Building PermitType: RETAINING WALL Subtype: RESIDENTIAL RW I Status: ISSUED
Parcel No: 00565600200202 Site Address: 18500 OLYMPIC VIEW DR EDMONDS,WA 98020-
2349
Subdivision: 005319, 005656, 004346 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: NIESEL-RETAINING WALL, INV2022-0013 LANDSLIDE
WA State Contractor L & I #: TRACKTE866NE
Applied: 8/24/2023
Issued:10/5/2023
Final:
Expiration Date: 4/2/2024
Issued by: BAC
CONTACTS
_.mm
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
SEAN NIESEL
15651 S PEBBLE LN, FORT
(239)478-1444
NIESEL@SHALIMAR.COM
MYERS FL 33912
15651 S PEBBLE LN, FORT
CONTACT
SEAN NIESEL
(239)478-1444
niesel@shalimar.com
MYERS FL 33912
3004 S Lake Stevens Rd, LAKE
CONTRACTOR
ON TRACK EXCAVATION
STEVENS WA 98258
OWNER
*SEAN NIESEL
15651 S PEBBLE LN, FORT
(239)478-1444
MYERS FL 33912
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT#
BLD - PERMIT BASE FEE
001.000.322.10.000.00
$100.00
$100.00
10/4/23
R31741
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
9/14/23
R31346
PERMIT
CONSULTANT PEER REVIEW
001.000.245.965
$3,500.00
$3,500.00
10/4/23
R31741
RETAINING WALL - RES - PER WALL
001.000.345.83.000.00
$656.00
$656.00
9/14/23
R31346
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
10/4/23
R31741
RES
TOTALS: $4,307.50
$4,307.50
RP
• •
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, October 05, 2023 2:03:54 PM 1 of 3
RETAINING WALL Permit
City of • • • -
98020 1 D6
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Special Inspection for:
1. Soils as per Geo-technical Engineer
REQUIRED SPECIAL
FOR
2. Installation and construction of soldier pile wall
INSPECTIONS
INFORMATION
3. Inspections of on -site storm system: Post wall construction and inspection of repairs as
required
RESTORE LANDSCAPE
FOR
Restore landscape to like or better conditions
NFORMATION
FOR
MANUAL ENTRY
INFORMATION
SEPARATE PERMITS REQUIRED
At time of permit application there is an existing deck and spa located in the area of
FOR
FOR
proposed work to be done (Soldier pile installation).
INFORMATION
Reconstruction of the Deck may and or will require a separate Building permit along with
associated permits for the reconstruction of the deck.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Printed: Thursday, October 05, 2023 2:03:54 PM 2 of 3
RETAINING WALL Permit
City of • • •
3610
www.edmondswa.gov
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
A Special Inspection agreement is required for this project. It is the owner/contractors
SPECIAL INSPECTIONS
FOR
responsibility to ensure inspections take place and that reports are provided to the
ENGINEERING
INFORMATION
Engineering Division on a weekly basis at Engineeringpermits@edmondswa.gov.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NTESO
X-2 ENGINEERING FINAL
E-5 ENG SPECIAL
NOTE TO INSPECTOR: REFER TO SI AGREEMENT. GEO
INSPECTION
TO INSPECT STORM SYSTEM POST WALL
CONSTRUCTION, AS WELL AS ANY REPAIRS REQUIRED
PER DEFERRED SUBMITTAL REVISION.
A-1 TESC AND MOBILIZE
A-1 ENGINEERING PRECON
NOTE TO INSPECTOR: GEO HAS INFORMED THAT
EXIST. STORM OUTFALL IS DAMAGED AND NEEDS
REPAIR. DEFERRED SUBMITTAL REQUIRED FOR
STORM REPAIRS.
B-5 BLDG SPECIAL
The installation and construction of the proposed
INSPECTION
soldier pile wall
Soils as per Geo tech Engineer report
Special Inspections are required for this permit:
A-1 BUILDING PRECON
The installation and construction of the proposed
soldier pile wall
Soils as per Geo tech Engineer report
Special Inspections are required for this permit:
X-3 BUILDING FINAL"
At time of permit application there is an existing deck
and spa located in the area of proposed work to be
done (Soldier pile installation).
Reconstruction of the Deck may and or will require a
separate Building permit along with associated
permits for the reconstruction of the deck.