Loading...
2023-09-19 Planning Board AgendaOF BbMG ti Agenda Edmonds City Council 1,00 SPECIAL MEETING BRACKETT ROOM 121 5TH AVE N, CITY HALL- 3RD FLOOR, EDMONDS, WA 98020 SEPTEMBER 19, 2023, 5:00 PM PERSONS WISHING TO JOIN THIS MEETING VIRTUALLY IN LIEU OF IN -PERSON ATTENDANCE MAY CLICK ON OR PASTE THE FOLLOWING ZOOM MEETING LINK INTO A WEB BROWSER USING A COMPUTER OR SMART PHONE: HTTPS://ZOOM. US/J/95798484261 BY PHONE: US: +1 253 215 8782 WEBINAR ID: 957 9848 4261 1. CALL TO ORDER 2. ROLL CALL 3. COUNCIL BUSINESS 1. Presentation of Proposed 2024-2029 Capital Facilities Plan & Capital Improvement Program (90 min) ADJOURN Edmonds City Council Agenda September 19, 2023 Page 1 3.1 City Council Agenda Item Meeting Date: 09/19/2023 Presentation of Proposed 2024-2029 Capital Facilities Plan & Capital Improvement Program Staff Lead: Rob English, Oscar Antillon, Angie Feser & Shannon Burley Department: Engineering Preparer: Rob English Background/History Staff Recommendation Hold public hearing at the City Council meeting on October 3, 2023. Narrative The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City's Comprehensive Plan. CFP projects are capital improvement projects that expand existing facilities/infrastructure or provide new capital facilities in order to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects. These preservation projects are part of the six -year capital improvement program (CIP) along with capital facility plan projects that encompass the projected expenditure needs for all city capital related projects. The Public Works and Utilities Department proposed 2024-2029 CFP/CIP is included as Attachment 1. The Parks, Recreation & Human Services Department proposed 2024-2029 CFP/CIP is included as Attachment 2. The Public Works & Utilities presentation is attached. (Attachment 3). A public hearing on this item is scheduled for the Planning Board on September 27, 2023. The City Council is scheduled to hold a public hearing at the October 3, 2023 meeting. Attachments: Attachment 1 - Public Works CFP-CIP 2024-2029 Attachment 2 - Parks CFP-CIP 2024-2029 Attachment 3 - Public Works CFP-CIP Presentation Packet Pg. 2 CRY OF EDMONDS ` PUBLIC WORKS 2024-2029 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM oi Rl 3.1.a TRANSPORTATION & UTILITY PROJECT MAP..............................................................ii FACILITIES & WWTP PROJECT MAP............................................................................iii TRANSPORTATION...........................................................................................................1 Ire PRESERVATION/MAINTENANCE PROJECTS............................................................6 SAFETY/CAPACITY ANALYSIS....................................................................................15 NON -MOTORIZED TRANSPORTATION PROJECTS ......................................... 39 FERRYPROJECTS....................................................................................................64 TRAFFIC CALMING 66 ................................................................................................ TRAFFIC PLANNING.............................................................................................. 68 GREENSTREETS......................................................................................................71 WATER........................................................................................................................... 73 STORMWATER.............................................................................................................. 78 EDMONDS MARSH ESTUARY RESTORATION RELATED PROJECTS .....................80 PERRINVILLE CREEK BASIN PROJECTS..........................................................................82 STORM DRAINAGE IMPROVEMENT PROJECTS...............................................86 ANNUALLY FUNDED PROJECTS..........................................................................89 COMPLIANCE RELATED PROJECTS.....................................................................92 SEWER............................................................................................................................ 94 FACILITIES.....................................................................................................................101 WASTEWATER TREATMENT PLANT.........................................................................123 CIP-CFP COMPARISON(2024-2029)....................................................................135 as Packet Pg. 4 CIPICFP v1.7 PWT-05 FPW,,,/PWT-65 T-07 �X-.� PWT-04 ,— PWT-51 PWT-21 PWT-06 PWT-06 PWT - • PWT-03 `PWT-09 �tVr �� PWT-12 ,C PWT-35 I PWT-3PWT-48 PWT-19 /PWT-16 - J • PWT-11 PWT-25 PWT-15 22 PWT-08 IWTI20 A PWT-13 PWT-14 P.WT 3 1 Mp,-WT-31 PWT-23 PWTP PWT-50 PWS-11 lNiffIL an (*IPWWO6 f �� PWT-10 PWT-26 0 * Site specific projects only. Citywide/annual citywide projects not shown. PWT-4311 Packet Pg. 5 S���w�►��p �♦ *� ��s�, • p� WF-0141 4el PWF-07, 4 Zak �y WP# W ^T PW0 : �I o yJ=y PWF-100 �PiWr�09: A Iw-§all FitFor U "uml �1. o q PWF-13�� . ,, 014 I us MEN Z .E*'■E�F li ■''���ELTi PWF-09 M T-03 1P • PW 3 PWF-10 14 RUB' IEPF-23 F PWF=13�� 0 * Site specific projects only. Citywide/a—nnual citywide PWF-08 • ��- ---FA. --TWA �-A rolects no sown." Packet Pg. 6 3.1.a 1 Packet Pg. 7 O O Cl) O O O O O O O O O O O O O o • O O O LO O LO O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O (fl a0 M_ O O I-�_ '_ _M_ M O O N P-_ O O I;t (.4 CV 00 Fsi � O LO Cl) m O V O L() O LO O 00 N O LO ti C9 M V N r— N 00 N O N (V EA Ef3 (fa Gr3 Ef3 - - I� _ O v LO Ha H) M ; N M N 6.> Ha • Ha Ha K-J H) K-J H) K-J Ha (t> O O O O 613 (f> O E03 O (ia O 613 O (ia O 613 O (ia O E03 O E03 O O O O O O O O O O O O O Fsi O (fa m _ O O O O O O O :t O O Cl) O O N PI- Q LC) O r- (D M C` (0 Nr O (D V N N (� M O N � Cl) N 06 (fa Ef3 EA E!? E!3 Ef3 (!J = LE O O Cl) O O O O O O O CD CD O O O O CD O d O O O LC) O LO O O O O O O O O O O O O O O O O O O O O EA K-J H) (t? O O O O y • O O O (fl C70 M O O f- 1;1 M O d O O 0) N 00 69 r co LO Cl) (A W V O LO O LO O 00 N O LO O LO 00 N O N _ (,.i Ha 0=1 64 Grl ti 6F) Lfi CM .O Ef-J K-J � � EA Ef3 E!T LL O O O O O O O O O O O O O O O O O O O m CD 61) Ha Ef3 Ha O (A Ef3 CD 69 Ka O O e4 H? Gq HJ O (A y O O O O O O Q O M M O -Izi O Cb r- V (.0 co 61) ItCD 61) (V 69 Ch (fl N Ef3 N Ef3 O N O O O O O O O O O O O O O O O O O O O V N O O Ha Ha O O O O O O EfT 691 O O Ef3 O O e4 O O E43 Ka EA 69 O O O O O O (O (6 o O N o Cb N N (Mp - LO LO O NOr- N Ka (!a Ka (4 C•7 61) Cn 6a (tJ 69 (tJ p C O O O O O Ka 69 O O O O O Ka O Ha O Ka O O O Ka O O O O O O Ka K- O H) O Vy O O O O L a _CL O O O O O O O O O M 6 O � O (00 O C C O (D ER _ O Cl) LO N _ = Q N C N 61) 613 O R O O O O O O O O O O O O O O O O O O O w+ = O E!a (A 613 (A Ef3 O 691 (A 613 O O (A Ef3 69 EA (!3 Ef3 (A d — O O CD O O O N O i M M O O a IL ,w (tT (fJ Ef3 V ER � v+ N Z O O O O CD CD CD O O O O O O CD O N O O O 6q (fJ Ka (fJ Ha O O CD N O O O (fJ Ka O O CD (Cl) O O O K-J Ka (A H) K-J 6q (fJ 04 04 (D N U O O O Cl) O LO O EA O Ha O 613 O (A O O O 69 O O O O O O O (A O E9, O (A O 613 O (A O 6q O (A ' a _ O O LO O O O O LL 0 00') 0 0 0 U y N N Y +r 61).E!) Ef3 � � o a� � a Q O N > d 0')M LC) O (A p _ > p) > _O �� "-O O CA O CA C) CT C) (A Q O U v.. O 0 L a � 0') C6 C6 6 6 6 6 y _ 0 � � a N <n Q (n (n (n (n (n (n fn CO w COLn d T E > c o a`) 'O C c c O c O c O c O c O c O c O N O L 2) U) c > O U m m i� m i� is io is (n V �► i > Q >, 0 N _O p p N N N N N N N N p > yr L O m > > Q m co m m m Q a Q O > 0) / ) (� a) H O �/ � a ai (D E O O CL > a) \ O gym) L.L tea)) LL tea)) L.L tea)) LL tea)) L.L tea)) LL tea)) L.L tea)) LL M O E v/ >> m o (n v> L (n U rn N (� rn (� rn (� rn rn U > E • f6 t� a> > � U) c a U) Q N E LO a a r � O a) > CM O >, O > O > m > m > O > O > N NCj) m O c t a 0 Q am (� t` co 2 a0 am �� in N 2 T� O U)�' Vi N 2 (q 2 2 2 2 2 2 2 (n 2i E r Q x x x x x x x x x x x Cl) It LC) w h — 00 00 C) O N M LO O ti 00 H H H H H H H H H H H H H H H H H H >H a a a a a a a a a a a a a a a a Packet Pg. 8 CIP/CFP vl.7 2 o Lo O O O O 0 o O 0 O O r- ti O o O O O O O 0 rn O O LO O O O O O O O O N O CO (9 O O r- U5 .1 L O O O 0') 00 N r— _ _ N _ O M LO O LO N N LO Cl) (0 r- O H) (f> 00 � 693 r-� M va Ef> (f> Qa ER d) 6s 6s 6s O O O O O O O O O O O O (A EF> H) ER K-? O O O O 69 6s 69 O O O O r- _L N _L M O It r- r-: M 61D ER 69 ER (D LO O O O O O O O O O O r- ti O O O H) 6f3 EA (f> O O O O LO O O O O N O O 0')O O('M (A O N - O O LO N CV LO O (f> EF> 6r, � 61Y H? Ef> (A 0 0 0 0 0 0 0 0 o O O O 0 0 0 0 0 0 0 0 o O O O 0 O 0 (f> 613, 69 (s> cf> (» (s> 0 O 0 (fl 00 N O NN N (f> (f> O O O O O O O O O O O O O O O O O Efl (f> 69 60> 0 6f3 Ef> O O O O O O O O O C O (D - W N O (9 'i (f> (f> (Al Ei) (A O O O O O O O O O O O O (f> V> (f> W (f> W ER (R (-J 64 (f> 64 0 O (fl 00 0 O O O 0 O r- O 0 O O 0 O N O 0 O M Cl) 3.1.a O 00 ti00 ER (f> ER d) (f> 6 fA O 613 O ER O O O r- O (fi O !A O (R O GG f s CM O (A C � CI S O O (D Lr) 00 O O 00 O O (A O O 00 Cl) O O N 00 LO O O CM Cl) Cl) f O O C 00 C Cl) I,- (f> (f> d) (f> � fA •C C u 0 0 0 N 0 U> 0 (» 0 cf> 0 0 0 N M 0 (» 0 U> 2 S C LO C c c c 0 0 -17 ONO 0 0 N O 0 0 0 0 o N 0 0 00 0 0 c v C ( � C Ff> O 61) _ ER O O O � O Ef> O O O O LO 693 O O O O -S _ EH O O O 00 _ C ER S O C O s O Iliw � EA 6a S w C (f> (f> 613 EFT 6a EFT w ER 00 00 O (» O (» O (» O (s> O (s> O (» O (s> O (s> o (» 0 6s 0 (sa o (t> O (s> O Fs> O (s> O Q=� O 69 O (f> � e (14 c r- (o c c (9 a 0000 � � � 6s � 6q 69 � � rn 0 b04 � � O � 69 6 N LO N O O u C V (fl CO o CO o LO +.� IL) 00 00 C C EA ER 69 E1� ell � s a c ( s O 00 0 CD .ja m T L L N L L C � .� C O O O = CO 00 (O Cn i N U) C/) dj > Cn >>� > � O fn U m Q O Q CA E O Cu > > 0 N E N E E O i U) C E C Q C U) L C U) >; w O O O w C N T > (n d N Cn > U C6 C ~ M > S L> O O Cn O (L) Q > > > � O > \ OL L N_ > > E L Q C (V a Y as Y L (>6 f� Y> (>6 > Cn •Q Y N C Q w N E E E N '� ) E .i 0 > > >Y >Y >Y T >� > L < Q m � .U- C) C: L Lf5 O• Op M L 5 O• a� � N (/5 U E w O O > � Q > V N > (fl > U C -U O N C C > > U) \ a C Cl- c *"' O (n Cn i fn No O (n00 a3 •� > U Q V E O E V O V U .0 U U 6 > U) E> V O .� U U O In M Cn -0 > Cn Q (B U) C (n (D O > CD O > O > O C C) Q 0 0 0> 0> 0 0 .Q a) Q 0> .Q ~ m > ' a) Q Q Q S Cl- �' >' :) L M >� L O O- L M O L N L~ M L CO Cn U) U) E .U-� U) S O S 00 N U) O S (V D >>� > Cn Z N = (+O') N w O N O 00 Cn O 00 Cn p 00 U) > C N Q w x x X X X X X X X X X X X X X CA O - N M I LO (O ti CO CA � CA O - N M I LO N N N N N N N N N Ln (D N M M M M M M a a a a a a a a a a a M a a a a Packet Pg. 9 CIP/CFP vl.7 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.1.a O O L N 00 CO O 4 4 C M O O O O O N 60') N— LO (O Cl) I— N V V (D CO O LO 00 N N N 6a O co LO (O N I- Cl) co Cl) 69 (fi 0 � Cl) LO 69 EFT N ER cli (f3 va 6q 0 H) 6c3 (fi fA b) fA (fi K) 093 EF} O O O O O O O O O O O O O O O O O O O (fi EFT (f3 ea E03 (fi va V) O O O O O (fl (fi to (fi 69 O m O O O O O O w' O M M O a N (O M !C f� Cl) Cl) M M (� Gq fA (f} _ ER (fi (f3 06 C LE 0 0 0 O o O O O O O O O O o o O o o O d 0 0 0 O 0 O O O 6cy (Al (» (» (» o � O 0 0 0 O O O O O O O O O rl O O O O y O O LO N 00 O O O O O O N O N LO (O ti Cl) I- M O LO 00 O , N N 6c3 O 00 LO (O N (fi (fi 0 � Cl) (fi EFT N ER " C6 00 H) (fi (fi •V 69 EFT ffi (fi GO cu LL O O O O O O O O O O O O O O O O O O O w0+ (f} EFT (A O EF3 (fl (fi O (fi va (f3 va EF> (fi 69 O (fi (fi 0 0 a O O N Lfi � O � 69 N O N O O O O O O O O O O O O O O O O O O Cl V (20). (Al fq OOOO EA 61i E� Vi EA 61) 63 O E� O O O 04 O O O_ O Cl)O CD N N N ClI- Cl) Cl) N O (.0� 61) ER 66, H) d N EFT fA ff3 O a O O O O O O O O O O O O O O O O O O O 0 O O 603 O O O O O EA (fi EA (fi (f3 Efl Vy O O O O L O O O O O O O O O O 0 d � N N _M (O ONO ti O 000 N 0 � � 69 H) 69 � � H) � 0 O ca O O O O O O O O O O o O O O O O O O 0 = o rn N Q) L � a rn N O O O O O O O O O O O O O O O O O O O O (A (fi 613 Efl Ef3 ER (A VR 0:3 V3 (f3 Q!) (f3 03 69 69 6-1 (f3 O N O IV N N � O N a_ o O 0 O O O O O O O O O o 0 o O O O 0 U Lri o o N U (A � � Y L O V aj j� O O O E 3 o (L c E c E 6 n3 cn (n S ° w CD E a)O N i a)> mw > J 0')L O O w+ L E > E o aE) U) °' o in � rn 0o d L aci c O > > m> O Z> a Y O > E > O E E d m n Y U)� a o c oo 3 o m U > �° > 3 >_ Q o 00 = - a) O 6 s 3 m 3 > _� E o N E m in �° I a c a Y �o Y� Q c - �� O �o E E O c v E o �+ �Q> (>i �N co �N �� �' Y ° o� �� f6U U m p �C) ca Q > cn m o o o ti c m cn ai 4F cn M F L O U c iA Q N O 3 c ai > CO (D ; ai >> c o V U N Of� �� NU) d� o C C oa cu �Q LN Q� Q� �� �� > > �+�cn o (o o >, •o .E 3 m w� v E� o S cm 0-0ai rn N v O M M 0 O Y.)(4 O O CD N 00 M> E O L L Gi O O L N �co Nrn Ud �� rnin cn2 0 co a- r� r4 00 (N 00r NQ w N v it� LL LLB F- r Q X X X X X X X X X X X X X X X to r- CD O r M V LO to P, c0 CD O LO O CO M r N M M M Ln Ln CO Cfl CO Ln Ln H H H H H H H H H H H H H H H H H H H a a a a a M a M a a a a a M a a a Packet Pg. 10 CIP/CFP vl.7 4 3.1.a O O LO 00 O O rn IRT O L` LO It LO O O LO O O O O O O O O N V � M O O O O O O M O O O M LO M_ N_ I-_ O O O CDO_ CD O O LO O (fl O r • ( �_ O LO O � O O O � CO M r V Cl)O Ln LO CO 00M W � LO 69 CO 00 LO 1:T N LO h Co m Il- (O M 6R N 69 fl- M 69 LO n 6R K-3 M 1- E9 (O ti ER 69 Lfi Ln M r 69 O 69 6R N N M M 69 69 6R CO M 69 69 6f)- O O O O O O O O O O O O O O O O O O 603, ER E9 O 69 O O 69 EA 6c) 6.) 69 69 61i 69 613 O O O _ O O O O 00 O O CO Co m LO Co (O C1 N LO O CO M CO _ _ (V 04 N E9 E9 N N E9 E9 ER O Ln O O O LO Lf) O O O O O N O O O m O 00 O IRT L` O LO O O O O �t M O O O le O O O M _ Lq M N f� O O O O O C V O O M O CD O Cl) • CO O LO CO O O_ O P.- 000 M V Co LO LO (D O 0') Co Co 0') � LO 613 00 N LO N LO N „ M O N CO Co 69 N 613 r- CO 613 O N ER M r EFi LO O E9 6R U5 LO � r 69 w 69 E9 69 EA N O LO r 69 r ER 69 6F3 O O O O O O O O O O O O O O O O O O Qa 69 6R O E9 O O 69 69 69 6c) 613 69 61i 613 69 O O O - O O O O N O N O N 04 � � Cli Ln O U) W M C) O O O O O O O O O O O O O O O O O O 69 69 ER O 6F3 O O 69 69 69 EA 69 69 O 69 69 O O O - O O O O O 41 O N 00 It le ti Co Cl) le Lly O r% Lfl 69 � � O O O O O O O O O O O O O O O O O O H? 09J 60, O 69 O O 69 69 69 69 69 69 O 69 69 O O O O O O O O 00 O N O CO 00 N O O I* T M Ci M E9 E9 N M ER 69 66, N} O O O O O O O LO O O O O LO O O O O O (A (f} O O 60D, O O f� 6f3 69 69 6H N O EA 69 O O O O O m O O fl- O O O 1 O O O O O 4 Lf) N LO N r- CO O N LO W CO O (D O N LO Co r 60) N M r 61i r 69 69 6c) 6F3 69 r 69 6%3 O O O 00 O O O O O O O O Co O O O O Co O (f3 O 00 O O O LO O O O O Co O 69 69 O 00 O O [- O O O r- O O O O O O O rl O O -It LO O N LO CO LO O LO O C) LO CC O LO f-- Co N It O M M O Co LO M M N Co 613 N 6:T CO (O Cl) LO 6f3 va 00 613 61i ER 6R 69 69 6R N N 00 6:3 69 613 69 O LO O r O LO LO LO O O O O O rl- O O O r 69 00 61) CC fl O N O O O 69 fl- M O O 613 CO O LL) Lfi M O O O O O C N Lfi O W (D O r- (0 O Co O LO N r- M O CO 00 LO fl- LO N V) CO CO ti EA CO 00 N I-- N 0') 61=k 6F3 U=l LO 69 f� 6R to Ef3 EF3 61i C 6:3 69 69 69 N3 L 00 O 06 X Co (n CuN H (6 CL Co � U N N U' C L Ur Co V LL y W .� d O Vi y.. M LO CO O Q) N 3: 0) L � • 7 C LL LL .�. 7 a a) a) C1 Co 0 = C/% W 7> LL N 7 LL 7 LL Q LL- D LB O O pm Co i °) o w w Cu 3' °) u°'Cu LU Q V' CD Q p u) E � � C� in cn LL iq O Q > X a LU M W LO LO to J J H H a a a � ~ Packet Pg. 11 CIP/CFP vl.7 5 Packet Pg. 12 CIP/CFP vl.7 Annual pavement preservation program to maintain City streets. Maintains the City's pavement infrastructure and reduces the need for larger capital investment to rebuild City steets $1,600,000 (2024) Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 3.1.a $150,000 $150,000 $150,000 $130,000 $130,000 $130,000 $1,950,00( $1,450,000 $2,250,000 $1,150,000 $2,500,000 $2,500,000 $2,500,000 $37,500,00( $1,600,000 $2,400,000 $1,300,000 $2,630,000 $2,630,000 $2,630,000 $39,450,00( $800,000 $750,000 $650,000 $750,000 $750,000 $750,000 $11,250,00( $800,000 $750,000 $650,000 $750,000 $750,000 $750,000 $11,250,00( $900,000 $1,130,000 $1,130,000 $1,130,000 $16,950,00( $1,600,000 $2,400,000 $1,300,000 $2,630,000 $2,630,000 $2,630,000 $39,450,00( Packet Pg. 13 CIP/CFP v1.7 7 185th PI SV! nI' P1 w � s 00 = a = o H 00,5t 192nd St SW 184th St SW 186th St SW 187th St SW 188th St SW 3 r, Q spy Q 187th P1 SV! T IR 3 �0 v i 189th PI S/✓ a>190th St SW f OPT � o 1 191st St SW Sib 8014 192nd PI SW I)r 193rd PI S 3 a a 194th St ss _ 196TH ST SV s s 7 103rd PI SW `F a A_ low O a, 185th St 185th St SW SW �y v 185th PI MP Q w SW I �C Q ,861hSt5W Stith St I e Sw LLJ 187th P1 SW�, Q 188TH ST SW= � 1881h=P1. -Penny� _Penny Ln d 189th- PI-Sh 1a9tha1sv,a 190th=St=SWs 190th_St=SW iw, 0N191 st PI SW ^ _! 191St=St-SW 192nd St PI SW SW192nd ¢ 3 W192nd PI=SW- Park Wa} S 193rd PI SW a -. � -193rdSt SW 193rd St SW 194r3P1 SW ; 194th SI SW a a Tv A A pavement overlay of 76th Ave from 196th St. SW (SR-524) to Olympic View Dr was completed in 2023. The project close- out and required federal documents for the transportation grant will be completed in 2024. The east side of the street is within the City of Lynnwood and was included in the project. Improve pavement condition and upgrade pedestrian curb ramps to meet ADA standards. In addition to the existing southbound bike lane, the project may add a new northbound bike lane as outlined in the City's Transportation Comprehensive Plan. $2,583,000 Design Right of Way Construction $20,000 Expense Total $20,000 Street Fund 112 - Gas Tax & Multi- $7,500 REET Fund 125 $5,000 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Other $7,500 Funding Source Total $20,000 Packet Pg. 14 CIP/CFP v1.7 8 0 z m 0 z w > Q �1ELL ST r Q U MY rAlIINsSiT DAYTON ST Pavement overlay along Main St. from 6th Ave. to 8th Ave. with pedestrian curb ramps upgrades. The project will be fundE with a federal grant and City funds for a local match. Improve pavement conditions and pedestrian accessibility (with ADA curb ramps) on this segment of Main Street. $937,500 Design $9,000 Right of Way Construction $780,553 Expense Total $789,553 Street Fund 112 - Gas Tax & Multi- $672 REET Fund 125 $158,001 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $630,880 State Grants Unsecured Funding Funding Source Total $789,553 Packet Pg. 15 CIP/CFP v1.7 9 3.1.a z w°Od Ch < rn Puget Way Z W .1 a H Puget Way a 104, J� Sr 4$' PUGET DR Edmonds Elementary cu a' u Excelsior PI E 0 U z a J The project will rebuild the existing traffic signal and remove the signal heads currently on span wire and install standard traffic signal poles with mast arms. Vehicle detention will also be upgraded as part of this project. This upgrade will provide safer roadway conditions since the hanging signal heads will be replaced with fixed signal heads c mast arms. The new vehicle detection will guarantee that all vehicles will be detected. $586,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $90,000 $496,000 $90,000 $496,000 $90,000 $496,000 $90,000 $496,000 Packet Pg. 16 CIP/CFP v1.7 10 Q\ d r ■ W 1� a a a a > 23� a N - SW 0 0 237th PI; i O O 'p V 238th St SW 3 a Faith au > r- o c C Community Q O • 238th St SW c Church c N C c St l t Install new traffic signal and vehicle detection system. The existing traffic signal is near the end of its anticipated service life. $938,000 Design $165,000 Right of Way Construction $773,000 Expense Total $165,000 $773,000 Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $165,000 $773,000 Funding Source Total $165,000 $773,000 Packet Pg. 17 CIP/CFP v1.7 11 Public Works - Transportation Main St @ 3rd Signal Upgrades Brackett s Piz _ Be// Landing as aS� = Post St South ,\�o oa Office aa\� a J� Railroad M'qi Station 'v tST IT Sp ITMini Park • 1� b Q. �a � �c,S nj St Install new traffic signal and vehicle detection system. The existing traffic signal is near the end of its anticipated service life. $493,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total Edmonds Polic �- UPS and Municipa Court Veteran' Edmonds Centennial Plaz City Hall Plaza Pall Fountain ills" $110,000 $383,000 $110,000 $383,000 $110,000 $383,000 $110,000 $383,000 Packet Pg. 18 CIP/CFP v1.7 12 Pavement overlay along Olympic View Dr, from 196th St. SW / SR-524 to Talbot Road, along with ADA curb ramp upgrades. Improve pavement condition and improve accessibility for pedestrians of all abilities. $1,500,000 Design $200,000 Right of Way Construction $1,300,000 Expense Total $200,000 $1,300,000 Street Fund 112 - Gas Tax & Multi- REET Fund 125 $100,000 $300,000 REET Fund 126 $100,000 $300,000 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $700,000 State Grants Unsecured Grants Funding Source Total $200,000 $1,300,000 Packet Pg. 19 CIP/CFP v1.7 13 l <t, r /- a a r �ilIra I� • AIL �•rll'; • .i� ir a I+mot. II � <<♦ M31 ♦r i -as` 1 ♦ • • 0•I�ia.