Loading...
ENG2023-0278 WATER AVAILABILITY CERTIFICATERECEIVED Jun 13 2023 pF EOdq() CITY OFEDMONDS DEVELOPMENT SERVICES v WATER AVAILABILITY APPLICATION DEPARTMENT Complete and submit this form through www.MyBuildingPermit.com. SECTION A Applicant Information Contact/Applicant Name Alvin Wong Phone Number 4254181235 Email Alvinwong@atdreamsllc.com Address PO Box 7207 City Bellevue State Wa Zip 98008 Property 1nf• Project Name Skypiea Associated Permit Number Address TBD City Edmonds State Wa Zip 98206 Parcel No. 0051310009006 Does the property currently have water service? ❑ Yes (City of Edmonds water) No Describe project (number of buildings, number of units, number of stories per building): Single SFR with 2 stories and a basement In what phase is the project? ❑ Design Review ❑ Preliminary Plat 0 Building Permit ❑ Rezone or Other Associated permit application number(s), if applicable: SECTION B V Applicant certifies that this project is a single-family residence, multi -family project of four units or less with combo water/fire lines, or short plat subdivision (four single-family lots or less), in which case completion of a full utility availability study shall not be required. Please sign below and submit this form through www.MyBuildingPermit.com. APPLICANT REQUESTING STUDY FOR WATER OFF 76TH AVE W ❑ For all other permit types, a utility availability study is required and associated fees will be due. Please submit the complete application through www.MyBuildingPermit.com. APPLICANT SIGNATURE. APPLICANT PRINTED NAME: Alvin Wong DATE: 06/13/2023 Form Updated 12/9/2021 WATER MAIN ON 76TH IS MUCH LOWER PRESSURE ZONE AND IS NOT ABLE TO PROVIDE SERVICE TO THE PARCEL. THE FOLLOWING INFORMATION IS PROVIDED FOR THE EXISTING WATER MAIN ON 74TH. SECTION C 1. 2. 3- 4• Z a. Water will be provided by service only to an existing main that is 29 (feet) from the site. OR 4 (size) water ❑ b. Water service will require an improvement to the water system of: ❑ (1). feet of water main to reach the site; and/or ❑ (2). The construction of a distribution system on the site; and/or ❑ (3). Other (describe) 0 a. The water system is in conformance with a City approved water comprehensive plan. OR ❑ b. The water system improvement will require a water comprehensive plan amendment. (This will cause a delay in permit issuance and approval.) 0 a. The proposed project is within the corporate limits of the City, or has been granted Boundary Review board approval for extension of service outside the City, or is within the City approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. M a. Water is/or will be available at the rate of flow and duration indicated below at no less than 20 psi - Measured at the nearest fire hydrant feet from the building/property (or as marked on attached map) Rate of Flow ❑ Less than 500 gpm. (approximately gpm) ❑ 500 to 999 gPm ❑ 1500 gpm or more ❑ Flow test of gpm ❑ Less than one (1) hour ❑ One (1) to two (2) hours ❑ Two (2) hours or more ❑ Other Duration Z Calculation of 388.6 gpm (Commercial building permits require flow test or calculation) OR ❑ b. Water system is not capable of providing fire flow. Water Agency Certification Comments/Conditions: The watelecl on 76th Ave W e in a much lower pressure zone and is not able to service to the parcel. The cenneraion for fre antl water service shall be matle on the existing water main on 74th Ave West If atltl4ional flow/pressure is neetletl, over E information provi0etl below the existing wetelmain on 74th will nee0lo be ups¢etl. the beup For the existing watermain on 74th: the existing Static Pressure= F-- MaximumAvailableFlow= Pressure al Max Available Flow =90,4 w = 90 46psi I hereby certify that the above information is true. This certification shall be valid for one year from the date of signature. City of Edmonds Michele (Mike) F. De Lilla (Agency Name) (Signatory Prin d N me) Senior Utilities Engineer VYJ(St—�hatul4Date (Title) Form Updated 3/28/2023