Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00665700010100 Site Address: 1110 5TH AVE S EDMONDS,WA 98020-4606
Subdivision: 006657, 005820, 010537, 006873 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $50,000.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: EDGWOOD CONDOMINIUMS -WALL REPAIRS, REPLACE WINDOW
Applied: 8/16/2023
Issued:9/28/2023
Final:
Expiration Date: 9/22/2024
Issued by: BAC
I WA State Contractor L & I #: CDKCOS1066MA I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
CHERYL NICODEMUS
1333 N NORTHLAKE WAY, STE
(206)547-7288
CHERYL@SOLTNERGROUP.COM
A,SEATTLE WA 98103
CONTACT
SOLTNER GROUP ARCHITECTS
1333 N NORTHLAKE WAY, STE
(206)547-7288
cheryl@soltnergroup.com
A,SEATTLE WA 98103
CONTRACTOR
CDK CONSTRUCTION
PO BOX 1767, DUVALL WA
(425)788-8441
chris_davies@cdkconstruction.com
SERVICES
98019
THE EDGEWOOD
1110 5TH AVE, EDMONDS WA
OWNER
CONDOMINIUMS
98020
T1,1190.1"TO•
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BLD - COM V ALUEE BASED FEE
001.000.345.83.000.00
$880.00
$880.00
9/28/23
R31598
BLD - COM VALUE BASED REVIEW
001.000.345.83.000.00
$748.00
$748.00
8/17/23
R30774
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
8/17/23
R30774
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
9/28/23
R31598
COM
TOTALS: $1,698.00
$1,698.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, September 28, 2023 2:34:14 PM 1 of 3
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2023-1036
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
The building enclosure must be inspected by a qualified inspector in accordance with
RCW 64.55.030, 64.55.040, and 64.55.050. A building enclosure certification letter from
the inspector must be submitted to the Building Division prior to final inspection by the
RCW 64.55 BUILDING
FOR
City Building Inspector in accordance with RCW 64.55.060. Where phasing of construction
ENCLOSURE
INFORMATION
occurs, coordinate inspection with the City Building Inspector to ensure that all required
inspections are performed. Inspection by the building enclosure inspector to meet RCW
64.55 does not substitute for required City building inspections which must be performed
by the City Building Inspector.
Special inspection for:
1. Wood
REQUIRED SPECIAL
FOR
2.Prefabricated construction
INSPECTIONS
INFORMATION
3.StructuralObservation
Please see approved set of plans for me detailed information as to the specific
inspections stated above.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
O
Submit all special inspection reports to the City Building Official on a weekly basis.
ORMATION
Printed: Thursday, September 28, 2023 2:34:14 PM 2 of 3
•MMERCIAL BLDG Permit
City of Edmonds PERMIT NUM
98020 1 1
. •.
INSPECTIONS•
•.
AdINSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES
X-1 FIRE FINAL
A-1 BUILDING PRECON
B-2 DEMO AMT
VERIFICATION
B-3 EXT GYP SHEATHING
B-3 EXT WALL SHEATHING
B-4 FRAMING
B-5 BLDG SPECIAL
INSPECTION
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"