► f Irr/tea f •I Ir'„' •11 IF •• 1 l •f per) wr t ■ • 1 rAo r �f ter+ i Ali+i i .La . or .. r 1� . a if ►�♦ i i = _ ♦ ♦„4 �• •vtwrDn w .a■ 185thPISW - .''r Ill�•­•ila' w! • IL ;•,�IIIa.WY.-.���I � i •III !Ili • ! i• r 11r as • �••. t - — — -ft r TY I• .a ,�_ -. tip'. ��'�� \. ;IF -w•^ ra • 1 a..•� y. 7 ■.- ..7 i� 7 l'w'--.. �r 'ram• M, 0� .: i w, — �■•—r•'.r.ri 41 ..• a �1 r • il!i k � • _ _ old A'S - 79tTX1:'rSW - This project will resurface 88th Ave and improve the existing asphalt sidewalk on the east side of 88th Ave from 196th St S\ to 185th PI SW in the Seaview neighborhood. All City utilities along this section of 88th Ave have been upgraded in recent years and the street is ready to pave. The existing curb is in poor condition and varies in height. The project will install 6" concrete vertical curbs and repave the existing asphalt sidewalk. Improve pavement conditions, pedestrian accessibility (with ADA curb ramps) and pedestrian safety. $1,500,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Sewer Utility Fund 423 State Grants Unsecured Funding Funding Source Total CIP/CFP 0.7 $150,000 $1,350,000 $150,000 $1,350,000 $65,000 $65,000 $20,000 $180,000 $40,000 $1,130, 000 $150,000 $1,350,000 14 Packet Pg. 20 CIP/CFP v1.7 15 Packet Pg. 21 i-.r.� r t �.� r�-== �'r�, ESPERANCE .•� L.. i Sth St SW 224th St SW ■' -0r� ~ _ 224th St S _ 224th St;SW •� zzmn�isw �� I� II ■�_U rr-1 ■ ■ j�`. IY0■i■ yl.�■Sraw4b1 r ■ - -- : * 1 v !`, ■ s_w ■ f + a I. �. y s fit' a 46 q OP �,i �.� I.i�L■. L3 aq .� ��■ ��M r S �� a ac'�..� r a E22srn ai sw is 7 . .• ♦ - co' MS. 11 - Zlc■ +Im �1 �f a�■ yJ 00 7� Or—ir /-' ■+,. Lr�•� Q ■ /2`;P` ��.�r _ t- -- _ > I A a� a 226th St SW,--_226th-`St SW v'�m*Cox I! I'j. rri 1 LQ�.s ��i♦ - I r ._.. iiw�r .�'rn -I .e.* w �} a1A'1 itgl�,f n"!�� ! r L� 7� �P�7I-V1, nnns sW . it.ti �a' Z 3 m at a 228TH ST S� c_e ,y r ilro 4 -ir i 'a• ■.'�� mvpM■w� A • �_'ti�s�lll +dam ■ z2a�nsrs;. a .I— F * )_ ■ i `` a ri . 229th St- �� ` ��s �■«1 Q�. !� )� �r�■ it 7LLJ �IF O 1 a µ J _.♦ :71 �27 iF r .ME- Ir a ! _ ip'.r-r ■ a' ■■ CO___ - a — m 230th St- SW > 230th St c�� u 9i• Lt MO i 1+ -V4P5� ' �r 231staStaSW a .�w Q c i� ■� ; Ti ! �a ■3� -�■� Pa` M.N. ■,sl■■s� r m w f �11 3ti i IJ ■c�,.(te1 �1 f A , IIR� 232nd St SW L y a J ■�q■■�■■ I ♦ I p_ ■� ai ,:,. n ,r♦ r zsz;,aaisw—m P ■ Y. � A �7 �+�•,.r.1�, � M t' _ *• ! - _. Widen 228th St. SW from Hwy. 99 to 95th PI. W to three lanes (with center two-way left turn lane), with curb and gutter, sidewalk, and bike lanes. This project would improve active transportation safety and traffic flows along this corridor. Community Transit will evalua the possibility of creating a new east -west bus route along 228th St. SW, if this project moves forward (connecting Edmond Transit Station to Mountlake Terrace Transit Station). $17,047,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,447,000 $1,500,000 $1,000,000 $13,100,000 $1,447,000 $2,500,000 $13,100,000 $1,447,000 $2,500,000 $13,100,000 $1,447,000 $2,500,000 $13,100,000 Packet Pg. 22 CIP/CFP v1.7 16 N N � > > w a a o = a _ M LO H p, 3 Q� > Q = a a o A. o �P 0 O O 3 &OW,DOIIM 244TH ST 212TH S1 SW w a Z N Ln w > a a 3 w 3 - � a .c = > 3 a~o Q �n = w %0 a Ln 2 F- 236TH ST SW - 244TH ST SW In 2023, the project constructed landscaped center medians on Highway 99 from 244th St. SW to 212th St. SW, a HAWK i signal — 600' north of 234th St. SW, and gateway signs on both ends of the corridor. Plant establishment and project close- out will continue in 2024. i The conversion of the center two-way left turn lane to a landscaped raised median will improve corridor safety along this Highway of Regional Significance (HRS), with an Average Daily Traffic (ADT) of - 35,000 vehicles per day. The new HAWK signal will provide a signalized pedestrian crossing between the existing traffic signals at 238th St and 228th St. $9,300,000 Design Right of Way Construction $114,000 Expense Total $114,000 REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants $114,000 Unsecured Funding Funding Source Total $114,000 Packet Pg. 23 CIP/CFP v1.7 17 rubl,icorks- Transportation 9 Revitalization Project - Stage 3 �0 r - 238th St SW 238TH ST SW Q 238th St SW 0_ 240th St SW�` 240th St SW a � 3 � a 242nd St SW o� m °J 244TH ST SW .9� co N s �c r mPi i ,C < 0 < ti� < KE BALLINGER WAY — `s WAY- LAKE BALLINGE%k '81, '>> � h Q x � Sva �$rr S 79th Q 240th PI SW 2415t 3 242nd St SW — — a a ZV Znd PI � t 243rd F The Stage 3 Highway 99 project limits are from 244th St SW to 238th St. SW. The project will widen the intersection of Highway 99 and 238th St SW to provide a second northbound left turn lane. Additional improvements will include ADA compliant sidewalks, a landscaped planter strip to separate sidewalk from adjacent traffic, enhanced street lighting, bike lanes, ADA compliant pedestrian curb ramps and utility improvements (with potential undergrounding of overhead utility lines). Improve aesthetics, safety, and user experience along this segment of the Hwy 99 corridor. $32,500,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,075,000 $630,000 $409,000 $215,000 $1,000,000 $1,203,000 $13,000,000 $13,752,000 $1,290,000 $1,630,000 $1,612,000 $13,000,000 $13,752,000 $1,290,000 $1,630,000 $1,612,000 $13,000,000 $6,688,000 $7,064,000 $1,290,000 $1,630,000 $1,612,000 $13,000,000 $13,752,000 Packet Pg. 24 CIP/CFP v1.7 18 e Jr OP ke AV�: ■ CO 222nd st Sw- - 223rd St SW q I`J -� ' 220TH ST SW Q Ad—? lst PI SW IMaAN' 3 22afh St S1Al d 224th s SW I r y !11 224th St SW 3.1.a A The Stage 4 Highway 99 project limits are from 224th St SW to approximately 500 feet north of 220th St. SW. The project will widen the intersection of Highway 99 and 220th St. SW to provide a second left turn lane for the northbound, southbound and westbound movements. Highway 99 corridor improvements will include wider ADA compliant sidewalks, landscaped planter to separate sidewalk from adjacent traffic, enhanced street lighting, bike lanes, ADA compliant pedestrian curb ramps and utility improvements (with potential to underground overhead utility lines). Improve aesthetics, safety, and user experience. In addition, future economic development would be improved $42,534,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees Water Utility Fund 421 Stormwater Utility Fund 422 Sewer Utility Fund 423 Federal Grants State Grants Unsecured Funding Funding Source Total $1,075,000 $1,000,000 $1,000,000 $484,000 $215,000 $500,000 $3,000,000 $1,885,000 $16,434,000 $16,000,00( $1,290,000 $1,500,000 $4,000,000 $2,369,000 $16,434,000 $16,000,00( $642,300 $29,025 $67,500 $1,020,975 $1,092,738 $432,500 $1,979,025 $168,237 $1,000,000 $357,700 $2,369,000 $16,434,000 $16,000,00( $1,290,000 $1,500,000 $4,000,000 $2,369,000 $16,434,000 $16,000,OOC Packet Pg. 25 CIP/CFP v1.7 19 a a P7L _216th St sw 3.1.a 3 I i A`,GG a' 214th st sw, .-moo Along Hwy 99 from 216th St SW to 212th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Improve aesthetics, safety, and user experience. In addition, future economic development will be improved along the corridor. $47,173,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $500,000 $1,000,000 $500,000 $1,000,000 $1,500,000 $1,593,00( $500,000 $3,951,00( $38,129,00( $2,000,000 $43,673,00( $500,000 $1,000,000 $2,000,000 $43,673,00( $500,000 $1,000,000 $2,000,000 $43,673,00( Packet Pg. 26 CIP/CFP v1.7 20 Madrona Ln 235th PI SW S� 3 s W 236th St SW Q > C OD � � I I 238TH ST SW ESPLKANC-E 234th St SW �i 236th St SW U 0 00 o 238th St SW 234th St SW a' ro 236th St SW s � n a Q s 28 th y � C c m C � Z t Along Hwy 99 from 238th St. SW to 234th St. SW, the project will add a planter strip on both sides of the street, new street i lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. $21,160,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $2,275,00( $1,519,00( $17,366,00( $21,160,00( $21,160,00( y $21,160,00( ` Packet Pg. 27 CIP/CFP v1.7 21 4r ` o: 2 3.1-st#St#SW` r r w I sa s - 228TH=ST SW m - .4md AIL AM "■ O■■A -� ��J �o •�.� 224}n StSWa_ i m 1 4. N " I I N7 �M �f _ A 229th St SW / a iAli f r! i 3 r 1 r - F + �+ *sszanH` �.��^ry p Q 230 2$Oth St §W h S 230th Si Sw ;� ■a,� 7 r'4 a L l '.-L'r raj+ it, $ o r L. r, � mi � I 7, 0. � � r . p } r 1W 232n iSW .� r Q a � 1011191111110, up. It. 2III 3rd SI SW ir Mee ,� a Maple Ln it b Y : CO ,fir rtr 234th St SW — `�� 234th St SW M adrona Ln A Along Hwy 99 from 234th St. SW to 228th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. $40,430,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $4,254,00( $5,675,00( $30,501,00( $40,430,00( $40,430,00( $40,430,00( Packet Pg. 28 CIP/CFP v1.7 22 Public Works - Transportation Hwy 99 Revitalization Project - Stage 8 ON -- 2we WIN 24ih St SW �— _ N � 224th St SW - — ■� *• `. � ' - — - 224tfi Si SW - „ w q�. � I M�J� �- �� IL ■ � � a � M ISIM NNE IN - 225th PI SW - a _ iistn PI sw v � or� NNW-MW WIN M i226th St s' E''co . 3 EDMONDS + WQ I�� ♦ -_,4 MOUNTLAKE� a J 81st �■Q 0 226TH PLSW f- 01 L„ isIIL 1 a `� �tri� ! a. /�Q a N J3— 228TH ST SW �� ~ .11 MR - Along Hwy 99 from 228th St. SW to 224th St. SW, the project will add a planter strip on both sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds. Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. $35,242,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $3,596,00( $2,439,00( $29,207,00( $35,242,00( $35,242,00( $35,242,00( Packet Pg. 29 CIP/CFP v1.7 23 216th St SW nStSW a LJ. Q+ 218th St SW 2 r` 220TH*STtSW (r� 216th St -SW - *so J "&h Along Hwy 99 from approximately 500 feet north of 220th St. SW to 216th St. SW, the project will add a planter strip on bo sides of the street, new street lighting, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments to identify the area as being in Edmonds Improve aesthetics, safety, and user experience. In addition, future economic development would be improved along the corridor. $21,277,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1, 978, 00( $2,159,00( $17,140, 00( $21,277,00( $21,277,00( $21,277,00( Packet Pg. 30 CIP/CFP v1.7 24 196TH ST SW A Install traffic signal at the intersection of 196th St. SW @ 88th Ave. W. The modeling in the 2009 Transportation Plan indicated that restricting northbound and southbound traffic to right -turn -only (prohibiting left -turn and through movements) would also address the deficiency identified at this location through 2025. This is same alternative as one concluded by consultant in 2007 study but not recommended by City Council. This could be implemented as an alternate solution, or as an interim solution until traffic signal warrants are met. The existing LOS is F (below City Standards: LOS D). This project was ranked #6 in the Roadway Project Priority in the 2015 Transportation Plan. Improve traffic flow characteristics and safety at the intersection. The improvement would modify LOS to A, but increase tf• delay along 196th St. SW. $1,289,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Federal Grants State Grants Unsecured Funding Funding Source Total $263,000 $238,000 $788,000 $263,000 $238,000 $788,000 $263,000 $238,000 $788,000 $263,000 $238,000 $788,000 CIP/CFP v1.7 Packet Pg. 31 25 Public Works - Transportation Main St @ 9th Ave Intersection Improvement Bell St z aU Q 00 Anderson Center Field W Bell St MAIN ST I♦ Dayton s_tr C W > Q 2 - Dayton_St a Yost Park Bell A Installation of a traffic signal or mini -roundabout. The project ranked #4 in the Roadway Project Priority of the 2015 Transportation Plan. The preliminary cost estimate for a new traffic signal is $1,290,000. A conceptual cost estimate for a mini -roundabout is $500,000. The existing intersection is stop -controlled for all approaches and the projected intersection LOS in 2035 is LOS F (below thl City's concurrency standards: LOS D). The installation of a traffic signal would improve the intersection delay to LOS B. $1,290,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $198,000 $1,092,000 $198,000 $1,092,000 $198,000 $1,092,000 $198,000 $1,092,000 Packet Pg. 32 CIP/CFP v1.7 26 WINCO 219th St SW LO oo N � m a 21919 STARBUCKS 00 r` �. 220TH ST SW a Lf a %LU aq 6: t22lsl 7514M.■PI SW I* � ESPERANCE LYNWOOD Reconfigure eastbound lanes to a left turn lane and through/ right turn lane. Add eastbound and westbound dedicated left turn lanes with a protected -permitted phase. Provide right turn overlap for westbound movement during southbound left turn phase. (Additional improvements include wider sidewalk, bike lanes, and various utility improvements (including potential conversion overhead utility lines to underground). ROADWAY PROJECT PRIORITY #1 in 2015 Transportation Plan . Reduce the intersection delay and improve the LOS. The projected LOS in 2050 would be improved from LOS F to LOS D. Improve active transportation conditions for pedestrians and bicycle riders. $9,000,000 Design $246,388 $224,788 $50,000 Right of Way $502,000 $448,000 Construction Expense Total $748,388 $672,788 Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees $397,000 $177,250 Stormwater Utility Fund 422 $45,000 $45,000 Water Utility Fund 421 $18,000 $18,000 Federal Grants $288,288 $432,538 State Grants Unsecured Funding Funding Source Total $748,288 $672,788 $6,670,000 $50,000 $6,670,000 $12,500 $37,500 $6,670,000 $50,000 $6,670,000 Packet Pg. 33 CIP/CFP v1.7 27 ,t - 225th P1SW quip 226th St S'l S� > -J a _ L Q fZ a ¢> > - 226th St S W 2 > 1i ¢ �. L pY m .o LO rn N x"'CO .4 •� . Q, - ! eD „r +o r T a• i �' • S ! a` �:' 228th St .• ■ �' - 228TH ST SW Peet Dr N '3 5. :�5 s. i j y •� • a �.� 229th St s<,. ee �■ W 230th St 31 Q231 st St 0 Q 232nd St SW �.r yiiniu is �� V a D 5 Q zaznarww m Holly LnF..L,.:) t'Q ,sett Rd 3 •mow Maple Ln ;/�`i .�G: - o v 234th St SW m i i'• ,� a �� Nottingha Rd > 234th St S o a ¢ Madrona Ln -_ Z 235th PI SW a e��a - N �CC0 m s 6 aY ay! C sU ""F' ° 236th St SW 236th St SW 236th� 3 UJ The project will add a traffic signal adaptive system on a 1.25-mile segment of SR104 from 236th St to 226th St. The syster will monitor and synchronize the timing of five existing signalized intersections (SR104 @ 236th St, SR104 @ 232nd St, SR1( @ 95th PI, SR104 @ 100th Ave, SR104 @ 226th St) and improve traffic flows along SR104. Improve traffic flows along this regional corridor with a current Average Daily Traffic (ADT) of - 25,000 vehicles per day. $4,810,000 Design $186,575 Right of Way Construction $4,400,000 Expense Total $186,575 $4,400,000 Street Fund 112 - Gas Tax & Multi- $7,313 REET Fund 125 $25,189 $440,000 REET Fund 126 $440,000 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $154,073 State Grants Unsecured Funding $3,520,000 Funding Source Total $186,575 $4,400,000 Packet Pg. 34 CIP/CFP v1.7 28 Public Works - Transportation P SR-104 a@ 100th Ave W Intersection Improvements is QFC PCC NATURAL MARKET s .AC, C C) �y� Z 76 GA: a a WALGREEN'S i Q, PARKING s BANK o EDMONDS WAY U w 00 O 00 W N N CD E � � 00 O 6� W O 6) (n N O t �' ` co 00 00 0o 00 f� h f_ P.-�p BANK rnrnrnm mrnrnmrn } nN N N r,r a IVAR'S a c = o c c � c BARTELL'S O c c c z c Implement Westgate Circulation Access Plan, install mid -block pedestrian crossing along 100th Ave. W, improve safety to i access the driveways within proximity to the intersection, and re -striping of 100th Ave. W with the potential addition of bik lanes. This project was identified in the SR-104 Completed Streets Corridor Analysis (completed in 2015). Improve access and safety at the intersection and improve active transportation safety. $1,226,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $180,000 $1,046,000 $180,000 $1,046,000 $180,000 $1,046,000 $180,000 $1,046,000 Packet Pg. 35 CIP/CFP v1.7 29 227th 27th St > a s1P2 o < �o V M Lam_ c LO C I 228tn St sw 228TH ST SW Ln LU y 0Q L P L Westgate 0 a �O5 Chapel w w AQ c Q c c c c c PU D c Sub Station Upgrade all ADA Curb Ramps; and add C-Curb for access management. This project was identified in the SR-104 Complete Streets Corridor Analysis (completed in 2015). Improve intersection safety for pedestrians and vehicles. $270,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $42,000 $228,000 $42,000 $228,000 $42,000 $228,000 $42,000 $228,000 Packet Pg. 36 CIP/CFP v1.7 30 a Y Y Vi 238th St SW 238TH ST SW,, 0�/ a' Os x a N e Korean c Presbyter s Church S Install traffic signal. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015) Improve vehicular and pedestrian safety. $1, 519, 000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $227,000 $1,292,000 $227,000 $1,292,000 $227,000 $1,292,000 $227,000 $1,292,000 Packet Pg. 37 CIP/CFP v1.7 31 Seaview Park , Post Office f a rn FpM �YQ10/VD al W VV6 Op r 00' 185th PI SW Q 2 F— 186th St SW? n 3 a� o, a it 784th PI SW OLYMPIC VIEW pR Lynndale Park Install traffic signal (the intersection currently stop controlled for all movements). (ROADWAY ROJECT PRIORITY in 2015 Transportation Plan: #11). The improvement will reduce the intersection delay. The projected Level of Service is LOS F in 2035, which is below the City concurrency standards (LOS D). The project will improve the Level of Service to LOS B. $1,347,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $230,00( i $1,117, 00( $1,347,00( $1,347,00( $1,347,00( . Packet Pg. 38 CIP/CFP v1.7 32 U W > a SOWI)O/ I F- —_ 2125 NSTSW 3 LU i Q > aQy > U a S T W Z N 'a S 220TH ST SWr= W > J a W > w a a a > - 4 ~ rn a C 3 228TH ST SW Fa 228TH Sr > a _ u W �L = i = O 20� 3Q > � N , C �C� 2��` c 236TH ST N e c c s c Widen 84th Ave. W to (3) lanes with curb, gutter, bike lanes, and sidewalk on each side of the street. (part of this project w i ranked #6 in the Long Walkway list of the 2015 Transportation Plan). Improve traffic flow, access and active transportation uses by installing a center two way left turn lane, sidewalks, bike IanE c and street lighting. $17,615,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $2,245,00( E C $15,370,00( i $17,615,00( $17,615,00( J $17,615,00( Packet Pg. 39 CIP/CFP v1.7 33 Seattle W 243rd PI SW Lake Baptist > Ballinger 4Q Church Q tilp� F H �9y S wAY �Nt20.51H ST - �z N 205TH ST W N 204TH PL -§� ���4TH PL a Z Z 0 0 _ ; Na N 2 3U RD p J a � - e Add a second westbound left turn lane along SR-104. This project was identified in the SR-104 Complete Street Corridor Analysis (completed in 2015). Improve access, safety and delay at the intersection. $3,424,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $510,00( $2,914,00( $3,424,00( $3,424,00( $3,424,00( Packet Pg. 40 CIP/CFP v1.7 34 ";� O DALE BEgC N'�'O 174th St SW 69 v o` a� a� �a 173rd PI SW O� 4 2p 4W# \Z Q 7jsth p,swe F 7�3rd St SW 174th St Sv, St. Thomas Moore School A Widen Olympic View Dr. to add a northbound left turn lane for 50' storage length. Shift the northbound lanes to the east t( provide an acceleration lane for eastbound left turns. Install traffic signal to increase the LOS and reduce intersection delay (ROADWAY PROJECT PRIORITY in 2015 Transportation Plan: #13) Improve intersection efficiency and safety of drivers accessing either street. $715,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $120,00( $595,00( $715,00( $715,00( $715,00( Packet Pg. 41 CIP/CFP v1.7 35 Public Works - Transportation 175th St SW Slope Repair • .r , � � a • "+ 175th St SW < .� u Pre N e c Snohomish 0 County Park i The project will stabilize the roadway subgrade and embankment and rebuild the damaged pavement on 175th St. SW Repair roadway and stabilize slope embankment. $1,000,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,000,000 $1,000,000 $1,000,000 $1,000,000 Packet Pg. 42 CIP/CFP v1.7 36 This program started in 2019 and will provide new signal upgrades, such as vehicle detection at intersections, new vehicle/pedestrian head equipment and other signal -related upgrades. These improvements will improve the safety of the City's transportation system. Improve reliability of traffic signal operation. $30,290 Design $500 Right of Way Construction $29,790 Expense Total $30,290 Street Fund 112 - Gas Tax & Multi- REET Fund 125 $30,290 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total $30,290 Packet Pg. 43 CIP/CFP v1.7 37 The City Council added this study to the 2023-2028 CFP-CIP during the 2023 budget deliberations. This study will re-evaluat alternatives identified in the 2016 Edmonds Waterfront Alternative Access Study and potential new alternatives for improving the reliability of emergency responses to the Waterfront. Both through and stopping trains can simultaneously block Main Street and Dayton Street impacting emergency response times to the Waterfront. The many amenities along the Edmonds Waterfront (including the new Waterfront/Senior Center dive park, marina, whale watching service, off leash dog park, restaurants, etc.) on the west side of the BNSF train tracks ar drawing an increasing number of visitors —meaning the potential for accidents and health emergencies is ever-increasing. The study will develop potential solutions to address this issue. Planning $50,000 Expense Total $50,000 Street Fund 112 - Gas Tax & REET Fund 125 $50,000 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $50,000 Packet Pg. 44 CIP/CFP v1.7 38 Q U 06 _ R IL m m LL �a Q m U as N O N lqt O N V O N O O L IL 4- 0 O r m r as m L a N O N N O N IL v d U. U L O :.i 3 IL Packet Pg. 45 CIP/CFP v1.7 39 WIVIU VUJ WAY ■ v I > d r � lu d Q o, H O O V. y Q� �C> 23 st FI s64 d' 233rd St SW rn � d L tSNtKANU Ll ,. '231st SI SW L i '01F IL 232nd St SW ti3 232nd PI d < C c N O` m a 234th St SW C c C c Z c Install sidewalk along 232nd St. SW from 100th Ave. W to SR-104. This project ranked #3 in the Long Walkway List of 2015 i Transportation Plan. This project would improve pedestrian safety. $1,856,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $284,000 $1,572,000 $284,000 $1,572,000 $284,000 $1,572,000 $284,000 $1,572,000 Packet Pg. 46 CIP/CFP v1.7 40 •��~••�� iviaarona Elementary School 236th St Install sidewalk with curb and gutter along 236nd St. SW from Madrona Elementary to 97th Ave. W. This project ranked #4 Long Walkway list of the 2015 Transportation Plan. This project would improve pedestrian safety. $1,988,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $296,000 $1,692,000 $296,000 $1,692,000 $296,000 $1,692,000 $296,000 $1,692,000 Packet Pg. 47 CIP/CFP v1.7 41 Public Works - Transportation 236th St SW Walkway from Hwy 99 to 76th Ave W W Q � a 00 .o r\ �p 'h ,o. u i a a i 00 C Q c c � c }, c � c 00 z c Install sidewalk along 236th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 i Transportation Plan. It This project would improve pedestrian safety. $1,937,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $276,00( k c L C $1,661,00( $1,937,00( i $1,937,00( $1,937,00( Packet Pg. 48 CIP/CFP v1.7 42 �:!*I`v LSPLRANCL W o y = 16 RE 234th St SN' U' W _ f 2 o 4 Madrona Ln PARK EDMONDS WHIRLY BALL S O a APTS N C m i 51504 I Christ "LL NORTH 11h ■rr� 235th PI S%, s Lutheran o N HAVEN MANOR w CHRIST LUTHR Church 10� f L CHURCH TRAILER 236th St S1^/ RICE Park and Ride OFFICE �Q COURT + 236th St SW�f 2360136 3601 �'> I 23603 SAFEWAY 23605 L KJIHG @ _C 3 %q - 100 M N 23619 �C,44 SUNSET t N 0 _ P WILLOW LL PARK PL Q CONDOS BROOK C '9 B1-10 D APT F R AURORA 23701.32 C LoENos C E S MARKETPLACE 04 C �^CREST _ B G T �" 06 f U a A U FAMILY PANCAKE s 08 8901 m H V •7-11" e 238TH ST SW rh St c 23800 Z 23BD423810- _ SEOUL The walkway project proposed approximately 1,000 LF of new sidewalk on the east side of 84th Ave W with ADA compliant i pedestrian curb ramps. It This project would improve pedestrian safety. Iroject Cost 2024 2025 2026 U0?A Design $88,000 Right of Way Construction $1,350,000 Expense Total $88,000 $1,350,000 Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 ARPA Funds $88,000 Federal Grants State Grants Unsecured Funding $1,350,000 Funding Source Total $88,000 $1,350,000 Packet Pg. 49 CIP/CFP v1.7 43 206th St a � > Q 207th St S v; 208th SY -. iW 208th PI S' li D; PI SW III a � v O Y Q ism z a N AG E -- a _ E - - - 3: 0 a t LYNNWOOD EDMONDS 208TH sT sw - W Q < = u i 210th St SVr , v C a' 3� I� a' c s a c m v c c 212TH ST SW c Z c Install sidewalk along 80th Ave. W from 206th St. SW to 212th St. SW with curb and gutter. This project ranked #1 in Long ` Walkway List of the 2015 Transportation Plan. The improvements will improve active transportation safety (including for school kids due to proximity of several schools). , $1,582,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $110,000 $120,000 $1,352,000 $110,000 $120,000 $1,352,000 $110,000 $120,000 $1,352,000 $110,000 $120,000 $1,352,000 Packet Pg. 50 CIP/CFP v1.7 44 � m OLYMP�c `180th St SW O � 181st PI SW f 70 Q f N ^ter O 3 j 782nd St SW C ! f PI SW a 3 f 3 a v Nlay w 9 � co co � � e d9 � M (b � stir i p 84th S Q � f > a a~o oo V y L _ 85th PI SW A�O �� y 186th St SW "10 NO`' °v f i i87th PI SW � LYNNWOOD i > c 3 a 187th St SW a s L a M�. C u C0 _Q 188th St SW._ 187th PI SW -187th P_I-SW-- C co C 188th-PI �. Install sidewalk along 80th Ave. W from 188th St. SW to OVD. This project ranked #13 in Long Walkway List of the 2015 Transportation Plan. This project would improve pedestrian safety. $2,333,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $482,000 $1,851,000 $482,000 $1,851,000 $482,000 $1,851,000 $482,000 $1,851,000 Packet Pg. 51 CIP/CFP v1.7 45 ementary Chase Lake School Q c N 00 216th St SW3 a a� 0 00 -Edmonds Woodway High School Swedis Edmorn W Q 2 H - �I 8th St S1N CO 00 W N d s > a 9 ve W _ `L 219th St SW F— 00 Edmonds F«F R A N E Church of God 220TH ST SW A Install sidewalk along 218th St. SW from 76th Ave. W to 84th Ave. W with curb and gutter. This project ranked #2 in Long Walkway List of the 2015 Transportation Plan. The improvements will improve pedestrian safety. $1,738,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $264,000 $1,474,000 $264,000 $1,474,000 $264,000 $1,474,000 $264,000 $1,474,000 Packet Pg. 52 CIP/CFP v1.7 46 Public Works - Transportation Walnut St Walkway from 6th Ave S to 7th Ave S THE MARINER Alder St w COMMODORE ¢w a w O o ~- to �KEGORY > Holly Dr .. ID J 0 s .AGO a Cedar Gt c c It c z Install sidewalk on the south side of Walnut St. from 6th Ave. S to 7th Ave. S. This project is ranked #9 in the Short Walkway i List (from 2015 Transportation Plan). It This project will improve pedestrian safety along this stretch. $290,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $50,000 $240,000 $290,000 $290,000 $290,000 Packet Pg. 53 CIP/CFP v1.7 47 Public Works - Transportation P 216th St SW Walkway from Hwy 99 to 72nd Ave W Q MCDONALD'S ANT a a 'E STEVENS COURT AEGIS VALUE O� Swedish VILLAGEO= -- Edmonds 216th St SW 216th St SW EDMONDS q0 MEDICAL Q p0 21605 PAVILION KRUGER CLINIC y Q, EN'S TH �pJ ER ' Install 150' sidewalk on north side of 216th St. SW from Hwy. 99 to 72nd Ave. W (completing a missing link on north side of 216th St. SW). This project is ranked #3 in the Short Walkway List (from 2015 Transportation Plan). To provide a safe and desirable walking route. $220,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $33,000 $187,000 $220,000 $220,000 $220,000 Packet Pg. 54 CIP/CFP v1.7 48 The project will add bike lanes or sharrows on the following streets: • 100th Ave/9th Ave from 244th St to Walnut St • Walnut/Bowdoin Way from 9th Ave to 84th Ave • 228th St. from 76th Ave to 80th Ave • Bike sharrows on 80th Ave from 228th St. to 220th St. Pedestrian crossing improvements including curb ramps, rectangular rapid flashing beacons (RRFB) and signing will be installed at 100th Ave & 224th St, 9th Ave & Pine St, Bowdoin Way& 96th Ave and Bowdoin Way & Pioneer Way. This project will create new bike connections to various destination points throughout the City (such as schools, parks, Downtown, Sound Transit Station...). Sound Transit awarded the grant to fund improvements that will provide more convenient access so that more people can use Sound Transit services. $3,000,000 Design Right of Way Construction $15,000 Expense Total $15,000 Street Fund 112 - Gas Tax & Multi- REET Fund 125 $10,095 REET Fund 126 $4,905 Federal Grants State Grants Other (Sound Transit Grant) Funding Source Total $15,000 Packet Pg. 55 CIP/CFP v1.7 49 s a a CASP-ERS-ST� - -- — ------200th-St-SWP-- Mountain Ln z Vista PI a > a 3 m 9 L N Q o Q 201 si PI SW v CO v > v Q b P - Z Car of Way 'i 3: 202nd St � SW -= Q ' ha St W Sierra PI a v -2 > W = n Z 2nd PI SW Q' > > Q - a Q H Glen St Glen St U Q s ^ ° ' D a\e N St SWco p 20a m z 1O -'04 h Daley St Daley St J 10 a O Lu ' SPI-i-si Sprague St PIN 205th PI SW a „ias St Edmonds St Edm�,nd� sr Edmonds St c� m ���--206th St SW c' - - o Bell St Fm�rat fills Bell St o x207th 1207thPI SW St N Q Q m N - -- - - - - - MAIN ST-- Dayton-St-� Dayton -St - = 208th PI SW Construct sidewalk on Maplewood Dr. from Main St. to 200th St. SW (- 2,700'). A sidewalk currently exists on 200th St. SW from Main St. to 76th Ave. W, adjacent to Maplewood Elementary School (rated #18 in the Long Walkway list of the 2015 Transportation Plan). Create pedestrian connection between Maplewood Elementary School on 200th St. SW and Main St., by encouraging kids t use non -motorized transportation to walk to / from school. $2,951,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $220,000 $220,000 $2,511,000 $220,000 $220,000 $2,511,000 $220,000 $220,000 $2,511,000 $220,000 $220,000 $2,511,000 Packet Pg. 56 CIP/CFP v1.7 50 Public Works - Transportation P 95th PI W Walkway from 224th St SW to 220th St SW ME 220TH ST SW -- W a NV 0 �' ■ Q W Re m c: SV�1 0 ■' 0 N '- '' w z r > 221 a ��� s M a .�CO `- , r 7 — .. Per 3 M do ., } • I � zzatn St sw ati — v zzatn St sw Q In • ��� 6 �, Q1 �z Install sidewalk along 95th PI. W from 224th St. SW to 220th St. SW with curb and gutter. This project ranked #8 in the Lonf Walkway List of the 2015 Transportation Plan. This project would improve pedestrian safety. $862,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $131,000 $731,000 $131,000 $731,000 $131,000 $731,000 $131,000 $731,000 Packet Pg. 57 CIP/CFP v1.7 51 a Seattle : 243rd PI SW Baptist W Lake FQMo 0 Church Q Ballinger Qtilp .~o /VOS tv t. AY N 205TH' SiTiilr�i • N 205TH ST z N 204TH PL Q 204TH PL a Z Z w 0 Q > z Q NERD P� I a W D� NO2/Vp A , -n�ao sr m Extend bike lanes within proximity of the intersection in northbound and southbound directions. Install APS on all corners and new ADA curb ramps. Improve active transportation safety along this section of the Interurban Trail and across SR-104. $1,571,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $261,000 $1,310,000 $261,000 $1,310,000 $261,000 $1,310,000 $261,000 $1,310,000 Packet Pg. 58 CIP/CFP v1.7 52 A Installation of street lights along various streets within Downtown Edmonds. This project will add new street lighting in Downtown to improve pedestrian safety at night. $1,638,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $328,000 $1,310,000 $328,000 $1,310,000 $328,000 $1,310,000 $328,000 $1,310,000 Packet Pg. 59 CIP/CFP v1.7 53 Public Works - Transportation SR-104 Walkway HAWK to Pine/Pine from SR - Edmonds Holly Dr Cedar S1 Marsh }�, Q, Howell Way Magndia 3 G Spruce St = Z Homeland D N Soru,-� r C O a WHemlock Wayt ��„__. c N n 0 UJ > Erben Dr N � > a Q Seamont Ln a Laurel St v + o Q Y = = Pine_' z c Ll c. C c },� Forsyth Ln Q> Q> a C �Z Fir PI a a m U C \ e c ` O Fir i; Q Fir PI C �jW < c Installation of sidewalk with ADA curb ramps along SR-104 from the HAWK signal to Pine St and along Pine St from SR-1041 i 9th Ave S s c w c Project Benefit w s c c This project will improve pedestrian connectivity between the residential areas along 3rd Ave. S to Downtown Edmonds an c City Park. c c Estimated Project Cost c C, s $3,276,000 c c 0 -- Z Design $273,000 $273,000 $2,730,000 C Right of Way c Construction Expense Total $273,000 $273,000 $2,730,000 Street Fund 112 - Gas Tax & Multi- s REET Fund 125 C REET Fund 126 Transportation Impact Fees < General Fund s Stormwater Utility Fund 422 c Federal Grants State Grants Unsecured Funding $273,000 $273,000 $2,730,000 i Funding Source Total $273,000 $273,000 $2,730,000 Packet Pg. 60 CIP/CFP v1.7 54 Public Works - Transportation 191 st St SW from 80th Ave W to 76th Ave W erra ark a AM 00 r` o `" O 0 po u sx J f S f s W c > c c a c � c Install sidewalk along 191th St. SW from 80th Ave. W to 76th Ave., with curb and gutter. This project ranked #8 in Long Walkway List of the 2015 Transportation Plan. This project would improve pedestrian safety. $719,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $106,00( k L ( $613,00( $719,00( i $719,00( i $719,00( Packet Pg. 61 CIP/CFP v1.7 55 s IS Flobin Hood Dr*44 cl J a P Q0 Z MO O:E �Lu w J T 232nd St SW Salem Edmonds Lutheran Heights Church 4 K-12 Scriber Lake ■ , High School" LU - a ost.� Hickman 236th PI SW r o :2 Park a �' N N 231 SW Edmonds Faith O Memorial ? 237th P Community 238tn St sw Cemetery rk.—k Install sidewalk along 104th Ave. W from 238th ST. SW to 106th Ave. W, with curb and gutter. This project ranked #10 in tr i Long Walkway List of the 2015 Transportation Plan. This project would improve pedestrian safety. $1,124,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $170,00( C C ( $954,00( i $1,124,00( i $1,124,00( $1,124,00( Packet Pg. 62 CIP/CFP v1.7 56 Public Works - Transportation 80th Ave W from 218th St SW to 220th St SW 218thi SW 219th St SW a L W Edmonds Church of God ESPERANCE Install sidewalk along 80th Ave. W from 218th ST. SW to 220th ST. SW, with curb and gutter. This project ranked #7 in the Short Walkway List of the 2015 Transportation Plan. This project would improve pedestrian safety. $344,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $63,00( $281,00( $344,00( $344,00( $344,00( Packet Pg. 63 CIP/CFP v1.7 57 Public Works - Transportation 84th Ave W from 188th St SW to 186th St SW PI SW E a 00 Seaview Elemental Ah 186th St SW a 188th St SW 187th St SW A Install sidewalk along 84th Ave. W from 188th St. SW to 186th St. SW., with curb and gutter. This project ranked #5 in Shor Walkway List of the 2015 Transportation Plan. This project would improve pedestrian safety. $348,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $53,00( $295,00( $348,00( $348,00( $348,00( Packet Pg. 64 CIP/CFP v1.7 58 i Y U U J 7$� > t Q Y Y O O Y L < fD C Ot > s Q a a YLU D 00 Q C)� \ 2 J 1 W s IIIIIIIIII, 1 M Ll c L L c c _ 2401h o St SW o Mathay N e c = Ballinger z - Park c s Project Description i a Install sidewalk along 238th St. SW from Hwy 99 to 76th Ave. W. This project ranked #10 in Long Walkway List of the 2015 i Transportation Plan. c Project Benefit w s This project would improve pedestrian safety. c c c Estimated Project Cost c c $1,363,000 e c c ' c a Design $199,00( IL Right of Way G U C Construction $1,164,00( c Expense Total $1,363,00( i Street Fund 112 - Gas Tax & Multi- REET Fund 125 1 REET Fund 126 Transportation Impact Fees General Fund s < Stormwater Utility Fund 422 s s Federal Grants ` w State Grants Unsecured Funding $1,363,00( i Funding Source Total $1,363,00( i Packet Pg. 65 CIP/CFP v1.7 59 T N M 7th and C A\je °' W 1'ista PI Q Elm Park 2 � H c O� Elm 5t 220TH ST SW F CO L L U A/ = a a Elm PI p rn , , �. OD p poA/ar Goo � N The walkway project is ranked #6 on the short walkway list from the 2015 Transportation Plan. The project will install ` approximately 700 feet of new sidewalk, six pedestrian curb ramps and modify the existing stormwater system on Elm Wad between 8th Ave. S and 9th Ave. S. This project will complete an important missing sidewalk link. The project will improve pedestrian safety and provide a missing link of sidewalk on Elm Way between 8th Ave and 9th Ave ' $1,100,000 Design Right of Way Construction $10,000 Expense Total $10,000 Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 $6,000 Transportation Impact Fees General Fund Stormwater Utility Fund 422 $4,000 Federal Grants State Grants Unsecured Funding Funding Source Total $10,000 Packet Pg. 66 CIP/CFP v1.7 60 This program started in 2019 and will provide pedestrian safety improvements, such as RRFB's and flashing LED's around stop signs. These improvements will improve the safety of the City's transportation system. Improve safety at pedestrian crossings. $80,770 Design $1,000 Right of Way Construction $79,770 Expense Total $80,770 Street Fund 112 - Gas Tax & Multi- REET Fund 125 $80,770 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total $80,770 Packet Pg. 67 CIP/CFP v1.7 61 Final design of 4th Avenue Cultural Corridor to include site design and construction documents for a safe, pedestrian friendly, and art enhanced corridor in the public right of way which provides a strong visual connection along 4th Avenue N between Main Street and Edmonds Center for the Arts. Interim work on this project since the concept was developed includes a 2015 temporary light artwork "Luminous Forest", as well as preliminary design development through 2020-21. Funding for this project has not been secured at this