.000 ft Span # where maximum occurs Span # I Span # where maximum occurs Span # 1 Maximum Deflection Max Downward Transient Deflection 0.000 in 0 Max Upward Transient Deflection 0.000 in 0 Max Downward Total Deflection 0.341 in 915 Max Upward Total Deflection -0.042 in 3730 Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Support 1 Support 2 Support 3 Overall MAXimum -0.040 4.623 1.501 Overall MINimum -0.024 2.774 0.901 +D+H -0.040 4.623 1.501 +D+L+H -0.040 4.623 A501 +D+Lr+H -0.040 4.623 1.501 +D+S+H -0.040 4.623 1.501 +D+0.750Lr+0.750L+H -0.040 4.623 1.501 +D+0.750L-+0.750S+H -0.040 4.623 1.501 +D+0.60W+H -0.040 4.623 1.501 +0+0.70E+H -0.040 4.623 1.501 +D+0.750Lr-fO.750L+0.450W+H -0.040 4.623 1.501 +D40.750L+0.750S+0.450W+H -0.040 4.623 1.501 +D+0.750L+0.750S+0.5250E+H -0.040 4.623 1.501 +0.60D+0.60W+0,60H -0.024 2.774 0.901 +0.60D+0.70E+0.60H -0.024 2.774 0,901 D Only -0.040 4.623 1.501 Lr Only L Only S Only W Only E Only H Only Title Block Line I Project Title: 'You can change this area using the "Seftings" menu item Engineer: Proiect ID: Project Descr: and then using the 'Printing & Title Block' selection. Title Block Line 6 Pdnted: 17 JAN 2018,10:26AM General Beam Analysis File = R-�_2017 ProjectsN17145 Larsen ResidenceUtructureAEngineedngkLarsen-Key-Plan.ec6 ENERCALC, INC. 1983-2017, Build:10.17.8.29,Ver.10.17.8.29 Description : Bi General Beam Properties Elastic Modulus 29,000.0 ksi Span #1 Span Length = 3.750 ft Area = 10.0 in42 Moment of inertia = 100.0 in A 4 Span #2 Span Length = 7.0 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A 4 Span #3 Span Length = 3.750 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A4 D(O.162g� L(O.540) --X 104 Span = 3.750 ft Span = 7.0 ft Span = 3.750 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Loads on all spans. Uniform Load on ALL spans: D=0,1620, L=0,540k/ft, Tributary Width= 1.0ft DESIGN SUMMARY Maximum Bending 2.437 k-ft Maximum Shear = 2.457 lk Load Combination +D+L+H Load Combination +D+L+H Location of maximum on span 3.750ft Location of maximum on span 3.750 ft Span # where maximum occurs Span # 1 Span # where maximum occurs Span # I Maximum Deflection Max Downward Transient Deflection 0.003 in 25851 Max Upward Transient Deflection 0.000 in 0 Max Downward Total Deflection 0.004 in 19885 Max Upward Total Deflection -0-000 in 121331 Vertical Reactions Supportnotation : Farleftis#1 Values in KIPS Load Combination Support 1 Support 2 Support 3 Support 4 Overall MAXimurn 0.666 4.423 4.423 0.666 Overall MINimurn 0.092 0.612 0.612 0.092 +D+H 0.154 1.021 1.021 0.154 +D+L+H 0.666 4.423 4.423 0.666 +D+Lr+H 0.154 1.021 1.021 0.154 +D+S+H 0.154 1.021 1.021 0.154 +D40.750Lr-PO.750L+H 0.538 3.572 3.572 0.538 +D+0.750L+0.750S+H 0.538 3.572 3.572 0.538 +D+0.60W+H 0.154 1,021 1.021 0.154 +D+0.70E+H 0.154 1.021 1.021 0.154 +D+0.750Lr+0.750L+0.450W+H 0.538 3.572 3.572 0.538 +D+0.750L+0.750S+0.450W+H 0.538 3,572 3.572 0.538 +D+0.750L+0.75OS-fO.5250E+H 0.538 3.572 3.572 0.538 +0.60D+0.60W+0.60H 0.092 0.612 0.612 0.092 +0.60D+0.70E+0.60H 0.092 0.612 0.612 0.092 D Only 0.154 1.021 1.021 0.154 Lr Only L Only 0.513 3.402 3.402 0.513 S Only W Only E Only H Only 17 CHgr-ioL. C-xl-.T' Foo'T 10 r, .. . ........ . . ..... . ............. ...... . ............. .. . ......... ..... LL -s7- pluss 31"4 o C..L Lj i 5"�Lo PIV . . ....... .. ... . . . . ..... ... . .. ..................... . . ...... . . . ......... Ft 51 f, . . .......... .... ... .... . ..... . .. . ...... . ...... ............. Title Block Line 1 Project Title: You can change this area Engineer: Project ID: using the "Settings" menu item Project Descr: and then using the "Printing & Title Block" selection. Title Block Line 6 Printed: 17 JAN 2018,11:24AM General Beam Analysis File = R-L2017 ProjeclsA17145 Larsen Residence\-Strucbjrdftineedng\Larsen 01.17.18.ec6 ENERCALC, INC. 1983-2017, Build:10.17.8.29, Ver.10.17.8.29 Description : (9) plies @ 3'6" OC General Beam Properties Elastic Modulus 29,000.0 ksi Span #1 Span Length = 3.50 ft Area = 10.0 in A 2 Moment of Inertia = 1 OQ.0 inA4 Span #2 Span Length = 3.50 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 inA4 Span #3 Span Length = 3.50 ft Area = 10.0 in A2 Moment of Inertia = 100.0 in A 4 Span #4 Span Length = 3.50 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A4 Span #5 Span Length = 3.50 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A 4 Span #6 Span Length = 3.50 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A 4 Span #7 Span Length = 3.50 ft Area = 10.0 in A2 Moment of Inertia = 100.0 in A4 Span #8 Span Length = 3.50 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A4 00.232�1-(l 520) X� - X- X IX b-C I- X DO ,4 014 e4 04 4 Span 3.50 Ift Span = 3.50 ft Span = 3.50 ft Span = 3.50 ft Span = 3.50 ft Span 3.50 ft Span = 3.50 ft Span = 3.50 lit Applied Loads Service loads entered. Load Factors will be applied for calculations. Loads on all spans. Uniform Load on ALL spans : D = 1.232, L = 1.520 k/ft, Tributary Width = 1.0 ft DESIGN SUMMARY Maximum Bending 3.562 k-ft Maximum Shear = 5.834 k Load Combination +D+L+H Load Combination +D+L+H Location of maximum on span 3.500ft Location of maximum on span 3.500 ft Span # where maximum occurs Span # 1 Span # where maximum occurs Span # 7 Maximum Deflection Max Downward Transient Deflection 0.000 in 0 Max Upward Transient Deflection 0.000 in 0 Max Downward Total Deflection 0.002 in 25109 Max Upward Total Deflection -0.000 in 584066 Vertical Reactions Support notation Far left is #1 Values in KIPS Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Support 7 Support 8 Support 9 Overall MAXlmum 3.798 10.923 9.284 9,731 9,582 9.731 9.284 10.923 3.798 Overall MINImum 1.020 2.934 2.494 2.614 2.574 2.614 2.494 2.934 1.020 +D+H 1.700 4,890 4.156 4,356 4.290 4.356 4.156 4.890 1.700 +D+L+H 3.798 10,923 9.284 9.731 9.582 9.731 9.284 10.923 3.798 +D+Lr+H 1.700 4.890 4.156 4.356 4.290 4.356 4.156 4.890 1.700 +D+S+H 1.700 4.890 4.156 4.356 4.290 4.356 4.156 4.890 1.700 +D+0.750Lr+0.750L+H 3.274 9.415 8.002 8.388 8,259 8.388 8.002 9.415 3.274 +D+0.750l--�0.750S+H 3.274 9.415 8.002 8.388 8.259 8.388 8.002 9.415 3.274 +D+0.60W+H 1.700 4.890 4.156 4.356 4.290 4.356 4.156 4.890 1.700 +D+0.70E+H 1.700 4.890 4.156 4.356 4.290 4.356 4.156 4.890 1.700 +D+0.750Lr+0.750L+0.450W+H 3.274 9.415 8.002 8.388 8.259 8.388 8,002 9.415 3.274 +D+0.750L+0.750S+0.450W+H 3,274 9.415 8.002 8.388 8.259 8.388 8.002 9.415 3.274 -H)+0.750L+0.750S+0.5250E+H 3.274 9.415 8.002 8.388 8.259 8.388 8.002 9.415 3.274 +0.60D+0.60W+0.60H 1.020 2,934 2.494 2.614 2.574 2.614 2.494 2.934 1.020 +0.60D+0.70E+0.60H 1.020 2.934 2.494 2.614 2.574 2.614 2.494 2.934 1.020 D Only 1700 4.890 4.156 4.356 4.290 4.356 4.156 4.890 1.700 Lr Only L Only Z098 6.033 5.128 5.375 5.293 5.375 5.128 6.033 2.098 S Only W Only E Only H Only Title Block Line I Project Title: -You can change this area Engineer: Project ID: using the'Settings" menu item Project Descr: and then using the 'Printing & Title Block" selection, Title Block Line 6 Pdnted: 17 JAN 2018,11:46AM File = R-�_20117 ProiecM17145 Larsen Residence\-StructurdEn�irteedngU-men 01.17.18.ec6 General Beam Analysis ENERCALC, INC. 1983-2017, Build:10.17.8.29, Ver.10.17.8.29 Description : (8) piles @ 6'0' OC General Beam Properties Elastic Modulus 29,000.0 ksi Span #1 Span Length = 6.0 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A 4 Span #2 Span Length = 6.0 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A 4 Span #3 Span Length = 6.0 ft Area = 10.0 in A2 Moment of Inertia = 100.0 in A 4 Span #4 Span Length = 6.0 ft Area = 10.0 lnA2 Moment of Inertia = 100.0 in A4 Span #5 Span Length = 6.0 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A 4 Span #6 Span Length = 6.0 ft Area = 10.0 in A2 Moment of Inertia = 100.0 inA4 Span #7 Span Length = 6.0 ft Area = 10.0 in A 2 Moment of Inertia = 100.0 in A4 D(1.139�L(0.620) _X_ X, X X_ X Span = 6�O ft Span = 6.0 ft Span = 6.0 ft Span 6.0 ft Span 6�O ft Span = 6,0 ft Span = 6.0 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Loads on all spans. Uniform Load on ALL spans: D = 1,139, L = 0.620 0, Tributary Width = 1 �O ft DESIGN SUMMARY Maximum Bending 6.689 k-ft Maximum Shear= 6.392 k Load Combination +D+L+H Load Combination +D+L+H Location of maximum on span 6.000ft Location of maximum on span 6.000 ft Span # where maximum occurs Span # 1 Span # where maximum occurs Span # 1 Maximum Deflection Max Downward Transient Deflection 0.003 in 22115 Max Upward Transient Deflection 0.000 in 0 Max Downward Total Deflection 0.009 in 7795 Max Upward Total Deflection -0-000 in 180722 Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Support 1 Support 2 Support 3 Support 4 Support 5 Support 6 Support 7 Support 8 Overall MAXimurn 4.162 11.966 10.182 10.628 10.628 10.182 11.966 4.162 Overall MINImurn 1.467 4.218 3.589 3.746 3.746 3.589 4.218 1.467 +D+H 2.695 7.748 6.593 6.882 6.882 6.593 7.748 2.695 +D+L+H 4.162 11.966 10.182 10.628 10.628 10.182 11.966 4.162 +D+Lr+H 2.695 7.748 6.593 6.882 6.882 6.593 7.748 2.695 +D+S+H 2,695 7.748 6,593 6.882 6.882 6.593 7.748 2.695 +D+0.75OLr+0.750L+H 3.795 10.912 9,285 9.692 9.692 9.285 10.912 3.795 +D+0.750L+0.750S+H 3.795 10,912 9.285 9.692 9.692 9.285 10,912 3.795 +D+0.60W+H 2,695 7.748 6,593 6.882 6.882 6.593 7.748 2.695 +D+0.70E+H 2.695 7.748 6.593 6.882 6.882 6.593 7,748 2.695 +D-t0.750Lr-�0.750L+0.450W+H 3.795 10.912 9.285 9.692 9.692 9.285 10.912 3,795 +D+0.750L+0.75OS-�0.450W+H 3.795 10.912 9.285 9.692 9.692 9.285 10.912 3.795 +D-4750L+0.750S+0.5250E+H 3.795 10.912 9.285 9.692 9.692 9.285 10.912 3,795 +0301)+0.13OW-i�.60H 1.617 4.649 3.956 4.129 4.129 3.956 4.649 1.617 40.60D+0.70E+0.60H 1.617 4.649 3.956 4.129 4,129 3.956 4.649 1.617 D Only 2.695 7.748 6.593 6.882 6,882 6.593 7.748 2.695 Lr Only L Only 1.467 4.218 3.589 3.746 3.746 3.589 4.218 1.467 S Only W Only E Only H Only Title Block Line I Project Title: You can change this area Engineer: Proiect ID: using the "Settings' menu item Project Descr: and then using the "Printing & Title Block' selection, Title Block Line 6 Printed: 17 JAN 2018, 3:09PM File = R`L2017 Projects117145 Larsen Residence�_StructuraREngineeOngILarsen 01.17.18.ed General Beam Analysis ENERCALC, INC. 1983-2017, Build:10.17.8.29,VerlO.17.8.29 Description : (6) plies @ T6' OC General Beam Properties Elastic Modulus 29,000.0 ksi Span #1 Span Length = 7.50 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A4 Span #2 Span Length = 7.50 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A 4 Span #3 Span Length = 7.50 ft Area = 10.0 inA2 Moment of Inertia = 100.0 in A4 Span #4 Span Length = 7.50 ft Area = 10.0 in A2 Moment of Inertia = 100.0 in A4 Span #5 Span Length = 7.50 ft Area = 10.0 in A2 Moment of Inertia = 100.0 in A4 D(O.90) X- -X- X Span T50 ff Span 7-50 ft Span 7.50 ft Span = 7.50 ft Span = 7.50 ft Applied Loads Service loads entered. Load Factors will be applied for calculations. Loads on all spans... Uniform Load on ALL spans : D = 0.90 k/ft, Tributary Width = 1.0 ft DESIGN SUMMARY Maximum Bending 5.329 k-ft Maximum Shear = 4.086 k Load Combination +D+H Load Combination +D+H Location of maximum on span 7.500ft Location of maximum on span 7.500 ft Span # where maximum occurs Span # 1 Span # where maximum occurs Span # 4 Maximum Deflection Max Downward Transient Deflection 0.000 in 0 Max Upward Transient Deflection 0.000 in 0 Max Downward Total Deflection 0.012 in 7774 Max Upward Total Deflection -0.001 in 174363 Vertical Reactions Support notation : Far left is #1 Values in KIPS Load Combination Support I Support 2 Support 3 Support 4 Support 5 Support 6 Overall MAXimum 2.664 7.638 6.572 6.572 7.638 2.664 Overall MINimurn 1.599 4.583 3.943 3.943 4.583 1.599 +D+H 2.664 7.638 6,572 6.572 7.638 2.664 +D+L+H 2,664 7.638 6.572 6.572 7.638 2,664 +D+Lr+H 2.664 7.638 6.572 6.572 7.638 2.664 +D+S+H 2.664 7.638 6.572 6.572 7,638 2.664 +D+0.750Lr+0.750L+H 2.664 7.638 6.572 6.572 7,638 Z664 +D+0.750L+0.750S+H 2.664 7.638 6.572 6.572 7,638 2.664 +D+0,60W+H 2.664 7.638 6.572 6.572 7,638 2.664 +D+0.70E+H 2.664 7,638 6.572 6.572 7.638 2.664 +D+0,75OLr+0.750L+0.450W+H Z664 7.638 6.572 6.572 7.638 2.664 +D+0.750L+0.750S+0.450W+H 2,664 7.638 6.572 6.572 7.638 2.664 +D+0.750L+0.750S+0.5250E+H 2.664 7.638 6.572 6.572 7.638 2.664 +0.60D+0.60W+0.60H 1.599 4.583 3.943 3.943 4.583 1.599 +0.60D+0.70E+0.60H 1.599 4.583 3.943 3.943 4.583 1.599 D Only 2.664 7.638 6.572 6.572 T638 2.664 Lr Only L Only S Only W Only E Only H Only �s C . . . .......... ....... .. ................ T ........ ... .... . ......... . 77 . . ... . .. .................... . ...... 15"- 1, 9 Il) i .1". sagr .......... 2.1 1 f - z5b C) I psi . .. . .. . ..... . ........... --- 72 ... ................ ... . .... . ........ . ..... ...... . ... 40 . . ......... ............. ........... . ..... . ............ ........ .... ........ ..... + .... . .. . ... . .............. . ..... ..... ........ . ..... .......... . ... ....... ..... . . . . . . . . ........ . ............ . ..... ........ ... . . . ......... ............. . ... ... ....... . .. ...... . ....... . ........ .. . ..... ...... .. . . ........... ........... . .... . .... . ........... y'zoo r 0 1 - — ------- ------ .. . ....... . ............. 141- F . ......... .. ............ .... .. . ...... . . ........... ...... .......... .... . . . . ............. ...... . ..... ................. I ........... . .... ........ . .. .......... LI 119 t�. Ft. i 0 &L 7 . ............ ............. . . . ... . ...... . ...... . . ..... . .... . . ... .................. .. . ........... . ..................... it I ...... .... .... . ... . .. ...... . .... . ... . . . ..... CH 9 G &A-6,c, I G-1 ... . ...... ...... ..... ........ ................. ....... . ..... N SN A N ir—i-I 6A-51 ... . ......... .............. .......... t . . . . . ................ . . ..... . ........ . ..... ..... . . . . ............ ............ . . . . ...... -T . ......... . . . .... ...... .......... . ....... ...... . ... ............ a 1 16L .. . ........... . . ........ . . ............. -4-:I. . ........ . . . . . ........ .... .......... .... . . . ..... ....... ... M97 IH t ............. .... ...... ...... ......... 1 .......... . . . ............. . ..... . . . ..... - - ------ -- .. . ........ ...... . .... ..... . ...... . .. ........... .......... . .... ....... .. .. ........ . ... . . ................ . . ..... .......... . .. .......... . ......... ... ... ....... - .. . . ........ T L.. . ........ . . ....... . . ........... ... .. . ....... . .............. . ..... ......... ...... Descr iption By AJA U Date Checked Date ENGINEERING Scale Sheet No. 250 4th Ave, South Suite 200 Edmonds, WA 98020 14 Project Job No. 4 /2,i�rn 06j,) cF 425.778.8500 www.cgengineering.com 1�+ 195, 1 (7 I � I I To Q3 Profis Anchor 2.6.5 Company Page: specifi- Project Ad ress S-b-Pmject I P— No, Phone I Pa.: Date 111WO113 specifi.e. ..armnems: I Input data Anchor " and diameter: KWIk Bait TZ - CS 518 (3 1/8) EffecM embedment depth: h, = 3.125 In., h_ = 3.563 In. pop Material Carbon Steel Evaluation Service Report: ESR-1917 Issued I Valid: 2/22/20161 MIMI` Proof. Design method Act 318 / AC1 93 Stand-off installation: Ob = 0-000 'M (no stancl-off); t = 0.25D In. Anchor plate: 1, x I, x t = 12.000 im x 6.000 in. x 0.250 in.; (Recommended plate thicknears, not ml..Iatd Profile: no profile Base material: macked concrete, 2500. f,= 2500 psi; h = 6.0DO In. Reinforcement tension: condition B, shear. conclition B; no supplemental splitting minflarcenvent present edge reinforcement none or< No. 4 bar Seismic loads last C, D. E, or F) no Geometry [in.] & Loading Olt, In.1b] Z lnp� k,�N W% ft �ft pu,�Ktyl Profis Anchor 2.6.5 Company: P ge* 2 Specifier. P.ject: Address. Sub�prolect I Pas. No.: Phone I F.X Date 1/1812018 E:_Mail: 2 Proof I Utilization (Governing Cases) Design values Obj UtIlication Loading proof Load C-p!cIty P. Lid, r/-I status T swn - - I- - shear Pryoul Strength 12000 17382 -170 CK Loading fW 0� Utillastion li, rl] status Combined tension and shear loacis - 3 Warnings - please consider all details and hintstwarnings given in the detailed reportl Fastening meats the design criteria! 4 Remarks; Your Cooperation Duties - Any and all Information and data contained In the Software woman solely the use of Hilt products and am based an the principles, formulas and security regulations in acoardance �vith Hilt's technical directions and operating. mounting and assembly instructions, eft�, that must be strictly compiled with by the wer. All figures contained thensin are average figures, and therefore use -specific tests am to be conducted prior to wing the relevant Hilt product The results of the calculations carried out by means of the Software am based essentially on the data you put in, Therefore, you bear the sole responsibility for the absence of orrons, the completeness and the rele,ance, of the data to be put in by you. Moreover, you bear sole responsibility far having the results of the calculation checked and cleared by an mpert, pauticularly vAth regard to compliance vAth applicable norms and permits, pdor to using them for your specific facility. The Soft —re serves only as an aid to interpret norms and permits mrithout any guarantee as to the absence, of emors, the correctness and the relevance of the results or sultability for a specific application. You must take all namsseuy and reasonable steps to prevent or limit damage mused by the Soft —re. in particular, you must arrange for the regular backup of programs and data and, If applicable, carry out the updates of he Sollivame offered by Hill on a regular basis. If you do not use the AutoUpdale function of the Softivars, you must ensure that you are using the current and thus up -to date version of the Sofhvam in each case by carrying out manued updat 'sviatheHilbWabsite. Hilt will not be liable for consequences. such as the recovery of lost or e, damaged data or programs, arising from a culpable bresch of duty by you. ';T) Titte Block Una 1 Project Title: Title Block Una I PrcijectTille: You can change this area Engineer: Project ID: You can change this area Engineer: Project ID: using the'Settings' menu item Proact Descr: using the 'Settings' menu item Protect DOSCT: and than using the'Printing and then using Ihe'Printing & Title Block' selection. Title Blocr selection. Tille Block Line 6 �d 17 � 2018, 4 3WM Title Block Una 6 "ed 17 JM Z19, 4:35PM Concrete Beam FbOt:A�21)17 PI n1d unft concrete Beam File z FUNIT PI 17145 1- 'Lir- N : I(W-06005155 L.censee CG ENGINEERING # Desorption: (10) piles 60' : L., � KW,06005155 Description : (IG)pIIqS@5V L,­­ CG ENGINEERING CODE REFERENCES Calculations per ACI 318-14, IBC 2015, ASCE 7-10 Load Combination Set: IBC 2015 3.0 ksi 6 Phi Values Rexurs: 0.90 ft = fc"2 * 7.50 410.792 psi Shear: 0.750 Y Density 150.0 Pat 0.850 X UNFw[or 1.0 Elastic Modulus 3,122.0 ksi Fy - Stirrups 60.0 ks! fy - Main Reber 60.0 kal E - Stirrups 29.0 ksi E-MainRobar 29,000.0 ksi Stirrup Bar Size# 3 Number of Resisting Legs Per Stirrup 2 L 50 .0 f .0 1 .0 ft 5ao 5.0 1 -0 on 12--114 1. 1 12-5-44-1, 1 62-5-44-6, 1 . 1 2-­114 2 ­%_ 1 1 12-5­11�1, 1 2-5 Cross Section & Reinforcing -Details Rectangular Section, Wdth = 12.0 In, Height = 14.0 in Span #1 Reinforcing 244 at 3.0 in from Top, from 0.0 to 10.0 it in this span 244 at 3.0 in from Bottom, from 0.0 to 10.0 ft in this span Span #2 Reinforcing 244 at 3.0 in from Top, Irm 0.0 to 10.0 It in this span 244 at 3.0 in from Bottom, from 0,0 to 10.0 If in this Span Span #3 Reinforcing 244 at 3.0 in from Top, torn 0.0 to 10.0 ft in this span 244 at 3.0 in from Bottom, from D,O to 10.0 R in this span Span #4 Reinforcing 244 at 3.0 in from Top, torn 0.0 to 10.0 It in this span 244 at 3.0 in from Bottom, from 0.0 to 10.0 ft in this span Span #5 Reinforcing 244 at 3.0 in from Top, torn 0.0 to 10.0 ft in this span 2441 at 3.0 in from Bottom, from 0.0 to 10.0 ft in this span Span #5 Reinforcing 244 at 3.0 in from Top, from 0.0 to 10.0 it in this span 2-94 at 3.0 in from Bottom, from D.0 to 10.0 ft in this span Span 97 Reinforcing 244 at 3.0 in from Top, tam 0.0 to 10.0 It in this span 244 at 3.0 in from Bottom, torn O.D to 10.0 ft in this span Span #8 Reinforcing 244 at 3.0 in from Top, from 0.0 to 10.0 it In this span 244 at 3.0 in from Bottom, torn 0.0 to 10.0 It in this span Applied Loads Senvice loads entered. Load Factors Will be applied for calculations. B02M self weight calculated ancladdedto loads Loads on all spans... D = 0.3440. L = 0.720 Uniform Load on ALL spans : D = 0.3440, L = 0,720 k1fi Section used for this Span Typical Section Max Downward Transient Deflection 0,000 in Ratio � 0 QW Mu Applied -4.689 k-ft Max Upward Transient Deflection 0.000 in Ratio= 0 <360 Mn Phi : Allowable 22.267 k-ft Max Downward Total Deflection 0.001 in Ratio= 59757�iil Max Upward Total Deflection 0.000in Ratio= 999C180 Location of maximum on span 0.000 it Span #where maximum occurs Span # 2 Vertical Reactions Support notation: Far left Is #1 d Combinalim Support I Support 2 Support 3 Support 4 Support 6 Supportli Suppor17 Support 8 Suppod9 Ovemil MAXimunt 2.443 7.025 5A7 1 6.259 6.163 6.259 5.971 7.025 2.443 Omrav MiNimu. 0.614 1.766 1.501 1.573 1.549 1.573 1.501 1.766 0.614 +D+H 1.023 2.943 2.501 2.622 2.582 2.622 2.501 2.943 1.023 +D+L-H 2.443 7.025 5.971 6.259 6.163 6.259 5.971 7.025 2.443 +D+tJ-H 1,023 2.943 2.501 2.622 2.582 2,622 2.501 2.943 1.023 +D+S-H 1.023 2.943 2.501 2.622 2.582 2.622 2.501 2.943 1.023 +D4().75OI_r4O.750L+H 2.088 6.005 5.104 5.350 5.268 5.350 5.104 6.005 2.088 -M.75OL-0.75OS-H 2.088 6.005 5.104 5.350 5.268 5.350 5.104 6,005 2.088 +M.60W-H 1.023 2.943 2.501 2.622 2.582 2.622 Z501 2.943 1.023 +0-0.70E+H 1.023 2.943 2.501 2.622 2.582 2.622 2.501 2.943 1.023 +D+0.75DLr4O.75OL40.45DW+H 2.088 6.005 5.104 5.350 5.268 5.350 5.104 6,005 2.088 40+0.75OL40.7508A.45DW+H 2.01113 6,005 5.104 5.350 5.268 5.350 5.104 6.005 2.088 -D47501.40.750840.525012+1­1 2.088 6.GO5 5.ID4 5.350 5.268 5.350 5A04 6,005 2.088 40.60040.601111+0101-1 0.614 1.766 1.501 1.573 1.549 1.573 1.501 1.766 0.614 40.6OD40.71)E40.60H 0.614 1.766 1.501 1.573 1.549 1.573 1.501 1.766 0,614 D Onty 1.023 2.943 2.501 2.622 2-582 2.622 2.501 2.943 1.023 Lronly L Only 1.420 4.082 3.470 3" 3.581 3.637 3.470 4.082 1.420 S OnV WOMY E Only HO* Shear Stirrup Requirements Entire Beam Span Length: Vu < PhIVcf2, RecfdVs= Not Reqd 9.63.1, usestimupsspacadat 0.000in Tiffe Block Une I Project Title: You can change this area Engineer: Project ID: using the 'Setfings' menu item Project Descr: and than using the'Prinling Title Block' selection. Tile Block Line 6 PrhM I? JM Nis, 4.