Loading...
APPROVED ENG PLN RESUB 1-Site PlanProposed site plan Ramp addition no scale signed of by supervisor eaxe of e.istinc pavement Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way Per city standards that is caused or occurs during the permitted project. Direction of the current water runoff from site No water run-off ocurs into site from any source 15'water line easement side sewer ENGINEERING DIVISION APPROVED AS NOTED (:: 11 09/16/2022 NO STORMWATER MANAGEMENT SYSTEM REQUIRED AT THIS TIME. IF NEW AND/OR REPLACED IMPERVIOUS SURFACE EQUALS 2000SQFT OR GREATER, A STORMWATER MANAGMEMENT SYSTEM MAY BE REQUIRED PER CITY CODES AND STANDARDS APPRROOVEEDO BY PLANNING Sep 12 2022 r X _RS-8 Zone _ ,' Corner_ Flag' -� Setbacks: Required Actual -27'- IN i_71/2''i E Side 71/2' 25' S Side 71/2' 'i 171/2' = 71/2''i 18•__ W Side 25 N/A Height _ guy wire outflow to storm dram f water 11So�1 � y2 GpPcxAl fM_ t e ovx cpAc" J SAS �01 / /V 1 v ,.\ EXIT existing asphalt r� _landing 4, --_existing field stone rockery I\ 9svv4 r EXIT Ot existingdeck wan 1 h'n e P�r Ge. L Is;µ �01 P`fkf 26,y4 9 C p-e Jr �2 \ 3 ove;-�1a.Ft5S 4 W 0 (J q9 \page 01etclpV'em6e OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING / ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. / / Proposed site plan Ramp addition / No scale required 21011 88th PI. W 0\ Edmonds, Wa, 98026 "/2 Lot 5 Espaland Estates in section 19, T27N, R. 4E, u � wer clean uut — / in thec awling seace MAINTAIN ACCESS OWNER/CONTRACTOR IS RESPONSIBLE FOR TO CLEANOUTS ON EROSION CONTROL AND DRAINAGE EXTERIOR OF BUILDING. BLD2022-0981 RESUB Sep 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT