APPROVED ENG TRAFFIC CONTROL PLANSr_ lei 23601 HWY 99—DELIVERIES DELIVERIES AND CONCRETE WORK —TRAFFIC CONTROL PLAN - �,_ - Edmonds Development has been made aware of the up -coming City project (Hwy 99 Revitalization Project from 244th to 212th" ccording to The City of Edmonds, the start date for the City project has not been determined at this time. The traffic control plan for work on Highway 99 may need to be revised depending on the progression of The City Project or ork delayed for Edmonds Development Project BLD2021-1653. TRAFFIC CONTROL PLAN PERMIT# BLD2021-165 I..EDMONDS, WA - i END CONTRACTOR: Edmonds Development LLC T �....'. ROAD WORK_ ROAD WORK .................. G20-2 Jr HIGHWAY H WAY CONTACT. Johnny Vong, 206 552 9053, Johnny@blackflshcapltal.us AHEAD G 99 SPEED PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, LIMIT elitetrafficsolutions@gmail.com, 206-922-9205) TCS # 12886, W20-1 45J - Expires 6/30/2025 AW CONTRACTOR TO CONTACT BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER, _ PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH THE HIGHWAY 99 RESTORATION PROJECT. Bertrand.hauss@edmondswa.gov or at 425-771-0220 k�, 20-1 {,A REGENCY CENTERS' 23632 HWY 99 WIF ENGINEERING DIVISION APPROVED AS NOTED I 3£1RrlRAND }MUSS 7/02/2022 Note: Since construction shows up as starting July 14th, contact with City sin City project will be in -construction at that tim (to guarantee both project aren I t conflicting with e h other). 500' /1 W20-1 500' www.invarion.com q."W_,- Ai s ROAD WORK i AHEAD W2:0-1 236TH ST SW UL CHECK WITH CITY TRAFFIC ENGINEER RE THE - NUMBER OF ARROW BOARDS NEEDED. ■ FLAGGERS ARE TO STOP PEDESTRIANS .� S TRUCKS ENTER - EXIT FROM THE PROJECT SI TE AT ALL TIMES. Legend a' MOBILE CRAN �''• Barrel •,, AREA '- •• '. PROJECT SITE ,^ Construction Fencing 23601 HWY 99, EDMONDS, WA '• -� Container Pedestrian Walkway o .., y ' Y ♦ Flagger 2 IN ♦ �' - r. Project Gates • 1 016 Sign Stand traffic light - � ••• '' 120' PEDESTRIAN OH PROTECTION �••. '* % 0%�. Trucks Entering Exiting Project Site CONEX CONTAINERS % Trucks Marked Path '• Work Area '`•, CONSTRUCTION START - JULY 14TH, 2022 - FEBRUARY 17TH, 2023, 157 DAYS DEMOLITION, SITE PREP AND UTILITIES CONCRETE WORK/DELIVERIES IS ANTICIPATED •,• TO START NOVEMBER 7TH, 2022 - INTERMITTENT WORK. "Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of T 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites✓activities must comply with the noise limits of Chapter 5.30, unless a variance has been ranted pursuant to ECC 5.30.120. " IN- 154KM �r 4 f + t - � � r ii — C6r~ FAMILY PANCAKE HOUSE EDMONDS 23725 HWY 99 W21-30 I, 7-11 8101 238TH ST SW j N� ffft-1 67—y ti 1 BLD2021-1653 EVISED 6/21/202213y Elite Traffic Solutions 206.922.9205 Christina Moullet .ih�-uU LOM$8 RESUB All Signs & Spacing to conform to the MUTCD Standards -reference WSDOT Jun 27 2022 CITY OF EDMONDS "Work Zone Traffic Control Guidelines M54-44.04 January 2021 " & The City of Edmonds Standards. DEVELOPMENT CE a= DEPARTM aw. 2 MPH TAPER SIGN SPACING TAPER TAGENT 45 540' 500' 30' 60' MPH TAPER SIGN SPACING TAPER TALENT 25 125' 200' 20' 40' SHIFT TAPER = 1/2 TAPER SHOULDER TAPER = 1/3 TAPER www.invarion.com REVISED 23601 HWY 99—TOWER CRANE DISMANTLE —TRAFFIC CONTROL PLAN —SHEET 1 O'SiOF L . & N 0. - - � - - mmmuml gErlmw TRAFFIC CONTROL PLAN PERMIT# BLD2021-1653 %t ' � , : Sound/Noise ong►nat►ng from temporary construction sites as a result of construct►on E D M O N D S, WA 1 activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding CONTRACTOR: Edmonds Development LLC Sundays and Federal Holidays. At all other times the noise originating from N construction sites/activities must comply with the nose limits of Chapter 5.30, unless � T CONTACT: Johnny Vong, 206-552-9053, Johnny@blackfishcapital.us a variance has been granted pursuant to ECC 5.30.120. - . • CONTRACTOR TO CONTACT BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER, PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, � PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH Expires 6/30/2025 elitetrafficsolutions@gmail.com, 206-922-9205, TICS # 12886, � THE HIGHWAY 99 RESTORATION PROJECT. Bertrand.hauss@edmondswa.gov or at 425-771-0220 NOTES _ ~ _ _ 1. A TMA is required for roadway 45 mph or higher. For roads 40 mph or less- If a TMA is not available, the protective work vehicle shall be strategically located in t J - the field to shield workers and no roll ahead distance is specified. 2. Extend device taper across shoulder. 3. Devices should not encroach into adjacent lanes, see sheet TCP16 for encroachment detail. The 2' lateral buffer is recommended. 4. Use transverse devices in closed lane every 1000' - when work operation allows. 5. Traffic safety drums or tall channelization devices required for all lane closures tapers on roadway 45 mph or higher. (Half spacing required for tall channelization devices). 6. When used, device spacing for the downstream taper should be 20' O.C. 7. Coordinate with Region Traffic office for work hour restrictions. General Notes: A%. 1. All signsspacing and acin shall conform to The MUTCD and WAC. 2. Priority passage through the work area for emergency vehicles shall be provided at all times. 3. Alert Community Transit10 days in advance 4. Protective vehicle recommended may be a work vehicle. 5. Devices should not encroach into adjacent lanes. 6. All signs min. 48 x 48 B/O unless otherwise specified. 7. Channelization devices are 28" reflective cones 8 All b d• t d t d t t d T Wrr sign spacing may e a jus e o accommo a e a -gra e intersections and/or driveways. 9. Maintain Minimum 12' travel lane. • me D ROAD WORK 4HEAE W20-1 Al REGENCY CENTERS 23632 HWY 99 %WX ? a Aill Legend � Arrowboard (Chevron) * Barrel Construction Fencing • Flagger Northbound Traffic Marked Path i Sign Stand traffic light Work Area ENGINEERING DIVISION haL :;P-= - - APPROVED AS NOTED BERTRAND HAUSS 6/22/2022 7:33:17 AM 7/02/2022 ATCHLINE SHEET 236TH ST SW il� %i HIGHWAY 99 SPEED LIMIT 45 105.4' HIGHWAY 99 W20-1 W20-1' 236TH ST SW u T M 11111I.- '••. III.. JL - CHECK WITH CITY TRANSSPORTATION ENGINEER RE NUMBER OF ARROW BOARDS REQUIRED. .% ti. •. '•. 0 % % % '••. '% ••, �• . % ••. ••., 100' ' n ' , % ''••''! • ••. •. ----- - - - - -- - - -- -- --- - - - - ------ - - - - -- FLA GGERS ARE TO STOP PEDESTRIANS SIDEWALK DURING LIFTS OR AS TRUCKS ENTER - EXIT CLOSED I ' 39 FROM THE WORK SITE AT ALL TIMES. 36.4' � R9-9 4 PROJECT SITE MOB ILE CRANE 23601 HWY 99, EDMONDS, WA AREA - FLAGGERS SHA CONFORM WITH WAC: 96.155.305, 468.95.3015 AND 468.95.302. / FLAGGERS ALL BE IN RADIO CONTACT AT ALL TIMES. A VALI LAGGER CERTIFICATION CARD IS REQUIRED WHEN ANY FLAGGING OR D ECTING OF PUBLIC VEHICULAR TRAFFIC IN THE PUBLIC ROW OCCURS. � rir _ . �.' r � LOADING/UN AD I N G AREA �` '• ,J 10'� � � 17,y BLD2021-1653 All "-. EVISED 6/16/2022 Elite Traffic Solutions 206.922.9205 Christina Moullet 4TW�� 2AKiUt %i-10 - .10 All Signs & Spacing to conform to the MUTCD Standards -reference 9► p g s eference WSDOT "Work Zone Traffic Control Guidelines M54-44.04 January 2021 " & The City of Edmonds Standards. SIDEWALK CL SED 9-9 MPH TAPER SIGN SPACING TAPER TAGENT 45 540' 500' 30' 60' MPH TAPER SIGN SPACING TAPER TAGENT 25 125' 200' 20' 40' SHIFT TAPER= 1/2 TAPER SHOULDER TAPER = 1/3 TAPER RESUB Jun 27 2022 CITY OF EDMONDS w DFVtLOPMENT SERVICES DEPARTMENT , www.invarion.com r REVISED 23601 HWY 99 TOWER CRANE DISMANTLE TRAFFIC CONTROL PLAN SHEET 2 OF dew �i TRAFFIC CONTROL PLAN PERMIT# BLD2021-165 EDMONDS, WA V - 90- CONTRACTOR: Edmonds Development LLC CONTACT: Johnny Vong, 206-552-9053, johnny@blackfishcapital.us PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12886, Expires 6/30/2025 "Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. CONTRACTOR TO CONTACT BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER, PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH 1••,i THE HIGHWAY 99 RESTORATION PROJECT. , ,Bertrand. hauss@edmondswa.gov or at 425-771-0220� CRANE DISMANTLE WILL ONLY TAKE 1 DAY START DATE TBD (SATURDAY) TO DISMANTLE • r Edmonds Development has been made aware of the up -coming City project (Hwy 99 Revitalization Project from 244th to 212th" r ccording to The City of Edmonds, the start date for the City project has not been determined at this time. The traffic control plan for work on Highway 99 may need to be revised depending on the progression of The City Project or work dela ed for Edmonds nevelopment Project BLD2021-1653. - 238TH ST SW_ _ W_ L So ow ROAD *� WORK RIGHT LAN CLOSED W20-1 W20-5 NOTES 1. A TMA is required for roadway 45 mph or higher. For roads 40 mph or less - If a TMA is not available, the protective work vehicle shall be strategically located in the field to shield workers and no roll ahead distance is specified. 2. Extend device taper across shoulder. 3. Devices should not encroach into adjacent lanes, see sheet TCP16 for encroachment detail. The 2' lateral buffer is recommended. 4. Use transverse devices in closed lane every 1000' - when work operation allows. 5. Traffic safety drums or tall channelization devices required for all lane closures tapers on roadway 45 mph or higher. (Half spacing required for tall channelization devices). 6. When used, device spacing for the downstream taper should be 20' O.C. 7. Coordinate with Region Traffic office for work hour restrictions. f r ' L 200. SPEED LIMIT 45 HIGHWAY 99 ONLY R3A ,TCHLINE SHEET 1 W4-119 (L) 238TH ST S RIGHT LANE - r'm MUST TURN RIGHT I R3-7R / RIGHT LANE MUST � TURN RIGHT .1��' VV O l L _ 0, 1 M4-10 � FAMILY PANCAKE HOUSE EDMONDS 23725 HWY 99 f W4-119 (L) �� dill 200' 7 - 11 8101 238TH ST SW RIGHT LANE CLOSED AHEAD �b•-071S _ W20-5 R 200' n L 1' r T • .r �' J rot 7 _� { • A_ •A 17 _ • r 1 - ROAD 6A WORK AHEAD _ W20-1. i 1 _ J 1 • .r• 1 N Legend ® Arrowboard (Chevron) Barrel Construction Fencing Flagger Northbound Traffic Marked