time. The 4th Avenue Cultural Corridor Project is managed by the Community Services/Economic Development Department. The corridor improvements in the public right of way will encourage pedestrian traffic and provide a strong visual connecti( between the ECA and downtown retail. Improvements will enhance connectivity as an attractive walking corridor and contribute to the economic vitality in downtown. The project has been supported by the community in the 2014 Communii Cultural Plan and in the goals and priorities for the State certified Creative District. This project is supported by the 2022 Parks, Recreation and Open Space (PROS) Plan. $9,206,600 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & REET Fund 125 REET Fund 126 General Fund Unsecured Funding Funding Source Total $1,000,000 $500,000 $500,000 $6,000,000 $1,000,000 $1,000,000 $6,000,000 $1,000,000 $1,000,000 $6,000,000 $1,000,000 $1,000,000 $6,000,000 Packet Pg. 68 CIP/CFP v1.7 62 SPRAGUEST 0 k M 4 F 00 Reconstruction of approximately 600 LF of existing sidewalk and curb and gutter along the frontage of Civic Park on 7th Av( N. Improve pedestrian access and safety to Civic Park and other destination points within proximity to 7th Ave. N $750,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $140,000 $610,000 $140,000 $610,000 $140,000 $610,000 $140,000 $610,000 Packet Pg. 69 CIPICFP v1.7 63 CIP/CFP vl.7 64 1 Packet Pg. 70 W Da ton St_ - -- Y_ _-- -- Dayton St - Dayton St Dayton St Puget Sound G Q i c > Maple St a Alder St I � > '-'der St a In N r LL I LLI"Q -- Walnut_St Edmonds Marsh L m u) Holly Dr Howell Way a',a Homeland Dr c < °1/ CIO a n < 0� cnl dye ZI rr w of Hemlock Way N < a O 04 Erben Dr < Seamont Ln Modify existing lane channelization on SR104 to add vehicle storage for ferry users. Reduce conflicts between ferry storage and access to local driveways. $380,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $57,000 $323,000 $380,000 $380,000 $380,000 Packet Pg. 71 CIP/CFP v1.7 65 CIP/CFP v1.7 66 3.1.a Install traffic calming devices along selected stretches throughout the City with speeding issues (through completion of detailed evaluation). This ongoing annual program started in 2015 and is included in the City's 6-year Transportation Improvement Program (TIP) and Capital Improvement Program (CIP). Reduce vehicle speeds on City streets that qualify under the City's Traffic Calming Policy. $82,000 (2024) Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi- REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $11,000 $71,000 $22,000 $22,000 $22,000 $22,000 $22,000 $330,00( $82,000 $22,000 $22,000 $22,000 $22,000 $22,000 $330,00( $82,000 $22,000 $22,000 $22,000 $22,000 $22,000 $330,00( $82,000 $22,000 $22,000 $22,000 $22,000 $22,000 $330,00( a Packet Pg. 73 CIP/CFP v1.7 67 CIP/CFP v1.7 The 2017 Transition Plan completed an ADA evaluation and prioritization of the City's street right-of-way. This decision package will update the 2017 plan and expand the evaluation to include City Buildings and Parks facilities. The Plan will inventory physical barriers preventing accessibility and develop actions and preliminary cost estimates to address ADA non compliance. Inventories and prioritizes ADA issues in the City right of way, as well as City buildings and parks facilities. $440,000 Design $440,000 Right of Way Construction Expense Total $440,000 Street Fund 112 - Gas Tax & Multi- $105,000 REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund $335,000 Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $440,000 Packet Pg. 75 CIP/CFP v1.7 69 The Transportation Plan serves as the transportation element of the City's Comprehensive Plan and is being updated in coordination with the 2024 Comprehensive Plan Update. Based upon existing and projected future land use and travel patterns, the Transportation Plan describes street, pedestrian, bicycle and transit infrastructure and services and provides i assessment of existing and projected future transportation needs. The Plan will establish the transportation priorities and guides the development of the six -year Transportation Improvement Program (TIP), Capital Improvement Program (CIP) an Capital Facilities Plan (CFP). The plan was last updated in 2015. The Transportation Plan serves as the transportation element of the City's Comprehensive Plan. The Transportation Plan is being updated in coordination with the 2024 Comprehensive Plan Update. Based upon existing and projected future land use and travel patterns, the Transportation Plan describes roadway pedestrian, bicycle and transit infrastructure and services and provides an assessment of existing and projected future transportation needs. The Plan will establish the transportation priorities and guides the development of the six -year Transportation Improvement Program (TIP), Capital Improvement Program (CIP), Capital Facilities Plan (CFP) and introduce Multimodal Level of Service (MMLOS). $406,000 Planning $236,085 Right of Way Construction Expense Total $236,085 Street Fund 112 - Gas Tax & Multi- $236,085 REET Fund 125 REET Fund 126 Transportation Impact Fees Funding Source Total $236,085 Packet Pg. 76 CIP/CFP v1.7 70 CIP/CFP v1.7 The City of Edmonds proposes the development of this project to demonstrate how green infrastructure can both address stormwater flows and enhance the streetscapes to benefit the Hwy 99 neighborhood and the downtown core. This project includes the following elements: • Roadway narrowing to reduce traffic speeds and to reduce impervious surface (vehicular capacity retained) • Sidewalks and planting strips added • Bioretention cells collect runoff from the road through curb cuts • Bioretention cells collect runoff directly from sidewalks • Public private partnership potential with Housing Hope and Terrace Place developments. Incorporating green streets into the urban fabric of the City of Edmonds is intended to demonstrate how trees, vegetation, engineered green stormwater solutions, physical and visual narrowing of vehicular lane widths, and shortening pedestrian crossings with curb bulbs help to slow traffic, ameliorate climate change impacts, and reinforce desired land use and transportation patterns on appropriate street rights -of -way. This project is intended to increase the livability of a diverse, growing city. $3,500,000 Design Right of Way Construction Expense Total Unsecured Funding Funding Source Total $350,000 $3,150,000 $350,000 $3,150,000 $350,000 $3,150,000 $350,000 $3,150,000 Packet Pg. 78 CIP/CFP v1.7 72 3.1.a R Q R U c 3.1.a i 0 0 0 0 0 0 0 0 0 0 0 C 0 C 0 C 0 C C 0 (n O_ O N O LO(O (C> 00 O NC) O (fl Cl) O O N U3 M O M l0 I� O M N E9 co V V V V V Cl) O U3 EFT U3 EFT 63 EFT O ER (n ER U3 U) U3 U3 U3 U3 U3 O 60 O r- (C N O O O O O O O O O O O O O O O O O O O O_ O LO O O N O V) (fl O N O O (O co O V O N U3 M O M (C> I� O (O N U3 Cl) V V V V V U3 O U) U3 U) 03 U) 03 03 O O O O O O O O O O U3 (A U) (R U) (A U) O O (A O O O M V N (.O V ER 69 O O O O O O O O O O U) U) U) 03 U) U3 00 00 U) U) V (fl N_ co V U) (i) (A HJ (A En (A O O U3 UJ (H O O co N M O W LO M 69 HJ O O O O O O O O O O E9 e3 Eq 03 E� 63 63 O O O M O O co LO 00 (f) CO M W, M Ef) U3 O O O O O O O O O O EA HJ (A O O U-? (A HJ (A O O O O co 6 (O LO lf7 M ER HJ HJ O O O O O O O O O O E9 U3 E9 U3 d) O O O O O Lf> O O (fl O N U3 Cl lqt 00 Ej Cl) (G H) U) N A N N N N N N N MM O O O O O O O O � O) Q m m m m m m 0) m rn m 0) m rn rn o6 O O O O O O O O N a a` a a` a a` a a m c c c c c c c c c- a� E E E E E E E E Of aD (u (D a) (D a) aD (D U OS U M U 03 U M U OS U M U OS U Co O d 0_ 0-0_ O_ 0_ O_ 0- N a a a a a a a a U) N m N (6 N (6 N (6 N N c c c c c c c c 0 a> Q Q Q Q Q Q Q Q a m0 J �2 V (O 00 O O N > N (D N N N U N N N 7 o6 U> U7 U> U7 U> U7 U> V> N OS (6 03 (6 OS (6 OS (6 LPL N N a a a a a a a a06 >- 0 0 Cl) 0 0 0 0 0 0 a a a a a a a a a a CIP/CFP vl.7 74 0 C IR co M O O r r O N O O O O co Q01 LO Cl) (9 O O O Cl) O ia (9 O O Co a O O CO N M 4a O O N N co O O O r co (A O O CD EA O 0 zo co c2 CD O r r N O EFT O O O 7 co Cl) O O O 7 O O O V U3 O O CO LO 7 Ei3 O O N co W U> O O O r co (A O O O CO V UJ v li [6 Packet Pg. 80 Per the approved 2017 Water Comprehensive Plan, the project will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone tc breakage due to its material properties. Road pavement overlays will cover areas of roadways that were excavated and patched in previous years as part of the Waterline Replacement Projects. Improve overall pavement condition in locations that were excavated and patched due to the Annual Waterline Replaceme Projects. $225,000 Design $20,000 Right of Way Construction $205,000 Expense Total $225,000 Water Fund 421 $225,000 Funding Source Total $225,000 Packet Pg. 81 CIP/CFP v1.7 75 3.1.a Per the approved 2017 Water Comprehensive Plan, the projects will replace/maintain pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone t( breakage due to its material properties. Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of breakages and leakage, improve fire flows, and decrease overall day to day maintenance costs. $2.1 to $4.9 million/year Design Right of Way Construction Expense Total Water Fund 421 Funding Source Total $461,000 $547,000 $569,000 $592,000 $616,000 $641,000 $13,348,01( $3,525,000 $3,666,000 $3,813,000 $3,966,000 $4,124,000 $4,289,000 $89,328,99( $3,986,000 $4,213,000 $4,382,000 $4,558,000 $4,740,000 $4,930,000 $102,677,00( $3,736,000 $4,213,000 $4,382,000 $4,558,000 $4,740,000 $4,930,000 $102,677,00( $3,736,000 $4,213,000 $4,382,000 $4,558,000 $4,740,000 $4,930,000 $102,677,00( Packet Pg. 82 CIP/CFP v1.7 76 s 185th PI SW QJ < Yost Park rn U >i 2 C� I- 0 000 �Q 186th PI SW Seaview a =ya Water Tank G y This work is being done to provide structural upgrades, repair leakages, and upgrades to our two underground potable wat storage reservoirs. Preliminary findings completed in early 2023 were used to determine order of magnitude/preliminary costs and next steps for the now planned repairs and upgrades project. The Yost Reservoir report shows that it will need a major structural and seismic retrofit, plus repairs to address leakage from the reservoir. The report for the Seaview Reservoir shows similar issues as the Yost Reservoir, with a less serious leakage issue. Maintain a high level of drinking water quality, improve overall system reliability, decrease probability of leakage, retrofit structures so that they meet current structural codes to improve their resiliency during earthquakes, and decrease overall day to day maintenance costs. $9,659,430 Design $850,000 $650,000 Right of Way Construction $3,850,000 $3,850,000 Expense Total $850,000 $4,500,000 $3,850,000 Water Fund 421 $850,000 $4,500,000 $3,850,000 Funding Source Total $850,000 $4,500,000 $3,850,000 ■ ■ CIP/CFP v1.7 77 Packet Pg. 83 00, v A-, lk -1, it Cl) O O O O O O O O O O O O O O M V O O O O O O O O O O O O O O M O O O M O O O O O O O O O O C N V O O It O O 1- N CO CO LO Lf) LO O N M O Co O O N O LO Ln LO � h O O Lf) N M_ C) C)N N M M Cl) M EA N EA M N N N N N (A EA EA <O EA EA EA EA EA EA K3 K3 K3 V ti K3 (R O O O O O O O O O O O O O O O O EA O Ufl EA EA (A EA EA EA EA EA EA EA Qa 40 O C O O O "t M ti O O EA V LO K3 (A M O O O O O O O O O O O O O O M V O O O O O O O O O O O O O O Cl) cc O O M O O O O O O O O O O O N V O O V O O h N CO M ;t Lf) Lf) O N M C)M O O N L� _ O t` CO Lf) O LO (O O LO N M C)O N M M M Cl) CD EA t` EA M N N N N N EA EA (A Lf) EA (Al EA K3 (A (13 (13 (13 N (fT O O O O O O O O O O O O O O O O (i) CD EA EA d7 EA EA ER Q3 EA EA EA CD O O O O O Nt LO (A O to � Co EA EA N EA E9 O O O O O O O O O O O O O O O O 603 643 EA GG EA (f3 EA K3 Cq EA EA CD O O O O O O O Co O � Co M EA EA N EA E9 O O O O O O O O O O O O O O O O EA UD3 EA UD> EA EA EA EA EA EA (f3 O O O O O O O LO LO O O O Co m N t CO _- EA LO (A EA (A O O O O O O O O O O O O O O O O EA EA CD UD> EA EA EA EA EA EA (f3 O O O O O O O O O LO Lp O O N I- M I* (A M EA (A L (A EA (A M O O O O O O O O O O O O O O M ER Gq (A ER EA (f3 EA EA EA EA le O O O O W V O O 00 Cl) w � M CO M O EA M EA w K3 EA E9 O O O O O O O O O O O O O O O O O O O (T (f> O O O (A K3 EA (A EA O O O O (A M V 0 O OM � N_ � N LO LO O EA (A � ua LO (A (f3 Co M (A M (A Cl) (A O L EA (A a a a� (o a� C p M Lf) r (A _ •� U O N O O N O O O O to N N N N N N 06 U U •� (6 L OM d (U H .o @ a U .0 o .0 0 .p 0 .0 0 .0 0 .0 0 > N > d @ .. ceS LL tL L1 tL L1 L1 Ll yCn d flooO Q •1 C C O_ GI C C C C C C (U L N N 0) N N N R 'Cu C (A T 0 Up (6 @ (6 @ N (D Q L p Cu 0 Co -a'a a)" w m Q �� a m� a E E E E E E o y (0 (D @ p O O O O O U (U p Cu > N U Y z E Coa) L 7 7 7 7 7 7 C U C V 7 y U ( C C C C C C 0) > i Co _ � M o zt LL m v LO (fl � Co m Ll ❑ m CO 'i L L y Co J U = N N (U N N N Q) N E LU E -O i 3p O y" Cu -` = m m m m m m m p W LU a N (L J (D 0- VI N J Co h (n Q L d L d L d L d L d L Ll L 7 d LL CD N V in 0 Z LU M X M M (O N N M I LO CD 00 M L.- LU O O O N O N T T T T T T T T r J a a a a a a a a a a a a a a a O F- CIP/CFP vl.7 79 m 'IT 3.1.a CO (fl U') LO O O 'IT Co CD CO N CO (fl CO (A (A (A EA CD6s � Qa O O CO O LO EA 1- 00 � M (O (C N LO N � m Ld O O N M CO CO (A (A EA EA CD O � � Cq O O O V N (A O CD CD 0 O O M N EA 6s � CD O O O O O O N Co N (A 6s � � CD O O O � O N M N (A 6q LO M M O (fl CO Lr O_ 00 r O LO LO W M EA di CEO 00 V 6q P-� O (O � Co LO N Co E!) Ef-J J Q Packet Pg. 85 CIP/CFP v1.7 80 Packet Pg. 86 Public Works - Stormwater Edmonds Marsh Water Quality Improvements Edmonds Marsh �• Q N 0 Z L o WI Wildlife Refuge City Park Howell Way _am a A i iW �t I_1 The project will be improving water quality of stormwater runoff by replacing existing catch basins along the west side of & 104 funded via a DOE grant and on the east side of SR-104 via a state funded appropriation. The catch basins will be replaced with catch basins that include water filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter the marsh from these locations. Improve water quality of stormwater discharging into the Edmonds Marsh from the west portions of SR-104 located near tl marsh. The improvements will provide better habitat for the return of salmon to the marsh. $876,000 Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total 2024 202 $644,843 $90,000 $644,843 $11,250 $69,211 $78,750 $575,632 $90,000 $644,843 2029 2030-4 Packet Pg. 87 CIP/CFP v1.7 81 Packet Pg. 88 CIP/CFP vl.7 Reducing scouring flows to reduce sediments load in Perrinville Creek was identified in a previous basin report completed ii 2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The project! funded by this program are incremental steps toward recovering this stream run as adequate fish habitat. These efforts hay become even more critical given recent challenges around the Perrinville Creek outfall area. This program is a fund for implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to respond to ad -hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grant applications for flow reductions projects. The project will reduce peak flows in Perrinville creek, improve fish passage and decrease creek bed scour during peak flow events. $100,000/year Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $140,00( $90,000 $90,000 $90,000 $90,000 $90,000 $90,000 $1,260,00( $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $1,400,00( $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $1,400,00( $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $1,400,00( Packet Pg. 89 CIP/CFP v1.7 83 A The purpose of this project is to improve the environmental health of the creek necessary to support fish habitat, and to restore the storm water capacity. The project consists of the modifications to three structures that currently prevent fish passage and are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove and replace with a fish - friendly culvert or bridge with adequate flow capacity, (2) return flow to the creek between the diversion structure and the BNSF culvert by blocking the structure and restoring creek capacity and (3) culvert at Talbot Road, remove and replace witl- fish-friendly culvert or bridge that provides adequate fish passage and storm water flow capacity. This project will increase the resiliency of the watershed by building the structures that mimic the natural channel performance necessary for fish habitat and stormwater flow capacity. The project also includes time and effort to research and apply for supplemental/additional funding sources for construction. Due to the project complexity and number of stakeholders, the planning and design phase is estimated to be 2-years. The project will reduce City maintenance needs in the future and improve fish passage. $7,636,000 Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $730,000 $500,000 $2,800,000 $3,000,000 $730,000 $3,300,000 $3,000,000 $67,014 $907,704 $750,000 $662,986 $582,697 $1,809,599 $2,250,000 $730,000 $3,300,000 $3,000,000 Packet Pg. 90 CIP/CFP v1.7 84 FA Am o Ind M. City of Edmonds and Lynnwood joint project to supplement/update the Perrinville Creek 2015 basin analysis that determined possible locations for projects that would help decrease the peak storm flows during high rain events. Project will be updated to reflect projects completed and also determine if there are other locations within the basin to aid in the reduction of peak flows in the basin. Improve overall basin and stream health, by using green stormwater infrastructure methods. This will make it so that rainf is not simply collected and conveyed downstream and instead behaves as close as possible to natural conditions. This includes infiltrating rainfall runoff as close as possible to where it fell. This will also decrease stream peak flows, which will decrease stream erosion and improve the overall stream habitat for aquatic life. $649,200 Design $594,390 Right of Way Construction Expense Total $594,390 Stormwater Utility Fund 422 $141,000 ARPA Funds Secured Grants $453,390 Unsecured Grants Funding Source Total $594,390 ■ Packet Pg. 91 CIP/CFP v1.7 85 Q U 06 _ R IL m m LL �a Q m U as N O N lqt O N V O N O O L IL 4- 0 O r m r a) N d L a rn N O N N O N IL v d U. U L O :.i 3 IL Packet Pg. 92 CIP/CFP v1.7 86 co 240th St SW ' w 79th P' Mathay Ballinger Park fe a a 0 r r n 242nd St SW 240th PI SW J W = 241 st St SW F— %O n A Lake Ballinger suffers from urban flooding & seasonal algae blooms along with other water quality impairments. The Highway 99 corridor is an area of high development, including a future City project which will require stormwater mitigation. By creating a regional facility, the City can improve the stormwater mitigation achieved by development, addressed stormwater mitigation needs for the future Highway project, and treat runoff from one of the City bigger polluti generating areas. The City can drastically improve Lake Ballinger water quality. The project proposes to implement water quality and flow control improvements at City -owned Mathay-Bal linger Park as green stormwater infrastructure (GSI) whic would significantly benefit the Lake ecology and habitat conditions and enhance a valued neighborhood, but underutilized, park. The project proposes to implement water quality and flow control improvements at City -owned