Loading...
ENG Correction Notice 9.8.20224 OF ED4f O CITY OF EDMONDS CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: September 8, 2022 PERMIT NUMBER: BLD2019-1189 OWNER: Wardak SITE CONTACT: Todd ADDRESS: 541 12th Ave N TYPE OF INSPECTION: Engineering Final — SFR, ROW, Side Sewer ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ® RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. Four sidewalk panels do not meet ADA requirements. The panels marked below shall be replaced such that both the cross slopes are under 2% and the running slopes of the ramps are under 8.3%. 2. Sewer cleanout at property line shall have gripper twist plug. 3. Install mailbox at approved location per postmaster. 4. All disturbed soils shall be compost amended. Please provide receipt for compost. 5. Provide geotech letter for stormwater management facility. 6. Provide compaction report for all work in the right-of-way. 7. Provide stormwater covenant for City of Edmonds signature, then covenant shall get recorded at Snohomish County. Provide recorded copy to City of Edmonds. Email to en ing eeringpermitsgedmondswa.gov. 8. Provide as built for project. Email as built to en ineeringpermits(cr�,edmondswa. og_v. THE ACTIONS OR CORRECTIONSINDICATED ABOVE ARE REQUIRED TO BE CORRECTED. FOR INSPECTION SCHEDULE THROUGH mybuildingpermit.com Inspector: - Natalie Griggs Date: September 8, 2022 Page 2 of 2