Loading...
BLD2018-1098RESIDENTIAL BLDG Permit . .... City of Edmond's VR 11 NUM M 121 Sth Ave N, Edmonds --WA 98020- BtD2018-109*8 i www.edmondswa.gov / 425.771.0220 Type: RESIDENTIAL BLDG Owner/ Business: LOT# 1 CHUNG tatus:,ISSUED S Subtype: NEW SINGLE FAMILY Parcel No: 00745300000500 Site Address: 721 EDMONDS WAY EDMONDS,WA 9862-05ii5—' —Applied;,11/8/2018 Subdivision: 003900, 007453 Lot: Issued: 6/22/2021 Fire Sprinklers: Yes Lot Area: 35 Zoning: BP Final: Valuation: $312,810.76 Occupancy Type: R-3 Construction Type: VB Expiration Date: 6/y4'022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: CHUNG LOT 1 NEW SINGLE FAMILY RESIDENCE WA State Contractor L & I #: MCLEOEL916PW City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL SUI H & LAI S/CHUNG STEPH 18321 3RD AVE SW, SHORELINE APPLICANT CHUNG WA 98177 (206)708-5538 THOMASCHUNG_1999@YAHOO.COM CONTRACTOR MCLEOD ENTERPRISES LLC 8517 S 114TH ST, SEATTLE WA 98178 OWNER LOT # 1 CHUNG 18321 3RD AVESW, SHORELINE (2a6)708-5538 THOMASCHUNG 1999@YAHOO.COM WA 98177 1 1 - FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # B-BUILDING PERMIT FEE 001.000.322.10.000.00 $2,378.00 $2,378.00 6/22/21 R13076 B-BUILDING PLAN REVIEW FEE 001.000.345.83.000.00 $1,937.00 $1,937.00 11/8/18 REC074748 B-MECHANICAL PERMIT FEE 001.000.322.10.000.00 $120.00 $120.00 6/22/21 R13076 B-PLUMBING PERMIT FEE 001.000.322.10.000.00 $310.00 $310.00 6/22/21 R13076 B-ROCKERY/RETAINING WALL PERMIT FEE 001.000.322.10.000.00 $150.00 $150.00 6/22/21 R13076 B-STATE BUILDING CODE 001.000.237.150 $6.50 $6.50 6/22/21 R13076 SURCHARGE ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $900.00 $900.00 6/22/21 R13076 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $65.00 $65.00 6/22/21 R13076 FEE STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $130.00 $130.00 6/22/21 R13076 FEE STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $360.00 $360.00 6/22/21 R13076 FEE STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $799.00 $799.00 6/22/21 R13076 CHARGE SFR OVER 5000 X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 $35.00 1 6/22/21 1 R13076 TOTALS: $7,190.50 $7,190.50 CONDITIONS CONDITION TYPE STATUS I NOTES Printed: Tuesday, June 22, 20211:49:50 PM 1 of 4 RESIDENTIAL BLDG Permit City of Edmonds PERMIT NUMBER 121 Sth Ave N, Edmonds WA 98020 BLD2018-1098 www.edmondswa.gov 1425.771.0220 48 HIRS NOTICE-ENGR FINAL FOR 48 Hours notice is required when requesting your FINAL engineering inspection. INFORMATION Damage to Frontage Applicant shall repair/replace all damage to utilities or frontage improvements in City Improvments right-of-way per City standards that is caused by or occurs during the permitted project. Electrical Permit Obtain Electrical Permit from State Department of Labor & Industries. 42S-290-1309 ESC REQUIRED FOR INFORMATION MAINTAIN EROSION & SEDIMENT CONTROL PER CITY SFANDARDS Expansion Tank In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. Approval of this foundation design is conditional subject to inspection of existing site soil conditions. Foundation Bearing Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. Provisions must be made for the control and drainage cf surface water around buildings. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its Hold Harmless officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Hose Bibbs Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. INSPECTION PRIOR TO BACKFILL FOR INFORMATION Call for all required inspections. All work shall be inspected prior to backfill. Lot Lines Staked Lot line stakes must be in place at the time of foundation/setback inspection. Installation, use and maintenance of equipment and components shall be per Manufacturer's Specs manufacturer's specifications, installation instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent/contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspection to verify. These items Maximum Height must be consistent with the approved plan. If the proposed height of a building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval an a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approva�� and final occupancy inspections. OVWSD WATER LINE/METER FOR This property falls within the Olympic View Water and Sewer District. Contact Olympic INFORMATION View for specific water line and/or water meter information. Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, arclinance-,� or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identillied, requested and considered by the appropriate city official in accordance with the aporopriate provision of city code I I or state law does not approve any items not to code specification. PRV Required I ---tshutoff. Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water P" Printed: Tuesday, June 22, 20211:49:50 PIVI 2 of 4 0 11,11 11111IRl 111111,11111111II1101,11111 I To., Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00arn to 6:00prn on weekdays and 10:00am and 6:00prn on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. SPECIAL INSPECTIONS FOR Special inspections have been called for on this project and are noted on the approved ENGINEERING INFORMATION civil plans. It is the owner and or contractors responsibility to ensure that reports are provided to the Engineering Division on a weekly basis. UNDERGROUND UTILITY FOR LOCATES INFORMATION Call for locates of underground utilities prior to any excavation. Underground Wiring All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. Vent Connectors Type B or L vent connectors required on fuel -burning appliances passing through unheated spaces. Per IMC 803.2 City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping Water Service Piping shall be of like materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1400. Water Service Shutoff Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it enters the building. installer shall provide the manufacturer's installation, operating instructions, and a whole Whole House Fan house ventilation system operation description. A label shall be affixed to the whole I I I house timer control that reads "Whole House Ventilation" (see operating instructions). INSPECTIONS - Schedule Online at: bitpsi/inspecti-on..MvBuildingPe-rmit.com 7, F0 "`7 MOID B-2 FOOTINGS B-2 FOUNDATION WALL B-2 RETAINING WALL B-2 SLAB INSULATION B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-5 INSULATION ENERGY A-1 BUILDING PRECON 8-1SETBACKS B-3 STUCCO B-4 INTERIOR SHEAR Printed: Tuesday, June 22, 20211:49:50 PM 3 of 4 k, X-3 BUILDING FINAL" RESIDENTIAL 121 5th www.edmondswa.gov BLDG Permit City of Edmonds PERMIT NUMBER Ave N, Edmonds WA 98020 BLD2018-1098 425.771.0220 B-7 BUILDING OTHER INSP B-7 BUILDING OTHER INSP E-5 DRIVEWAY SLOPE A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL E-4 WATER SERVICE LINE E-3 STRM TIGHTLINE E-3 STRM MGMT FACILITY E-3 STRM FOOTING DRAIN E-3 STRM CONVEYANCE E-3 STRM PERVIOUS SURFACES E-9 COMPOST AMEND E-9 PROJECT ASBUILTS E-3 STRM COVENANT Printed: Tuesday, June 22, 20211:49:50 PM 4 of 4 a South Sound Gkotechnical Consulting April 10, 2018 Beyler Consulting, LLC 5920— 1 001h Street SW, Suite 25 Lakewood, WA 98499 Attention: Ms. Monica Koehl Subject: Geotechnical Engineering Report Chung - 721 Edmonds Way Short Plat Edmonds, Washington SSGC Project No. 18025 Mr. Koehl, South Sound Geotechnical Consulting (SSGC) has completed a geotechnical assessment for the proposed short plat at 721 Edmonds Way in Edmonds, Washington, Our services have been completed in general conformance with our proposal P18021 (dated March 5, 2018) and authorized per signature of our services agreement. Our evaluation included completion of two test pits and one infiltration test on the property, laboratory testing, engineering analyses, and preparation of this report. PROJECT INFORMATION Development plans include subdividing the existing property at 721 Edmonds Way into three individual single family lots. An existing residence is on the property and will be removed. We anticipate new residences will be supported on conventional spread footing foundations with slab -on -grade concrete garage floors. Access to the new lots will be from Edmonds Way. Stormwater control will utilize infiltration facilities. SITE CONDITIONS The project property is on the east side of Edmonds Way. The existing residence is located in the approximate center of the site with surrounding landscape lawn and access drives. Elevation across the site rises gently to the east from street level, with an elevation change of about 6 (+/-) feet. SUBSURFACE CONDITIONS Subsurface conditions were characterized by completing two (2) test pits and one Pilot Infiltration Test (PIT) on the site on March 22, 2018. Excavations were advanced to final depths between about 10 and 12 feet below existing ground surface. Approximate locations of the explorations are shown on Figure 1, Exploration Plan. Logs of the test pits are provided in Appendix A. A summary description of observed subgrade conditions is provided below. 1118;' Mlliq-1:4 1A NOV 0 8 2018 DEVELOPMENT SERVICES COUNTER Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 6%TM- Soil Conditions Surface topsoil was observed in the test pits and ranged in depth from about 6 inches to I foot. Silty sand with occasional gravel and cobbles was observed below the topsoil and extended to depths between about 1.5 and 3.5 feet. This soil was in a loose to medium dense condition. Below this sand was fine to medium sand with trace silt. It was also in a loose to medium dense condition and extended to the termination depth of the test pits. Groundwater Conditions Groundwater was not observed in the test pits at the time of excavation. Additionally, no evidence of perched groundwater (e.g. mottling) was observed to the depths explored. We expect the permanent groundwater table to be at depth which will not adversely affect the planned development. Groundwater levels will fluctuate due to seasonal precipitation variations and on - and off -site drainage patterns. Geologic Setting Soils. within the project area have been classified by the NRCS soil map of Snohomish County, Washington. Surface soils are mapped as Everett very gravelly sandy loam. Everett soils reportedly formed in glacial outwash. Native soils in the test pits generally conform to the mapped soil type. GEOTECHNICAL DESIGN CONSIDERATIONS Planned development is considered feasible based on observed soil conditions in the test pits. Properly prepared native soils can be used for support of conventional spread footing foundations, floor slabs, and pavements. Infiltration to assist in stormwater control is considered feasible at this site. Outwash soils should support conventional infiltration facilities. Groundwater or restrictive soil layers were not observed to a depth of 12 feet below existing ground surface in the test pits. Recommendations presented in the following sections should be considered general and may require modifications when earthwork and grading occur. They are based upon the subsurface conditions observed in the test pits and the assumption that finish site grades will be similar to existing grades. It should be noted subsurface conditions across the site may vary from those depicted on the exploration logs and can change with time. Therefore, proper site preparation will depend upon the weather and soil conditions encountered at the time of construction. We recommend SSGC review final plans and further assess subgrade conditions at the time of construction, as warranted. 4"T'. PJ Geotechnical Engineering Report SSGC Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 General Site Preparation Site grading and earthwork should include procedures to control surface water runoff. Grading the site without adequate drainage control measures may negatively impact site soils, resulting in increased export of impacted soil and import of fill materials, thereby potentially increasing the cost of the earthwork and subgrade preparation phases of the project. Site grading should include removal (stripping) of topsoil and any fill encountered, or very loose or soft soils in building and pavement areas. Subgrades should consist of firm, undisturbed native soils following stripping. Stripping depths are expected to average around I to 1.5 feet., but may be locally deeper or shallower depending on previous site development act ivities. General Subgrade Preparation Subgrades in building footprints should consist of firm, undisturbed native soil. We recommend exposed subgrades in building and conventional pavement areas are proofrolled using a large roller, loaded dump truck, or other mechanical equipment to assess subgrade conditions following stripping. Proofrolling efforts should result in the upper I foot of subgrade soils in building and conventional pavement areas achieving a compaction level of at least 95 percent of the maximum dry density (NIDD) per the ASTM 131557 test method. Wet, loose, or soft subgrades that cannot achieve this compaction level should be removed (over -excavated) and replaced with structural fill. The depth of over -excavation should be based on soil conditions at the time of construction. A representative of SSGC should be present to assess subgrade conditions during proofrolling. Grading and Drainage Positive drainage should be provided during construction and maintained throughout the life of the development. Allowing surface water into cut or fill areas, utility trenches, and building footprints should be prevented. Structural Fill Materials The suitability of soil for use as structural fill will depend on the gradation and moisture content of the soil when it is placed. Soils with higher fines content (soil fraction passing the U.S. No. 200 sieve) will become sensitive with higher moisture content. It is often difficult to achieve adequate compaction if soil moisture is outside of optimum ranges for soils that contain more than about 5 perceni fines. Site Soils: Topsoil is not considered suitable as structural fill. Native soils observed could be suitable for use as structural fill provided they can be moisture conditioned to within optimal ranges. Native soils have some fines which may make them moisture sensitive and difficult to use as structural fill, if wet. Optimum moisture is considered within about +/- 2 percent of the Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 =014 moisture content required to achieve the maximum density per the ASTM D-I 557 test method. If moisture content is higher or lower than optimum, soils would need to be dried or wetted prior to placement as structural fill. Import Fill Materials: We recommend import structural fill placed during dry weather consist of material which meets the specifications for Gravel Borrow as described in Section 9-03.14(l) of the 2016 Washington State Department of Transportation (WSDOT) Specifications for Road, Bridge, and Municipal Construction (Publication M 41 -10). Gravel Borrow should be protected from disturbance if exposed to wet conditions after placement. During wet weather, or for backfill on wet subgrades, import soil suitable for compaction in wetter conditions should be provided. Imported fill for use in wet conditions should conform to specifications for Select Borrow as described in Section 9-03.14(2), or Crushed Surfacing per Section 9-03.9(3) of the 2016 WSDOT M-41 manual, with the modification that a maximum of 5 percent by weight shall pass the U.S. No. 200 sieve for these soil types. Structural fill placement and compaction is weather -dependent. Delays due to inclement weather are common, even when using select granular fill. We recommend site grading and earthwork be scheduled for the drier months of the year. Structural fill should not consist of frozen material. Structural Fill Placement We recommend structural fill is placed in lifts not exceeding about 10 inches in loose measure. It may be necessary to adjust lift thickness based on site and fill conditions during placement and compaction. Finer grained soil used as structural fill and/or lighter weight compaction equipment may require significantly thinner lifts to attain required compaction levels. Coarser granular soil with lower fines contents could potentially be placed in thicker lifts if they can be adequately compacted. Structural fill should be compacted to attain the recommended levels presented in Table 1, Compaction Criteria. Table 1. Compaction Criteria S4 Footing areas 95% I Upper 2 feet in pavement areas, slabs and sidewalks, and utility trenches 1 95% 1 Below 2 feet in pavement areas, slabs and sidewalks, and utility trenches 1 92% I Utility trenches or general fill in non -paved or -building areas 1 90% 1 the. AcTM D 1 �57 teqt method Trench backfill within about 2 feet of utility lines shouW not be over -compacted to reduce the risk of damage to the line. In some instances the top'of the utility line may be within 2 feet of the surface. Backfill in these circumstances should be compacted to a firm and unyielding condition. Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 SSGC We recommend fill procedures include maintaining grades that promote drainage and do not allow ponding of water within the fill area. The contractor should protect compacted fill subgrades from disturbance during wet weather. In the event of rain during structural fill placement, the exposed fill surface should be allowed to dry prior to placement of additional fill. Alternatively, the wet soil can be removed. We recommend consideration is given to protecting haul routes and other high traffic areas with free -draining granular fill material (i.e. sand and gravel containing less than 5 percent fines) or quarry spalls to reduce the potential for disturbance to the subgrade during inclement weather. Earthwork Procedures Conventional earthmoving equipment should be suitable for earthwork at this site. Earthwork may be difficult during periods of wet weather or if elevated soil moisture is present. Excavated site soils may not be suitable as structural fill depending on the soil moisture content and weather conditions at the time of earthwork. If soils are stockpiled and wet weather is anticipated, the stockpile should be protected with securely anchored plastic sheeting. If stockpiled soils become wet and unusable, it may become necessary to import clean, granular soils to complete wet weather site work. Wet or disturbed subgrade soils should be over -excavated to expose firm, non -yielding, non -organic soils and backfilled with compacted structural fill. We recommend the earthwork portion of this project be completed during extended periods of dry weather. If earthwork is completed during the wet season (typically October through May) it may be necessary to take extra measures to protect subgrade soils. If earthwork takes place during freezing conditions, we recommend exposed subgrades are allowed to thaw and re -compacted prior to placing subsequent lifts of structural fill. Alternatively, the frozen soil can be removed to unfrozen soil and replaced with structural fill. The contractor is responsible for designing and constructing stable, temporary excavations (including utility trenches) as required to maintain stability of excavation sides and bottoms. Excavations should be sloped or shored in the interest of safety following local and federal regulations, including current OSHA excavation and trench safety standards. Temporary excavation cuts should be sloped at inclinations of 1.5H: IV (Horizontal:Vertical) or flatter, unless the contractor can demonstrate the safety of steeper cut slopes. Permanent cut and fill slopes should be graded at inclinations of 2HAV, or flatter, with appropriate erosion control measures implemented. A qualified geotechnical engineer and materials testing firm should be retained during the construction phase of the project to observe earthwork operations and to perform necessary tests and observations during subgrade preparation, placement and compaction of structural fill, and backfilling of excavations. k' Geotechnical Engineering Report SSGC Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Foundations Foundations can be placed on native subgrade soils or on a zone of structural fill above prepared subgrades as described in this report. The following recommendations are for conventional spread footing foundations: Bearing, Capacity (net allowable)- 2,500 pounds per square foot (psf) for footings supported on firm native soils or structural fill over native subgrades prepared as described in this report. Footing Width (Minimum): 18 inches (Strip) 24 inches (Column) Embedment Depth (Minimum): 18 inches (Exterior) 12 inches (interior) Settlement: Total: < I inch Differential: < 1/2 inch (over 30 feet) Allowable Lateral Passive Resistance: 325 psf/ft* (below 12 inches) Allowable Coefficient of Friction: 0.40* * These values include a factor of safety of approximately I.S. The net allowable bearing pressures presented above may be increased by one-third to resist transient, dynamic loads such as wind or seismic forces. Lateral resistance to footings should be ignored in the upper 12-inches from exterior finish grade unless restricted. Foundation Construction Considerations All foundation subgrades should be free of water and loose soil prior to placing concrete, and should be prepared as recommended in this report. Concrete should be placed soon after excavating and compaction to reduce disturbance to bearing soils. Should soils at foundation level become excessively dry, disturbed, saturated, or frozen, the affected soil should be removed prior to placing concrete. We recommend SSGC observe all foundation subgrades prior to placement of concrete. Foundation Drainage Ground surface adjacent foundations should be sloped away to facilitate drainage. We recommend footing drains are installed around perimeter footings. Footing drains should include a minimum 4- inch diameter perforated rigid plastic or metal drain line installed along the exterior base of the footing. The perforated drain lines should be connected to a tight line pipe that discharges to an approved storm drain receptor. The drain line should be surrounded by a zone of clean, free -draining 6 Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 SSGC granular material having less than 5 percent passing the No. 200 sieve or meeting the requirements of section 9-03.12(2) "Gravel Backfill for Walls" in the 2016 WSDOT Standard Specifications for Road, Bridge, and Municipal Construction manual (M41 -10). The free -draining aggregate zone should be at least 12 inches wide and wrapped in filter fabric. The granular fill should extend to within 6 inches of final grade where it should be capped with compacted fill containing sufficient fines to reduce infiltration of surface water into the footing drains. Alternately, the ground surface can be paved with asphalt or concrete. Cleanouts are recommended for maintenance of the drain system. On -Grade Floor Slabs On -grade floor slabs should be placed on native soils or structural fill prepared as described in this report. We recommend a modulus subgrade reaction of 225 pounds per square inch per inch (psi/in) for native soil or compacted granular structural fill over properly prepared native soil. We recommend a capillary break is provided between the prepared subgrade and bottom of slab. Capillary break material should be a minimum of 4 inches thick and consist of compacted clean, free - draining, well graded course sand and gravel. The capillary break material should contain less than 5 percent fines, based on that soil fraction passing the U.S. No. 4 sieve. Alternatively, a clean angular gravel such as No. 7 aggregate per Section 9-03.1(4) C of the 2016 WSDOT (M4 I - 10) manual could be used for this purpose. We recommend positive separations and/or isolation joints are provided between slabs and foundations, and columns or utility lines to allow independent movement where needed. Backfill in interior trenches beneath slabs should be compacted in accordance with recommendations presented in this report. A vapor retarder should be considered beneath concrete slabs that will be covered with moisture sensitive or impervious coverings (such as tile, wood, etc.), or when the slab will support equipment or stored materials sensitive to moisture. We recommend the slab designer refer to ACI 302 and/or ACI 360 for procedures and limitations regarding the use and placement of vapor retarders. Seismic Considerations Seismic parameters and values in Table 2 are recommended based on the 2015 International Building Code (IBC). 7 Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Table 2. Seismic Parameters SSGC PARAMETER VALUE 2015 International Building Code (IBC) D Site Classification' S., Spectral Acceleration for a Short Period 1.264 S, Spectral Acceleration for a I -Second Period 0.495g .. . . . ........ . ............. -------- Fa Site Coefficient for a Short Period 1.00 . . ........ - ----- . ...... .. . ........ F, Site Coefficient for a I -Second Period 1.505 Note: In general accordance with 2015 International Building Code, Section 1613.3.1 for risk categories IBC Site Class is based on the specified characteristics of the estimated upper 100 feet of the subsurface profile. S,, S j, Fa, and F, values based on the USGS US Seismic Design Maps website. Liquefaction Soil liquefaction is a condition where loose, typically granular soils located below the groundwater surface lose strength during ground shaking, and is often associated with earthquakes. The Washington State DNR "Liquefaction Susceptibility Map of Snohomish County" (dated, 2004) shows the site in an area designated as having low susceptibility to liquefaction. The risk of liquefaction at this site is considered low for the design level earthquake. Lateral Earth Pressures Below grade and retaining walls will be subject to lateral earth pressures. Subgrade walls are typically designed for "active" or "at -rest" earth pressure conditions. Active earth pressure is commonly used for design of free-standing cantilever retaining walls and assumes lateral movement at the top of the wall of around 0.002H to 0.004H, where H is the height of the wall. The at -rest condition assumes no wall movement. The following recommended earth pressures (Table 3) should be applied as a triangular distribution starting at the top of the wall (for active and at -rest) and bottom of wall (for passive) and assume: • Backfill behind walls is level and no surcharge loads will be applied; • Drainage is provided behind the wall to prevent the development of hydrostatic pressures. 8 Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Table 3. Lateral Earth Pressures Earth Pressure Equivalent Fluid Soil Type Coefficient* Pressure (pcf) Active: 0.31 Active: 35 Native outwash At -rest: 0.47 At -rest: 50 sand Passive: 3.25 Passive: 325 A factor of safety of about 1.5 should be applied to these values, SSGC Additional lateral pressures should be added to these values to model surcharges such as sloped backfill, traffic, construction, or seismic loads. We recommend an active seismic pressure of 4H psf (where H is the height of the subgrade wall) and an at -rest seismic pressure of 7H. The effects of other surcharge loads should be accounted for as appropriate. Wall Drainage Drainage should be provided behind subgrade walls to reduce the potential for hydrostatic pressure developing against the wall and to reduce the risk of groundwater from entering subgrade floors. We recommend a minimum 12-inch wide zone of free draining granular soil (WSDOT Section 9- 03.12(4), or as approved by the engineer) is placed directly behind the wall. A perforated rigid plastic drain pipe at least 6-inches in diameter should be installed behind the base of the wall within 6-inches of the bottom of the footing. The drain line should be surrounded with the free -draining granular soil zone and sloped to provide flow to an approved storm water receptor. The granular fill zone should extend to within I foot of final grade of the wall, where it should be capped with compacted low permeable fill containing sufficient fines to reduce infiltration of surface water into the drainage zone. A filter fabric (such as Mirafi 140N, or other approved material) should be placed between native soils and the granular drain material to limit siltation into the drainage zone. Cleanouts are recommended for maintenance of the drain system. Wall Backrill Backfill behind the drainage zone should consist of granular material that satisfies the criteria of Section 9-03.12(2) "Gravel Backfill for Walls" per the 2014 Washington State Department of Transportation (WSDOT) Specifications for Road, Bridge, and Municipal Construction Manual (Publication M 41 -10), or as approved by the engineer. Wall backfill should be placed in lifts not exceeding 8 inches and compacted with hand -operated compaction equipment. Compaction of wall backfill should be between 90 to 92 percent of the maximum dry density (MDD) per the ASTM D1557 test method within 3 feet of the back of the wall. At a distance greater than 3 feet behind the back of the wall, backfill can be compacted using conventional rollers, with backfill compacted to at least 92 percent of the MDD (ASTM D1557). Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Infiltration Characteristics SSGC Infiltration characteristics of the lower native sand were assessed by completing one small-scale pilot infiltration test in general confortriance with Volume III of the 2014 DOE "Stormwater Management Manual for Western Washington". Result of the infiltration test is provided in Table 4. Table 4. Infiltration Rates Infiltration Depth of Test Uncorrected (Field) Corrected Correction Factor* Test No. ftom surface Infiltration Rate Infiltration Rate (CFv/CFt/CFm) (feet) (in/hr) (in/hr) PIT -I 4.5 64 21 (0.75/0.5/0.9) * Correction Factors from the 2014 WDOE Stormwater Management Manual for Western Washington. The measured field and corrected rates are considered appropriate for the soil tested. The sand across the site appeared similar in the test pits and suggests infiltration characteristics would also be similar. Groundwater or other restrictive soil layers were not observed to a depth of 12 feet below existing grade. Appropriate separation between the bottom of infiltration facilities and restrictive soil or groundwater levels are feasible. Cation Exchange Capacity (CEC) and organic content test were completed on soils from the infiltration test hole. Test results are summarized in the table below. Table 5. CEC and Organic Content Results Test Location and Sample CEC Results CEC Required* Organic Content Organic Content Number (milliequivalents) (milliequivalents) Results Required* PIT-1, S-I 2.7 5 1.2 >1.0 *Per the 2014 WDOE Stormwater Management Manual for Western Washington. Organic content test results satisfy DOE requirements. The CEC value was below the required level and is not unusual for outwash soils. We suggest additional organic content and CEC tests are completed once infiltration areas have been selected to assess soil treatment capabilities and the need for soil amendments. 