REV 2 Sharma - alt bsmt wall calcs 04-15-2020[1][2]eS SITE STRUCTURES
A Division of Kosnik Engineering, PC
Sharma Residence
15712 72"d Ave West
Alternate Basement Wall Design
To Allow for Building Construction
City of Edmonds, Washington
Structural Calculations
2UI14 I
Cr�RAI ENS'\
G
TONAL
Project No. S-19-083B
First Issue 04-15-2020
REVISION
Apr 29 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
1050519T" Ave SE, Suite B, Everett, WA 98208 ♦ (425) 357-9600 (phone) ♦ e-mail: dan@kosnik.com
i
A Dlvlslon of Kosnik Enginsering PC
i
U L U IN i K I P
FOUNDATION DESIGN:
.
RETAINING WALL DESIGN IS BASED ON THE FOLLOWING VALUES AS
PROVIDED IN THE GEOTECHNICAL REPORT BY GEOTECH CONSULTANTS =
INC. DATED 01-25-18 & E-MA
IL CORRESPONDENCE OF
09,27-19,
ALLOWABLE BEARING PRESSURE: 3,000 PSF
LATERAL EARTH PRESSURES: DRAINED BACKFILL
ACTIVE CONDITION: 35PCF EFW (LEVEL BACKFILL j
PASSIVE CONDITION; 300PCF EFW ULTIMATE
SEISMIC ADDITION: La= 8H PSF UNIFORM
SATURATED SOIL DENSITY:
COEFF OF FRICTION;
: : : : : : : : : : : : :
: : p:p I
:
. . . . .
. . . . .
i
: : : : : : : : : : : :
. . . . . . . .
i
: : : : : : : : : : :
125 PCF wl LEVEL BACKFILL
0,50 ULTIMATE
lip
p IF Is A Is
Is
No w p is
Is Is
Is
Is
No
Is w
Is
is
Is Is
lo IL
IL
Is
IL
IL
is ic
L !: -
do
is
id
Is
IL
is is
is id
p IL IL
id
40
NIL
v�Is IM
lip is
Is
is is is
is
Is Is
is ol Is
Is
is
do
Is
ol
III I Is is IN,
Is v Vo Is
:�
liff
Al
zea is Is
Ir
is
ol
zlao���y d� dn.
Is
Is is
Is
I IN
Is
is
IF
is Is
100Ir
1' �l - NOJl-✓dNn �1
Aft li Wei 400
V� �I ON awe x euuaeule� aim � �+acwa v
lea
91 n:gonxg
ir
lei ieo48 � ioardd e4'
SITE STRUCTURES
10511 19th Ave SE, Suite C
Everett, WA, (425)-357-9600
Project Sharma Residence
8.71FT RETAINING WALL REINFORCING
sheet
date
prJ . no.
Active Pressure + Surcharge
H from top
Ms
Mu
As
Wall thick
8 in
1
20
32
0.001
Concrete cover
1.5 in
2
103
164
0.006
Rebar size
5
3
284
454
0.018
Concrete Strength fc
3000 psi
4
597
956
0.037
5
1079
1727
0.067
Depth to rebar center
6.19
6
1764
2822
0.110
Comp block depth
0.90
7
2687
4299
0.168
8
3883
6212
0.243
9
5387
8618
0.337
10
7233
11573
0.452
11
9458
15133
0.591
12
12096
19354
0.756
13
15182
24291
0.949
EFWa(pcf)
35
14
18751
30001
1.172
Surcharge(psf)
100
15
22838
36540
1.428
Soil Density(pcf)
125
H from top
Ms
Mu
As
LF active
1.6
8.25
4228
6765
0.262
LF surcharge
1.6
6
1764
2822
0.109
�'/a
id r�7- 2eZv
5-19-083
Vertical Reinforcing:
bar size: # 5
spacing: 16 it o/c As = 0.23 sq in >_ 0.11
Footing to Wall Dowels:
bar size: # 5
spacing: 8 it o/c As = 0.46 sq in >_ 0.26
tension controlled cracking: p <_ pt: p = 0.0048 pt = 0.0136
development length: 27.4
Extend Dowels: 3.5 ft minimum into wall --+ go to 3.67 ft
end hook development: 9.6
