Loading...
ENG2023-0427 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds - N, Edmonds WA 98020 ENG2023-0427 www.edmondswa.govi Description: ZIPLY - OVERLASH CONNECTION ACROSS 76TH AVE ISSUED: 09/20/2023 Address: 20632 76TH AVE W 1 EDMONDS WA 98026-6812 EXPIRES: 03/20/2024 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00784600000100 i NAME TYPE NAME ADDRESS PHONE APPLICANT RICHARD KNOWLES 1800 41ST ST N-100, EVERETT WA 98203 (951)264-8824 CONTACT ZIPLY FIBER 1800 41ST ST N-100, EVERETT WA 98203 (951)264-8824 CONTRACTOR STARTAK FIBER, LLC 4401 S TECHNOLOGY DR, SUITE 3, SIOUX FALLS SD 57106- (717)371-3001 4249 OWNER MARK E ZIELKE j PO BOX 3384, LYNNWOOD WA 98046-3384 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $252.00 $252.00 RIGHT-OF-WAY PERMIT - MINOR $126.00 $126.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 09/20/2023 Printed: Wednesday, September 20, 2023 1:21:05 PM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NU �!B E City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE X-2 ENGINEERING FINAL A-1 JOB START E-7 TRAFFIC CTRL Printed: Wednesday, September 20, 2023 1:21:05 PM 2 of 2 RECEIVED RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. Sep 12 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General• Project Name 5515542 - 20632 76TH AVE. W Site Address or if no site address use Property Address at NW corner of project area: Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company ZIPLY FIBER Franchise Ordinance No: Point of Contact RICHARD KNOWLES Title PROGRAM MANAGER Address 1800, 41 st St, N-100 City EVERETT State WA Zip 98203 Phone 951-264-8824 Email RICHARD.KNOWLES@ZIPLY.COM ffelffiffig owl • • -• • • Name of Company StarTAK Fiber, LLC • • • • • • 1 _ • • Primary Name Chris Tyson Agent Name Chris Tyson Title Construction Manager Title Construction Manager Mobile (717) 371-3001 Address 4401 S Technology Dr. Email ctyson@teamstarlink.com City Sioux Falls State SD Zip Secondary Name Phone (717) 371-3001 Title Email forms@takcommunications.com Mobile City of Edmonds Business License No: Email State License No: STARTFL790QE ® Contractor verifies it is currently bonded ® Contractor verifies it currently has general liability insurance NUTS: I CDC 18.60.020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) X Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) The proposed re -enforcement will over -lashed to an existing aerial crossing that consists of a single 6 pair fiber tail that will service as the primary cable to allow Day One turn up will provide enhanced Voice, Video, and Data services to the residences of the Hampton Place Condominiums at 20632 76th Ave W. The residences at this location are cur- rently served only by Ziply's copper -based network which does not support high speed services. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 2 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: X telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of • to be Completed 1. 