10 Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 Apri 1 10, 2018 Conventional Pavement Sections SSGC Subgrades for conventional pavement areas should be prepared as described in the "Subgrade Preparation" section of this report. Subgrades below pavement sections should be graded or crowned to promote drainage and not allow for ponding of water beneath the section. If drainage is not provided and ponding occurs, the subgrade soils could become saturated, lose strength, and result in premature distress to the pavement. In addition, the pavement surfacing should also be graded to promote drainage and reduce the potential for ponding of water on the pavement surface. Minimum recommended pavement sections for conventional pavements are presented in Table 5. Pavement sections in public right-of-ways should conform to City of Edmonds requirements for the road designation. Table 5. Preliminary Pavement Sections 1 Minimum Recommended Pavement Section Thickness (inches) Traffic Area AsphsA Portland Aggrepte Subbase Concrete Cement Base Aggrepti? Surface' Concrete2 Course �4 Private Drive and 2 5 4 12 Parking Areas 1 1/2 —inch nominal aggregate hot -mix asphalt (HMA) per WSDOT 9-03.8(l) 2 A 28 day minimum compressive strength of 4,000 psi and an allowable flexural strength of at least 250 psi 3 Crushed Surfacing Base Course per WSDOT 9-03.9(3) 4 Although not required for structural support under concrete pavements, a minimum four -inch thick base course layer is recommended to help reduce potentials for slab curl, shrinkage cracking., and subgrade "pumping" through.joints 5 Native compacted soil or Gravel Borrow per WSDOT 9-03.14(l) or Crushed Surfacing Base Course WSDOT 9-03.90) Conventional Pavement Maintenance The performance and lifespan of pavements can be significantly impacted by future maintenance. The above pavement sections represent minimum recommended thicknesses and, as such, periodic maintenance should be completed. Proper maintenance will slow the rate of pavement deterioration, and will improve pavement perfort-nance and life. Preventative maintenance consists of both localized maintenance (crack and joint sealing and patching) and global maintenance (surface sealing). Added maintenance measures should be anticipated over the lifetime of the pavement section if any existing fill or topsoil is left in -place beneath pavernent sections. I I Geotechnical Engineering Report SSGC Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 REPORT CONDITIONS This report has been prepared for the exclusive use of Mr. Thomas Chung for specific application to the project discussed, and has been prepared in accordance with generally accepted geotechnical engineering practices in the area, No warranties, either express or implied, are intended or made. The analysis and recommendations presented in this report are based on observed soil conditions and test results at the indicated locations, and from other geologic information discussed. This report does not reflect variations that mav occur across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after constmetion, If variations appear, we should be. immediately notified so that further evaluation and supplemental recommendations can be provided. This report was prepared for the planned type of development of the site as discussed herein. It is not valid for third party entities or alternate types of development on the site without the express written consent of SSGC. If development plans change we should be notified to review those changes and modify our recommendations as necessary. The scope of services for this project does not include any environmental or biological assessment of the site including identification or prevention of pollutants, hazardous materials, or conditions. Other studies should be completed if the owner is concerned about the potential for contamination or pollution. We appreciate the opportunity to work with you on this project. Please contact us if additional information is required or we can be of further assistance, Respectfully, South Sound Geotechnical Consultin. Timothy H. Roberts, P.E., R.G. Member/Geotechnical Engineer Attachments: Figure I — Exploration Plan Appendix A — Field Exploration Procedures and Test Pit Logs Appendix B — Laboratory Testing and Results Unified Soil Classification System 12 N TP-2 Nlr_ 1A PIT-' L ACRES TP-1 q� I \ c T irim WA L no ft_7M A ts�w $1, 6w,# nw M. It LOT I 6,173 SF 0. 14 ACRES IN 01 W SMET IRIOT Legend TP - 1 6M Approximate Test Pit Location PIT - I Approximate Infiltration Test Base map from drawing "Cover Sheet/Overall Site Plan", by Beyler Consulting (dated 6/29/17). Scale: NTS .5dwa Saaad Geotechnical Consulting Figure 1 — Exploration Plan P.O. Box 39500 Chung — Edmonds Way Short Plat Lakewood, WA 98496 Edmonds, WA (253) 973-0515 SSGC Project #18025 Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Pro ect No. 18025 April 10, 2018 Appendix A Field Exploration Procedures and Test Pit Logs SSGC A-1 Geotechnical Engineering Report SSGC Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Field Exploration Procedures Our field exploration for this project included two test pits and one PIT test completed on March 22, 2018. The approximate locations of the explorations are shown on Figure 1, Exploration Plan. The exploration locations were determined by pacing from site features. Ground surface elevations referenced on the logs were inferred from Google Satellite imagery. Test pit locations and elevations should be considered accurate only to the degree implied by the means and methods used. A private excavation company subcontracted to SSGC dug the test pits. Soil samples were collected and stored in moisture tight containers for further assessment and laboratory testing. Explorations were backfilled with excavated soils and tamped when completed. Please note backfill in the explorations will likely settle with time. Backfill. material located in building or pavement areas should be re -excavated and recompacted, or replaced with structural fill. The following logs indicate the observed lithology of soils and other materials observed in the explorations at the time of excavation. Where a soil contact was observed to be gradational, our log indicates the average contact depth. Our logs also indicate the approximate depth to groundwater (where observed at the time of excavation), along with sample numbers and approximate sample depths. Soil descriptions on the logs are based on the Unified Soil Classification System. Prqject: Chung — Edmonds Way Short Plat SSGC Job# 18025 TEST PIT LOGS PAGE I OF I Location: Edmonds. WA I Test Pit TP- I Depth (feet) Material Description 0-1 Topsoil 1-2 Silty SAND with occasional gravel/cobble (SM): Loose to medium dense, moist, light brown. (Sample S- I @ 1.5 feet) 2-12 SAND with trace silt (SP): Loose to medium dense, moist, brownish gray. (Sample S-2 @ 4 feet; Sample S-3 @ 8.5 feet; Sample S-3 @ I I feet) Test pit completed at approximately 12 feet on 3/22/18. Groundwater not observed at time of excavation. Approximate surface elevation: 288 feet Test Pit TP-2 DepLh (feet) Material Description 0-0.5 Topsoil 0.5-3.5 Silty SAND with occasional gravel/cobble (SM): Loose to medium dense, moist, light brown. (Sample S- I @ 1.5 feet) 3.5-10 SAND with trace silt (SP): Loose to medium dense, moist, brownish gray. Test pit completed at approximately 10 feet on 3/22/18. Groundwater not observed at time of excavation. Approximate surface elevation: 292 feet I TEST PIT LOGS FIGURE A-1 South Sound Geotechnical Consulting TP-1 TO TP-2 Logged by: THR Geotechnical Engineering Report Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Appendix B Laboratory Testing and Results SSGC I ID I Geotechnical Engineering Report SSGC Chung Short Plat 721 Edmonds Way Edmonds, WA SSGC Project No. 18025 April 10, 2018 Laboratory Testing Construction Testing Laboratories (CTL) of Puyallup, Washington performed gradation testing on select samples. A sample from the base of PIT -I was tested for organic content and cation exchange capacity (CEC) by Northwest Agricultural Consultants of Kennewick, Washington. Results of the laboratory testing are included in this appendix. I'M 100 90 80 70 E x (D LU 60 Z Z 50 iz UJ 0 L) LU 40 (D 30 M 01 0 A 0 20 10 % +3" 0 Particle Size Distribution Report ASTM C-1 179C1 36 C! -4. J 4 41- 114 4- 4 1 T 7 T 7 i'j 4-+- 1 411 -4-- + �1 I ------ - Tt" 77 100 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. % Gravel %S nd % Fines Coarse Fine Coarse Medium Fine Silt Clay.. 0 0 1 52 46 1 SIEVE PERCENT SPEC! PASS? SIZE FINER PERCENT (X=NO) 3/8" 100 #4 100 #8 99 #16 97 #30 78 #50 17 #80 3 #100 2 #200 1.4 Material Description Grab Sample, S-3 Sampled at 8.5' Afterberg Limits PL= LL= Pl= Classification USCS= SIP AASHTO= Remarks Report: #0 1 Sampled by: Client (no specification provided) a) e Source of Sample: TP-I 0 Sample Number: 18-289 Date: 03-22-18 Construction Testing Laboratories ent: South Sound Geotechnical tf' Project: Chung(18025) 01 400 Valley Ave. NE, Suite #102 a) Tel. (253) 383-8778 1 Puyallup WA, 98372 - ProiectNo: -- 715&-- Fiaure-- Tested By: R Rowden . Checked By: C Pedersen - - - Northwest Agricultural South Sound Geotechnical Consulting PO Box 39500 Consultants Lakewood, WA 98496 2545 W Falls Avenue PAP -Accredited Kennewick, WA 99336 509.783.7450 Report: 44353-1 www.nwag.com Date: March 29, 2018 lab@nwag.com Project No: 18025 Project Name: Chung Sample ID Organic Matter Cation Exchange Capacity PIT-1, S-1 1.21% 2.7 rneq/100g Method ASTM D2974 EPA 9081 UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory TeStSA Coarse Grained Soils Gravels Clean Gravels More than 50% of coarse Less than 5% finesc More than 50% retained fraction retained on on No. 200 sieve No. 4 sieve Gravels with Fines More than 12% fines' Sands Clean Sands 50% or more of coarse Less than 5% fines' fraction passes No. 4 sieve Sands with Fines More than 12% fineSD Fine -Grained Soils Silts and Clays inorganic 50% or more passes the Liquid limit less than 50 No. 200 sieve organic Soil Classification Group Symbol Cu �! 4 and 1 5 Cc:5 3' GW Cu < 4 and/or 1 > Cc > 3 E GP Fines classify as ML or MH GM Fines classify as CIL or CH GC Cu�!6and 1 5Cc53 E SW Cu < 6 and/or I > Cc > 3 E Fines classify as ML or MH Fines Classify as CL or CH PI > 7 and plots on or above "A" line' P1 < 4 or plots below "A" line' Liquid limit - oven dried Liquid limit - not dried Silts and Clays inorganic PI plots on or above "A" line Liquid limit 50 or more PI plots below "A" line organic Liquid limit - oven dried Liquid limit - not dried Highly organic soils Primarily organic matter, dark in color, and organic odor ABased on the material passing the 3-in. (75-mm) sieve If field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. cGravels with 5 to 12% fines require dual symbols: GW-GM well -graded gravel with silt, GW-GC well -graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. DSands with 5 to 12% fines require dual symbols: SW-SM well -graded sand vAth silt, SW -SC well -graded sand with clay, SP-SM poorly graded sand Wth silt, SP-SC poorly graded sand with clay r:Cu = D6o/Dio Cc —_ (Dm� Dio x D60 F If soil contains 2! 15% sand, add "with sand" to group name. G if fines classify as CL-ML, use dual symbol GC -GM, or SC-SM. 60 so a. X 40 W 0 z 30 20 a_ 10 7 4 0 <V�(Q - _ 5 SID SM SC CL ML OL CH MH OH PT Group Name B Well -graded gravel' Poorly graded gravel' Silty gravellG, I Clayey gravelF.G.H Well -graded sand' Poorly graded sand' Silty sand G,".1 Clayey sand G.M.1 Lean ClaylL�l SiltK.I.M Organic clayl-L.I.N Organic SiltK.L,M.0 Fat clayK.L�" Elastic SiltK,L.1 Organic clayK�L.1.1 Organic Siltl.L.1.0 Peat �llf fines are organic, add "with organic fines" to group name. 1 If soil contains �: 15% gravel, add "with gravel" to group name. J If Afterberg limits plot in shaded area, soil is a CL-ML, silty clay. KlfSoil contains 15 to 29% plus No. 200, add "with sand" or"with gravel," whichever is predominant. L If Soil contains �: 30% plus No. 200 predominantly sand, add "sandy" to group name. M If soil contains �! 30% plus No. 200, predominantly gravel, add "gravelly" to group name. N PI �! 4 and plots on or above "A" line. 0 PI < 4 or plots below "A" line. PPI plots on or above "A" line. 0 PI plots below "Xiine. 10 Is 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT (LL) Category 2 Small Site Drainage Report Chung Short Plat May 2018 Construction Stormwater Pollution Prevention Plan (CSWPPP) Report Plan. Design. Manage CIVIL & STRUCTURAL ENGTN1::ERING I LAND SURVEYING 1 LAND PLANNING PRWECTMANAGEIVI'E::��:l I PERMITEXPEDITING I FEASIBILT-1Y 13 CHUNG SHORT PLAT SITE ADDRESS: 721 EDMONDS WAY, EDMONDS, WA 98020 SECTION 25, TOWNSHIP 27 S., RANGE 03 W.f W.M. 0411 � I * I ~'. I Prepared for: 721 Edmonds Contact: Sui Hing Chung 183213rdAve SW Shoreline, WA 98177 Date Prepared: May 14, 2018 Prepared by: Lance Hollingsworth Reviewed by: Dan Budsberg, P.E. Beyler Consulting 5920 100th St SW Ste #25 Lakewood, WA 98499 253.301.4157 Project Number: 16-089 Project Name: Chung Short Plat 16-089 CSWPPP-Chung Short Plat.2018.05.14 1. Construction Pollution Prevention Plan .................................... 3 Section 1 - Project Overview ......................................................... 3 Section 3 - Existing Site Conditions ................................................ 3 Section 4 - Adjacent Areas ............................................................ 3 Section 5 - Critical Areas .............................................................. 4 Section6 - Soils .......................................................................... 4 Section 7 - Potential Erosion Problems ............................................ 4 Section 8 - Construction Stormwater Pollution Prevention Elements ... 4 Section 9 - Construction Phasing ................................................... 8 Section 10 - Construction Schedule ................................................ 9 Section 11 - Financial/Ownership Responsibilities ............................ 9 Section 12 - Engineering Calculations ............................................. 9 Section 13 - Conclusion ................................................................ 9 The Construction Stormwater PoIllution Prevention Plan should be kept onsite with a copy of the plans at all time. The objective is to control erosion and prevent sediment and other pollutants from leaving the site during the construction of the project. The owner or assigned contractor shall be responsible for maintaining erosion control Best Management Practices during construction. All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. The owner or contractor shall identify a Certified Erosion and Sediment Control Lead. This person shall be on -site or on -call at all times. The Erosion Control Lead information shall be inserted into this report. The CSWPP shall be modified, if during inspection or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the CSWPPP is ineffective in elimination or significantly minimizing pollutants in stormwater discharges from the site. The CSWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) calendar days following the inspection. Construction site operators are required to be covered by a Construction Stormwater General Permit through the Department of Ecology if they are engaged in clearing, grading, and excavating activities that disturb one or more acres and discharge stormwater to surface waters of the state. Smaller sites may also require coverage if they are part of a larger common plan of development that will ultimately disturb one acre or more. i3o Page 2 of 9 BEYLER CON5ULTING 111111111 i�� l 1! riiii;iiiiiilliii i l��illi�ll���ill�ill�lli�ll���ill�ill��lI Section I — Project Overview The proponent of the Chung Short Plat proposes to subdivide a developed parcel into a three - lot short subdivision, per ECDC 20.75. The parcel is located in the City of Edmonds, Snohomish County Washington and the parcel number for the property is #00745300000500. The proposed project is on an existing 0.46-acre parcel. It is classified as a small site, category 2 project and is subject to RS-6 zoning requirements. See the Project Classification chart and the end of this report, Handout E72. The allowed density range in the RS-6 zone with a density of 6.5 dwelling units per net acre (DUA). The Chung Short Plat proposes to subdivide the current parcel into three single-family lots equating to a proposed density of 6.48 DUA. The proposed lots range in size from the smallest being 6,031 sf in size and the largest being 7,952 sf in size. The property is adjacent to Edmonds Way to the west and single-family parcels to the north, south, and east. The proposed project is keeping consistent with neighboring land use characteristics. The proposed project is subject to the 2005 Stormwater Management Manual for Western Washington (Ecology 2005) and Exhibit A, the 2010 Stormwater Code Supplement to Edmonds Community Development Code Chapter 18.30 (Edmonds 2010). Section 2 — Erosion Control Specialist It will be responsibility of the owner and/or the contractor to regularly inspect and maintain the proposed erosion control BMPs, and will take additional measures, as necessary, to respond to changing site conditions. Should it become necessary, the engineer will be made available in providing recommendations for additional erosion control measures to the site. Section 3 — Existing Site Conditions The subject site is a southwesterly facing, 20,156 square feet lot located approximately one mile inland from Puget Sound in the Edmonds Way Direct Discharge Basin. It was created as Lot Five of the Pinestone Plat per Snohomish County records. There are two access points to the site via driveway drops on Edmonds Way (SR-104). There is a single home on the site along with a gravel driveway, a concrete loop driveway, concrete patio and walkway, rockeries as retaining walls, and landscaping consisting of lawn, shrubs, and trees. The existing impervious area on the site is 9,598 square feet, or 48% of the parcel area. The rockeries onsite allow for the gradual slopes from northeast to southwest with rockery retaining walls at an average slope of 4%, with a total relief of eight feet. The steepest portion of the site is a 35inch stretch of gravel driveway that slopes toward the road at 8%. Site soils consist primarily of Everett very gravelly sandy loam, which is in hydrologic soils group A and highly conducive to infiltration. Runoff from the site that does not infiltrate, i M� 30 Page 3 of 9 SEYLER CON3VLTI�td drains as sheet flow or shallow, subsurface flow to an existing 48-inch storm drain into Edmonds Way. Section 4 — Adjacent Areas The property is adjacent to Edmonds Way to the west and single family parcels to the north, south, and east. The proposed project is keeping consistent with neighboring land use characteristics. Section 5 — Critical Areas City of Edmonds GIS mapping was utilized to determine critical areas that may be located on or near the project site. The only critical areas shown on the project parcel are small pockets of minor landslide and erosion hazards in the middle of the parcel and along the north west property line. Section 6 — Soils The Soil Conservation Service Soil Survey shows that the project area soils are comprised of Everett very gravelly sandy loam. Everett gravelly sandy loam soils are generally derived from sandy and gravelly glacial outwash and are somewhat excessively that range in slope from 0 to 8 percent. Site soils are described in a soils report provided by South Sound Geotechnical Engineering and NRCS Custom Soil Resource Report are attached at the end of the drainage report. Section 7 — Potential Erosion Problems Due to the existing stabilized ground cover and the site consisting of average slopes of 4%, it is anticipated the site will be adequately protected from potential erosion problems. Care shall be given to stockpiled materials during construction to minimize the potential for erosion. Catch basins shall be fitted with inlet silt protections, both on -site and off -site, to protect the existing stormwater management systems. The existing drainage swale along Duvall Ave NE shall be protected from erosion, at a minimum, with silt perimeter fencing along cleared/graded areas. To minimize any potential erosion problems, Grade roads/driveways and construct bases as soon as possible. Cover any unworked soil during extended times of no construction activity. Keep as much construction traffic as possible on the road base and off open soils to avoid compaction of the native soils. Silt fences or other BMPs that are capable of retaining water shall be utilized to retain silt laden runoff to the project area. Section 8 - Construction Stormwater Pollution Prevention Elements Element 1: Mark Clearinci Limits Prior to beginning land disturbing activities, including clearing and grading, all clearing limits, sensitive areas and their buffers, and trees that are to be preserved within the construction area shall be clearly marked, both in the field and on the plans, to prevent damage and offsite impacts Plastic, metal, or stake wire fence may be used to mark the clearing limits. The cluff layer, native top soil, and natural vegetation shall be retained in an undisturbed state to the maximum extent practicable. If it is not practicable to retain the cluff layer in place, it should i M SO Page 4 of 9 BEYLER COX6ULTMG be stockpiled on -site, covered to prevent erosion, and replaced immediately upon completion of the ground disturbing activities Suggested BMPs: BMP: Preserving Natural Vegetation BMP D.3.1.1: High Visibility Plastic or Metal Fence BMP D.3.3.1: Silt Fence Element 2: Establish Construction Access Construction vehicle access should utilitize the proposed stabilized construction entrance within the project clearing limits. Contractor shall restrict movement in and out of the site to one entrance and one exit. When a construction entrance is not preventing sediment from being tracked onto pavement, a wheel wash should be considered. If sediment is tracked off site, the public roads shall be cleaned thoroughly at the end of each day. During wet weather, public roads may need to be cleaned more frequently to prevent sediment from entering water of the state. Suggested BMPs: BMP D.3.4.1: Stabilized Construction Entrance/Exit BMP D.3.4.2: Construction Road/Parking Area Stabilization Element 3: Control Flow Rates Properties and waterways downstream from development sites shall be protected from erosion due to increases in the volume, velocity, and peak flow rate of stormwater runoff from the project site. Temporary interceptor swales will be installed, as necessary, to direct runoff during construction to the temporary sediment trap located along the west boundary of the project site. Depending on the longitudinal slope of the swale, rock check dams will be placed to control flow rates of runoff. Suggested BMPs: BMP D.3.6.1: Interceptor Dike and Swale BMP D.3.6.4: Check Dams BMP D.3.5.1: Sediment Trap BMP D.3.6.5: Outlet Protection Element 4: Install Sediment Controls Prior to leaving a construction site, stormwater runoff from disturbed areas shall pass through a sediment removal BMP. Runoff from fully stabilized areas may be discharged without a sediment removal BMP. Full stabilization means the use of erosion products or vegetative cover that will fully prevent soil erosion. Suggested BMPs: BMP D.3.5.1: Sediment Trap BMP D.3.3.1: Silt Fence a BPYLER COUBULTING Page 5 of 9 Element 5: Stabilize Soils The following constraints will apply. From October 1 through April 30, no soils shall remain exposed and unworked for more than 2 days. From May 1 to September 30, no soils will remain exposed and unworked for more than 7 days. This condition will apply to all soils on site, whether at final grade or not. The areas outside of the roadway will be stabilized with mulch, grass planting or other approved erosion control treatment during the construction phase. Suggested BMPs; BMP D.3.2.1: Surface Roughening BMP D.3.2.6: Temporary and Permanent Seeding BMP D.3.2.2: Mulching BMP D.3.2.3: Nets and Blankets BMP D.3.2.4: Plastic Covering BMP D.3.2.7: Sodding BMP D.3.2.9: Compost Blankets BMP D.3.8: Dust Control Element 6: Protect Slopes Design and construct cut and fill slopes in a manner that will minimize erosion. If found necessary to aid in surface water routing during construction, temporary interceptor swales shall be excavated to slope any developed runoff to a sediment trap or pond. Rock check dams shall be placed at regular intervals to reduce slope runoff velocities within the temporary inceptor swales. Exposed soils on slopes shall be stabilized as specified in Element 5. Suggested BMPs: BMP D.3.2.6: Temporary and Permanent Seeding BMP D.3.2.2: Mulching BMP D.3.2.3: Nets and Blankets BMP D.3.6.4: Check Dams Element 7: Protect Drain Inlets All storm drain inlets made operable during construction shall be protected so that stormwater runoff shall not enter the conveyance system without first being filtered or treated to remove sediment, Existing downstream catch basins located within the vicinity of the project site shall be protected using storm drain inlet protection. After installation of grated inlets on the property, these structures shall be provided a form of inlet protection. Suggested BMPs BMP D.3.5.3: Storm Drain Inlet Protection Page 6 of 9 BEYLER CONSULTING Element 8: Stabilize Channels and Outlets There are no channels either existing or proposed nor are there any existing or proposed outlets to channels. Element 9: Control Pollutants Control of pollutants are the responsibility of the construction superintendent. Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic system drain down, solvent and cle-greasing cleaning operations, fuel tank drain down and removal, and other activities that may result in discharge or spillage of pollutants to the ground or into stormwater runoff must be conducted using spill prevention measures, such as drip pans. Contaminated surfaces will be cleaned immediately following any discharge or spill incident. The superintendent will be expected to use his best judgment in addressing any and all conditions that are potentially damaging to the environment. Emergency repairs may be performed on -site using temporary plastic placed beneath and, if raining, over the vehicle. All pollutants, including waste materials and demolition debris that occur on -site during construction will be handled and disposed of in a manner that does not cause contamination of stormwater. Cover, containment, and protection from vandalism will be provided for all chemicals, liquid products, petroleum products, and non -inert wastes present on the site. Suggested BMPs BMP C151: Concrete Handling (2015 Washington State DOE Manual) BMP C152: Sawcutting and Surfacing Pollution Prevention (2015 DOE Manual) BMP C153: Material Delivery, Storage and Containment (2015 DOE Manual) Element 10: Control De -Watering De -watering is not anticipated. However, if encountered, cle-watering shall be discharged into a closed conveyance system for discharge from the site. The water resulting from construction site de -watering activities must be treated prior to discharge or disposed in a manner that is consistent with the City of Renton Manual. Highly turbid or otherwise contaminated dewatering water, such as from construction equipment operation will be handled separately from stormwater. Element 11: Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. All maintenance and repair will be conducted in accordance with standard procedures for the BMPs. Sediment control BMPs will be inspected weekly or after a runoff -producing storm event during the dry season and daily during the wet season. All temporary erosion and sediment control BMPs will be removed within 30 days after final site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil areas resulting from removal of BMPs or vegetation will be permanently stabilized with mulch, grass planting or other approved erosion control treatment. Suggested BMPs NO Page 7 of 9 BEYLER cox6uWflua BMP C150: Materials On Hand (2015 DOE Manual) BMP C160: Certified Erosion and Sediment Control Lead (2015 DOE Manual) Element 12: Manage the Project Site construction will be performed after the erosion and sediment control measures have been constructed. Preparation for site grading and earthwork should include procedures intended to drain poncled water and control surface water runoff. Grading the site without adequate drainage control measures may negatively impact site soil. From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if the transport of sediment from the construction site to receiving waters will be prevented through a combination of favorable site and weather conditions, limitations on extent of activity, and proposed erosion and sediment control measures. The Contractor and/or owner should stop the permitted activity if sediment leaves the construction site causing a violation of the surface water quality standard or if erosion and sediment control measures are not adequately maintained. Trenches should be opened only immediately prior to construction and the trenches will be backfilled immediately after any required testing or inspections of the installed improvements. Trenching spoils will be treated as other disturbed earthwork and measures will be taken to cover or otherwise stabilize the material, as required. All BMPs; shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. Section 9 — Construction Phasing The recommended construction sequence will include these steps in this order, but some portions of the steps may be performed out of sequence as conditions require. The Construction Sequence is as follows: 1. The contractor shall become familiar with the property, construction drawings and geotechnical conditions on site. The contractor shall meet with the developer, civil engineer, and any other design professional to review the physical constraints affecting the proposed construction. 2. The contractor shall schedule and attend a pre- construction meeting with the City of Renton prior to preforming any site work. 3. For each phase of work, the project surveyor shall flag the limits of clearing and grading, and the contractor shall install all temporary erosions control measures. 4. When TESC measures are approved by the City inspector, install site improvements. 5. Proceed with site improvements making adjustments to the Erosion Control measures as needed. 6. Install final soil stabilization/amendments in areas where final grades have been achieved and future disturbance can be avoided. 7. Hydroseed or place straw mulch on any other disturbed areas. 