Embed Dowels: 5.5 in min into footing —+ go to 9 in into
Horizontal Reinforcing:
bar size: # 5
spacing: 16 it o/c
each face: no p = 0.0024 >_ 0.0020
12 in ftg
SITE STRUCTURES Project Sharma Residence sheet
10511 19th Ave SE, Suite C date
Everett, WA, (425)-357-9600 prj. no. 5-19-083
8.71FT RETAINING WALL REINFORCING Active Pressure + Seismic
Seismic Pressure Component
Uniform Lateral Earth Pressure
8 H psf =
66 psf
Load Factor for Seismic Pressure Component
1.00
H from top
Ms
Mu
As
Wall thick 8 in
1
39
42
0.002
Concrete cover 1.5 in
2
179
207
0.008
Rebar size 5
3
455
549
0.021
Concrete Strength fc 3000 psi
4
901
1125
0.044
5
1554
1992
0.078
Depth to rebar center 6.19
6
2448
3204
0.125
Comp block depth 0.90
7
3618
4818
0.188
8
5099
6891
0.269
9
6926
9477
0.370
10
9133
12633
0.494
11
11757
16416
0.641
12
14832
20880
0.816
13
18393
26082
1.019
14
22475
32079
1.253
15
27113
38925
1.521
EFWa(pcf) 35
Soil Density(pcf) 125
H from top
Ms
Mu
As
8.25
5522
7487
0.290
LF active 1.6
6
2448
3204
0.124
Vertical Reinforcing:
bar size: # 5
spacing: 16 " o/c As =
0.23 sq in >_ 0.12
Footing to Wall Dowels:
bar size: # 5
spacing: 8 it o/c As =
0.46 sq in ? 0.29
tension controlled cracking: p < pt: p =
0.0048 pt = 0.0136
development length: 27.4
Extend Dowels: 3.7 ft minimum into wall - * go to
3.67 ft
end hook development: 9.6 it
Embed Dowels: 6.0 in min into footing --+ go to
9 in into 12 in ftg
SITE STRUCTURES
10511 19th Ave SE, Suite C
Everett, WA, (425)-357-9600
Project Sharma Residence sheet Cf l q
8.71 FT RETAINING WALL REINFORCING
date 4 01 1'% 4ev
prj. no. 5-19-083
,Pi
Active Pressure +Surcharge
Ha(ft)=
9.25
EFWa(pcf)=
35
Tw(in)=
8
Tftg(in)=
12.00
Hp(FT)=
2.00
EFWp(pcf)=
300
Hw(ft)=
8.71
Wftg(ft)=
5.00
FSpassive=
1.00
D(wall)pcf=
150
Lheel(ft)=
3.00
CoeFrict=
0.50
Dsoil(pcf)=
125.00
Ltoe(ft)=
1.33
Surchg(psf)=
100.00
D(ftg)pcf= 150
W(surchg)=
300
W 1(heel)=
3094
Fsrchg(lbs)=
259
Allowalbe Bearing Pressure
3000 psf
W2(wall)=
871
Fa(lbs)=
1497
LF oveturn=
1.5
Fp(lbs)=
600
Ms-ot(ft-lb)=
5 815
W4(ftg)=
750
Ffrict(lbs)=
2507
Mu-ot(ft-lb)=
8722
Wtotal=
5015
FS sliding=
1.77
FS slide reqd=
1.50
D key(ft)=
0.00
Net Sliding=
-13 51
Xcw(ft)=
1.97
Ecc-s(ft)=
1.16
Xresult-s(ft)=
3.13
Tr-s(ft)=
1.87
Ecc-u(ft)=
1.74
Xresult-u(ft)=
3.71
Tr-u(ft)=
1.29
3rd point=
1.67
CASE= Service
RESULTANT WITHIN MIDDLE 3rd
Tr (ft)=
1.87
Lbrg(ft)=
5.00
Q 1(psf)=
1758
< 3000 psf
Q2(psf)=
248
CASE=
Ultimate
RESULTANT OUTSIDE MIDDLE 3rd
Tr (ft)=
1.29
Lbrg(ft)=
3.88
Q 1(psf)=
2586
< 1.5 X 3000 =
4500 psf
Q2(psf)=
0
HEEL REINFORCING DESIGN
Top bar cover (in)=
2
Top bar size =
5
Top bar spacing (in)=
16
Depth to Reinf d (in)=
9.69
Comp Block a (in)=
0.45
d - a/2 (in)=
9.46