� [concrete Boom L­ 4 KW-06005155 Li"n­. CG ENGINEERIIW� : Description : (10) plies @ 5'D' CODE REFERENCES Calculations per ACI 318­14, IBC 2015, ASCE 7-10 Load Combination Set: IBC; 2015 Material Properties fo 1`2 3.0 kai 6 Phi Values fr= fc; * 7.50 = 410.792 psi W Density = 150.Opd X UVV: Factor 1.0 Elastic Modulus = 3,122.0 Its! Fy - Stirrups fy - Main Reber = 60.0 kai E - Stirrups = Stirrup Bar Size 9 E - Main Reber = 29.000.0 ksi Number of Resisting Logs Per Stirrup = Flexure: 0.90 Shear: 0.750 0.850 60.Oksl 29.Oks! 3 2 te 5�'o% i. I a 5�0�12-t. 5 0� '-2 a �"- ;2 h Cross Section & Reinforcing Details Rectangular Section, Wdth=116.0in, Helght=12.0in Span #1 Reinforcing 244 at 3.0 in from Top, roniO.0 to 10.0 flin this span 244 at 3.0 in from Bottom, from 0,0 to 10.0 It in this span Span #2 Reinforcing 244 at 3.0 in from Top, from 0.0 to 10.0 ft in this span 244 at 3.0 in from Bottom, torn 0.0 to 10,0 ft in this span Span #3 Reinforcing 244 at 3.0 in from Top, ftDm 0,0 to 10.0 It in this span 244 at 10 in from Bottom, torn 0.0 to 10.0 it in this span Span #4 Reinforcing 244 at 30 in torn Top, ftom 0,0 to 10.0 ft in this span 244 at 3,0 in from Bottom, torn 0.0 to 10.0 ft in this span Span #5 Reinforcing 244 at 3.0 in from Top, torn 0.0 to 10.0 11 in this span 244 at 3.0 in from Bottom, torn 0.0 to 10.0 ft in this span Span #6 Reinforcing 244 at 3.0 in from Top, from 0.0 to 10L ft in [his span 244 at 3.0 in from Bottom, torn 0.0 to 10,0 fin this span Span #7 Reinforcing 244 at 3.0 in from Top, korn 0.0 to 10.0 111 in this span 244 at 3.0 in from Bottom, torn 0.0 to 10.0 ft in this span Span #8 Reinforcing 24M at 3.0 in koin Top, kom 0.0 to 10,0 ft in this span 244 at 3.0 111 Ill B61torm, torn 0.0 to 10.0 ft in this span Avvilled Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Loads on all spans... D = 0.8570, L = OA880, S = 0.920 Uniform Load on ALL spans: D = 0.8570, L = 0,4880. S = 0.920 Witt MaximUM Bending Stress Ratio 0.405 :1 Maximum Deflection Section used for this span Typical Section Max Downward Transient Deflection 0.000 in Ratio= 0 *60 Mu Applied -7.884 k-ft Max Upward Transient Deflection 0.000 in Ratc= 0 <360 Mn Phi: Allowable 19.482 k-fit Max Downward Total Deflection 0.002 in Ratio 29421 >=18 Max Upward Total Deflection 0.000 in Ratio 999 <180 Location of maximum on span 0.000 0 Span #where maximum occurs Span #2 Tile Block Line 1 Project Tile; You can change this area Engineer: Project ID: using lhe'Settinge menu item Project Descr: and then using the'Prinling & Tile Block' selection. Tille Block Une 6 R-dINM Iii,435i'M Concrete Beam File - Ftt"17 P,*.M 7145 L'-RWidi-1,.W.=W11arsibevreglanien 01,17.1ted , _ 1_4, ._ I I . � _'. 1� . . I Reactions Suppon notatim: Far left Is #1 -Vertical Load combination Support 1 Support2 Suppor[3 Support 4 Support 5 Support 6 8uppon7 Support 8 Support 9 Oarmll MAXimum 4.166 11.981 10AB41 10.674 10.511 10.674 10.184 11.981 4.166 Oweall MINimurn 0.962 2.767 2.352 2.465 2.427 2.465 2.352 2.767 0.962 .0-111 1084 5.993 5.094 5.339 5.258 5.339 5.094 5.993 2.084 +D.L.H 3.046 8.760 7.446 7.805 7.6115 7.805 7.446 8.760 3.046 -04oli! 2.084 5.993 5.094 5.339 5.258 5.339 5,094 5.993 2.084 40+S+H 3.898 11.210 9,528 9.987 9.834 9.987 9.528 11.210 3.898 +0+0.75OLr+0.750L+H 2.806 8.069 6.858 7.188 7.078 7,188 6.858 8.069 2+806 +D40.750L+0.7508+H 4.166 11.981 10.184 10,674 io.511 10.674 10A84 11.981 4A66 +M.60W+H 2.084 5.993 5.094 5.339 5.258 &339 &094 5.993 2.084 4M.70E+H 2.084 5.993 5.094 5.339 5258 5239 5.094 5,993 2.084 +DQ.750Lr40.75DL--(.450WM 2.806 8.069 6.&58 7,188 7.078 7.188 6058 8.069 2.806 +M.760L--0.750S+0A50W+H 4.166 11.981 10.184 10.674 10.511 10.674 10.184 liv9lll 4.166 -D-0-75OL-0.7508-0,5250E+H 4.166 11.981 10.184 10.674 10.511 10.674 10.184 11.981 4.166 40.60D40.60W+0.60H 1.250 3.596 3.057 3.204 3.155 3.204 3.057 3.596 1.250 40.60D-0.70E+0.60H 1.250 3.596 3.057 3.204 3.155 3,2114 3.057 3.596 1.250 D Only 2.084 5.993 5.D94 5.339 5.25B 5.339 5.094 5.993 2.084 lur Only L Only 0.962 2.767 2.352 2.465 2.427 2.465 2.352 2.767 0.962 8 Only 1.814 5.216 4.434 4.647 4.576 4.647 4.434 5.216 1.814 IN Only Between 0.00 to 3.98 ft, Vu < PhrVQ7, Rocrd Vs = Not Reqd 9.6.3.1, use stirrups spaced at 0.000 In Betwes" 4 - 09 to 5.57 ft, PhiVGr2 < Vu - PhIVc, Reqd Vs = Min 9.6.3.3, use stirrups spaced at 4.000 In Between 5 .68 to 9.55 ft, Vu < PNW2, Rood Vs = Not Reqd 9.6.3.1, use stirrups spaced at 0.000 In Between 9,66 to 10.34 ft, PhIVr12 < Vu - PhiVc, Rood Vs = Min 9.6.3.3, use stirrups spaced at 4.000 In Between 10A5 to 14.43 ft, VU<PhfVcJ2. Req'dVs=NotReqd9.6.3.1, usestiniosspacedat 0.01XIn Between 1 4.55 to 15.45 ft, PNVo2 < Vu <= Ph[Vc, Req'd Vs = Min 9.6.3.3, use stioups spaced at 4.01)0 in .,h,n 15.57 to 19.43 K Vu < PhiVd2, Req'd Vs = Not Rao 9.6.3.1, use stimips spaoecl at 0.01)(I In Between 19.55 to 20.45 It PhiVc?2 < Vu � PhiVc, Roq'd Vs = Min 9.6.3.3, use stirrups spaced at 4.000 In Between 20,57 to 24.43 ft, Vu < PhIVc/2, Rec(d Vs = Not Reqd 9.6-3.1. use stirrups spaced at 0,01)(I in Between 24,55 to 25AS ft Phi-VW7 < Vu c= PhIVc, Raq'd Vs = Win 9.6.3.3, use stirrups spaced at 4.010 In Between 25.57 to 29.55 it Vu � PhlVcn, Rect'd Vs = Not Reqd 9.6.3.1, use stirrups spaced at O.ODO in Between 29,66 to 30.34 It PhiVd7 < Vu � PhrVc, Reqd Vs = Win 9.6.3.3, use s1Jmip3 VaoW at 4.000 in Between 3OA5 to 34.32 It Vu < WWI, Reqd Va z Not Reqd 9.63.1, use stirrups spaced at G.ODD In Between 34.43 to 3511 it, Ph(Vtv2 < Vu - PhIVc, Rectcl Vs = Min 9.63.3, use stirrups spaced at 4,00 in Between X02 to 39.89 ft, Vu<PhIVGf`2, ReqdVs =Not Reqd9.6.3.1, usestIrrupitspaoisdal 0.0(Oln (AC-1 A v/s sc, /1E ')� '0-0#37' 40,000 -0 Aq 1, A v ea_ov,,>oD , 44v Vn,_- iz" z "L > 0- 16 )"L I - :is- o--e p'iil Tide Block Line 1 Proect Tide: Title Block Line I Project Tide: You can change this area Engineer: Proirct ID: You can change this area Engineer. using the'Settings' menu item Project Descr. using the 'Sedings' menu item Project Descr: and then using the 'Printing & and than using the *Printing & Title Block' selection. Title Block' solection. Tide Block Une 6 17 � NIA 4 37N Tide Block Line 6 Concrete Beam -a DUtCALC. W. 1993-2011 FI.W0.17.8,29. V.10.17.&29 Concrete Beam F%-Rt"l7P Description: (4) piles @ TV CODE REFERENCES Calculations per ACI 318-14, ISC 2015, ASCE 7-10 Load Combination Set: IBC 2015 fc 3.0 ksi Phi Values Rexurs: 0.90 if= rc"' - 7.50 = 410.792 psi Shear: 0.750 y Density = 150.0 pef 0.850 X LtVVt Factor 1.0 Elastic Modulus = 3,122.0 W Fy - Stirrups 60,0 ks! fy - Main Rebar = 60.0 Its! E - Stirrups = 29.Oksi E-MainRebar = 29,000.0 ksi Stirrup Bar Size# 3 Number of Resisting Legs Per Stirrup = 2 8.0 ft 1 8.0 It 1 8.0 ft Cross Section & Reinforcing Details Rectangular Section, Wdlh = 16.0 in, Height = 12.0 in Span #1 Reinforcing 244 at 3.0 in from Top, from 0.0 to 10.0 ft in this span 244 at 3.0 in from Bottom, from 0.0 to 10.0 ft in this span Span #2 Reinforcing 2-94 at 3.0 in from Top, from 0.0 to 10.0 ft in this span 244 at 3.0 in from Bottom, from D,O to 10.0 If in this span Span 93 Reinforcing 244 at 3.0 in from Top, from 0,0 to 10.0 ft in this span 244 at 30 in from Bottom, from 0.0 to 10,0 it In this span Applied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight calculated and added to loads Loads on all spans D = 0.4440, L - 0.240 Uniform Load on ALL spans: 0 = 0.4440, L � 0.240 Will DESIGN SUMMARY Maximum Bendino Stress Ratio 1 M.-A-M D�fl-fi- Section used for this span Typical Section Max Downward Transient Deflection 0.0021n Ratio= 59250>=36 Mu Applied -7.404 k-ft Max Upward Transient Deflection O.OQQ in Ratio 0 <360 Mn Phi: Allowable 19.482 k-� Max Dowhward Total Deflection 6.006 in Ratio= 16086>=18 Max Upward Total Deflection 0.000 in Ratio= 999<180 Location of maximum on span O.DOO fl Span #where maximum occurs Span #3 Vertical Reactions Support notation: Far left is #1 Load combination Support 11 Support 2 � 3 Support 4 overall Walmum 2.829 7.779 7.779 2.829 overall MlNimum 0.768 2.112 2.112 0.768 ,D+H 2.061 5.667 5.667 2.061 +D-L+H 2.829 7.779 7.779 2.829 +D+LF+H 2.061 5.667 5.667 2.061 +D+S+H 2.061 5.667 5.667 2.061 +D+0.750Lr+0.750L+H 2.637 7.251 7.251 2.637 +D+0.750L+0.750S+H 2.637 7.251 7.251 2.637 Description: (4) olo� @ 75* Vertical Reactions Support notation: Far left is #1 Load Combination Support 1 Support 2 Support 3 Support 4 Project ID: +D40.70E+H 2.061 5.667 5.667 2.061 -O-0.750Lr+0.750L-0.450W+H 2.637 7.251 7.251 2.637 +D-O.750--O.750S+0.45GW+H 2.637 T251 7.251 2.637 -040.75OL-0.75DS40.5250E+H 2.637 7.251 7.251 2.637 -0.6DD40.60W40.60H 1.236 3.400 3.400 1.236 AAODAJOE-0.6011 1.236 1400 3.400 1.236 0 Only 2.061 5.667 5.667 2.061 Lf Only L Only 0.768 2.112 2.112 0.768 S Only W Ordy E Only' H Only Shear Stirrup Requirements Enike Beam Span Length! Vu < PhfVcf2, RoqdVs= Not Recitig.6.3.1, uessfirrupsspacodat 0.000in 9-oo& =Fa)kpi.roio zi Beam Span Table - Floor Beams Allowable Uniform Distributed Load in Pounds Per Lineal Foot (PLF) Span Length in Feet Beam 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 4x6 HIF #2 815 522 362 266 204 160 117 - - - - 3 1/2 x 6 1/2 LSL 1340 858 546 344 230 162 118 08 HF #2 1270 902 627 460 353 279 226 186 155 122 - 3 1/2 x 7 1/4 LSL 22751 1456 1011, 743 522 367 267 201 155 122 - 6x8 DIF #2 1880 1203 836 614 470 371 201 249 209 178 153 134 114' - - 2 11/16 x 9 1/4 PSL 2405 1924 1603 1374 1193 889 648 487 375 295 236 192 158 132 111 4xlOHF#2 1620 1296 942 692 530 419 339 280 236 201 173 151 133 113 - 3 1/2 x 9 1/4 PSL 3130 2504 2087 1789 1553 1169 852 640 493 388 310 252 208 173 146 124 106 5 114 x 9 114 PSL 46951 3756 3130, 2683. 2328 1753 1278 960 739 582 466 379 312 260 219 186 160 2 11116 x 9 1/2 PSL 2470 1976 1647 1411 1 1235 965 704 529 407 320 256 209 172 143 121 103 - 3 112 x 9 1/2 LSL 3160 2528 2107 1646 1260 953 694 522 402 316 253 206 170 141 119 101 3 1/2 x 9 112 PSL 3215 2572 2143 1837 1608 1270 926 696 536 421 337 274 226 188 159 U5 116 WO DF #2 2960 1930 1340 984 754 596 482 399 335 285 246 214 188 167 149 134 118 5 114 x 9 112 PSL 4825 3860 3217 2757 2413 1905 1389 1043 804 632 506 412 339 283 238 202 174 7 x 9 1/2 PSL 6430 5144 4287 3674 3215 2540 1852, 1391 1072 843 675 549 452 377 318 270 231 2 11116 x 11 114 PSL 2925 2340 19501 1671 1463 1300 1104 890 1 686 539 432 351 289 241 203 173 148 3 1/2 x 11 1/4 LSL 3740 2992 2493 2137 1740 1375 1114 866 667 525 420 342 281 235 198 168 144 3 112 x 11 114 PSL 3810 3048 2540 2177 1905 1693 1438 1155 889 700 560 455 375 313 264 224 192 6x12 DF #2 3585 2829 1964 1443 1105 873 707 584 491 418 361 314 276 245 218 196 177 5 1/4 x 11 1/4 PSL 5710. 4568 3807 3263, 2855 2538. 2157 1739 1340 1054, 844 686 565 471 397 337 289 2 11116 x 11 7/8 PSL 3085 2468 2057 1763 1543 1371 1222 1010 804 632 506 412 339 283 238 202 174 3 1/2 x 117/8 LSL 3950 3160 2633 2257 1930 1525 1235-1018 784 617 494 402 331 276 232 198 169 3 112 x 11 718 PSL 4020 3216 2680 2297 2010 1787 1592 1316 1050 826 661 538 443 369 311 265 227 6 114 x 11 7/8 PSL - 4824 4020 3446 3015 2680 2389 1974 1575 1239 992 8b7 665 554 467 397 340 7 x 11 718 PSL 5357, 4591 . 4018. 3571 . 3185 2632 20901 1644, 1316. 1070 882 735 1—�l 9 .--�26 4511 N otes: 1 . This table is applicable for Simple Span beams with uniformly distributed loads (no point loads) 2. Table values are based on the limiting beam shear & moment capacities, as well as deflection 3. The deflection limit used in the above table is (L1240 Total Load) and (LJ360 Live Load) 4. This table is applicable for WLL/VVDL — 4.0 5. Table values include the Size Factor (CF) 4= 0- C�M�' ENGINEERING 250 4th Ave. South Su�e 2C)O Edmonds, WA 98020 Project Beam Span Table Larsen Residence NAL Checked Date Scale Sheet No. Job No. 17145.10 10/18/17 17- HF Column & HF Sill Plate Capacity TABLE IBC 2012, NDS 2012 Date modified 10-2-14 6 7 8 9 10 11 12 13 14 15 16 (2) 2A HF Stud 5,149 4,121 3,311 2?693 &224 1,862 1,579 1,355 1,175 1,028 906 PSILL 4,784 - - - - - - - - - - (3) 2X4 HF Stud 9,220 7,723 6,382 5,1281 4,406 3,715 3,166 ;726 :�369 2,076 1,834 PS,LL 6,910 6,910 - - - - - - - - (4). 2x4 HF Stud 12,294 16, .�98 8,1510 7,041 5,875 4.,953 41,221 3,636 3.,159 2,769 2,445 PSILL 8,605 .8,505 8,505 - (2) 3A HF Stud 10,245 8,581 7,091 5,868 4,896 4�1 28 3,618 3,029 2,632 2307 2,038 PSILL 7,619 7,619 (3) 3A HF Stud 15,367 121,1872 10,637 8,802 7,343 6,191 qj?77 4,543 3,948 3,461 3,067 PSILL 10,631 10,631 10,631 - - - - - - - - (2) M HF Stud 7,951 6,406 6,164 4,210 3,481 2,917 2,476 2,126 1,843 1,613 1,423 PSILL 7,618 - - - - - - - - - (3) 2x6 HF Stud 16,730 15,297 13,636 11,927 10,333 8,934 7,746 6,750 51,918 61,221 4,634 PSILL 10,869 10,859 10,869 10,859 - - - - - - (4) 2x6 HF Stud 23,902 22,755 21,314 19,614 17,764 15,903 14,146 12,558 11,158 9,942 8,891 PsILL 13,366 13,365 13,365 13,365 13,365 13,365 13,365 - - - - 4A HF #2 14,409 111,327 9,009 7,286 5,993 6,006 4,239 3,633 3,147 2,751 2,426 P sILL 8,328 8,328 8,328 - - - - - - - - 4x8 HF #2 18,744 14,808 11,809 9,566 7,876 6,583 6,577 4,782 4,142 3,622 3,193 PSILL 10,277 10,277 10,277 - - - - - - - - 4x1 0 HF #2 23,562 18,717 14,972 12,160 10,016 8,377 7,101 6,090 5,277 4,615 4,069 PSILL 13,112 13,112 13,112 - I - - I - - I - - - 6x6 DIF #2 19,595 18,889 17,995 16,908 15,659 14,315 12,960 11,665 10,475 9,407 8,463 PSILL 13,087 13,087 13,087 13,087 13,087 13,087 - - - - - 6x8 DF #2. 