8. Once the threat of erosion has passed, and all construction is complete, the remaining erosion control measure may be removed with approval from the City inspector. aPage 8 of 9 BEYLER COUBULTING 9. All permanent drainage facilities shall be cleaned of any sediment and construction debris. Sediment laden water shall not be flushed downstream. All storm drainage facilities shall be protected in place from construction activity via brightly flagged stakes or, if necessary, temporary construction fencing. Section 10 — Construction Schedule The project is intended to begin construction in the Spring of 2017. Special consideration is required for source control during the wet season period, which may include phased construction, materials available for immediate stabilization of denuded areas and diligent review of site for noted erosion concerns. Section 11 — Financial/Ownership Responsibilities The property owner will be responsible for bonds and other required securities for this project. Section 12 — Engineering Calculations No calculations were required during the construction of this SWPPP plan. Section 13 — Conclusion Erosion control procedures as described in this report and illustrated on the design plans, if properly implemented, should mitigate anticipated erosion effects from the development of this project. The success of erosion control measures is usually related to the Contractor's attention to maintenance of such measures. However, in some instances, even with proper attention being paid to erosion control, measures such as those shown on the plans are unable to prevent the discharge of turbid water. In this event, secondary measures may be required. These additional BMPs are provided in Appendix D of the 2010 City of Edmonds Stormwater Management Code and Volume 2 of the 2005 edition of the Washington State Department of Ecology Stormwater Management Manual for Western Washington. il Page 9 of 9 BEYLER CONSULT1140 CITY OF EDMONDS — ENGINEERING DIVISION SPECIAL INSPECTION AND TESTING AGREEMENT tit. 1990 ,RNTIT 4- BLD20181098 DATE: 11/27/2019 ',O.IECT SITE ADDRESS: 721 Fdmonds Way. Fdmonds, WA 98020 Chunu Lot I ,0JECT NAME: ECLAL INSPE(71'ION AGENCY k V-1q Inc form must be completed by each Special Inkpection Agency or Inspec 'ECIAL INSPECTIONS REQUIRED: Special inspections are required for this prqject. as applicable. iccordance with Title 18 Ednionds Community Development Code (ECDC). 'When requiml. the project ist be iiistalledlconstructed per appro-ved plans and specifications. The owner or the registered design )fessional in charge shall emploN an independent testingf) rispection agencyispecial inspector to perform juired special inspections. The special inspector shall be a qualified person with competence for pecting tile specific type of construction or operation requiring special inspection. The oNvner. registered ifessional. contractor and special inspectoriagencN shall provide a special inspection report detailing -npliance with approved plans and specifications directly to the Engineering Division. DRK REQURING SPECIAL INSPEC`I"ION: Special inspections will be required for the following egories of work: FOR SPECIFIC INFORNMATION REGARDING REQUIRLD SPECIAL SPLC I IONS SEETHE STATEMENTOF SPFCIAI- INSPF(7ION NOTED AS A CONDITION ON IF, BU11.1)ING PFRMIT AND,'OR ON' THE -APPROVED PLANS. Road subgrade placement and compaction Pervious Pavement and Pervious Concrete Installation Erosion and Sediment Control and Slope Protection Infiltration/bioretcrition subp-rade preparation (prior to placing rock') JANI Detention Vault D 1E C Final FSC: r3- Li I L D I Ni G :FORE A PERMIT CAN BE ISSUED: The mwrier and contractor and special inspector shall complete, s agreement and return to a Permit Coordinator prior to permit issuance. 'PROVAL OF SPECUL INSPECTORS: Each special inspector shall be approved by the Engineering vision prior to performing an), duties or inspections. The credentials of the specific person performing inspection shall be submitted, '&-hen applicable. the company performing inspections inust be ,redited by [be American Association of State Iligh-way and Transportation Officials (AAS14TO) R 18. Page I of 3 1. OBSEAVEWORK 9 T�e special inspector shall observe the site work for confonnance with the approved (stamped) plam and specifications. Special inspections are to be performed as needed- to confirm that the work being completed meets specifications and approvcd plans. 2. REPORT NONCONFORMINCT ITEMS The special inspector shall bring non -conforming. items to the immediate attention of the contractoi and engineer of record. I*he special inspector shall ptovide a report to the Engineering Division notlf\-in2 of anv items not resolved an&or not installed CT the appTOVed plans and specifications. p Items not constructed per the approved plans and specifications will result in a review of the plam to detennine what requirements will be needed for the pi­(�Ject to meet the necessary stormwatet requirements: such as removal and reconstruction. Te-design of the siormwater management system(s). etc, Final approval for the prqicct Nvill not occur until installation ofall required imPTOVernents is complete and accepted b% the Special InSpeCtOT and the Civy. I I 3. FINAL CONSTRUCTION R.EPORT Tile slwcial inspector or inspection agency shall submit a final signed report or Certificate ol Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. The report shall als-(,) include a statement ftom the inspector stating to the best of his/her knowledge the projJect is In cont'ormance With the Uppi"oved plans. specifications. and approved plan revisions. ifany. Items not in conformance. unresolved items or any discrepancies in inspection covcragc (i.e.. missed inspections. periodic Inspection when continuous inspectiom %%ere required, etc) shall be specifically addressed in this report. Contractor Responsibilities I . NOTTFV THE SPECLALL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notif� the special inspector when -,Nork is ready for special inspection. Note, the items listed under the statement of special inspection on the building I . pen -nil and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the projJect. All \&.ork requiring special inspection must be approved prior to concealing or covering said work. 2. PRON71DE ACCESS TO APPROVED PLANS The contractor is re-srmnsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the ,pecial inspector. These records are to be provided to the Cit,, Engineering inspector upon request and upon completion of work-. City of Edmonds Engineering Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Engineering Division shall approve all Special Inspectors and special Inspection requirements, 2. NIONITOR SPECIAL INSPECTIONS AND APPRONTE REPORTS Page 2 of'3 -fhe F�girtcering Division shall approve all SpecW inspectors and special inspection requirements 2. MONIT01t SPECIAL INSPECTIONS AND APPROVE REPORTs Work requiring special inspection and performance of gxcial inspectors shall be monitored by the L-rigineeringDivision Inspector. Enginewing InsPectorapproval must be obtained prior to plactment of concrete or other similar activities in addition to that of the special inspectot. 3. FINAL APPROVAL The F-mgineering Division may provide fina inspection ap val after the s ial ins -tior I Pro pec peL report(s) have been submitted and accepted by the City. Owner Responsibilities 1. 1"he project owner of the engineer or architect of record acting as the owner's agent shall fund spetial inspection services. Engineer or Architect of Record Rangnsibilifies I - Prepare Statement of Special Inspections, 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. ACKNOWLEDGEMENTS I haty read and agree to conro with &e term and condWons of this agreement wntr namt '-"-% LA- " (pin* 101M ai6") Signature - R Date intral Contractor Company/Owner name LA,-% Signature (Pksw 08'r tym) Date r* I -- ecial Inspector/Agency name —South Sound ES2ftjhnical-Consu1tip-ff--_ fpk*n Signature 22R��7, Date 112-20-19 tgincer of Re -cord name Consulting, LLC, Mark Keller, PE IPUM PARI or tm) Signature, tum the original signed agreement to: ty of Edmonds Development Servim Department I 5b Avenue North, City . Hall Second Floor =onds, WA 98020 -CF PTED BV CITY OF EDMONDS ENGINEERING DIVISION-. Date 12/23/19 I / co / --�-o Z,-) Page 3 of 4 CITY OF EDMONDS - ENGINEERING DIVISION SPECIAL INSPECTION AND TESTING AGREEMENT .RNITT #- RLD20181098 DATE: I I n- 71210 19 .OJECTSITE ADDRESS: 721 Edmonds Way. Edmonds, WA 98020 ,OJECT NAME: Chunu Lot I Geo cw� 0 v-t ci ECIAL INSPECTION AGENCY �cc b C Inc form must be completed by each Special on Agency or lnspec�!#- 0 5FECIAL INSPECTIONS REQUIRED: Special inspections are required for this proJect, as applicable. iccordance with Title 18 Edmonds Community Development Code (ECDC). When required. the project ist be installed/constructcd per approved plans and specifications. The oNNncr or the registered design )fessional in chari I ge shall emploN an independent testinglinspection agency /special inspector to perform juired special inspections. The special inspector shall he a qualified person with competence for pecting the specific type of construction or operation requiring special inspection. The owner, registered )fessional. contractor and special inspector/agency shall provide a special inspection report detailing npliancewith approved plans and specifications directly to the Engineering Division. DRK REQT-TRING SPECIAL INSPECTION: Special inspections will be required for the following egories of work: FOR SPECIFIC INFORIMATION RECiARDING REQUIRED SPECIAL SPLC I IONS SE-h THF STATFIMEN-l'OF SPECIAL INSPEC-11ON NOTED AS A CONDITION ON IF, BUILDING PFRMIT AND,'OR ON THEAPPROVED PLANS. Road subgrade placement and compaction Pervious Pavement and Pervious Concrete Installation Erosion and Sediment Control and Slope Protection Infiltration/bioretention subgrade preparation (prior to placing rock) Detention Vault X-C Final ESC: 3,U JiLD I I �iG :FORE A PERMIT CAN BE ISSUED: 1-he owner and contractor and special inspector -shall complete s agreement and return to a Permit Coordinator prior to permit issuance. 'PROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Engineering 6sion prior to performing an% duties or inspections. The credentials of the specific rs)n perfo pe ( rminp inspection shall he submitted. When applicable. the company perl'orn-ung inspections must be :redited bv the American Association of State Highway and Transportation Officials (AAS14TO) R I R. Pap,e I or 3 1. OBSFIRVE )NYORK The s�ecial inspector shall observe the site work for conformance with the approved (stamped) plan!� and specifications. Special inspections are to be performed as needed. to confirm that the Nvork being completed mcets specifications and approved plans. 2. REPORT NONCONFORMINC ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractot and engineer of record. I'he special inspector shall provide a report to the Engineering Division notiA,inp of any items not resolved andior not installed er the approved plans and specifications. p Items not constructed per the approved plans and specifications will result in a review of the plam to determine %%hat requirements %vill be needed for the project to ineet the necessary stormwatet requirements: such as removal and reconstruction, Te-design of the stormwater management system(s). etc. Final approval for the project xvill not occur until installation ofall required improvements is complete and accepted b% the Special Inspector and the City. 3. FINAL CONSTRUCTION REPORT The special inspector or inspection ag ncy shall submit a final signed report or Certilicate M ge Compliance to the City stating that all items requiring special inspection and testinu were fulfilled and reported. The report shall a]so include a statement 1rorn the inspector statine to the best of his/her knowledge the prqJJect is in conflormance with the approved plans. specifications. and approved plan revisions. if any. Items not in conforniance. unresolved items or anv disercpancic5 in inspection coverage (i.e.. missed inspections. periodic inspection when continuous inspectiom were required, etc.) shall be specifically addressed in this report. Contractor Responsibilities I . NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notif�, the special inspector when work is ready for special inspection. Note, the items listed under the statement of special inspection on the building pen -nil and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All %%.ork requiring special inspection must be approved prior to concealing or coveri�ng said work. 2. PRONIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at The Jobsile. 3. RETAIN SPECIAL INSPECTIONRECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records arc to be provided to the City Engineering inspector upon request and upon completion of work. City of Edmonds EnIzincerinp. Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Engineering Division shall approve all Special Inspectors and special inspection requirements. 2. NIONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS Page 2 of 3 I ,wMe Engineering Division shall approve all Special Inspectors and special inspection requirements 01 2. MONIT61i SPECIAL INSPECTIONS ANI) APPROVE REPORTS Work requiring special inspection and performance of special inspectors shall be monitored by the Engineering Division Inspector. Engineering Inspector approval must be obtained prior to placement of concrete or other similar avivities in addition to that of the special inspector. 3. FINAL APPROVAL The Engineering Division may provide final inspection approval after the special inspectior report(s) have been submitted and accepted by the City. 1. Cluner Responsibilities I - The project owner or the engineer or architect of record acting as the owner's agent shall Rind special inspection services. Enp_ineer or Architect of Record Resp2nsibilifies, 1. Prepare Statement of Special Inspections. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. ACKNOWLEDGEMENTS I havt read and agree to conWly wilk lite temn and conditions of thfs agreenteny. wrier name (Pit= ;list of.") Signature A NJ Date 7- eneral Contractor Company/0%,ner name t.A" Signature Date 2 r* I �ecial Inspector/Ageacy name - South Sound Greatechnical Consulting (Pkaft ofit (W type) Signature 2-� - Date 12-20-19 igincer of Record name _"r Consulting, LLC, Mark Keller, PE Apkm print of ") Signature, turn the original signed agreement to: 1), of Edmonds Development Services Department 15 1b Avenue North, City Hall Second Floor monds, WA 98020 Date 12/23/19 'CEPTED BY CITY OF EDMONDS ENGINEERING DIVISION: Page 3 of 4 After recording return to: City Clerk City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Document Title(s) Declaration of Covenant - Private Stormwater Facility Reference Number(s) of Related Documents N/A Grantor(s) (Last, First and Middle Initial) Sui Hing Chung Grantee(s) (Last, First and Middle Initial) City of Edmonds Legal Description (abbreviated form; i.e., lot, plat or section,. township, rangue, quarter/quarter) 719 Edmonds Way - Lot 3, S25, T27S, R03W Assessor's Property Tax Parcel/Account Number at the Time of Recording: TBD The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verify the accuracy or completeness of the indexing information provided herein. DECLARATION OF COVENANT Private Stormwater Facility WHEREAS, the undersigned Declarant(s) have installed a stormwater facility under Edmonds Community Development Code Chapter 18.30 known as a "low impact development best management practices (LID BMP)" in lieu of other required more conventional stormwater systems, as selected below: M Permeable Pavement M Drywell Ll Rain Garden / Bioretention Cell Ll Gravelless Chamber Ll Other Ll Infiltration Trench WHEREAS, the City of Edmonds has allowed installation of the LID BMP, subject to the execution and recording of this Declaration of Covenant; NOW, THEREFORE, THE UNDERSIGNED DECLARANT(S), being the owners of the real property ("the Property") located at the following address: 719 Edmonds Way in the City of Edmonds, Washington, and legally described on Exhibit A attached hereto and incorporated herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of himself/herself/themselves/itself and his/her/their/its successors and assigns, as follows: 1. Declarant(s) warrant that he/she/they are the owners of the property described on Exhibit A and have the authority to impose this covenant on the property and bind all future owners, successors, and assigns of the Declarant(s). The Declarant(s), future owners, successors, and assigns of the Declarant(s) shall be referred to collectively as "Owners." 2. The Owners of the property described on Exhibit A agree that the property contains a stormwater management facility called a "LID BMP," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious or non-native pervious surfaces on the property. "Low impact development" means development conducted in a way that seeks to minimize or completely prevent alterations to the natural hydrology of the site. Low impact development includes site planning and design to reduce alterations of natural soil and vegetation cover, minimize impervious surfaces, and specific practices that help to replicate natural hydrology such as permeable pavements, green roofs, soil amendments, bioretention systems, and dispersion of runoff. The Owners of the property described on Exhibit A shall maintain the size, placement, and design of the LID BMP as depicted on the approved site plan, Exhibit B, and design details shall be maintained and may not be changed without written approval either from the Engineering Division of the City of Edmonds or through a future development permit from the City of Edmonds. Chemical fertilizers and pesticides shall not be used where LID BMP is located. . All costs of maintenance and repair shall be the sole responsibility of the Owners. 4. The Owners of the property described on Exhibit A shall inspect LID BMPs annually for physical defects. After major storm events, the system shall also be checked to ensure that the overflow system is working properly. The Owners also shall maintain all LID BMP so it functions as designed on a year-round basis. 5. The City of Edmonds is hereby granted by the Owners the night, but not the obligation, to enter upon the property described on Exhibit A at all reasonable times for the purpose of inspecting the private stonriwater LID BMP facility. If, as the result of any such inspection the City of Edmonds determines that the LID BMP is in disrepair, requires maintenance or repair, or is otherwise not functioning as provided in the BMP site plan, the City Engineer or his designee shall have the right, but not the obligation, to order the Owners of the property described on Exhibit A to maintain or repair the same. 6. If the City of Edmonds determines that the LID BMP requires maintenance or repair pursuant to Section 5, the City of Edmonds shall provide notice to the Owners of the deadline within which such maintenance or repair must be completed. Said notice may further advise that, should the violator fail to perforin required maintenance or make repairs within the established deadline, the work may be done by the city or a contractor designated by the City Engineer and the expense thereof shall be charged to the Owners. The City's officers, agents, employees, and contractors shall have the right, which is hereby granted by the Owners, to enter upon the property described on Exhibit A in order to perform such work. The Owners shall bear the cost of all work performed. 7. The Owners shall indemnify, defend and hold harmless the City of Edmonds, its officers, officials, employees and agents from any and all claims, demands, suits, penalties, losses, damages, judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of or in any way resulting from the approval of the LID BMP, the installation and presence of the LID BMP, and the acts or omissions of the Owners, their officers, employees, contractors, and agents relating to the construction, operation and maintenance of the LID BMPs on the property, except for the City's intentional and willful tortious acts, and waive and release the City of Edmonds from any and all claims for damages and injunctive relief which the Owners may themselves have now or in the future, by reason of the construction, maintenance and operation of said LID BMPs. 8. This covenant shall run with the land and be binding upon the Declarant(s), as the owner of the property described on Exhibit A, and on Declarant's successors and assigns as to such property. Dated: DECLARANT(S): !��' &:�n - - (Signature) kfl// ///A 4 � C11, VA 12! (Print Name) (Signature) (Print Name) State of Washington ss. County of Snohomish APPROVED: CITY OF EDMONDS (Signature) (Print Name) (Title) On this day personally appeared before me J,// 111,41a I Declarant(s)) to me known to be the individual, or individuals described in and who executed the within and foregoing instrument, and acknowledged that he/she/they signed the same as his/her/their free and voluntary act and deed, for the uses and purposes therein mentioned. SUBSCRIBED AND SWORN before me this day of ?0��hlad'nl 20P (Signature) f'o I z 4 0 44's. fo 20998 5 0 z 'Ouso 0 A .9 1%.$— AZ zz N woo" (Name legibly printed or stamped) Notary Public in and for the State of Washington. Residing at: IYXIAIWM�9 , My commission expires Exhibit A LOT 3 THAT PORTION OF LOT 5, PINESTONE, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 46 OF PLATS, PAGE(S) 226 AND 227, RECORDS OF SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHWEST CORNER OF SAID LOT 5; THENCE NORTH 74000'00" EAST ALONG THE NORTH LINE OF SAID LOT 5 A DISTANCE OF 10.86 FEET TO A POINT THAT IS 10.00 FEET DISTANT WHEN MEASURED PERPENDICULARLY TO THE WESTERLY LINE OF SAID LOT 5; THENCE SOUTH 38056'18" EAST ON A LINE THAT IS PARALLEL WITH AND 10.00 FEET EAST OF THE WEST LINE OF SAID LOT 5 A DISTANCE OF 75.00 FEET; THENCE NORTH 65"19'09" EAST 74.28 FEET TO THE POINT OF BEGINNING; THENCE NORTH 47012'41 " EAST 28.00 FEET; THENCE NORTH 42047'19" WEST 50.68 FEET TO A POINT ON THE NORTH LINE OF SAID LOT 5-1 THENCE NORTH 74000'00" EAST ALONG SAID NORTH LINE 35.85 FEET TO THE NORTHEAST CORNER OF SAID LOT 5-1 THENCE SOUTH 42047'19" EAST ALONG THE EAST LINE OF SAID LOT 5 A DISTANCE OF 116.00 FEET TO THE SOUTHEAST CORNER OF SAID LOT 5-1 THENCE SOUTH 54003'06" WEST ALONG THE SOUTH LINE OF SAID LOT 5 A DISTANCE OF 60.43 FEET TO A POINT THAT BEARS SOUTH 42047'19" EAST FROM THE POINT OF BEGINNING: THENCE NORTH 42047'19" WEST 74.28 FEET TO THE POINT OF BEGINNING; SITUATE IN THE CITY OF EDMONDS, COUNTY OF SNOHOMISH AND STATE OF WASHINGTON. 04 OC) 00 -j C14 w > 3: z co zo 0 0 LL x w I CO 0 z 0 w CY) --r-7',77 7-r 7�/ '/, LLJ co z < LU w 2 2 w Irf > LU < Cl. Cl. E M; 4% 3 CONTRACTOR INFORMATION: Company Name: SIDE SEWER PERMIT APPLICATION Company Addres' — o�.2 c, v Ml-44t/,,kd* 77�=,t�mz-r- . City: Zip: State License # 7 �'e Expiration Date: Site Contact: Phone#: Email '�PfSk?4 i- City Business License'# PROPERTY INFORMATION: Address: Owner's Name: Phone ft: El FULL LINE REPLACEMENT SPOT REPAIR PIPE BURST RELINE (PERMALINE ONLY) DESCRIPTION OF PROPOSED WORK (Be Specific): ISSUANCE OF THIS PERMIT DOES NOT CONSTITUTE PERMISSION TO WORK ON ANY PROPERTY OTHER THAN THAT OWNED BY THE SUBJECT PROPERTY OWNER. CERTIFICATIONS NECESSARY FOR INSTALLATION METHODS ARE THE RESPONSIBILITY OF THE CONTRACTOR PERFORMING SAID WORK. I REPRESENT AND WARRANT TO THE CITY OF EDMONDS, IF REPAIR OF EXISTING SEWER EXTENDS TO AN ADJACENT PROPERTY, I HAVE OWNERS EXPRESS PERMISSION TO PERFORM WORK ON THAT ADJACENT PROPERTY. SIGNATURE DATE Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE R E 8 Ul 8 R-L 1ILDING DEPARTMEN-i [TY rl� P F-, r� k,' (�j N r� 4v.v DEVELOPMENT SERVICES RESIDENTIAL BUILDING PERMIT APPLICATION St. 1 %9Z 121 5h Avenue N, Edmonds, WA 98020 City of Edmonds Phone 425.771.0220 ft Fax 425.771.0221 —1 t3LDZ&J,5- PLEASE REFER To THE RESIDENTIAL BUILDING CHECKLIST FOR SUBMITTAL REQUIREMENTS PROJECT AD LU - g;PS (Street,,tSuite #, City Sta 767*1 'Parcel #: -7 99doNS3 &V005-00 Sub 'vision/Lot #: Project Valuation: $ 7,f 0 Mb APPLICANT: Phot)e: Fax: Add,jess (Street Cit tate, Zi dail Addrqss: L�7 4 q" (A AV-e- ) dailefLx, &�At?c&27 V=�-qdkAo_ 11?44440. Cum S11 Ftione: Fax:' ...A AM& '94a"(W. dam A�dress (StUpet, 2y, kate 1 7NIail Addres,$: LENDING AGENCY: Address (Street, City, State, Zip): Phone: Fax: E-Mail Address: CONTRACTOR:* Phone: ax: Address (Street, City, State, Zip): E-Mail Address: *Contractor must have a valid City of Edmonds business license prior to WA State License #/Exp. Date: doing work in the City. Contact the City Clerk's Office at 425.775.2525 City Business License #/Exp. Date: DETAIL THE SCOPE OF WORK: A I ei.) del PROPOSED NEW SQUARE FOOTAGE FOR THIS PROJECT: Basement: (fl) sq. ft. Select Basement Type, Finished J Unfinish—ed 1 st Floor: f b '4 sq. Garage/Carport: 2 nd Floor: (A y &- — sq. Z!j 3 sq. ft. Bedrooms # -3/4 Bath # 2- Deck/Cvrd Porch/Patio: —sq. ft. __3 Full Half -Bath # _C_ -it'her: Fire Sprinklers: Yes L] No 1KJ - I Retaining Wall: Yes I I N-o-F( Grading: Cut ---L:cu. yds. Fill cu.yds. I Cu - t/Fill in Critical Area: Yes No Ideclare underpenalty ofperjury laws thatthe information Ihaveprovidedon this formlapplication is true, correctand complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: MAI's d� Owner Agent/Other 0 (specify): Signature. A � Date: 9-v r FORM A LABuilding New Folder 201000NE & x-ferred to L-Building-New drive\Form A2014.docx Updated: 1/17/2014 4r. OV EDAI City of Edmonds Equipment Type DEVELOPMENT SERVICES RESIDENTIAL BUILDING PERMIT APPLICATION FORM A th 1215 Avenue N, Edmonds, WA 98020 Phone 425.771.0220 ft Fax 425.771.0221 Appliance/Equipment Information (new and relocated) Total # Furnace Gas #XElec #—Other:-- #—'BTUs: <100 Location(s) Air Handler I VAV (circle selected) Gas # Elec # Other: # CFM: <10k >10k Location(s) AC / Compressor Boiler / Heat Pump Roof Top Unit (circle selected) Gas #—Elec #—Other:— #_ BTUs:—<100k, 100k-500k, _500k-IMil HP: —<3, 3-15,15-30 Location(s) Hydronic Heating Gas #—Elec #—In-Floor —Wall Radiant— Boiler BTUs: Location Exhaust Fans (single duct) Bath # 7- Kitchen #_LLaundry # ( Other: # 4 Fireplace Gas# - -A-Elec #—Other:— # Location(s) Dryer Duct Appliance Type I Appliance/Equipment Information (new and relocated) Total # AC Unit BTUs: Location(s): Furnace BTUs: ��2,_ Location(s): Water Heater F4,4 L, V BTUs: 19 ?zV-Q_ Location(s): Boiler BTUs: Location(s): Other: BTU[s: Location(s): Fireplace/Insert BTUs: 6,p 0 Location(s): Stove/Range/Oven Dryer Outdoor BBQ TOTAL OUTLETS PLUMBING FIXTURE COUNT Fixture Type (new and relocated) Total # Fixture Type (new and relocated) Total # Water Closet (Toilet) 3 Pressure Reduction Valve/Pressure Regulator Sink (kitchen, laundry, lavatory, bar, eye wash, etc.) -7 Water Service Line Tub/Shower Drinking Fountain Dishwasher Clothes Washer Hose Bib Backflow Prevention Device (e.g. RBPA, DCDA, AVB) Water Heater Tankless? Yes [] NoE] Hydronic Heat in: Floor WalIE] Floor Drain/Floor Sink Other: Refrigerator water supply (for water/ice dispenser) Other: FORM A LABuilding New Folder 2010\130NE & x-ferred to L-Building-New drive\ForTn A2014.docx Updated: 1/17/2014 BEAM CALC...ULATIONS FOR f FLAN M24ci5A25-OR TO BE BUILT IN NA. FOR THOMAS CHUNS BUDZ01'3-0 ICA9 I nAnimr, Roof 15 F5F Dead Load + 25 P5F Live Load 40 P5F Floor 15 F5F Dead Load + 40 P5F Live Load 55 P5F Ceiling 5 F5F Dead Lood + 10 P5F Live Load 15 PSF Deck 5 FSF Dead Load + (50 PSF Live Load 65 F5F Interior via I 1 0-7 P5F Exterior vqoll 10 F5F DEFLECTION Roof 1 560 Live Load, I / 560 Total Lood Floor I 4aO Live Load, I / 36>0 Total Load NOTE: This stomp applies to the members and assemblies described in these calculations only. And is valid if it hoe a viet stomp. MAR 0 "1 2019 Architects Northp4est JOB No. 160561 AEDMONDS CORRECTION 12/15/la ARCHITECT5 NORTHNE5T, Inc.. l5ql5 142nd Avenue NE 5uite 100 Vioodinville, NA q80-12 (425) 455-44100 FAX (425) 45-7-6555 YqvivcArchitectsNN.com Project: M2495A2S-OR Location: 01. BEDRM 3 DOOR HEADERS Roof Beam [2015 International Building Code(2015 NDS)] 3.125 IN x 15.0 IN x 13.5 FT 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 36.5% Controlling Factor: Deflection DEFLECTIONS Center Live Load 0.20 IN L/807 Dead Load 0.13 in Total Load 0.33 IN U491 Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U360 REACTIONS A B Live Load 2869 lb 2869 lb Dead Load 1843 lb 1843 lb Total Load 4712 lb 4712 lb Bearing Length 2.32 in 2.32 in BEAM DATA Span Length 13.5 ft Unbraced Length -Top 2 ft Unbraced Length -Bottom 0 ft Roof Pitch 3 :12 Roof Duration Factor 1.15 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Ad'usted Bending Stress: Fb = 2400 psi Controlled by: Fb—cmpr= 1850 psi Fb'= 2730 psi Cd= 1. 15 C/= 0. 99 Shear Stress: Fv = 265 psi Fv' 305 psi Cd= 1. 15 Modulus of Elasticity: E = 1800 ksi E'= 1800 ksi Comp. -L to Grain: Fc - 650 psi Fc - -L'= 650 psi '�D r ;� enise Hall Architects Northwest 18915 - 142nd Ave NE �'.Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:29 PM ..... ................. A -13.5 ft B ROOF LOADING Side One: Roof Live Load: ILL 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW 1 ft Side Two: Roof Live Load: LL= 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW = 16 ft Wall Load: WALL = 0 plf Controlling Moment: 15902 ft-lb Adjusted Beam Length: Ladj 13.5 ft 6.75 ft from left support Beam Self Weight: BSW 10 plf Created by combining all dead and live loads. Beam Uniform Live Load: wL= 425 plf Controlling Shear: -4712 lb Beam Uniform Dead Load: wD_adj = 273 plf At support. Created by combining all dead and live loads. Total Uniform Load: wT = 698 plf Comparisons with required sections: Redd Provided Section Modulus: 69.91 in3 117.19 in3 Area (Shear): 23.19 in2 46.88 in2 Moment of Inertia (deflection): 643.91 in4 878.91 in4 Moment: 15902 ft-lb 26657 ft-lb Shear: -4712 lb 9523 lb Project: M2495A2S-OR Location: 02. BM BETWEEN KITCHEN & FOYER Uniformly Loaded Floor Beam [2015 International Building Code(2015 NDS)] 3.5 IN x 11.25 IN x 5.5 FT #2 - Doug las-Fir-Larch - Dry Use Section Adequate By: 64.4% Controlling Factor: Moment DEFLECTIONS Center Live Load 0.02 IN U3294 Dead Load 0.01 in Total Load 0.03 IN U2178 Live Load Deflection Criteria: L/480 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 1779 lb 1779 lb Dead Load 910 lb 910 lb Total Load 2689 lb 2689 lb Bearing Length 1.23 in 1.23 in BEAM DATA Center Span Length 5.5 ft Unbraced Length -Top 1.33 ft Floor Duration Factor 1.00 Notch Depth 0.00 MATERIAL PROPERTIES #2 - Douglas -Fir -Larch Base Values Adousted Bending Stress: Fb = 900 psi Fb'= 988 psi Cd= 1. 00 C/= 1. 00 CF= 1. 10 Shear Stress: Fv = 180 psi Fv' 180 psi Cd= 1. 