Loading...
APPROVED RESUB 1 BLD2021-1653+Landscape_Estimate+5.3.2022_8.41.47_AM+28426281 ]49301YAN A[: RESUB PROJECT NAME: PROJECT #: ADDRESS/PARCEL: PREPARED BY: LANDSCAPE ESTIMATE APOLLO APARTMENTS 23601 HIGHWAY 99 ORIGIN DESIGN GROUP, ILC 1425 346-1905 May 03 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT UNIT PRICE UNIT TYPE QUANTITY PRICE SOIL PREPARATION A. TOPSOIL (6" DEEP) $ 25.00 CY (cubic yard) 55.50 $ 1,387.50 B. MULCH (2" DEEP) $ 4.00 SY (square yard) 840.00 $ 3,360.00 C. PEAT MOSS (2" DEEP) $ 2.30 SY (square yard) D. COMPOST (3" DEEP & TILLING) $ 26.00 SY (square yard) E. FERTILIZER $ 6.67 CY (cubic yard) PLANT MATERIALS A. DECIDUOUS TREES 1.75-2.00" CALIPER (minimum height 10') PERIMETERS AND PARKING AREAS $250 EACH Cost & Labor 12.00 $ 3,000.00 1.5-1.75" CALIPER (minimum height 10') INTERIOR LANDSCAPING AND OTHER REQUIRED LANDSCAPING $225 EACH Cost & Labor 29.00 $ 6,525.00 3.00" CALIPER DOWNTOWN ZONES $275 EACH Cost & Labor B. EVERGREEN TREES FIVE (5) FEET OR ABOVE $150 EACH Cost & Labor 74.00 $ 11,100.00 TEN (10) FEET OR ABOVE DOWNTOWN ZONES $175 EACH Cost & Labor C. SHRUBS $35 EACH Cost & Labor 467.00 $ 16,345.00 D. GROUND COVER $4 EACH Cost & Labor 1882.00 $ 7,528.00 MISCELLANEOUS TREE STAKES $2.65 EACH Per Stake & Labor 82.00 $ 217.30 PLANTERS 2' X 2' $ 483.00 14 $ 6,762.00 PLANTERS 5' X 5' $ 1,932.00 13 $ 25,116.00 PLANTERS 5' X 2' $ 974.00 17 $ 16,558.00 IRRIGATION $ 0.80 Square Foot 11779.00 $ 9,423.20 TOTAL PRICE: $ 107,322.00 Prices based on Kenmore bond quantiity worksheet.