REVIEWED BLD2023-0667+mount info 7.18.2023_6.53.59_AM+3670637Date 7/18/23
To: Edmonds Planner
RE: BLD2023-0667
317 3RD AVE S, #203
Commercial Mechanical
The outdoor unit will be mounted on the wall and will not extend more than 30" into the setback.
Bracket information is included on the next page.
Thank you,
Bekah Swanson, Permitting Manager
Seatown Services
Electric 9 Plumbing • Heating • Air
425.270.1623
www.SeatownServices.com
WBB300 & WBB500 Installation
Bracket Arm (2)
Crossbar(l)
8x8Omm
1 Omm Concrete
1"Bolt (4)
Rubber Mount (4)
'
Lag Screw(6)
V
Anchor (6)
Clip Nut (4)
0
Extend bracket arms.
1-1
Tighten two bolts on
each arm.
0
Unscrew rubber stand-offs on the
back of each arm as needed to
level both arms.
72
Level and attach crossbar with two lag
screws or anchors provided (Substitute
other fastener types where appropriate).
Slide extended bracket arms onto
crossbar.
LSJ
Position arms to accomodate equipment
measurments and tighten set screws.
Use remaining lag screws or anchors to
secure bracket arms.
n
Insert clear clip/nut into mounting
key hole from below arm. Attach
rubber mount through key hole,
aligning center hole with clip/nut.
Repeat and slide all four mounts to
the center of their respective slots.
Position mounts to accomodate
equipment measurments. Place
condenser on mounts aligning holes
in feet with center hole in mounts.
Attach using 4 provided bolts.