00 Modulus of Elasticity: E = 1600 ksi E'= 1600 ksi Comp. -L to Grain: Fc - 625 psi Fc - 625 psi Controlling Moment: 3698 ft-lb 2.75 ft from left support Created by combining all dead and live loads. Controlling Shear: -2689 lb At support. Created by combining all dead and live loads. Comparisons with required sections: Redd Provided Section Modulus: 44.92 in3 73.83 in3 Area (Shear): 22.41 in2 39.38 in2 Moment of Inertia (deflection): 68.63 in4 415.28 in4 Moment: 3698 ft-lb 6077 ft-lb Shear: -2689 lb 4725 lb Denise Hall Architects Northwest 18915 - 142nd Ave NE -.Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:32 PM Side 1 Side 2 Floor Live Load FLL 40 psf 40 psf Floor Dead Load FDL 15 psf 15 psf Floor Tributary Width FTW = 2.2 ft 14 ft I Wall Load WALL = 80 plf I BEAM LOADING Beam Total Live Load: wL= 647 plf Beam Total Dead Load: wD= 323 plf Beam Self Weight: BSW 9 plf Total Maximum Load: wT = 978 plf Project: M2495A2S-OR Location: 03. BM OVER ENTRY (CORR#1) Multi -Span Roof Beam [2015 International Building Code(2015 NDS)] 5.5 IN x 11.5 IN x 16.25 FT Pressure Treated (2.2 + 3.8 + 10.2) #2 - Douglas -Fir -Larch - Dry Use Section Adequate By: 218.3% Controlling Factor: Moment DEFLECTIONS Left Center Right Live Load 0.01 IN 2L/7674 0.00 IN L/MAX 0.03 IN U4881 Dead Load 0.00 in 0.00 in 0.02 in Total Load 0.01 IN 21J4882 0.00 IN L/9158 0.04 IN U2914 Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/360 REACTIONS A B C Live Load 715 lb 1601 lb 633 lb Dead Load 231 lb 1036 lb 438 lb Total Load 946 lb 2637 lb 1071 lb Uplift (1.5 F.S) -231 lb 0 lb 0 lb Bearing Length 0.28 in 0.77 in 0.31 in BEAM DATA Left Center Right Span Length 2.25 ft 3.75 ft 10.25 ft Unbraced Length -Top 2 ft 2 ft 2 ft Unbraced Length -Bottom 2.25 ft 3.75 ft 10.25 ft Roof Pitch 2 :12 Roof Duration Factor 1.15 Notch Depth 0.00 MATERIAL PROPERTIES #2 - Douglas -Fir -Larch Bending Stress: Shear Stress: Modulus of Elasticity: Comp. -L to Grain: Base Values Ad'usted Fb = 875 psi Fb'= 799 psi Cd=1.15 C1=0.99 CF=1.00 Ci=0.80 Fv = 170 psi Fv' 156 psi Cd= 1, 15 Q= 0. 80 E = 1300 ksi E'= 1235 ksi Ci=0.95 Fc - I = 625 psi Fc--L'= 625 psi Controlling Moment: -2536 ft-lb Over left support of span 3 (Right Span) Created by combining all dead loads and live loads on span(s) 2, 3 Controlling Shear: 1554 lb At left support of span 3 (Right Span) Created by combining all dead loads and live loads on span(s) 2, 3 Comparisons with required sections: Recrd Provided Section Modulus: 38.09 in3 121.23 in3 Area (Shear): 14.9 in2 63.25 in2 Moment of Inertia (deflection): 86.1 in4 697.07 in4 Moment: -2536 ft-lb 8070 ft-lb Shear: 1554 lb 6595 lb "ADenise Hall Architects Northwest 18915 - 142nd Ave NE --Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:35 PM ...... ... ... .. ..... ..... .......... . ...... ..... 2.25 ft -3.75ft 10.25 ft A B C ROOF LOADING Left Center Right Roof Live Load RLL 25 psf 25 psf 25 psf Roof Dead Load RDL 15 psf 15 psf 15 psf Roof Tributary Width Side One TW1 3 ft 3 ft 3 ft Roof Tributary Width Side Two TW2 3 ft 3 ft 3 ft Wall Load WALL = 0 plf 0 plf 0 plf BEAM LOADING Left Center Rlqht Total Live Load 150 plf 150 plf 150 plf Total Dead Load (Adjusted for Roof Pitch) 91 plf 91 pif 91 plf Beam Self Weight 14 plf 14 plf 14 plf Total Load 255 plf 255 plf 255 plf Project: M2495A2S-OR Location: 04. BM OVER OUTDOOR LIVING Multi -Loaded Multi -Span Beam [2015 International Building Code(2015 NDS)] 5.125 IN x 15.0 IN x 16.0 FT 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 18.5% Controlling Factor: Deflection DEFLECTIONS Cente Live Load 0.25 IN U758 Dead Load 0.20 in Total Load 0.45 IN U426 Live Load Deflection Criteria: U480 Total Load Deflection Criteria: L/360— REACTIONS A B Live Load 3207 lb 4457 lb Dead Load 2555 lb 3300 lb Total Load 5762 lb 7757 lb Bearing Length 1.73 in 2.33 in BEAM DATA Center Span Length 16 ft Unbraced Length -Top 2 ft Unbraced Length -Bottom 16 ft Live Load Duration Factor 1.00 CamberAdj. Factor I Camber Required 0,2 Notch Depth 0.00 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Ad*usted Bending Stress: Fb = 2400 psi Controlled by: Fb—cmpr= 1850 psi Fb'= 2392 psi Cd= 1. 00 Cl= 1. 00 Shear Stress: Fv = 265 psi Fv' 265 psi Cd= 1. 00 Modulus of Elasticity: E = 1800 ksi E'= 1800 ksi Comp. -L to Grain: Fc - 650 psi Fc - -L= 650 psi Controlling Moment: 24035 ft-lb 9.76 Ft from left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 2 Controlling Shear: -7757 lb At right support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 2 Comparisons with required sections: Reaj Provided Section Modulus: 120.55 in3 192.19 in3 Area (Shear): 43.91 in2 76.88 in2 Moment of Inertia (deflection): 1216.79 in4 1441.41 in4 Moment: 24035 ft-lb 38317 ft-lb Shear: -7757 lb 13581 lb IDenise Hall Architects Northwest L 18915-142ndAveNE Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:38 PM Uniform Live Load 130 plf Uniform Dead Load 49 plf Beam Self Weight 17 plf Total Uniform Load 196 Dff Load Number One Two Live Load 1874 lb 1874 lb Dead Load 1211 lb 1211 lb Location 3.58 ft 11.92 ft * Load obtained from Load Tracker. See Summary Report for details. TRAPEZOIDAL LOADS - CENTER SPAN Load Number One Two Left Live Load 0 plf 450 plf Left Dead Load 80 pif 270 plf Right Live Load 0 plf 450 plf Right Dead Load 80 plf 270 plf Load Start 0 ft 11.92 ft Load End 16 ft 16 ft Load Length 16 ft 4.08 ft Project: M2495A2S-OR Location: 05. STAIR WINDOW HEADERS Roof Beam [2015 International Building Code(2015 NDS)] 5.125 IN x 12.0 IN x 12.5 FT 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 22.5% Controlling Factor: Deflection DEFLECTIONS Cente Live Load 0.21 IN L/726 Dead Load 0.13 in Total Load 0.34 IN L/441 Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 3125 lb 3125 lb Dead Load 2016 lb 2016 lb Total Load 5141 lb 5141 lb Bearing Length 1.54 in 1.54 in BEAM DATA Span Length 12.5 ft Unbraced Length -Top 2 ft Unbraced Length -Bottom 0 ft Roof Pitch 3 :12 Roof Duration Factor 1.15 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Admusted Bending Stress: Fb = 2400 psi Controlled by: Fb—cmpr= 1850 psi Fb'= 2752 psi Cd= 1. 15 C/= 1. 00 Shear Stress: Fv = 265 psi Fv' 305 psi Cd=1. 15 Modulus of Elasticity: E = 1800 ksi E'= 1800 ksi Comp. -L to Grain: Fe - 650 psi Fc - -L'= 650 psi d Denise Hall Architects Northwest 18915 - 142nd Ave NE '.Woodinville, WA98072 StruCalc Version 10.0,1.4 2114/2019 3:34:41 PM -12.5ft- ROOF LOADING Side One: Roof Live Load: LL= 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW 18 ft Side Two: Roof Live Load: LL= 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW = 2 ft Wall Load: WALL = 0 plf Controlling Moment: 16066 ft-lb Adjusted Beam Length: Ladj 12,5 ft 6.25 ft from left support Beam Self Weight: BSW 13 plf Created by combining all dead and live loads- Beam Uniform Live Load: wL= 500 plf Controlling Shear: 5141 lb Beam Uniform Dead Load: wD_adj = 323 plf At support. Total Uniform Load: wT = 823 plf Created by combining all dead and live loads. Comparisons with required sections: Read Provided Section Modulus: 70.05 in3 123 in3 Area (Shear): 25.3 in2 61.5 in2 Moment of Inertia (deflection): 602.37 in4 738 in4 Moment: 16066 ft-lb 28209 ft-lb Shear: 5141 lb 12495 lb Project: M2495A2S-OR Location: 06. DEN TRANSOM HEADER (CORR#I) Multi -Span Roof Beam [2015 International Building Code(20115 NDS)] 5.5 IN x 11.5 IN x 16.25 FT Pressure Treated (2.2 + 3 + 11) #2 - Doug las-Fir-Larch - Dry Use Section Adequate By: 100.2% Controlling Factor: Moment DEFLECTIONS Left Center Right Live Load 0.01 IN 2L/6122 0.00 IN L/MAX 0.04 IN L/3153 Dead Load 0.01 in 0.00 in 0.03 in Total Load 0.01 IN 2L/3810 -0.01 IN L/6958 0.07 IN L/1893 Live Load Deflection Criteria: U360 Total Load Deflection Criteria: L/360 REACTIONS A B C Live Load 921 lb 2429 lb 889 lb Dead Load 87 lb 1514 lb 599 lb Total Load 1008 lb 3943 lb 1488 lb Uplift (1.5 F.S) -734 lb 0 lb 0 lb Bearing Length 0.29 in 1.15 in 0.43 in BEAM DATA Left Center Right Span Length 2.25 ft 3 ft 11 ft Unbraced Length -Top 2 ft 2 ft 2 ft Unbraced Length -Bottom 2.25 ft 3 ft 11 ft Roof Pitch 2 :12 Roof Duration Factor 1.15 Notch Depth 0.00 MATERIAL PROPERTIES #2 - Douglas -Fir -Larch Base Values Adousted Bending Stress: Fb = 875 psi Fb'= 798 psi Cd=1.15CI=0.99 CF=1.00Ci=0.80 Shear Stress: Fv = 170 psi Fv' 156 psi Cd= 1� 15 Ci=O. 80 Modulus of Elasticity: E= 1300 ksi E'= 1235 ksi Ci=0.95 Comp. -L to Grain: Fc - -L = 625 psi Fc - 625 psi Controlling Moment: -4030 ft-lb Over left support of span 3 (Right Span) Created by combining all dead loads and live loads on span(s) 2, 3 Controlling Shear: 2211 lb At left support of span 3 (Right Span) Created by combining all dead loads and live loads on span(s) 2, 3 Comparisons with required sections: Redd Provided Section Modulus: 60.56 in3 121.23 in3 Area (Shear): 21.2 in2 63.25 in2 Moment of Inertia (deflection): 132.54 in4 697.07 in4 Moment: -4030 ft-lb 8066 ft-lb Shear: 2211 lb 6595 lb �7 Denise Hall X�Architects Northwest 18915 - 142nd Ave NE ",Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:44 PM ROOF LOADING Left Center Bight Roof Live Load RILL = 25 psf 25 psf 25 psf Roof Dead Load RDL = 15 psf 15 psf 15 psf Roof Tributary Width Side One TW1 = 3 ft 3 ft 3 ft Roof Tributary Width Side Two TW2 = 5 ft 5 ft 5 ft Wall Load WALL = 0 plf 0 plf 0 plf BEAM LOADING Left Cente Bight Total Live Load 200 plf 200 plf 200 plf Total Dead Load (Adjusted for Roof Pitch) 122 plf 122 plf 122 plf Beam Self Weight 14 plf 14 plf 14 plf Total Load 335 plf 335 plf 335 plf Project: M2495A2S-OR Location: 07. DINING WINDOW HEADER Multi -Loaded Multi -Span Beam [2015 International Building Code(20115 NDS)] 5.125 IN x 12.0 IN x 10.58 FT (3 + 7.6) 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 58.3% Controlling Factor: Shear DEFLECTIONS Left Center Live Load 0.00 IN U8400 0.04 IN L/2448 Dead Load 0.00 in 0.02 in Total Load -0.01 IN L/5802 0.06 IN L/1570 Live Load Deflection Criteria: L/480 Total Load Deflection Criteria: L/360 REACTIONS A B C Live Load 1833 lb 7322 lb 3446 lb Dead Load 13 lb 4222 lb 1956 lb Total Load 1846 lb 11544 lb 5402 lb Uplift (1.5 F.S) -1893 lb 0 lb 0 lb Bearing Length 0.55 in 3.47 in 1.62 in BEAM DATA Left Center Span Length 3 ft 7.58 ft Unbraced Length -Top 1.33 ft 1.33 ft Unbraced Length -Bottom 3 ft 7.58 ft Live Load Duration Factor 1.00 Notch Depth 0,00 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Adiusted Bending Stress: Fb = 2400 psi Controlled by: Fb-cmpr = 1850 psi Fb-Cmpr'= 1836 psi Cd=1.00 CI=0.99 Shear Stress: Fv = 265 psi Fv' 265 psi Cd=1.00 Modulus of Elasticity: E = 1800 ksi E'= 1800 ksi Comp. -L to Grain: Fc - 650 psi Fc - 650 psi Controlling Moment: -9411 ft-lb Over left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2 Controlling Shear: 6864 lb At left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2 Comparisons with required sections: Redd Provided Section Modulus: 61.52 in3 123 in3 Area (Shear): 38.85 in2 61.5 in2 Moment of Inertia (deflection): 169.23 in4 738 in4 Moment: -9411 ft-lb 18815 ft-lb Shear: 6864 lb 10865 lb -V-tY7r ' r*JD enise Hall Architects Northwest 18915 - 142nd Ave NE _,Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:47 PM Uniform Live Load 477 plf 56.0 plf Uniform Dead Load 179 plf 210 plf Beam Self Weight 13 plf 13 plf Total Uniform Load 669 plf 783 plf Load Number One Live Load 1199 lb Dead Load 760 lb Location 0.58 ft CENTER SPAN Load Number One Live Load 1199 lb Dead Load 760 lb Location 2.92 ft * Load obtained from Load Tracker. See Summary Report for details. TRAPEZOIDAL LOADS - LEFT SPAN Load Number One Two Left Live Load 0 plf 450 plf Left Dead Load 80 plf 270 plf Right Live Load 0 plf 450 plf Right Dead Load 80 plf 270 plf Load Start 0 ft 0 ft Load End 3 ft 0.58 ft Load Length 3 ft O�58 ft CENTER SPAN Load Number One Two Left Live Load 0 plf 500 plf Left Dead Load 80 plf 300 plf Right Live Load 0 plf 500 plf Right Dead Load 80 plf 300 plf Load Start 0 ft 2.92 ft Load End 7.58 ft 7.58 ft Load Length 7.58 ft 4.66 ft Project: M2495A2S-OR Location: 08. GARAGE DOOR HEADER Multi -Loaded Multi -Span Beam [2015 International Building Code(2015 NDS)] 5.125 IN x 16.5 IN x 16.67 FT 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 24.4% Controlling Factor: Deflection DEFLECTIONS Center Live Load 0.25 IN U808 Dead Load 0.20 in Total Load 0.45 IN U448 Live Load Deflection Criteria: L/480 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 3795 lb 2695 lb Dead Load 3082 lb 2421 lb Total Load 6877 lb 5116 lb Bearing Length 2.06 in 1.54 in BEAM DATA Center Span Length 16.67 ft Unbraced Length -Top 2 ft Unbraced Length -Bottom 16.67 ft Live Load Duration Factor 1,00 CamberAdj. Factor 1 Camber Required 0.2 Notch Depth 0�00 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Adwusted Bending Stress: Fb = 2400 psi Controlled by: Fb—Cmpr= 1850 psi Fb'= 2379 psi Cd= 1. 00 Cl= 1, 00 Cv=O. 99 Shear Stress: Fv = 265 psi Fv' 265 psi Cd= 1. 00 Modulus of Elasticity: E = 1800 ksi E'= 1800 ksi Comp. -L to Grain: Fc - 650 psi Fc - -L'= 650 psi Controlling Moment: 34674 ft-lb 8.17 Ft from left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 2 Controlling Shear: 6877 lb At left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 2 Comparisons with required sections: Rg!�d Provided Section Modulus: 174.9 in3 232.55 in3 Area (Shear): 38.92 in2 84.56 in2 Moment of Inertia (deflection): 1542.4 in4 1918.51 in4 Moment: 34674 ft-lb 46104 ft-lb Shear: 6877 lb 14939 lb Denise Hall Architects Northwest 18915 - 142nd Ave N E Woodinville, WA 98072 414. 4�1� StruCalc Version 10.0.1.4 2/14/2019 3:34:51 PM Uniform Live Load 40 plf Uniform Dead Load 15 plf Beam Self Weight 18 plf Total Uniform Load 73 plf POINT LOADS - CENTER SPAN Load Number One Live Load 2869 lb Dead Load 1843 lb Location 8.25 ft * Load obtained from Load Tracker See Summary Report for details. TRAPEZOIDAL LOADS - CENTER SPAN Load Number One Two Three Left Live Load 0 plf 307 plf 50 plf Left Dead Load 80 plf 184 plf 30 plf Right Live Load 0 plf 307 plf 50 plf Right Dead Load 80 plf 184 plf 30 plf Load Start 0 ft 0 ft 8.25 ft Load End 16.67 ft 8.25 ft 16.67 ft Load Length 16.67 ft 8.25 ft 8.42 ft Project: M2495A2S-OR Location: 09. GREAT ROOM DOOR HEADER Uniformly Loaded Floor Beam [2015 International Building Code(20115 NDS)] 3.125 IN x 9.0 IN x 8.33 FT 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 40.2% Controlling Factor: Deflection DEFLECTIONS Center Live Load 0. 14 IN L/701 Dead Load 0.06 in Total Load 0.20 IN L/505 Live Load Deflection Criteria: U480 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 1874 lb 1874 lb Dead Load 728 lb 728 lb Total Load 2602 lb 2602 lb Bearing Length 1.28 in 1.28 in BEAM DATA Center Span Length 8.33 ft Unbraced Length -Top 2 ft Floor Duration Factor 1 �00 CamberAdj. Factor 1 Camber Required 0,06 Notch Depth 0.00 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Bending Stress: Fb = 2400 psi Fb—Cmpr= 1850 psi Cd=1.00 CI=0.99 Shear Stress: Fv = 265 psi Cd=1.00 Modulus of Elasticity: E = 1800 ksi Comp. -L to Grain: Fc - 650 psi Controlling Moment: 5420 ft-lb 4.165 ft from left support Created by combining all dead and live loads. Controlling Shear: -2602 lb At support. Created by combining all dead and live loads. Adousted Controlled by: Fb'= 2387 psi Fv' = 265 psi E' = 1800 ksi Fc--L'= 650 psi Comparisons with required sections: Redd Provided Section Modulus: 27.24 in3 42.19 in3 Area (Shear): 14.73 in2 28.13 in2 Moment of Inertia (deflection): 135.42 in4 189.84 in4 Moment: 5420 ft-lb 8393 ft-lb Shear: -2602 lb 4969 lb D enise Hall Architects Northwest 18915 - 142nd Ave NE ',Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:34:54 PM . . .... .... ......... ..... ---- ---- - A FLOOR LOADING Side 1 Side 2 Floor Live Load FLL = 40 psf 40 psf Floor Dead Load FDL = 15 psf 15 psf Floor Tributary Width FTW = 8 ft 3.3 ft Wall Load WALL 0 plf BEAM LOADING Beam Total Live Load: wL= 450 plf Beam Total Dead Load: wD = 169 plf Beam Self Weight: BSW 6 pif Total Maximum Load: wT = 625 plf Project: M2495A2S-OR Location: 10. MSTR BEDIRM WINDOW HEADER Roof Beam [2015 International Building Code(2015 NDS)] 3.125 IN x 9.0 IN x 8.33 FT 24F-V4 - Visually Graded Western Species - Dry Use Section Adequate By: 18.3% Controlling Factor: Deflection DEFLECTIONS Center Live Load 0.14 IN L/701 Dead Load 0.09 in Total Load 0.23 IN U426 Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 1874 lb 1874 lb Dead Load 1211 lb 1211 lb Total Load 3085 lb 3085 lb Bearing Length 1.52 in 1.52 in BEAM DATA Span Length 8.3 ft Unbraced Length -Top 2 ft Unbraced Length -Bottom 0 ft Roof Pitch 4 :12 Roof Duration Factor 1 A 5 MATERIAL PROPERTIES 24F-V4 - Visually Graded Western Species Base Values Ad*usted Bending Stress: Fb = 2400 psi Controlled by: Fb—cmpr = 1850 psi Fb'= 2743 psi Cd= 1. 15 Cl=0. 99 Shear Stress: Fv = 265 psi Fv' 305 psi Cd= 1. 15 Modulus of Elasticity: E= 1800 ksi E'= 1800 ksi Comp. -L to Grain: Fc - 650 psi Fc - -L'= 650 psi _�IDenise Hall Architects Northwest 18915 - 142nd Ave NE Woodinville, WA 98072 StruCalc Version 10,0.1.4 2/14/2019 3:34:57 PM ROOF LOADING Side One: Roof Live Load: LL= 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW 16 ft Side Two: Roof Live Load: LL 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW = 2 ft Wall Load: WALL = 0 plf Controlling Moment: 6425 ft-lb Adjusted Beam Length: Ladj 8.33 ft 4.165 ft from left support Beam Self Weight: BSW 6 plf Created by combining all dead and live loads. Beam Uniform Live Load: wL= 450 plf Controlling Shear: 3085 lb Beam Uniform Dead Load: wD_adj = 291 plf At support. Total Uniform Load: wT = 741 plf Created by combining all dead and live loads. Comparisons with required sections: Reced Provided Section Modulus: 28.1 in3 42.19 in3 Area (Shear): 15.18 in2 28.13 in2 Moment of Inertia (deflection): 160.52 in4 189.84 in4 Moment: 6425 ft-lb 9644 ft-lb Shear: 3085 lb 5714 lb Project: M2495A2S-OR Location: 11. PANTRY DOOR HEADER Uniformly Loaded Floor Beam [2015 International Building Code(20115 NDS)] 5.5 IN x 11.5 IN x 6.0 FT #2 - Doug las-Fir-Larch - Dry Use Section Adequate By: 146.0% Controlling Factor: Moment DEFLECTIONS Center Live Load 0.02 IN L/3926 Dead Load 0.01 in Total Load 0.03 IN L/2806 Live Load Deflection Criteria: L/480 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 1710 lb 1710 lb Dead Load 682 lb 682 lb Total Load 2392 lb 2392 lb Bearing Length 0.70 in 0.70 in BEAM DATA Center Span Length 6 ft Unbraced Length -Top 2 ft Floor Duration Factor 1.00 Notch Depth 0.00 MATERIAL PROPERTIES #2 - Doug las-Fir-Larch Base Valuea Admusted Bending Stress: Fb = 875 psi Fb' 874 psi Cd= 1. 00 C1= 1. 00 CF= 1. 00 Shear Stress: Fv = 170 psi Fv' 170 psi Cd= 1. 00 Modulus of Elasticity: E = 1300 ksi E'= 1300 ksi Comp. -L to Grain: Fc - 625 psi Fc--L'= 625 psi Controlling Moment: 3589 ft-lb 3.0 ft from left support Created by combining all dead and live loads Controlling Shear: -2392 lb At support. Created by combining all dead and live loads Comparisons with required sections: RLqJ_ Provided Section Modulus: 49.29 in3 121.23 in3 Area (Shear): 21.11 in2 63.25 in2 Moment of Inertia (deflection): 89.42 in4 697.07 in4 Moment: 3589 ft-lb 8826 ft-lb Shear: -2392 lb 7168 lb Denise Hall Architects Northwest 18915 - 142nd Ave NE Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/1412019 3:35:00 PM ............ FLOOR LOADING Side 1 Side 2 Floor Live Load I'LL = 40 psf 40 psf Floor Dead Load FDL = 15 psf 15 psf Floor Tributary Width FTW = 11 ft 3.3 ft Wall Load WALL = 0 plf BEAM LOADING Beam Total Live Load: wL= 570 plf Beam Total Dead Load: wD = 214 plf Beam Self Weight: BSW = 14 plf Total Maximum Load: wT= 797 plf Project: M2495A2S-OR Location: 12. MSTR BATH WINDOW HEADER Roof Beam [2015 International Building Code(2015 NDS)] 3.5 IN x 9.25 IN x 5.33 FT #2 - Douglas -Fir -Larch - Dry Use Section Adequate By: 97.1 % Controlling Factor: Moment DEFLECTIONS Center Live Load 0.02 IN L/2891 Dead Load 0.01 in Total Load 0.04 IN L/1769 Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 1199 lb 1199 lb Dead Load 760 lb 760 lb Total Load 1959 lb 1959 lb Bearing Length 0.90 in 0.90 in BEAM DATA Span Length 5.3 ft Unbraced Length -Top 2 ft Unbraced Length -Bottom 0 ft Roof Pitch 3 :12 Roof Duration Factor 1.15 MATERIAL PROPERTIES #2 - Doug las-Fir-Larch Base Values Adousted Bending Stress: FIb = 900 psi Fb'= 1238 psi Cd= 1. 15 C/= 1. 00 CF= 1. 20 Shear Stress: Fv = 180 psi Fv' 207 psi Cd= 1. 15 Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Comp. -L to Grain: Fc - 625 psi Fc - -L'= 625 psi Controlling Moment: 2611 ft-lb 2.665 ft from left support Created by combining all dead and live loads. Controlling Shear: -1960 lb At support. Created by combining all dead and live loads. Comparisons with required sections: RNJ Provided Section Modulus: 25.32 in3 49.91 in3 Area (Shear): 14.2 in2 32.38 in2 Moment of Inertia (deflection): 46.97 in4 230.84 in4 Moment: 2611 ft-lb 5148 ft-lb Shear: -1960 lb 4468 lb _1'_ D enise Hall Architects Northwest 18915 - 142nd Ave NE '.Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:35:03 PM ROOF LOADING Side One: Roof Live Load: LL 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW 16 ft Side Two: Roof Live Load: LL= 25 psf Roof Dead Load: DL= 15 psf Tributary Width: TW = 2 ft Wall Load: WALL = 0 pif Adjusted Beam Length: Ladj = 5.33 ft Beam Self Weight: BSW 7 plf Beam Uniform Live Load: wL= 450 plf Beam Uniform Dead Load: wD — adj = 285 plf Total Uniform Load: wT = 735 olf Project: M2495A2S-OR Location: 13. BM OVER ENTRY (CORR#1) Multi -Span Roof Beam [2015 International Building Code(2015 NDS)] 5.5 IN x 11.5 IN x 16.25 FT Pressure Treated (6 + 10.2) #2 - Doug las-Fir-La rch - Dry Use Section Adequate By: 108.8% Controlling Factor: Moment DEFLECTIONS Left Center Live Load 0.13 IN2L/1080 0.04 IN L/3411 Dead Load 0.05 in 0.01 in Total Load 0.18 IN21J798 0.04 IN L/3008 Live Load Deflection Criteria: U360 Total Load Deflection Criteria: L/360 REACTIONS A B Live Load 1610 lb 641 lb Dead Load 1156 lb 302 lb Total Load 2766 lb 943 lb Uplift (1.5 F.S) 0 lb -18 lb Bearing Length 0.80 in 0.27 in BEAM DATA Left Center Span Length 6 ft 10.25 ft Unbraced Length -Top 2 ft 2 ft Unbraced Length -Bottom 6 ft 10.25 ft Roof Pitch 2 :12 Roof Duration Factor 1.15 Notch Depth 0.00 MATERIAL PROPERTIES #2 - Doug las-Fir-Larch Base Values Adiusted Bending Stress: Fb = 875 psi Fb'= 799 psi Cd= 1. 15 C/=O. 99 CF= 1. 00 Ci=O. 80 Shear Stress: Fv = 170 psi FV 156 psi Cd= 1. 15 Ci=O. 80 Modulus of Elasticity: E= 1300 ksi E' 1235 ksi Ci--0.95 Comp. -L to Grain: Fc - -L = 625 psi Fc - 625 psi Controlling Moment: -3865 ft-lb Over left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2 Controlling Shear: 1478 lb At left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2 Comparisons with required sections: Regj Provided Section Modulus: 58.06 in3 121.23 in3 Area (Shear): 14.17 in2 63.25 in2 Moment of Inertia (deflection): 314.36 in4 697.07 in4 Moment: -3865 ft-lb 8070 ft-lb Shear: 1478 lb 6595 lb NOTES ­iDenise Half Architects Northwest 18915 - 142nd Ave NE -'.Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:35:06 PM .... ...... . 6ft ______..__10.25ft B ROOF LOADING Left Center Roof Live Load RLL = 25 psf 25 psf Roof Dead Load RDL = 15 psf 15 psf Roof Tributary Width Side One TW1 = 2 ft 2 ft Roof Tributary Width Side Two TW2 = 3 ft 3 ft Wall Load WALL = 0 plf 0 plf BEAM LOADING Left Center Total Live Load 125 plf 125 plf Total Dead Load (Adjusted for Roof Pitch) 76 plf 76 plf Beam Self Weight 14 plf 14 plf Total Load 215 plf 215 plf Project: M2495A2S-OR Location: Fl. FTG at BM 04a Footing [2015 International Building Code(2015 NDS)] Footing Size: 2.5 FT x 2.5 FT x 10.00 IN Reinforcement: #4 Bars @ 7.00 IN. O.C. E/W / (4) min. Section Footing Design Adequate FOOTING PROPERTIES Allowable Soil Bearing Pressure: CIS = 1500 psf Concrete Compressive Strength: F'c = 2500 psi Reinforcing Steel Yield Strength: Fy 40000 psi Concrete Reinforcement Cover: C 3 in FOOTING SIZE Width: W 2.5 ft Length: L = 2.5 ft Depth: Depth = 10 in Effective Depth to Top Layer of Steel: d 6.25 in COLUMN AND BASEPLATE SIZE Column Type: Concrete Column Width: m= 6 in Column Depth: n = 12 in FOOTING CALCULATIONS Bearing Calculations: Ultimate Bearing Pressure: Qu= 922 psf Effective Allowable Soil Bearing Pressure: Qe = 1375 psf Required Footing Area: Areq = 4.19 sf Area Provided: A 6.25 sf Baseplate Bearing: Bearing Required: Bear = 8197 lb Allowable Bearing: Bear -A 198900 lb Beam Shear Calculations (One Way Shear): Beam Shear: Vul = 1571 lb Allowable Beam Shear: Vc1 = 14063 lb Punching Shear Calculations (Two Way Shear): Critical Perimeter: Bo 61 in Punching Shear: Vu2 = 6161 lb Allowable Punching Shear (ACI 11-35): vc2-a = 57188 lb Allowable Punching Shear (ACI 11-36): vc2-b = 87188 lb Allowable Punching Shear (ACI 11-37): vc2-c = 57188 lb Controlling Allowable Punching Shear: vc2 57188 lb Bending Calculations: Factored Moment: Mu= 19673 in -lb Nominal Moment Strength: Mn= 169665 in -lb Reinforcement Calculations: Concrete Compressive Block Depth: a 0.49 in Steel Required Based on Moment: As(l) = 0.09 in2 Min. Code Req'd Reinf. Shrink./Temp, (AGI-10.5.4): As(2) = 0.60 in2 Controlling Reinforcing Steel: As-reqd 0.60 in2 Selected Reinforcement: #4's @ 7.0 in. o.c. e/w (4) Min. Reinforcement Area Provided: As = 0.79 in2 Development Length Calculations: Development Length Required: Ld = 15 in Development Length Supplied: Ld-sup 9 in Note: Plain concrete adequate for bending, therefore adequate development length not required. ----�7 c--� " -71 D eniseHall Architects Northwest 18915-142ndAveNE '—Woodinville, WA 98072 StruCalc Version 10.0. 1 A 2/14/2019 3:35:09 PM LOADING DIAGRAM 12in- 10 in 3 in 2.5ft--- 6 in 10 in 3 in 2.5 ft Live Load: PIL 3207 lb * Dead Load: PD 2555 lb * Total Load: PT 5762 lb * Ultimate Factored Load: Pu 8197 lb Footing plus soil above footing weight: Wt 503 lb * Load obtained from Load Tracker. See Summary Report for details. Project: M2495A2S-OR Location: F2. FTG at BMS 04b, 07a & 07b Footing [2015 International Building Code(2015 NDS)] Footing Size: 3.0 FT x 5.5 FT x 10.00 IN Reinforcement in Long Direction: #4 Bars @ 9.00 IN. D.C. / (4) min. Reinforcement in Short Direction -center band (Equal to width of short side): #4 Bars @ 7.00 IN. O.C. / (5) min. Reinforcement in Short Direction -outside bands: #4 Bars @ 9.00 IN. O.C. / (1) Each band. Section Footing Design Adequate FOOTING PROPERTIES Allowable Soil Bearing Pressure: Qs = 1500 psf Concrete Compressive Strength: F'c = 2500 psi Reinforcing Steel Yield Strength: Fy 40000 psi Concrete Reinforcement Cover: C 3 in FOOTING SIZE Width: W 3 ft Length: L = 5.5 ft Depth: Depth = 10 in Effective Depth to Top Layer of Steel: d 6.25 in COLUMN ND BASEPLATE SIZE Column Type: Concrete Column Width: m= 8 in Column Depth: n = 42 in FOOTING CALCULATIONS Bearing Calculations: Ultimate Bearing Pressure: Qu = 1282 psf Effective Allowable Soil Bearing Pressure: Cle = 1375 psf Required Footing Area: Areq = 15.38 sf Area Provided: A 16.50 sf Baseplate Bearing: Bearing Required: Bear = 30821 lb Allowable Bearing: Bear -A 928200 lb Beam Shear Calculations (One Way Shear): Beam Shear: Vul = 6635 lb Allowable Beam Shear: Vc1 = 30938 lb Punching Shear Calculations (Two Way Shear): Critical Perimeter: Bo 125 in Punching Shear: Vu2 = 21902 lb Allowable Punching Shear (ACI 11 -35): vc2-a = 80915 lb Allowable Punching Shear (ACI 11 -36): vc2-b = 117188 lb Allowable Punching Shear (ACI 11-37): vc2-c = 117188 lb Controlling Allowable Punching Shear: vc2 = 80915 lb Short Direction: Bending Calculations: Factored Moment: Mu = 83902 in -lb Nominal Moment Strength: Mn = 299406 in -lb Reinforcement Calculations: Concrete Compressive Block Depth: a 0.39 in Steel Required Based on Moment: As(l) = 0.38 in2 Min. Code Req'd Reinf. Shrink.fTemp. (ACI-10.5.4): As(2) = 1.32 in2 Controlling Reinforcing Steel: As-reqd 1.32 in2 Selected Reinforcement: Short -band: #4's @ 7.0 in. o.c.(5) Min. Out. bands: #4's @ 9.0 in. o.c.(1) Min. F r ow, Denise Hall Architects Northwest 18915 - 142nd Ave NE 'Woodinville, WA 98072 StruCalc Version 10.0.1.4 2/14/2019 3:35:12 PM LOADING DIAGRAM 42 in 10 in' 3 in ------ — -- - ----5.5ft ain- 10 in 3—i n- 3ft Live Load: PL= 13612 lb * Dead Load: PID = 7535 lb * Total Load: PT = 21147 lb * Ultimate Factored Load: Pu = 30821 lb Footing plus soil above footing weight: Wt = 1329 lb * Load obtained from Load Tracker. See Summary Report for details. Long Direction: Bending Calculations: Factored Moment: Mu = 33623 in -lb Nominal Moment Strength: Mn = 170909 in -lb Reinforcement Calculations: Concrete Compressive Block Depth: a 0.41 in Steel Required Based on Moment: As(l) = 0.15 in2 Min. Code Req'd Reinf. Shrink./Temp. (ACI-10.5.4): As (2) = 0.72 in2 Controlling Reinforcing Steel: As-reqd 0.72 in2 Selected Reinforcement: Long Dir: #4's @ 9.0 in. o.c.(4) Min. Reinforcement Area Provided: As = 0.79 in2 Reinforcement Area Provided: As = 1.37 in2 Development Length Calculations: Development Length Calculations: Development Length Required: Ld 15 in Development Length Required: Ld = 15 in Development Length Supplied: Ld-sup 9 in Development Length Supplied: Ld-sup 11 in Note: Plain concrete adequate for bending, therefore adequate development length not required. NOTES I N Fo—,41 Foll G-L.13. 24F-V4 FLUSH 5 YW. 1.2 '' 6.L.B. 24F-V4 5EA*M'" <E"� SCALE: Va" = 1'-0" UFFER FLOOR FRAMIN& 4.10 OF02 6LB. 24r-V4 EKI 24F-V4 LON& 2. 4 5 Yb"xlZ &.L.B. 24F-V4 16'-0' LONC. -w-_: 6xI2 OF#2 6-0" i I LONG, CANT-L Z-O" a ONE END !b LU z ri LL f4 6 Z (-12 P.T. DI 1,'-0,. LONG, Lu � 6 0 z —ANOLED P.T. 6X6 SWIROW CANT . L 2'-0" a ONE END POST Sm PET ON SHT AD <E'� .5EA�� SCALE: 1/0" = 1'-0" ROOF FRAMIN6 6.12 P.T. P"2 CANT'L 2'-0" o ONE END 7— Lu Z 7- 7— LL 0 0 Lu m 00 P�, 00 0 '41- oo 0\ 1.0 V) C)\ 1 00 uj Lo Z co 00 Lu LLi 00 =) —1 00 z — I �, Lu 1-4 c\j > > d3l 11c Z Lu LL X —3 %c c\j (D u- 00 V) �-- �- V) U Ui Lu �: �-- 7� -7 �— u ry ce 0 < z DESIGNED BY: DATE: TRO'T' 1/2 015 DRAWN BY: DATE: JRA 4/15/15 PROJECT MANAGER: SARAH NE16H7 REVISED BY: DATE: JRA 5/21/15 1.�H 7/25/15 ANW WOODINVILLE OFFICE JOB NUMBER: E-5 I 9O.*XaO,,xIO,, DEEP aoNc, FT6. ./ (2) *4 BARS EA AA'T' 5 10" f�T(q. / #4 0 q O.C. (4) MIN. LON6, #4 al" O.C. (-Q MIN. SHORT ----------------------------- J: lic =ME m m lc = --, =M-- == =M-- = = =m =:::: = 2111 — =0 — — — -Im = = = m ----------------------------- L------------- 48"x4VxI2.' DEEP r,ONr-. FT6. KI (4) *4 5AR5 EA4,H PtAy SCALE: I/a" = 1'-0" < E )oo` 4*x24'xl2* DEEP COW- FTS K/ $4 BARS * VOL. E2ArH KAY (5) HIK FND/F00TlNC-,,S z Lu cl� z 0 0 LL, oi co I- co 0 00 0,% Lo M I co 'It Lo Lu ',I: co o z 3g: co UJ Ld co 00 Z 3 Lo W F-4 (v > > Lu t z Lu " ix -13 o LL- r- cv 0 —1 LL 0 V) F— F— Lf) L) Lij Lu F— F— rvlo 0 < z t�� DESIGNED �—Y----DATE: 7RC'T' 1/2015 DRAWN BY: DATE: JRA 4/15/15 PROJECT MANAGER: 5ARAH �NE16HT REVISED BY: DATE: JRA 5/21/15 DH -7/25/la ANW WOODINVILLE OFFICE JOB NUMBER: 160561 4 1 . I MITCHELL ENGINEERING INC. - 5raii pr : 70 Aeb 7821 - 168th Ave. N.E. Redmond, WA 98052 (425) 747-1500 mitchellenginceringinc@coi-ncast.net L wr 14" PREPARED BY ir PROJECT A-bv- ��W Y-f5 SHEET NO. 411 OF DATE SUBJECT A�a4(70 VA/4a/"& 4;;A1dJ^1f6' JOB NO. 7, / 7a 4 MITCHELL ENGINEERING INC. 41 =� 1 194, a i&- 4 7R 'y a r e7 7821 - 168th Ave. N.E. Redmond, wA 98052 (425) 747-1500 mitchellengineeringinc@comcast,net A4=1 �4 2 1 A e�s 4,llkj I-C j - 4o 2-, /70/1.6 214 77 /,.:! f PREPARED BY PROJECT DATE SUBJECT :24 d�5 ................ .21 SHEET NO: %P�OF JOBNO. MITCHELL ENGINEERING INC. I _'5 r, e" p r k' p&' i:: � : 01 7a 400w�74.df Aa 04 A/p '7 R4 . . . . . . .... cLAaoff 40474� 1 7 41 4AwPY 7821 - 168fli Ave. N.E. Redmond, WA 98052 (425) 747-1500 mitchellengineeringinc@comcast.net SHEE N OF PREPARED BY PROJECT �24- �,5` T' 0: - A�_ / CIT I E) FT"/"P pliji: I'Ad-ur's TCNn -kTn 017-12a MITCHELL ENGINEERING INC. 7821 - 168th Ave. NZ Redmond, WA 98052 (425) 747-1500 mitchellengineeringinc@comcast.net ;w 0 41 10, 4P dfi... /0 6.0 A 4 0, z' 4w 26 00 2 /dIL /9/4�a `0 7/!51,,/,-,F' I 54"la, /�3(214q sr Sit Y44 �qS�o4 -.73 5;; /7 4 PREPARED By k'4 PROJECT DAT-F 1115117 QTTlaTPrl'r r4�'Op' SHEETNO. OF PAIrICHELL ENGINEERING INC. &A, 4"'I'l,5105c 14 A.; AIIA )octo RECEIVED ,*�-JV 08 2018 DEVELOPMENT SERVICES COUNTER PREPARED BY PROJECT SHEET NO. OF ;5.> DATE Y�3 ;-77' SUBJECT 5-'QA 4---;) 17- JOB NO. 7821 - 168th Ave. N.E. Redmond, WA 98052 (425) 747-1500 mitchellenginceringinc@comcast.net 7821 - 168th Ave. N.E. ,M*lr-'*VCHELL ENGINEEPJNG INC. Redmond, WA 98052 M (425) 747-1500 mitcheHengineeringinc@comcast,not 1132 -7al o e.. 4 AdA 7 7z, L rA Jr 14 P�- T2) - A-7 >4 IJ,5r 72-) .PREPARED BY PROJECT DATE 7&/ SUBJECT R�247.5 - SHEETNO. �1220F JOBNO. c�'17-)lc7 MITCHEL-L ENGINEERING INC. 4� (Aeal .41 i ; �5 / 4.r 4�p, Co3 4v 15 - Aajg 7821 - 168th Ave. N.E. Redmond, WA 98052 (425) 747-1500 mitchellengineeringinc@comcast.net % -j OA 04 I- - *1 1 'OL -146 4 flo, )V/ :14 14 �a 2,2 42 - X/ 7) Ma-� �Wdlv /; s -.4 " I-"Y — 1,515 -M7; 72 PREPARED BY �/, d AQ1247.5 4�f PROJECT SHEET NO. OF DATE SUBJECT JOB NO. 4:�),/ 7- 1*74; MITCHELL ENGINEERING INC. 6d At A A 7821 - 168th Ave. N.E. Redmond, WA 98052 (425) 747-1500 mitchellengineeringinc@comcast,net 7� 71-442-6.2 //v 7; 1�4 2,1 7 751,-1;,l kAud Sas 9 t Ay� lap 7x, YJ-3�4 - 73 Sv /7 4 PREFARED BY PROJECT DAT-E 77/%/ SUBJECT M SHEET NO. A14 OF JOIBNO.� 017-.17o SHEAR WALL SCHEDULE Shear Wall —Desipation Nail Size N Spacing ALLOWABLE SIIEAR Hem -Fir #2 #/Ft Eftes Studs Top/Btm. Plate Blocking Reg'd. PI-6 8d 611 1211 611 Yes 210 PI-4 8d 4" 1211 41t Yes 310 PI-3 8d 311 12" 311 Yes 400 PI-2 8d- 211 1211 211 Yes 525 P2-3 8d 311 1211 3 'T Yes 800 P2-2 8d 211 12" 3" Yes 1050 Shear Wall Notes: I . PI - 7/16 A.P,A. rated Plywood or Orientated Strand Board (O.S.B.) on one side of wall. P2 - 7/16 A.P.A-. rated Plywood or Orientated Strand Board (O.S.B.) on each side of wall. 2. For P 1-3, P 1-2, P2-3, & P2-2 shear walls use 3x stLids at adjoining panel edges. Nailing shall be staggered. 3. Nails shall be 8d common. (d 131 inch) 4. W-iore plywood is installed on both sides of wall plywood joints shall fall on separate stLids each side. 5. All panel edges backed with 2-inch nominal flaining for P 1-6 & P 1 -4 shear wall. All panels edges backed with 3x fa-aming at P 1 -3, P 1 -2, P2-3, & P2-2 shear walls. histall panels either horizontally or vertically. Space nails @ 10 inches on center @ intermediate supports. 6. All anchor bolts shall be installed with hot dipped galvanized plate washers. 7. Refer to foundation plan for anchor bolt size, spacing and inudsill/rim connections. 4- STRUCTURAL NOTES CODE: DESIGN IS IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (I.B.C.) AS AMENDED BY THE LOCAL BUILDING DEPARTMENT, LIVE LOADS: ROOF ------------------- 25PSF FLOOR ----------------- 40PSF LATERAL WIND ------------------ EXPOSURE B, 85MPH/I I OMPH(ULT) SEISMIC -------------- SITE CLASS D FOUNDATIONS: EXTEND FOOTINGS TO FIRM UNDISTUR13ED SOIL, ASSUMED 13EARINCT CAPACITY OF 15DOPSF. ALL EXTERIOR FOOTINGS SHALL EXTEND A MINIMUM OF V-6" BELOW ADJACENT EXTERIOR GRADE. CAST -IN -PLACE. CONCRETE: F'c=2500 PSI @ 28 DAYS. MINIMUM 5-1/2 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE AND MAXB/IUM OF 6-3/4 GALLONS OF WATER PER 94# SACK OF CEMENT. NO SPECIAL INSPECTION REQUIRED. MAXIMUM SIZED AGGREGATE IS 1-1/2 INCHES. MAXIMUM SLUMP IS 4 INCHES. ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL CONFORM TO BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE. ALL REINFORCING STEEL, DOWELS, ANCHOR BOLTS, AND OTHER INSERTS SHALL BE SECURED IN POSITION PRIOR TO POURING CONCRETE. ANCHOR BOLTS FOR PRESSURE TREATED SILL PLATES TO FOUNDATION WALLS TO BE 5/8 INCH DIAMETER WITH 7 INCH MINIMUM EMBEDMENT INTO CONCRETE AND MAXIMUM SPACING OF 2 FEET ON CENTER. MINIMUM 2 BOLTS PER SILL PLATE PIECE. ONE BOLT TO BE PLACED WITHIN 6 INCHES OF EACH END OF THP, SILL PLATE. DIPPED GALVANIZED CONNECTORS SHALL CONFORM TO ASTM STANDARD 153 AND HOT DIPPED GALVANIZED CONNECTORS SHALL CONFORM TO ASTM A653M CLASS G-185. STAINLESS STEEL FASTENERS AND CONNECTORS SHALL BE TYPE 304 OR 316. SIMPSON PRODUCT FINISHES CORRESPONDING TO THESE REQUIREMENTS ARE ZMAX (HOT DIPPED GALVANIZED) AND S ST 3 00 (STAINLESS STEEL). FASTNERS FOR PRESSURE TREATED AND FIRE -RETARDANT TREATED WOOD SHALL BE ZMAX HOT DIPPED GALVANIZED (GI 85), OR STAINLESS STEEL. REINFORCING STEEL: ALL REINFORCING STEEL SHALL BE PLACED IN CONFORMANCE WITH THE BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE AND THE MANUAL OF STANDARD PRACTICE FOR REINFORCED CONCRETE CONSTRUCTION BY CRSI. DEFORMED REINFORCING STEEL BARS SHALL CONFORM TO ASTM A- 615 GRADE 40 FOR #5 AND SMALLER REINFORCEMENT AND GRADE 60 FOR #6 AND LARGER. ALL REINFORCING 13AR BENDS SHALL BE MADE COLD WITH A ,4/& MINIMUM RADIUS OF 6 BAR DIAMETERS (1'-7" MINIMUM). CORNER BARS (2'41 BEND) SHALL BE PROVIDED FOR ALL HORIZONTAL REINFORCEMENT. LAP ALL BARS A MINIMUM OF 48 BAR DIAMETERS UNLESS NOTED OTHERWISE. UNLESS NOTE OTHERWISE ON THE DRAWINGS REINFORCING STEEL SHALL HAVE THE FOLLOWING MINIMUM COVER: CONCRETE CAST AGAINST EARTH 31NCHES CONCRETE EXPOSED TO EARTH OR WEATHER: #6 THROUGH # 18 BARS 21NCHES #5 BAR AND SMALLER 1-1/2 INCHES STRUCTURALSTEEL: STRUCTURAL STEEL SHALL CONFORM TO ASTM A36, fy--36,000 PSI. ALL WELDING SHALL BE IN CONFORMANCE WITH ASTM AND AWs STANDARDS AND SHALL BE PERFORMED BY WABO CERTIFIED WELDERS. STEEL TUBING SHALL CONFORM TO ASTM A500 fy-50,000PSI, STRUCTURALTIMBER: ALL LUMBER SHALL CONFORM TO WWPA GRADING RULES FOR WESTERN LUMBER, LATEST EDITION. PROVIDE CUT WASHERS UNDER ALL NUTS AND BOLTS BEARING AGAINST WOOD. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED. ALL STRUCTURAL LUMBER SHALL BE AS NOTED BELOW: 2X FLOOR JOIST HEM-FIR#2 ------------------ Fb=850 PSI 2X ROOF RAFTERS HEM-FIR#2 ------------------ Fb=850 PSI 4X BEAMS DOUG-FIRJLARCH #2----Fb=850PSl 6XBEAMS DOUG-FIR/LARCH #2----Fb=850PSI LUMBER NOT NOTED HEM -FIR #2 ------------------ Fb=850 PSI MISCELLANEOUS HANGERS TO BE SIMPSON OR APPROVED EQUAL. ALL HANGERS SHALL BE FASTENED TO WOOD WITH PROPER WAILS. ALL HOLES SHALL BE NAILED. MACHINE BOLTS TO BE A-307. ANCHOR BOLTS INTO CONCRETE SHALL BE 5/8 INCH DIAMETER WITH 7 INCHES OF EMBEDMENT INTO CONCRETE UNLESS NOTED OTHERWISE ON THE PLANS. ALL NAILS SHALL BE COMMON WIRE NAILS. NAILING SHALL 13E IN ACCORDANCE WITH THE CURRENT I.B.C. SCHEDULE. STRUCTURAL LAMINATED LUMBER (GRADE 2.0) Fb=2600 PSI E=2,000,000 PSI Fv= 285 PSI 4)7 FLOOR SHEATHING: SHEATHING SHALL BE Y4 INCH TONGUE AND GROOVE A.P.A. RATED SHEATHING. SPAN RATING 48/24 WITH LONG DIMENSION PERPENDICULAR, TO SUPPORTS. UNLESS NOTED OTHERWISE NAIL WITH 8d COMMON NAILS AT 6 INCHES ON CENTER AT SUPPORTED PANEL EDGES AND 10 INCHES ON CENTER AT INTERMEDIATE SUPPORTS, THE FLOOR SHEATHING SHALL BE GLUED TO THE JOIST AND THE TONGUE AND GROOVE JOINTS WITH AN APPROVED ADHESIVE. WALL SHEATHING: SHEATHING SHALL BE 7/16 INCH A.P.A. RATED SHEATHING, SPAN RATING 2410. PANEL END JOINTS SHALL OCCUR AT SUPPORTS. NAIL PANEL EDGES WITH 8d NAILS AT 6 INCHES ON CENTER AND 10 INCHES ON CENTER AT INTERMEDIATE SUPPORTS UNLESS NOTED OTHERWISE ON THE DRAWINGS. GLU-LAMINATED TINEBE : LAMINATED TIMBER SHALL BE DOUGLAS-FIR/LARCH KILM DRYED, STRESS GRADE COMBINATION OF 24F-V4 FOR SIMPLE SPANS AND 24F-V8 FOR CANTILEVER AND CONTINUOUS BEAMS, ROOFSHEATHING: SHEATHING SHALL BE 5/8 INCH A.P.A. RATED SHEATHING. SPAN RATING 32/16, INSTALLED WITH LONG DIMENSION ACROSS SUPPORT. PANEL END JOINTS SHALL OCCUR AT SUPPORTS. NAIL PANEL EDGES WITH 8d NAILS SPACED AT 4 INCHES ON CENTER AND 10 INCHES ON CENTER AT INTERMEDIATE SUPPORTS, FLOORFRAMING: PROVIDE FULL DEPTH BLOCKING FOR JOIST AT THE SUPPORTS. FLUSH BEAMS (FB) AND HEADERS NOT CALLED OUT ON THE PLANS SHALL BE (2)2X8. ALL VERTICALLY LAMINATED COLUMNS AND HEADERS SHALL BESPIKED TOGETHER WITH 16d NAILS SPACED AT 6 INCHES ON CENTER. BEARING WA-LL FRAMING: ALL DOOR AND WINDOW HEADERS NOT CALLED OUT ON THE PLANS SHALL BE (2) 2X8 HEM-FIR#2 WITH ONE CRIPPLE AND ONE STUD AT EACH END FOR OPENINGS 4 FEET WIDE OR LESS. ALL COLUMNS NOT CALLED OUT ON THE PLANS SHALL BE (2) STUDS SPIKED TOGETHER WITH 12d NAILS AT 12 INCEFS ON CENTER. PROVIDE 2 LAYERS OF BUILDING PAPER BETWEEN WOOD AND CONCRETE. WALLS SHALL HAVE A SINGLE BOTTOM PLATE AND DOUBLE TOP PLATE. END NAIL TOP PLATES AND BOTTOM PLATES TO EACH STUD WITH 2-16d NAILS. FACE NAIL DOUBLE TOP PLATE WITH 16d NAILS AT I o INCHES ON CENTER. LAP AND FACE NAIL PLATES WITH 2-16d NAILS AT EACH SPLICE, CORNER INTERSECTION. STAGGER SPLICES A MINIMUM OF 48 INCHES. ROOF TRUSSES: TRUSSES SHALL BE PLANT FABRICATED DOUGLAS-FIR/LARCH OR HEM -FIR. TRUSS MANUFACTURER SHALL SUBMIT SHOP DRAWING AND CALCULATIONS -A1,22 STAMPED, SIGNED AND DATED BY A WASHINGTON STATE LICENSED STRUCTURAL ENGINEER. SUBMIT TRUSS DRAWING TO THE ENGINEER OF RECORD AND BUILDING DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. ROOF TRUSSES SHALL BE DESIGNED AS ATTIC,TRUSSES WITHOUT STORAGE. 9 MITCHELL ENGINEERING INC. 01 1 Ao MITCHELL L-N GIN ELMIN G IN C. o4u. 4 jt4 A t r VA 44 MITURELL E-N GINEEREN 6 IN U. 14 1 7o-7f 4A�i �o 12Y :i-- 7i "Ir IDI 1,,� Hl)6 lz �2) 44 /Y) 'r or.. 41 It 44( ).7 44 14 let t\4 � yfo L �J7 LO 4-d ZO vw Al 44, V.� a rL517 14 D ra ol ep —V (5j7t—,-r Zbe lk� 07 -?I vq -41e:7 rl-�5 eL PPV I rrfz7v I 4 0 ,atl 4 � / I 1 40 �J_ ul N, -X? � , ul; 7re� MITCHELL ENGINEERING INC. 7821 - 168thAve. N.E. Redmond, WA 9 8052 (A , 0) 747-1500 mitchellenginceringinc@comcast.net AA4 -544, b,41 L ghg- 79A,� I- rtA� 4e gzZig,,,�A L 11 L-5 r-S) -14 L 15 -MITCHELL ENGINEERING INC. 7821 - 168th Ave. ME Redmond, WA 9805" (425) 747-150, (--S OYI'A il. P4-�' fT�AJ /20-�A_l ;�/6v ivil I %--Ixlr-)JLJJL jPAIN k-Tli'N -LlinjiN kff IiN k-1. AeCIMUMI, YVA �FOU:)x (425) 747-150( mitcheEengineezincrinc@comcast.ne 0 A P,2y .0 I r�2) --1�4 A�7 UN WALEM-N G I-N C. — , is,— . " . 1� I -- . AA-�- 5, i ?e-4 J( j 0 J) d--.7-p z III = �2) 44 ol Al--15 AA-�- 5, i ?e-4 J( j 0 J) d--.7-p z III = �2) 44 ol Al--15 AUT(AIELL LIN GIN EEXIJN G JJN C 67 /44 f f JITAI JL %--IJLJLJ-�-LJ-U 11-jil "li , N jpd jpjmi , N kff IIN I I --- I Lrlo4- vvl Oil 4 4� I 4�, e;) 6 r= VVAI-( lin 4 O'le, A501w�c F lv� 12 L-d /,2 114 a mr, -- �210 MITCHELL ENGINEERING INC. 7821 - 168th Ave. N.E. Redmond, WA 98052 (425) 747-150C mitcheHengineeringinc@comcast.neI 7 '5 -44 'Pli- 41 MITCHELL ENGINEERING INC. 4�a LDddJe*d Jv/�7 7jjqp- 4641-7- "17-17 IT- 422 MITCHELL ENGINEERING INC. 7821 - 168th Ave. ME Redmond, WA 9805: (425) 747-150' mitchellenginceringinc@comcast.ne w 0 gig -4 1144 I I T �E I rr- �fi 4 �1-;LLA � XL "'� 451w&t� 5; 51 T, MIT, CHELL ENGINEEPJNG INC. 10 L I - 10 0 L.0 Ive. M.U. Redmoad, WA 98052 (425) 747-1500 mitchellen,o,,-inceringinr,@comcast.net 4AL ----------- I— �- Ik- bA Lj, 24 0 ,-M-.-ITCHELL ENGINEERING INC. Redr�cad, WA 9805: (425) 747-150, initcheEen,-ineeringinc@comcast.ne ly,4, i zo�- 5 c,::: r, �,/ � / 7 '24d MIJ'CHELL L-N GIN LEM-N G INC. .,5w / (-o ab 4 �'� :5 . . M4.41 4�r- tx. ,�f5k,,-T,,) ;� /� :27 5-1�0 LA13 -,Pf (57 -7letv 7,v�g -4tfli'l -W,119 T� PeW V�L rl/ 2 e-� f VIXrTr,4 VT,) VrJ JJJITATTI� 1-1 �T, �r -,'� iq 27 MITCHELL ENGINEERING INC. 1A 7821 - 168th Ave, KE Redmond, WA 9805'� (425) 747-150( mitchellerigineeringinc@coiiicast-ne- sz 71 h- q 1�r "-- 24 A 24 Qz- 't �2, ,;a MITCHELL E-N GINEERING INC. A C5, 6 aj �A ;I 6s IQ 21 6474�jl 1, Redmond, WA 980! (425) 747-ISC n-dtcheEe-ti,aineetingiac@comcast.n fU r,:p MITCHELL ENGINEERING INC. jt4T �O� :2 4 gz� 7821 - 168th Ave, N.E. Redmond, WA. 98052 (425) 747-1500 mitchellengincerin-inc@comcast,net 0 cs) 0 42c) �'2 -MITCHELL ENGINEERING INC. V lw�A 7821 - 168th Ave. N.� Redmond, WA 9801 (425) 747-15( naitchellengineerin-ijic@comcast,n 0 ,4.55� 2.,q, 1411,;P-4 I 7\161A4 24 7 L kvl. 7& Q iiiiiiiiii!/. il,l -5 dfD14 ,T ALVI PV/ 4?4� ��L)/ i 4 ,O� �/. 47-/ m STdo 14. A if 0 16�r,YD4 iJ,�J ,kid 4 4 V uo iol-2 Av. 24q.6; - A�zoJ.,, 0174 7v -k 1pi+ --, ro )Js1-),Prx-9 M6772 g44�AIJ a4. �q joeloo) 6114 142 IPA,) d12495' 143 '4k $1 i Lakewood Office 5920 100TH St. SW Ste #25 Lakewood, WA 98499 BEYLER 253-984-2900 C - DIN S U 1, T I N G STORMWATER MEMO FOR CHUNG SHORT PLAT - LOT I 721 Edmonds Way Edmonds, WA 98020 Applicant: Thomas Chung 721 Edmonds Way Edmonds, WA 98020 Prepared by: Lance Hollingsworth & Brian Lewis Beyler Consulting 5920 100TH St. SW Ste #25 Lakewood, WA 98499 253-984-2900 Job No. 16-089 October 10, 2019 Fml [ �- 2 U 1 7z" OCT 2 9 2019 BUIU3MG DEPMTMENT CRY OF EDMONDS C M7 (7-N 01 -:)�Y I Chung Short Plat - Lot 1 1. Project Description: The proposed project will develop Lot 1 of the Chung Short Plat (PLN20160035) by creating a single-family residence, driveway, utilities, and associated grading and landscaping. This drainage memo will discuss/address stormwater design specific to Lot 1. See the original Chung Short Plat report for additional information about site characteristics, how minimum requirements are being met, and the construction stormwater pollution prevention plan. 2. Developed Site Conditions: To mitigate stormwater for the project, the driveway and walkway will be constructed with permeable pavement. Runoff from the house will be collected and sent to a gravelless infiltration chamber. Landscaped areas will receive amended soils. All stormwater from the lot will remain on site through infiltration. See Table 1 below for the site's new impervious areas. Table I - Impervious Areas 7!" 'A House 21 14 0. 5 0 0.049 Driveway 510.60 0.012 Walkway 88.75 0.002 Total Impervious 2,7439.85 0.063 Total PGIS 511 0.012 3. Onsite Stormwater Management Permeable Pavement Surfaces: The driveway and walkway will be built with either permeable concrete or pervious pavers. The permeable pavement should be constructed at a slope no greater than 3% to avoid the need for check dams. The pavement design was modeled in WWHM2012 to ensure it would meet the stormwater demands of the site. One model was created using 4" of permeable pavement (porosity of 0.20) and 6" of permeable ballast (porosity of 0.20). The corrected infiltration rate given by the geotechnical report lists 21 in/hr. This design will allow 100% of the runoff to be infiltrated for the driveway and walkway. Plan. Design. Manage CIVIL_ & STRUCTURAL. ENGINEERING I LAND SURVEYING I LAND PLANNING PROJECT MANAGEMENT I PERMIT EXPEDITING I FEASIBILI TY 4 Chung Short Plat - Lot I Figure 1 - WWHM2012 Permeable Pavement Information facility Dimensions Payemmt Length Iftl Bott=,Width [ft) Pbnding 0 epth Above Pavemert (Itj Iffective Total Depth N �Boqom slope OtAtf. IffectiveVolumefactor. 'Layers for Permeable Pavement .Paveowit Thicknen (IQ Pavement poro* (0-1) 'SU*w 1 Thidux��, (ft) Underdrain ra .1 ro ,Sublayer 1 poro* JO-1) :SublaW 2 Thrknets (ft) ly. 1tweKwVolume at Top of Pavenvitfac4t) 003, Neauxed lnfiltratkm Rate (hft) Rediction Factor (kWactorl Show Pavement Table FOWn TZ; --!I �Uw Wetted Swface Area (sidewalls) FN —5 -.1 initial stage (w W77771 TotalVolums lh%ated (ac-ftl O.M TotalVdwneThrou9hFaA-ty7a_c-W_ OMS TotalVolume Ttwough Rim fac.ft) 0 Percent Infkated 100 Size Pavemerd T 000— ­4 Gravelless Chambers: The gravelless chamber was designed using the length version of the simplified sizing method. BMP Length (feet) = Impervious Area (square f eet) x Sizing Factor (%)/100 Lot 1 Roof Area (2,140.50 square feet) x Sizing Factor (1,4)/100= 29.97 feet The Quick4 High Capacity Chamber sections measure 4' long, so 8 sections will be provided to achieve a total length of 32'. A catch basin with a riser will be included upstream of the chambers to provide pre-treatment. Plan. Design. Manage CIVIL & STRUCTURAL ENGINEERING 1 LAND SURVEYING I LAND PLANNING PROJECT MANAGEMENT I PERMIT EXPEDITING I FEASIBILITY 3 M Chung Short Plat - Lot 1 Post -Construction Soil Quality And Depth All pervious areas onsite will use amended soil in accordance with the Department of Ecology's Stormwater Management Manual for Western Washington (SWMMWW) and ECDC 18.30. 4. Operation and Maintenance Operation and Maintenance of all installed BMPs for the site will be performed by the homeowners in accordance with the provisions in Chapter 7 of the City of Edmonds Stormwater Supplement. Plan. Design. Manage CIVIL & STRUCTURAL ENGINEERING I LAND SURVEYING I LAND PLANNING PR03ECT MANAGEMENT I PERMIT EXPEDITING I FEASIBILITY 2 L,C) --c I It i3o"" BEYLER C 0, N7 S 1T 1, T I '�? G Lakewood Office 5920 100TH St. SW Ste #25 Lakewood, WA 98499 (253) 301-4157 STORMWATER SITE PLAN REPORT FOR CHUNG SHORT PLAT (SMALL SITE, CATEGORY 2 PROJECT) 721 Edmonds Way Edmonds, WA 98020 Applicant: Thomas Chung 721 Edmonds Way Edmonds, WA 98020 Prepared by: Lance Hollingsworth, Engineer II Beyler Consulting 5920 100TH St. SW Ste #25 Lakewood, WA 98499 253-301-4157 Job No. 16-089 May 14, 2018 DLDW 0 t9 19-1 154 Plan. Design. Manage CIVIL &- STRi.KA Ur,AL ENGTNF-*;::VUNG � E'AND SURVEYING I LAND PLANNING PROjECi MANAGEMENT I PERMIT EXPI - jej�C'113T[T'�' tCEIVED NOV 0 8 2018 DEVELOPMEtiT SERVICES ON WIrro Project Engineers Certificate I hereby certify that this Stormwater Site Plan Report for the Chung Short Plat project has been prepared by me or under my direct supervision and meets minimum standards of care and expertise which is usual and customary in this community for professional engineers. I understand that the City of Edmonds does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities designed by me. Seal 07/03/2018 Date Plan. Design, Manage CIVIL & S1RUCrJJRAL. E�NGI NEF RING I LAN D SURVEYING 1 L,'\ND PLANNTNG P�OOEC*f MANAGE"VIEW 1 PERPAT! EXPEDI I ING I FEASIBILITY Category 2 Small Site Drainage Report Chung Short Plat May 2018 1. Project Description: The proposed project is a three -lot short subdivision, per ECDC 20.75, on an existing 0.46-acre parcel (#00745300000500). It is classified as a small site, category 2 project and is subject to RS-6 zoning requirements. See the Project Classification chart at the end of this report, Handout E72. The proposed project is subject to the 2005 Stormwater Management Manual for Western Washington (Ecology 2005) and the 2010 Stormwater Code Supplement to Edmonds Community Development Code Chapter 18.30 (Edmonds 2010). Table 1 below breaks down the project site areas. , 2. Existing Site Conditions: The subject site is a southwesterly facing, 20,156 square feet lot located approximately one mile inland from Puget Sound in the Edmonds Way Direct Discharge Basin. It was created as Lot Five of the Pinestone Plat per Snohomish County records. There are two access points to the site via driveway drops on Edmonds Way (SR-104). There is a single home on the site along with a gravel driveway, a concrete loop driveway, concrete patio and walkway, rockeries as retaining walls, and landscaping consisting of lawn, shrubs, and trees. The existing impervious area on the site is 9,598 square feet, or 48% of the parcel area. The rockeries onsite, that will be removed, allow for the gradual slopes from northeast to southwest with rockery retaining walls at an average slope of 4%, with a total relief of eight feet. The steepest portion of the site is a 35-foot stretch of gravel driveway that slopes toward the road at 8%. Site soils consist primarily of Everett very gravelly sandy loam, which is in hydrologic soils group A and highly conducive to infiltration. Runoff from the site that does not infiltrate, drains as sheet flow or shallow, subsurface flow to an existing 48-inch storm drain into Edmonds Way. Site soils are described in a soils report provided by South Sound Geotechnical Engineering and NRCS Custom Soil Resource Report are attached at the end of this drainage report. 3. Developed Site Conditions: The proposed/assumed new plus replaced impervious surface is 9,777 square feet. The proposed impervious area includes a 2,097 square feet 12-foot wide shared access driveway with a 15-foot wide entrance within a 15-foot wide easement, serving lots Two and Three. Total driveway areas equate to 1,394 square feet making the total pollution generating impervious surface area 3,491 square feet. This is under the 5,000 square feet threshold for runoff treatment for pollution -generating impervious surface (PGIS). The remaining 6,492 square feet of impervious surface are composed of the roofs from the three lots and sidewalks at 115.75 square feet. The frontage improvements include 1,107.8 square feet of sidewalks and driveway accesses and 591.2 square feet of planter strips. The calculated areas can be found in Table 1- Surface Areas on the following page. A soils report containing infiltration tests performed by South Sound Geotechnical Consulting is included as an attachment at the end of this report. The results showed rates conducive to infiltration facilities. Runoff from the proposed shared access road will infiltrate into the road which will be composed of permeable pavers and/or permeable pavement depending on the slope being greater than 5%. The driveways for all lots will also be made of pervious pavers to infiltrate any runoff incurred on their surfaces. The roof runoff for Lot One and Two will infiltrate into Gravelless Chambers. Lot Three will infiltrate into a proportionately designed drywell. All surfaces developed as lawn or landscaping will utilize the Amended Soils LID BMP T5.13 (Post- Construction Soil Quality Plan. Design. Manage CIVIL& STRUC I URAL ENGINEERING I LAND SURVEYING I LAND PLANNING PR10iF.C! MANAGEMENT 1 PERMI'T EXPEC)ITING I 2 Category 2 Small Site Drainage Report Chung Short Plat May 2018 and Depth). All onsite runoff will be managed onsite. The frontage improvement runoff will flow into the Edmonds Way ROW. Further detail of onsite and offsite stormwater management can be found in Section Four of this report. Table I- Surface Areas SURFACE AREA CALCULATIONS OFFSZTE IMPROVEMENTS (�MND�S WAY) IMPERVIOUS (SIDEWALKIDRIVEWAY) 1,107.SSF PERVIOUS (PLANTER STRIPILAWN) 591.2 SF TOTAL 1,699.0 SF (0.04 AQ ONSITE IMPROVEMENTS PRIVATE ACCESS ROAD 2,097.59 SF (PGIS) DRIVEWAYS 1,394.04 SF (PGIS) LOT 1 510.60 SF LOT2 385.57 SF LOT3 497.68 SF ROOFTOPS 6,492,50 SF LOT 1 2,140.50 SF LOT 2 Z 211.50 SF LOT3 2,140.50 SF SIDEWALKS 115.75 SF LOT 1 88. 75 SF LOT 2 2ZOO SF LOT3 0. 00 SF PERVIOUS (LA WNZLANQSC.4PE) 10.,055.12 SF TOTAL PROJECT AREA 20,155. 00 SF (0.46 AC) TOTAL PROJECT PGIS 3,491.63 SF (0.07 AC) TOTAL PROJECT NPGIS 6,608.25 SF (0.14 AC) TOTAL PROJECT PERVIOUS 10,055.12 SF (0.26 AC) 4. Small Site Minimum Requirements (SSMRs) Per City of Edmonds Stormwater Supplement Chapter 5. SSMR #1 — Preparation of Stormwater Site Plan This report and accompanying plan set combined with the Site Development Plans addresses this requirement. SSMR #2 — Construction Stormwater Pollution Prevention Plan This development will be constructed in one phase. For areas of disturbance, proper sediment control measures are proposed to protect the surrounding properties. Clearing limits are to be established with perimeter protection around portions of the project site to be impacted by grading activity. Disturbed areas will be seeded or landscaped for permanent ESC. A Construction Stormwater Pollution Prevention Plan (CSWPP) Report has been included in appendices of this report. SSMR #3 — Source Control of Pollution Specific source controls are not required for single-family residential sites. Plan. Design. Manage CIVIL & SIR! CTURN_ ENGINEEPING I LAAD SUIRVEYiNG I LAND P:�ANNING PP'0,1�.-'C! MANAGEMENI 1 PERMH* EXPEDITING I FEASIBILlry 3 Category 2 Small Site Drainage Report Chung Short Plat May 2018 SSMR #4 — Preservation of Natural Drainage Systems and Outfalls The proposed development preserves the natural drainage system and outfall to the Edmonds Way direct discharge basin considering all onsite stormwater will be managed entirely onsite. SSMR #5 — Onsite Stormwater Management Onsite LID techniques for infiltration and dispersion, as described in Chapter Five of the City of Edmonds Stormwater Supplement, were considered for each lot, in the order as per required, until feasibility was met. Using City of Edmonds BMP Handout #E72 B and the Edmonds 2010 manual, the following LID BMPs are listed in the handout for the simplified sizing method: • Permeable pavement surfaces • Bioretention cells (rain gardens) • Gravelless chambers • Infiltration trenches • Drywells The following paragraphs will consider each design criteria until a BMP is considered feasible and discuss any criteria that disqualifies the preceding BMPs. Table 3 of the Handout contains the design criteria for all these BMPs. The applicable criteria that affects all BMPs are they must be within five feet of property lines and easements. BMPs must also be a minimum of five feet from structures without basements or ten feet from structures with basements. Before considering infiltration facilities, a site -specific infiltration test was performed by South Sound Geotechnical Consulting and can be found in the attachments section of this report. The corrected Infiltration Rate reported is 21 inches per hour, making infiltration facilities feasible for consideration. Permeable Pavement Surfaces: For permeable pavement, the minimum slope is five percent. The private access road contains a stretch of road that is less than five percent, but the driveways and beginning of the private access road are greater than five percent, therefore permeable pavers will be feasible for areas greater than 5 percent and less that 10 percent per DOE manual BMP T5.15: Permeable Pavements. Therefore, all roadway surfaces will be made of permeable pavers unless the client or contractor wishes to construct permeable pavement in areas less than 5 percent. Bioretention cells (rain gardens): Bioretention cells were considered for mitigating the roof runoff for each site. Sizing calculations were made based on the following City of Edmonds Handout #E72 C simplified sizing method for area calculations: BMP Area (square feet) = Impervious Area (squarefeet) x Sizing Factor (%)/100 The sizing factor can be found on page 10 of Handout E72B. The tables shows the infiltration rate relations go up to two inches per hour. With our corrected infiltration rate being much higher, the maximum pre -sized infiltration rate of two inches per hour was Plan. Design. Manage OVIL & STPLIC I UR.4­ EN61NEEIRZING I LAND SURVEYING I LAND PI-ANNING PROIECi MANAGEMENT I PERMITEXPEDIIIN"S I FEASIBILD. Y 4 Category 2 Small Site Drainage Report Chung Short Plat May 2018 used in the calculations. The following calculations find the areas of a potential bioretention cell for each lot: Lots 1 and 3 Roof Area (2,140.50 square feet) x Sizing Factor (2.3/100) 49.23 square feet Lot 2 Roof Area (2,211.50 square feet) x Sizing Factor (2.3/100) 50.86 square feet These areas represent the required base area of the bioretention cells. Adding the minimum three to one side slopes with 12 inches of ponding depth and six inches of freeboard, the areas became too great for any location on site, thus making bioretention infeasible for all lots. Gravelless Chambers: The Gravelless chamber design will use the length version of the simplifies sizing method. BMP Length (feet) = Impervious Area (square feet) x Sizing Factor (%)/100 Lots 1 and 3 Roof Area (2,140.50 square feet) x Sizing Factor (1.4)/100= 29.97 feet Lot 2 Roof Area (2,211.50 square feet) x Sizing Factor (1.4)/100= 30.96 feet With these calculations and the areas available for infiltration facilities on each lot, the gravelless chamber system is feasible for Lots One and Two. There is not enough space on Lot Three for the required length. The Stormtech SC-310 Chambers will be used for design purposes since they meet the design criteria for gravelless chambers per the handout Figure A-4. More details about these chambers can be found in the accompanying site plan sheet set. Infiltration Trenches: The infiltration trench design is similar to the Gravelless chamber design in that it uses the length version of the simplified sizing method with its respective sizing Factor. Using the maximum depth of three feet the calculation is as follows: Lot 3 Roof Area (2,140.50 square feet) x Sizing Factor (2.0)/100= 42.81 feet Similar to the gravelless chamber, the infiltration trench will be too long for the available area in Lot Three, thus making an infiltration trench infeasible. Drywells: The drywell maximum depth is six feet for the simplified sizing method followed by using the area to determine the diameter of the drywell. The calculations for the area and diameter are as follows: Lot 3 Roof Area (2,140.50 square feet) x Sizing Factor (2.5)/100= 53.51 square feet Plan. Design. Manage CIVIL& STRUC I URAL ENGINEERING I I -AND SURVEYING I LAND PUkNNING PR0jF`C*1 MANAGF:MENI 1 PERMIT EXPEDITING- I FEASIBILITY Category 2 Small Site Drainage Report Chung Short Plat May 2018 —:r. FArea (squa e feet) Diamter (feet) = 2 * L_ 7r 2 153.51 square feet = 8.25 feet I 7T The minimum design diameter for the drywell fits into the available area on Lot Three for an infiltration facility thus making the drywell feasible for Lot Three. The sidewalks on the frontage will flow into the planter strips and the driveway accesses will flow into Edmonds Way Right of way. A WWHM model of the frontage basin was created to show compliance with the traditional method mentioned in Edmonds 2010 manual and addressed below. All pervious areas onsite and offsite will use compost amended soil per City of Edmonds Handout #E72 C. The locations of each facility can be found in the accompanying site plan sheet set. It also should be noted that the project does not exceed the flow control thresholds below under SSMR #7 within the City of Edmonds Direct Discharge Basin. SSMR #6 — Runoff Treatment Proposed PGIS for this project equates to 3,491.63 square feet (The breakdown can be found above in Table 1 - Surface Areas) which is less than the 5,000 square feet threshold required for treatment. SSMR #7 — Flow Control Flow Control Facilities "To reduce the impacts of stormwater runoff from impervious surfaces and land cover conversions, flow control BMPs shall be implemented for all effective impervious surface that is new and replaced and converted pervious surfaces. To meet this minimum requirement", The LID Credit option from the Edmonds 2010 supplement was used for all onsite runoff (Edmonds 2010). The frontage improvements equate to 1,107.8 square feet of new plus replaced impervious surface which falls below the threshold of 2,000 square feet or more, thus exempting the frontage improvement basin from flow control requirements. Conveyance Analysis Conveyance elements proposed as part of this project are to be privately owned and maintained and no all onsite conveyance is expected to remain onsite. The frontage runoff requires no conveyance system as it flows directly into Edmonds Way without much impact due to the impervious surfaces being under 2,000 square feet. Plan. Design. Manage OVIL & S"MUCIUPAIL ENGMEERING I LAND SUQ.V!.:.:.YING I LAND PLANNING PRMECI MANAGEMENI I PERMI-1 . EXPEDITING I FEASIBILI-Y 11 Category 2 Small Site Drainage Report Chung Short Plat May 2018 SSMR #8 — Wetland Protection No known wetlands are located within 1/4 mile of the subject site SSMR #9 — Operation and Maintenance Operation and Maintenance of all installed BMPs will be performed by the homeowners in accordance with the provisions in Chapter 7 of the City of Edmonds Stormwater Supplement. SSMR #10 — Offsite Analysis and Mitigation The existing downstream conveyance system was examined during the design process and appears to be functioning properly. Minimal to no additions in the flow shows no adverse impacts anticipated. SSMR #11 — Financial Liability Necessary performance bonds will be placed by the developer prior to construction. The currently proposed limits on the future lots will require recording of a covenant to guarantee that the impervious limits are adhered to in the future. S. Attachments 0 VICINITY MAPS 0 PROJECT CLASSIFICATION 0 DRAINAGE BASIN MAP 0 GEOTECHNICAL REPORT 0 NRCS SOILS REPORT 0 Construction Stormwater Pollution Prevention Plan (CSWPPP) Report Plan. Design, Manage CIVIL & SiRLIC I URAL ENGITNETRING, I LAND SURVEYING, I I -AND PLANNING PR0jFC**:* MAW.3EMIEN 1 1 PERMIT EXPEOPING 1 FEASIBILI-1-Y 7 Category 2 Small Site Drainage Report Chung Short Plat May 2018 VICINITY MAPS NTS "ry VQ1yofEdmUrA6 uads� ..