As provided (sq in)=
0.23
TOE REINFORCING DESIGN
Bot bar cover (in)=
3
Bot bar size =
4
Bot bar spacing (in)=
16
Depth to Reinf d (in)-
8.75
Comp Block a (in)=
0.29
d - a/2 (in)=
8.61
As provided (sq in)=
0.15
Load Factor 1.5
Wall Mu= 6343 ft-lbs
Heel Mu based on Wdl
Heel Mu DESIGN=
As reqd =
As min =
1.33 X As reqd =
Wall Mu - Heel Mu
Toe Mu DESIGN =
As reqd =
As min =
1.33 X As reqd =
6222
6222 ft-lbs @ wall
0.15 sq in per ft
0.39 sq in per ft
0.19 sq in per ft
121
150 ft-lbs @ wall
0.00 sq in per ft
0.35 sq in per ft
0.01 sq in per ft
SITE STRUCTURES
10511 19th Ave SE, Suite C
Everett, WA, (425)-357-9600
Project Sharma Residence
sheet (p
date �
prj . no. 5-19-083 �i
8.71FT RETAINING WALL REINFORCING Active Pressure + Seismic
Ha(ft)= 9.25
Hp(FT)= 2.00
CoeFrict= 0.50
W 1(heel)=
3094
W2(wall)=
871
W4(ftg)=
750
Wtotal=
4715
FS sliding=
1.40
Net Sliding=
-850
Xcw(ft)= 2.00
CASE= Service
CASE= Ultimate
EFWa(pcf)=
35
EFWp(pcf)=
300
FSpassive=
1.00
Dsoil(pcf)=
125.00
Wseismic(psf)=
66.00
F seismic=
611
Fa(lbs)=
1497
Fp(lbs)=
600
Ffrict(lbs)=
2357
FS slide reqd= 1.36
Tw(in)= 8
Hw(ft)= 8.71
D(wall)pcf-- 150
Allowalbe Bearing Pressure
LF oveturn= 1.36
Ms-ot(ft-lb)= 7040
Mu-ot(ft-lb)= 9546
D key(ft)= 0.00
Tftg(in)= 12.00
Wftg(ft)= 5.00
Lheel(ft)= 3.00
Ltoe(ft)= 1,33
D(ftg)pcf-- 150
3000 psf
Ecc-s(ft)= 1.49
Xresult-s(ft)=
3.49
Tr-s(ft)=
1.51
Ecc-u(ft)= 2.02
Xresult-u(ft)=
4.02
Tr-u(ft)=
0.98
3rd point=
1.67
RESULTANT OUTSIDE MIDDLE 3rd
Tr (ft)=
1.51
Lbrg(ft)=
4.5 3
Q1(psf)=
2083
< 3000 psf
Q2(psf)=
0
RESULTANT OUTSIDE MIDDLE 3rd
Tr (ft)=
0.98
Lbrg(ft)=
2.93
Q 1(psf)=
3216
< 1.5 X 3000 =
4500 psf
Q2(psf)=
0
HEEL REINFORCING DESIGN
Top bar cover (in)=
2
Top bar size =
5
Top bar spacing (in)=
16
Depth to Reinf d (in)=
9.69
Comp Block a (in)=
0.45
d - a/2 (in)=
9.46
As provided (sq in)=
0.23
TOE REINFORCING DESIGN
Bot bar cover (in)=
3
Bot bar size =
4
Bot bar spacing (in)=
16
Depth to Reinf d (in)=
8.75
Comp Block a (in)=
0.29
d - a/2 (in)=
8.61
As provided (sq in)=
0.15
Load Factor = 1.5
Wall base Mu= 8282
Heel Mu based on Wdl 5672
Heel Mu DESIGN= 2800 ft-lbs @ wall
As reqd = 0.07 sq in per ft
As min = 0.39 sq in per ft
1.33 X As reqd = 0.09 sq in per ft
Wall Mu - Heel Mu 2610
Toe Mu DESIGN = 2700 ft-lbs @ wall
As reqd = 0.07 sq in per ft
As min = 0.35 sq in per ft
1.33 X As reqd = 0.09 sq in per ft
A Dhr��han of Kownik Enn rind P�
Nnu
�G��NG
I
Job No OPP& P;p
I
OP
P
T � TV: P
p
Y
* ,
S0IiGHof'I�G—=�{D�F
Izti i
9
p
=� I 9 a 0
0
l�-Np 4 4 9 6 4 48
ww
4
', sores f('ti=ss
' C ?ra,->
Now
Pw 4 1 damp 4
aw
for
Op
:00
VIV
/rht — 112vi�J.a = p.,'Owy���-
l�-Np 4 4 9 6 4 48
ww
4
', sores f('ti=ss
' C ?ra,->
Now
Pw 4 1 damp 4
aw
for
Op
:00
VIV
/rht — 112vi�J.a = p.,'Owy���-