25,1830 24,899 23,721 22,288 20,642 18,870 17.,1083 15,377 13,808 12,400 11,166 PILL 16,149 16,149 16,149 16,149 16,149 16,149 16,149 - - - - 6x1 0 DF #2 28,621 27,790 26,739 25,45 929 22,224 20,420 18,614 16,886 16,286 13,835 PILL 20,604 20,604 20,604 20,604 20:604 20,604 - Description BY NAL Date 10/18/17 Wood Column Capacity Table Checked Date r=NGINIEERING Scale Sheet No. 250 4th Ave. South Suite 200 Project Larsen Residence Job No. 17145.10 13 fir -L D C- Description By MA t— Date I Checked Date 250 4th Ave. South Suite 200 Edmonds, WA 98020 Project Job No. 425.778,8500 I WoodWorks' COMPANY SOFrWAREFOR WOOD DESfCM Jan. 18, 2018 11:06 Design Check Calculation Sheet WoodWorks Sizer 11. 1 Loads: Load e Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End d Dead Full A ea 12.00(12.0") �_sf Live Full Area 40.00(12.0") psf Self -weight Dead Full UDL 3.5 plf Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in): t 18.069, PROJECT 1 New Joists (2nd Floor) Unfactored: Dead Live 140 361 140 361 Factored: Total Bearing: - 501 501 Capacity - Joist 501 501 Support 967 967 Des ratio Joist 1.00 1.00 Support 0.52 0.52 Load comb #2 #2 Length 0.82 0.82 Min req'd 0.82 0.82 Cb 1.00 1.00 Cb Min 1.00 1.00 Cbpsupportl 1.251 1.25 Fc, SUP 625 625 New Joists (2nd Floor) Lumber -soft, Hem -Fir, No.2, 2x12 (1-1/2"xi 1-114") Supports: All - Timber -soft Beam, D.Fir-L No.2 Floor joist spaced at 12.0" c/c; Total length: 18.07'; Clear span: 17.931'; volume = 2.1 cu.ft. Lateral support: top= full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion Value Design Value Unit Analysis/Design Shear -Analysis fv = 40 Fv' = 150 psi fv/Fv' = 0.26 Bending,(+) fb = 852 Fb' = 977 psi fb/Fbl = 0.87 Live Defl'n 0.41 = L/528 0.60 = L/360 in 0.68 Tot 1 Defl'n 0.57 = L/381 0.90 = L/240 in 0.63 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LCH Fv' 150 1.00 1.00 1.00 - - - - 1.00 I.Do 1.00 2 Eb" 850 1.00 1.00 1.00 1.000 1.000 1.00 1.15 1.00 1.00 - 2 Fcp' 405 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.3 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+L, V max 499, V design 445 lbs Bending(+): LC #2 = D+L, M = 2247 lbs-ft Deflection: LC #2 = D+L (live) LC #2 = D+L (total) D=dead L=live S=snow W=wind 1=impact Lr=roof live Lc=concentrated E=earthquake All LC , s are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection : 231e06 lb-in2 CE10= . Live" defle ti n Deflection from all non -dead loads (live, wind, snow Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NOS 2015), and NOS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NOS Clause 4.4.1. -I � ENGINEeRING civil & structural engineering & planning ADDITIONAL STRUCTURAL CALCULATIONS 5LP2-0 IS 06 1'* 250 4th Ave S Ste 200 Edmonds, WA 98020 Phone: (425) 778-8500 Fax: (425) 778-5536 Larser Residence FAR--, JUL 2 6 2018 DE ART F V ia L'UM"OGF K %F Foundation Repair 2832 Marine View Drive Mukilteo, WA 98275 0712612018 CG Project No.: 17145.10 - IL Lt- -91 )"- Lt- $�, 31ZTl- ?ao tLF % 14- V884 720 ci XIST (3) 2x12 bc P /F, Ci ...... EXIST 2xlZ 16" O.C� �z 112 Ex, 2 @ 16'. D.C. NEW STUD WALL 'r, (I— RJECCIE REPLACE PONYWALL COMPANY PROJECT WoodWorks July 23, 2018 16:49 Beaml.wwb SOFrWAREFOJ? WOOD DEUGN Design Check Calculation Sheet WoodWorks Sizer 11. 1 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End Loadl Dead FUll _UDL 162.0 plf Load2 Live Full UDL 540.0 plf Self -eight Dead Full_.UDL 18.5 plf Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) Unfactored: Dead Live Factored: 1365 4087 - 1365 4087 Total Bearing: 5452 - 5452 Capacity Beam 5452i 5452 Support 5841 5841 Des ratio Beam 1.00 1.00 Support 0.93 0.93 Load comb #2 02 Length 1.66 1.66 M in req'd 1.66 1.66 Cb 1.00 1.00 Cb min 1.0c 1.00 Cb support 1.07 1.07 Fcp sup 625 625 PSL, 2.01E, 2.OE, 5-1/4"XIII-1/4" Supports: All - Timber -soft Beam, D.Fir-L No.2 Total length: 16-1.66"; Clear span: 14'-10.3,V'; volume = 6.2 cu.ft. Lateral support: top= at supports, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion Analysis Value Desjgn H�Iue Unit Anal ' WE R= Shear fv = 11 �' Yv' 290 - psi 107 024l ...ding(+) fb = 2196 Fb' = 2856 psi fb/Fb' - 0.77 Live Deflln 0.49 = L/364 0.50 - L/360 in 0.99 Total Deflvn 0.66 = L/273 0.75 =_ L/240 in 0.88 Additional Data: FACTORS: F/E(psi)CD CM Ct CL Cv Cfu Cr Cfrt Ci Co. LC# Fv:+ 290 1 00 - 1.00 - - - - 1.00 - 1.00 2 Fb 2900 1:00 - 1.00 0.978 1.01 - 1.00 1.00 - - 2 FCP '25 - - 1.00 - - - - 1.00 - - - Z' 2.0 Million - 1.00 - - - - 1.00 - - 2 Eminy' 1.04 million - 1.00 - - - - 1.00 - - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+L, V max = 5403, V design = 4678 lbs Bending(+): LC #2 = D+L, M = 20263 lbs-ft Deflection: LC #2 = D+L (live) LC #2 = D+L (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: El - 1246eO6 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection. Lateral stability(+): Lur = 15' Le = 271-7.19" IRS = 11.6 Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. SCL-BEAMS (Structural Composite Lumber): the attached SCL selection is for preliminary design only. For final member design contact your local SCL manufacturer. 4. Size factors vary frum one manufacturer to another for SCL materials. They can be changed in the database editor. 5. FIRE RATING: LVL. PSL and LSL are not rated for fire endurance. COMPANY PROJECT WoodWorks' July 23,2018 16:45 BeamZ�b SOFrIVARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11. 1 Loads: Iload I Type 13bistribution1p:t-1 Lee [ftIj Magnitude Jun at:tion t 0 � ad 11 u J, 'F'U'll 'start 1p� I L'022 Liv. UD DL 5:u.0 0.0 pl S.If-weight, lDead Ful 1 U DL 8.5 PI Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 16-1.72" Unf t..ed: Dead Live 1410 1240 1410 4240 I..t.red: Total 5651 5651 ring. - Capacity Be.' 5651 5651 Supp, rt 6054 6054 DI: ratio . am l 00 1.00 .Support 0:93 0 Load ..mb #2 #2 ,an,, t h 1.72 1 72 Min req'd 1.72 1:72 C" 1-00 1 00 Cb l... 1 00 Cb support 1.0' 1 07 Fop up 625 .1 PSL, 2.01E, 2.OE, 5-1/4"XIIII-1/4" Supports: All - Fimb-soft Beam, D.Flr-L NO.2 Total length: 15 .1.72"; Clear span; 14'-10.28"; volume - 6.2 ctuft, Lateral support: top= at supports, bottom= at supports; This section FAILS the design check WARNING: This section violates the following design criteria: Deflection Analysis vs. Allowable Stress and Deflection using Nos 2015: Criterion Analv5iS Valu,e Desiqn Value I Unit Analysis�De;sign ' a- Pin IV711 U*42 B..di.,I-) �111 9 275" 2z.�SU6'o p.i fb/Eb' = 0 %-I L 0.51 L/3 0Fb' .50 L/3 I I 4z' T' 0.68 L/263 0 .7 5 L/240 5--- 6,j I'lHiP S70 0 r, Additional Data: FACTORS: F/Elp.i)CD CM Ct CL CV CfU C. Cf�t Ci C' LC# Fv, 290 1 .00 1.00 - - - 1. 0 0 1 .00 2 Fb'+ 2900 1 .00 1.00 0.978 1.01 1.00 1.00 2 F P 2 - 0 1 6 5 1.0 - 1 00 - E 2 .0 million, I... 1:00 2 Eminy' 1.04 million 1.00 1. 00 2 CRITICAL LOAD COMBINATIONS: shear : LC #2 D+L: V ma. = 5598, V do.ign 4845 lb. B..di.g(+, ; LC #2 D+L M = 20994 lb.-ft Deflection: LC #2 D+L Ilivel LC #2 D+L (total) D=dead live S=snou, W-wind 1=impact Lr=roof live L-concentrated E=earthqu.ke rare All LC. is zed 1, the Analysis output Load ..�_ti,ns: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: El 1246a,06 lb-it2 ,,Liv." deflection Deflection from all non -dead load, (live , wind, snow I To tal Deflection 1.00(Dead Load Deflection) + Live Lead Deflection. Lateral stability(+): Lu - 3. 51 Le - 271-7.19" RB = 11.6 Design Notes: I WoodWorlu� nalysis and design are in accordance with the 10C International Building Code (IBC 2015). the National Design Specification INDS 2015), and NDS Design Supplement. 2: Please verifyothat the default deflection limits are appropriate for your application. 3 SOL-BEAMS (Structural Composite Lumber): the attached SOL selectlon Is for preliminary design only. For final member design contact your n�J SCL manufacturer. 4: Size factors vary from one manufacturer to another for SOL materials. They Dan be changed In the database editor. 5. FIRE RATING: LVL, PSL and LSL are not rated for fire endurance. COMPANY PROJECT WoodWorks' July 23, 2018 15:50 Beam3wwb SOFTWARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11.1 Loads: T-1 -t-.t I I M gnitude Unit IDistributionlP I.:t.-nl B rion t Enfr rt F,,d �L-11� ad 'It jb PP11 Loa.� Live Full U L Full 1 1 :U 240 0 pl Dead UUD�L 12 . 3 Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 13'-721' Unf ctozed i Dead Live 1008 1. 1008 1632 Fee red: Total - 2640 2640 ,:,in c C ity Beam 2640 2640 B upp..t 2923 2923 De ti. 8: - 1.00 1 00 support 0. 9 0 0:90 Load comb #2 *2 Length 21 1.21 Mi n reqld 1. 21 1.2 1 Cb 1.00 1.00 Cb min 1.00 1.00 Cb Supp. rt 1 11 1.11 I Fcp Up ;2S 625 PSL, ZOE, 2.OE, 3-1/2"x11-114" Supports: All - Timber -soft Beam, D.Fir-L N0.2 Total length: IT-7.21"; Clear span: 13'-4.79'; volume z 3.7 cu.R. I Lateral support: top= at supports, bottom= at supports; WARNING: this CUSTOM SIZE Is not in the database. Refer to online help, Analysis vs. Allowable Stress and Deflection using NOS 2015: criterion I Analysis Value, Design Value Unit Ana I 113WOP" she at tv Z90 1v717 OB29 Bending(+) it, 14 38 2716 psi fb/Fb' = 0 53 Li 0.22 L/750 0.45 L, 360 in In" 0:48 To 0.42 L1309 0,68 L/240 0.62 Additional Data: FACTORS: F/E(pai)CD CK Ct CL CV Cf. C. Cf.t Ci Cn LC# 290 1 .00 1.00 - - - 1.00 1.00 2 Fb-+ 2900 1 1.00 0. 931 1.01 1 00 1 00 - 2 F-P 625 1.00 - - 1:00 'j, 2.0 million 1.00 1 . 00 - 2 Emi ey 1 1.04 million 1.00 1 . 00 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 D+L ' V "X = 2621, V design 2237 lbs .end,.g,.) : LC #2 D+L, M = a 84 6 lb,-ft Deflection: LC #2 D+L (live) LC #2 D+L (total) D=d'ad L-live S-s-ow W-i-d I=Jurpact Lr-roof live L-concentrated E=earthquake All LC a a re I isted in the A. ly in -tput Load combination- ASCE 7-10 ; NC 2015 CALCULATIONS. �eflcction: ZI = B3leO6 lb-inZ Live " d Election Deflection from all n-dead loads (live, wind, snow...) Tlt:l Deflection 1:50(Dead Lo.d.Deflection) + Live Load Deflection. Let r. I t..ility(+). Lu = 131-6 DO- Le = 24-10.06" Re - 16.5 Design Notes: 1. WoodWorks analysis and design am in accordance With the ICC International Building Code (IBC 2015),the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. SCL-BEAMS (Structural Composite Lumbeo: the attached SOL selection is for preliminary design only. For final member design contact your local SOL manufacturer, 4. Size factors vary from one manufacturer to another for SCL materials. They can be changed in the database editor. . ... . .... . .. . ......... .... . ..... .. ................ . .. . ........ ........ .. .... .... .. . . . . ..... ... . .. ...... ..... . ..... ....... ..... .... .................... ....... ..................... ............. .. . .... . ........ .......... . .......... :IeAu stm� ............ .. ...... ..................... ........... .. r6 - G-A 1. S.-I. I, ij 1 . ......... F.Ott.�-- . .... . ...... . ....... .. .......... - L ............. . ................ ---------- . . ......... ...... .......... . .. . . .... . ... . .......... ............... . W" W4 .... ...... ...... . ... . .... .. ......... .................. .... ........ . ..... . ............ . ..... . .......... ........ .. ....... . ....... . .... . ....... .. . . ............................. . . . . .. . . . . ........ . . .. .............. ........ .... ... ......... C #-Xj<4- ... . ......... .... . ..... .. . ......... .. ........... .... I, i ---------- 'P ... . .. .... ft ........... Z0.1 - - ------- - ILA - - - - - - . .. . . ..... . Ak . ....... ............. . . ....... .. .......... .. .. ............ . . . .... .... .......... . ................. ... .. ............ . . . .. ............... . .. ......... ........ -M A ..... . .......... Sw 6.4r . . ......... . .. ... . ... ... - .......... . .. . .... . . .. ............ ..... ... ..... ........ .. . .. .. ... ..... - Vt 16 f. .... . .... . ... . ... ..... . . ...... . ..... ............. . ......... .. ...... . ........... . .. . .......... . .... .. . . . .... . . .. ...... ....... .. . ... .. .. .... . .. . ........ . ..... ...... . .. . . ... ..... ... . ............. ... ......................... ... . ........ . ............. .... . . . ....... . ....... ......... .. . . ................... . . ... . .......... . . . . . . . ... ............ ... .......... . r . . .............. . . . i 31V SiL - - - --------- --- . . . ... ............ .. ... . ............ . ........ ...... . . . ......... . . - -ro i )C/ . . .............................. . ...... .. . .......... . .. . ....... . . ........ . ...... . . . ....... . . .......... .. ........ . . ... I ............. . - - - - - - --------- .. . . . . . . .............. .......... . ................. . .... ...... ..... .. . . ..... ............... 4. ........ .... .. I ......... ....... . ............. ... ...... . Description By )t�17 Date Checked Date ENGINEERING Scale Sheet No. 250 4th Ave. South Suite 200 Edmonds, WA 98020 Job No. 425.778.8500 www.cgengineering.com COMPANY PROJECT WoodWork I s July 20, 2018 16:07 sisteredjoists.wwb SOFTWARE FOR WOOD DES GN Design Check Calculation Sheet WoodWorks Sizer 11. 1 Loads: Load Type Distribution Pat- Location (ft] Magnitude unit tern Start End Start End _0") Loadl Dead - Full Area 12. 0 0 (T6. psf Load2 Dead Full Area 1 40.00(16.0") psf Self -weight Dead -----Full UDL _ 7.0 plf Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 16-0.57" Unfactored: Dead 688 688 Factored: Total - 668 688 Bearing: - Capacity Joist 68B 688 Support 1195 1195 Des ratio Jo i st 1.00 1.00 support 0.58 0.58 Load comb *1 #1 Length 0.57 0.57 Min reqld a. 57 0.57 Cb 1 00 1 00 cb min 1 00 1:00 Cb support 1.13 1 . 13 Fop sup 1 6251 625, Lumber n-ply, Hem -Fir, Nlo.2,2x112,2-ply (3"xil-1/4") Supports: All - Timber -soft Beam. D.Fir-L No.2 Floor joist spaced at 16.0" c/o; Total length: 1 W-0.57"; Clear span: 1T-1 1.43"; volume = 4.2 OU ftr Lateral support: top= full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion Analysis Value Desiqn Value Unit Analysis/Design Shear fv = 27 Fv1 = 135 psi fv/Fv' = 0.20 Bending(+) fb = 586 Fb' = 880 psi fb/Fbl = 0.67 Live Deflln negligible Total Defl'n 0.58 = L/369 0.90 = L/240 in 0.65 Additional Data: FACTORS: F/E(psi)CD CM ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv:+ 150 0.90 1.00 1.00 - - - - 1.00 1.00 1.00 1 Eb 850 0.90 1.00 1.00 1.000 1.000 1.00 1.15 1.00 1.00 - 1 Fcpl 405 - 1.00 1.00 - - - - 1.00 1.00 - - E, 1.3 million 1.00 1.00 - - - - 1.00 1 00 - 1 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1:00 - 1 CRITICAL LOAD COMBINATIONS: Shear : LC #1 = D only, V max 687, V design 613 lbs Bending(+): LC #1 = D only, M = 3090 lbs-ft Deflection: LC #1 = D only (total) D=dead L--live S=snow W-wind I=impact Lr=roof live Lc=concentrated E-earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: EI 23leO6 lb-in2/ply "Live" deflection = Deflection from all non -dead loads (live, wind, snow...) Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (Nos 2015). and NOS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3- Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4. 1. 4. FIRE RATING: Joists, wall studs, and multi -ply members are not rated for fire endurance. WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN sistered joists.wwb WoodWorks@ Sizer 11.1 July 24, 2018 13:51:19 Critical Results ANALYSIS DIAGRAMS (known section - includes self -weight) REACTION [lbs] Maximum... Uplift: 0 Bearing: 688 68B 688 01 18, SHEAR [lbs] Load Combination #1: D only 3 0 V design: 613 343 6 �13 01 131-61 18' BENDING [lbs-ft] Load Combination #1: D only +M max: 3090 3090 2318 A A of 91 13'-6" TOTAL DEFLECTION [in] Load Combination #1: D only Total = 1.50 x Dead + Live (all others) Critical Live: 0.00 Critical Total: 0.58 0.21 0 0.48 of 91 18' REO"' DENCE L A'FE"�" FOUNDATION 15729 75TH PL W EDMONDS, WA 98026 OWNER CONSULTANTS SHARON & CARL LARSEN STRUCTURAL ENGINEER GEOTECHNICAL ENGINEER 9832 MARINE VIEW DRIVE CG ENGINEERING NELSON GEOTECHNICAL ASSOCIA7ES, INC MUKILTEO,WA98275 250 4TH AVE S, SUITE 200 17,311 135TH AVENUE NE A-500 425.349.1451 EDMONDS, WA 98020 WOODINVILLE, WA 98072 SHARON.LARSEN@FRONTIER.COM 425.778.8500 FAX 778.5536 425 ' 486.1669 CONTACT. DENNIS TITUS, PE. SE CONTACT: LEE S. BELLAH LEGAL DESCRIPTION ALL OF TRACT 27 MEADOWDALE BEACH SUPPLEMENTAL PLAT, SNOHOMISH COUNTY, WASHINGTON PARCEL NUMBER 00513300002700 PROPERTY INFORMATION EX BUILDING FOOTPRINT = 1904 SOFT PROPOSED BUILDING FOOTPRINT = NOT TO CHANGE SCOPE OF WORK THIS PROJECT INVOLVES THE STABILIZATION OF AN EXISTING HOME THAT HAS EXPERIENCED SOME SETTLEMENT. WILL UNDERPIN THE EXISTING FOUNDATION WITH r DIAMETER PIN PILES TO SUPPORT FUTURE LOADS OFTHE PLANNED ADDITIONAL FLOOR. FILTER FABRIC MATERIAL 36" MIN WIDE ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. FILTER FABRIC 2"x2" BY 14 GA. WIRE MATERIAL FABRIC OR IVALENT 2"x2'. BY 14 GA WIRE FABRIC OR EQUIV IF STANDARD STRENGTH FABRIC IS USED 6"x6" MIN TRENCH AC U. TRENCH 1�11F" �ER I BURY B 0 40 1 IF IL IV Scat OR �1' N F!�TRENCH3 WASHED ROCK MATER At 1 6"XI6 NAT E 6", TYP VX4�'WOCID POSTS, STANDARD 2"x4'. WOOD POST ALT: OR BETTER OR EQUAL STEEL FENCE POSTS ALTERNATE: STEEL FENCE POSTS SILT FENCE NOTES: 146 1. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6 INCH OVERLAP, AND BOTH ENDS SECURELY FASTENED TO THE POST. 2. THESILT NCE SHALL BE INSTALLED TO FOLLOW THE CONTOURS (WHERE FEASIBLE). THE FENCE POSTS SHALL BE FE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 18 INCH 3. A SHALLOW TRENCH SHALL BE EXCAVATED, ROUGHLY 6 INCHES WIDE AND 6 INCHES DEEP, UPSLOPE AND AEDSJACENT TO THE WOOD POSTS To ALLOW THE LOWER EDGE OF THE FILTER FABRIC TO BE SECURED WITH GRAVEL. 4. WHEN FILTER FABRIC NOTAS STRONG AS MIRAF] 70OX IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY-DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE MESH SHALL EXTEND 114TO THE SHALLOW TRENCH A MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE. 5. THE MIRAFI 70OX FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND AT LEAST 18 INCHES OF THE FABRIC SHALL BE BURIED IN THE SHALLOW TRENCH. THE FILTER FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE AND SHAUL NOT BE STAPLED TO TREES. 6. WHEN EXTRA -STRENGTH FILTER FABRIC (MIRAF1 70OX OR EQUAL) AND FOUR (4') POST SPACING IS USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF NOTE 5 APPLYING. 7 ' THE TRENCH SHALL BE BACKFILLED WITH NATIVE SOIL OR 3/4�'-15' WASHED ROCK. 8. FILTER FABRIC FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. THE NEWLY DISTURBED AREAS RESULTING FROM SILT FENCE REMOVAL SHALL BE IMMEDIATELY SEEDED AND MULCHED, OR OTHERWISE PERMANENTLY STABILIZED TO THE SATISFACTION OF THE CIVIL INSPECTOR. 9. SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. 10. MAINTENANCE: ANY DAMAGED OR CLOGGED FENCE SHALL BE REPAIRED/REPLACED IMMEDIATELY. SEDIMENT MUST BE REMOVED WHEN THE SEDIMENT DEPTH IS 6 INCHES OR GREATER. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. SILT FENCE SCALE: 1/2" = V-0" 1 12 L )vr(dr+ raA . " 1*4 1 -Ha 60"IdiA.) )k1wc4-,w w,U ki�tnv�n-e, Ka4fvvA -IV 4v t'4-5 uyl:ji�kA Nothing in thia writ 2porwarl pmess shall k 18 t orp" ed a lil "T ' ' "' g ' na"" ngh, avunw- 11 ofan,,,—`11cy1"a1Iw ..._ . _. or a._— -11, or sue 1 ... _'J.h Is n r.I applies... mc= I buffl.. . anit og,. I. sh.— o�n Oh'. ". an Such buildiag, structure or en. satilict cfa acparau ........... q�, '�TW14- (tq (bl 1`44�vni Qt�—d-n; 4w) eNGINEIERING 250 4TH AVE. S., SUITE 200 EDMONDS . WASHINGTON 98020 PHONE (425) 778-8500 Nil FAX (425) 778-5536 KNOWN LAND AREA SLIDE '&C41'L IN #Y M �A PROJECT SITE WALL -J RI1 LINE TYP. NeO 131 �';�'oant a hall rapair/replace all damage to 'it/ ep'ac damage to. � or r o f, � mintage improvements arp"vemen. m City in City -" "or stendards Ithat . caused 'w yp --�Wfiy Per CAystandards that is c, used a -q as during the Permitted project. to . OWNEFVCO NMACTOR RESPONSIBLE FOR LOCATING ALL ON -SUE UTILITIES, ri" damege tq utiAW orfrDn'tage ir provementa in City RELOCATION/REVISION TO ANY UTILITIES right-0-la/UY per Cityntandards; that N caupect orow"13 during the permitted project. MAY REOj ' :,",E SEPARATE PERMIT rjWNER!0O,ViR1,CTOR IS RESPONSIBLE FOR EROSION COIWOL AND DIRMNACE 071 /15 21D �Nom- z S 2 in (A (L 0 w 0 2 2 LLI OW ow 4-----.4 --- 4-4 .256- 25— APP40%1YBY qrw DY�ew 7� J�r� 1 1 1 1. Ir soft, Z.- -ro rqpft- AfftoVA� br- MS fanmric I BUILDING DEPARTMENT OWNER La APPROVED DATE: BLE PERMIT WUMBER M rf�� DESIGN: NAL DRAWN: JEG CHECK: DIAT JOB NO: 17145.10 DATE: 02/21/18 (0 C14 LLJ 3: 0 0 00 z _j 0) LLJ CL 2 < V) z Lu < fl� Lo —J r- D- :z UJ IM, z (/) C-4 0 LLI < LO CI -J — ILLJ V) SHEET Is U B JUL 2 6 2018 STRUCTURAL NOTES_ (THESE NOTES ARE TYPICAL UNLESS NOTED OR DETAILED OTHERWISE ON DRAWINGS) CODE ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, SPECI FICATIONS, AND THE INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION. SPECIFICATIONS AND STANDARDS WHERE REFERENCED ON THE DRAWINGS ARE TO BE THE LATEST EDITION. DESIGN LOADS DEAD LOADS: ROOF 15 PSF FLOOR 12 PSF LIVE LOADS: ROOF (SNOW LOAD) 25 PSF FLOOR 40 PSF (LIVE LOADS ARE REDUCED WHERE PERMISSIBLE PER ISC SECTION 1607.10). STATEMENT OF SPECIAL INSPECTIONS SPECIAL INSPECTIONS ARE REQUIRED AS INDICATED IN THE FOLLOWING TABLE. THE CONTRACTOR SHALL SUBMIT A WRITTEN STATEMENT 0 F RESPONSIBILITY TO THE BUILDING OFFICIALAND OWNER PRIOR TO COMMENCEMENT OF WORK IN ACCORDANCE WITH CHAPTER 1704.4 OF THE IBC. FREQUENCY AND DISTRIBUTION OF REPORTS - INSPECTION REPORTS SHALL BE PROVIDED FOR EACH DAY ON SITE BY SPECIAL INSPECTOR. STRUCTURAL OBSERVATION REPORTS SHALL BE PROVIDED AFTER EACH OBSERVATION� REPORTS SHALL BE DISTRIBUTED TO THE CONTRACTOR, ARCHITECT, ENGINEER AND BUILDING OFFICIAL. SPECIAL INSPECTION OPERATION CONT PERIODIC REMARKS SOILS PIPE PILING INSTALLATION x GEOTECH ENGINEER HELICALANCHOR INSTALLATION x GEOTECH ENGINEER PILING REFUSAL VERIFICATION x GEOTECH ENGINEER CONCRETE AD ORS X IF REO'D SHOP & FIELD WELDING SINGLE PASS FILLET WELDS!� 5/16" X FILLET WELDS � 5116" X OTHER WELDING x SHOP DRAWINGS NOT REQUIRED. FOUNDATIONS: PIN PILES SOILS REPORT: REPORT NO: 999017 PREPARED BY: NELSON GEOTECHNICAL DATED: 09/29/17 ALLOWABLE PILE CAPACITY. 