Mathay-Ballinger Park as green stormwater infrastructure (GSI) which would significantly benefit the Lake ecology and habitat conditions and enhan a valued neighborhood, but underutilized, park. $3, 200, 000 Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $200,000 $200,000 $2,800,000 $200,000 $3,000,000 $200,000 $750,000 $2,250,000 $200,000 $3,000,000 Packet Pg. 93 CIP/CFP v1.7 87 The project proposes to purchase an existing single family residential property located within the Lake Ballinger flood plain The City secured a $500,000 Department of Ecology grant to aid in this process. The home is the lowest property on the lal and is badly damaged from previous flooding to the point it is generally uninhabitable. It is also nearly undevelopable due the flood plain and critical area regulations onsite. The City intends to remove the home and any pollution generating surfaces from the site as part of the initial effort on the site. The grant has restrictions for allowing this parcel to be used for public use. After demolition of the structures and impervious surfaces, the planned site use would be for public utility benefit only. Because the City storm drain line for SR-1 cuts through in an easement immediately adjacent to this parcel, the City plans to pursue a future project to split appropriate flows from the City system and provide water quality treatment to the maximum extent feasible. The future project would provide water quality treatment for a very heavily trafficked highway (SR-104) and would make significant improvement in water quality to Lake Ballinger and its downstream course to Lake Washington via McAleer Creek. Improve the health and water quality of Lake Ballinger by removing hard surfaces and a home that is generally uninhabitable. Project will also provide a future location to treat stormwater runoff from portions SR-104. $750,000 Design Right of Way $10,000 Construction $110,000 Expense Total $120,000 Stormwater Utility Fund 422 $92,500 Secured Grants $27,500 Unsecured Grants Funding Source Total $120,000 Packet Pg. 94 CIP/CFP v1.7 88 CIP/CFP v1.7 89 Packet Pg. 95 Annual storm drain replacement/maintenance projects. Projects propose to replace or rehab storm drain infrastructure in several locations throughout the City. Locations of work identified by City crews and staff via firsthand knowledge or video inspection results. Much of Edmonds stormwater infrastructure is past its useful lifespan and requires routine replacement or repair to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will increase chances of storm drain system failure. Improve system reliability and capacity, decrease breakages, and decrease overall day to day maintenance costs $1.7 to $2.4 million/year Design Right of Way Construction Expense Total Stormwater Utility Fund 422 Funding Source Total $354,000 $337,000 $351,000 $365,000 $380,000 $395,000 $8,230,13( $1,347,000 $1,687,000 $1,755,000 $1,825,000 $1,898,000 $1,974,000 $41,129,86' $1,701,000 $2,024,000 $2,106,000 $2,190,000 $2,278,000 $2,369,000 $49,360,00( $1,701,000 $2,024,000 $2,106,000 $2,190,000 $2,278,000 $2,369,000 $49,360,00( $1,701,000 $2,024,000 $2,106,000 $2,190,000 $2,278,000 $2,369,000 $49,360,00( Packet Pg. 96 CIP/CFP v1.7 90 Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Annual Storm Maintenance Projects. Improve overall pavement condition in locations that were excavated and patched due to the Annual Storm Replacement Projects. $315,000 Design $25,000 Right of Way Construction $290,000 Expense Total $315,000 Stormwater Utility Fund 422 $315,000 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $315,000 Packet Pg. 97 CIP/CFP v1.7 91 CIP/CFP v1.7 I rm.aw = LYNNWOOD 4 t i ' Y Nrtrw 1M/If ISW ! % r � EDMONDS UNWORPOUTED coVNIY WOODWAY MOUNTLAKE f rtsncAe¢E TERRACE � u .•�•.. •• ONG COUN7Y 1MN13 W ..... The City of Edmonds (City) owns and operates an extensive system of drainage pipes, ditches, and other assets to convey stormwater runoff into streams, lakes, and Puget Sound to prevent and minimize damage to private property, streets, and other infrastructure. The City is faced with the challenge of conveying this runoff safely and cost-effectively while preventir or minimizing the adverse impacts of high flows (erosion, flooding, and sediment deposition) and of stormwater pollutants on water quality and aquatic habitat. In addition, recent state and federal stormwater regulations make it technically and financially challenging to address these issues while balancing utility ratepayer costs. To proactively address these challeng and remain in compliance with the State -mandated National Pollutant Discharge Elimination System Western Washington Phase II Municipal Stormwater Permit (NPDES Phase II permit) and other increasing regulatory requirements, the City is updating its current comprehensive storm and surface water management plan. This permit has and will continue to have significant impact on the workload and operational budget of both the Engineering Division and the Storm Crews within the Public Works Department. Per the State Department of Ecology, the plan will also include the work findings from their required (stormwater Management Action Plan) SMAP process of City drainage watersheds. Project will also include recommendations for stormwater utilities rates to be adjusted at the discretion of Council. A holistic summary of the City's Stormwater system with recommended priorities for selecting future capital maintenance and improvements projects. $733,000 Design $350,000 Right of Way Construction Expense Total $350,000 Stormwater Utility Fund 422 $350,000 Funding Source Total $350,000 Packet Pg. 99 CIP/CFP v1.7 93 3.1.a Ago, evllm� IJ_ W rW U) 0 0 0(M 0 0 0 0 o O o It O O O O O O Cn C4 CM M 00 C4 U). EA O It LO Cfl O� 00 N N N N N N CA CA CA CA CA H) U). Gq EA EA U> EA U). 6q 0 0 0 00 m 0 0 0 0 O O o v_ o C o O O O Cn CO Cl) Cl) 00 C4 � E!) O It LO C09 Or-- 00 N N N N N N CA CA CA CA CA CA Y> U). U> EA Cf3 EA U7 O O O M N EA LO � U> � � � O O O O Cr LO N V N � LO U7 U). U7 U7 U7 0 0 CD O O o_ o N V N La U7 LOCU7 U> 0 0 O O LO m N_ O M N � Cf> V> Cf> CO3 O O Efi H) CA O O It � O co N EA 0 0 0 rnCLOCY> O O O v 0 0 LO Cl) C4 O C4 CA CA O M N u-, 6? O O O M co O U> EA O O O O O 00 LO 60 0 0 0 N V EA O O O N V EA O V> O V> O O H) O 0 0 0 O O O COO O N O � (fl r V) H) 6q O EA EA O M N N c� 0 0 0 O o O V O N O O � EA EA O U> Gq O Cfl M Cfl EA O U> Ufl 0 O EA 0 0 � O O CD LO 0 d) Cfl U> 0 0 � O O LO o Cfl O Cn O EA U7 O H) EA O N LO Cfl EA L07U> 0 O N N LO Vp 06 M V M M O O V O O O O CN O O O O c N N N (6 L U U U U U U U U a) (6 f6 f6 f6 f6 N N N N 3 u N � 7 7 7 7 7 7 7 7 f/7 a c c c c c c c c 3 a 0� Q Q Q Q Q Q Q Q U) �2 (N w w w w w w w w c N (0 (6 (6 (6 (6 C oaaCacaca M N Li Q U r N M le N CO 1.- 00 O O r M O O O O O O O O O r r r a a a a a a a a a a a a CIP/CFP vl.7 95 rn v rn v 3.1.a M N O E9 • M N 0 Iq O O O N n O O O N C\j (Q Q U V co v to 00 _ v C.0 • 06 = O N d4 O N (Al � f4 O O O O to � O O _ O O V V LL (Q y+ Q f4 U 0 O LO M o o LO co N O N 04 N � 0 O ( 0 oco co OCV CD N d N O N cS "' o Cn GS _ C Q OL a O m O O O Cl) co O O C yr yr = 41 O N d4 O o N K3 U1 L a v � rn ' COD rn Ni9 rn (00 O U� O N IV CDE N M V • V y� � Q L w LL = � N W E U) t � v H r G Q Z W M x w J a 0 ~ Packet Pg. 101 Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Sanitary Sewer Replacement Projects. Improve overall pavement condition in locations that were excavated and patched due to Sanitary Sewer Replacement Projects. $60,000 Design $2,000 Right of Way Construction $58,000 Expense Total $60,000 Sewer Fund 423 $60,000 Funding Source Total $60,000 Packet Pg. 102 CIP/CFP v1.7 96 0 Per the approved 2013 Sewer Comprehensive Plan, the projects will replace pipe and related appurtenances at various locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due t its material properties. Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. $1.8 to $2.7 million/year Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total $378,000 $378,000 $393,000 $409,000 $425,000 $442,000 $9,203,67� $2,000,000 $2,043,000 $2,125,000 $2,210,000 $2,299,000 $2,391,000 $49,787,32: $2,378,000 $2,421,000 $2,518,000 $2,619,000 $2,724,000 $2,833,000 $58,991,00( $2,378,000 $2,421,000 $2,518,000 $2,619,000 $2,724,000 $2,833,000 $58,991,00( $2,378,000 $2,421,000 $2,518,000 $2,619,000 $2,724,000 $2,833,000 $58,991,00( Packet Pg. 103 CIP/CFP v1.7 97 Public Works - Sewer 3 Annual Citywide CIPP Sewer Rehabilitation Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. $540,000 to $640,000/year Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total $81,000 $85,000 $88,000 $92,000 $96,000 $1,996,67� $461,000 $480,000 $499,000 $519,000 $540,000 $11,231,32' $542,000 $565,000 $587,000 $611,000 $636,000 $13,228,00( $542,000 $565,000 $587,000 $611,000 $636,000 $13,228,00( C $542,000 $565,000 $587,000 $611,000 $636,000 $13,228,00( Packet Pg. 104 CIP/CFP v1.7 98 tbt'tKAINUL. ��■ — ,evisw .a Lk- - •.;3 Maple Ln .�� !� +T 234th` Si SW — Q 3 234th St sW ,1Q Madrona Ln _ Z w z N 236th St SW Q 236th St SW 2361h St SN' C 00 �t v h St SW 238TH ST SW __ 238th St sw _ a Oth St SW 2th SW _ 1� ` ' s Q ' a 242nd St SW 6 _Ire, 244 T H ST SW 242nd St SWa a �tiOS WAY 0- Lake Ballinger 232nd St Sv ' 32nd St SW '232nd St rn N N vO o '001 Ln CU __ ,;3 235thStSW 235TH PL.SWhW 236TH ST SW adll �h w o LO r aye ym a O LLINGER_WAY-244TH=ST SW Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the sewer pipe along Lak Ballinger will require additional flow capacity in the near future. These improvements are needed to account for populatio growth, reduce Infiltration and Inflow from the pipe and improve maintenance and emergency access for this major trunk system. Improve system reliability and capacity, decrease infiltration and inflow, and decrease overall day to day maintenance cost. Improved access will help ease maintenance and access for emergencies, which will further decease any chance of potenti� sewer spills into Lake Ballinger. $7,000,000 Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total $1,000,000 $1,000,000 $5,000,000 $1,000,000 $6,000,000 $1,000,000 $6,000,000 $1,000,000 $6,000,000 Packet Pg. 105 CIP/CFP v1.7 99 Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existing sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless method. Improve system reliability and capacity, decrease infiltration and inflow, decrease breakages, and decrease overall day to day maintenance costs. $522,000 Design $70,000 Right of Way Construction $452,000 Expense Total $522,000 Sewer Fund 423 $522,000 Funding Source Total $522,000 Packet Pg. 106 CIP/CFP v1.7 100 so . A( LLJ H I S r U K I C A L -MUSEUM t i't t l 1. �.7101 '-�/iy'-'ter•{.�_,•��•' •''• _ rr, M law- 4A W J V a u f� O LO O N O O O M O O 'It It M M O LO (0 LO O It O ti N O O M � 1 N 00 O LO O (C (D O c0 � ti O c0 c0 M O (D L() O I� � L() O O _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ f1- 00 It N LL) (D It 0) It Cl) O LL) 00 LO It LO M N O M ti M O M N M O N Ef3 C0 Efl N N Ef3 Ef3 N 0) r N O LLj M Ef3 613 613 613 613 01, " Ef3 Ef3 e3 _ Efl cq cq cq ea Efl O O O O O O O O O O O O O O O O O O O 6r3 6q (t} 613 60 Ef3 613 Ef3 60 60 613 E13 613 60- 60 613 613 Ef3 Ef3 Il- r O LO (D N M (O O M O r O "T r T M M O LO It (O LO O NT (O I- N (0 O 00 Il- r- N c0 (O LO O CO (C O c0 lq � O M M M O (O Ln O I� lq Ln O O f� 00 �t N LO (D 't d) M O LO r "t r CO LO 't LO Cl) r N r (O t Cl) f� CO O r Cl) "t N CO O r N E0- (.0 El3 It N It N Ef3 6a N O (V r O LO M r r 6a to ea Ef3 Ef3 Qf l , Ef} E13 60- - Ef3 6q Ef3 6q Ef3 to O O O O O O O O O O O O O O O O O O O Ef3 613 Efl 613 Efl Efl Efl 613 ER EA Ef3 Ef3 E13 (!? 613 E43 Efl Ef3 E43 O O O O O O O O O O O O O O O O O O O O O O O O O O O O Ef3 O O O O O O O O ER O O LO O O O O LL) O O O O O O O O O r O O LL) LL) O LL) O Lf) Lf) O O O LL) O Ef3 00 Efl 00 (M It N 613 ER O Ef3 N N 00 LL) N M Ef3 Ef3 Efl Efl Efl m 6s U), Efl Ef? Ef? Ef? Ef3 M 00 cl) d7 r LO LO d7 a7 O O O 0) 00 r r N O O N 't N Cl) 't (O (O O O H? LO r N I- N r- M U) 00 (.0 O O (O N r- 't r O LO N O 00 00 M O Ef3 r Cl) N N W r CO tf3 N (Dr � N Cl) r E13 r 613 Ef3 Ef3 Ef3 Ef} Lf) Ef3 60 60 60 Ef3 Ef3 Ely w 0) 00 ItL) f- L N 00 O (D O f'- 00 It1- O f� It N Cl)M O f- 00 (D N Ef3 It O f- 00 It Cl)Ef3 N _ M 0� (O 0') LO f- M (.0 O 'ITO r 't Mr- M O Lf) O O r- 4 Lf) � Lf) Lf) 0) LL) d Ef3 f- E13 N M N (0 Wf cq It ea N Ef3 LO f- Ef3 Ef3 Efl Efl Efl Efl Ef3 Efl Ef3 Ef3 Efl J V It 00 N 00 N 00 (O O LO O LO O d7 0) LO O 0) O (0 O) 00 N CDN GS 00 O It (D r 00 O U) U V O 0) c0 Cli Cl N LO CDCM 0) O Cl)r M 00 t _ M 0) N 00 0) r �t 613 O CM f- Ln 0) Ln O cli 00 63 r--GO 0) (0 N 0) r LO Ef3 N E13 LO ODNt 6q C) N 60 Ef3 N 613 60 60 60 Eli Ef3 Ef3 Ef3 W LL 00 O O O O 't O O O O r O O O I,- 00 O O fl- O 00 O f- O O O Ef3 0) LO N O O f- N O _ O O m O N O N O O O O O M O O O O Ili O N O 6) O (0 O LL) O r_ N O O Lf) O) (0 LL) N 00 Ef3 r q LO M M 't O d) M NT N c0 m N N 613 Efi r Efl 61) Efl 613 613 613 r Ef3 N N 61) 613 E13 613 Ef3 Efl Efl Efl C O O C (n C O U)O co Q C L co 0 U O H m a) - CDU U O c a — N 73 (a a)C) O O 0 a) m N C C C C o) N co C i _ 03 > Q O O O 0 N O L) E U) >O p 25 0)m m (6 U U U)> O O O O O L6 Eli O 00 co CD Ln r EA LO co LO O r- to ER I* N co CD O O Eli O 11 N N LO LO ER C) 2 C (A (A (A O O (6 (0 'O 0- U U OO a J LU .O U U LL LL LL LL LL 2 2 J J 0-O d d d > LL Z W a. x N M le LO to ti c0 O O r M N M le LO w r- c0 O W O O O O O O O O r r N r r r r J LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL Q IL a. a. a. a. a. a. a. a. a a a a. a. a. a. a. a. a Packet Pg. 108 CIP/CFP v1.7 102 0') It fl_ 00 � K-T O O O O M O O M O O M to 3.1.a M O O') 6FJ tM tfi Efl EFT Il- to tM0 c0 EA O O ER ER O K) O E!) O EH O EH O ER O tf} t6 0 rn - 0 t ti 0 0 O CM 0 O M 0 O Cl) 0 rn LO ttoo (Mo Q t0 U otS cu a o 0) 64 6q cfl � ti 00 cr� 0) � � � � 6s � 6q � LL o O Ef? O LO 0 U0, 0 EFT 0 EFT 0 EFT 0 O LO N 0 O O CD Q 0 U N N Ef? [I- M Ln Efl CDN u) Vj? 4M C N O N Vy � Cfl ti O K? O 60} O K} O EA �t N N 0 to ccoo c0 u) 0) O Q- 0 6q 0 rn 6q N r- 0 61) 0 ER 0 Efi 0 K) O 0 LO O r r vq- Ln co to a 4- 0 c 0 � N Efl O � K) � to vi +m+ C d N Cfl 00 to N I� O (14 U) O O K) O Ef3 O H) O K) O CD O LP) N It N cc c0 t0 d L a N � � r EiT N � � N O � O Ln 00 Gq OOOV O LO Cl) O LO Cl) O Ln M N N (fl It N N LO N d () LO Cfi ER EA ER 00 LO r 1 a U N L 0 0 m° L aD 0 _ O r _0 M 2 a , r .5 � LL O O O N a 7 U-LL O _ N O : Cd C V CO CO O O "O O LL LL " � 'On V ? co O 0 3 L 0 VJ = a) ' a U 5 ram+ Q i 0) E LU J Z ca +a `W LU I.L J Q H 0 ~ Packet Pg. 109 CIP/CFP v1.7 103 This small structure houses the Edmonds Cemetery funerary services and the cemetery Sextant office. The building is in relatively good condition and has little deferred maintenance backlog. Minor security and communications updates will be needed as technology dictates. Projects: Minor repair and maintenance Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well -maintained facility creates a safe work environmei that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $24,048 (2024) Construction\Professional Services $24,048 $8,414 $3,377 $818 $1,000 Expense Total $24,048 $8,414 $3,377 $818 $1,000 Fund 016 (2021 Facilities Bond) $20,000 Fund 016 (non -bond proceeds) $8,414 Unsecured Funding $4,048 $3,377 $818 $1,000 Funding Source Total $24,048 $8,414 $3,377 $818 $1,000 Packet Pg. 110 CIP/CFP v1.7 104 • '� l • BOA J"� �' .J -' ,r,11tilU 11�; (MIY SI'L l City Hall was built in 1979 and was operated as a private business office center until the City purchased and renovated the building in the 1990s. The City has operated Edmonds City Hall from this location since the renovations were completed. Tr building is in near original condition and needs substantial repair and maintenance. Projects: All Mechanical, Electrical and Plumbing systems need replacement, Restroom remodels w/gender neutral consideration, Center Stairway Code updates and replacement, Lobby remodel, Entry Awning re -glazing, Interior Painting, ADA accessibility improvements. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well -maintained facility creates a safe work environmei that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $80,000 (2024) Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $80,000 $279,064 $80,000 $279,064 $80,000 $129,064 $150,000 $80,000 $279,064 $70,949 $108,628 $80,000 $70,949 $108,628 $80,000 $70,949 $108,628 $80,000 $70,949 $108,628 $80,000 Packet Pg. 111 CIP/CFP v1.7 105 The Pier was recently renovated and is generally in good condition. The Beach Ranger Office is a 1200 square foot office an restroom facility located near the east end of the pier. There are season programs and visitor support functions that operas out of this facility. Projects: Electrical panel clean up and safety inspection, minor repairs, and maintenance, Beach Ranger Station/restroom roof replacement. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $2,971 (2024) Construction\Professional Services $2,971 $2,918 $5,628 $1,043 $1,500 Expense Total $2,971 $2,918 $5,628 $1,043 $1,500 Fund 016 (2021 Facilities Bond) $2,918 Fund 016 (non -bond proceeds) Unsecured Funding $2,971 $5,628 $1,043 $1,500 Funding Source Total $2,971 $2,918 $5,628 $1,043 $1,500 Packet Pg. 112 CIP/CFP v1.7 106 The Frances Anderson Center serves as the City's main recreation center offering arts, athletic and cultural programing yea round. Due to the age and high usage of the building there are many building systems that are in need of replacement or restoration. Projects: Replacement of Heating Boilers with Electric alternatives that will add ventilation, cooling and heating Investment grade audit approved by City Council, Replacement of all exterior doors scheduled for 2024, ADA accessible door closures, Plumbing drainage collector, Restroom remodels (w/ gender neutral consideration), Replacement of all plumbing fixtures, Addition of building security card readers, Building HVAC controls to maximize efficiency, Fire Sprinkler replacement, and clean building act compliance efforts will be addresses by IGA.) Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $110,000 (2024) Construction\Professional Services $110,000 $98,892 $20,934 $113,029 $80,000 Expense Total $110,000 $98,892 $20,934 $113,029 $80,000 Fund 016 (2021 Facilities Bond) $110,000 $98,892 Fund 016 (non -bond proceeds) Unsecured Funding $20,934 $113,029 $80,000 Funding Source Total $110,000 $98,892 $20,934 $113,029 $80,000 Packet Pg. 113 CIP/CFP v1.7 107 This facility is operated by South Snohomish County Fire and Rescue and was built in 2003 and has a building area of 10,70( square feet. The building is in fair condition and will require some infrastructure updates or replacements to remain operationally ready for the needs of the City. Projects: Roll -up Bay door controller replacements, HVAC unit assessment, Gutter replacement, interior coatings updates Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $49,280 (2024) Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $49,280 $69,388 $49,280 $69,388 $69,388 $49,280 $49,280 $69,388 $30,107 $31,631 $35,000 $30,107 $31,631 $35,000 $30,107 $31,631 $35,000 $30,107 $31,631 $35,000 Packet Pg. 114 CIP/CFP v1.7 108 This building is operated by South Snohomish County Fire and Rescue, was built in 1999 and has a building area of 9,800 square feet. This building has had some updates but will need some infrastructure upgrades to remain operationally ready Projects: Bay Door assessment, Electrical infrastructure updates, roof soffit enclosure, interior painting. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $50,000 (2024) Construction\Professional Services $50,000 $221,922 $27,575 $122,245 $45,000 Expense Total $50,000 $221,922 $27,575 $122,245 $45,000 Fund 016 (2021 Facilities Bond) $221,922 Fund 016 (non -bond proceeds) Unsecured Funding $50,000 $27,575 $122,245 $45,000 Funding Source Total $50,000 $221,922 $27,575 $122,245 $45,000 Packet Pg. 115 CIP/CFP v1.7 109 This building is the eldest of the City's three fire stations and is operated by South County Fire and Rescue. This station sery Esperance and supports the other two fire stations in Edmonds. The building is 6400 square feet and was built in 1990. Th( building has had significant updates to the exterior envelope and is in need of interior and HVAC system updates. Projects: interior painting, restroom fixture replacement Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $36,274 (2024) Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $36,274 $94,248 $36,274 $94,248 $94,248 $36,274 $36,274 $94,248 $69,782 $23,765 $20,000 $69,782 $23,765 $20,000 $69,782 $23,765 $20,000 $69,782 $23,765 $20,000 Packet Pg. 116 CIP/CFP v1.7 110 3.1.a This Historic log cabin is home to the Edmonds Chamber of Commerce visitor center, the structure was a purpose built cabi from the turn of the century. The structure is professionally maintained on a three year cycle by a log cabin specialist and requires only minor maintenance and upkeep annually. Projects: new thick cut shingle replacement, chinking of exterior log finish, interior lighting. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $30,000 (2024) Construction\Professional Services $30,000 $546 $1,361 $6,469 $1,500 Expense Total $30,000 $546 $1,361 $6,469 $1,500 Fund 016 (2021 Facilities Bond) $30,000 Fund 016 (non -bond proceeds) $546 $1,361 $6,469 $1,500 Unsecured Funding Funding Source Total $30,000 $546 $1,361 $6,469 $1,500 Packet Pg. 117 CIP/CFP v1.7 111 The 110-year-old original Carnegie Library building is home to the Edmonds Museum. The building is on the State of Washington Historic registry and has been well maintained over the last several years. Buildings of this age require specialized maintenance and coordination with the state historic architect to maintain the historic status. Structural stabilization and weatherproofing are the most significant priorities to maintain this facility. Projects: minor structural reinforcement, entry fagade masonry repair, lower entry restoration Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $45,000 (2024) Construction\Professional Services $45,000 $10,000 $4,621 $10,199 $5,000 Expense Total $45,000 $10,000 $4,621 $10,199 $5,000 Fund 016 (2021 Facilities Bond) $45,000 Fund 016 (non -bond proceeds) $10,000 $4,621 $10,199 $5,000 Unsecured Funding Funding Source Total $45,000 $10,000 $4,621 $10,199 $5,000 Packet Pg. 118 CIP/CFP v1.7 112 The Edmonds Library is operated by the Sno-Isle Library system with exception of the Second floor Plaza room rental space The library is a 19,000 square foot building built in 1982. The building hosts special event rentals and daily Library programming and community services. This is one of the City's most heavily used buildings by the public and has significant deferred maintenance needs, including the building fagade and plaza deck waterproofing. Projects: window replacement, ADA access device upgrades or replacement, gender inclusive public restroom creation, Pla Room restroom/changing facilities, Plaza Room A/V installation, building masonry restoration or building cladding, exterior stairway restoration, HVAC ventilation fan assessment, building breezeway remodel, flood damage restoration, and plaza level green roof now on CIP. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $100,000 (2024) Construction\Professional Services $100,000 $53,325 $45,038 $35,000 Expense Total $100,000 $53,325 $45,038 $35,000 Fund 016 (2021 Facilities Bond) $100,000 Fund 016 (non -bond proceeds) $53,325 $45,038 $35,000 Unsecured Funding Funding Source Total $100,000 $53,325 $45,038 $35,000 Packet Pg. 119 CIP/CFP v1.7 113 Mmi This 4000 square foot facility was built in 1965 as a community theater facility and later was transformed into the Meadowdale community club house. The building is currently owned and maintained by the City of Edmonds and houses tl City operated Meadowdale pre-school and the 1500 square foot Meadowdale club house rental facility. This facility while dated has been well maintained and only requires minor maintenance and repairs. Projects: minor maintenance and repairs, interior flooring and painting, and bath fixture replacement. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $97,091 (2024) Construction\Professional Services $97,091 $7,985 $4,446 $1,159 $5,000 $5,000 Expense Total $97,091 $7,985 $4,446 $1,159 $5,000 $5,000 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) $7,985 $4,446 $1,159 $5,000 Unsecured Funding $97,091 Funding Source Total $97,091 $7,985 $4,446 $1,159 $5,000 Packet Pg. 120 CIP/CFP v1.7 114 Public Works - Facilities PVm. ublic Works This facility was built in 1965 to house the City's Public Works Department, the building was converted in 1995 to tenant space and City storage, as well as Edmonds Police large evidence storage. This is a vital piece of property adjacent to the Waste Water Treatment Plant, and could be converted for utility use if regulatory requirements dictate. Building is primaril used as storage and will need some updates to maintain current operational readiness. Projects: HVAC updates, roll -up door replacement, security camera system. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $132,051 (2024) Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $132,051 $25,000 $132,051 $25,000 $132,051 $25,000 $132,051 $25,000 $25,000 $24,519 $25,000 $25,000 $24,519 $25,000 $25,000 $24,519 $25,000 $25,000 $24,519 $25,000 Packet Pg. 121 CIP/CFP v1.7 115 This facility was built in 1967 by Ed Huntley who at the time was the City Facilities supervisor. The 4800 square foot facility now houses all City Facility Operations staff(11) and all of Park and Rec Parks Maintenance Staff(12+ seasonal help) This Facility is home to the City Carpentry Shop, Key Shop, City Flower program, Parks engine repair shop and Parks and Facilitie maintenance supply storage as well as Parks and Facilities Manager offices. This Facility is near end of life and is undersized to support the departmental staffing that are assigned to this facility. Projects: maintenance and repair to maintain operational capacity, ADA restroom updates, shop floor replacement, Pine St facility exit, exterior painting. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $40,320 (2024) Construction\Professional Services $40,320 $9,349 $5,177 $69,228 $20,000 Expense Total $40,320 $9,349 $5,177 $69,228 $20,000 Fund 016 (2021 Facilities Bond) $25,000 Fund 016 (non -bond proceeds) $9,349 Unsecured Funding $15,320 $5,177 $69,228 $20,000 Funding Source Total $40,320 $9,349 $5,177 $69,228 $20,000 Packet Pg. 122 CIP/CFP v1.7 116 s-_ The Public Safety building houses Edmonds Police Department, Edmonds Municipal Court and the City Council Chambers. The building was built in 1999 encompassing 30,000 square feet of office, court and municipal government uses. The buildi houses one of the City emergency operations centers, large police training, simulator facilities and evidence processing anc storage. The building has had minimal system updates over it's life and has a significant amount of deferred maintenance and should be retrofitted with new fire sprinklers. Projects: air handler and outdoor ventilation unit replacements, new solar plant installation, parking lot reconfiguration to meet current usage, fire sprinkler installation, interior hallway renovation and painting, sleeping room remodel and gender specific/neutral accommodations, gender inclusive public restrooms, operable windows is specific locations, courts flat roo replacement. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $220,000 (2024) Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $220,000 $55,169 $151,481 $515,071 $80,000 $220,000 $55,169 $151,481 $515,071 $80,000 $140, 000 $55,169 $151,481 $80,000 $515,071 $220,000 $55,169 $151,481 $515,071 $80,000 $80,000 Packet Pg. 123 CIP/CFP v1.7 117 This building built in 1995 houses four Public Works divisions and the auxiliary City Emergency Operations Center. This building is 28,000 square feet and is capable of operations 24/7 during weather emergencies and natural disasters. The building has significant deferred maintenance needs and infrastructure updates. Projects: vehicle yard leveling, HVAC unit replacements, roof system for material bunkers, ventilation fan replacements, firs alarm system replacement, lobby remodel, restroom remodel with gender inclusivity considerations, electric vehicle charging and maintenance infrastructure, emergency communications updates, interior hallway flooring thresholds, utility bay HVAC replacement, water main replacement (building connection). Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $285,000 (2024) Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) General Fund Water Fund 421 Stormwater Fund 422 Sewer Fund 423 Unsecured Funding Funding Source Total $285,000 $80,315 $285,000 $80,315 $35,000 $80,315 $35,000 $35,000 $35,000 $145, 000 $285,000 $80,315 $79,348 $43,821 $50,000 $79,348 $43,821 $50,000 $79,348 $43,821 $50,000 $79,348 $43,821 $50,000 CIP/CFP v1.7 118 Packet Pg. 124 This community theater was built by the Driftwood Players theater group in 1967 and was deeded to City ownership at a later date. The facility is 6,300 square feet in size and houses the Driftwood Players theatrical performances and City meetings. The City's maintenance responsibilities are limited to large infrastructure, parking lot, roofing, and grounds. Projects: parking lot repair and recoating, minor repair, and maintenance. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $99,077 (2024) Construction\Professional Services $99,077 $43,880 $115,734 $21,872 $25,000 Expense Total $99,077 $43,880 $115,734 $21,872 $25,000 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) $43,880 Unsecured Funding $99,077 $115,734 $21,872 $25,000 Funding Source Total $99,077 $43,880 $115,734 $21,872 $25,000 Packet Pg. 125 CIP/CFP v1.7 119 This recreational facility houses the City's aquatic programing and some Parks and Recreation programs. Built in 1971 the pool house historically was only operated seasonally. The tenant run aquatic programing is currently expanding to year round lap and team aquatic activities and will continue to support summer open swim programing. The facility requires minimal maintenance to remain operational and is subject to tenant lease terms of use. Projects: security updates, roof replacement, gutter replacement, plumbing fixture updates, exterior door replacements, operational repair and maintenance to accommodate 365 operations. Public owned facilities and properties are maintained to assure safe and property operating conditions and to assure the protection of the physical asset throughout an expected lifespan. A well maintained facility creates a safe work environmer that is clean and sanitary which promotes workplace efficiency and confidence. Routine and preventative maintenance reduces energy consumption and provides for building systems to operate as designed during manufacturer expected lifespan. $26,128 (2024) Construction\Professional Services $26,128 $8,409 $19,127 $30,389 $30,000 Expense Total $26,128 $8,409 $19,127 $30,389 $30,000 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) $8,409 Unsecured Funding $26,128 $19,127 $30,389 $30,000 Funding Source Total $26,128 $8,409 $19,127 $30,389 $30,000 Packet Pg. 126 CIP/CFP v1.7 120 All fire and life safety systems are required to be monitored 24/7 in case of emergency. Previously this monitoring has beer done by traditional phone lines (POTS). This infrastructure is aging in place and is not required to be maintained by the telecommunications providers as of 2020. In 2022 we have had 3 catastrophic communications failures that resulted sever; thousand dollars expense and lack of compliance with fire code. The City has eleven facilities with life safety monitoring, ar six locations with elevators, making a total of 17 locations with monitoring requirements that will need to be updated. Maintaining and updating aging infrastructure allows the City to continue to operate older buildings by staying compliant with fire code and L&I regulations. $125,000 Construction\Professional Services $125,000 Expense Total $125,000 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding $125,000 Funding Source Total $125,000 Packet Pg. 127 CIP/CFP v1.7 121 The Library Plaza Deck is essentially a green roof on the second floor of the Edmonds Sno-Isle Library. The deck surface was waterproofed and remodeled in 2003, since that project continuous water intrusion has occurred through the waterproof membrane. This water intrusion has been successfully mitigated over the years and has not been deemed a project of significance previously. In 2018 Western Specialty Contractors inspected the water intrusion and offered an initial ROM price to demolish and waterproof the existing plaza deck. Rebuilding the plaza deck and replacement of landscape, planter! grass, pavement, flashing and hand railings would be a separate construction project. The Parks Director in 2018 offered ar estimate to replace landscaping and irrigations systems. In 2021 a draft structural report was performed by MLA Engineerir to discover any structural consequences from the years of water intrusion, building was deemed structurally sound and water intrusion not factoring in to building structural stability. Maintaining building in operational and safe condition, in order to maintain partnership with Sno-Isle Library system. Preservation of the City's physical assets in appropriate condition vs. the age of the facility and historic capital investment. $4,900,000 Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Fund 016 (2021 Facilities Bond) Fund 016 (2021 Facilities Bond) Unsecured Funding Funding Source Total $4,900,000 $4,900,000 $4,900,000 $4,900,000 Packet Pg. 128 CIP/CFP v1.7 122 '� - _ Packet Pg. 129 Q J Z W 73 LU �/ L.1_ L.1_ w a W 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 C O O O O O O OLO CD O OLO CD X) � O� LO 00 OM I- O O O Cl) M 69 (fl (fl (f) (fl Ef3 GG (f3 N V EA 69 O O O O Ln M co 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O 0 0 V) 0Cm 0 m 0 r- L o E» v co O O O O S N EA O O 0 O O O oLO o � N O m 04 O O O C C C O O O O O N O � EA N EA O O O O O O O O O OLO LO LO (fi (A3 EFT (A3 O O O O C C C C O O O O O Ln LO LO 0 0 0 0 0 0 0 O O O O O O O O O O O O O O LO LO Cl) M � N (O 64 EFT (43 EFT 64 EFT (A3 O Co O O 7 -6 � = O O N E U7 a O 0 a) 0) -O @ U Q U N � U U Q Q N @ Q E 2 co m a c 0. a a u U N n ._ U N M 7 7 > O o E m N n 'OO - -[ i m � � g Q U O E Q 0 v EU Z) � (D (�i w 0 E E o s 0- U z (D Q> a a O Q 0 O O O O O 3: � 3: � 3: a a a a a O r_ N_ Cl) IV a a. a a. a a a a a a O 0 0 LP) N 00 T co (sT O O O O N ti 00 O O O LO O LO N E9 O O O O LL7 N fH O 0 O LO N O 17 619 O Ln 0 04 N r N E9 O O O O N cl r EA O 0 Ln O It N fa w H Z w a X w Q 0 �2_ LLo m rn V O M V 00 (.0 (4 V 1? N (O O M M EA 6n, EA EA N Io N Lo M M M Cl) O N V O I- LO M I� � V) V) 6q m 0000 N O_ O O v m cli V) rn v ao v_ co Ln _ t N EA ER CG (A I- N � N M O 00 O 1� O O 00 (+m 00 O _ CO N N 613 (Al (A (Al 0000 M_ M N_ M LO O N Cl) o_ 1- O O Ln O O � Cl) � Ln Ln Ln Ln c m aoo_ m N M (O (O I� � LO O O lzt Cl) N EA 64 (f3 EA Ln m LO O O Lr O 00 (O LO co 0)� M � (Al (Al (Al (A LO co O M (O V Ln V Il- Lo N CD co N m 't N (A 64 (A M O c0 O O Lr V Lo 00 V co LC7 M (O N EA EA (A (Al 0 Lo In o � O ' U O LO N_ (.j o N N v 3 0 cyj m C N U) D rn LL. 3 c a) a) O — ~ N s co a)C > U U)C - E E 21, w 2 O U 3.1.a O O O N N 00 CD O W ER O_ O f4 O w+ 00 U 6.1� 06 o r_ O d r- r- rn o � L ER o f4 O LL Ny�i N Q O o N O NuS , N � N r CD N o G> o to O O Q LO O N L N d 69. 