� ..... ... .. 7.. Win st ............ . - vw� M . .... . ...... . ... .. ...... .. ....... .... ... # yfttpA ftwst St. -212,h 31 220th &I SW 1E 5 n.ffinsw --Y nod --Y MOON 228thStSW, MLAW . MM&O X, A— ...... ......... .. . .. ...... .. .... . ....... > 1-M *AT r-Y. aw--y . ....... . . % PROJECT SITE S! 721 EDMOND aw — ------- - ..... ..... . Plan. Design. Manage CIVIL & SIRUCTURA-L ENG'�NEERING I I -AND SUPVE:YING 1 LAND PLANNING PROjECI MANAGEMENT I PERMI, EXPEDITI-ING I FEASIBILFTY 8 Category 2 Small Site Drainage Report Chung Short Plat May 2018 PROJECT CLASSIFICATION Per City of Edmonds Handout #E72 If you have detennined that the StorTnwater tManagenient Code appiJes to your pjoLect ffigure-A), follow tiv Blue boxes in t1w chart. below to detet-inine the Classification of your p!�oiect Does the project involve I - acre or more of land - disturbing actiri(VI No Is the project part of a larger common plan ofdevelopmenj or sak where the total disturbed area for (he entire plan will total I -acre or more of land -disturbing arli pity'! Yt,s Does the Pr*ct involve one or more of the following: 2,000 square teet (A) or more of new impervivas surface, regulated replaced impervious surface or new plus regwlared roplared impervious surface? OR 7,000 sf or more of land -disturbing actiri(v? OR 50 cubic yards or more of either grading. fill. or awavation as defined in Chapter MAIM) ECDC? No Nlinor Site Project - See Stormwatef Supplenvent Chapter 6 for specific requirt-InLnts Large Site Project: See Stormwater Supplement yvi Chapter 4 for specific mquirements, Does the project cresate or add 5,000 square feet or more of new impervious surpee, regidatrd replaced unpersious suipee or new plus regulated replaced impervioussurfare? OR Convert -Y4 acre or more of nafive vegetation to lawn or landscaped area OR nrmigh a combination of creating efferrive inspervioussurface and convertedpervioa.v suifaces. causes an increase of 0, 1 cubic feet per second in the 100-year flow frequency from a threshold discharge area as estimated using an approved model? 10 Category I Small Site ProJect: See Stormwater Supplement Chapter 5 or specific requirements Plan. Design. Manage CIVIL & STRUC I URAI - ENGINEERINC'. I LAND SURVEYING 1 LAND PLANNING PR03,E(­F MANAGEMENT 1 PERMI'f EXPEDITING I FEASIBILDY Yes 9 Category 2 Small Site Drainage Report Chung Short Plat May 2018 DRAINAGE BASIN MAP City of Edmonds GIS NTS . . . ........... '41 t I r Z, HT 4) Creek watersheAv .0 Sk . .............. D 't C' e ' 'W, i d'," .,h iq iVt, ECT SZT,�- R AM WAY, (I 4ONft q P, w 21, o Fd = UM J� Plan. Design. Manage CIVIL & SIRUCTURA ENGINEERING I LAND SURVEYING I LAND PLANNING PROA-C: Y"ANAGEJO. ENI 1 PIERMIT EXPE:,E)ITING I FEASIBILITY 10 Category 2 Small Site Drainage Report Chung Short Plat May 2018 NRCS SOILS REPORT Plan. Design. Manage CIVIL& STRUCTURAL ENGINEERING, I LAND SURVEYING I LAND PLANNING PRO)ECTMANAGEMENT I PERM IT EXPEDITI NG I FEASIBILLFY 11 USDA United States Department of Agriculture NRCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants COustorn Soil Resource Report for anohomish County Area, Washington June 16, 2016 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can usethe surveysto help them understand, protect, orenhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/portal/ nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (http-./f offices. sc. egov. usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation forbuildingsor roads. Clayey orwet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface...................................... ........................................................................ How Soil Surveys Are Made ............................................................................. SoilMap ............................................................................................................. SoilMap ........................................................................................................... Legend. ............................................................................................................ MapUnit Legend ............................................................................................. MapUnit Descriptions ..................................................................................... Snohomish County Area, Washington ......................................................... 17—Everett very gravelly sandy loam, 0 to 8 percent slopes .................. References ................... ..2 ..5 ..7 ..8 ..9 10 10 12 12 14 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). IVILRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more IVILRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the Custom Soil Resource Report individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil - landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components- Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields underdefined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year, For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 2 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 47- 47 38'N 4r 47 36'N Custom Soil Resource Report ?. Soil Map 547050 547060 547070 547080 547090 547100 Map Scale: 1:470 � printed on A landscape (11" x 8.5') sheet Meters N 0 5 10 20 30 Feet 0 20 40 80 120 Map projecdon: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 1ON WGS84 8 547110 547120 547130 547140 M 47- 47 38'N 47- 47 36" N 547150 3: MAPLEGEND Area of Interest (AOI) Area of Interest (AO I) Soils Soil Map Unit Polygons Soil Map Unit Lines 13 Soil Map Unit Points Special Point Features 06 Blowout Borrow Pit Clay Spot 0 Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial water Rock Outcrop + Saline Spot Sandy Spot 4& Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Custom Soil Resource Report MAP INFORMATION Spoil Area The soil surveys that comprise your A01 were mapped at 1:24,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting Special Line Features soils that could have been shown at a more detailed scale. Water Features Streams and Canals Please rely on the bar scale on each map sheet for map Transportation measurements. ++4 Rails Source of Map: Natural Resources Conservation Service ^0 Interstate Highways Web Soil Survey URL http://websoilsurvey.nrGs.usda.gov Coordinate System: Web Mercator (EPSG:3857) US Routes Major Roads Maps from the Web Soil Survey are based on the Web Mercator Local Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Background Albers equal-area conic projection, should be used if more accurate 0 Aerial Photography calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Snohomish County Area, Washington Survey Area Data: Version 13, Sep 15, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 7, 2014—Jul 8, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting Custom Soil Resource Report Map Unit Legend Snohomish County Area, Washington (WA661) Map Unit Symbol Map Unit Name Acres in A01 Percent of A01 .17 Everett very gravelly sandy 0.4' 100.0% loam, 0 to 8 percent slopes Totals for Area of Interest 0.4 100.0%J Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits forthe properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, ordissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complexthat itwas impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but ratherto separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. 10 Custom Soil Resource Report An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha - Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform- An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 11 Custom Soil Resource Report Snohomish County Area, Washington 17—Evereft very gravelly sandy loam, 0 to 8 percent slopes Map Unit Setting National map unit symbol: 2t629 Elevation: 30 to 900 feet Mean annual precipitation: 35 to 91 inches Mean annual air temperature: 48 to 52 degrees F Frost -free period: 180 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Everett and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Everett Setting Landform: Eskers, kames, moraines Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Crest, interfluve Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy and gravelly glacial outwash Typical profile Oi - 0 to 1 inches: slightly decomposed plant material A - 1 to 3 inches: very gravelly sandy loam Bw - 3 to 24 inches: very gravelly sandy loam C1 - 24 to 35 inches: very gravelly loamy sand C2 - 35 to 60 inches: extremely cobbly coarse sand Properties and qualities Slope: 0 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available waterstorage in profile: Low (about 3.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Other vegetative classification: Droughty Soils (GO02XS401WA), Droughty Soils (GO02XF403WA), Droughty Soils (GO02XN402WA) Minor Components Alderwood Percent of map unit.- 10 percent Landform: Ridges, hills 12 Custom Soil Resource Report Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest, talf Down -slope shape: Linear, convex Across -slope shape: Convex Indianola Percent of map unit: 10 percent Landform: Eskers, kames, terraces Landform position (three-dimensional): Tread Down -slope shape: Linear Across -slope shape: Linear 13 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T, LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. hftp://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/soils/?cid=nrcsl42p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcsl42p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 1 1th edition. U.S, Department of Agriculture, Natural Resources Conservation Service. http://www.nrcs.usda.gov/wps/ portal/nrcs/detail/national/soils/?cid=nrcsl42p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. hftp://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcsl42p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. hftp-./fwww.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdbl043084 14 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 43041. http://www.nrcs.usda,gov/wps/portal/ nrcs/detaii/soils/scientists/?cid=nrcsl42p2—O54242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. hftp://www.nrcs.usda,gov/wps/portal/nrcs/detail/national/soils/? cid=nrcsl42p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:H www,nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl42pLO52290.pdf 15 Category 2 Small Site Drainage Report Chung Short Plat May 2018 GEOTECHNICAL REPORT Plan. Design. Manage CIVIL & STRUC! URAL ENGINEERUN- 1 i ANb SUPVEYING 1 LANDN-AINNING ..F. -' I FEA51B4.17Y PROJE"C" . MANAGf.:.:.,Mf;.N; 1 PLP,115 T I 12 OMER THOMAS CHUN6 la527 - 5rcl A\/E NN SHORELINE, NA 151-7-7 thomoschung-10101,16yohoo.com SITE ADDRF-55 RFzMC\/Er> ROOKFERY .7 '721 E12MONDS NAY REVISIEED 6RAPIN67 iol : :I— . -T45500000500 PARCEL #00 LOT I EDMONDS, Y4A. SK Dec. 0,00 ,�,Sz 50". HE. 00 dVE' ZONE % TAX f'AfP,--FL TAX PARCEL 00145500000500 003,10000000500 o HE16HT CALC MAX. HEI(SHT ALLOOED 25' A 25q.55 5 2cla.00 —A� > 2-15 25 15� v" REMOVE 1165.05 / 4 2011.2-1 AV6. EX. 5RADE 1 4 r-i -T + 25 516.2-1 MAX. HEI(5HT 0' r K. A, 16 Plvrzr= = 516.10 I'T'(2") 5ELOIN MAXIMUM A0.0 0, LOT \> I PROVIDE FINAL LETTER OF HEIGHT 5 CONFIRMATION UPON COMPLETION -7,4152 OF THE STRUCTURE L.Vm 50 FUTURE RE51DENCF- LOT I Ilk, LOT IMPERVIOUS AREA zxl� C, -75 2 LOT AREA: 6,1 '051 ROOF AREA: 2140.50 S.F. PATIO AREA: 0 S.F. Remov,70 FUTURF (r,=.tJDfE5 AREA UNDER ROOF OVERHANCS) RESIDENCE DRIVE 4 NALK AREA: A994=9 S.F. MOVE RR - ovewmr (excLuvEs AREA uNvEp. Roor .5) �5F 12 HE B / / "S. 2ft44;65-5-F. N TOTAL AREA: 5.00 ol AV K IV 0 REMOVE Y, g4v�-M�N-p 50"A.Uhag N A MN . HIT U uj LLJ Z . g Z x 3t 01 En u 0 < Z Z. D -, x Z.� I A m 16 cl LOT AREA: MAIN FLOOR AREA: LOT &ARA&E AREAz 5015.15 S.F. 2 to PATIO AREA: 112.00 S.F Z 6,115 'e� ENTRY ARI=-A: 80.55 S.F* RE FT u, <90 TOTAL AREA: 1,745.55 S.F. 25.55% cj N LEISAL PES(�,-RIFTION Y� 115 00 LOT 1 7 W"'p,\y lu z ly THAT PORTION OF LOT 5, PINESTONE, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 46 OF PLATS, LL PAGE(S) 226 AND 227, RECORDS OF SNOHOMISH COUN7)� \�x WASHINGTON, DESCRIBED AS FOLLOWS: /L 40- '7 V COMMENCING AT THE NORTHWEST CORNER OF SAID LOT 5; C THENCE NORTH 74'00'00"EAST ALONG THE NORTH LINE OF �'F \ \ \,k \ SAID LOT5A DISTANCEOF10.86 FEETTO A POINTTHATIS 10.00 FEETDISTANT WHEN MEASURED PERPENDICULARLY TO THE WESTERLY LINE OF SAID LOT 5; VAL THENCE SOUTH 38o56'18" EAST ON A LINE THAT IS PARALLEL WITH AND 10.00 FEET EAST OF THE WEST LINE OF SAID LOT 5 A DISTANCE OF 75. 00 FEET TO THE POINT h. REMOVE, . sp.pa-1. Lp > NEV4 Ror-l'.:eRy T r-rzwrz TAX PARCEL 00145500000400 NOTE: 0 ku SEE CIVIL DRAKN65 BY BEYLER CONSULTIN6 FOR (SRADINC7-T5r=r,/DEMO,!BTORMNATER, SHARED ACCE55, FRONTA&E IMPROVEMENTS, NATER SERVICE 4 UTILITY PLANS. e I TEE f=L-AN Fr -- SCALE I" = 10'-0" 0 10 20 40 OF BEGINNING, THENCE CONTINUING ALONG SAID PARALLEL LINE SOUTH 38'56'16' FAST 88.39 FEET TO THE SOUTH LINE OF SAID LOT 5; T THENCE NORTH 54-03'06'EASTALONG SAID SOUTH LINE 7ZO9 FEET; [-- THENCE NORTH 42o47'19� WEST74.28 FEETTOA POINT D-GNED 0 THAT BEARS NORTH 65ol9'09"EAST FROM THE POINT OF BEGINNING; �y THENCE SOUTH 65-19'09' WEST 74.28 FEET TO THE POINT DRAVN Or. DATL' APPROVE Y PLANNING OF BEGINNING; JRA 4/15/15� PR..T SITUATE IN THE CITY OF EDMONDS, COUNTY OF SNOHOMISH AND STATE OF WASHINGTON. SARAH MI(SHT > REMKD BY.- JRA AS Zon&2_RS Cozmer� Fla& HORIZONTAL 1�)ATQM DH '7/2 Setbml� El-0 =1 Front N74'00'00"E BETWEEN FOUND MONUMENTS ON 15TH is ��AL BY-. DAM Sides 5, STREETSW. 'S -JT� Rear 1-7 m mr:l 5/117 Other \/ERTIrAL DATUM U�AL JO NUMSM; NAVD 86 A BENCHMARK CITY co Fy IL 2"BRASS DISK IN CASED CONCRETE MONUMENT IN RFsuB CENTERLINE OF 1007H AVENUE WEST 600'NORTH OF INTERSECTION WITH SR 1041EDMONDS WAY, OPPOSITE THE OCT 29 2019 SOUTHEAST CORNER OF CEMETERY PROPERTY, ELEVATION = 312.10 FEET. (WGS CONTROL POINT #22) Al�,WOODINM� —CE 40 NUMB_ LD4NGDEPARTME calTVY OF EDMON (00561 F-NER&'-r C,02E 2015 NASHIN&TON 5TATE ENER6`r CODE/ IFrr, EEC) TABLE R402.1.1 INSULATION AND FENESTRATION REOUIREMENT5 13Y COMPONENT CLIMATE ZONE 5 4 MARINE-4 FENESTRATION U-FACTOR 0.50 SK�rl_ISHIT' U-wFAOTOR 0.50 &LAZED FENESTRATION SHOO NR OrILINO R-VALUE ' 4-1 MOV, FRAME INALL *"" R-VALUE 21 INT MA55 KILL R-YALuml 21/21 FLOOR R-VALUE 50 oELoA &RADE � ImALL R-vALuF 10AS/21 INT + T5 OLAEP R-vALur & DEPTH -0, � PT TABLE R402.1.1 FOOTNOTES FOR 91: 1 FOOT = 504.5 MM, Cl - CONTINUOUS INSULATION, INT. - INTERMEDIATE FRAMING A R­vALuFs ARE MINIMUMS. u-PAr_ToR5 AND sHer, ARE MAXIMUMS. MEN INSULATION 45 INSTALLED IN A CAVITY INHICH IS LESS THAN THE LABEL OR DESIGN THICKNESS OF _17HE INSULATION, THE COMPRESSED R-VALUE or THE INSULATION FROM APPENDIX TABLE AIOIA SHALL NOT BE LESS THAN THE R-VALUE SPECIFIED IN THE TABLE. a THE FENESTRATION U-FACTOR COLUMN EXCLUDES, SKYLIGHTS. THE SH66 COLUMN APPLIES TO ALL &LAZED FENESTRATION. ' "10/15/21.+T13" MEANS R-10 CONTINUOUS INSULATION ON THE EXTERIOR OF THE KALL, OR R-15 ON THE CONTINUOUS INSULATION ON THE INTERIOR OF THE KALL, OR R-21 CAVITY INSULATION PLUS A THERMAL BREAK 5ETINEEN THE SLAB AND THE BASEMENT INALL AT THE INTERIOR Or 714E BASEMENT INALL. '110/15/21.+TB" SHALL BE PERMITTED TO BE MET NITH R-15 CAV17r INSULATION ON THE INTERIOR OF THE BASEMENT INALL PLUS R-5 CONTINUOUS INSULATION ON THE INTERIOR OR EXTERIOR OF THE INALL. '115" MEANS THERMAL BREAK 5ETINEEN FLOOR SLAB AND BASEMENT INALL. ' R-10 CONTINUOUS INSULATION 19 RISOUIRED UNDER HEATED SLAB ON GRADE FLOOR6.51515 R402.2.q.1. THERE ARE No 5H&�_ REauRemENTs IN THE MARINE ZONE. RESERVED RESERVED RESERVED THE SECOND R-vALuE APPLIES MEN MORE THAN HALF THE INSULATION 15 ON THE INTERIOR OF THE MA95 INALL. Resm"W K FOR SINGLE RAFTER- OR JOIST VAULTED CEILINGS, THE INSULATION MAY M RMUCED jor R-58. L RESERVED " INT. (INTERMEDIATE FRAMING) DENOTES STANDARD FRAMING 16 INCHES ON oENTER,,AuTH HEADERS INSULATED INITH A MINIMUM OF R-10 INSULATION. "LOS, AND 50LID TIMBER KALLS Y41TH A MINIMUM AVERAGE THICKNE55 OF 5.5 INCHES ARE EXEMPT FROM TH15 INSULATION REOUIREMENT. 1. A CERTIFICATE COMPLYING INITH 2015 INSEC, R401.5 15 REQUIRED TO BE COMPLETED BY THE DESIGN PROFESSIONAL OR BUILDER AND PERMANENTLY POSTED. 2. THE BUILDING SHALL BE TESTED AND VERIFIED AS HAVIN& AN AIR LEAKAGE RATE NOT EXCEEDING 5 AIR CHANGES PER HOUR. TESTING SHALL BE CONDUCTED INITH A BLOINER DOOR AT A PRESSURE Or 0.2 INCHES N.G. 5. EACH DINELLINS, UNIT 15 REOUIRED TO BE PROVIDED Y41TH AT LEAST ONE PROGRAMMABLE THERMOSTAT FOR THE REGULATION OF TEMPERATURE. 4. DUCT5, SHALL BE LEAK TESTED IN ACCORDANCE INITH INSU RS-55 USING THE MAX. DUCT LEAKAGE RATES SPECIFIED. S. A MINIMUM OF '15% OF PERMANENTLY INSTALLED LAMPS, IN LIGHTING FIXTURE5 SHALL BE H161-f-EFFICACY LAMPS,. NHOLE HQQ5E VENTILATION AHOLE HOUSE VENTILATION SYSTEM TO BE INSTALLED PER 2015 IRr, SECTIONS M150,73.1 THROUGH M1501.5.1. SEE "MOLE HOUSE VENTILATION" ON THE SCHEDULE SHEET FOR SELECTED OPTION. IRO TABLE M150-1.5.50) CONTINUOUS INHOLE-HOU515 MECHANICAL VENTILATION SYSTEM AIRFLOIN RATE REGUIREMENT5 (AIRFLOA IN CFM) FLOOR AREA NUM5FR OF BEDROOMS (50, PT) 0-1 2-5 4-5 - -7 >1 <1900 so 45 6 '75 110 50i 5000 45 60 '75 -10 Orl 5001 4900 60 -10 05 120 4501-6000 -5 -10 105 120 155 Too-i - iwo .40 Orl 120 1361 150 Y1500 105 120 - I- IR/_ TABLE M150-7.5.5(2) INTERMITTENT MOLE -HOUSE MECHANICAL VENTILATION RATE FACTORS WN TIM4M_��ISNTAGE IN 15^014 1 .25% ro% Er,% UR SEGMENT % 0% 0 I FACTOR 1 4 1 5 1 2 1 1.5 1 1.5 �41.0 A. FOR VENTILATION SYSTEM RUN TIME VALUES BETINEEN THOSE GIVEN, THE FACTORS ARE FERMI I I TO BE DETERMINED BY INTERPOLATION. B. EXTRAPOLATION BEYOND THE TABLE IS PROHIBITED. MECHANICAL rz,ENERAL SOLID FUEL BURNING APPLIANCES INCLUDE AIRTIGHT STOVES, FIREPLA.-_E STOVES, ROOM HEATERS, FACTORY BUILT FIREPLACES AND FIREPLACE INSERTS. ALL 50LID FUEL BURNING, APPLIANCES SHALL COMPLY Y41TH THE PROV15ION5 OF I.R.C. R1006.2. HEATIN& EACH DINELLING, UNIT SHALL BE PROVIDED INITH HEATING FACILITIES CAPABLE OF MAINTAINING A TEMPERATURE OF 66 DEGREES FAHRENHEIT AT A HEIGHT OF S'-O" A50VE THE FLOOR AND TP40 FEET FROM EXTERIOR INALLS IN ALL HABITABLE ROOMS MEN THE OUTSIDE TEMPERATURE 15 AS SET FORTH IN THE 2015 INSE.C. DEFINITION Or THERMAL BUILDING ENVELOPE FROM THE 2015 IAA5HIN(5TON STATE ENERGY COVE THE BELOIN-61RADE KALLS, ABOVE-61R.-DE INALLS, FLOOR, ROOF, AND ANY OTHER BUILVIN(S, ELEMENTS THAT ENCLOSE CONDITIONED SPACE OP. PROVIDES A BOUNDARY BETIMEEN CONDITIONED SPACE AND EXEMPT OR UNCONDITIONED SPACE. 1. FUEL BURNING APPLIANCES LOCATED INITHIN THE BUILDING ENVELOPE SHALL OBTAIN AIR FROM OUTDOORS, MEETING THE PROVISIONS OF 014AFTER 24 OF THE 2015 Ro. 2. FUEL BURNING APPLIANCES LOCATED OUTSIDE THE BUILDING ENVELOPE SHALL MEET THE PROVISIONS Or CHAPTER 24 OF THE 2015 IRC. S. DUCTINORK LOCATION SHALL MEET THE PROV15IONS OF CHAPTER 24 OF THE 2015 IRC. 4. COMBUSTION AIR TO MEET THE REGUIREMENTS OF I.R.C. MI'701.1 ALL INARM AIR FURNACES SHALL BE L15TED AND LABELED BY AN APPROVED AGENCY AND INSTALLED PER CHAPTER M1502 OF THE 2015 IRC. NO INARM AIR FURNACE SHALL BE INSTALLED IN A ROOM USED OR DESIGNED TO BE USED AS A BEDROOM, BATHROOM, CLOSET OR IN ANY ENCLOSED SPACE INITH ACCESS ONLY THROUGH SUCH ROOM OR SPACE, EXCEPT DIRECT VENT FURNACE, ENCLOSED FURNACES, AND r-1 r=CTRlr, HEATING FURNACES. NO INARM AIR FURNACE SHALL BE INSTALLED IN A CLOSET OR ALCOVE V41TH A SPACE LEW THAN 12" P41DER THAN THE FURNACE OR A CLEARANCE OF 5" ALONG THE SIDES, BACK AND TOP. LIGUEFIED PETROLEUM GAS BURNING APPLIANCES SHALL NOT BE INSTALLED IN A PIT, BASEMENT OR SIMILAR LOCATION INHERE HEAVIER THAN AIR GASES MIGHT COLLECT. APPLIANCES So FUELED SHALL NOT BE INSTALLED IN AN ABOVE GRADE UNDER FLOOR SPACE OR BASEMENT UNLESS SUCH LOCATION 15 PROVIDED Y41TH AN APPROVED MEANS FOR REMOVAL OF UNBURNED (SAS. HEATING AND COOLING APPLIANCES LOCATED IN A GARAGE AND MICH GENERATE A OWN, SPARK OR FLAME CAPABLE OF IGNITING, FLAMMABLE VAPORS SHALL BE INSTALLED Y41TH THE PILOTS AND BURNERS OP, HEATING ELEMENTS AND SINITCHES, AT LEAST 10" ABOVE THE FLOOR SURFACE. FIRE DAMPERS NEED NOT BE INSTALLED IN AIR DUCTS PASSING THROUGH THE AALL, FLOOR OR OEILIN6 SEPARATING A RESIDENCE (R-3 OCCUPANCY,) FROM A GARAGE, PROVIDED SUCH DUCTS INITHIN THE GARAGE ARE CONSTRUCTED OF STEEL HAVING A THICKNESS NOT LESS THAN 0.0111" (NO. 26 GALVANIZED SHEET GAUGE) AID HAVE NO OPENINGS INTO THE GARAGE EVERY APPLIANCE DESIGNED TO BE VENTED SHALL BE CONNECTED TO A VENTING SYSTEM COMPLYING INITH CHAPTER IS OF 71-E 2015 IRC. EVERY FACTORY BUILT CHIMNEY, TYPE L VENT, TYPE IS (SAS VENT OR TYPE BA GAS VENT SHALL BE INSTALLED IN ACCORDANCE INITH THE TERMS OF ITS LISTING, MANUFAC-TURERS, INSTALLATION INSTRUCTIONS AND THE REOUIREMENTS, PER CHAPTER 24 OF THE 2015 IRC. A I Y 5 OR BPI GAS VENT SHALL TERMINATE PER CHAPTER 24 OF THE 2015 IRr, VENT CONNECTORS SHALL BE INSTALLED V41THIN THE SPACE OR AREA IN INHICH THE APPLIANCE 19 LOCATED AND SHALL BE CONNECTED TO A CHIMNEY OP. VENT IN SUCH A MANNER AS TO MAINTAIN THE CLEARANCE TO COMBUSTIBLE-. PER SECTION M1803 OF THE 2015 IRc' - HEATIN& EQUIPMENT ALL HEATIN(S EQUIPMENT SHALL MEET THE REGUIREMENTS, OF THE 2015 NATIONAL APPLIANCE ENERGY CONSERVATION ACT (NAIECA) AND BE 50 LABELED. EOUIPMENT SHALL ALSO COMPLY INITH SECTION M1411 OF THE 2015 PRO DUOTNORK 1. DUCT SYSTEMS OP. FACTORY BUILT AIR DUCTS SHALL BE OF METAL AS SET FORTH BY TABLE 1601.1.1 OF THE 2015 IRO. 2. RECTANGULAR, FLAT, OVAL AND ROUND DUCT JOINTS AND SEAMS SHALL BE AIRTIGHT MR SECTION M1601.4.1 OF THE 2015 IRC. S. INSTALLATION OF DUCT5 SHALL COMPLY INITH SECTION M1601.4 OF THE 2015 IRC. 4. DUCT INSULATION SHALL BE INSTALLED IN ACCORDANCE INITH SECTION M16012 Or THE 2015 IFv_. S. FINAL DUCT LEAKAGE AFFIDAVIT 19 TO BE PROVIDED TO THE BUILDING INSPECTOR PRIOR TO FINAL INSPECTION. DUCT LEAKAGE AND SEALING, REOUIREMENT5 IN 2015 INS.E.C. SECTION IZ405.5.2 To BE MET. b. =T5 IN5ULATAED TO A MINIMUM R-8, INSULATION IN UNCONDITIONED SPACES PER INS.E.C. SECTION R4033.1 Lwz=lAR_f;ArA 6ENERAL ALL FRAMIN& SHALL COMPLY 11ITH THE APPLICABLE 5ECTION(5) Or THE 2015 151-ARO. PRESSURE TREATED INOOV REOUIRED IN LOCATIONS L15TED IN IRO R311.1 2" MINIMUM VERTICAL CLEARANCE BETINEEN INOOD 4 CONCRETE STEPS, PORCH SLABS, PATIO SLABS $ OTHER SIMILAR HORIZONTAL SURFACES EXPOSED TO THE INEATHER. 6" MINIMUM CLEARANCE BETINEEN V400P AND EARTH. 6" MINIMUM CLEARANCE BETINEEN UNTREATED MUSILL5 AND EARTH. 12" MINIMUM CLEARANCE BETINEEN FLOOR BEAMS, AND EARTH. 15" MINIMUM CLEARANCE BETINEEN FLOOR_10157`5 AND EARTH. LOADING ROOF 15 P5F DEAD LOAD + 25 PSF LIVE LOAD = 40 P5F FLOOR 15 F5F DEAD LOAD + 40 PW LIVE LOAD = 55 FSF CEILING 5 PSF DEAD LOAD + 10 PSF LIVE LOAD = 15 PSF PECK 5 FSF DEAD LOAD + 60 P5F LIVE LOAl2 = 65 PEP INTERIOR PARTITION '7 P5F EXTERIOR PARTITION 10 FSF INOOV MAKING ON OR INSTALLED INITHINY2" OF: MA50NRY OR CONCRETE To BE TREATED P41TH AN APPROVED PRESERVATIVE. SOLID BLOCKING OF NOT LE-55 THAN 2x THICKNESS SHALL BE PROVIDED AT ENDS AND AT ALL SUPPORT Or J015115 AND RAFTERS. ANCHOR BOLTS To BE PER SHEAR INALL SCHEDULE AND FOUNDATION PLAN. T' MINIMUM EMBEDMENT. ALL METAL FRAMING ANCHORE, AND HANGERS 5HOINN ON DRAININ65 SHALL BE STRONG TIE CONNECTORS AS MANUFACTURED BY SIMPSON COMPANY. PROV112E MREBLOCKIN& IN CONCEALED SPACES Or STUD KALLS 4 PARTITIONS, INCLUDING FURRED SPACES 4 PARALLEL ROINS OF STUDS OP STAGGERED STUDS AS FOLLONSi 1. VERTICALLY AT THE CEILING 4 FLOOR LEVELS. 2 . HORIZONTALLY AT INTERVALS NOT EXCEEDING 10 FEET. PROVIDE FIREELOCKIN6, AT OTHER LOCATIONS PER 2015 IFV, R302.11 APPROVED FIRE DEPART E IN5ULATION � MOISTURE PROTECTION SENERAL 6ENERAL PLAN5 rOMPLY V41TH THE 2015 INTERNATIONAL RE51DENTIAL OODE. UNLESS NOTED oTHERHisE, INSULATION SHALL CONFORM TO THE KASHIN&TON STATE ENERGY CODES. INSULATION BAFFLES TO MAINTAIN I" CLEAR SPACE ABOVE INSULATION. BAFFLES To CONTRACTOR SHALL VERIFY ALL NOTES, DIMENSIONS AND CONDITIONS PRIOR TO EXTEND 6" ABOVE BATT INSULATION 4 12" A50VE LOOSE FILL INSULATION. IN--AJLATr= BEHIND CONSTRUCTION. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING AS REWIRED UNTIL BATNTU55,5HOVERS, PARTITIONS AND CORNERS. PROVIDE FACE STAPLED BATTS OR FRICTION ALL PERMANENT CONNECTIONS HAVE BEEN MADE. IT 15 THE CONTRACTORS RESPONSIBILITY FIT FACED BATTS. PROVIDE 4 MIL (0.0049 POLYETHYLENE VAPOR BARRIER AT INALL5 OR USE TO 1015ITIFY ALL DISCREPANCIES TO THE ARCHITECT AT THE TIME THEY ARE NOTED. PVA PRIMER NITH A DRY CUP PERM RATING OF ONE (MAX). PROVIDE R-10 INSULATION UNDER DIMENSIONS TAKE PRECEDENCE OVER SCALED DRAININ&S. ELECTRIC INATER HEATERS. CODE5: INFILTRATION CONTROL ALL APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION SHALL BE FOLLoAED 1. EXTERIOR JOINT5 AROUND ININDOIN5 AND DOOR FRAMES, OPENING-5 5ETMEN KALLS, AND 1. 2015 INTERNATIONAL RESIDENTIAL CODE (IRr-) INITH KA,5HINSTON STATE AMENDMENTS FOUNDATIONS, BETINEEN INALLE, AND ROOF AND BETINEEN INALL PANELS, OPENINGS AT "'A) EXCEPT CHAPTERS 11 AND 25 THROUGH 42 ARE NOT ADOPTED. KAC 51-51 PENETRATIONS OF UTILITY SERVICES THROUGH WILLS, FLOORS, AND ROOF, AND ALL 2. 2015 INTERNATIONAL BUILDING COM (IW) V41TH KA5HINSTON STATE AMENDMENTS 011SA0 OTHERS SUCH OPENINGS IN THE BUILDING ENVELOPE, INCLUDING ACCESS PANELS INTO UNHEATED SPACES SHALL BE SEALED, CAULKED, &ASKETED OR YeATHER-5TRIPPW To S. =5 INTERNATIONAL MECHANICAL CODE (IMC) INITH KASHIN&TON STATE AMENDMENTS LIMIT AIR INFILTRATION. (ABA) INAO 51-52 2. ALL EXTERIOR DOORS, OTHER THAN FIRE -RATED DOORS, SHALL BE DESIGNED TO LIMIT AIR INFILTRATION AROUND THEIR PERIMETER MEN IN A CLOSED P051TION. DOORS BETINEM 4. 2015 UNIFORM PLUMBING CODE (UpC) INITH KA5HIN&TON STATE AMENDMENTS, jNAO 51-56. S. 2015 INTERNATIONAL FIRE CODE INITH KASHIN&TON STATE AMENDMENTS, KAC 51-54A. RESIDENCE AND (SARA9E ARE NOT CONSIDERED "FIRE -RATED" AND MUST MEET THE ABOVE 6. 2015 KASHINOTON STATE ENERGY CODE, RESIDENTIAL PROVISIONS (jNSECJ. KAO. 51-11R. REOUIREMENT. 5. ALL EXTERIOR ININVOIN5 SHALL BE DESIGNED TO ADMIT AIR INFILTRATION INTO OR FROM BUILMN6 THE BUILDING ENVELOPE ViHlcH SHALL ISM SUBSTANTIATED By TESTING To STANDARD ASTM CONSTRUCTION TYPE. V_15 E 255.15. SITE BUILT AND MILLV40RK SHOP MADE V400DEN BASH ARE EXEMPT FROM OCCUPANCY GROUP. R-5 TESTING BUT SHALL BE NEATHER-STRIPPED, CAULKED AND MORE TIGHTLY FITTING. 4. RECESSED LIGHT FIXTURES TO LIMIT AIR LEAKAGE PER KSE.C. APPROVED PIPING FOR. HOT INATER / STEAM SYSTEMS Or PIPIN(S FOR CONTINUOUSLY CIRCULATING HOT LOCAL.JURISDICTION RIEGUIRES INATER SERVICE 15 RE(SUIRID TO BE INSULATED PER THE IN.S.E.C. HOT INATER PIPING SHALL BE INSULATED TO A MINIMUM OP R-5 PER Azao. R40553. MECHANICAL SYSTEM PIPING SHALL BE YES DINELLINS UNIT FIRE SPRINKLER SYSTEM PER IRC APPENDIX R MNO PjAxgl INSULATED TO A MINIMUM R-6 PER A.S.E.C. R405.4 klu VAPOR, BARRIER5 / &ROUND COVER5 AN APPROVED VAPOR BARRIER SHALL BE PROPERLY INSTALLED IN ROOF PECKS, N ENCLOSED RAFTER SPACES FORMED INHERE CEILINGS ARE APPLIED DIRECTLY To THE UNIVERS�VE OF JOB ROOF RAFTERS, AND AT EXTERIOR KALLS. INSET STAPLED BATTS INITH A PERM RATING LESS THAN ONE MAY BE INSTALLED IF THE VAPOR BARRIER 19 TO THE INARM SIDE, STAPLES SHALL BE PLACED NOT MORE THAN 5" O.o. AND GAPS BETV�IEBN THE FACING AND THE FRAMING SHALL 51 TE NOR< NOT EXCEED 1/16" !SENQ15�LL VAPOR RETARDER5 AT KALLS MR IRC, R'702.7 ALL FOOTINGS TO BEAR ON FIRM, UNDISTURBED EARTH BELOVJ OR.&ANIC SURFACE SOILS. ALL A GROUND COVER OF & MIL (0.00( 59 BLACK POLYETHYLENE OR ffouIVALENT SHALL BE LAID BACK r-ILL MATERIAL SHALL BE THOROUGHLY COMPACTED. FOUNDATION VENTS, SHALL NOT INTEWE�.RIE INITH THE DIRECT LOAD PATH OF COLUMNS. OVER THE GROUND IN ALL CRAM SPACE$. THE GROUND COVER SHALL BE OVERLAPPED ONE FOOT AT EACH JOINT AND SHALL EXTEND TO THE FOUNDATION KALL. aLIMATIC AND SE06RAPHIO DE516N ORITERIA N[ND DESIGN SUSJ5CT TO VAMIA6r: FROM CA SEISMIC OM14 yqlNTER DESISN ICE BARRIER UNDER- LAYMENT rLoop AIR : FREEZINS MEAN AHNJAL UNE -vm�m I - CAM= -.1 Tmf. ..I. HAZAPIX SEX TEMP 25 P.f 172 MODERATE 15, 1 SLlr+T TO MODERATE NO �qIUtIvALENT FLUID PRESSURE - w PC.P. owmmAiNw KALLIS) 50 PZP. ORMTRAINED INALLS) -POORS, NINDONS AND 5f<"rLl&HT5_ 6ENERAL THE REGUIRED EGRESS DOOR MAY HAVE A MAXIMUM I %" STEP FROM TOP OF THE THRESHOLD TO A MINIMUM 56" DEEP LANDING ON THE EXTERIOR SIDE OF THE DOOR. OTHER EXTERIOR DOORS MAY HAVE A MAXIMUM (2) 1 W STEPS TO A MIN. 56" DEEP LANDING. ALL GLAZING SHALL MEET THE REWIREMENTS, OF THE 2015 INS.E.C. TABLE R402.1.1 UNLESS NOTED OTHERAISE. ALL SKYLIGHTS AND SKYJAIALLS; SHALL HAVE LAMINATED GLASS UNLESS NOTED OTHERAISE. ALL BEDROOM EMERSENCY EGRESS, ININVOKS SHALL HAVE A MINIMUM NET CLEAR OPENING OF 51 SGUAIRS FEET. MINIMUM NET CLEAR OPERABI E V41DTH OF 20" AND A MINIMUM NET CLEAR OPENING HEIGHT OF 24", MAXIMUM SILL HEIGHT OF 44" MEAWREP FROM THE FINISHED FLOOR. To THE BOTTOM OF THE CLEAR OPENING. OPERABLE ININDOINS P41TH A SILL OF MORE THAN '12" ABOVE FINISHED THE (SR.ADE OR SURFACE BELOIN, To BE A MINIMUM OF 24" ABOVE ADJACENT FINISHED FLOOR. 