3"o PILE 6 TONS 2"0 PILE 3 TONS PASSIVE EARTH PRESSURE: 250 PCIF LATERAL EARTH PRESSURE: UNRESTRAINED: 45 PCF , ANY APPLICABLE SURCHARGE RESTRAINED: 65 POP IMPORTED STRUCTURAL FILL AND BACKFILL MATERIAL SHOULD CONSIST OF CLEAN, WELL GRADED GRANULAR MATERIAL FREE OF DEBRIS OR ORGANICS WITH A MAXIMUM PARTICLE DIAMETER OF TH REE I INCH ES AND NO MORE THAN 10% FINES (PASSING THE #200 SIEVE). FILL AND BACKFILL MATERIAL SHOULD BE PLACED IN LEVEL LIFTS NOT EXCEEDING TWELVE (12") INCHES IN LOOSE THICKNESS AND COMPACTED TO A MINIMUM OF 95% OF ITS MAXIMUM DRY DENSITY AS DETERMINED BY ASTM TEST METHOD D1557-00. BACKFILL BEHIND ALL RETAINING WALLS WITH WELL -DRAINING, GRANULAR FILL AND PROVIDE FOR SUBSURFACE DRAINAGE. PROVIDE DAMPPROCIFING AT EXTERIOR FACE OF ALL FOUNDATION WALLS EXPOSED TO EARTH PER ARCHITECTURAL SPECIFICATIONS. T-0 PIPE PILING INSTALLATION 3" STD PIPE SHALL CONFORM TO ASTM A53 GRADE A OR B, FY = 30 KSI (MIN) REFERENCE PLAN FOR ANY BATTER PILES REQUIRED. PIPE PILING SHALL BE DRIVEN INTO THE SUBGRADE TO A POINT OF REFUSAL BY MEANS OF A TRACTOR MOUNTED TB425 BREAKER HAMMER W/ AN ENERGY RATING OF 1100 FT -LB, WITH REFUSAL BEING DEFINED AS 4 INCH OR LESS OF PENETRATION DURING I MINUTE OF SUSTAINED DRIVING. PIPE SECTIONS SHALL BE BUTTED TOGETHER AND WELDED. PROPERLY PREPARE ENDS OF WELDED JOINTS TO AVOID FRACTURE OF JOINT. WELDED COUPLERS $HALL BE USED. WHERE NOT INDICATED, MINIMUM FILLET WELD SIZE SHALL BE PER TABLE 5.8 IN AWS "STRUCTURAL WELDING CODE". WELDING SHALL CONFORM TO AWS Dl. 1 LATEST EDITION. ALL WE UDING SHALL BE DONE WITH 70 KSI LOW HYDROGEN ELECTRODES. ALL WELDING SHALL BE PERFORMED By WELDERS CERTIFIED IN ACCORDANCE WITH AWS AND WABO. SLEAVED COUPLERS IF DESIRED SHOULD BE SUBMITTED TO THE ENGINEER FOR APPROVAL. HELICAL SCREW ANCHORS SCREW ANCHORS SHALL BE CONTRACTOR SELECTED AND BE CAPABLE OF DEVELOPING DESIGN LOAD ON THE ANCHOR SCHEDULE. ANCH OR SHAFT SHALL BE 11/2" SQUARE AN D HELIX SHALL HAVE A 3/8" MINIMUM THICKNESS. ANCHOR SHAFT SHALL BE 11/2" SQUARE. H E LIX SHALL CONFORM TO ASTM A29 AND HUB SHALL CONFORM TO ASTM A576. EXTENSIONS TO HAVE SAME SHAFT SIZE AND TYPE AS ANCHOR. ANCHORS SHALL BE COATED FOR CORROSION PROTECTION. COATING MAY BE HOT DIP GALVANIZED OR CORROSION RESISTANT EPDXY PAINT. THE CONTRACTOR MAY USE AN ENGINEER -APPROVED EQUAL IF IT IS CAPABLE OF DEVELOPING THE DESIGN LOADS LISTED IN THE FOUNDATION NOTES. REFER TO SOILS REPORT FOR ADDITIONAL ANCHOR INSTALLATION REQUIREMENTS. CONCRETE ALL CONCRETE SHALL BE MIXED, PROPORTIONED, CONVEYED, AND PLACED IN ACCORDANCE WITH SECTION CHAPTER 5 OF ACI 318 AND THE AMERICAN CONCRETE INSTITUTE'S SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS (ACI 301). ALL CONCRETE SHALL BE STONE -AGGREGATE CONCRETE HAVi NG A U IN IT WE IG HT OF APPROXIMATELY 150 POUNDS PER CUBIC FOOT. CONCRETE STRENGTHS AT 28 DAYS WC) AND MIX CRITERIA SHALL BE AS FOLLOWS: TYPE OF CONSTRUCTION PC MAXIMUM WATER/CEMENT RATIO MIN CEMENT CONTENT PER CUBIC YARD AXIMUM SHRINKAGE STRAIN SLABS ON GRADE 3000 PSI 0.55 5 1/2 SACK N/A FOOTINGS 3000 PSI 0.55 5 1/2 SACK N/A GRADEBEAMS 3000 PSI 0.50 5 1/2 SACK N/A WALLS 4000 PSI 0.45 5 1/2 SACK N/A OTHER CONC. L� 250�!`Si 0.45 5 SACK N/A 11 THE MINIMUM AMOUNT OF CEMENT LISTED ABOVE MAY BE CHANGED IF A CONCRETE PERFORMANCE MIX 15 SUBMITTED TO THE ENGINEER AND THE BUILDING DEPARTMENT FOR APPROVAL TWO WEEKS PRIOR TO PLACING ANY CONCRETE. THE PERFORMANCE MIX SHALL INCLUDE THE AMOUNTS OF CEMENT, FINE AND COARSE AGGREGATE, WATER, AND ADMIXTURES AS WELL AS THE WATER -CEMENT RATIO, SLUMP, CONCRETE YIELD, AND SUBSTANTIATING STRENGTH DATA IN ACCORDANCE WITH CHAPTER 5 OF AC(318. ALL CONCRETE EXPOSED TO WEATHER OR TO FREEZING TEMPERATURES SHALL BE AIR -ENTRAINED IN ACCORDANCE WITH ACI 318 TABLE 4.2.1 FOR MODERATE EXPOSURE CONDITION. UNLESS OTHERWISE NOTED, REINFORCING SPLICE LENGTHS AND DEVELOPMENT LENGTHS SHALL BE AS TABULATED RFJ nw. Vc = 2500 PSI DEVELOPMENT LENGTH LAP SPLICE BAR TENSION COMPRESSION TENSION COMPRESSION SIZE TOP EARS OTHER BARS ALL BARS TOPBARS OTHER BARS ALL BARS #3 24 18 9 30 23 12 #4 31 24 12 41 31 is #5 39 30 15 51 39 19 #6 47 36 18 61 47 23 6;8 53 21 8L9 !! 27 60 24 102 1 7. 30 Vc - 3000 PSI DEVELOPMENT LENGTH LAP SPLICE BAR TENSION COMPRESSION TENSION COMPRESSION SIZE TOP BARS OTHER BARS ALL BARS TOP BARS OTHER BARS ALL BARS #3 22 17 9 28 22 12 #4 29 22 11 37 29 is #5 36 28 14 47 36 19 r 43 33 17 56 43 23 #1 63 4. 20 81 63 27 #8 1 72 22 93 72 30 M 1. ALL LENGTHS ARE IN INCHES. 2. ALL LAP SPLICES ARE CLASS B. 3. "TOP BARS" ARE HORIZONTAL REINFORCEMENT PLACED SUCH THAT MORE THAN 12 INCHES OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR. I PROVIDE THE FOLLOWING MINIMUM REINFORCING UNLESS NOTED OR DETAILED OTHERWISE fGRADF AM - THICKNESS REINFORCING PLACEMENT 6" WALLS #4 @ 13" OC EA WAY CENTERED 8" WALLS N5 @ 15" OC EA WAY CENTERED lV'WALLS #4 @ 16" OC EA WAY, EA FACE CONCRETE GENERAL NOTES VERTICAL BARS SHALL START FROM TOP OF FOOTING. HORIZONTAL BARS SHALL START A DISTANCE OF 1/2 THE NORMAL BAR SPACING FROM TOP OF FOOTING AND TOP OF FRAMED SLABS. IN ADDITION, THERE SHALL BE A HORIZONTAL BAR AT A MAXIMUM OF 3" FROM TOP OF WALL AND BOTTOM OF FRAMED SLABS. PROVIDE CORNER BARS TO MATCH THE HORIZONTAL REINFORCING WITH TENSION LAP SPLICE AT EACH SIDE PER TABLE, OR BEND ONE SIDE OVER TO PROVIDE TENSION LAP. PROVIDE CONTROL OR CONSTRUCTION JOINTS IN SLABS ON GRADE TO BREAK UP SLAB INTO RECTANGULAR AREAS OF NOT Mo RE THAN 400 SQUARE FEET EACH. AREAS TO BE AS SQUARE AS PRACTICAL AND HAVE NO ACUTE ANGLES . JOINT LOCATIONS TO BE APPROVED BY THE ARCHITECT. ALL CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED AND PROPERLY PREPARED IMMEDIATELY PRIOR TO POURING OF CONCRETE. DOWEL STEEL SHALL BE THE SAME SIZE AND SPACING AS MAIN REINFORCING DETAILED BEYOND JOINT. SEE ARCHITECTURAL DRAWINGS AND MECHANICAL DRAWINGS FOR EXACT LOCATIONS AND DIMENSIONS OF OPENINGS IN CONCRETE WALLS, FLOORS AND ROOF. UNLESS INDICATED OTHERWISE, REINFORCE AROUND OPENINGS GREATER THAN 12" IN EITHER DIRECTION WITH (2) #5 EACH SIDE AND (1) #5 x 4'-0" DIAGONAL AT EACH CORNER. EXTEND BARS T-O"BEYOND EDGE OF OPENING. IF 2`0" IS UNAVAILABLE, EXTEND AS FAR AS POSSIBLE AND HOOK. HOOK ALL REINFORCING INTERRUPTED BY OPENINGS. BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE SHALL NOT BE FIELD BENT UNLESS SO DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER. SEE ARCHITECTURAL DRAWINGS FOR ALL GROOVES, NOTCHES, CHAMFERS, FEATURE STRIPS, COLOR, TEXTURE AND OTHER FINISH DETAILS AT ALL EXPOSED CONCRETE SURFACES. PROVIDE 3/4" CHAMFER AT ALL CORNERS EXCEPT AS NOTED. NON -SHRINK GROUT NON -SHRINK GROUT SHALL BE CEMENT -BASED WITH A MINIMUM COMPRESSIVE STRENGTH OF 5000 PSI WHEN TESTED IN ACCORDANCE WITH ASTM C-109. GROUTSHALL BE MIXED AND PLACED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. ITRUCTURAL STEEL STRUCTURAL STEEL DESIGN, FABRICATION AND ERECTION SHALL BE IN ACCORDANCE WITH THE AISC "SPECIFICATION FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS", LATEST EDITION. SHAPES SHALL CONFORM TO ASTM A992, Fy = 50 KSL PLATES, ANGLES, AND RODS SHALL CONFORM TO ASTM A36, Fy = 36 KSL STRUCTURAL TUBING SHALL CONFORM TO ASTM A500 GRADE 8, Fy = 46 KSL STEEL PIPE SHALL CONFORM TO ASTM A53 GRADE B, Fy = 35 KSL BOLTS CONNECTING STEEL MEMBERS SHALL CONFORM TO ASTM A32S-N. BOLTS SHALL BE 3/4"0 MINIMUM, ONO ANCHOR BOLTS SHALL CONFORM TO ASTM A307. CONTRACTOR SHALL PROVIDE CONNECTION ADJUSTMENT TOLERANCES TO SATISFY THE REQUIREMENTS OF AISC MANUAL OF STEEL CONSTRUCTION. UNLESS SPECIFIED AS STAINLESS STEEL, ALL STEEL MEMBERS, SHAPES, BOLTS, AND ACCESSORIES EXPOSED TO WEATHER SHALL BE HOT DIP GALVANIZED. WELDING WELDING SHALL CONFORM TO AWS "STRUCTURAL WELDING CODE", LATEST EDITION. ALL WELDING SHALL BE DONE WITH 70 KSI LOW HYDROGEN ELECTRODES. WHERE NOT CALLED OUT, M [NI MUM FI LLET WELD SIZE SHALL BE PER TABLE 5.8 IN AWS D1.1, LATEST EDITION. WELDING OF REINFORCING BARS SHALL NOT BE PERMITTED UNLESS SPECIFICALLY CALLED OUT ON DRAWINGS OR APPROVED BY STRUCTURAL ENGINEER. WELDING OF GRADE 60 REINFORCING BARS SHALL BE PERFORMED USING LOW HYDROGEN ELECTRODES. WELDING OF GRADE 40 REINFORCING BARS SHALL BE PERFORMED USING E70XX ELECTRODES. SEE REINFORCING NOTES FOR MATERIAL REQUIREMENTS OF WELDED BARS. WELDING WITHINVOF COLD BENDS IN REINFORCING BARS IS NOT PERMITTED. ALL WELDING SHALL BE DONE BY WASHINGTON ASSOCIATION OF BUILDING OFFICIALS (WABO) CERTIFIED WELDERS. IUMBER ALL GRADES SPECIFIED ARE MINIMUM GRADES REQUIRED. ALL LUMBER SHALL BE IN ACCORDANCE WITH WWPA GRADING RULES, KILN -DRIED TO MC 19 AND OF THE FOLLOWING MINIMUM STANDARDS: SIZE CLASSIFICATION SPECIES GRADE Fb (PSI) Fc (PSI) SLEEPERS DOUG-FIR STUD 700 - LIGHT FRAMING (STUDS) HEM -FIR STUD 675 800 2x JOISTS AND PLANKS HEM -FIR #2 850 - PLATES AND BLOCKING HEM -FIR #2 850 6x AND LARGER BEAMS AND ' STRINGERS T I DOUG-FIR #2 875 4x A�ND SMALLER BEAMS AND L ST STRINGERS I [�AALL HEM -FIR #2 850 ILL P; T POSTS AND TIMBERS __20UG-FIR 1 #1 1200 1000 REFER TO PLAN NOTES, SCHEDULES, AND DETAILS FOR MORE SPECIFIC LUMBER SIZE AND GRADE REQUIREMENTS. UNLESS NorED OTHERWISE IN THE PLANS, ALL WOOD AND WOOD -BASED MEMBERS EXPOSED TO WEATHER OR IN CONTAcr WITH CONCRETE, MASONRY, OR WITHIN 8" OF SOIL SHALL BE PRESERVATIVE -TREATED BY VACUUN,PRESSURE IMPREGNATION IN ACCORDANCE WITH AWPA STANDARD Ul. NAILS, DDLTS, AND METAL CONNECTORS FOR WOOD ALL NAILS SHALL CONFORM TO THE STANDARDS SET FORTH BY THE NATIONAL DESIGN STANDARDS (NDS) FOR WOOD MNSTRUCTION, LATEST EDITION. NAILING NOT SPECIFIED SHALL BE PER IBC TABLE 2304.10.1 NAILING SCHEDULE. ALL NAILS CALLED OUT ON PI ANq qWAI I Rp r-Aunm m- c i i,n cc Mttl UK EXCEED ME FOLLOWING MI NAIL IMUM GUIDELINES: SHANK 0 MIN LENGTH 8dCOMMON 0,1310 2 1/2" SHANK 10dCOMMON 0.1480 3"SHANK 12d COMMON 0.1480 3 1/4" SHANK l6d COMMON 0.1620 3 1/2"SHANK 1UG dUA NALb MAY BE SUBSTITUTED FOR 8d COMMON NAILS WITH NO CHANGE IN NAIL SPACING. FRAMING MEMBERS MAY BE NAILED WITH 16d SINKERS (0.148"0 x 3 1/4"), BUT ONLY 16d COMMON NAILS SHALL BE USED WHERE 16d NAILS ARE INDICATED IN THIS DRAWING SET. ENGINEER MAY APPROVE OTHER NAILS IF NAIL LABELS ARE SUBMITTED TO ENGINEER PRIOR TO START OF CONSTRUCTION. ALL BOLTS IN WOOD MEMBERS SHALL CONFORM TO ASTM A307. PROVIDE WASHERS UNDER THE HEADS AND NUTS OF ALL BOLTS AND LAG SCREWS BEARING ON WOOD. LEAD HOLES FOR LAG BOLTS SHALL BE BORED FOR THE SHANK ANDTHREADED PORTIONS PER NOS 11.1.3. CONNECTORS CALLED OUT BY LETTERS AND NUMBERS SHALL BE "STRONG -TIE" BY SIMPSON COMPANY, CATALOG TO BETHE LATEST EDITION, OR ENGINEER APPROVED EQUAL. CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND WITH THE NUMBER AND SIZE OF FASTENERS AS SPECIFIED BY THE MANUFACTURER. WHERE CONNECTOR STRAPS CONNECT TWO MEMBERS, PLACE ONE-HALF OF THE NAILS, SCREWS, OR BOLTS IN EACH MEMBER. INSTALL SOLID BLOCKING AT ALL BEARING POINTS. ALL SHIMS SHALL BE SEASONED, DRIED, AND THE SAME GRADE (MINIMUM)AS MEMBERS CONNECTED. TIMSERSTRAND, MICROULAMI, AND PARALLAM MEMBERS FABRICATED IN CONFORMANCE WITH THE INTERNATIONAL CODE COUNCIL EVALUATION SERVICE (ICC-ES) REPORT NO, ESR-1387 OR CCMC REPORT NO. 12627-R, 08675-R, AND 11161-R. EACH MEMBER SHALL BE IDENTIFIED BY A STAMP INDICATING THE PRODUCT TYPE AND GRADE, ICC-ES OR CCMC REPORT NUMBER, MANUFACTURER'S NAME, PLANT NUMBER AND INDEPENDENT INSPECTION AGENCY'S LOGO. FABRICATOR SHALL BE CERTIFIED. MEMBERS SHALL MEETTHE FOLLOWING MINIMUM STANDARDS: SIZE CLASSIFICATION SPECIES GRADE Fb (PSI) Fv (PSI Fe (PSI) BEAMS & POSTS (d < 9 1/2--) LSL 1.3E 1,700 425 1,835 RINS & BEAMS (d ?. 9 1/2") LSL 1.55E 2,325 310 BEAMS & POSTS LVL 2.OE 2,600 28S 2,510 POSTS (d �9 1/211) PSL 1.8E 2,400 190 2,500 BIAMS (d � 9 1/2") PSL 2.2E 2,900 290 - I IM5tM I HAND, MICROULAM, AND UNTREATED PARALLAM MEMBERS ARE INTENDED FOR DRY -USE APPLICATIONS. UNLESS NOTED OTHERWISE, ENGINEERED WOOD BEAMS EXPOSED TO WEATHER SHALL BE TREATED PER MANUFACTURES RECOMMENDATIONS. TYPICAL FRAMING NOTES 1. BEARING WALL FRAMING 2x STUDS @ 16" OC FOR ALL SHEAR AND/OR BEARING WALLS ONO. REFER TO FRAMING PLAN NOTES FOR TYPICAL DOOR & WINDOW HEADERS NOT CALLED OUT ON THE PLANS. HEADERS SHALL BE SUPPORTED BY A MINIMUM OF (1) CRIPPLE AND (1) FULL HEIGHT STUD UNO. COLUMNS BELOW FLUSH MULTIPLE JOIST BEAMS SHALL BE EQUAL IN WIDTH TO THE BEAM. ALL COLUMNS NOT CALLED OUT OTHERWISE SHALL BE TWO STUDS. 2. WALL BASE PLATE ON CONCRETE WALL PLATES BEARING ON CONCRETE SHALL BE PRESSURE -TREATED. FOR ALL EXTERIOR AND INTERIOR WALLS, BOLT PLATES OR SILLS TO CONCRETE WITH 5/8 INCH DIAMETER ANCHOR BOLTS WITH 7 INCH MINIMUM EMBEDMENT. PLACE AT V-0" OC MAXIMUM FOR SHEAR WALLS, AND AT V-0" OC FOR BEARING WALLS AND OTHER PARTITIONS. USE M INIMUM OF TWO ANCHOR BOLTS PER SILL AND PLACE ONE WITHIN 12 INCHES OF EITHER END TYPICAL UNLESS NOTED OR DETAILED OTHERWISE. REFER TO SHEAR WALL SCHEDULE. AT ALL SILL PLATE ANCHOR BOLTS, CONTRACTOR SHALL INSTALL 1/4" x 3" x 3" FLAT PLATE WASHERS. 3. ROOF AND FLOOR FRAMING PROVIDE 1 1/2" BLOCKING FOR JOISTS AND RAFTERS AT ALL SUPPORTS AND AT 8'-0" OC MAXIMUM UNO. INSTALL DOUBLE JOISTS UNDER PARTITIONS EXTENDING ONE HALF OR MORE OF THE JOIST SPAN. PROVIDE TRUSS BLOCKING PANELS FOR ROOF TRUSSES AT SUPPORTS AND SHEAR WALLS, AND WHERE INDICATED ON PLANS AND DETAILS. 4. DIAPHRAGM NAILING ALL SHEAR WALLS, FLOOR AND ROOF DIAPHRAGM NAILINGS SHALL BE AS CALLED OUT ON SCHEDULES OR ON THE PLANS. EXTERIOR WALLS NOT INDICATED AS SHEAR WALLS SHALL BE SHEATHED AND NAILED TO SUPPORTING FRAMING WITH Ed NAILS AT 6" OC AT ALL PANEL EDGES AND 12" OC AT ALL INTERMEDIATE SUPPORTS. THE USE OF NAIL GUMS W;U. BE APPROVED IF NAILING INTO THE DIAPHRAGMS CAN BE INSTALLED FLUSH WITH FACE OF SHEATHING. NAIL PENETRATIONS GREATER THAN 1/16" ARE NOT ACCEPTABLE. S. ALLOWABLE STUD AND PLATE PENETRATIONS CUTTING AND/011 NOTCHING OF WOOD STUDS OR PLATES SHALL NOT EXCEED 25% 0 F THE STU D/PLATE WIDTH I N EXTERIOR AND BEARING WALLS AND SHALL NOT EXCEED 4091 OF THE STUDIPLATE WIDTH IN ANY N 0 N-BEARI NIS PARTITIONS. BORED HOLE DIAMETER IS LIMITED TO 40% OF STUD/PLATE WIDTH IN ANY STUD AND MAY BE 60% IN NON BEARI NG PARTITIONS OR IF STUD IS DOU BLED. MAI NTAI N 5/8" MI NI M U M EDGE DISTANCE FROM HOLE EDGE. 6. GYPSUM WALLBOARD NAILING ALL GYPSUM WALLBOARDSHALL BE NAILED TO ALL STUDS AND TOP AND BOTTO M PLATES WITH 6d COO LER NAI LS OR NO. 13 GAUGE x 15/8" @ 7" OC (Sd COOLER NAILS FOR 1/2 INCH GYPSUM SHEATHING). TYPICAL UNLESS NOTED OTHERWISE. INSTALLATION OF GWB SHALL BE SUCH THAT JOINTS ARE STAGGERED ON EACH SIDE OF A SINGLE WALL. EXISTING BUILDING CONTRACTOR SHALL VERIFY ALL DIMENSIONS, MEMBER SIZES AND CONDITIONS OF THE EXISTING BUILDING DEPICTED IN THE DRAWINGS, AND NOTIFY THE STRUCTURAL ENGINEER OF ANY DISCREPANCIES FOR POSSIBLE REDESIGN. CONTRACTOR RESPONSIBUE FOR COMPLETELY SEALING ALL AREAS WHERE EXISTING ROOF MATERIAL IS PENETRATED OR REMOVED. PROVIDE WATER PROOFING AS REQUIRED BY THE ARCH. GENERAL STRUCTURAL DRAWINGSSHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL, CIVIL, ELECTRICAL, AND MECHANICAL DRAWINGS FOR BIDDING AND CONSTRUCTION. CONTRACTOR SMALL VERIFY ALL DIMENSIONS AND CONDIT:ONS FOR-COMPA-ABILITY BEFORE PROCEEDING. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENT ON OF THE ARCHITECT BEFORE PROCEEDING. CONTRACTOR TO SEE ARCHITECTURAL, CIVIL, ELECTRICAL AND MECHANICAL DRAWINGS FOR SIZE AND LOCATION OF PIPE, VENT, DUCT AND OTHER OPENINGS AND DETAILS NOT SHOWN ON THESE DRAWINGS. CONTRACTOR SHALL BE FFSPONSIBLE FOR ERECTION STABILITY AND TEMPORARY SHORING AS NECESSARY UNTIL PERMANENT SUPPORT AND STIFFENING ARE INSTALLED. CONTRACTOR-INITIATEDCHANGES SHALL BE SUBMITrED IN WRITING TO THE ARCHITECT AND STRUCTURAL' ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFYIHIS REQUIREMENT. DRAWINGS INDICATE GINERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATELIBUT ARE OF A SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL IE USED, SUBJECT TO REVIEW AND APPROVAL BY THE ARCHITECT AND THE STRUCTURAL ENGINEER. Im ow 0- ENGINEIERIM 250 4TH AVE. S., SUITE 200 EDMONDS , WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 07126118 .0 w F- NAL DRAWN: JEG rDESIGN: CHECK: IDMT JOB NO: 17145.10 D AT E: 02/21/18 (o C*4 LLj 3:: C) 0 00 z _j LLJI a_ 0 < ui m �!.' Li F- a: L0 z r- Lj 0) Z (/) N 0 Cy- t" Ld SHEET: V) LLJ 0 z 0 ::D S1.1 RESUB JUL 2 6 2018 11IM51-fallaTHIMULma (THESE NOTES ARE TYPICAL UNLESS NOTED OR DETAILED OTHERWISE ON DRAWINGS) ANCHOR TESTING EACH GROUND ANCHOR SHALL BE TESTED. THE MAXIMUM TEST LOAD SHALL NOT EXCEED THE MANUFACTURER RECOMMENDED MAXIMUM LOAD. TENDON ANCHORS SHALL BE LOADED SIMULTANEOUSLY TO THE ENTIRE TENDON. STRESSING OF A SINGLE ELEMENT OF MULTI -ELEMENT TENDONS WILL NOT BE PERMITTED. A DIAL GAUGE OR VERNIER SCALE CAPABLE OF MEASURING TO 0.001 INCHES SHALL BE USED TO MEASURE THE GROUNDANCHOR MOVEMENT. THE MOVEMENT MEASURING DEVICE SHALL HAVE A MINIMUM TRAVEL EQUAL TO THE THEORETICAL ELASTIC ELONGATION OF THE TOTAL ANCHOR LENGTH AT THE MAXIMUM TEST LOAD PLUS I INCH. THE DIAL GAUGE OR VERNIER SCALE SHALL BE SUPPORTED INDEPENDENT OF THE JACKING SYSTEM & RETAINED STRUCTURE & SHALL BE ALIGNED SO THAT ITS AXIS IS WITHIN S* FROM THE AXIS OF THE GROUND ANCHOR. A HYDRAULIC JACK OR RAM SHALL BE USED TO APPLY THE TEST LOAD. THE JACK & PRESSURE GAUGE SHALL BE CALIBRATED BY AN INDEPENDENT TESTING LABORATORY AS A UNIT. THE PRESSURE GAUGE SHALL BE GRADUATED I N 100 PSI INCREMENTS OR LESS. THE RAM TRAVEL OF THE JACK SHALL NOT BE LESS THAN THE THEORETICAL ELASTIC ELONGATION OF THE TOTAL ANCHOR LENGTH AT THE MAXIMUM TEST LOAD PLUS 11 INCH. THE JACK SHALL BE INDEPENDENTLY SUPPORTED & CENTERED OVER THE ANCHOR SO THAT THE ANCHOR DOES NOT CARRY THE WEIGHT OF THE JACK. ANCHOR LOAD TEST AT LEAST (2) ANCHOR SHALL BE PERFORMANCE TESTED TO 200% OF THE DESIGN LOAD. ANCHORS TO BE TESTED SHALL BE SELECTED BY THE GEOTECHNICAL ENGINEER. ADDITIONAL ANCHOR TESTS MAY BE REQUIRED ATTHE REQUEST OF THE GEOTECHNICAL SPECIAL INSPECTOR. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF WHALERS IF REQUIRED TO LIMIT PILE DEFLECTION DURING TESTING. THE PERFORMANCE TEST SHALL BE COMPLETED BY INCREMENTALLY LOADING THE GROUND ANCHOR IN ACCORDANCE WITH THE FOLLOWING TABLE. ANCHOR LOADING ANCHORUNLOADING LOAD HOLD TIME LOAD HOLDTIME ALIGNMENT LOAD I MINUTE 175% DESIGN LOAD UNTIL STABLE 25% DESIGN LOAD 5 MINUTES 150% DESIGN LOAD UNTIL STABLE 50% DESIGN LOAD 5 MINUTES 125% DESIGN LOAD UNTIL STABLE 75% DESIGN LOAD 5 MINUTES 100% DESIGN LOAD UNTILSTABLE 100 DE LOAD 5 MINUTES 75% DESIGN LOAD UNTILSTABLE 125% DESIGN LOAD 5 MINUTES 50% DESIGN LOAD UNTILSTABLE 150% DESIGN LOAD 5 MINUTES 25% DESIGN LOAD UNTIL STABLE 175% DESIGN LOAD 5 MINUTES ALIGNMENT LOAD UNTILSTABLE 200% DESIGN LOAD 60 MINUTES THE ALIGNMENT LOAD (AL) SHOULD BE THE MINIMUM LOAD REQUIRED TO ALIGN THE TESTING APPARATUS & SHOULD NOT EXCEED 5% OF THE DESIGN LOAD. DIAL GAUGES SHOULD BE SET TO ZERO AFTER THE ALIGNMENT LOAD HAS 13EEN APPLIED. A CREEP TEST SHALL BE PERFORMED DURING THE 200% OIL HOLD TIME. ANCHOR MOVEMENT DURING THE CREEP TEST SHALL BE MEASURED & RECORDED AT 1, 2,3,5,6,10,20,30,40, 50 & 60 MINUTES OF ELAPSED TIME FROM WHEN THE LOAD INCREMENT WAS APPLIED. ANCHOR PROOF TEST ALL OTHER ANCHORS SHALL BE PROOF TESTED TO 130% OF THE DESIGN LOAD BY INCREMENTALLY LOADING THE ANCHORS IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. AT LOAD INCREMENTS OTHER THAN THE MAXIMUM TEST LOAD THE LOAD SHALL BE HELD LONG ENOUGH TO OBTAIN A STABLE READING. ANCHOR LOADING LOAD HOLD TIME 25% DESIGN LOAD UNTILSTABLE 50% DESIGN LOAD UNTILSTABLE 75% DESIGN LOAD UNTILSTABLE 100% DESIGN LOAD UNTILSTABLE 130% DESIGN LOAD 10MINUTES THE ALIGNMENT LOAD (AL) SHOULD BE THE MINIMUM LOAD REQUIRED TO ALIGN THE TESTING APPARATUS & SHOULD NOT EXCEED 5% OF THE DESIGN LOAD. DIAL GAUGES SHOULD BE SET TO ZERO AFTER THE ALIGNMENT LOAD HAS BEEN APPLIED. THE MAXIMUM TEST LOAD SHALL BE HELD PER THE SCHEDULE. THE LOAD HOLD PERIOD SHALL START AS SOON AS THE MAXIMUM TEST LOAD IS APPLIED & THE ANCHOR MOVEMENT SHALL BE RECORDED AT 1, 2, 3, 5, 6, & 10 MINUTES. IF THE TOTAL ANCHOR MOVEMENT EXCEEDS 0.04 INCHES, THE MAXIMUM TEST LOAD SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES & ANCHOR MOVEMENT SHALL BE RECORDED AT 20,30, 50 & 60 MINUTES. IF ANCHOR FAILS IN CREEP, RETESTING WILL NOT BE ALLOWED. ACCEPTABLE ANCHOR TELTS A LOAD TESTED OR PROOF TESTED ANCHOR WITH A 10 MINUTE HOLD CREEP TEST IS CONSIDERED ACCEPTABLE WHEN: THE ANCHOR CARRIES THE MAXIMUM TEST LOAD WITH LESS THAN 0.04" OF MOVEMENT BETWEEN THE 1 & 10 MINUTE READINGS. A LOAD TEST OR PROOF TESTED ANCHOR WITH A 60 MINUTE HOLD CREEP TEST IS CONSIDERED ACCEPTABLE WHEN: THE ANCHOR CARRIES THE MAXIMUM TEST LOAD WITH LESS THAN 0.08" OF MOVEMENT PER LOG CYCLE OF THE TIME & THE CREEP RATE IS LINEAR OR DECREASING. IN ADDITION TO THE ABOVE, A TESTED ANCHOR SHALL NOT EXPERIENCE A PULLOUT FAILURE AT THE MAXIMUM TEST LOAD. A PULLOUT FAILURE IS DEFINED AS THE LOAD AT WHICH ATTEMPTS TO INCREASE THE TEST LOAD RESULT IN CONTINUED PULLOUT MOVEMENT OF THE TEST ANCHOR. ANCHORS THAT HAVE CREEP RATES GREATER THAN SPECIFIED CAN BE INCORPORATED IN THE FINISHED WORK AT A LOAD EQUAL TO 1/2 OF THE FAILURE LOAD. THE FAILURE LOAD 15 THE MAXIMUM LOAD CARRIED BY THE ANCHOR AFTER THE LOAD HAS BEEN ALLOWED TO STABILIZE FOR 10 MINUTES. F AN ANCHOR FAILS, THE CONTRACTOR SHALL BE RESPONSIBLE TO MODIFY THE DESIGN AND/OR THE INSTALLATION METHODS USED IN CONSTRUCTION. ANY MODIFICATIONS BY THE CONTRACTOR THAT REQUIRE CHANGES TO THE STRUCTURE SHALL HAVE PRIOR APPROVAL PER THE ENGINEER. LEGEND DEFINITION SYMBOL DEFINITION SYMBOL DIRECTION OF NATIVE SOIL FRAMING p_ EXTENT OF < GRANULAR FILL —mmum FRAMING COLUMNS m 0 STRUCTURAL STEEL COLUMN BEARING RATED SHEATHING ON BEAM BEAM CONTINUOUS SHEAR WALL SWX OVERSUPPORT (SEE SCHEDULE) COLUMN MARK CONCRETE WALL (SEE SCHEDULE) BEARING STUD FOOTING MARK WALL SE (SEE SCHEDULE) NON -BEARING HOLDOWN MARK STUD WALL (SEE SCHEDULE) BEARING STUD HANGER MARK SHEAR WALL (SEESCHEDULE) NON -BEARING FLAG NOTE STUD SHEAR WALL (SEE PLAN NOTES) CMU WALL STEEL MOMENT FRAME CONN. ABBREVIATIONS (A) ABOVE GLIB GLUE -LAMINATED BEAM AB ANCHOR BOLT HORIZ HORIZONTAL ALT ALTERNATE KIP KING POST ARCH ARCHITECT KSI KIPS PER SQUARE INCH (B) BELOW L ANGLE BID BAR DIAMETER MECH MECHANICAL BUKG BLOCKING MF MOMENT FRAME Bm BEAM MTL METAL BOT BOTTOM NEAR SIDE BRING BEARING OC ON CENTER BTWN BETWEEN OPP OPPOSITE Cip COMPLETE JOINT PENETRATION kNS PIL PLATE CUR CLEAR CS PLCS PLACES CMU CONCRETE MASONRY UNIT PSI POUNDS PER SQUARE INCH COL COLUMN PSF POUNDS PER SQUARE FOOT CONC CONCRETE P/T POSTTENSIONED CONN CONNECTION PT PRESSURE TREATED CONT CONTINUOUS REINIF REINFORCING COORD COORDINATE, REQ`D REQUIRED DEL DOUBLE SCHED SCHEDULE DIET DETAIL Sim SIMILAR DIA DIAMETER SOG SLAB ON GRADE DIM DIMENSION sm STANDARD DIR DIRECTION STIFF STIFFENER EA EACH STIL STEEL ELEV ELEVATION SYMM SYMMETRICAL ES EACH SIDE SW SHEARWALL EX EXISTING TOC TOP OF CONCRETE EXP EXPANSION TOS TOP OF STEEL FUR FLOOR Tow TOP OF WALL FDN FOUNDATION TYP TYPICAL ErG FOOTING UNO UNLESS NOTED OTHERWISE FS FAR SIDE VERT VERTICAL GC GENERAL CONTRACTOR WF WIDE FLANGE SENGIMSERNG 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 01126116 z 0 in F- DESIGN: NAL DRAWN: JEG CHECK: DMT JOB NO: 17145.10 DATE: 02/21/18 Ld CD F- 0 04 LLJ 0 0 z 00 z 0) Ld CL 0 < < Ld 0:� Lo V� D z 0 0 Lj Z 0 M < Lo a _J — LLJ V) SHEET "'12 JUL 2 6 2018 A--n-- w-n-- 1 -n,, (81 PILES 0 5-0" OC 250 4TH AVE. S., SUITE 200 FOUNDATION PLAN NOTES: EDMONDS , WASHINGTON 98020 PHONE (425) 778-8500 1. REFER TO "CONCRETE GENERAL NOTES" ON SHEET S1.1 FOR CONTROL JOINT PLACEMENT AND DETAIL 2/54.1 FOR FAX (425) 778-5536 CONTROL JOINT CONSTRUCTION. 2. WHERE SLAB ON GRADE IS INDICATED, SLAB SHALL BE 6"THICKW/#4 @ 16" OC EAWAY UNO.SLAB SHALLBE POU RED OVER A 10 MIL VAPOR BARRIER OVER 6" OF 5/8" CRUSHED ROCK. 3. REFER TO SHEET S4.1 FOR TYPICAL FOUNDATION DETAILS. 4. PLACE ALL REINFORCEMENT PER THE STRUCTURAL NOTES AND FOUNDATION DETAILS. REFER TO SHEET S1.1 FOR TYPICAL CONCRETE WALL REINFORCEMENT. 5, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, WALL LOCATIONS, AND CONCRETE ROUGH OPENINGS WITH ARCHITECTURAL DRAWINGS AND NOTIFY ALL PARTIES OF ANY DISCREPANCIES. 6. CONTRACTOR SHALL PROVIDE FOOTING AND SLAB SUBSTRATE PREPARATION, AND BACKFILL BEHIND RETAINING (3) PILES @ 5--0" OC 41/2" WALLS PER GEOTECHNICAL REPORT. 7. CODNTRACTOR SHALL PROVIDE FOOTING AND SLAB SUBSTRATE PREPARATION, WATERPROOFING, AND BACKFILL C, GUlt & RAINAGE BEHIND RETAINING WALLS PER GEOTECHNICAL REPORT. GEOTECHNICAL ENGINEER SHALL OBSERVE 0 EXCAVATED SOIL CONDITIONS DURING CONSTRUCTION (AND GROUNDWATER CONDITIONS) AS REQUIRED, AND PROVIDE ADDITIONAL RECOMMENDATIONS IF NECESSARY BASED ON ACTUAL SITE CONDITIONS. 9) ANCHOR 80HEDULE ANCHOR DESIGN LOAD ULTIMATE LOAD MIN EMBED MOUNT HI 5.OK 10.OK 151-01, H2 S.ok 10.OK is.-O.. H3 11.9K 23.8K H4 ll.OK 22.OK HS 10.OK 2O.OK 1O.OK 20.OK aH6 H7 10.OK 20.OK 15�O" H8 20.OK H9 11 nK LS'-O" NOTES: I —REFER TO STRUCTURAL NOTES FOR HELICAL ANCHOR SPECIFICATIONS. 2. HELICAL ANCHOR SHALL BE CAPABLE OF DEVELOPING DESIGN LOADSABOVE. 3. MULTIPLE HELICAL ANCHOR MAY BE REQD, 4. THE 0NIMUM HELIX DIAMETER SHALL BE B". 07126116 DESIGN: NAL DRAWN: CHECK: DMT JOB NO: 17145.10 DATE: 02/21/18 z C*4 < I Ld c) CL 0 00 z 0) Ld (L z in < Fn = 3: 0 Ld a:: Lo < 0 z W 0) Z 71 C-4 0 r-, M D Lo 0 0 -J — LLI LJ- SHEET: rc—� e�) %Dd-V.2 RESUB JUL 2 6 2018 OITY OF FIRST FLOOR FRAMING PLAN SCALE: 1/4" = V-13" ENGINSERNS 250 4TH AVE. S., SUITE 200 TYPICAL FLOOR FRAMING PLAN NOTES: EDMONDS . WASHINGTON 98020 PHONE (425) 778-8500 1. FLOOR SHEATHING SHALL BE 3/4'- PI 48/24 WITH 10d COMMON NAILS SPACED AT 6" OC AT ALL DIAPHRAGM FAX (425) 778-5536 BOUNDARIES, PANEL EDGES AND SHEAR WALLS AND 10" OCAT INTERMEDIATE FRAMING. FOR SHEATHING LAYOUT AND NAILING REFER TO DETAIL 3/S4.1 2. COLUMNS AND BEARING WALLS SHOWN ON PLANS SHALL BE CONTINUED DOWN TO THE FOUNDATION UNLESS CARRIED BY A BEAM BELOW. 3. ALL DIAPHRAGMS UNBLOCKED UNO. 4. CONTRACTOR SHALL HAVE THE OPTION TO DRILL A 11/2"0 HOLE CENTERED IN THE DEPTH AND AT THE THIRD POINT OF THE SPAN FOR ALL WOOD FLUSH BEAMS SHOWN ON THE PLAN. 5. WALLS SHOWN ON THE FRAMING PLANS ARE WALLS BELOW THE FRAMING LEVELS INDICATED. HOLDOWNS SHALL BE PLACED AT THE BASE OF THE WALLS SHOWN. 6. TYPICAL HEADERS AT BEARING LOCATION SHALL BE 4X6 DF#2 UNO SUPPORTED BY A MINIMUM OF (1) CRIPPLE STUD AND (1) FULL HEIGHT STUD. GUrZ 7. COLUMNS NOT OTHERWISE SHOWN OR CALLED OUT ON PLAN SHALL BE (2) 2x STUDS. 8. UNLESS NOTED OTHERWISE ALL STUDS SHALL BE HF STUD GRADE AND SPACED AT 16 - OC. 9. UN LESS NOTED OTHERWISE, ALL BEAM -TO -BEAM CONNECTIONS 5 HALL BE SIMPSON HU SERIES FACE MOUNT HANGERS W/ MAX NAILING, 0, 110. SO INSTALL INTERCONNECTED SMOKE DETECTOR WITH BATTERY BACKUP IN EACH ROOM. 11. N TALL INTERCONNECTED SMOKE DETECTOR/CARBON MONOXIDE DETECTOR WITH BATTERY BACK UP S :NSGARAGE & MECHANICAL ROOM. (MECHANICAL SYSTEMS MOTTO CHANGE) 07126118 Smoke alarms shall be installed in each sleeping room, o�tside of each separate sleeping area in the immediate. vicinity of the bedrooms, and on each level (including basements and habitable attics) in new construction and in" existing dwellings when alterations, repairs or additions requiring a permit occur. Smoke alarms shall be hard-1 LACE wired with battery backup, and when mom than one, is < IY WALL smoke alarm required within an individual dwelling unit, they shall be interconnected. Discuss exceptions to the power source requirements with the Building z Inspector. 0 ca IRC R314 EBC 907.2.11.2 I= 0- =, Carbon monoxide a arms shall be I V) W W - installed outside of each separate 0. sleeping area in the immediate vicinity of the bedrooms and on each Lj 00 00 — — — — level in new construction and in existing dwellings when alterations, repairs or additions requiring a permit occur, or when one or more sleeping 0 0 rooms am added or created. ERC R315 ly DESIGN: NAL DRAWN: JEG CHECK: DMT JOB NO: 17145.10 DATE: 02/21/18 Z to IN Lij 0 0 00 0 < 4-- �t 0 LLI —i W Lo LL. z P11 Lj 0) Z V) 04 0 -J LL1 LL. - SHEET: i(E 3 2 %6 3�)� RESUS JUL 2 6 2M "A" IN ALL AREAS WITH EXPOSED CONC FLOORS, EDGE SLAB WITH 1/8.. MAX R CONC SLAB ON GRADE FILL JOINT WITH SEALANAT SLAB RE I N F AT CE NTER OF SLAB CORNERBARSx ADIUS AND "A" MAY BE SUBSTITUTED FOR ALL 90* HOOKED BARS PROVIDE 518"o x 2�O" ORATTOPAND OT.REINF 4::::�� SHALL NOT PASSITHRU JOINT 4 SMOOTH SLIP DOWEL BARS AT 12" OC, TYP UNO sm 90* Xl_ X Ty HOOK j FUND UNO, VERT CORNER BARS SHALL BE TRENCH EXCAVATION SAME SIZE TABULATED FOR MIN GREASE THIS PARALLELTO WALL REINF FOR THICKER WALL HALF OF BAR vl— - "A"= SPLICE LENGTH -4 . . TYPICAL CONSTRUCTION jOINT SLEEVES TO CLEAR /--NO PIPES ALLOWED IN MIN PIPE 1" ALL SIDES THIS REGION. LOWER SEE NOTES, DETAILS, OR PLANS FOR SAWCUTJOINT- IN ALL AREAS WITH IF BAR REINF USED, PROVIDE CONC SLAB ON GRADE FTGS AS REQ�D =LSOR AT TOPA L OT, HA L N X 4 EXPOSED CONC. FLOORS, FILL JOINT 4S.LAB RENF 'AT CEI RT REC!D REINF. ALL BARS TO BECONT I CONC SLAB ON GRADE 'Z'BARS W/ LAP SPLICE PER SLAB REINF AT CENTER OF 4 OR SPLICED PER STRUCTURAL NOTES WITH SEALANT. N LIEU OF SAWCUT _'O JOINTS CONTRACTOR MAY USE ZIP STRUCTURAL NOTES SLAB OR AT TOP AND BOT TOF STRIP PLACED WITH SLAB SLAB REINF AT CENTER OF PIPE 4b ."0' SLAB OR AT TOP AND BOT SLAB STEP L FS TD 'voE HORIZ CORNER BARS OF SIZE 4� PER PLAN BOF TO MATCH REINF OF THINNER WALL X X AND SPACING 'X (2) #6 VERT X 2 4 X—X X X. 4. WS'iIiECVD 4 t ER BOF V-O" MIN PIPE TRENCH EXCAVATION PARALLEL TO FOOT NG IS NOT ALLOWED PLACE VERT REINF OUTSIDE EXCEPT BELOW THIS LINE. STEP ErG AS AS OTHERWISE NOTED OR SHOWN TYPICAL CONTRACTION JOINT TYPICAL SLAB STEP REQUIRED FOR THIS CONDITION &TYPICAL CONCRETE WALL REINFORCING DETAIL TYPICAL SLAB ON GRADE DETAILS TYPICAL PIPE PENETRATION AT WALLS AND FOOTINGS _sWI 0 �Z I Al... —SCALE'. 1/2' l'-O" #4 @ 12" OC FA WAY EX STUD WALL CENTERED IN WALL /-DOWE - EPDXY LAB REINF 5/8"0 AB @ 4'-0" OC NT. EXIST IN. VS/ SIMPSON SET­XP & 4" MIN EMBED T/2 S B ON GRADE & 1.5 H LAP SPLICE 4"0 PERFORATED PVC PIPE PER (2) #4 CONT TOP LA LOCAL CODES WITH 6" OF V' REINF PER PLAN NOTES I'l v FINISHED GRADE MIN MINUS GRAVEL ALL AROUND, C WRAP ED IN NON -WOVEN NOTTO HANGE 2'-0" Al EXIST FOUNDATION N DRAIN 1/8" PER 1�0" MIN. TURN P GEOTEXTILE FABRIC. SLOPE TO 2" RIGID INSULATIO DOWN PERFORATIONS AS SHOWN 4 (3) 5/8"0 EXPANSION THICKENED SLAB (2) #4 TOP REINF 4 GRADE BEAM BOT, TYP PER PLAN ANCHOR EA SIDE OF PILE SLAB & I o 0 oo 00 00 4 0 oo '20 1 I-T I Ittl I 1... 2" SAND OVER CHIP OUT PORTION PRE-ENGINEERED PILE 0. 0 ..4 6 MIL VAPOR OF FOUNDATION BRACKET 24K ULT CAPACITY 0- TO INSTALL 0 BARRIER ,4 & LAP FO :NG 4 'oo Opo OC 0 1 .0 4, gig f BOTTOM ORTE NF 'o .. 0 VAPOR BA RIER & o 4 . 000 SUBGRADE P PLAN c� 9" PIPE PILE PER PLAN 1.4". lo�*Typ I I NOTES I I-Lil 17L UNDISTURBED EARTH OR COMPACTED FILL LINE OF MAX EXCAVATION. (2) #4 CONT PER STRUCTURAL NOTES 1 8 (3) #4 BAM P 3" CLR IF SOIL IS OVER EXCAVATED, PER FILE TO & BOT Typ REPLACE WITH LEAN MIX ALT HOOK CONCRETE. EARINr SOIL OR AS SHOWN CAP PL 1/4 x 6 x O'=611 T FTG THICKNESS PER PLAN, COMPACTED 2"0 PIN PILE, TYP PILE PER PLAN SCHED, AND DETAILS STRUCTURAL FILL TYPICAL STEPPED WALL FOOTING TYPICAL FOOTING DRAIN SECTION z4)e'-&wt44't I A! I &C a-M—PIS M., (i>_SWcM EX STUD WALL VERIFY/PROVIDE 5/8'.0 EXPANSION ANCHOR @4 . -01, OC EXIST FOUNDATION FINISHED GRADE NOT TO CHANGE CHIP OUT PORTION OF FrG TO INSTALL ANGLE DIRECTLY BENEATH STEM WALL 2/2"0 THREADED ROD W1 4- MIN EMBED INTO FTG W/ HILT] HIT HY 150 INJECTION ADH ESIVE�AIATNERIAIE LI.11.0 S IC . C EXPAN �.ORS Ay E USED W/ 4" MIN EMBED DOWEL& EPDXY SLAB REINF INTO EXIST FND W/ SIMPSON SET_XP & 4" MIN EMBED ON M riffift VAPOR BARRIER & SUBGRADE PER PLAN NOTES 1-11-11-11--11-- PRECAST FOUNDATIO BRACKET W/ 24K ULT CAPACITY MIN PIPE PILE PER PLAN EXIST FOUNDATION EXISTFLOORJOIST PROVIDES/8"O XPANSION ANCHOR @ 4'-O� OC % \_PVC SLEEVE HELICAL ANCHOR PER PLAN _gCAL DETAIL pg%. DOWEL & EPDXY SLAB REINF INTO EXIST FND W/ SIMPSON SET-XP & 4" MIN EMBED #4 @ 6" OC #3 STIRRUPS @ 6" OC SLAB ON GRADE PER PLAN =INSULATION 'Al VAPOR BARRIER & S U LA UBGRADE PER PLAN NOTES 5 8' x lox '-10' P W WE GE WASHER & NUT V-15" x l'-6'x T-O" LONG GRADE BEAM CENTERED @ ANCHOR W/ (3) #5 EA FACE 4=-4m (ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS . WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 07126116 DESIGN: NAL DRAWN: JEG CHECK: DMT JOB NO: 17145.10 DATE: 02/21/18 V) 04 Ld 0 cl C) co z _j (3) Ld rL z 0 < U) 0 Ld F_ o:: LO V� < cl LO z Lj 0) Z :z 0 cq 0 :D cy-- t-- M < U-) a ol _J — Ld I. N SHEET C "'31 ) RESUB jjjL 2 6 2018 IQ DEPARTM IDrT BUb%NO'*F EDMON STAGGER MAILS ON EA SIDE OF PANELJOINT AS REQUIRED PER SHEAR WALL SCHED PANEL EDGE NAILING PER SHEAR WALL SCHEDULE, TYP - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - FT PANEL EDGE NAILING INTO 12 - - - ri - - - - - - - ri - - - - - - - n - - - - - - HOLDOWN CHORDS, TYP INTERMEDIATE HEADER PER PLAN 1 1 NAILING @ 12" OC RA ING AT ADJOINING SHEATHING PER PLAN AND CRIPPLE STUDS PER PA E' EDGE ERSHEAR L , P SHEAR WALL SCHEDULE PLAN; DO NOT CUT WALL SCH ED AWAY MATERIAL ITRCO. �' 4T) CRIPPLE STUDS HOUDOWN CHORD PER if SCHEDULE. REFER TO TYPICAL BUILT-U FULL-HEIG14T HOUDOWN CHORD - if If COLUMN DETAILP ADDITIONAL END STUD I J IF REQUIRED TO I PROVIDE COUNTERSINK FOR I IJ HOLDOWN BOLTS HOLDOWN ANCHORAGE PER PLAN AND SCHEDULE AB W/ SIMPSON BP PL WASHER, TYP SIMPSON CNW COUPLER UT W/ SIZE TO MATCH HOLDOWN ANCHORAGE PT SILL PIL PER SHEAR WALL SCHED A 1! if iij PANELEDGE - - - - - - - NAILING PER SHEAR 7r —7 --7--n — WALLSCHED 1 11 Cof I � i H 1 �1' TO FOUNDATION NOTE: NTARGER SHEATHING AS SHOWN.(IBCTABLE 2306.3.1, CASE 1OR 3) INTERMEDIATE FRAMING MEMBERS SHEATHING PANEL,TYP CONTINUOUS PANELEDGESN... 2x OR 3x BLOCKING ONLY IFEILOCKED 0 I e-- ADJACENT NAILS IN A ROW ARE TO BE DRIVEN FROM OPPOSITE SIDES, TYP DE R F 0.131"0 x 3" NAILS, TYP PANELEDGES (5) STUDS MAX TO BE USED FOR BUILT-UP COLUMNS DITA�l c�Pl���LFLO�ORRO�OFSHEATHIN�G L s _�Lll�LT—UP S�TUD CO�LUMN �DETAI�L FUBLE TOP PLATE (2) ROWS OF (8) 0.131"0 x 3" 2 1/4" END NAILS @ 3" OC EA SIDE OF SPLICE AND (2) @ 9" OC PLATE WASHER DISTANCE, TYP ELSEWHERE W/ 11/2" EDGE SIMPSON A35 (ONLY PERSHEAR DISTANCE " REQUIRED AT EXTERIOR OC WAU-SCHED Si3rAYNG HEADERS GREATER THAN 6' SPAN) TOPCHORD SPLICE AT LOCATIONS WHERE IT IS NOT POSSIBLE Bo - rro TYPICAL.TUDS TO INSTALL THE SPECIFIED 0.131"0 CHORD SPLICE NAILS, THE CONTRACTOR SHALL SPLICE I 1 11 INSTALLS MPSON CS20 STRAPS EA SIDE BEAM OR HEADER PER CONCRETE FOOTIN AB SIZE AND SPACING SECTION A -A OF WALLIAT SPLICE. INSTALL EA STRAP PLAN AND NOTES G PER PLAN ID SHEAR SCALE: 11/2" I�U' W/ (12) 10d AT EA END. WHERE BOTH OR P/T SLAB WALL SCHEDULE, TYP RIM BOARD PLATESARECUT, INSTALL CS20 STRAPS NA LING PER TYP ATEAPLATEAND EA SIDE OFTHE WALL. OR BLOCKING BUILT-UP STUD NOTES: CONCRETE STEM WALL COLUMN DETAIL 1. REFER TO STRUCTURAL NOTES FOR 61-01, MIN BETWEEN SPLICES ADDITIONAL INFORMATION. CONCRETE FOOTING 2 . FOR SHEAR WALLS WHERE NO HOLDOWNS SPL CES TO OCCUR AT RIPPLE STUDS PER PLAN ARE SPECIFIED THE FIRST AB SHALL BE CENTEIR OF VERTICAL STUD AT HOLDOWNS: PROVIDE FULL HT AND LOCATED NOT MORE THAN V-0" AND NOT S-4 HOLDOWN CHORDS PER NO SCHED. UCOLUMN SCHEDULE OR LESS THAN (7) BOLT DIAMETERS FROM END : (1) 2x FULL 14T STR CTURAL NOTES OF WALL. TOPCHORDSPLICE BOTTOM CHORD SPLICE TYPICAL SHEAR WALL DETAIL �_�CAUE- �3/4" � 1.-0.. sc ��OP �PLATE �IPLICI �DETAI�L. bCAUE: I" = V-0" ML EDGE NAILING PER PLAN AND SHEAR WALL ENGINCECERING 250 4TH AVE. S., SUITE 200 EDMONDS . WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 07126116 1 z co 0. uJ DESIGN: NAL DRAWN: JEG CHECK: DMT JOB NO: 17145.10 DATE: 02/21/18 SCHEDULE OR EDGE NAILING PER PLAN ZX6 STUD @ 2x4 CROSS WALL EXIST STUD WALL STRUCTURAL NOTES, TYP AND SHEAR WALL 2x8 STUD @ 2X6 CROSS WALL SCHEDULE OR 0' 131"o x 3" STRUCTURAL NOTES, TYP NAILS @ 9" OC JOIST W/ NEW SISTERED JO ST N LLJ 0 < F 0. 131"o x 3" NAILS 9" Oc EDGE NAILING PER PLAN AND 0 00 Z (3) @ SHEAR WALL SCHEDULE OR STRUCTURAL NOTES, _j LLJI Q_ TYP L cl < 0 I-- in = STUD WALL PER FRAMING PLAN 0.131"o x 3" Ld 0 NOTES, TYP NAILS @ 9" OC 0:� L0 V) STUD WALL PER FRAMING r" I=) PLAN NOTES, TYP PANEL EDGE NAILING Bd NAILS @ 6" OC, TYP PROVIDE 2X4 BLOCKING OR z LLJI 0) Z 12 SHEATHING (OR GWB) AND SIMPSON A35 @ 16" OC C14 0 NAILING PER PLAN AND SHEAR SHEATHING (OR GWB) AND rN—OTE--� r-, M < WALL SCHEDULE OR STRUCTURAL NOTES, TYP NAILING PER PLAN AND SHEAR VO—NSHEARWALL STUD Wk%.%-'N/ R-21 MWIATION < L0 0 L WALL SCHEDULE OR STRUCTURAL NOTES, TYP NAILING SHALL BE PER -j — LLJ LL. IBC TABLE 2304.9 SHEET: A. CORNER INTERSECTION B.'VINTERSECTION TYPICAL WALL INTERSECTION DETAIL SECTION Z� SCALE: I"= V-0" 4.1 Ea BUILDING DE CITY OF EtWTMENT ONDS