4- 0 0 c O 0 yr N c0 y2 = � ER N L O 0 d O N Q N � N O O O O N to N ER w w, r z Q LU w a J O ~ Packet Pg. 130 CIP/CFP v1.7 124 The WWTP Annual Capital Replacement In -House Projects is intended to maintain infrastructure and equipment to ensure that the treatment plant is well maintained. This project ensures that critical infrastructure is maintained and equipment is replaced in order to reduce risk to the City $500,000 (2024) Design Right of Way Construction Expense Total Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total $100,000 $100,000 $100,000 $200,000 $250,000 $250,000 $3,750,00( $400,000 $400,000 $400,000 $800,000 $1,000,000 $1,000,000 $15,000,00( $500,000 $500,000 $500,000 $1,000,000 $1,250,000 $1,250,000 $18,750,00( $253,950 $253,950 $253,950 $507,900 $634,875 $634,875 $9,523,12' $115,850 $115,850 $115,850 $231,700 $289,625 $289,625 $4,344,37` $82,750 $82,750 $82,750 $165,500 $206,875 $206,875 $3,103,12E $47,450 $47,450 $47,450 $94,900 $118,625 $118,625 $1,779,37` $500,000 $500,000 $500,000 $1,000,000 $1,250,000 $1,250,000 $18,750,00( Packet Pg. 131 CIP/CFP v1.7 125 To cover any carryover or close-out costs associated with the Carbon Recovery Project that occur in FY 2024. To complete and close out all items associated with the Carbon Recovery Project. $500,000 Design Right of Way Construction $500,000 Expense Total $500,000 Sewer Fund 423 $253,950 Mountlake Terrace $115,850 Olympic View Water Sewer District $82,750 City of Shoreline $47,450 Funding Source Total $500,000 Packet Pg. 132 CIP/CFP v1.7 126 Public Works - Treatment Plant ' roject 3.1.a The WA Dept of Ecology has imposed the Puget Sound Nutrient General Permit upon us. It is anticipated that our current process will not be able to meet these new permit requirements. This decision package will allow us to team with an engineering firm to study our current process and design a solution that will allow our plant to meet the new PSNGP requirements as well as accommodate projected service area growth over the next decade. To meet new permit requirements and increase capacity for projected 20-year service area expansion. $41,850,000 Design Right of Way Construction Expense Total Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total 2024 2025 2026 2027 2028 21111111 cc e1 0 $20,000,000 $20,000,000 $350,000 $750,000 $750,000 $20,000,000 $20,000,000 $177,765 $380,925 $380,925 $10,158,000 $10,158,000 $81,095 $173,775 $173,775 $4,634,000 $4,634,000 $57,925 $124,125 $124,125 $3,310,000 $3,310,000 $33,215 $71,175 $71,175 $1,898,000 $1,898,000 $350,000 $750,000 $750,000 $20,000,000 $20,000,000 Packet Pg. 133 CIP/CFP v1.7 127 This allows the ability to continue production of class A solids if/when the gasification system is shut down for repairs or preventative maintenance. The ability to produce and haul class A solids will eliminate a temporary but substantial cost increase hauling as this product is essentially the same in volume as biochar or concentrated minerals and is accepted at th local transfer station whereas if this option is not available, sludge will need to be loaded into trailers and hauled to Oregor as was done during the Carbon Recovery Project at a cost of up to $200,000 per month. This redundant solids processing mode was an option to add to the Carbon Recovery Project and was rejected by previous administration. Along with the savings in hauling costs, there will be no additional odor issues or daily sludge truck traffic in the adjacent neighborhood. Allow solids handling system redundancy and the ability to run the dryer unit independently in the event of a gasification system failure or repair. The dryer is capable of producing Class A biosolids, which would negate the need for temporary hauling and disposal of wet cake at a rate of up to $200,000/month. $300,000 Design $50,000 Right of Way Construction $250,000 Expense Total $300,000 Sewer Fund 423 $152,370 Mountlake Terrace $69,510 Olympic View Water Sewer District $49,650 City of Shoreline $28,470 Funding Source Total $300,000 Packet Pg. 134 CIP/CFP v1.7 128 Work with engineering firm to develop a comprehensive asset management system which includes an asset condition assessment as well as asset criticality ranking. This will allow the WWTP to develop a 5 and 10 year asset repair and replacement and CIP schedule which will improve overall plant reliability. Develop a short and long term plan to improve plant reliability by ranking critical assets and creating a capital improvemen plan. As the majority of this facility is coming to the end of its useful life, the planned replacement/repair of failing equipment and structures will be much more cost effective than replacing upon failure and ensure that the plant maintains its ability to meet discharge permit requirements. This will also be valuable in future rate studies. $150,000 • ���Y� ! Design $150,000 Right of Way Construction Expense Total $150,000 Sewer Fund 423 $76,185 Mountlake Terrace $34,755 Olympic View Water Sewer District $24,825 City of Shoreline $14,235 Funding Source Total $150,000 Packet Pg. 135 CIP/CFP v1.7 129 100000mb— = -- The WWTP has several VFD's (variable frequency drives) on various critical equipment influent pumps, effluent pumps, RAS/WAS pumps, aeration blowers, etc. These VFD's have an expected useful life of 15-20 years. Several of the VFD's here at the plant range in age between 20-30 years old. There have already bees some failures and replacements made. These outdated VFD's need to be replaced to avoid a catastrophic failure event that could happen to these weakened state VFD's for any number of reasons, including abrupt starting and stopping due to power bumps/loss, switching from grid to generator power supply or just a parts failure. If multiple critical components fail simultaneously, then the plant may lose it ability to treat wastewater that meets NPDES permit requirements resulting in pollution of our receiving waters and possib fines by our governing agency. To keep critical equipment reliable and in working condition. $250,000 Design $50,000 $50,000 $50,000 Right of Way Construction $200,000 $200,000 $200,000 Expense Total $250,000 $250,000 $250,000 Sewer Fund 423 $126,975 $126,975 $126,975 Mountlake Terrace $57,925 $57,925 $57,925 Olympic View Water Sewer District $41,375 $41,375 $41,375 City of Shoreline $23,725 $23,725 $23,725 Funding Source Total $250,000 $250,000 $250,000 Packet Pg. 136 CIP/CFP v1.7 130 Primary Clarifier #2 cage, center column, feedwell, corner sweeps, weir, counterweight, skimming device and rake arms ne replacement due to severe corrosion. The steel has not been replaced since the original construction. The limited access wi require that pieces be assembled inside the tank. The concrete structure also needs to be inspected and repaired as neede as corrosion of the concrete in spots has led to exposed rebar and may have compromised the structural integrity of the clarifier. Improve reliability of critical infrastructure as it is in a state of imminent failure. Ensure WWTP's ability to treat wastewate up to its rated capacity and meet discharge permit requirements. $600,000 Design $100,000 Right of Way Construction $500,000 Expense Total $600,000 Sewer Fund 423 $304,740 Mountlake Terrace $139,020 Olympic View Water Sewer District $99,300 City of Shoreline $56,940 Funding Source Total $600,000 Packet Pg. 137 CIP/CFP v1.7 131 r-- Primary Clarifier #3 (dual drive) cages, center columns, feedwells, corner sweeps, weirs, counterweights, skimming devices and rake arms need replacement due to severe corrosion. The steel is in a highly corrosive environment and has not been replaced since the original construction approximately 30 years ago. The limited access will require that pieces be assembl( inside the tank. The concrete structure also needs to be inspected and repaired as needed as corrosion of the concrete in spots has led to exposed rebar and may have compromised the structural integrity of the clarifier. Improve reliability of critical infrastructure as it is approaching a state of imminent failure. Ensure WWTP's ability to treat wastewater up to its rated capacity and meet discharge permit requirements. $950,000 Design $150,000 Right of Way Construction $800,000 Expense Total $950,000 Sewer Fund 423 $482,505 Mountlake Terrace $220,115 Olympic View Water Sewer District $157,225 City of Shoreline $90,155 Funding Source Total $950,000 Packet Pg. 138 CIP/CFP v1.7 132 The ODS pumps are over 30 years old and are at the end of their useful life. The maintenance, reliability and efficiency of t primary sludge pumping system would be greatly improved by replacing the current diaphragm pumps with progressive cavity pumps. During this pump replacement, piping modifications would also be done to allow pumps to support more th one clarifier, improving system redundancy along with reliability. Improve reliability, redundancy and efficiency of the primary sludge and scum pumps by replacing 30+ year old pumps and improving piping system. $600,000 Design Right of Way Construction Expense Total Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total $100,000 $250,000 $250,000 $350,000 $250,000 $177,765 $126,975 $81,095 $57,925 $57,925 $41,375 $33,215 $23,725 $350,000 $250,000 Packet Pg. 139 CIP/CFP v1.7 133 Replace two gate valves and actuators at the inlets of the two chlorine contact channels. These gates have repeatedly failed. Repair is often expensive and time consuming, as access is an issue, so it is necessary to rent scaffolding and other equipment to make repairs. When a gate fails, it effectively cuts the disinfection capacity of the plant in half. These are critical pieces of equipment and need to be replaced with a different technology to improve performance and reliability. To replace problematic, yet critical valves with more reliable technology that helps to ensure disinfection system functionality and the ability to continue to meet NPDES discharge permit requirements. $375,000 Design Right of Way Construction Expense Total Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total $75,000 $300,000 $375,000 $190,463 $86,888 $62,062 $35,587 $375,000 Packet Pg. 140 CIP/CFP v1.7 134 D 01JAI UTO'4 6*10 301A=01❑ Packet Pg. 141 CIP/CFP v1.7 135 3.1.a Q .. ,-a ral To (3) c (1) (1) E E a) L) U U U U U U U O � O O a) a) a) a) a) U a) Q E Q CL Q CL Q CL Q N C C C C C C C Q Q Q Q N N N N co O O O c O a) C O c N c a) c N c a) c a) c a) c a) .o .0 3 E U) a) E E E E E E E 0" L 0" L L L O N U —0E O U U (o (o N (6 (o (o (o Q Q Q Q (p _N a) a) a) a) a) a) a) • C O C O C O C O 7 'p Q � U Q U � -0 Q +L' L yL-. L aL-. L +L-. L +L-. L +L-. L .L-. L • .m — U LCL L •CU L pL U L 0 0 0 0 0 0 0 L }COS L }COS L L .L N m m m I� m m :O Q Q Q Q a) L L E a) CL m ai ai ai - 0 0 O L U U O L U L L L L L L O L O L O L O L O L O L O L O L L O O O L O O O O L O p U U U U O U O U U U U U U U U U O O O O U O O O O U O O O O O O O O U U U U U U U U OU U U U U U U U U a) a) a) a) O O O O a) a) a) a) a) a) a) a) 4 y-+ _0 _0 70 16 (o Z6 (� E E E E E E E E E E E E E E E E E E 0 0 0 0 0 w w U) w(n(n� w(n LU w LU LU LU LU w w w w LU. LU ui w w w ui w o E c CD C) CD 0 cn a) a) (M c) N U a) L CDce) N O a) U -0 U U Q c O U (0 E (6 a E 7 -0 p c E a a) L 0) m� a) L m cd� a) 0 Q Y •�CL (n a) 0 (o Q) (o L (—L6 CU � O Ly N c6 a) V cu 0 E /— �L/ OL U) (A O a) O a) m a) cu -0 N M E U N 3 a) m CD a U m -L cu cu E W L.L N (� CD- H •L •L VJ c z (o a) o C/) 3 (o U co Q U U 3 c • a) a) > / LL . • U) N (� LU L L (n ' U a) O > N F C a /c U— Q= E E L U N ON c V O Q (L N � m U L L E U (� N Q~ Q N U O 0 CL [L . L 0 o O r a) N Q L U C N N N a) N o U o N �00 - c Q Q O a) a U a) L a m (D ° d � U 0 0 0 0 11 I^1 l^1 I^1 !^1 I^1 l^1 Q Q Q Q CD CD a^) rE^ Cn rE^ Cn r ) r v) r ) cu cu c LL r LL L LL L LL L L-1 V • • N N N O O O Q) a) (1) (o (o (o C C C _0 -a _0 a) (] a) Cl E E E a) a) a) O U O U p Q 0 U a) Q () a) a) 'CL c- 0 o U ° U U U U E E 0) U a] " " ^O U m " OL -a � � (o U L !^1 LL R L ai L O L � O L 0- 7u- cu ol 0 L)) cu m > O co c // CA L c: 0- (� L L ` 5 V! (oCo J — a) a) E • O U aL U (o L O a�i In • O !A U) c) ' O H O O Q N N N NN a M U N N O N N N N (o c O c O c O c O }N. L m "IfL }N. m 'If L a) L a) E L _ Q O Q O (o (6 CO^ n U) L L LL r F— LL L F— CIP/CFP v1.7 136 Packet Pg. 142 3.1.a > > > E E E N a) a) • N N N O O O ' N N N N N N ON N N C C C a a a C C C -0-0 a co m co U U U CV O O O O O N O _a) (D co CCf m Q a)(D 0 0 X 25 JID O O O U U U)c� U U U � M O Co O O E a O Q U CO }' = - C O 0 L m y_ L C2 0 O� L C: N n U N U L (V L L O > co VJ L O O LLJ Y L O • CO � Y E O (a ' �`�^� VJ � O /^c'o I..L • O Y U Q U 0") 0) Ci O � d U d U N N T rL^ `L^^ U- U- N p W Z ti O' ch Q W a0 � a I -A 1A mwmmcotirI- N N N N N N N wC*ao N N N -� I- Nt rnmmCom N N N N N mcom N N N O N O N O N O N O N Cl N O N O N O N O N O N O N O N O N O N O N O N O N O N O N f-� N M N M N I-� N ti N 4 N 4 N P-� N ti N r�. N O CO O CO M N CD N I. N r,� N N rl� N rl� N rl� N pp N cp N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O N O O +-. O +-. O .- O O O O O O O O O O O O O I� r- 0 0 0 f� N I� N OO N c0 N r� N c0 N w N I- N Cfl N Cn N I- N � N ti N�'It M m [I- N C 0 N (D N C 0 N ti N M N O N O N o0 N I� N 00 N O N O N O N O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N 1 O N O N O N O N O N O N O O O N C)O N N O O O CD N N N N N co N (D N M N M N CD N Cfl N CO N O N O N O - r- N ti N CO N CD N CD N Cfl N CD N Cfl N Cfl N Cfl N ti N C` N ti N O N O N O N O N O N O N O N O N O N O N O N O N CO N O N O N O N O N O N O N O N O N O N O N O O O E E E E E E E E E E E E N E E E E E E E E E E N N N O L O L O L L O O L O L O L O L O L O L O L O L E O L 0 L 0 L 0 L 0 L 0 L 0 L w 0 L 0 L w 0 L O O O a a -0-0 -0-0 -0-0 -0-0 -0-0 OL a -0-0-0-0 -0-0-0-0-0 N N N O > O > O > N > O > O > O > O > O > O > N > 0� > O > N > O > 0 > 0 > 0 > 0 > 0 > 0 > 0 > E E E 0 0 0 0 0 0 0 0 0 0 0 0(D 0 0 0 0 0 0 0 0 0 0 0 0 o E E E E E E E E E E E E> E E E E E E E E E E � _ O a�aaaaaa-Oaaa-0-6a N CD N CD N N N N N CV N CD E-0-Oaaaaaaaa CV CV CU N CU a) a) N a) a) > > > .Cn U U U U U U D U Dw T .N w DU rn Cn rn Cn Cn O E O E O E > N L > O L > O L > O L > N L > O L > O L > O L > CU L > O L > O L > O L O U > O L > O L > N L > O L > N L > O L > N L > O L > N L > O L •O U a a a a a a a �. a a a a a a a a a a a a a a -0 Cn C: O a a a a a a a a a a C C6 C (6 C m C m C m C m C m C m C m C m C m C O C m C O C m U C m C m C m C m C m C m C m C m C m C m in in in in in in in in in in in in in in in N in in in in in in fn in fn in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U U U U U U U U U U U U U U U N U U U U U U U U U U U C: L a 0 0 CL >Or- O_> CO Co > � > -- � - m E w O LU > QU) L C Z p>O w > a E O L M O E >C)NN�U_ C—) O CU U _ UU O> E N OC C N NtiN N N ULO1 L(6 00 IO LL � � O _O O +L Q E Eo U ai > Q»vJSZ O M N 2 0 „ a) co C , c AN 7Cn Lo O C O a)_ Nm CO C L O L �� CD co n U�Q _O cn L mU) OQ Cn O 2) CA CV N N (B a) i C: 1 E 0)� i O> O E C-- O w N CD 2 L O cl CAODU > > O C O C: OaNN� E O oN� >O� C-606Q �U)U) >U) >'g E E� 0 �N c • ICSI `l V 0 Q 8D > U > 0) w= U) V= O O co > L • 0 N C� 0 M N M N co \ Q L O Q- Co Q L Cn - Q CO In CO > Ctf 2: f6 � N>0 Yi Y (6 >, (6 CO ��11 Lrl- Co(6 � i 2co N �j N N VV0 �1 � �j > > NCO0 /ON �1-- > L L C U) It C) O't 00> " a)Cn a > N > (D> >� O CO O coo >' > CO (6 > ����'Q U N M In > QQ > >�CD (0 N [L V N22��a Cn U) U) E NU) Q N Q co LOO LO ti O CD M In co co co N C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 C 0 0 iz 0 Q 0 iz 0 O_ 0 Q 0 Q 0 Q 0 O_ 0 Q 0 0- 0 0- 0 0- 0 O_ 0 0- 0 Q 0 a 0 Q 0 a 0 Q 0 a 0 C1 0 a 0 C1 0 0- 0 0- 0 Q L L L L L L L L L L L L L L L L LL LL LL LL LL LL LL LL LL LL Packet Pg. 143 CIP/CFP v1.7 137 3.1.a N N N O O O 1 ti 1 � 1 N N N N O O O C)co N 0 0 O NO N Q fl- 00 It N O -O O C)O (D > N O N N N (6 N O N O O O O O O a O O O O O O Cfl CO co Ln ON p N N N U N U N to N U N O O U N O O U N O O MnMnU N N N U N U N to N y N N N y N U 0 0 0 N O � > > '> '> '> '> '> '> '> '> '> '> '> '> '> '> '> '> '> '> N N N N Ln N O L O L O L N L O L N L N L N L N L N L N L O L O L N L O L N L O L O L O L N L E E E —O N C)C)O N N O O O o W o 0 0 0 o W O O O O o 0 0 0 0 O O O U) N N N cnC)O I N N N O N CD N N CD N CD N CD N C) N C) N CD N N O N C)O N N O N O N O N O N C) • -Q -Q O O N �.�F> O N N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 N 1 >> > U C) y N N L O N Nt ItIt It It It It ItIt Nt qt Nt qt U N OC N N N N N N N N N N N N N N N N N N N N 0 0 0 O p N— O E O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p No p N N N N N N N N N N N N N N N N N N N N U L M E O o O N N N N N N N O N N "O "O "O 70 -O -O "O "O "O 70 -O -O "O N U '> ,U U U N O O O O O O O > >> O CL6 E C M O L 7 7 C 7 C 7 C 7 C 7 C 7 C C C C C 7 C 7 C 7 C 7 C 7 C 7 C 7 C 7 C 7 0 L 0 L 0 L 0 L U C O �} N U) 4 444444 7 w 7 w 7 w 7 w 4�� L- L-��� L- O N a a - C � C C C C C C C C C C C C C C C C C C C C C _Q C -0 C)O C C N C)`� O C C (0 N m m m N m N m m m m m m m N m N m m C C C C E .-" O O C C (A w 0 0 0 w w w fA U) fn 0 0 0 0 w 0 w 0 0 — O cu O 'p N O O O O O O O O O O O O O O O O O O O O O N r L Q U > _0 U L U L U L U L U L U L U L U L U L U L U L U L U L U L U L U L U L U L U L U L cu m m � a) C m C cu � mcu co�/X� m cu m m m m m m m m m m 0 + > (/� (/� -0 'Q > > U) cn 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 U l C l / \ ccO C ccO C l /o\ /p\ l �O\ / �l/X^� VJ �`/X^� VJ /X_� VJ �/X� V/ /X_� VJ �/X� VJ VJ �/X-� /'1 �/X� VJ �/X-� /Y �/X� VJ �l/X^� VJ �,/X_^� VJ �/X� V/ /X_� VJ �/X� V/ �,/X_^� VJ �`/X^� VJ ,,X_^^ VJ �/X� V/ ov) rn >.o c C N (n O E U D C O O cLo N —" N C ig o _ OL _ a... COL D -Q Q U "a C O C C p .� O > c6 U -0 � O OL p p C N 0 O> Q N > L fn C N O L O OL O L C O U 0 Q U �_ L Q�d� Q m 06 0 -� Q N IE5�UcOr�o O C 0� E 0 �2 0 0 L00 7 06 c0 p N cn N Q� O >i - N — (� C N U (>>B 0 O O U ~_ 00 O O � "/ LL C L >, C) O L > 7 w C C O C O 7 >, > _7 > U C `� (6 fn � 00 U L n U) O O m = i L .O ++ p p> c c L Y U Y L U CO O (� 7 U E U N L� tv co U J a� C O O N- (0 n i N m L L > d O �_ U O C Q U) U) U) .>. _U L to U_ 0 N a 7 C > (0 O d _O • J Y E yw U 1> N co N U m N m L N N L O L N L O 0 L 0 m -O m U O O > Q L N 00 O O O N U LL LL LL U) U) N� (6 -0 -Q O o cn L U L. c� U d C a> = 2 L� O cn d (6 } O= O J o ccu J cu M z L O O U)O L L N C fn LL 0 Y Q) U�x) m O O Fu C LLcu J L o L 06 Qi E >� � U) C }' p LO J N m O Q N U) � LL U J cn I� 0 0 0 0 0 +. �- � -- m� �- cu m E E E E a� a� to a� O m to a� U) m V) aD U) m cn m w m U) m to m cn m U a U LD U) LD.2 to cn LD to LD to U D Q- Q Q- Q Q .0 .0 .0 U .L.i U .0 'U 'U 'U 'U U .0 U .0 U .0 .0 .0 rO^ U) rO^ U) `O^ U) rO^ U) r�^ U) `�^ V J m m Q m Q Q m m m m m m m m m m m m m L p L LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL L4 Q U C LE a N L4 LL f4 Q co ci N O N N O N d U) 0 ^1 0 a` 4- 0 C 0 �1 co am U) L- a M N O N IV N O N a U d LL U N Y 0 3 a CIP/CFP v1.7 138 Packet Pg. 144 �w - kt- EDMONDS PARKS, RECREATION & HUMAN SERVICES 2024-2029 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM t Y� 00 ��. III�IN�!tIIBIng4EIII11iiI11111inmm�mm�mnnuum y DRAFT SEPTEMBER 2023 "EDMONDS PARKS. RECREATION & HUMAN SERVICES Table of Contents Director's Letter................................................................ 2 CIP/CFP Worksheets.......................................................3-7 Project Distribution Map ................................................. 8 Project Descriptions......................................................9-31 Program Descriptions...................................................32-34 Acquisition Descriptions...............................................35-37 FundDetail..................................................................... 38 Fund 332 (Capital Const. & Impact Fee) Detail ............39-40 Fund 125 (REET 11) Detail ................................................ 41 Fund 126 (REET 1) Detail ................................................. 42 Fund 143 (Tree) Detail .................................................... 43 Fund 137 (Cemetery) Detail ........................................... 44 Annual Project Comparison ............................................ 45 � , Mr �r .4 on ` on ` 3.1.b ti EDMONDS PARKS, RECREATION & HUMAN SERVICES September 19, 2023 Members of the City Council, Parks & Planning Board, Staff and Citizens of Edmonds, The following document outlines the 6-year Parks Capital Improvement Program (CIP) and Capital Facilities Plan (CFP). The CIP/CFP serve as a planning guide identifying parks capital projects and related funding sources and reflects the priorities established in the 2022 Parks, Recreation and Open Space (PROS) Plan based largely on citizens' priorities. The CIP/CFP is updated annually through a public process including presentations and Public Hearings hosted by both the Parks & Planning Board and the City Council. There were several significant Parks Capital project accomplishments in 2023 to include: 1. Completion of the 8-acre Civic Center Playfield two-year construction project with a June 23rd Grand Opening. 2. Completion of the 96th Avenue Infiltration project required for Civic Center Playfield which will significantly reduce the contaminated water run-off into Shell Creek in Yost Park. 3. An Interlocal Agreement with City of Mountlake Terrace supporting the Ballinger Park Phase 3 development to provide improved park access for Edmonds residents. The 2023 projects in process include: 1. Demolition of the structures on the property donated by Shirley Johnson (abatement completed). 2. Improvements to the Edmonds Lake Ballinger Access (McAleer) area. 3. Improvements to Mathay Ballinger Park — engineering completed, and permit submitted for paved path, shade structure, permanent restroom and parking improvements. 