5Ar-ETY rvLAZIN(S LOOATIONS PER 2015 IRr, SEOTION R50e,.4 P-150S.4.1 GLAZING IN A" FIXED AND OPERABLE PANELS OF 51NIN&INS, SLIVIN& AND BI-FOLD DOORS. R506.4.2 GLAZING IN AN INDIVIDUAL FIXED OF, OPERABLE PANEL ADJACENT TO A DOOR MERE THE BOTTOM EDGE 15 LE55 THAN 60 INCHES ABOVE THE FLOOR 4 THE GLAZING 15 EITHER INITHIN 24 INCHES OF EITHER 51DE OF THE DOOR IN THE PLANE OF THE DOOR IN A CLOSED P051TION OP, ON A INALL PERPENDICULAR To THE PLANE Or THE DOOR IN A CLOSED POSITION 4 P41THIN 24 INCHE-9 OF THE HINSE SIPE OF AN IN-SININSING, DOOR. R50a.4.5 GLAZING IN AN INDIVIDUAL FIXED OR OPERABLE PANEL THAT MEETS ALL OF THE FOLLOINING, CONDITIONS: 1. THE EXPOSED AREA OF AN INDIVIDUAL PANEL 19 LARGER THAN 11 SWARE FEET, 2. THE BOTTOM EDGE Or THE GLAZING 19 LE55 THAN 18" ABOVE THE FLOOR S. THE TOP EDGE OF THE OLAZINO 19 MORE THAN 86" ABOVE THE FLOOR, AND, 4. ONE OR MORE KALKINS SURFACES ARE V41THIN 96" MEASURED HORIZONTALLY AND IN A STRAIGHT LINE, OF THE GLAZING. R305.4.4 GLAZING IN GUARDS AND RAILINGS, INCLUDING 5TIRLICTURAL BALUSTER PANELS AND NONSTRUCTURAL IN -FILL PANELS, REGARDLESS OF AREA OR HEIGHT ABOVE A PLAILKINS SURFACE. R505.45 GLAZING IN AALLS, ENCLOSURES OR FENCES CONTAINING OR FACING HOT TUBS, SPAS, INHIRPOOLS, SAUNAS, STEAM ROOMS, MATHITU55,5HOMRS, AND INDOOR OR OUTDOOR SAIMMIN& POOLS INHERE THE BOTTOM EXPOSED EDGE OF THE GLAZING 15 LE55 THAN 60 INCHES MEASURED VERTICALLY AWVF ANY STANDING OR INALKINS, SURFACE. RSObAb GLAZING MERE THE BOTTOM EXPOSED EDGE OF THE GLAZING IS LESS THAN 36 INCHES (q14 MMI) ABOVE THE PLANE OF THE ADJACENT INALKINS, SURFACE OF 5TAIRKAY5, LANDINGS BETINEEN FLIGHTS OF STAIRS AND RAMPS. R06.4.1 GLAZING ADJArENT TO THE LANDING AT THE 50TTOM OF A 5TAIRAAY MERE THE &LAZINO 19 LESS THAN 56 INCHES ABOVE THE LANDING AND INITHIN A (10" HORIZONTAL ARO LEW THAN IaO PEOREM FROM THE BOTTOM TREAD NOSING. FOR EXCLEPTION5 SEE IR05ECTION R308.4 i�P 17T '17 co q, SHEET I Nl�)Ex 5HIEET7[_ DEC fz,=' +-4 1 AO 5ITE PLANZ A 'I AOci DRAINASE P,-/AN AOb 6RADIN&ITbEC, P4AN Al rO\/ER5H T A2 SCHEDULE HEET AB DETAIL SHE T A4 'N$jAIN Ao FOUNDATION OR Fkx_,fk rnwilL._mjEcT A5 i� C7 PL N MAIN FLOOR f=I AN $ UPPE�-_ Ldftoiwfl"�:hhlop A6 UPPER FLOOR PLAN 4 ROO Iqe Al EXTERIOR ELEVATION5 Ae, BUILDINs SECTIONS 51 LA AL - 5HEAR HALLS, HARDAARE 4 STRUOT. NOTES TZ�R 5:2 ILATE L-DET811CIPUD; E-Silol 250,1 0. . - md-ml'15 b -4 a, a 5Kj2­ -3F � ..O�xw 061 6 556 FEWFA o F .. WHRM F_ tn u Lu 3:: 1 w z 8p. o 2H z .�@k LIN �D � Z,6 'k. ILI 0: z < F DAM /'0 z z 0 LL nwktrp Uwa APPROVED DATE: 411,-1 t-1 f4AII O.'j 201.9 BLDG. OFFICIAL: 2;dc Q A PERMIT H!J - - __ 4 0 /A5- ANW MOD NM� OMCE JO NUMSM: TRU55 PEP PLAN INTERIOR PARTITION- NALL BELON PER PLAN TRU55 PER PLAN TRUSS MR PLAN SHEETROOK SACKER TO 5E NAILED & TOP OF NALL 4 NOT TO TRUSS, TTIP. -51HEETROOK E5ACrER TO BE NAILED fit TOP OF NALL 4 NOT TO TRU55, Trr. i i L . L_ . U it I F PRESCRIPTIVE ENERGY CODE COMPLIANCE This project will use the requirements of the Prescriptive Path below and incorp o rate the mi nimum values listed. I n addi t ion, ba s e d on t h e s i z e of t h e structure, E, appropriate number of additional credits are checked. All Climate Zones Fenestration U-Factort Skylight U-Factor Glazed Fenestration SHGC" Ceiling Wood Frame Wall""' Mass Wall R-Valud . Floor Below Grade Wall"' slab' R-Value & Depth R-Value' U-Fact6r' With use of Credit 1 a n/a 0.30 0.28 U-Factor WE 0.50 n/a 414 _n/a 0.026 21 int 0.056 21/21' 0.056 30' 0.029 138 R-Value (0.025) 10/15/21 int + T13 0.042 JR-10 perimeter & entire slabr 10, 2 it n/a JR-10 perimeter & eriffire slab For single rafter- orjoist-vaulted ceilings, the insulation maybe reducedto R-38.; Table R402.1.1 footnotes included on Sheet Al. E I ac . It dwelling unit In a residential building shall comply with sufficient options from Table R4062 io as to achieve the following minimunt number of credits: 1. Small Dwelling Unit: 1.5 points Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration area. Additions to existing building that are 500 square feet of heated floor area but less than 1500 square feet. 21 2. Medium Dwelling Unit: 3.5 points All dwelling units that are not included in #1 or #3. Exception: Dwelling units serving R-2 occupancies shall require 2.5 credits. :13. Large Dwelling Unit; 4.5 points Dwelling units exceeding 5000 square feet of conditioned floor area. :1 4. Additions less than 500 square feet: .5 credits ENERGY CREDIT OPTION DESCRIPTIONS 2[�bon Description Credig§) la Efficient Building Envelope 1 a 0.5 0.5 21 lb Efficient Building Envelope 1 b 1.0 0 11C Efficient Building Envelope 1c 2.0 ld Efficient Building Envelope ld 0.5 2a Air Leakage Control and Efficient Ventilation 2a 0.5 2b lAir Leakage Control and Efficient Ventilation 2b 1.0 2c Air Leakaae Control and Efficient Ventilation 2c 1.5 3a High Efficiency HVAC 3a 1.0 1.0 31D High Efficiency HVAC 3b 1.0 El 3c High Efficiency HVAC; 3c 1.5 0 3d High Efficiency HVAC 3d 1.0 0 4 High Efficiency HVAC Distribution System 1.0 0 5a lEfficient Water Heating 5a 0.5 0.5 5b Efficient Water Heating 5b 1.0 5c Efficient Water Heating 5c 1.5 1.5 10 5d Efficient Water Heating 5d 0.5 0 6 Renewable Electric Energy i-1200 kwh 0 Total Credits 3.5 VAPOR RETARDER FLOOR 4 MILPOLY FACE STA'PLE6. KE66khS �PLAMCCOW/EnGWE WALL 4-MlIm POLY =.FAC _SWUEp,RA[1KED,PATTB r --- 1 __ W X A MER RiMild �MILPMY M FACE-swiLm 646Km5_SkftS PVA__ &EIiJNG =4 Mit. pay ............ FACE STAPLED BACKED = I SIMPLE HEATING SYSTEM SIZE This heating system sizing is based on the Prescriptive Requirements of the 2015 Washington State Energy Code. This is for heating only. ACCA procedures for sizing cooling systems should be used to cleterming cooling. Indoor Design Temperature 70 Outdoor Design Temperature F 24 Design Temperature Difference Indoor - Outdoor Design Temp 46 Conditioned Floor Area F__25o81 Conditioned Volume L 2n6ol] Glazing Sum of UA from Glazing Schedule Attic Ll-Factor X Area = UIA R-49 0026 F__ 1-4471 F 37.60 Other: Single Rafter or Joist Vaulted Ceilings LI-Factor X Area = UIA R-38 0-027 F___2331 Other� Above Grade Walls UI-Factcur X Area = LIA R-21 + R-10 HEADERS 0.056 F__31961 Other� Floors LI-Factor X Area = LA R-38 0.025 F 15911 F 39 781 Other, Below Grade Walls ILL -Factor X Area = UA R-21 Interior 0.042 R-10 Continuous exterior 0.064 Other: Slab Below Grade F-factor X Le th = UA R-10 Fully insulated 0.36 Other: Slab on Grade F-factor X L th = UA R-10 Fully insulated 0.36 Other: Sum of UA Envelope Heat Load Btu / Hour Sum of UA X Design Temperature Difference Air Leakage Heat Load Btu / Hour ((Volume X 0.6) X Design Outdoor Temp) X.018)) Building Design Heat Load Btu / Hour Air Leakage. Envelope Heat Loss Building and Duct Heat Load btu Hour Use 1.1 if ducts are located in unconditioned space: Sum of Building Heat Loss X1.1 Use I if ducts am located in conditioned sposse: Sum of Building Heat Loss X I Maximum Heat Equipment Output Btu Hour Use 1.4 for forced air furnace; Building & Duct Heat Loss x 1.4 Use 1.25 for heat pump: Building & Duct Heat Loss x 1.25 Residential Construction Energy Compliance AIR BARRIER AND INSULATION INSTALLATION TABLE R402.4.1.1 BARRIER C13119RIA! I_- 1141511WHON CRITERIA! __-ROMPONENT Air barrier and A c.rt b m.'"" he rebuleam the b,ildir,.�.I.�.Extrio,th,�ienml,�c,n!,!- ..... 1-1,11-1,11 - th-sred Be a sualing, material. 'p.ImIlvapr interior fianned the_,, battle, . . " dra:aien Breaks or huntsur I a air �Al Cie. rotempor a, required 0, the side of ::,,tru,,, do she" be led. cWti.s. All ca�tics in the thermal a cps shall be filledwith !mutation. The derefty of the insulation shall beat the _nufaoftxam� produpt recommendation and said density shel be maintained for all volume, of each cmily. Bad type maulmon will show no wide or gaps and maintain an awn density for the entire cavity. Sam insulation shall be installed in the recommanded cmity Cavity insulation depth. Where arr obstruction In the caxfty due to serhoes, blockhrog, bracing or oftimotatructitm miste, the halt mcluctwifil installation be cut to it the remaining depth of the cmity. Where the halt is cus around oWbructions, loose fill insulation shall be placed tolillanysurfac or concealed wide, and at the manufausere'specified damily. Where faced halt is used, the installation tabs must be st�led to the face of the and. Them hoU be no compression to the hatt at the edges of the cmfty due to inset stapling installation tabs. Insulation that upon installation readily conform, to awflable space shall be Insisted filling the entire caulty, and within the manufacturare'donsity recommendation. The -ft harder in my dropped ceifing/soffit shall Ile Batt Insulation installed in attic mof assemblies may be comprossed aligned With the Insulation and any gaps in the ar at extedor wall lines to allow for required attic wrallatim, Ceifing/attiC bamer seated. Access openings, drop down stmr or The imulasm in any dropped calling or soffit shall be aligned with suare wall dome to unconditioned attic spaces shall be the air harder. a.aled. Oaxilies within pornme and headers shall be moulated by completely The junction of the foundation and sill plate shelf be filling the casity with a material himing a minimum thermal resistance Walls sealed. The junction of the top plat, and top of exterior of R�3 per wil. Exterior thermal emolope insulation for trained wells walls shall be seated. Knee walls shall be sealed. shall be installed in substantial comeact and continuous alignment with the air hard,, Windows, skylights Space between indomdoorlarba and mining and and doors iskylighus and flaming shall be sealed. Rina joists Rim joists shall Include the air barrier. Rim joists shall be hmulated Instal ad to maird in permanent correct with underside of subtroor Floors (including show- Th. ar harder sh.11 be installed at any exposed edge decking or ritted to be in contact with the topside of sheathing gamage and carrifickereff Of insulation. -onfinuou insulation installed on the underside of floor framing and extend Imm the bottom to the top of all perimeter floor flaming. Soil n arkented crawl spaces shall be cmmd with Where provided in lieu of floor Insulation, insulation shall be C.l Space watift class 1, black vapor Warder with joints taped. pernumenfly attached to the crewhipace walls. Shafts, ponetrations Duct shafts, utility penetrations, and It- hafte opering to exterior or unco,diti ... of space hall be -aled. �. wiles shall be cut to fit and metalled the correct Narrow cavities 11311111-aml, 11 �tho t any wids or gaps or compression. Narrow camitle. admety w ubyinsulaston that on installation readily conforrms, to be I, led the mailable ­Oyr pace. Garage Separation Air sealing shall be prouded between the garage and conditioned spaces. Recessed fighting Shall be eased to the drywall. iShall be air tight, IC sted. Batt insulat" shall be cut reality to fit amund wiring and plumbing Plumbing and wining in exterior walls. Them shall Is, no tifile or gaps or compression where cut to fit. Insulation that readily conforms to axrilable space shall extend behind piping and whing. Shovver andlor tab Installed at exterior walls adjacent to showers and tubs shall separate them kom showers and lubs. E.I.6-flatudjaceatt-howc. r tubs shall be insulated Electricallphone bOX Barrier shall be Installed behind al,chipal at communication boxes on exterior wall or install airrusued boxes. Bols that parestrate building thermal e-lop. hall HVAC register boots be speed to the exubifloor or dly-11. Ww" required 10 be -led, 11 1prerillms shelf "I, be sealed in a manner that is recommended by the Concealed Sprinklers manulactuser. Caulking or ther adhosi,e sealants I- shall not be used to fill vulds between fire sprinkler plates and wells or ceilings. 1 serfiftme .. a J lhla�!TpE! ollogualls . sMllb_elnaccofda�Wthftpn�,�imm�IICC-400. 2X STUDS PER PLAN 5HEETROCIK PER /_FLAN BATT IN5UL. PER PLAN SHEAR NALL c PER PLAN 4 SCHEDULE -DRYNALL BACKER FINISH PER ELEVATfON OVE SHEAR NALL HOUSE NRAIP PER PLAN it OVER SHEATHIN& 50HEDULE PER PLAN TYPICAL C.ORNr=R FRAMINIS, FOUNDATION VENTILATION Crawlspace Area: 1044 s.f. Ventilation Required: 1044 s.f. / 300 501.12 s.l. Reqd Use: 14" x 7" Foundation Vents Vent Area 98 s.i. - 25% reduct.,1/4"mesh 73.5 s.i. Vents Required 501.12 s.i. / Vent Area 6.82 s.i. Provide : 7 14!'x 7" Vents, Area = 514.5 s.i. Ventilation Provided 514.50 s.i. is Greater than 501.12 s.i. Req'd Use: 7 14" x 7" Foundation Vents FOUNDATION VENTS SHALL NOT INTERFERE WITH DIRECT LOAD PATH OF COLUMNS INSTALL 6 MIL BLACK POLYETHYLENE VAPOR RETARDER GROUND COVER LOCATE ONE VENT WITHIN 3 FEET OF EACH CORNER OF THE BUILDING, EXCEPT ONE SIDE OF THE BUILDING SHALL BE PERMITTED TO HAVE NO VENTS. ROOF VENTILATION Standard Truss I Scissor Truss Roof Frannina Assembly: Roof Area : 1447 s.f. Ventilation Required: 1447 s.f. x 144 / 300 694.56 s.i. RWd Provide between 401/6 & 501/6 of the total required ventilation no more than 3 It below the ridge or the highest 22int of the space. Remainder to be installed at save vents. Upper Roof Ventilation: AF50 Roof Jack (10" x 7") TO.00 a.!. each. Upper Ventilation MINIMUM 694.56 s.l. x 0.4 / s.i. of each vent = 6 vents Upper Ventilation MAXIMUM 694.56 s.l. x 0.5 / s.i. of each vent = 6 vents Provide: 6 -1 ONT' roof jacks. Ventilation 300.00 S.i. Ventilation area remainder for save vents 394.56 s.i. (Reti'd vent -Upper vent) Eave Ventilation: Birdblocking: (3)2.25" dia holes per bay = 5.96 s.i. per I.f. - 25% reduction 4.47 s.i. per Lf.. Eave Ventilation Required 394.56 s.i. / 4.47 s.i. per Lf. = 88.27 I.f. Provide Minimum: 89 Lf. birdblockfing. Ventilation 397.83 s.i. Minimum Ventilation Provided 697.83 s.i. IS GREATER THAN : 694.56 a.!. Resi'd ROOF VENTILATION Stick Framed Roof Assembly: Roof kea: 233 s.f. Ventilation Required: 233 s.f. x 144 / 300 111.84 s.i. Rect'd Provide between 40% & 50% of the total required ventilation no more than 3 ft below the ridge or the hifitherst point of the space. Remainder to be installed at save vents. Upper Roof Ventilation: AF50 Roof Jack (19'x 7") - 50.00 s.i. each. Upper ventilation MINIMUM 111.84 s.i. x 0.4 / s.i. of each vent = I vents Upper Ventilation MAXIMUM 111.84 s.i. x 0.5 / s.i. of each vent = 1 vents Provide: 1 -1 ON7 roof jacks. Ventilatfort 50.00S.I. Ventilation area remainder for eave vents 61.84 s.i. (Req'd vent -Upper vent) Eave Vent aton: Birdblocking: (3)2.25" dia holes per bay = 5.96 s.l. per Lf. - 25% reduction 4.47 s.i. / Lt. Eave Ventilation Required 61.84 s.l. / 4.47 s.i. per I.f. 13.83 Lf. Provide Minimum: 14 I.f. birdblocking. Ventilation 62.58s.l. Minimum Ventilation Provided 112.58s.i. IS GREATER THAN: 111.84 s.l. Reci'd ALARM SCHEDULE 2015 IRIC SECTIONS R314 & R315 SYMBOL DESCRIPTION REQUIREMENTS Smoke *110 V interconnected w/ battery backup. Alarm *Installed on each floor, in each sleeping area, and outside each separate sleeping area. Installed not less than 3 it from the door of a bath which contains a tub or shower unless this prevents placement in a required location. ,*Listed in accordance With LIL 217 and to comply With NFPA 72. Combination *Installed on each floor, outside of each separate sleeping Smoke area in the immediate vicinity of the bedrooms, and in a Alarm & bedroom that contains a gas fireplace in the bedroom or Carbon adjacent bathroom. Monoxide :Smoke alarm requirements per above. Alarm Combination smoke & carbon monoxide alarms listed in accordance With UL 217 & UL 2034. WINDOW, SKYLIGHT & DOOR SCHEDULE " COND=LOOR SUM - UA FOR HEATING SYSTEM SIZING, =Je6 6 SUMOFALLGLAZNG 13=� (DOES NOT INCLUDE EXEMPT DOOR & WINDOW) GLAZING TO FLOOR AREA, RAT10,M1,81 23.7% EXEMPT DOOR AND WINDOW ROOM U­VAL CITY IN H AREA LIA GARAGE 1,EXEMPT SWINGING DOOR (24 S.F. MAX) 0.46 1 1 1 19iq EXEMPTWINDOW (15 S.F. MAKI 1 SUM OF AREA AND UA FOR HEATING SYSTEAs EXTERIOR DOORS (OPAQUE) ROOM TYPE REF U-VAL On' W H AREA LIA FOYER 1 1 046 1 1 1 1 3.001 &00 24.00 = N NEP 11.04 E0. 1 1 1 1 000 0. IDOOR IWSEC I 1 1 0.00 0.00 SUMOFAR-A1.UA- 24.0 11.0 AREA WEIGH VERTICAL GLAZING (ALL WINDOWS ARE DOUBLE GLAZED. U-FACTORS ARE DETERMINED IN ACCORDANCE WITH NFRC 100) ROOM TYPE REF MODEL FRAME GAS LCIE E PKG U­VAL SPORS OTY W H AREA LIA MAIN FLOOR I I I 1 0400 0.0 FOYER IPICTURE I MILGARD 8520 VINYL AIR IYES suNc/flag, 0.27 1 EDGE 1 2.50 1.50 &75 1.01 DEN IPICTURE I MILGARD 832D VINYL AIR YES SUNC/189 0.27 EDGE 10.00 3.00 30.00 B.16 DEN P! RE MILGARD 832D VINYL AIR YES SUNCR89 0.27 EDGE _1 1 g�50 3.00 7. 2.0 DEN C E MILGARD 85M VINYL AIR IYES SUNC/i89 0.27 EDGE 1 2.50 6.00 15.00 LF5 DEN PICTURE MILGARD War VINYL AIR YES SUNC/189 aZ7 EDGE 2.50 1.50 3.75 1.01 DEN PICTURE MILGARD 832D VINYL AIR YES SUNIC/189 027 EDGE _1 5.00 3.00 15.00 4JO5 DEN PICTURE MILGARD 832D VINYL AIR YES SUNC/189 0.27 EDGE 5.00 6.00 30. flAo DEN PICTURE MILGARD 8320 VINYL AIR YES SUNCfi89 0.27 EDGE 1 5.00 1.50 7.5D 2.03 PDR CASE MILGARD 8520 VINYL AIR YES SUNC/189 0.27 EDGE 1 1.50 4.50 6,75 I.E DINING PICILE MILGARD 8320 VINYL AIR YES SUNC/189 0.27 EDGE 1 1 7.001 6.001 42.00 11.341 DINING CASE MILGARD 8520 VINYL AIR YES SUNCA89 0.27 EDGE 1 1 2.50 6.00 15.00 4*05 DINING PICTURE MILGARD 8320 VINYL AIR YES suNctm 0.27 EDGE 1 1 5.00 6.05 30.00 &to GREATRM WICTURIE MILGARD 8320 VINYL AIR YES SUNCfl89 0.27 EDGE 2.50 6.00 45.00 12.15 G T M E_ !P!CTURE MILrARD VINYL AIR YES SUNCA89 0.27 EDGE _L 3 2.50 1.50 11.25 3.04 ,�=T RM G.D. MILGARD 8621 1 VINYL AIR IYES SUNC/189 0.27 EDGE 1 8.00 IT00 64.00 117.21) I UPPER FLOOR - - - - LALRDFY PICTURE MILGARD 83M VINYL AIR YES SUNC/189 0.27 EDGE 2 TOD 1.50 15.00 4.05 STAIR PICTURE MILGARD 832D VINYL AIR YES SUNC/189 0.27 EDGE 2.50 1.50 315 1.01 STAIR PICTURE MILGARD 8320 VINYL AIR YES SUNCfi89 0.27 EDGE _L I TZ5 1.50 ila63 3*14 STAIR PICTURE MILGARD 8320 VINYL AIR YES _SUNC489 0.27 1 EDGE 2 2.50 4.501 22.60 Soal BONUS SLIDER MILGARD 8120 VINYL ARGON YES SUNCfiS9 0.27 EDGE 2 5.00 4. 45.00 12.15 M BATH CASE MIU3ARD 8520 VINYL AIR YES Nor SUNC1189 0.27 EDGE 2 1 2.50 4.50 22.50 6JOB M51R BR PICTURE MILGARD 8320 VINYL tAIR YES SUNC/189 Nor" 0.27 EDGE 1 8.00 Z50 36.00 9.72 MSTR Bit CASE MILGARD 8520 VINYL VINYL IAIR YES SUNC489 �27 EDGE 2 2.50 50 22.50 6u)8 BEDRIM 2 SLIDER MILGAIRD 20 I 81_1 VINYL flNYL A YES S�Ncfiffg SU AS 0.27 EDGE 1 5.00 7. So 22.50 6.08 BEDRIM3 SUDER MILGARD 1 8120 VINYL ARGON YES SUNCID19 0.27 EDGE 1 7.50 4.50 33.75 9.11 M!2 000 000 0.00 0.00 SUMOFARE4ANDUA: 561.63 A. .. U . UAIAII.; OVERHEAD GLAZING ROOM TYPE REP MODEL FRAME GAS LO­E LAYERS L-VAL CITY W H AREA �AIR EL�HTILI�RD 1 191 IALUM 1A. I LS P M 422 1 0 F 11.111 ,.L LGA MU.ATH RD 1 790 IALUM JARGON lyy 1 11 4:13c 4!L. ISKYUGHI-Imit-GARD, 1 790 JALUM JARGON IY 2N220 SUMOFAREAANDU AREA WEIGHTED U UAIARE4: 161.64 0.1� UA T-1 10N 0,49 VERTICAL GLA23NG IN UNHEATED SPACES ROOM TYPE REF MODEL FRAME GAS LO-E LAYERS U­VAL SPCRS OTY W H AREA GAR�AGFIPIC RE MILGARD! 8320 1VI JARGON SUNC4 0.00 EDGE 1 2 1.501 2z� �EF.6-rJRE MIDGARD 1 8320 IVINYL ARGON I SUNG/ 1 0.00 1 EDGE 1 1 7.0 1. HIS I I 1 11 0.00 SUM OF VERTICAL GLAZING IN UNHEATED SPACES. %25 (not Included in surn of all g(aDing above) OVERHEAD GLAZING IN UNHEATED SPACES ROOM TYPE RBF MODEL FRAME GAS UO-E LAYERS U­VAL CITY w H AREA 00 0.00 (rot hopfuded In aten of all oseling above) I I R LEAKAGE =nents of the building thermal envelope as listed in TABLE R402.4.1.1 shall be installed per manufacturef's allions to Ifirlit air leakage rate to not exceed 5 air �Ihan=�'ou,,AGK test 'I AIR LEAKAGE CALCULATION (maximurn blower 'RK.,cat 1`-��,!,.ACTUIAIL Blower test result maximum ACH CFM­e. BLDG VOL Ile) 5ACH/WrN`rT.-'l'_.11 "T., lofm 41 if Ing WHOLE HOUSE T IN op-noNi. iNTrRMffTTENT WHOLE HOUSE VENnLA-noN USING ExMbST FANS (IRC 101507,6.�) 80 MIR CFM CD 0.25 WG EXHAUST FANS FLOW RATING PER IRG TABLE M1507.3.3(l) OUTDOOR AIR DISTRIBUTED TO EACH HABITABLE ROOM BY INDIVIDUA�OUTDOOFI INLETS. F­X_1 OPTICN2. INTERMITTEN17WHOLE HOUSE VENTLKnoN INTEGRATED WITH A FORCED -AIR SYSTEM (IRIC M1507.3.$) PROVIDE OUTDOOR AIR AT 80 CleMPERIFROSECT1014101507.3.3 MOTORIZED DAMPER CONNECTED TO THE AUTOMATIC VENTILATION CONTROL OPTION& INTERMITTENT WHOLE HOUSE VENTILATION USING A SUPPLY FAN (IRC M1507.3.6) PROVIDE OUTDOOR AIR AT 80 CFM @ 0.40 WG PER IRIC TABLE M1507.3.3(i) INCH SMOOTH OR INCH FLEXIBLE OUTDOOR AIR INLET DUCUT PER IRC TABLE M1507.3.6.2 BACK -DRAFT DAMPER SELECTION: CALIBRATED MANUAL VOLUME DAMPER MANUAL VOLUME DAMPER AUTOMATIC FLOvy-REGuLAnNG DEVICE 01�-,l. NTERMTTENTWHOLEHOUSEVENTLATION.SlIN.A HEAT RECOVERY VENTILATION SYSTEM (IRC M1 507.3.7) VENTILATION SCHEDULE 2015 IRG SECTION M1507 SYMBOL AT'ON MINIMUM FAN REQUIREMENTS 4 Bath, Powder, M1n.50cfmat0.25"WG (IRC TABLE M1507.4) A Laundry rKitchen to Min.100cfmat0.2F'WG (IRC TABLE M1507.4) 4 B (Rangehood or down draft exhaust fan rated at min.100 cfm at 0.10" WIG may be used for exhaustfan requirement.) 'us W W .1. our hole House Sized per "Intermittent Ventilation Flow Rate" below. 4 C Fan *Whole house fans located 4 ft. or less from interior grille to haveasoneratngo 1.0 or less measured at0.1" WG INTERMITTENT Min. ofm = 80 a10.26' WG(IRC TABLE M1507.3.3(l)) VENTILATION FLOW (based on 2,508 s.f. floor area & 3 bedrooms) RATE (daily fractional operation time = 75 %) All fans to vent to outside. All other requirements of the 2015 WSEC and the 2015 IRC section M1507 must be met. N ki� so I -.5 lcn4- al Q!t; "_ o m �t6 Ffl FEA U LJJ LLJ U Z < Z A 0 � Ul Z,6 IT T LU r DER-NED WTSYDAU TROY 1/201! DMM BY. DAM JRA 4/15/1! PROJECT MANAGER: SARAH AEI&HT REMSED BY.. DAn /Ae)- ANW -DO NMLUE OMCE JOB Nu.50; 11600561 A-5.1E.C. SCHF-DULF-5 SCALE, NOT TO 5-Ad-E N111111 0 5 120119 FIRAMINS, 4 FOUNDATION FRAMING, 4 FOUNDATION FRAMING 4 FOUNDATION FRAMING, A FOUNDATION FRAMING, $ FOUN12ATION DIMENSION DIMENSION DIMENSION 12IMEN51ON N OVER DIMENSION 2X STUPSI PER PLAN 2X STUDS PER PLA14 jHlEffl Y,4ft� Ml;� PLAN 4EE P L FINISH PER ELEVATION OVER 2X STUDS PER PLAN FINISH PER ELEVATION OVE 2X STUDS PER PLAN 15 LB. BUILDING PAPER -LAN BATT INSULATION PER PLAN 15 LB. BUILDIt 6�'ATP"ER BATT INSULATION PER PLAN FINISH PER ELEVATION 0 VISR 2x STUDS FER PLAN 15 L5. BUILDING PAPER OVER SHEATHING PER PLAN BATT INSULATION PER PLAN 15 LB. BUILDING, PAPER Om';t SHEATHING, PER PLAN BATT INSULATION PER PLAN OVER SHMATHI NIS PER I DSILL A.. LTS OVER 5HEATf I D5 LL A. BOLTS 15 LIS. BUIL12IN15 PAPER OVER SHEATHING, PER PLAN I&d NAIL 9 61, O.r'. lbd & 4" 0.0.— FOUNDATION I -LAN I&cl @ (", O.C. FOUNDATION PLAN Z - FLASHIN& -MUD5ILL / A. BOLTS SHEAR NALL PER E HEDULE .0 Ibd MAIL a 6 Ir. SHEAR AALL PER SCHEDULE INSTALL ELVIS. PAPER BETINEEN CONO. 4 J015T 5/4" T 46 FLYWOO SOFLOOR I I 9/4" T.46. FLYHOOD SUSFLOOR 1:2 TRIM PER FOUNDATION PLAN MUPSILL / A. BOLTS MUDSILL / A. BOLTS a DOOR, I" MAX 5LUE 6 k�ILED a DOOR: I" MAX GLUED 4 NAILE17 990FIONAL 4", ONr,. 5LA13 OVER PER FOUNDATION FIL PLYAOOD SUBFL. PER FOUNDATION T*16* PLY110011 5U5rL. OR 4" MIN fiF(`BATrDINSULATlON OR 4" MIN M IS SL TO I IS, MIL (BLACK) VJ5. OVER 99mil OD TO BITUMINOUS r5/41'T.46. __ (SLUM, 4 NAILED BITUMINOUS FB/4" (SLUED 4 RAILED PER I -LAN BATT INSULATION PER PLAN 4" GRANULAR FILL '(1) DAMPPROOPIN& or FTr-- F5ATTlIN5UL. PER PLAN F DAMPPROOFIN(9 TOP OF FT6. BATT INSUL. PER PLAN WC SLAB 4'0 SLAS #4 BAR CONT. MAX 1,A Toll TO FIN. r2RADE\ TO FIN. GRADE\ I BELopq Top or r-Np. Kq-L \ 140 rL-7 FLP. JST5. MR PLAN FL P TFOL PER PLAN I FME HANGER T16 Ta I U17E. 'PLIFIL JSiS. PER PLAN STUB OUT #4 BAR X24' 0 lb"O.C. (1) 04 BAR CONT MAX. 6" BISLOA TOP OF FND KALL TOP OF SIB OUT 94 BAR 24" 15" OL.' I. JSTS. PER PLAN FLANGE! HANGER #4,BAR VERTICAL @ 16, 0.0. 17 �SAR TCA' - WLI;,&. PAPER BTAN 57`5 z ICAL a 15" 0.0. #4 BAR VERT - #4 BAR 43 6151100 - I - -- -11-1 CONr,. 4 JOISTS BITUMINOUS 0 $,HORIZONTAL a 15" O.C. DRIZrNTl . 16 #4 BAR VERTla� 8 1w ar'. L. a 15" O.C. #4, Rl Z,//< - MIL. BLACK V.B. C, MIL. BLACK V.5. TOP OF M. TO MIL BLACK V.S. cl TOP OF ri 4 HORIZONTAL a 15" O.C. 4" HOOK-L.� Moo MIL. BLACK V.5. BAR CONTINUOUS Ij (2) #4 ISAR. (2) #4 ISAI 5" C'J-R� (2) #4 BAR CONTINUOUS (2) #4 BAR CONT INUOUS 4" Hom CONTINUOUS CONITINUOL le, 4-0 FERF. FNIO. DRAIN W SCALE I.. 1._O.. 4"IlI PERF. FW. DRAIN W W4, CONT. 'IL v 1, -0 b" �4;� 4'0 PEW. FIND. DRAIN W !lm CONT. FILTER MM43RAM SCALB 'SOCK" AROUND PIPE 1-0 .1011 5" &ARA&E FND. NALL RAISED 5" FND. NALL JOIST5 PAR 5) RAISED a f=Nr,>. NALL.. RA15ED 5" f=ND. NALL N/ SLAB 5 RAISED �5" FND�.��NALL N/ SLAB FRAMING 0 FOUNDATION FRAMING, 4 FOUNDATION' e- - FLR. J5T5. PER PLAN APPROACH BY OTHERS DIMENSION DIMEN51ON BATT INSULATION PER PLAN f-4" CONCA;MTE 1/21, IS.N.B. 2X STUDS PER PLAN 1/21, G.A.B. 2X STUDS PER PL.AN 5/4" T.40. PLYY400D SUBPLOOR BUILDING, LINE BEYOND SHEAR NALL PER 5C+E0ULr= BATT INSULATION PER PLAN SHEAR INALL PER, Sam,, BATT INSULATION PER PLAN GLUED 4 NAILE17 I&d NAIL a 6" O.C. b"O.C. 450, &ARA&E SLAB MUDSILL / A. BOLTS /r PER FOUNDATION PLAN— rI&dNAIL MU1251LL /A. BOLTS PER FOUNDATION PLAN OLD6. PAPE er;T�IEEN CONC.. $ NBLOCK12 U��l < SLOPE PER PLAN 5/4" T .46. PLYYvIOOD SUBM. E/4" TA IS ILYINOOP SUBIL, I-L, A. INM 1 lbd BEAM PERPLAN NAILS 1 K\\kl'1lr111R lh BATT' INSUL. PER PLAN BATT INSUL. PER SIDE - ---------- - + 2 X 4 CLEAT 14�11�7`* '" I, - I mi v r -0, C. SLAB P. SLAB----., 4" CON I EACH SIDE 7FOM OF SEA I Ell (2 lbel PA. SIDE P.'T. I -05T PER I'LAN ICKENED SLAB OF PORCH .- If c - �� FLR -. � A'�:--.�' , .. WSIMP50N A54 AMING, NC44 6 MIL. BLACK V. E. A ORS-,� WISP TURN DOAN SLAE, INTO CONT. NIS j S-1 )UT #4 5AR:X �224` PER P rL ).C. #4 BAR X 24" PER PLAN L'�T rl @ EACH P 05T PTUM OXIIN& E31TUM NOU5 VAMPPROOFINIS j OFF LA IS HANGER (2) #413AR5 CONTINUOLLS. TOP OF 1 T 0, EL 4� 1r #4 PAP VERTICAL 0 IG" O.C. J.: TOP C IF FTC BLDG. PAPE T CONC. 4 JOISTS AL IS" 0.'. .4 BAR VERTIC IS" O.r 0 �4 1, $ HORIZONTAL a la" O.C. - 6 MIL. BLACK V.5. 50 MIL. BLACK V.5. 1 4 HORIZONTAL 0 18 O.C,,.. 4"HOO .... .. 4"HOOK BAR CONTINUOUS 44 FERF. FND. DRAIN ri/ 6 (2) #4 BAR lz (2) #4 BAR . . . . 4" dia. PER CONT. FILTER MEMOR NE 51, 61-R. _j�N.TINUOIJS 5" CLR. . CONTINUOUS k4" k 6" k4" --'T'lLqcTAL TF -4" FND. DRAIN SCALE 1" 1'-0" 11" #42 SCALE I" - 1'-0" S A'4L 1. D& CONTINUOUS FOOTINry -7 FND. NALL 5) THICKENED SLAB Q O.H. POOR q) RA15ED a" FNP:�,,Q��.ISARAI57E ri 0 RAISED a" FNI:;) OARA&E GRIP 912 P MRJ NOTlEi SPACING 5ETVIEEN . INTERMEDIATE A VARIES IsUARDRAIL MEMBERS TO BE SUCH THAT RS,,., G�,j 4" PIA. SHALL NOT PASS A SPHERE OF 1 1/411� VIA. MIN. THROUOI ANY OPENING, HANDRAIL, CONT. FOR FULL LENGTH HANDRA L!,5 PM 4 —2.6 STUD K'LL, BATT INSULATION SIDING PER PLAN CRICKET 2 X 6 BUILT-UP CURB Or STAIR IR C, HOUSE ARAP OVER FLA5HINC, SKYLIGHT SIZE PER PLAN W BALUSTERS TO TO JR4, R512.12VI FLANGE 4" MIN. CURS FLASHING AS RECOMMENDED 13r MANUFACTURER 2077 "I" FLASHIN& PER MANUF. 5PE05 I (2 LAYERS LAMINATED C-LA55 a +12'-0" A.r.rJ 2 LAYERS TEMPERED TT&5tol OR IEGU L 4x AINDOP4 HEADER All 1ILL'2AV" Tlq'. -Z" MASH ING VANPOA PER I'LAN GLASS - 12�0" A.F.F) 2X4 a w RIGID 4 SCHEDULE RAFTERS OR TRUSS BEYOND &'I IN. STAIRY4AY AIPTH 5 m ITION VARIES NAILB PER IRC R811.1.1 MM PER t SHIM AS NEEDED— ELEVATIONS Ix TRIM SEALANT c I 1 10" MIN. TREAv SEALANT Ix TRIM, EXTENDED TRIM PER FINISH INSUL OA STAIR INSTALL 1/2" I"BEYOND KALL FINISH ELEVATIONS O.A.B. @ CEILINS, $ KALLS SHIM AS NEEDED—/ u OPTIONAL Ix4 HOUSE ARAP HOOD mm OVER AiNVON (5) 2XI2 STRINOER5 FLASHING FLANGE Np INC, INSULATION PER FL "—FIRE Z-- I I WES : 2X STUD KALL LAN BLOCKING 0 MID-51-AN 16416 2X4 5T NOTE: &REATEST AND LEAST TREAD $ P41NI20N PER PLAN 4 SCHEDULE ------4 1/21, rll;lx PLYNOOD 4" 0.0 . OLD R15ER SHALL NOT VARY MORE THAN 5/5" 2xb STUD KALL' 5/e �L &Y4. SHEATHING (PER IRC 4 RSIL-152) BATT I 7 I 2 LAYERS GR,-DE P (5) 5d TOE NAIL STRINGER ,,,,,,N5ULATION PER I'LAN IS 5LV . PAPER MATHER To THI;tUST BLOCK ...... (4 RESISTANT BARRIER OR BLOCKING 0 FLOOR BELOY4 NOT TO SCALE SCALE 1" 11-01, CORROSION '14) RES15TANT (SALV) INTERIOR STAIR 1.2) INDON HEADER TYPICAL IN TYPICAL AINDOIN SILL 5KYLI&HT METAL LA114 1,15) ROOrINry MATERIAL PER ELEVATION OVER FELT PAPER R —5d NAILS a 4" O.C. ROOFING MATERIAL FIER PLYHOOP OR 0.5.5. ELEVATION OVER FELT SHEATHING NAILED PAPER PER PLAN ROOFING MATERIAL PER 5d NAILS o 6" O.C. ROOFING MATER PER PLY1,400V OR 0.5.5. SHEATHING 13 iAL PER STRUCTURAL. NAILED W ed T: ELEVATION OVER FELT PAPER PER PLAN NAILS ap 4" O.C. 4 SUPPORTED 13 ADHERED STONE VENEER TYPE IN" MORTAR JOINT TYPE "N" MORTAR— SHEATHING FIER 5 L TRUSS PEP, P AN NOTES PER STRUCTURAL W INSULATION 5AFFLE, NOTE: EXTEND 12" Ed NAILS @ 4" O.C. 4 ELEVATION OVE R. FELT NEL EDGES 5d NAILS a 62 " O.C., SEATING BED T IN 'L.1 13AT 5 DRIP EDGE FLASHING, 0 AaV. INSUL. v41 I" CLEAR AIRSPACE SUPPORTED PANEL R I -LAN OVF PAPER M -R SHEATHING PIER STRUCTURAL (5HTIS. TO BLK '&) 'I", PER PL AN PER I.RL. R-O5.2.55 VENTED 2x BLK'(S W (5) 2" EDGES NOTES )m6ff'- TRIM/BARSr: BOA clia. HOLES PER 24" O.C. (E3LK'& To Touci-i Top PLATE) BATT INSUL. 2x RAFTERB BLOCK PER TRUSS SLIF�PLIER z - 4 26 9A SALV. CORRO51ON PER ELEVATIONS PER PLAN O.H. PER PLAN IS" MAX. PER PLAN DRIP EDGE PLAsim r RE515TANT AEEP SCREED-OVERLAP BLV&. ;e 2x4 SOFFIT v41 -ON SCREENED VENT (1'2T 1,E) 5d NAILS a 6" 0.0. (SHT&. TO BIRD BLI"&) BATT INSUL RE010 PER I.Rfl. P-105.2.5.5 > 2x4 OUT-RI&&ER AS I -APE R-LATH TO COVER $ FLANGr= 014. PER PLAN PR P Dr, ASHIN6 REQUIRED a 24" O.C. PER PLAN (5) &clj TERMINATE ON -LYAOOD� SHEATH (9— - IN 12 R R.C. (FLAT) IF OR E XCEW� lwf� FOUNDATION KALL ON GABLE TRU55. NAILED R 4'MIN, (SCRED P BE TO GRAM =LoYq IN/ Ed NAII-5 @ 4" O.C. Yq/ TRIM/BARISE BOAR 'D I BL 2"MIN. (SORM To PAVEMENT) MUCI-SILL ALL EDGES BLOCKED OVERHANG FER PLAN PER ELEVATIONS Y2" MIN. (VRMD TO KALKIN& SMACE) l6d Torz-NAIL5 Q 6" O.C. 2x4 SOFFIT Yq/ CONITIN. x RIM CONT. METAL 55 PER PLAN SIMPSON A95 @ 24" 0.0. lx4 RAFTERS WNT. PER PLAN SCREENED VENT avy GUTTER OVER OVERHANG SIMPSON HI OR H25 L2x CUMR OVER 16d TOE-NAII-5 @ W O.C. FASCIA BOARD c.LIP a EACH TRU55 OVM— ELIEVATION --USE FULL HEIGHT FINISH PER r 5IMP50N HI OR H2.5 FAWIA BOARD CLIP a EACH RAFTER FINISH PER ELEVATION BLOCK ONE PERPLAN z '4 HOUSE NRAF OVER STUDS @ GABLE END PER PLAN OVER 19 LB. EILDS. PAPER RAFTER BAY 0 4D" 2x4 SOFFIT Yq COWIN I&d SHEATHING COVERSHEET OR RAKE AALL 2x4 SOFFIT vHql TIN. (5) I&d TOF--NAILS OVER SHEATHING PER PLAN O.cl. SIMPSON A55 5C.REENED VENT (jy2" HIDE) (4) TOE -NAILS MIR 5TRUCTURAL NOTES NOTE; IF OVERMAN& SCREENED VENT (LL," Y41M PEP BLOCK SHEAR KALL PER PLAN 2x STUDS BATT INSULATION EXCEEDS 12" INSTALL SHEAR KALL PER PLAN 2x STUD5 $ BATT INSULATION @ 161 O.C. t SCHEDULE OR HEAVEF LL I HAR 0 5 20A 0 PER PLAN SCHEDULE 2x& FLAT @ 24" O.C. SLOT TOP CHORD AS SCHEDULE OR HEADER FINISH PER ELEVATION PER PLAN 4 SCHEDULE L HEIGHT FINISH PER ELEVATION OVER HOU5F BATT INEULAIT NOT TO SCALE 5HEAR INALL PER PLAN REGUIRED, OVER HOUSE Y4RAF OVER BATT INSULATION PER SHEAR IAALL PER :—FUL STUDS GAME ARAF OVER SHEATHING FER PLAN CIP14;-IMR,-�11 PLAN 4 SCHEDULE SHEATHING PER PLAN PLAN 4 SC+EDULE PLAN 4 SCHEDULE @ END 0 15 ADHERED VENEER 0/ SHEATHIN& 67ABLE END DETAIL VAULTED CEILIN6 o EAVE �j 67ABLE END DETAIL '24) TRU55 HEEL a FLAT OEILINCVEAVE <- A AD �-IAIN FLOOR FRAKNO FLAN_ SCALE: 1/4" - 1'-0" FLOOR FRAMIN& NOTES: 1. CONTRACTOR SHALL VERIFY ALL NOTES, DIMENSIONS 4 CONDITIONS PRIOR TO CON5TRUrTION. 2. ALL FLOORJOISTS TO BE 2x1O HEM -FIR #2 @ 16" ON CENTER UNLE55 NOTED OTHERNISE (U.N.OJ 5. ALL BEAMS 6 HEADERS To BE 4xIO VF#2 U.N.O. 4. PROVIDE SOLID BLOCKIN& OVER SUPPORTS. 5. PROVIDE FIRE BLOCKING, a ALL FLUM511,16 PENETRATIONS. 