1 Does the utility owner have existin overhead infrastructure in the area of work? Yes X No 2. 1 Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? X Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 1 1 How many are to be added? 1 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? 2 What is the height of the existing poles? 35' How many poles are to be removed? NONE Are additional poles to be laced? NONE How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit ao -,, AA „Ooo'1 APPLICANT SIGNATURE: 8-21-23 APPLICANT PRINTED NAME: RICHARD KNOWLES APPLICANT TITLE: PROGRAM MANAGER NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 ENGINEERING DIVISION APPROVED AS NOTED 61 33S 3bO 'ONdl NZZ dHSNM1 9 d0 C JMa 30919131a1SIOXtl1 V/N'31VOS 9MOZD99199 31 HSIWOHONS d1N3 OZObUMZb 3N0HdJ SNI11003AVC KN3 7UMV60 31VONM E SONONE Z6 MOO d OX3 Ztgg 655 ,3Sf02ld 9ZO96 VM `SONOWa3 `M 3M' H19L Z£90Z 0Z MIN d8 XX`dMN7H ldiz � I �#and O �IlkiNl�.OIXSXI sa�gsa -6Ip noel aao;aq lied 011 1 N011111/� 8 olaq mew mourn z '1NIVA XXX'XXb9 ❑ 213dd00 on wvzzbz ❑ IVAOW321 XXX'XXb£ ❑ 2d3913 HO 60Z' IZt7Z 191 iin4N00 100'1bbZ ❑ 213dd00 HO l0l'lZt7Z ❑ b39I3 on loz*zzbz ❑ S3lOd S3000iNn000v JNIISIX3 01 b3913 b]DUNObd ❑ ❑ lid 9 HSYTHDn0 I AlvO ❑ ❑ 2J3MOd M ❑ ❑ W02d3 Ol a3NMO Ndf Ndf 3lOd aajin0321 Ndf ON ❑ 1#and ki n00HSIWOHONS L 1 XXVM)411- #SNnfN/Ndf 310d 1N10f (iEianoEiH ilMEld ON ❑ (iDNNVl9 lON) 431IV134 0I3dVHi/d01 0 1 iEINNVlS ❑ SONONO3 30.11I0 :.11llVd10lNnW S11Wb3d �JOlOV�J1N00 ❑ JNIHSn2d8 ❑ JNIJJdId ® 11 and.INnOOHS+WOHON£ ISLI VMJ111F Nouon2USN00 is 2J3H10 39v"va ❑ 31Va 301A2J3S NI OV10 [I 13N2131-113 ❑ 12JV1S NOI10f12d1SNO0 2J3nRJa 'O'M S3,1 :a3?J1nD32J 302i SDA :i1MJ3d 3Sn 1NIOf VAA SONOWa3 =10 A110 SE]KiIW213d dOl'8 AAMA L £ XXVMN1-1H HW ONAIX3 U I18E HSV-NEIAO SdONO dSO £ SiNn o� e 9a-19 SdOUa dSO £ SiNnoi ,.Cn9 O Q 19 and .11NnOO HSIWOHONS LM XXVM1111H HH 9£X9£X9£ XXVM>il l H HH 9NIISIX3 — — 09/19/2 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. a3AI333U 96 XXVMNIIH 310d NO NOUVOO-11 3011dS Ol NOV13 11VI 1`dNIW2131.Z9 30`dld SIM a - 8 Dais SIM a - v Jaffa :S3SS321a(3`d ONIA213S Wax +996-696`6009H XXVMM-l-lH:NI .o0 6 US) 60Z' 6Zvz ZO£80 4 V1=1 01d63 1 IVNIWN311SW Id 9 M3N 96-LS`aX +06£-6K t-009H XXVM>i11H +9LVII, 6009H XXVM)1-1-lH .86Z 9819t,V03 d1360 E1719VO 2J3813 86 ONIISIX3 �j Z6 V 011,'d 4009H d1360:1f10 80VU011,0d XXVM)1-1-lH:NI :M3111-1dS Z£XII, (0 M3N 09V6W31009H d1360:1f10 L0-V`Z£0603 XXVM>111H:NI 8Z[-L6`a1009H d1360:1f10 90-V`Z£0603 XXVM>411H:NI 96-99`01009H d1360:1f10 90-V`Z£0603 XXVM>411H:NI -V9-££`8[009H d1360:1f10 t,0VZ£0603 XXVM>111H:NI Z£-CV[009H d1::160:1f10 £0VZ£0603 XXVM>I11H:NI :S2131111dS ONIISIX3 Z£-V-I,'[009H d1::160:1f10 8v-n,aX 96V-£0-V`Z£0603 XXVM>i1]H:N1 SCHEDULE ALL I I PEOTRO :S �f — W09H d1360 UGH 1 S11W2Eld AERIAL FIBER PLACEMENT 76TH AVE. W. & 208TH ST. SW. W Q 2 co EM END ROAD WORK WORK W20-1 ENGINEERING DIVISION APPROVED AS NOTED ddl tV1,-zjj:,44z 09/19/2023 vv 1 rf1r!KIr11. = WORK AREA • = TRAFFIC CONE = HIGH LEVEL WARNING DEVICE = PORTABLE SIGN = EXISTING SIGN H = TYPE III BARRICADE H = TYPE III BARRICADE WITH SIGN = FLASHING ARROW BOARD .{. 11 = FLAGMAN 250' 208TH ST. SW. (PRIVATE ROAD) TOSTOPD) 114 12'II 11, W20-7 W3-4 END ROADWORK IIU G20-2 208TH ���NNNN ST 30 SW. SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP FLAGGER TO ASSIST VEHICLES THROUGH THE WORK AREA. BE PREPARED 20632 76TH AVE. W. I TO STOP rT.A.N.S.A.T.j W -4 W 0-7 �^42 ^1 BUFFER ^250' 250' i POLE # GC 289 SIDEWALK 5 o- mg 11'CERTIFIEDF 11' FLAGGER — — — — — — — — — 12 / — C TY OF LYNNWOOD R/W — — — — — — — — — — — — — — — — — — — — — — — — — — — y 11' 23' EX. ZIPLY POLE 264' �' +BUFFER r T.A.N.S.A.T. 7501 208TH ST. SW. CONTACT PROPERTY OWNER(S) 72 " HOURS PRIOR TO START OF WORK FLAGGERS TO ASSIST PEDESTRIANS ROAD THROUGH WORK AREA. WORK AHEAD (SEE PED NOTES) W20-1 FOR TEMPORARY AERIAL WORK. ESTIMATED TIME OF COMPLETION IS 10 MINUTES. F = PORTABLE FLASHING BEACON T.A. N. S.A.T. = TOW AWAY NO STOPPING ANYTIME ® = EXISTING DRIVEWAY >--< = TYPE II BARRICADE R/C = EXISTING RED CURB = DOUBLE YELLOW LANE LINES = EXISTING STRIPING O= SIGNALIZED INTERSECTION = EXISTING LANE FLOW DIRECTI, = DIRECTION TRAFFIC FLOW RECEIVED AUG 22 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT A DEDICATED INDIVIDUAL WILL BE ASSIGNED THE RESPONSIBILITY OF ESCORTING PEDESTRIANS THROUGH THE WORK AREA IN ACCORDANCE WITH THREE MAJOR CONSIDERATIONS: 1. PEDESTRIANS SHOULD NOT BE LED INTO DIRECT CONFLICT WITH WORK SITE VEHICLES, EQUIPMENT OR OPERATIONS. 2. PEDESTRIANS SHOULD NOT BE LED INTO DIRECT CONFLICT WITH MAINLINE TRAFFIC MOVING THROUGH OR AROUND THE WORK SITE. 3. PEDESTRIANS SHOULD BE PROVIDED WITH A REASONABLY SAFE, CONVENIENT AND ACCESSIBLE PATH THAT REPLICATES AS NEARLY AS PRACTICAL THE MOST DESIRABLE CHARACTERISTICS OF THE EXISTING SIDEWALK OR FOOTPATH. ROAD WORK AHEAD END ROAD WORK G20-2 z SCALE: 1 "=60' GRAPHIC SCALE (IN FEET) 60 0 30 60 (1 in = 60 ft) �51NFRASTRUCTURE ziplyrfliber CONTACT INFO PROJECT MANAGER KEKE MURPHY 562-991-2708 pelenatete.murphy@ziply.com NETWORK PLANNING PROJECT MANAGER DAVID REED 352-345-2348 david.reed@ziply.com SHEETINDEX 1 : COVER SHEET 2 : TCP DESIGN CAUTION ** g11 MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD w CALL BEFORE YOU DIG PROJECT 20632 76TH AVE. W. ADDRESS: EDMONDS, WA 98026 PROJECT 5515542 COUNTY: SNOHOMISH PERMITS 5515542 - HAMPTON PLACE CONDOMINIUMS 20632 76TH AVE W, EDMONDS, WA 98026 HLLKWAXX _BF MDU 20_G.FAST_2 BLDGS EXISTING 120V AC POWER - PENETRATION RATE 9.1% r CONTACT PERSON: ZIPLY FIBER ZIPLY FIBER OSP ENGINEER: OSP ENGINEER: RENEE VALENCIA DAVID REED PHONE: 951-443-6296 PHONE:352-345-2348 RENEE.VALENCIA1@ZIPLY.COM DAVID.REED1 @ZIPLY.COM ROW & TCP PERMIT:YES CITY OF EDMONDS WA JOINT USE PERMIT: YES ROE REQUIRED: YES W.O. DRIVER CONSTRUCTION START ❑ ETHERNET ❑ CIAC IN SERVICE DATE ❑ DAMAGE M OTHER CONSTRUCTION ® FLAGGING ❑ BRUSHING ❑ CONTRACTOR PERMITS MUNICIPALITY: CITY OF EDMONDS ❑ BLANKET ® TCP/TRAFFIC ® DETAILED (NOT BLANKET) ❑ NO PERMIT REQUIRED JOINT POLE JFN/NJUNS# ❑ NO JPN REQUIRED POLE JPN JPN OWNER TO FROM ❑ ❑ ® POWER ❑ ❑ ❑ CATV ❑ ❑ ❑ FRONTIER ACCOUNT CODES ❑ 2411.001 POLES ❑ 2422.201 UG FIBER ❑ 2421.101 OH COPPER ❑ 2441.001 CONDUIT ® 2421.201 OH FIBER ❑ 34XX.XXX REMOVAL ❑ 2422.101 UG COPPER ❑ 64XX.XXX MAINT. Know what's below. A CAUTION Overhead Call before you dig. cables cables RECEIVED ziply AUG 22 2023 HLLKWAXX BF MDU 20 20632 76TH AVE W, EDMONDS, WA 98026 CITY OF EDMONDS PROJECT NUMBER: 5515542 C.O. AREA, 962 EXCH.CODE: WA EDMONDS DRAWN DATE: 0911412022 ENGR: DAVE COLLINS PHONE:4252634020 CNTY: SNOHOMISH FILE: 5515542 DWG SERVICES DEPARTMENT SCALE, NIA TAX DISTRICT: 5160E I DWG 1 OF 5 TWNSHP:27N PIN& 04E ISEC 19 VICINITY MAP 20632 76TH AVE. W., EDMONDS, WA 98026 I 2 a fit h St SW College Place Biddle Schlool Details Saving WORK Edmonds -Learnin AREA Academ 208th St S 9 D Building Blocks Jr I A&I's Painting Services Cc 19 2QSth St S 3 A F r RECEIVED AUG 22 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ziplyfliber CONTACT INFO PROJECT MANAGER KEKE MURPHY 562-991-2708 pelenatete.murphy@ziply.com NETWORK PLANNING PROJECT MANAGER DAVID REED 352-345-2348 david.reed@ziply.com SHEETINDEX 1 : COVER SHEET 2 : TCP DESIGN CAUTION ** g11 MULTIPLE VOLTAGE POWER CIRCUITS OVERHEAD CALL BEFORE YOU DIG PROJECT 20632 76TH AVE. W. ADDRESS: EDMONDS, WA 98026 PROJET 5515542 COUNTY: SNOHOMISH r51NFRASTRUCTURE RECEIVED AUG 22 2023 CITY OF EDMONDS M BuildingPerm it.com CITY OF EDMONDS Right -of -Way Application #1365073 - 5515542 - Facility Upgrade SERVICESLOPMENT DEPARTMENT Applicant First Name Last Name Company Name Richard Knowles Ziply Fiber Number Street Apartment or Suite Number E-mail Address 1800 41st St N-100 richard.knowles@ziply.com City State Zip Phone Number Extension Everett WA 98203 (951) 264-8824 Contractor Company Name Contractor Unknown Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 20632 76TH AVE W City Zip Code County Parcel Number EDMONDS 98026 00784600000100 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Mark E Zielke Number Street Apartment or Suite Number PO BOX 3384 City State Zip LYN N WOOD WA 98046-3384 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 8/21/2023 Submitted By: Richard Knowles Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1365073 - 5515542 - Facility Upgrade Project Contact Company Name: Ziply Fiber Name: Richard Knowles Email: richard.knowles@ziply.com Address: 1800 41 st St N-100 Phone #: (951) 264-8824 Everett WA 98203 Project Type Multifamily Residential Activity Type Scope of Work Street Use Objects Temporary in Nature Project Name: 5515542 - Facility Upgrade Description of Work: Upgrade existing Ziply communication cable between two existing joint utility poles crossing over 76th Ave at the front of 20632 76th Ave W Project Details Project Information Other Project Start Proposed start date 10/2/2023 Project End Proposed end date 10/13/2023 Page 2 of 2