Path i Sign Stand traffic light FZ Work Area R3-7R TRAVELODGE BY WYNDHAM All Signs & Spacing to conform to the MUTCD Standards -reference WSDOT 23825 HWY 99 Work Zone Traffic Control Guidelines M54-44.04 January 2021 " & The City of Edmonds Standards. MPH TAPER SIGN SPACING TAPER TAGENT 45 540' 500' 30' 60' MPH TAPER SIGN SPACING TAPER TAGENT 25 125' 200' 20' 40' SHIFT TAPER = 1/2 TAPER SHOULDER TAPER = 1/3 TAPER EVISED 6/21/20221Y Elite Traffic Solutions 206.922.9205 Christina Moullet ii• .W./. V Ow. ..A ATCHLINE SHEET 3 6/22/2022 7:33:17 AM V REVISED 23601 HWY 99 TOWER CRANE DISMANTLE TRAFFIC CONTROL PLAN SHEET 3 OF 5 TRAFFIC CONTROL PLAN PERMIT# BLD2021-1653 , EDMONDS, WA . 1 Jbe 11 hl CONTRACTOR: Edmonds Development LLC CONTACT: Johnny Vong, 206-552-9053, johnny@blackfishcapital.us PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, elitetrafficsolutions@gmail.com, 206-922-92057 TCS # 128867 Expires 6/30/2025 "Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of i T00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding i Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. " NOTES 1. A TMA is required for roadway 45 mph or higher. For roads 40 mph or less - If a TMA is not available, the protective work vehicle shall be strategically located in the field to shield workers and no roll ahead distance is specified. 2. Extend device taper across shoulder. 3. Devices should not encroach into adjacent lanes, see sheet TCP16 for encroachment detail. The 2' lateral buffer is recommended. 4. Use transverse devices in closed lane every 1000' - when work operation allows. 5. Traffic safety drums or tall channelization devices required for all lane closures tapers on roadway 45 mph or higher. (Half spacing required for tall channelization devices). 6. When used, device spacing for the downstream taper should be 20' O.C. 7. Coordinate with Region Traffic office for work hour restrictions. Legend � Arrowboard (Chevron) Barrel Construction Fencing Flagger Northbound Traffic Marked Path i Sign Stand traffic light Work Area CONTRACTOR TO CONTACT BERTRAND HAUSS SCITY TRANSPORTATION ENGINEER PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH THE HIGHWAY 99 RESTORATION PROJECT. 1 Bertrand.haus` s@edmondswa.gov or at 4E 25-771-0220% ' F 1 r'••'A,��'� `I • 240TH ST SW I 200' 200' SPEED LIMIT 45 HIGHWAY 99 1W !t 1 r #MATCHLINE SHEET 2� 540''` W4-119 (L) RIGHT LANE CLOSED ift 21 oft .0 -A ti M 4 ir- 200' �. s,. L 4 r TRAVELODGE BY WYNDHAM 23825 HWY 99 a A� * 111,W" ,.Cr P P _ PE1 i Lda rr.w. a k 6 rN e 4,4%4. ROAD WORK 4HEAE W20-1 OFF, ■� MPH TAPER SIGN SPACING TAPER TAGENT 45 540' 500' 30' 60' MPH TAPER SIGN SPACING TAPER TAGENT 25 125' 200' 20' 40' SHIFT TAPER= 1/2 TAPER SHOULDER TAPER = 1/3 TAPER the MUTCD Standards -reference WSDOT �.04 January 2021 " & The City of Edmonds Standards. A EVISED 6/21/20221b� Elite Traffic Solutions 206.922.9205 Christina Moullet www.invarion.com 6/22/2022 7:33:18 AM �R i ak 7 . t -W i 1 HIGHWAY 99 SPEED LIMIT -' 454.0 IL 0= d 40 #MATCHLINE SHEET 3 REVISED 23601 HWY 99 TOWER CRANE DISMANTLE TRAFFIC CONTROL PLAN SHEET 4 OF 5 Za CONTRACTOR TO CONTAG i BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER, PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH THE HIGHWAY 99 RESTORATION PROJECT. : Bertrand. hauss0edmondswamov or at 425-771-0220 '• RIGHT LANE CLOSED ,AMEMP�_.