APPROVED ENG RESUB 2 BLD2021-1653+Bond_Quantity_Worksheet+6.24.2022_3.28.30_PM+2953917Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201F
RESUB
King County Jun 27 2022
BLD2021-1653 CITY OF EDMONDS
Department of Permitting & Environmental Review DEVELOPMENT SERVICES
35030 SE Douglas Street, Suite 210 DEPARTMENT
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Apollo Apartments
Location: 23601 Highway 99, Edmonds, WA 98026
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Construction Cost Estimate
Date: 6/24/2022
Project No.: 20261.20
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
TOTAL IMPROVEMENTS $1,649,083.84
TESC/RIGHT OF WAY BOND $172,137.04
INSPECTION FEES $20,448.00
FUTURE MAINTENANCE BOND $ 247,362.57
(15% OF TOTAL IMPROVEMENTS)
ENGINEERING DIVISION
APPROVED .
Q� 09/06/2022
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/24/2022
Site Improvement Bond Quantity Worksheet
S15 Web date: 04/03/201F
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost J
EROSION/SEDIMENT CONTROL
Number
cl
DEVE
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
6
1
480
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
800
1
1200
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
1
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
1000
1
4000
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
2
1
6400
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
136
1
2584
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
54
1
3780
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
40
1
4400
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
40
1
5600
WRITE -IN -ITEMS **** (see page 9)
Catch Basin Protection
$ 83.00
Each
11
1
913
Temporary Construction Fencing
$ 0.35
LF
1150
1
403
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Construction Cost Estimate
$ 29,759.50
$ 8,927.85
$ 38,687.35
A
ESUB
n 27 2022
"Y OF EDMONDS
OPMENT SERVICES
DEPARTMENT
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/24/2022
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Jun 27
CITY OF EDM
DEVELOPMENT
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
26600
159,600.00
Backfill & Compaction- trench
GI-2
$ 9.00
CY
Clear/Remove Brush, by hand
GI-3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI-4
$ 10,000.00
Acre
Excavation - bulk
GI-5
$ 2.00
CY
33100
66,200.00
Excavation - Trench
GI-6
$ 5.00
CY
Fencing, cedar, 6' high
GI-7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI-8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 21
GI-9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
550
1,375.00
650
1,625.00
Grading, fine, with grader
GI - 18
$ 2.00
SY
7400
14,800.00
Monuments, 3' Ion
GI - 19
$ 250.00
Each
1
250.00
Sensitive Areas Sin
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
2200
17,600.00
Surveying, line & grade
GI - 22
$ 850.00
Da
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew 2 flaggers
GI - 24
$ 120.00
HR
40
4,800.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
2,600.00
143,000.00
Wall, rockery
I GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
6,425.00
402,825.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022
022
)NDS
ERVICES
NT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Jun 27
CITY OF EDM
DEVELOPMENT
Unit Price
Unit
I Quant.T Cost
Quant. Cost
QuantT Cost
ROADIMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000s
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000s
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
130
4,550.00
3000
105,000.00
Barricade, type III Permanent
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
510
6,375.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
330
5,940.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
60
420.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
115
212.75
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, see AC road unit price
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
300
9,600.00
120
3,840.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and dispos
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
1
1 151
1,275.00
Striping, per stall
RI - 22
$ 7.00
Each
136
952.00
Striping, thermoplastic, for crosswalk
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
SUBTOTAL
26,677.75
111,487.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022
022
)NDS
ERVICES
NT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Jun 27
CITY OF EDM
DEVELOPMENT
nPPAPTRAE
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" top course 9 1/2" Rock= 8" base & 1.5" top course
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
214
3,852.00
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 S
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 S
RS - 6
$ 42.00
SY
80
3,360.00
900
37,800.00
HMA Road, 3", 9 1/2" Rock, Qty Over 25
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desi
RS - 15
Thickened Edge
IRS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
7,212.00
37,800.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022
D22
)NDS
RVICES
IT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Jun 27
CITY OF EDM
DEVELOPMENT
DEPARTM
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert rices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
1 $ 21.001
SY
Bollards - fixed
D - 2
1 $ 240.74
1 Each
Bollards - removable
D - 3
1 $ 452.34
Each
* (CBs include frame and lid
CB Type I
D - 4
$ 1,500.00
Each
1
1,500.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter SD&SS
D - 6
$ 2,300.00
Each
3
6,900.00
3
6,900.00
for additional depth over 4'
D - 7
$ 480.00
FT
4.5
2,160.00
6
2,880.00
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework Add
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
1
200.00
Culvert, PVC, 4"
D - 18
$ 10.00
LF
1150
11,500.00
Culvert, PVC, 6"
D - 19
$ 13.00
LF
26
338.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
337
5,055.00
Culvert, PVC, 12"
D - 21
$ 23.00
LF
432
9,936.00
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
9,060.00
38,309.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022
D22
INDS
RVICES
IT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Jun 27
CITY OF EDM
DEVELOPMENT
DEPARTM
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant,
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench 1,436 base+
D - 50
$ 28.00
LF
French Drain 3' depth
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer 36" diameter
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022
D22
INDS
RVICES
IT
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Jun 27
CITY OF EDM
DEVELOPMENT
DEPARTM
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cour
PL-2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied b Franchise Utility's Cost Estimate
Utility Poles Relocation
UP-1
$ 25,000.00
1 Each
1 1
$ 25,000.00
Street Light Poles w/Luminaires
UP-2
$ 7,500.00
1 Each
WRITE -IN -ITEMS
Such as detention/water quality vaults.
No.
Stormwater Vault
WI - 1
$ 330,000.00
Each
1
330,000.00
Block Wall
WI - 2
$ 16.00
SY
Yard Drain
WI - 3
$ 225.00
Each
2
450.00
4" DIP WA
WI - 4
$ 45.00
LF
32
1440
18
810.00
6" DIP WA
WI - 5
$ 65.00
LF
12
780
232
15,080.00
12" DIP SD
WI - 6
$ 105.00
LF
38
3990
Modular Wetlands System
WI - 7
$ 10,000.00
Each
1
10,000.00
WI-8
WI-9
WI-10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
31,210.00
80,584.75
24,175.43
104,760.18
B
C
356,340.00
761.00
284,028.30
1,230,789.30
D
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022
D22
NOS
RVICES
JT
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
RESUB
Original bond computations prepared by: Jun 27 2022
Name: Jared Underbrink, PE Date: 6/24/202 CYOFEDMONDS
��� �i ITQo nll SERVICES
PE Registration Number: 47741 Tel. #: 425.778.8500 DEPARTMENT
Firm Name: CG Engineering
Address: 250 4th Ave S, Suite 200 Project No: 20261.20
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*
AMOUNT
(A) $ 38,687.4
(B) $ 104,760.2
(C) $ -
(D) $ 1,230,789.3
(A+B) $ 143,447.5
(T) $ 1,374,236.8
Minimum is $2000.
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
T x 0.30 $ 412,271.0
Minimum is $2000.
Date:
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $ 26,190.0
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kinucounty.aoy/permits Version: 03/02/2015
Construction Cost Estimate Report Date: 6/24/2022