Loading...
ENG2023-0456 ROW PERMITRIGHT OF WAY PERMIT PERMIT NUMBE3 City of Edmonds 98020 ENG2023-14 www.edmondswa.gov i Description: ROW -REQUEST TO REMOVE 1 ROW TREE WITH REPLANTING ISSUED: 10/06/2023 Address: 8307 214TH PL SW EDMONDS WA 98026-7457 EXPIRES: 04/05/2024 Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00467400001202 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT MATHEW BRENAN 318 SE EVERETT MALL WAY, EVERETT WA 98208 (425)248-5765 CONTACT WESTERN HEMLOCK TREE & STUMP 318 SE EVERETT MALL WAY, EVERETT WA 98208 (425)248-5765 SERVICE CONTRACTOR WESTERN HEMLOCK TREE/STMP SRV 318 SE EVERETT MALL WAY, EVERETT WA 98208-3258 (425)362-8284 OWNER BONNYJ KINGEN 8307 214TH PLSW, EDMONDS WA 98026-7457 INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $126.00 $126.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS AL REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: GRN DATE: 10/06/2023 Printed: Friday, October 06, 2023 3:21:33 PM 1 of 2 RIGHT OF WAY PERMIT PERMIT NU �!B E City of Edmonds SID www.edmondswa.gov • • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. • PECTION TYPE DATE 7TESC RESULT NOTES 17 COMPLETE MOBILIZE X-2 ENGINEERING FINAL" Printed: Friday, October 06, 2023 3:21:33 PM 2 of 2 RECEIVED Sep 13 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance -Mth the Submittal Re-quirements outlined in Right -of -Way permit Handout E6;1. If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A O61dppli, Name of Company- 6 � �� A, Franchise Ordinance No: Point of Contact Title [� �_ Address 3u 7 �-� 1 00 City State Zip g z- Phone -� L/1 7 " 3 it y Email J2 G �n�f i�/ry ! 0 A. I C rrrv� Contractor and Authorized Agent of Owner , -. Name of Company L- 5 7_,E-1Z4V 1y//11C �L �Jt�� r`S�Uh! W During ' I ame )1 Ltyi _&gent Name /���( —w f -28 "A -A / Title Title _X�_r�p, a W t1' C %'rt.'1 / F) A e—b s Mobile L• Address ? G ✓ L� /t BI%�let- l�i/l Email City t State Zip 2-b6 Secondary Name Phone 22 3 Z _ 7� Title /_2M Email !�T/ 14,V e WL,� 14,� Z 5 Mobfie / City nds Bu�iss Lace ro pZ 1Sr C1 ceJl l mail State License No: 1, /t/ 6 Tr-, h �- 77 a i z_ qX Contractor verifies it is currently bonded I Contractor verifies it currently has general liability insurance NOTE: ECDC18:6o.o2o requires that 7thheeApplicationt,(tAsagned by a licensed and bonded contractor unless otherwise approved by the city engineer. of 0 —97J ' 2i��77S-9/ Type of „apply Multifamily residential o Commercial ❑ City project 9 TSingle family residential subdivision ❑ Demo and rebuild or from vacant land? a Other, please specify: o Single family -other ❑ industrial o Utility Franchise Work .associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) Cty of Edmonds R011 construction permit Application --Page 1 of 3 Updated 3/25/2021 Utility Franchise Work (no associated development) Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, uvires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e,g,, bores; trenches, overhead wires proposed, depth for underground utilities, etc,) FIGHT -OF -WAY CLOSURE AREA TOTAL DURATION (.Number of Months) Sidewalk 72 hours + LF x LF SF ! Allen 72 hours + LF x LF SF Parldng 72 hours + LF X1 LF SF SECTION B - If you are not a utility company pet forming zvork in the City ROW, skip to SECTION G WL" 11-t� /tIvf-A UrIt t4 (` , f 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas a water ❑ sewer ❑ storm Details of Work to be Completed i. i Does the utility owner have existing overhead infrastructure in the area of work? 2, i Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If Yes, describe: S. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? b. ` Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work- o be Completed Yes No b, i Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permitApplication—Page 2 of 3 Updated 3/25/2o21 If yes, answer the fofloiAng questions related to project area, i.e. the actual area in which the roiect is proposed: 6a. Does your project involve wiresleables/lines?i Ifyes: j I ! How many are existing? Howmany are to be added? 6b. , Does your project involve poles? If yes: { How many poles are existing in the project area? What is the beigbt of the existing poles? How many poles are to be removed? t Are additional Kles to be laced? How manor? I I What is the height of the additionalpoles? 6c, Are any poles to be modified/rebuilt/replaced? If yes: s How mane? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verif iug completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and standards. All street cut trench work shall be patched -with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance, The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any Iand or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements, Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply i� itb them to the satisfaction of the City Engineer. Applicant further agrees to comply »pith the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant, I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Pees, The Al APPLICAN1 T apPLICA:'TPRI?N'TED ',,.: ! ' A--rU `CPV P—Xeq AYi' % -} APPLICANT TITLE: K NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3J26/2021 WI WW1W N ,.-I WlvldWqXwp qmw uV R. tPe6V1 Y`WC LPNV vU tl{mmw,uop tt'1 asnlap"Z I PsMnlP slsla V 1 vErl NN {9 epgXttud M:149^. Lp47 l ZS wv. m, 19XV �/ n 1Nx+Pa' t xub )991YP Kara Ru 1 w f AI,"P �o ur!ga rP X'9n InIX N I 4Alunoa 49xuvy9uSll Va bail. 'wwb1199n a Ryl4suaRa (F w ie aNlt1 Pry111aan 9srv�9Na Abu 9s am9w9waiaR ♦9ntllM mmaixe Rug MI9Nau;9 �o Alpx{Xw'ty9:ew.16 AIUP1iCw AxX u:ago9!F A199a1C9b We WXXI pnur4urq qN0 bll lb AI'IC9C i0 9X64''491Yw09'R?WUP9'.1]11.19tC';W Iu9a 9411Y11u�X9W9AlYeuPx M uNXrvlm96idb�bX sngXUl w0 R1,9Ar,)y5x.+n1a15't4WIVNbWa1 lal PXt1mnIN NQQQ Alhu 'rupvnwd9WyAIUM9 gGObgbN 1 irV aNW.iq'49v9gUP9n Wes1U9wpuVu4 'a+o;)Awnoo,rvavaplly eN 7o uFwlvox WUM q�mnelu mrXuo uX wlPP�'In wof loll n.i WC Rlw 5v9aLlx1 vnilvlHnn' wl Xrv'(,aKp.l u++vX Y WI;Xv w4vuw{ui WC'v1UP'vbUW W peO2j Ie00-1 ajno�j ajejS alelsia}ul sadl( . aa}eM 1saao-1 Ieu011eN Ted Alunoo Ampuno8 A1i0 LZoZ Sales Juaoa�j ZZOZ sales Juaoad sZOZ sales Juaoa�] ia0Xd puafia-1 t uo;RulNouM Josses9v A;uno3 a S1,LU0 0US �. i 2�81 aonadS NI` AAA A Ol ald selbnoa ENGINEERING DIVISION "'DTED _ pI� 0/05/2 repair/replace all OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING lities or frontage ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY i City right-of-way UTILITIES MAY REQUIRE A SEPERATE PERMIT. Is that is caused or _ � permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROLAND DRAINAGE 1NANI2A /dd4 SN1 Jvd Ails Ol adl`dNOa d9 Ol S9A2i1 AAli rN E 'VA2J / SIHi ! NI a91NVdA2J 39 Ol dbrllA109HV Z L Z, qct040 �5 mac% `�%►l2`, L ��� SIGN SPACING = X (1) RURAL ROADS & URBAN ARTERIALS 35 140 MPH 350't RURAL ROADS, URBAN ARTERIALS, 25 130 MPH 200't (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 1001t (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. MINIMUM SHOULDER TAPER LENGTH = Ll3 (feet) SHOULDER Posted Speed (mph) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8' 40 40 60 90 - - - - - - 10' 40 60 90 90 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8' BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. HOST VEHICLE WEIGHT > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED CHANNELIZATION DEVICE SPACING feet MPH TAPER TANGENT 35/40 30 60 25/30 20 40 O 9 b 4 ® ® �¢ WORK AREA X X L/3 B R 50, 48' 41" ROAD WORK SHOULDER AHEAD WORK 48' 4s" ENGINEERING DIVISION W20-1 W21-5 ­)TED 0/05/2023 NOTES LEGEND 1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT). K TEMPORARY SIGN LOCATION SHOULDER CLOSURE - LOW SPEED 2. ALL SIGNS ARE BLACK ON ORANGE. O CHANNELIZING DEVICES (40 MPH OR LESS) PROTECTIVE VEHICLE NOT TO SCALE FILE NAME S:\Desi n R P& SW-SOndardsl2-Plan Sheet Libra 101-Published PSL\ TC Work Zone Traffic Control\ TC-5 Shoulder Closure - Low Speed 40 MP or Less)\TC-5.dgn Plot 1 TIME 2,59,41 PM s Tr FED.AID PROJ.NO. AmokRux Rv DATE 1/212018 Y�/� PLOTTED BY Ilddslf WAS �I/ TCS� DESIGNED BY Joe xo..ER ENTERED BY Washington State .... CHECKED BY coxTRnm x iounox "". Department of Transportation oR PROJ. ENGR. re " E TRAFFIC CONTROL PLAN REGIONAL ADM. REVISION DATE BY