Loading...
REVIEWED BLD2023-0667+mount info 7.18.2023_6.53.59_AM+3670637Date 7/18/23 To: Edmonds Planner RE: BLD2023-0667 317 3RD AVE S, #203 Commercial Mechanical The outdoor unit will be mounted on the wall and will not extend more than 30" into the setback. Bracket information is included on the next page. Thank you, Bekah Swanson, Permitting Manager Seatown Services Electric 9 Plumbing • Heating • Air 425.270.1623 www.SeatownServices.com WBB300 & WBB500 Installation Bracket Arm (2) Crossbar(l) 8x8Omm 1 Omm Concrete 1"Bolt (4) Rubber Mount (4) ' Lag Screw(6) V Anchor (6) Clip Nut (4) 0 Extend bracket arms. 1-1 Tighten two bolts on each arm. 0 Unscrew rubber stand-offs on the back of each arm as needed to level both arms. 72 Level and attach crossbar with two lag screws or anchors provided (Substitute other fastener types where appropriate). Slide extended bracket arms onto crossbar. LSJ Position arms to accomodate equipment measurments and tighten set screws. Use remaining lag screws or anchors to secure bracket arms. n Insert clear clip/nut into mounting key hole from below arm. Attach rubber mount through key hole, aligning center hole with clip/nut. Repeat and slide all four mounts to the center of their respective slots. Position mounts to accomodate equipment measurments. Place condenser on mounts aligning holes in feet with center hole in mounts. Attach using 4 provided bolts.