-r 11 W4-2 MPH TAPER SIGN SPACING TAPER TAGENT 45 540' 500' 30' 60' MPH TAPER SIGN SPACING TAPER TALENT 25 125' 1 200' 20' 40' SHIFT TAPER = 1/2 TAPER SHOULDER TAPER = 1/3 TAPER Legend ® Arrowboard (Chevron) Barrel Construction Fencing op Flagger Northbound Traffic Marked Path i Sign Stand RIGHT LANE CLOSED traffic light AHEAD Work Area W20-5 1 s� �F _.L � NV T TRAFFIC CONTROL PLAN PERMIT# BLD2021-165 EDMONDS, WA - CONTRACTOR: Edmonds Development LLC CONTACT: Johnny Vong, 206-552-9053, johnny@blackfishcapital.us PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12886, Expires 6/30/2025 www.invarion.com NOTES 1. A TMA is required for roadway 45 mph or higher. For roads 40 mph or less - If a TMA is not available, the protective work vehicle shall be strategically located in the field to shield workers and no roll ahead distance is specified. 2. Extend device taper across shoulder. 3. Devices should not encroach into adjacent lanes, see sheet TCP16 for encroachment detail. The 2' lateral buffer is recommended. 4. Use transverse devices in closed lane every 1000' - when work operation allows. EVISED 6/21/2022 Elite Traffic Solutions 5. Traffic safety drums or tall channelization devices required for all lane 206.922.9205 closures tapers on roadway 45 mph or higher. (Half spacing required for tall Christina Moullet •��cs �o�s� channelization devices). 6. When used, device spacing for the downstream taper should be 20' O.C. 7. Coordinate with Region Traffic office for work hour restrictions. "Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of rw 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless Ar a variance has been granted pursuant to ECC 5.30.120. " All Signs & Spacing to conform to the MUTCD Standards -reference WSDOT "Work Zone Traffic Control Guidelines M54-44.04 January 2021 " & The City of Edmonds Standards. 7 BURLINGTON 24111 HWY 99 'Y` 0 �MATCHLINE SHEET 5 6/22/2022 7:33:18 AM W20-5 f L r �NIATCHLINESHEET4� � REVISED_23601 HWY 99 TOWER CRANE DISMANTLE TRAFFIC CONTROL PLAN SHEET 5 OF 5 www.invarion.com TRAFFIC CONTROL PLAN PERMIT# BLD2021-165 EDMONDS, WA rM-0 �. hL R SPEED LIMIT Ism 45 HIGHWAY 99 0 0 500 SR 104/EDMONDS WAY ROAD" WORK AHEAD \A/') rl— 1 CONTRACTOR: Edmonds Development LLC CONTACT: Johnny Vong, 206-552-9053, johnny@blackfishcapital.us PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, elitetrafficsolutions@gmail.com, 206-922-9205) TCS # 12886, Expires 6/30/2025 F--�IN F6. t + Adfro T i f 4 CONTRACTOR TO CONTACT BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER; PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH THE HIGHWAY 99 RESTORATION PROJECT. ,Bertrand. hauss@edmondswa.gov or at 425-771-0220 "Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless . a variance has been granted pursuant to ECC 5.30.120. " BUFFER DATA BUFFER SPACE = B OR SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (FT) 155 200 250 305 1360 425 495 570 645 730 PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE TYPICAL PROTECTIVE VEHICLE TYPICAL PROTECTIVE VEHICLE STATIONARY OPERATION TYPE WITH TMA (WITH TMA) LOADED WEIGHT (feet) (LBS) wM0 VW VW MINIMUM WEIGHT 15,000 LBS 4 YARD DUMP TRUCK (MAXIMUM WEIGHT SHALL BE IN SERVICE TRUCK ACCORDANCE WITH 30 MIN FLAT BED, ETC. MANUFACTURER RECOMMENDATIONS ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT * A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IF A TMA IS AVAILABLE, IF NO TMA IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TO SHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED. �9�m71 ■ SIGN SPACING=X (FEET) (1) FREEWAYS & EXPRESSWAYS 55/70 MPH 1500±(OR AS PER MUTCD) RURAL HIGHWAYS 60165 MPH 800' I RURAL ROADS 45155 MPH 500'--4- RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'� RURAL ROADS, URBAN ARTERIALS 25130 MPH 200'±(2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'±(2) ALL SIGNS ARE 48" X 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. (1) All spacing may be adjusted to accommodate interchange ramps, at -grade intersections, and driveways. (2) This spacing may be reduced in urban areas to fit roadway conditions. it � I Legend SPEED LIMIT 35 0 ROAD WORK W20-1 a Fdm 14 ® Arrowboard (Chevron) Barrel Construction Fencing T �• Flagger � e l ,,0 ' I Northbound Traffic Marked Path -•� ' i Sign Stand 4ft- N traffic light T Work Area EVISED 6/21/20221Y Elite Traffic Solutions 206.922.9205 Christina Moullet CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 40 80 35/45 Q0 60 25130 20 40 MINIMUM TAPER LENGTH (L) IN FEET Lane Width Feet 25 30 35 Posted Speed (mph) 40 45 50 55 60 65 70 10 105 150 205 265 450 500 550 11 115 165 225 295 495 550 605 660 12 125 180 245 320 540 600 660 720 780 840 7=Mrw All Signs &Spacing to conform to the MUTCD Standards -reference WSDOT "Work Zone Traffic Control Guidelines M54-44.04 January 2021 " &The City of Edmonds Si 6/22/2022 7:33:18 AM REVISED 2 23601 HWY 99 DELIVERIES & CONCRETE WORK TRAFFIC CONTROL PLAN SHEET 1 OF 2 CONTRACTOR: Edmonds Development LLC , CONTACT: Johnny Vong, 206-552-9053, johnny@blackfishcapital.us _ PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, -7 elitetrafficsolutions@gmail.com, 206-922-9205, TCS # 12886, Expires 6/30/2025 r Community Transit a minimum of 15 days :e of the work. sounawo/se originating nom temporary construction sites as a result or construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours c T00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites7activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120." n� REGENCYCENTERS - 23632HWY 99 ' Edmonds Development has been made aware of the up -coming City project (Hwy 99 Revitalization Project from 244th to 212 ccording to The City of Edmonds, the start date for the City project has not been determined at this time. he traffic control plan for work on Highway 99 may need to be revised depending on the progression of The City Project or ork delaved for Edmonds Development Project BLD2021-1653. =IC CONTROL I ,NDS, WA Ii IRul.II—a IMRI-J -in, LULL-r—ml VOLITION, SITE PREP AND UTILITIES NCRETE WORK/DELIVERIES IS ANTICIPATED START NOVEMBER 7TH, 2022 - INTERMITTENT %MOBILE CF /j AREA PERMIT# BLD2021-1653 X 17TH, 2023, 157 DAYS _AGGERS SHALL CONFORM WITH WAC: 96.155.305, 468.95.3015 AND 468.95.302. _AGGERS SHALL BE IN RADIO CONTACT AT ALL TIMES. VALID FLAGGER CERTIFICATION CARD IS REQUIRED WHEN ANY FLAGGING IGGERS ARE TO STOP PEDESTRIANS TRUCKS ENTER - EXIT FROM THE PR CONTRACTOR TO CONTACT BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER, 12,/ PRIOR TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH THE HIGHWAY 99 RESTORATION PROJECT. Bertrand.hauss@edmondswa.gov or at 425-771-0220 Legend o -- Construction Fencing ® Container Pedestrian Walkway CONFER WITH CITY TRAFFIC ti Flagger ENGINEER REGARDING NUMBER OF ARROW BOARDS Project Gates 500'.* REQUIRED. ® Project Site ' i Sign Stand ■ Trucks Entering Exiting Project Site � ♦ _ri - SPEED LIMIT - RUCI(8 -- ._.._..... r• ENGINEERING DIVISION 0 _ APPROVED AS NOTED r BERTRAND HAUSS FAMILY PANCAKE HOUSE EDMONDS F"�-Awf1 500' 23725 HWY 99 7/02/2022 r' r, yi ROAD WORK _ HEA W20-1 7-11 8101 238TH ST SW v �Yi MPH I TAPER SIGN SPACING TAPER TAGENT 45 540' 500' 30' 60' ~ MPH TAPER SIGN SPACING TAPER TAGENT 25 125' 200' 20' 40' EVISED7/28/2022 Elite Traffic Solutions SHIFT TAPER = 1/2 TAPER Chris naMo�let 4�k% ftat 7,1 SHOULDER TAPER = 1/3 TAPER All Signs & Spacing to conform to the MUTCD Standards -reference WSDOT "Work Zone Traffic Control Guidelines M54-44.04 January 2021" & The City of Edmonds Standards. tw REVISED 2_23601 HWY 99—DELIVERIES & CONCRETE WORK TRAFFIC CONTROL PLAN SHEET 2 OF 2 TRAFFIC CONTROL PLAN --PERMIT# BLD2021-165 j General Notes: "SoundTloise originating from temporary construction sites as a result of construction EDMONDS, WA 1. Al signs and spacing shall conform to The MUTCD and WAC. activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of _ CONTRACTOR: Edmonds Development LLC 2. Priority passage through the work area for emergency 7:00am to 6:OOpm on weekdays and 10:00am and 6:OOpm on Saturdays, excluding vehicles shall be provided at all times. Sundays and Federal Holidays. At all other times the noise originating from CONTACT: Johnny Vong, 206-552-9053, johnny@blackfishcapital.us 3. Alert Community Trecom 0 days in advance 4. Protective vehicle recommended may be work vehicle. construction sites/activides must comply with the noise limits of Chapter 5.30, unless t"':- -- 5. Devices should not encroach into adjacent lanes. a variance has been ranted pursuant to ECC 5.30.120." - 'S.it PREPARED BY: Christina Moullet, Elite Traffic Solutions LLC, 6. Al signs min. 48 x 48 B/O unless otherwise specified. elitetmffiosolutions mail.com, 206-922-9205, TCS # 12886, @9 7. Channelization devices are 28" reflective cones ,;;k Expires 6/30/2025 8. Al sign spacing may be adjusted to accommodate at -grade , intersections and/or driveways. 9. Maintain Minimum 12'travel lane., ,,.__ ry Edmonds Development has been made aware of the up -coming City project (Hwy 99 Revitalization Project from 244th to 212th"t -cording to The City of Edmonds, the start date for the City project has not been determined at this time. he traffic control plan for work on Highway 99 may need to be revised depending on the progression of The City Project or ork dela ed for Edmonds Development Project BLD2021-1653. _ CONTRACTOR TO CONTACT BERTRAND HAUSS, CITY TRANSPORTATION ENGINEER, TO TRAFFIC CONTROL SET-UP ON HIGHWAY 99 TO AVOID CONFLICTS WITH lPRIOR THE HIGHWAY 99 RESTORATION PROJECT. f Bertrand.hauss@edmondswa.gov or at 425-771-0220 r\ MCI W 20-1 All Signs & Spacing to conform to the MUTCD Standards -reference WSDOT ."Work Zone Traffic Control Guidelines M54-44.04 January 2021 " & The City of Edmonds 1 236TH ST SW Al �•t � ATCHLINE SHEET 2 ibet � 236TH ST SW i w to 1'