6. BEARIN& KALLS ARE SHAPED. T FLUMBIN6 AND MEC44AK[rAL FIXTURES ARE DASHED. NOTEI SEE S SH!Mr 5. ALL HOOD IN CONTACT VCTH CONCRETE TO BE PRESSURE LATERAL I" TREATED. * ENSINES q. SEE SHEET At FOR ADDITIONAL NOTES. �150 W -i iC - Ui6 ALE STASCER JOINT5, TYR BEAM SCHEDULE PLAN VIEN DESCRIPTION DROPPED BEAM DE515NATED ON FLOOR PLANS. DROPPED BEAM DE516NATEI? ON FRAMIN9 PLANS. FLUSH AND TOP FLUSH BEAM PC-516NATED ON FRAMINS PLANS UPSET BEAM V1251SNATEP ON FRAMINS PLANS. 10 COLU MN BA -Se �R CONO. Fx Tc'. ABV. PE FRAMINO PLAN 04 IRS l2s. SLAB STUB OUT #4 :T �GONCRETE OVER BAR 24" a 4" &RANUILAR FILL IWO/- 21-0" 101-V T'x14" 51-REFNED, FOUNDATION VENTS (7) REGUIRED 17.5. 0 7, 7 5&!'xb&"xIO" rTiS. A/ #4 W' O.C. (4) MIN. LON6, *4 9, 1 C SHORT ME Illiz =ME 2'-0" 4--o' 4'-0" 4'-0" 4'-O'__r 4--0" 41" 4'-I'� -0" =r_4'-O" T__4'-O" 1, T. �_LINE '�__'O �T.Ilml OF BEAM ABV. T'rFlrAL FRAMING PLANS, rrPICAL 16. I 4'-0" f f STEP FNIV. KALL PER VSHEETS STEP FND. KALI- PER. WSHEETS 12.5. -LINE OF r_OOTINr.5 TYPIOAL J A 5LA5 ON &RAPE 4" CONORETE 57ER _&MIL (BLACK) V ' B. OVER 4" &RANULAR FILL, SLOPE 4" TO VOPRS /—LINE Or THICKENED SLAB MIN. lb"x24" CRAM SPACE ACCESS, INSULATE 4 YeATHEI;ZSTRIP X: = :PC :D. .�­ 4­1­ 24"44'X12'DEEF C4W,. M. W 14 r-b" ams 0 a, 01C. EACH #AY (3) MIN. Ez = = 4 Ez = = = m = -_ = m 6 V-6- \�V�2'-O%2'-O% 4'-0. 2'-0" cl z '0 32 lzr 2OU F I'd z .0, Z V) Z' U LLI LLJ Z Cie < Z L* Q43-a .1 .1 14Y41 wl A5 STUS, OUT #4 BAR 24" O.C. 0 t4\ �CONGOVER CRAkNL VT 4' GM�LAR FILL Lu SPACE 1; V TmiL. —(f3LArr,) va % 2 IS) AS T 11 I'll 46"X46"X12" PIMP '7 �mu CONC. Fw *4 BARS EAC44 KAY .7 DAM TROr 1/2015 20k-b" ci DRAM B�. DATF. 96'-0" (OVERALL) JIRA 4115AB PROECT MA AGER: SARAH NEIGHT 5: REMSED Br. DAM J­ JRA 5/21/15 u� PH FOUNI-:;)ATI ON FLAN SCALE: 1/4" 1'-0" FOUNDATION NoTr=5: 'ZAL By. 1. CONTRACTOR SHALL VERIFY ALL NOTES, 7"! DIMENSIONS 4 CONDITIONS PRIOR TO z CONSTRUCTION. 2. ALL FOOTINSS TO REST ON UNDISTURBED A4/ SOJL. 0 5. ALL Y400P IN CONTACT AITH rONrf BE PRESSURE TREATED. IlL. 4. SOFFiT4 INSULATE CANTILEVERED AREAS. 43 S. STEP FOUN17ATION PER 51TE CONDITIONS. r'. 1_-00 P.S.F. ASSUMED SOIL MARINS HEET5 PORI .MATION CAPACITY SHALL BE VERIFIED IN FIELD. � T SEE SHEET At FOR ADDITIONAL NOTES. -,.'D DETAILS ZUBER, A AS T.a e. PLYyqOOp SLUMP 4 NAILED. IF -0-7 1 STAGGER JOINTS, TYP 5VA2" &L.E. 24F-V4 55 CONNECTIbN FLR. TRUS5 H L Nr POINT LOA B. 24F­V4 L-0 A.3 HDR. NOTE: aa5 S.F. FLOOR AREA i NOTE: 460 S.F. li H � T 5IDr: OF t ( I FLOOR AREA DRAFT STOP THIS DRAFT 51DE STOP or NO'M DRAFT STOFF R MR LRIC. R502.12 M N& THIS FLOOR TRUBB I 1 11 11 DROPPED -11, 4.250 LL 2-7310001- -4 LO 111 'or- (4 VA5HEV MEM5EPS: PASH Lit "_ 2X6 CEILING 02 POINT LOAD ABV. JOISTS @ 24" O.o. 4X12 V1112 OVER I -DR, BOT. a DROPPED qW' A.M.F. U) r-ANT-L MR. TP.USSrS 2'-0" a ONE E SLOPING 6x12 Pii2IRAPTER 5LKl PER Lp. 2XI2,RAFTER -TRUSS MANUF. F 2x]'2 RAFTER L 2.-12�> 2xI2 RAFTER 11 lL[L 11 1� 11 i 2XI2 R. I 2xI2 RAFTER FLOOR FRAMIN& NOTES: 1. CONTRACTOR SHALL VERIFY ALL NOTES, DIMENSIONS 6 CONDITIONS f RIOR. TO 2XI2 R. 2XI2 R. at 2A2 RAFTER CONSTRUCTION. 2. ALL FLOOR JOISTS TO DE 15" DEEP, 2X4 Y41 A ci rium 02). -12 OPEN AES FLOOR TRUSSES a 24" ON CENTER Ae, �V — ILM UNLESS NOTED OTHERIAIISE (U.N.0) S. ALL BEAM5 4 HEADERS TO BE 4XIO PF#2 0 x 2XI2 R. It i V 2X12 RAFTER 2X4 KALLL5 U.N.O., AT EXTERIOR AARM INIALLS, ALL HEADERS TO BE 4XIO PF#2 W R-10 (2)&xI2 P.T.. .00 2x12 RAFTER 161D INSULATION, U.N.O. 2xI2 BARGE 130ARP� 4. PROVIDE SOLIP SLOCKINO OVER SUPPORTS. POSTS S. PROVIDE FIRE BLOCKING 0 ALL PLUMBING PENETRATIONS. 2XI2 R. LED P.T. 2XI2 RAFTER 6. NINDON HEADERS 9 V-O" ABOVE FIN15HED SUPPORT FLOOR @ MAIN FLOOR U.N.O. AINIPPA HEAVERS a T-O" ABOVE FINISHED FLOOR,* T SEE PET l2xI2 RAFTER ON SHIT AS 2XI2 RAFTER UPPER FLOOR U.N.O. 1. SEARING KALLS ARE SHAPED. 6. PLUMBING AND MEC44ANICAL FIXTURES ARE 2x12 RAKE DASHED. 6 -1. m INDICATES POINT LOA17 SUPPORTED BY (2� STUDS, U.N.O. 10. ALL NOOD IN CONTACT IAIITH CONCRETE TO 5E PRESSURE TREATED. ii. SEE SHEET Al FOR ADDITIONAL NOTES. A A8, Nr--;, 'PLAN SCALE. 1/4" = 1'-0" - NOTE: SEE 'S' SHEETS FOP LATERAL INFORMATION 4 ENGINEERING DETAILS Y 14'-0' TTP. SILL 15 / -N Phi. TO OAS Fir, POST PER FRAMING GIRADE BIG. s I -LAN, TYR G c\/ r? U) FWT E060 CONCRETE PIC, x 5.6. apao 5.a.v. v4/ S's. S.G. 26&0 Fir, DININ& LIN __��_266p Pic, w/ 2616 pic, HA Rphoop v4l:el6 FIC 0 _11,15TALL 56" IAIIPM �, ,' DIRECT VENT GAS - ----- --------- - - - -- - - --- ____rr b.-Ol. F.P. FLUE FIREPLACE: PER MANUIr sper's --j 4' V-0 2x4 KNEE 0 &REAT ROOM K`LL BELOP4 HARDIAIOOV PREP. ISLAND x POSTS PER 7- �FRMIN& FLAK TYP KITO wo...... HB.. RI&I 2 /_11N 2x6 FULL HEIGHT ]BALLOON FRAMED YLALL, -5TUP5 a 12" O.C. 2x(, STUDS 9 - 161, 041. TYP PLATE o PPR a &ARASE a 11W A.Mr, 10"xl" ATTIC ROOF JACKS (1) REOV a PEN/FPR/FOyER ROOF — PLATE @ PEN a P-l" A.M.F. __�2x12 FASCIA AD21 S —6 12 P.T. PF#2 6�01. LONG, r -ANT'L 2'-0" @ ONE END BEAM 5CHEPULE- PLAN VIEA DESCRIPTION DROPPED SEAM DESIGNATED ON FLOOR PLANS. DROPPED BEAM DESIGNATED ON FRAMING PLANS. FLUSH AND TOP FLUSH SEAM DESIGNATED ON FRAMING PLANS. UPSET SEAM DESIGNATED ON 4! TIGHT FITTING, 1-%` THICK (MIN) SOL117 CORE SELF CLOSING NOOP wl� Lu DOOR N :2-OAR < &ARA&E 4" CONCRETE 6ARA61E NO INSTALL Y2" &A '�"j NALLS 4 POST W, TYPE X, (9 CEILINGS $ SEA% 20--W ADHERED - — — — — — — - �b LIGHT1,40SHT STONE VENEER 2616 C, -M6 Pic, NOTE: L ANGLED LINE OF KALL ABV. < POSTS AS FRAMING _�jl PLAN, TYP. bx& ANGLED BRACE 20--b` 56'-0' (OVERALL) A.H. 116 j15 j14 S,-O. 2'-0" 2'-0 - PAmy� 1_5`­� 56" RANCE 4 OVEN H/' HOOD VENT V.T.O. FURNACE TE. SA5/PROPANE OR OIL W MIN. ARE OF qS% TfM: TRAIN MODEL. TLH25O&OAA36VA MAX. 57U: 41�560/HOUR 4'-:?'; ffm A NATER HEATER, ON DEMAND TANKLES5 AN 01 IN5UL. III MIN. EF 0 OAI I RINNAI MOM. RLI5lN INHOLE HOUSE FAN TIMER RNOTEL-11 KALL K/ \-DASH LIIE OF D INSUL. FURNACE/MC-5H AIR INTAKE —MIK WX24" 0 CRAPqL SPACE ""GUARD, ACCESS, INSULATE ?N CURS YEATHERSTRIP —2`G IGHT B B ALLLLOON K4LL NA CAS CLI,16. o PDR @ -I'-I" A.M.P. gsag,SpLp MR REENNUMP ,.0 1- �. �88H-s �:8-F w. 53 3105 Ln Z, U Lu 3:: Ld Z. O:R U 0 ZW4 < Z W I A ml �ZVFT r 2x& Ift-AILL HIC RE. -Ilk ll'-O" A.M.F. 5,&. 2�10 K j c I VAULTED DEN VAULTED ENTRY 2;0 �C A51 A 2'30 PIC, R r ABV. 4 :eI6 Pic SELOIAI BEAM 5060 Fir' A/ 5050 PlCo Z� ASV. ... ....... PIC 5ELOA By 50E I.—NED TROY 1/201! 2: 5,_O" FLOOR FLAN N017=5 DRAWN BY. JRA DAM 4115/1! lw CONTRACTOR SHALL VERIFY ALL NOTES, DIMENSIONS 4 CONDITIONS z Cj PROJECT MANAGER: TO CONSTRUCTION. SARAH YqEIGHT 2 N,NDOA. ', POOZq A 'r N 5HO *"r�, , : " R,�'. By: DATE NOTED AS NOMINAL SIZES. 5. EXTERIOR INALLS, TO BE 2X67 MOB o JRA PH 6/21/1! IS" O.C. U.N.O. 4. SOFFIT DOM AREAS ARE 5HAOW. 5. INDICATES POINT LOAD SUPPORTED(�, it- 5Y (2) 5TUD51 U.N.O. _j 1I.ATERA BY*, DATE MIE1 1/15/1- --SEE SHEET Al FOR ADDITIONAL NOTES. 8 -1. Z SEE SHEET A2 FOR VENTILATION A. ARM SCHEDULES. LATERAL JOB NUMBER; 5. PROVID STAIRIALAY ILLUMINATION PER IFZ 0117-l"To ]'�-1 A I N FLOOR FLAN SCALE: 1/4" = '-0" PROVIDE STAI IRKA�� N TE: SEE S' SHEETS FO ILLUMINATION PER LATERAL INFORMATION 8 ENGINEERING DETAIL5 ALL 5HONERHEAD 4 KIT FAUCETS MAX I. -IS GPM. ALL OTHER LAVATORY FAI h MAR 0 2019 AREA SUMMAR)' MAIN FLOOR; 1165 S.F. UPPER FLOOR: 1545 S.F. TOTAL HEATED AREA: 250a S.F. &ARA&E AREA; 5-13 B.F. COVERrn AfRFA- 1-15 5.r. LL 7A5 FANWI;�CLDINMILLE PLATE a UPPER 9 la' -El %" A.M.F. 1 -0` TRUSS HEEL (lq'-8 AM.F) = NAM I PLATE a BEV �M a W-L3 9/4" p A.M.F. 7 %" TRUSS HEEL (Iq'-5 1%` AMP) 6XI2 DF02 6�0" LONG, CANTL 2'-0" a ONE EN12 2XI2 5AReE E30ARD NOTE: SEE 'S' SH ETS ' E Fop LATERAL INFORMATION I$ ENGINEERING DETAILS ROOF FRAMIN& NOTES: 1. CONTRACTOR SHALL VERIFY ALL NOTE5j PIMS45ION5 4 CONDITIONS PRIOR TO CONSTRUCTION. 2. ALL BEAMS 4 HEADERS TO BE 4XIO VF*2 III KALLS U.N.O., AT EXTERIOR VAARM KALLS ALL HEADERS TO BE 4XIO D"2 VV R-10 RIGID INSULATION, U.N.O. 5. PROVIDE vewiv BLorKmi, OVER SUPPORTS. 4. BEARING KALL5 ARE SHADED. 5. AINDOIN HEADERS a W-O" ABOVE FINISHED FLOOR,* MAIN FLOOR u.m.o. INmDoyq HEADERS a -i,-o,, ABOVE FINISHED FLOOR s UPPER FLOOR U.N.O. 6. ALL TRUS,15E5� SHALL CARRY MANUFACTURERS STAMP. SHALL BE INSTALLED 4 BRACED To MANUFACTURERS SPECIFICATIONS * SHALL HAVE DESIGN DETAILS 4 DRAAIN(55 ON SITE FOR FRAMING INSPECTION. SHALL NOT BE FIELD ALTERED YiITHOUT PRIOR BUILDING DEPARTMENT APPROVAL OF ENGINEERS CALCULATIONS. . TRU55 HANGERS SHALL BE SPECIFIED BY THE TRUSS ENGINEER. ff INDICATES POINT LOAD SUPPORTED BY (2) STUDS, U.N. 0' a. INSTALL SHEAR KALL5 4/OR BLOCKING IN ROOF STRUCTURE BEFORE INSTALLING FINISH ROOMING. -1. SEE SHEET Al FOR ADDITIONAL NOTES. 10. SEE SHEET A2 FOR ROOF VENTILATION CALCULATION(S). COMPOSITION SHINGLE' , OVER I -LATE a UPPER o Ial-5 5/4" A.M.F. + I �O" TRU55 HEEL (1-1�a 5/4" AMP) /_7\ NIV 10"X-V ATTIC ROOF JACKS (1) RESI'D a VEN/PDR/FOYER ROOF LINE OF CONTINUOUS METAL OUTTER, TYR PLATE a DEN o W-I" A.M.F. /Ii %;Li OA5 W F24� 5.6. 4 OBSCURE r 8940 PIC GLASS :2'4' (EGRESS) jE CA5 TUB DECK �-z 4949 -HT MSTR BEDRM SKYLIC I GLASS- w 1 1 266& GARFFT -.� m I� :4-0�'-0" 4�-&'<N PKT. 2 -6 1 S`70 L rf 2610 PKT. ms m *NT Is m1f4pow MIN. 2211X`5011 c ATT (2)2x6 INSULATE 4 42 Ic AocES5, V) PiALL5 .2 10,11EATHERWRIP U Lu La 2x4 Lu vm M Z So46 x i: A GIL, 2XI rrp. 0 5 W BA 2 BONUS I R� < z Z:s L x Bt=Dpzm 2 er 7­—L GARFET 0. A W-O' V-15" 510" 5�1011 4-2" 2W 11 1. l� 14 .1 HALL' Z71RFET 3ARPET IT R. 111 4949 SKYLIGHT sl H/ LAM. GLASS 5( 5 GUARD 56" SUAfU� ON, CL�RBI oD OPEN 'D To —aeLopq 2W -;Q x R15E = -Ty�,, I PIC rj 0 1 21514 15 1 & 1 16 LAUN. 2614 PIC -Ill PIC .26,0 PIC (EQUAL) V-9" S,v 4 -0". (EoUAL) V-TAV 2XI2 FA501A I P.T. VP#2 C) Ds. W-O" LONG, CANTL 21-0" 0 ONE END H. TYR. a 2:12 FAVES FTER FTER FTER FTER R.AKE IfD:, A ROOF FR-t-NIN& PLAN SCALE: 1/4" = 1--0" BEAM SCHEDULE LA11 VIEH P f-LAN VIEK DESCRIPTION PpoPPED BEAM DESIGNATED 7 ON FLOOR PLANS. � - DROPPED BEAM DESIGNATED ON FRAMING PLANS. FLUSH AND TOP FLUSH BEAM' DESIGNATED ON FRAMING PLANS. T BEAM DESIGNATED ON rull.- RAMIN6 PLANS. PLATE a UP! ER o 6x12 PM 10'-0' LON&, 4'-O'o ONE 50, W-D 5/4" A.M.r. TOP o 22'-0 AMP. 12 TF 1 2 2 t�[ L 6i-e 1, 14'-0" 2--a" V-6" L 14�oll �O" 0 O.H. -H' 'PL�TE . UPPER W-6 A.M.P. �MONNO TRU55 SC MONO TRUSS y ViHOLE HOUSE 0 FAN C Nil T� VBL. BEAM SLM 9 0--BEAM-11 137 ASV. Lu C, AD r-I -I IL u _j AIL, c.. iz 0— . ........ IDESIGNED BY TROY 1/201! DRAWN BY-. DATI JRA 4/[L/I! 14'- z 13 PROJECT MANAGER: 5ARAH Ve*HT REVISED BY. DATI JRA &/21/1! NOTIEt SM'S'SHEIETS FOP MAR 0 '7/25/14 LATERAL INFORMATION Wil lwny, t i O.YO,- a�;"'Lj�;j 4 ENGINEERING DETAII 5 UFFER FLOOR FLAN �—Al_ BY: DAT r 1/1,/, SCALE, I/W;c 1'-0" FLOOR PLAN NOTES: m �j 1. CONTRACTOR SHALL VERMY ALL N LATERAL JOB NIUMBER: DIMENSIONS & CONDITIONS PRIOR Tr" Y4HOLE HO'6`5E VENTILATION: CONSTRUCTION. z VENTILATION sysTem INTEGRATED YiiTH FORCED AIR PROV Dr: 5TA I RAAY 2. P41NDOM 4 DOORS ARE SHOV4N 4 NOMD IV FURNACE INCLU17ES 24-HOUR TIMER LABELED 4 ILLUMINATION PER IF 5. :� �NOMINAL SIZES. MOUNTED TO THE FURNACE. TIMER SHALL OPERATE RSOS.IT 4 RSO5.a OR Y4ALL5 TO BE 2X& STUDS a 16" Ck Ab S-HOURS IN EVERT4-HOUR CYCLE IN ACCORDANCE — -N.O. tu 4. SOFFIT DOAN AREAS ARE SHADED. IL V41TH M150-7.5.5 ANDTABLE M150-7.5.50.5Y`15TEM ALSO ALL 5HOMRHEAD 1, KIT SUPPORTED 13 INC,LUM5 6" ROUND PUCT, MOTORIZED DAMPER AND FAUCETS MAX 1:15 GPM. S. m INDICATES POINT LOAD AALL FRESH AIR INTAKE HOOD ALL OTHER LAVATORY BY (2) STUDS, U.N.O. FAIJOETS MAX 1.0 GPM 6. SEE SHEET Al FOR A17PITIONAL NOTES 7A5 I FRovii7r=Louvr=REvDooRoRamEkonNiNrorAT SHEET A2 FOR VENTILATION AND LEAST 100 90. INCHES PER IRC, SEC. 624945 AT ALARM SCHEDULES. I FANW WO11111— 01111 PROVIDE 5TAIRAAY ILLUMINATION MR Inc. <1 LAUNDRY FOR MAKE-UP AIR. R505.11 4 R505D BEAM PM I -LAN APPLY INOOD STAIN r PRESERVATIVE To (,xI2 BEAMS, TYP. CONT. METAL GUTTER OVER 2xI2 FASCIA BOARD, TYPICAL a 2:12 EAVES —FLATE a PEN LINE OF VOYqNSF TYP. 2xr, BARGE BOARV lx2 TRIM OVER 2XI2 4040 SKYLIGHT TYF . a 5:12 GABLE BARGE BOARD, TYP. W/ LAM. GLASS ENDS It RAKES @ 2:12 GABLE ENDS 4`W SKYLIGHT --MAX- HEIGHT, HIGH RIDGE 4 RAKES 12 H/ LAM. GLASS EL. 51621 ELEV. 316.10 W SMOOTH F5-12-1 LAP, SIDING C4, TOP OF: BEAM 12 21— TPUS5 HEEL TPU55 -- - ------ ------- HEEL ------------- - - - ---------- PLATE a PLATE o UPPER UPPER B M PER N LINE OF J _7 VOIAINSpOUIT, d) Typ. 71 In -T i, ELEV. 50.2.1 VASH LINE OF SU5FLOOFZ 5UBFLoOR "Ji SUBIFLOOR SMOOTH HARDIE ANGLED DASH LINE OF CEILING I -LATE @ MAI�_ \FLATE @ MAIN BRACE PA514 LINE OF STEM Y4ALL 4 PT9. PER PLAN --- - ----- - — - — - - ---------- - ------------------------------ - ------ - - - - - - - — ------------- - - - - — - - - - - - - - -- — - ------ - -------------- - ------------------ - ------ - - - - ---- - R10HT ELEVATION 5-1ALE: 1/4" = 1'-0" REAR ELEVATION 5CALE, 1/4'' = I'-0` T ELEV. 2-115:2 MAIN FLOOR -1 -1 .1 MAIN FLOOR ERVATIVE TO POSTS 4 6X6 �ES, 7YP. ADHERED ,zz:�SHIN&LES TYPICAL CONT. METAL GUTTER 4'4* SKYLIGHT OVER 2x& FASO JA F LAM. GLASS BOARD, TYPICAL a —5,12 EAVES BEAM PER, ��W PLAN TRU55 HEEL g, PLATE a UPPER FF EAM PER 61, SMOOTH PLAN ViINDovi TRIM 2 PLATE L!L2 0 OEM m BEAM PM PLAN ----�LINE j IL or - VOIAIN5POUT, M, TYP. Li IN FLOOR ELEVATION NOTE5: 1. VERIFY SHEAR AALL KAILIN(5 ilt HOLPOIAINS PER PLAN PRIOR To FRON7 ELEVATION INSTALLING SPINS. 2. MASONRY � NOOV FRAME CHIMNEYS ARE TO BE CONSTRUCTED MR SCALE: 1/4" 1'-0" R.O. CHAPTER 10. 5. CAULK ALL EXTERIORJOINTS 4 PENETRATIONS. 4. PROVIDE APPROVED CORROSION RESISTANT FLASHING AT EXTERIOR K6LL ENVELOPE PER R1703.8 S. PROVIDE FLASHING AT ROOF PENETRATIONS PER I.R.C. RqO5.2 4 R-103.2.1 6. PROVIDE AEATHER STRIPPING AT ALL EXTEERIOR 4 SARASE-INTERIOR VOOR5. 1. PROVIDE CONTINUOUS GUTTERS 4 DOIAINSPOUTS v ALL EAVES, TYP. 5. ADDRESS OR HOUSE NUMBER TO BE POSTED AND PLAINLY VISIBLE FROM THE iTREET FRONTAGE. HUMBER5 To BE MIN. 4" HIGH AITH YY ADE STROKE 4 CONTRASTING BACKGROUND. -1. PROVIDE 57AIRKAY ILLUMINATION PER IRC R505.7 4 PBO3.0 10 . SEE COVERSHEET FOR ADDITIONAL NOTES. LEF7 ELE\/A71 ON 5C,6LE: 1/4" = 1'-0" o N .w� Z, Lu 3:: x 0 Zx F3 L2 %,D 1 U) z W :p T 0 6 N z f- P JOL DESIGNED B DAM' TROY 1111 Ols DRAWMN BY: DAM- JRA 4115/15 z (3 PROXCT MANAGER' tn SARAH )AIZI&HT 5: REVISED 8�. D - JRA 5/21/15 PH 'T/25/15 �LAIERAL BY.� 1/1 DATE-. ca MEI 5/1-71 jJ) LATERAL JOB NUMIIRZ Ok 01_1_1.10 � I A-1 LL t.,� '' I AID AR (11; �6'19 ullat Vc. =MOIIN N�IAE .9-.El N�IJEIE 1 0 c,0561 Ix2 TRIM OVER 2xI2 BARGE BOARD, TYP. a 2:12 6AELE ENDS AS 4 RAKES ----------- T20 COMPOSITION SHINGLES OVER FELT PAPER OVER CDX OR 0.5.5. SHEATHING PER PLAN, STAGGER JOINTS, TYPICAL R-4-1 INSULAT ON TYP. a FLAT L_A_N_ CEIL NGS. 15EAM FER F 2x6 STUDS v 16" O.C.. W/ 9-21 INSULATION TYP. FIN15H PER ELEVATION OVER HOUSE ARAP OVER CIDX OR O.S.B. PER STRUCT. NOTES BEAM PER PLAN 2'-0" GANT'L 4" CONCRETE OVER 6 MIL. (BLACK) VS. OVM 4" GRANULAR FILL, SLOPE 4" TO O.H. DOORS W/ BLOCKING PER FLR TRY55 MANUF. 5FI &ARA6E &ARACPE NOTE: INSTALL Y." 6.1AI.B. 0 KALLS 4 POSTS. TYPE X, &J,4B. CEILINGS 4 BEAMS. (E4ALL SEC,710N SCAL5 1/2" = 1�0" TRUSS HEEL PLATE @UPPER PLATE a MAIN MAIN FLOOR LOIA� 5 . LAB BEAM PEF 5IMP50N [X!2 TRIM OVER 2xI2 SARI BOARD, TYP. 0 2:12 6A5LE ENDS $ RAKES NTR J El —4:: CONCRETE C I" �'4 GRANULAR F COMPOSITION SHINGLES OVER FELT PAPER OVER rZ).X. OR O.S.B. SHEATHING PER STRUCTURAL, STAGGER JOINT$, TYPICAL _14N 4949 SKYLIGHT v4/ LAM. GLASS Al' I I re i lx2 TRIM OVER 2xI2 t24 - ------- BARGE BOARD, TYP. 1--R-44 (k-G AS 0 2:12 GABLE ENDS TRUSS, HEEL WNT �WAL GVM' 4 RAKES OVER 2xb FAWIA NOTE. BOARD PLATE a UPPER I � . _,,l �AT 2; 12 ROOF ..... ..... iTcHes, APPLY ion 2x& STUDS o 16" O'C. N1 R-21 4 NATER SHIEL12 -------- UNDr INSULATION TYP. SRLAINT -IN15H PER 12 RAFTERS r �:)NU 5TAIRNELL ELEVATION OVER 0 24" O.C. HOUSE ARAP OVER clD.X OR . 6 , " —7T, I L 0.5.B. PER FEFEE, L WARD te OF i, INsUcATION TYP. 9TRuCT. NOTES RAIL. OVERIa-vemp, 5UBFLOOR —2. OYN� CEILINGS 4T TRUSWS RAFTER PLATE a MAIN JL Sim. A r NJ IL PER— @j ENTRY A FI Kllrl N PANEL . T G. T. PLYP4001, r 2XIO HWF #2 F.J. p . ... .. ... ' 7 ...wl R-55 INSULATION MAIN FLOOR FLOOR 4' NCAM OVER 6 MIL i ORAAL AM5 ;-0R5T-"-,r i 4- &RARLAR FILL i i i VB. C-OMP051TION SHINGLES OVER FELT PAPER OVER CIDX OR O.SZ. PER STRUCTURAL ' STAGGER JOINTS, TYPICAL R-55 INSULATION TYP a VAULTED CEILINGS ,2xl2 RAPTERS 0 24" O.C. H=. AT 2; 12 ROOF PITCHES, APPLY ICE 4 HATER SHIELD UNDERLAYMENT E DEN --- --- ------- CONT. t-ETAL G L 2X& STUDS a 16" SVrTER OVER 2X12 O.C. V41 R-21 FAWIA 50AF47 LATO 1117]INSU6LATION TYFI FINISH PER J ELEVATION B/WT-46- OVER HOUSE PLYV400P OVER ARAP OVER 2xIO HF 02 F,.l. V41 CDX OR -P-, 511 INSULATION o S.B. PER ili5I�T. NOTES & MIL. (BLACK) V.S. 5UILDINO SEr,,TION 1\� SCALE: 1/4" 1'-0" BUILDIN. SCALE: 1/4" = 1'-0" 4P4' SKYLIGHT �-2xb BARGE BOARD, 41 LAM. GLASS � . q.11 ARI F \ — A 61,1,�,!�s BY y -A COMP051TION 5HI w" 6w NSLE5 OVER FELT lx2 TRIM OVER 2A2 PAPER OVER 0DX. BARGE BOARD, TYP. OR 0.5.5. 5HEATHIN6 Z, U Lu 3:: LL.j 4M R'j u < z X z I 2;12 &ABLE ENDS PER STMTKAL, him�L11;­­ 1 to RAKES STAGGERJOINTS, �Ar2AMJWOO U) TYPICAL PITCHE5,AF!!LYlCE tqc— MOS 4 RAKES 12 4 AATER SHIELD Sim. UNDERLAYMENT ATTIC. :TRUSS HEEL .............. PLATE o UFTF �pl PLATE a UPPER FINISH PER R I - 4q LAT ON TYP ... .... ELEVATION OVER HOUSE ARAP OVER VA5k LI 12 LAUN'. 0-PLAT CEILINS 4, bwP641 5 COW. �STAL W7ER OVM2xl2FWIA Z, CDX OR % or Poor V BOARD 0.52. PER S TRUCT. NOTES TAG. PLYHOOD OVIS , 18 mP " DEEP 2x4 --2x6 STUDS a I(v or K/ R-21 INE OF C, L LNG OPEN lAIE5 FLR. TMSE- IAV R-56 INSULATION NiijLATION 7YP. SUBFLOOR L I -LATE =a MAIN \,-GIRDER FLO OR ;.)y &JALB. RAIL &ARA&F.l; JJ ,/4" T PLYNOOD 'OVER 2XIO HF #2 FJ. N1 R—W INSULATION 6AMCS� N7-,. Lj KALL5 4 POSTS. VTYPE I GAB. @ MAIN FLOOR - -------- EILINS5 $ BEAMS. MAIN FLOOR LON SLAB ORA10I 41 i 4" CONCRETE O`VISR MIL.. SLOPE 4" TO O.H. bOORS r_-,\5ULE�1NO SEC,710N AS WAR 0 5 ZW 00 1 < Z < z DESIGNED ft. DATE: �y 1/2011 DRAM BY: DATE- JRA 4/15/15 PROJECT AMAGM SARAH IAeI(9HT REMSED BY. DATE- JRA 5/21/15 z BY, DATE-. �LATERAL MI /I 1 SIM LATERAL OB N ol,L,.,�MBER: z 2 AA STRUC,'TURAL NOTES (MITCHELL EN&NEERIN&) CODE PE51(9N is IN ACCORDANCE AITH THE 2015 INTERNATIONAL 5UILDIN& CODE (1.5.0) AS AMENDED BY THE LOCAL BUILDIN& PEPARTMENT. LIVE L ROOF ----------------- 25 PSF FLOOR -- - --------- - - 40 par LATERAL V41ND ------------------------ EXPOSURE B; W MP14 / 110 MPH (ULT) SEISMIC --- - -------- - ------- 51TE CLASS D FOUNDATIONS EXTEND poOTINSS To FIRM UNDISTURBED SOL, ASSUMED 5EARIN55 CAPACITY OF 1500 PSF- ALL EXTERIOR FOOTIN&S SHALL EXTEND A MINIMUM OF 1�&" BELOA ADJACENT EXTERIOR FIN15HED (WRADE. CAST-IN-FLAOrz CONCRETE Pa = 2,500 PSI a 28, DAYS. MINIMUM 5-1/2 BACKE, OF CEMENT PER CUBIC, YARD OF CONCRETE AND A MAXIMUM OF 6-5/4 GALLONS OF AATER PEP, 144# SACK OF CEMENT. NO SPECIAL INSPECTION REWIRED. MAXIMUM SIZED ASSREOATE5 19 1-1/2 INCHES. MAXIMUM SLUMP 15 4 INCHES. ALL PHASES OF NORK PERTAININS TO THE CONCRETE CONSTRL�--TION SHALL CONFORM TO 5UILDIN& COVE REGUIREMENT5 FOR REINFORCED CONCRETE. ALL REINFORCINS STEEL, DOAELS, ANCHOR BOLTS, AND OTHER INSERTS SHALL BE SECURED IN P051TION PRIOR TO FOURIN& CONCRETE. ANCHOR BOLTS FOR PRESSURE TREATED SILL PLATES To FOUNDATION NALLS To BE 516 INCH DIAMETER AITH I INCH MINIMUM EMBEDMENT INTO CONCRETE AND MAXIMUM 5FACIN(5 or 2 FEET ON CENTER. MINIMUM 2 BOLTS PER SILL PLATE PIECE. ONE BOLT TO BE PLACED V41THIN & INCHES OF EACH END OF THE SILL PLATE. PIPPED (qALVANIzEP CONNECTORS SHALL CONFORM To ASTM STANDARD 153 AND HOT PIPPED cALVANIZED coNNECTOR5 $HALL CONFORM To ASTM A655M CLA59 0-165. SIMPSON PRODUCT FINISHES CORRE5PONDIN6 TO THESE REOUIREMENTS ARE ZMAX (HOT DIPPED &ALVAINZW (6185), STAINLE59 STEEL. fPEINF0Rjr,IN9 STEEL ALL REINFOMCIN& STEEL SHALL BE PLACED IN CONFORMANCE Y41TH THE BUILDINS, COPE RIS2UIREMENTS FOR REINFORCED CONCRETE AND THE MANUAL OF STANDARD PRACTICE FOR REINFORCED CONCRETE CONSTRUCTION BY CRSI. DEFORM07 REINFORCAN& STEEL BARS SHALL CONFORM To ASTM A-615 (9RADE 40 FOR ft AND SMALLER REINFORCEMENT AND (SPADE 60 FOR #6 AND LA"ER. ALL REINFORCIN& BAR BENDS SHALL BE MADE COLD AITH A MINIMUM RADIUS Or 6 BAR DIAMETERS W-l" MINIMUM). CORNER EARS (2'-0'- BEND) SHALL BE PROVIDED FOR ALL HORIZONTAL REINFORCIFMENT. LAP ALL EARS A MINIMUM OF 48 BAR DIAMETERS UNLESS NOTED OTHEIRAISE. UNLESS NOTED OTHERAISE ON THE DRANI"S REINFORI-INS 57MEL SHALL HAVE THE FOLLOAIN& MINIMUM COVER, CONCRETE CAST ArAINST EART44 9 INC+ES CONCRETE EXPOSED TO EARTH OR AEATHER: #6 THROU&H #16 BARS 2 INCHES #5 BAR AND SMALLER 1-1/2 INCHES STRUICVRAL STEEL STRUCTURAL 57EM SHALL CONFORM To ASTM A-56, fy=56,000 P51. ALL AELDINS SHALL BE IN CONFORMANCE P41TH ASr-1 AND AWS STANDARDS AND SHALL BE FEIPPORt"IED By AAW CERTIFIED AELDERS. STEEL TU5IN& SHALL CONFORM TO ASTM ABOO fg=50,000 PV. 97RU0M)RAl- TI ALL LUMBER SHALL CONFORM TO ANPA (SRADIN& RULES FOR AESTERN LUMBER, LATEST EDITION. PROVIDE CUT AA51-ERZ UNDER ALL NUTS AND BOLTS BEARINS A(5AINST MOD. ALL NOOD IN CONTACT AITH CONCRETE SHALL BE PRESSLIRE TREATED. ALL STRUCTURAL LUMBER SHALL BE AS NOTE17 BELON, 2X FLOOR JOISTS HEM -FIR #2 - - -------------- - -- flo 650 PSI 2X ROOF RAFTERS HEM -FIR #2 ---- - --------------- Fb 850 P91 4X BEAMS POUS-FIR,1LAI;VH #2 - - --- - ---- Fb 590 PSI 6X BEAMS DOUC,-FIPI-AF;VH #2 -------- - -- Fb 550 P51 LUMBER NOT NOTED HEM -FIR #2 ---- - --------------- r-b 850 PSI MISCELLANEOUS HAWERS To BE SIMPSON OR APPROVED EGUAL. ALL HAN&ERS 514ALL BE FASTENED To AOOP NITH PROPER NAILS. ALL HOLES SHALL BE RAILED. MACHINE BOLTS To BE A -Sol. ANCHOR BOLTS INTO CONCRETE SHALL BE 5/8, INCH DIAMETER AITH I INCHES OF EMBEDMENT INTO CONCPZM UNLESS NOTED OTHERoNISE ON THE PLANS. ALL NAIL5 SHALL BE COMMON AIRE NAILS. NAILIN& SHALL BE IN ACCORDANCE AITH THE CURRENT 1.5-C. SCHEDULE. 5TRUOTURAL LAMINA-TED LJ)MMR (GRA17E 2 0) Fb = :2f,00 PSI E = :2,000,000 F51 Fv = 2ar, PSI FLOOR SHEATHI SHEATHIN6 SHALL BE 5/4 INCH TONGUE 4 GROOVE, A.P.A. RATED 5141EATHINS, SPAN RATINS 46/24 V41TH LON& DIMENSION PERPENDICULAR TO SUPPORTS. UNLESS NOTED OTHERIAIISE "L INITH ad COMMON NAILS AT & INCHES ON CENTER AT SUPPORTED PANEL ED&E-5 4 10 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. HAI-L e4-E-ATHINry SHEA114ING SHALL BEWIWAFA. RATED SHEATHIN& SPANRATING24/0. PANFLENDJOINT55RALLOC-CAR AT SUPPORTS. NAIL PANEL ED&E5 Y41TH ad NAILS AT 6 INCHES ON CENTER AND 10 INCHES ON CENTER AT INTERMEDIATE SUPPORTS UNLE55 NOTED OTHERA15E ON THE DRAININGS. 61-U-LAMINATrED TIMBr:R LAMINATED TIMBER SHALL BE VOUiSLAS-FIR/LARCH KILN PRYED. STRESS &FACE COMBINATION OF 24r-V4 FOR SIMPLE SPANS AND 24F-V5 FOR CANTILEVER AND CONTINUOUS BEAMS. ROOF S+C-ATHIN& 5HEATHIN& SKNLL BE 5/8' A.P.A. RATED 5HEATHINS. SPAN RATINS 52/16, INSTALLED AITH LON& DIMEN51ON ACROSS SUPPORTS PANEL END JOINTS SHALL OCCUR AT SUPPORTS. MAIL PANEL EPSE5 AITH ad NAILS AT 4 iNCHM ON CENTER AND 10 INCHES ON CENTER AT INTERMEDIATE surpoRT5. PLOOR FRAMINC, PROVIDE FULL DEPTH BLOCKINr, FOR JOIST AT THE SUPPORTS. FLUSH BEAMS (F5) AND HEADERS NOT CALLED OUT ON THE PLANS SHALL BE (2) 2X&. ALL VERTICALLY LAMINATED COLUMNS AND HEADERS SHALL BE SPIKED T06eTHER P41TH Cld RAILS SPACED AT a INCHES ON CENTER. MAKIN& KALL FRAMINS ALL POOR AND AINDOA HEADERS NOT CALLED OUT ON THE PLANS SHALL BE (2) 2X6 HEM -FIR #2 V41TH ONE CRIPPLE AND ONE STUD AT EACH END FOR OPENINSE, 4 FEET AIDE OR LE55. ALL COLUMNS NOT CALLED OUT ON THE PLANS SHALL BE (2) 5TUD5 SPIKE12 TOOETHER P41TH 12d NAILS AT 12 INCHES ON CENTER. PROVIDE 2 LAYERS OF BUIL121NO PAPER 5ETMEN NOOD AND CONCRETE. AALLS SHALL HAVE A SIN&LE BOTTOM PLATE AND A E70UBLE TOP PLATE. EN12 NAIL TOP PLATES AND BOTTOM PLATES TO EACH STUD AITH 2-Ibd RAILS. FACE NAIL DOUBLE Top PLATE AiTH lbd NAILS AT 10 INCHES ON CENTER. LAP AND PACE MAIL PLATES AITH 2-16d NAILS AT EACH SPLICE, CORNER INTERSECTION. 5TA&SER SPLICES A MINIMUM OF 45 INCHES. ROOF Tipus TRUSSr5 SHALL ISE PLANT FABRICATED OF POUr.LAS-FIR/LARl-H OR HEM -FIR. TRUSS MANUFACTURER SHALL SUBMIT SHOP PRAAIN&S AND CALCULATIONS STAMPED, 516NEP AND DATED BY A KA5HINSTON STATE LICENSED STRUCTURAL ENSINEER. SUBMIT TRUSS DRAIAIINs, TO ENSINEER OF RECORD AND EUILDINS DEPARTMENT FOR REVIEN AND APPROVAL PRIOR TO FABRICATION. ROOF TRUSSES SHALL BE PES16NEP AS ATTIC TRUSSES NITHOUT 5TORA&E. REV. T REV. /---�FOIJNVATION MALLS 4 HARViNARE) Q'/l-;z--17W = �P-w P.T. 5xb W %" dia. x 12" ANCHOR BOLTS @ 24" ar- W (5ALVANIZED 3"0'94" PLATE AA514ER. MERE J51'5. ARE HUNG FROM MLV-SILL, USE P.T. 5x RIPPED To STEM KALL AIDTH W COUNTERSUNK Wdlo. A2" ANCHOR BOLTS @ 24" O.C. N/ 5"x5"vV4" PLATE KASHER AT ORIP 0: ANCHOR BOLTS PER DETAIL 11/52 REV. r4') T SHEAR NALL SCHEDULE NAIL SPACINS TOPABOTTO SHEAR ViALL NAIL HEM -FIR #2 DESISHATION SIZE EDSIES STUDS PLATE I BLOCKINS REWIRED */T-'T. PI-6 ad YES 210 FI-4 ad 4" 121, 4" YES 510 PI-S ad E.. 121, 51, YES 400 PI-2 ad 2.1 12.. 21, YES 525 F2-3 ad 5. 12" 5.1 YE5 600 P2-2 ad '.. W, YES 1050 —12" SHEAR AALL NOTES: 1. FI- % A.P.A. RATED PLYNOOD OR. ORIENTATE12 STRAND BOARD (0.5.5) ON ONE SIDE OF NALL. F2- 1(6 A.P.A. RATED PLYNOOP OR ORIENTATED STRAND BOARD (0.513) ON EACH 5112E OF NALL. 2. FOR pi-E, PI-2,1-2-5 4 F2-2 SHEAR NALLS, USE 5. STUDS AT ADJOININS PANEL EDOE5. RA SHALL BE 5TAOGEREP. MAILIN& 5. LE, SHALL M ad COMMON (0.151" DIAMETER). 4. AHERE PLYNOOD 15 INSTALLED ON BOTH SIDES OF AALL, PLYINOOD JOINT5 SHALL FALL ON SEPARATE STUDS, EACH SIDE. 5. ALL PANEL WrSEE, BLOCKED NITH 2-INCH NOMINAL FRAMINS FOR Fll-b 4 PI-4 SHEAR AALLS. ALL PANELS 13ACKED Y41TH Ox FRAMING, AT 1-1-5, PI-2, P2-5 AND P2-2 SHEAR KALLS. INSTALL PANELS EITHER HORIZONTALLY OR VERTICALLY. SPACE NAILS s 10 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. 6. ALL ANCHOR BOLTS SHALL BE INSTALLED AITH HOT PIPPED &ALVANIZEP PLATE NASHERS. 'I. REFER TO FOUNDATION PLAN FOP ANCHOR BOLT SIZE, SPAOIN55 AND MUP5ULL/mM CONNECTIONS. LATERAL RESTRAINT HARDINARE '*MITC.HELL EN61NEERiNI55* SYMBOL HOLPOAN TYPE SIMPSON STHD14. INSTALL 1-1/2" FROM CORNERS OR ROUC-H OPENIN&S, USE (30) lad NAILS. SIMP50N HDU5. INSTALL PER 12ETAIL 12/52, 19)52 OR 15A/92 SIMP50N MST'12. INSTALL PER PETAIL 14/52 SIM. DETAIL AS sHom ON ARcHiTISmiRAL cAo PLAN SHEETS Sim. ENSINMERIN6 DETAIL AS SHOAN ON 97RWTLRAL C59 SHEErS - - - - - INPICATES SHEAR NALL 5 52 QMAIN FLOOR SC �IN /-�UFFER FLOOR - FRAMIN6 4 PETAIL5 LL5 U. RO ROOF FRAMINO 4 PETAILS 7- Dk Lu u- 0 5 2JA 92"i WD U". U., 49 ..a �.z U Lu In Lw d5. Z z Oki r U ce 2 co ET, W Ind 0 Z < Z 0 N �b i z lu DRAM Br. DATE, JRA 4/15/1 PROJECT MANAGER: 5ARAH Ml(5HT REMSED Br. DATE-. JRA 6/21/15 PH m_— LATERAL BY. DATE: ME1 1/1 9/111 LATERA JOB NUMBER: 011-170 51 / 52 ANW WDODINMLLE OFFICE JOBNUMBERt 160561 NOTE: DETAIL SHOAN ON PLAN 5HEET AS 5�FNND�." 10 �IA'&E AALL NOTE; DETAIL SHOIAIN ON PLAN SHEET AS F NN D YA, 'A' I LL LL :05 2 1�06T51-ARNLLEL NOTE: VETAIL 5HOAN ON PLAN SHEET AS e;�&' FND. AALL 1'-0" JOI�,TS FTERFENDICULAR NOTE: DETAIL SHOAN ON PLAN SHEET AS THICKENED 5LA5 @ O.H. DOOR NOTE: DETAIL 5HOVIN ON PLAN SHEET AS FNI:;>. INALL a HOUSE/&ARA&E 51-11LE: I" m 11-01, J015T5 PARALLEL NOTE: DETAIL 5HOJAIN ON PLAN SHEET A5 FND. AALL HOU5E/6ARA&E 10 4,vw L 7 `vv HOLr;)OAN t;'ETAIL r 7 �5;5,-A 2A Ad-4 /UUUA71,�) HOLDOAN DETAIL A WALE, 1" 1'-0" T.$(9. FLYNOOD SUBFLOOR PER PLAN, 6LUIEP 4 NAIL ED7 111" I1EEPl2x4 OPEN 111EB !J FLIR. TRU55E5 PEP. PLA] So all O.C. c:l c 3 III NAILS BLOCK PEP. r . TRU55 PER BLOCK -LR V I MANUF. DES16N BLOCK A I FOP 400# FORCE IN THE PLANE OF THE r SHEAR YiALL M BLOCK PLAN 4 SCHEDULE OR HEADER --v/1- LATERAL DETAIL WALE, I" EXTEND HEADER -7 DOUBLE TOP PLATE TO END Or IAIALL F * - - ----------- KALL p OMITTED (5) ROvL1- ad a S" O.C. ad o 5,, oz. To STUDS, PLATES, < - 4 BLOCKIN9 ----- VL— A 5x STUDS 4 5LOCKIN6 SHEAR NALL PER I -LAN 4 50HEDULIE SIMPSON STHD14 HOLDOJAIN tAil (5S) ad 5INKER5 P.T. 5xb W (2) 5/4" dia. 12" ANCHOR 5OLT5 V41 SALVANIZED 5"x5'Wv4`FLATIE JAIA5HER x .A� A REV. - (5) #4 BARS - VERTICAL W 4.. HOOK 4 o FOOTINS SLAB 4 ON SRADE - 4 . A= 4., 4 ad a 3" O.C. TO EACH TOP 12L��=e . . . . . . . . (a) ROY4E ad a 51, O.C. A TOP PLATE 2x STUDS FIER PLAN 5HEAP KALL PER PLAN 4 SCHEDULE P.T. 5x RIPPED EXTEND HEADER TO all K/ SIMPSON TO END OF KALL W, Clio. x a)v, (5) #4 EARS STPONS BOLT (9 VERTICAL W 4" acl @ 311 O.C. TO STUDS a 12" O.C. 0-0- a PoOTIN& PLATES, 4 BLOCKINS w/ &ALV. 5"x55vv4' �-HOOK PLATE ViA5HER 5x STUDS t BLOCKING #4 BAR5 e lo" SHEAR 104ALL PER SHEAR ViALL -J7� I LAN 4 SCHEDULE PER PLAN a O.C. HORIZONTAL SIMPSON STHD14 _L SCHEDULE 'LAN PER PLAN HOLDOJAIN w/ (50) acI 5INKER5 2x STUDS PER PLAN SHEAR PqALL PER PLAN 4 SCHEDULE PEP, PLAN LATERAL DETAIL LATERAL DETAIL P.T. 5x(o Y4/ (2) W do. x 12" ANC,HOP BOLTS W &ALVANIZED 5"x5"xV4" PLATE YqASHER -LL jj-= 9 . al - in 4'. AB ON 4 L &RAPE 71 .4. (5) #4 EARS VERTI AL W 411 HOOK a FOOTIN& 4 < N</ �Z\,< N, \�//\\ /�O/no/ z 0/ #4 5ARS a loll #4 BARS a loll O.C. HORIZONTAL O.C. HORIZONTAL L �ATI Er- R A LL R �E51 IT R"A �INN IT IF �AN E LL� L A T E- R A L R I = 5 T R A I N T f I A N E L r = V-0-�� DOUBLE STUD & HOLDONN PL'T`Y40OD 51.15PLOOR FER FL N, 9LUED 4 NAILED SIMI-SON MST HOLVOIAIN PER SHEAR m LF PLAN N1 ALL HOLES FILLED 1. 1 =EDUILE v41 [ad COMMON NAILS 16d C.C. CENTERLINE 1114" L.S.L. RIM - OR RIM PER FLOOR TRUSS SUPPLIER laid TOE-NAILS- c", O.C. z". DEEP, 2x4 SHEAR 104ALL OPEN I^E5 SHEAR ViALL PER W" PER I -LAN 4 FLR TRUSSES PLAN 4 SCHEDULE 50HEDULE PER' PLAN OR HEADER Q, —Z;oU5LIE STUD 9 HOLDOIAIN 116" DEEP, 2x4 OPEN YeB 2 MR. TRJ)sSES 117. PER PLAN — AT SIM. DETAIL ADD A55 (9) b" O.C. sw&4 X22 15;-/4xt, 'wj hlb -)5" INTERIOR 5TEM YiALL HOLPONN DETAIL SCALE: I" = 1'-0" @ 5'-ALE; I" = 1'-0" T.46- PLYIAlOOV 5UBFLOOR PER PLAN, SLUED $ NAILED --7 SHEAR HALL PEP, PLAN 4 SCHEDULE Ibd 0 (01, O.C. — 11,4" L.S.L. RIM OR RIM PER FLOOR TRUSS SUPPLIER I&cl TOE-NAIL5 a 6" 0.0. SHEAR INALL PE PLAN 4 SCHED1. OR HEADER H D 0 1 N N DE IT A 11 1� LATERAL DETAIL LATERAL DETAIL I L I"'-- �OL _�N 50ALE: 1" 1'-0" T.$&. PLY161000 5U5FLOOR MR PLAN, &LUED 4 NAILED lad a 41 o.c. 12 1jeu p4g, SHEAR NALL PER 15" DEEP, 2!x4L A,, A, PLAN 4 SCHEDULE OPEN INES FLR.TRUSSES Z LTP4 HORIZ PER PLAN @ 12" 0.0. 114" L.V.L. izzz- BLOCK STAIR OMITTED FOR CLARITY SIMP50N A55 A3ra 5HEAR KALL PER a 12" 0.0, PLAN 4 SCHEDULE OR HEADER PLYHOOD INSTALLED CAN BE ON EITHER FACE OF THE KALL C�r LATERAL DETAIL LATERAL DETAIL /—,,LATERAL DETAIL SCALE, I" = 1--o" 200 SCALE: I" = 1'-0" SCALE, I" - 1'-0" P.T. 2xb vi/ SIMPSONv,211 dio, x 5 YY STRON(S BOLT a 12" O.C. v41 GALV. 5"x5"xY4" PLATE VNIASHER (4) MIN. (5) #4 EARS �j VERTICAL W 4" 1 11 HOOK @ FOOTIN6 14 #4 13ARS a 10.1 O.C. HORIZONTAL 'I J A*-7 t7j'e'.0" SHEAR KALL PER 15" DEEP, 2x4 PLAN il: SCHEDULE OPEN JAIEB FLR. TRUSSES R PLAN Ibd 0 4" 56 a all e ,� e D e, 1110,0E00a -.0001 V) V) Lu L6 LLJ 06 Z. 0.1 z Z� Z,6 ly (5)lbcl TOE-NAIL5 \ fl "\-5lMp�50 A55 2: PER BLOCK V I @ 12" O.C. C, SHEAR KALL PER __.s PLAN 4 5CHE ULE OR HEA12ER ....... L, 6. g�E N� sp A.wilimwi� �m LATERAL D 1-7 SCALE. 1'-0" tA z NOTE: DETAIL ........ SHOIAIN] L= NSHEETAS JDESIG�E— DA TROIr I/2QI5 DRAM Br. DATE: D COLIN& a EAVE JRA 4/15/15 :21 PROJECTMA AGER: REMSED BY. DATE: JRA 6/21/15 PH '7425/15 NOTF: DETAIL SHOIIN 0' 'T VE S IL'f [N�NIPLAN SHFE�T A3:1 -.11 LATERAL B1. DATE' ME (5ABLE END DETAIL =1 1/15/1-7 LATERAL 409 NU WALE: I" = 1'-0" 2077 1 -ITO z IL NOTE: DETAIL SHOIAIN (73 ON PLAN SHEET A5 3 2 MAN, li- 1`3 AW WOOIMLLE 0 FLAT CEILIN(5 @ EAVE JOB NUMBERI�CE 160561 -L- L I'- r 2 4: