Loading...
REVIEWED RESUB2-BLD2021-0926+Valuation info+9.3.2021_3.31.03_PM+2393236BLD2021-0926 Cornerstone ARCHITECTURAL GROU P September 3, 2021 Eric Carter City of Edmonds Building Division (425) 771-0220 RE: BLD2021-0926 Sep 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 6161 NE 175th Street, Suite 101 Kenmore, Washington 98028 206.682.5000 cornerstonearch.com Response to Plan Review Comments for corrections required and additional information needed. 2) The provided valuation of $40,000 does not seem to accurately reflect the proposed plans. Please adjust the valuation to reflect the proposed plans or provide a cost breakdown to justify the amount. The valuation provided appears to only cover material costs. In accordance with IBC 109.3. The valuation shall include valuation for total value of work, including materials and labor for which the permit is being issued, such as electrical gas, mechanical, plumbing equipment, and permanent systems. Please provide a revised valuation to accurately reflect the scope of the permit. Valuation has been revised to include materials, labor, electrical, mechanical and plumbing as requested and is included as attachment to this response letter. Sincerely Steve Barnes - Architect Project Manager enc. (two pages) Page 1 of 1 Office Building Tenant Improvement Cornerstone Architectural Group Edmonds, WA Steve Barnes September 2, 2021 Items/Descriptions Quantity Unit Unit Cost Sub -Total TOTAL SUMMARY Div 02 - Demolition $3,432 Div 05 - Metals $550 Div 06 - Wood & Plastics $7,718 Div 07 - Thermal & Moisture $300 Div 08 - Doors & Windows $4,275 Div 09 - Finishes $19,724 Div 10 - Specialties $2,040 Div 12 - Furnishings $3,500 Div 22 - Plumbing $3,625 Div 25 - Mechanical $3,000 Div 26 - Electrical $4,224 Div 28 - Electronic Safety and Security $27,600 CONSTRUCTION COST $79,988 Labor 0.28 $22,397 TOTAL VALUATION (Labor & Materials) $102,385 ESTIMATE DETAIL Div 02 - Demolition $3,432 Remove flooring 1 LS 1,000.00 $1,000.00 Remove interior finishes and trim 200 SF 2.75 $550.00 Plumbing demolition 3 EA 275.00 $825.00 Remove suspended ceiling 800 SF 0.75 $600.00 Remove interior partition walls 166 LF 2.75 $456.50 Div 05 - Metals $550 Metal railings 2 EA 275.00 $550.00 Div 6 - Wood & Plastics $7,718 2x4 @ 16" OC interior wall framing 1,192 SF 4.45 $5,304.40 2x6 @ 16" OC interior wall framing 320 SF 5.20 $1,664.00 Finish carpentry 1 LS 750.00 $750.00 Div 7 - Thermal & Moisture $300 Sealants, caulking & firestopping - allow 1 LS 300.00 $300.00 Div 8 - Doors & Windows $4,275 3070 SCW door - frm & hw 9 EA 475.00 $4,275.00 Div 09 - Finishes $19,724 ACP 1,213 SF 2.35 $2,850.55 GWB ceiling 159 SF 8.00 $1,272.00 Paint GWB walls and ceiling 3,024 SF 2.75 $8,316.00 Plastic Laminate wainscot 609 SF 4.75 $2,892.75 Flooring 1,058 SF 3.75 $3,967.50 Rubber base 189 LF 2.25 $425.25 Page 1 of 2 Div 10 - Specialties Fire extinguishers Paper towel dispenser & waste receptacle Soap dispenser Mirrors wl SST frame - 20" x 28" Seat cover dispenser Sanitary napkin disposal - recessed Multi -roll Tissue paper dispenser Grab bar - 36' & 42" long & 18" vertical Div 12 - Furnishings Miscellaneous casework Div 22 - Plumbing Piping Plumbing fixtures Div 25 - Mechanical HVAC ductwork Controls Div 26 - Electrical Interior Luminaires Enclosed Switches Power receptacles Exit lighting Div 28 - Electronic Safety and Security Fire alarm TOTAL MATERIAL COST $2,040 2 EA 80.00 $160.00 3 EA 175.00 $525.00 5 EA 25.00 $125.00 3 EA 100.00 $300.00 3 EA 35.00 $105.00 3 EA 75.00 $225.00 3 EA 25.00 $75.00 3 SET 175.00 $525.00 $3,500 1 LS 3,500.00 $3,500.00 $3,625 1 LS 2,500.00 $2,500.00 3 EA 375.00 $1,125.00 $3,000 1 LS 2,500.00 $2,500.00 1 LS 500.00 $500.00 $4,224 49 EA 80.00 $3,920.00 18 EA 5.00 $90.00 31 EA 4.00 $124.00 2 EA 45.00 $90.00 $27,600 2,300 SF 12.00 $27,600.00 $79,987.95 $79,988 Page 2 of 2