4. Tree maintenance for large oak trees at 5th and Main. 5. Many deferred maintenance projects throughout the park system. After completing two significant multi -million -dollar park projects consecutively (Edmonds Waterfront Center and Civic Center Playfield), the Parks, Recreation & Human Services Department will turn our focus on deferred maintenance throughout the city's existing parks system and recreation facilities. Further, the department will remain focused on acquisition of additional parkland to fill system gaps in park services and to address inequities in parkland distribution as identified in the 2022 PROS Plan. Your Parks, Recreation & Human Services Department is proud to serve the citizens and visitors of Edmonds and we look forward keeping the Edmonds parks safe, accessible, and enjoyable for all. Sincerely, Angie Feser Edmonds Parks, Recreation & Human Services Director 425-771-0256 Angie.Feser@EdmondsWA.gov Page 2 Packet Pg. 147 3.1.b 2024-2029 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN Costs inflated at 3% per year Project CFP Project Site & Description 2024 2025 2026 2027 2028 2029 6-Year Tot: # Lake Ballinger Park Mountlake Terrace ILA *CARRYFORWARD* D19 Funding to support City of Mountlake Terrace Ballinger Park Phase III $ 200,000 $ $ $ $ $ $ 200,0( Development. Payment due upon completion of project. D5 Mathay Ballinger Park *CARRYFORWARD* D6 Construction of improvements including permanent restroom, paved trail, picnic $ 271,300 $ $ $ $ $ $ 271,3( D7 shelter ADA access and other amenities. Shell Creek Restoration *CARRYFORWARD* R19 Stream health and erosion control of shell Creek in Yost Park, scope TBD based $ 120,000 $ 380,000 $ $ $ $ $ 500,0( on study. Study in 2024, work in 2025. R9 Yost Park & Pool R4 Park enhancements, repair and maintenance to include resurface of tennis courts $ 154,300 $ 1,296,400 $ $ $ $ $ 1,450,7( R6 and trail, bridge and boardwalk repairs/replacement in 2024, inclusive - - - - R11 playground and pool upgrades in 2025. Columbarium Expansion - Phase II D8 Expansion of the current columbarium. Funding provided through the Cemetery $ $ 159,100 $ $ $ $ $ 159,1( Trust Fund 137. Woodway Campus Athletic Complex - Phase I - Lighting X D20 In cooperation with the Edmonds School District, complete a community park $ $ 1,500,000 $ $ $ $ $ 1,500,0( and athletic complex at Former Woodway High School to include lighting and future construction of two additional fields. Neighborhood Park SE 1 X D13 Master plan and development of a new neighborhood park in South Edmonds $ $ 79,600 $ 819,500 $ $ $ $ 899,1( (funding is in Parkland Acquisition program for purchase). R8 Sierra Park $ $ - $ 415,000 $ $ $ $ 415,0( Playground replacement and upgrade to inclusive standards. R7 Olympic Beach Park $ $ 20,000 $ 33,000 $ $ $ $ 53,0( Renovation of existing restrooms. Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) CL M U N O N Iq N O N N Ch O CL O L IL 4- 0 C O rr C N O O IL Page 3 Packet Pg. 148 3.1.b 2024-2029 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN Costs inflated at 3% per year Project CFP Project Site & Description 2024 2025 2026 2027 2028 2029 6-Year Tot: # D10 Pine Street Park D11 Park enhancements to include the addition of a small shelter with picnic tables, $ $ 40,000 $ 124,400 $ $ $ $ 164,4( D12 canopy shade trees and a paved connecting pathway. Johnson Property R2 Master plan for future park use. Site development not included in estimate. $ $ $ 82,000 $ $ $ $ 82,0( P5 Demolition, debris removal and site security completed in 2023. Neighborhood Park SR99 X D15 Master plan and development of a new neighborhood park in Southeast $ $ $ 82,000 $ 844,100 $ $ $ 926,1( Edmonds (funding is in Parkland Acquisition program for purchase). x P1 Parks & Facilities Maintenance and Operations Building $ $ $ 1,125,500 $ 4,637,100 $ $ $ 5,762,6( D2 Replace and/or renovate shop facilities located in City Park. R12 Maplewood Hill Park $ $ $ - $ 347,800 $ $ $ 347,8( Playground replacement. Neighborhood Park SE 2 X D18 Master plan and development of a new neighborhood park in Southeast $ $ $ $ 84,400 $ 869,500 $ $ 953,9( Edmonds (funding is in Parkland Acquisition program for purchase). Waterfront Walkway P3 Connecting the waterfront walkway from Brackett's Landing North to $ $ $ $ $ 515,000 $ 819,500 $ 1,334,5( D14 Marina Beach Park by adding missing section in front of the Ebb Tide _ Condominiums, to provide ADA improvements. R16 Seaview Park $ $ $ $ $ 417,900 $ - $ 417,9( Replacement of permanent restroom to provide ADA upgrades. D16 Elm Street Park D17 Park enhancements to include the addition of a nature playground, $ $ $ $ $ 100,000 $ 340,370 $ 440,3, R14 small shelter with picnic tables and habitat restoration. Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) CL M U N O N 4 N O N N Ch O CL O ILL_ O c O r C N O N L IL Page 4 Packet Pg. 149 3.1.b 2024-2029 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN Costs inflated at 3% per year Project CFP Project Site & Description 2024 2025 2026 2027 2028 2029 6-Year Tot: # X R15 Pool Replacement $ $ $ $ $ $ 23,881,000 $ 23,881,0( Replacement of the existing Yost pool. Design, location, and funding TBD. Meadowdale Playfields R3 Renovations as suggested by the City of Lynnwood and consistent with re TBD TBD TBD TBD TBD TBD $ negotiated and updated Interlocal Agreement. May include addition of dugout - roofs, light replacement and playground upgrade. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Master Plan development and implementation of the Edmonds Marsh to daylight X P4 D9 the waterway connection of Puget Sound to the Edmonds Marsh and two fresh TBD TBD TBD TBD TBD TBD $ water creeks providing restoration of fresh water/salt water estuary and natural - D1 tidal exchange. (All expenses are TBD per Council direction in December 2022). Acquisition funding identified in Parkland Acquisition program. (A) SUBTOTAL PARKS CIP/CFP PROJECTS $ 745,600 $ 3,475,100 $ 2,681,400 $ 5,913,400 $ 1,902,400 $ 25,040,870 $ 33,070,01 Costs inflated at 3% per year Project PARKS CIP PROGRAMS 2024 2025 2026 2027 2028 2029 6-Year Tot: Citywide Park Improvements / Capital Replacement Program R17 Ongoing program of funding allocation for regular and deferred maintenance, $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,0( repair and replacement of parks amenities, structures and equipment. Signage & Wayfinding R10 Replacement of aging signage to improve accuracy and provide a $ 75,000 $ - $ - $ - $ - $ - $ 75,0( consistent City of Edmonds Parks visual identification system. Parkland Acquisition Support $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 300,0( Funds utilized to evaluate potential acquisitions and complete due diligence. Debt Service and Interfund Transfers Debt service on Civic Park $1.6M bond (2021) and Interfund transfers to $ 123,000 $ 123,000 $ 123,000 $ 123,000 $ 123,000 $ 123,000 $ 738,0( Engineering for Capital Project Support. (B) SUBTOTAL - PARKS CIP PROGRAMS $ 698,000 $ 623,000 $ 623,000 $ 623,000 $ 623,000 $ 623,000 $ 3,813,0( Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) M M U N O N Iq N O N N uJ O CL O L IL 4- 0 C O r M .r c N O L IL Page 5 Packet Pg. 150 2024-2029 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 3.1.b Costs inflated at 3% per year Project PARKLAND ACQUISITION 2024 2025 2026 2027 2028 2029 6-Year Tot: X A2 Neighborhood Park SE 1 $ 1,500,000 $ - $ $ $ $ $ 1,500,0( Acquisition of parkland in South Edmonds. X A3 Neighborhood Park SR99 $ - $ 1,545,000 $ - $ - $ - $ - $ 1,545,0( Acquisition of parkland near SR 99. X A4 Neighborhood Park SE 2 $ $ - $ 2,185,500 $ $ $ $ 2,185,5( Acquisition of parkland in South Edmonds. A5 Interurban Trail $ $ - $ _ $ $ $ 895,585 $ 895,5E Acquisition for trail extension. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) X Al Acquisition of the Unocal property in support of greater Edmonds Marsh TBD TBD TBD TBD TBD TBD $ restoration. (C) SUBTOTAL - PARKLAND ACQUISITION $ 1,500,000 $ 1,545,000 $ 2,185,500 $ - $ $ 895,585 $ 6,126,01 Q M U rn N 0 N Iq N O N N O CL O ILL_ O C O r cC c N W O a` N O N N (D) TOTAL PARKS CIP/CFP EXPENDITURES (A+B+C) $ 2,943,600 $ 5,643,100 $ 5,489,900 $ 6,536,400 $ 2,525,400 $ 26,559,455 $ 43,009,1! N a PARKS CIP REVENUE 2024 2025 2026 2027 2028 2029 6-Year Tot: Real Estate Excise Tax (REET) I - Fund 126 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,01 Real Estate Excise Tax (REET) II - Fund 125 $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 9,500,0 Park Impact Fees - Fund 332-100 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,800,0 Tree Fund 143 - Land Acquisition $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 1,290,0 Cemetery Trust Fund 137 - Columbarium Expansion $ 159,100 $ 159,1( ARPA Contribution - Shell Creek Study $ 120,000 $ - $ - $ $ - $ $ 120,0( Investment Interest (3%) $ 18,918 $ 24,795 $ 30,849 $ 37,085 $ 43,507 $ 50,122 $ 205,2- Donations $ - $ $ - $ $ - $ $ Bond Proceeds $ $ $ $ $ $ $ Secured Grants $ $ $ - $ $ - $ $ Unsecured Grants/Funding - non -land acquisition $ - $ 1,500,000 $ 1,945,000 $ 5,481,200 $ 869,500 $ 24,756,800 $ 34,552,5( (E) TOTAL PARKS CIP REVENUE $ 2,853,918 $ 3,898,895 $ 4,190,849 $ 7,733,285 $ 3,128,007 $ 27,021,922 $ 48,826,8-, U a LL U Y a N C N t 0 r Q C d t c� ca Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) Q Page 6 Packet Pg. 151 2024-2029 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 3.1.b Parks Fund 6-Year Overview 2024 2025 2026 2027 2028 2029 (F) Beginning Fund Balance $ 3,150,795 $ 3,061,113 $ 1,316,908 $ 17,857 $ 1,214,742 $ 1,817,349 (E) Revenue $ 2,853,918 $ 3,898,895 $ 4,190,849 $ 7,733,285 $ 3,128,007 $ 27,021,922 (D) Expenditures $ 2,943,600 $ 5,643,100 $ 5,489,900 $ 6,536,400 $ 2,525,400 $ 26,559,455 (G) Ending Fund Balance (F+E-D) $ 3,061,113 $ 1,316,908 $ 17,857 $ 1,214,742 $ 1,817,349 $ 2,279,817 Project Type: A: Acquisition - R: Replacement/Upgrade - P: Master Planning - D: Development (new) Page 7 Packet Pg. 152 3.1.b P5 Johnson Property R3 Meadowdale Playfields D6 Mathay Ballinger Park R9, R4, R6, R11 Yost Park & Pool D19 Lake Ballinger Park (MLT) D8 Columbarium Expansion - Phase II i R7 Olympic Beach Park D10, D11, D12 Pine Street Park R8 Sierra Park P3, D14 Waterfront Walkway R12 Maplewood Hill Park P4, D9, D1 Edmonds Marsh Restoration _ D16, D17, R14 Elm Street Park P1, D2 Parks Maintenance Building R16 Seaview Park R15 Pool Replacement Al Edmonds Marsh Restoration A5 Interurban Trail �; I R19 Shell Creek Restoration D20 Woodway Campus Athletic Complex MILE- * Non -site specific projects A2 , P2, D13 Neighborhood Park SE 1 A3, P6, D15 Neighborhood Park SR99 A4, P7, D18 Neighborhood Park SE 2 R17 Citywide Park Improvements R10 Signage & Wayfinding r40 D1 P4 D1 Al • D9 P1 ID2 MrA XV14 E&M * Site specific projects only. Citywide/annual citywide projects not shown DRAFT I Packet Pg. 153 2024-2029 Parks Capital Improvement & Capital Facilities Plan PROJECTS ,{ EDMON DS PARKS, RECREATION & HUMAN SERVICES Page 9 Packet Pg. 154 3.1.b Parks & Recreation Lake Ballinger Park/Mountlake Terrace ILA — D19 Proposed Crossing by the U S. —^ -� Army Corps of Engineers Senior Center -, Proposed Channel by the ft Asphalt Path U.S. Army Corps of Engineers 6 ft Wood Chips Path ! 6 ft Gravel Path" Proposed Boardwalk by the U.S. Army Corps of Engineers - Viewing Platform ;rdwalk& 7,1 4 �... Lake Ballinger Lake Ballinger Park, City of Mountlake Terrace Project Summary: Through an Interlocal Agreement with the City of Mountlake Terrace, the City of Edmonds will support the construction of the planned improvements in the northwest area of Lake Ballinger Park including a park entry, pathways and access to Lake Ballinger. The project is underway and payment is due upon completion of the project. Project Justification: This western boundary of the park is Edmonds city limits and these improvements will provide better access to Lake Ballinger Park for Edmonds residents. The revenue contribution supports the construction of the improvements which will benefit the City of Edmonds. This project is supported by the 2022 Parks, Recreation and Open Space (PROS) Plan including 3 Recommendations, 1 Goal and 3 Objectives. Recommendation 1.2 Expand partnerships and agreements with other nearby jurisdictions. Recommendation 3.6 Explore options for access to Lake Ballinger with the City of Mountlake Terrace to include possible joint development and consideration of a fishing pier. Recommendation 5.2 Repair and improve or extend trails and boardwalks to allow improved public access to natural areas for nature/wildlife viewing, hiking and outdoor experience. PROS Goal 3, Objectives 3.2, 3.8 and 3.11. Estimated Cost: $200,000 Page 10 Packet Pg. 155 3.1.b Parks & Recreation Mathay Ballinger Park - D6 24100 78th Place West Project Summary: Park improvements to Mathay Ballinger Park began in 2023 and are continuing into 2024. Improvements include the addition of a permanent restroom, a shelter with picnic tables and a paved pathway to provide ADA accessibility to the playground as well as connect the paved Interurban Trail spur. Approximately $228,000 was expended in 2023 for the engineering, permitting and restroom procurement. Project Justification: Upgrades to this park are supported by 5 Recommendations, 3 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.3 is to prioritize improvements to Mathay Ballinger Park and upgrade, enhance or replace park amenities, specifically the play amenities. Recommendation 3.5 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park ... and paved pathway connections in Mathay Ballinger Park. Recommendation 6.4 is to install permanent restrooms at Marina Beach Park and Mathay Ballinger Park. PROS Plan Goal 2, Objective 2.6, Goal 3 Objectives 3.3, 3.4, 3.5, 3.6, 3.8 and 3.9 Goal 9 Objective 9.1 and Recommendations 3.1 and 6.2 also align with these upgrades. Estimated Cost: $499,300 (approx. $228,000 expended in 2023) 024 2025 2026is 2029 Total Construction (D6) — Permanent Restroom $271,300 $271,300 Total Expenses $271,300 $271,300 Real Estate Excise Tax II - Fund 125 $271,300 $271,300 Total Revenue $271,300 Unsecured Funding $0 $271,300 $0 Page 11 Packet Pg. 156 3.1.b Parks & Recreation Shell Creek Restoration — R19 Shell Creek, Yost Park Project Summary: Restorative work of Shell Creek waterway in Yost Park to address erosion issues. Scope of this work will be determined based on a study conducted in 2024. The goal of the study is to determine what improvements are needed to support a healthy environment for the natural ecosystem within the park. and decrease stream bed erosion. With Shell Creek in its entirety being a salmon -bearing stream silting issues caused by erosion within Yost Park may impact spawning habitat. Erosion has caused closure of a pedestrian bridge in the upper creek corridor in the park, causing significant impact to trail users by lack of ability to cross the creek to access both sides of the park. In addition, other pedestrian bridges are deteriorating and in short order, require replacement. Restoration, including near t erm actions to address severe erosion issues caused by the creek, may include habitat and environmental protection and enhancement, mitigation opportunities and potential trail and bridge relocations. Project Justification: The 45-acre Yost Park, containing a portion of Shell Creek, has a need to prevent erosive conditions. This work is the second phase in addressing the pedestrian system (boardwalks, bridges, and trails) and Shell Creek water quality and health. 2022 Parks, Recreation & Open Space (PROS) Plan - Goal 3: Parks, Trails & Open Space, Objectives 3.7, 3.8 and 3.9; Goal 4: Waterfront Use & Access, Objectives 4.2 and 4.4; Goal 5: Natural Resource & Habitat Conservation Objectives, 5.1, 5.3 and 5.4; Goal 6: Climate Change, Adaptation & Resiliency, Objective 6.5; and Goal 9: Park Operations & Administration Objectives 9.1 and 9.2. Estimated Cost: $500,000 Construction (R19) — Creek Restoration 2024 $120,000 2025 2026 $380,000 2027Total $500,000 Total Expenses $120,000 $380,000 $500,000 ARPA Funding Transfer $120,000 $120,000 Real Estate Excise Tax II — Fund 125 $380,000 $380,000 Total Revenue Unsecured Funding $120,000 i $380,000 $500,000 Page 12 Packet Pg. 157 3.1.b Parks & Recreation Yost Park & Pool - R91 R4, R6 & R11 96th Ave W & Bowdoin Way, Yost Park Project Summary: Future Park enhancements, repair, and maintenance to include a playground replacement, resurface of tennis/pickleball courts, pool upgrades and trail, bridge, and boardwalk repairs / replacement. The playground at Yost Park installed in 1995, is 27 years old, has reached the end of its lifecycle, is not ADA accessible and is scheduled to be replaced in 2025. Project Justification: To maintain safety amenities should be repaired and/or replaced as supported in the 2022 Parks, Recreation and Open Space (PROS) Plan Recommendation 3.1 which is to maintain, renovate or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety and Recommendation 3.4 replace the playgrounds at... Yost Memorial Park. In addition, this work is supported by PROS Plan Goal 1, Objective 1.1 and 1.4; Goal 3, Objective 3.6, 3.8 and 3.9; Goal 4, Objective 4.4, Goal 5, Objective 5.4; Goal 6, Objective 6.5; Goal 9, Objective 9.1 and Recommendation 3.10 and 6.2 for a total of 4 Recommendations, 6 Goals and 9 Objectives. Estimated Cost: $1,450,700 Construction (R4) — Bridge repairs $80,000 $80,000 Construction (R6) — Playground Replacement $750,000 $750,000 Construction (R9) —Tennis Court Resurface $74,300 $74,300 Construction (1311) — Pool Upgrades $546,400 $546,400 Total Expenses $154,300 $1,296,400 1,450,700 Real Estate Excise Tax II - Fund 125 $154,300 $1,296,400 1,450,700 Total Revenue Unsecured Funding $154,300 i 1 $1,296,400 1,450,700 Page 13 Packet Pg. 158 3.1.b Parks & Recreation Olympic Beach Park - R7 200 Admiral Way, Entrance of the Fishing Pier Project Summary: Renovation of existing restroom and Visitor Center. Project Justification: This work is supported by 3 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. PROS Plan Goal 3, Objective 3.8; Goal 4, Objective 4.1; Goal 9, Objective 9.1 and Recommendation 6.3 also align with these upgrades. Estimated Cost: $53,000 Planning (R7) — Restroom Renovation $20,000 $20,000 Construction (R7) — Restroom Renovation $33,000 $33,000 Total Expenses $20,000 $33,000 $53,000 Real Estate Excise Tax II - Fund 125 $20,000 $33,000 $53,000 Total Revenue Unsecured Funding $20,000 so $33,000 $53,000 Page 14 Packet Pg. 159 3.1.b Parks & Recreation D20: Woodway Campus Athletic Complex Phase I Lighting 23200 1001h Ave. W Project Summary: This project consists of two components: Phase I lighting addition, Phase II renovation of existing underdeveloped athletic field and would be coordinated with the property owner, Edmonds School District. Project Justification: By adding lighting to the renovated Phase I year-round field, usage of the multi -use facility would significantly increase. Phase II would renovate a currently poorly maintained and underutilized large athletic field to provide community significantly more multi -sport use of an existing facility. This Athletic Complex serves a densely populated area of more than 150,000 residents within 5-mile radius. Future maintenance costs could be offset by user fees. Phase I without lighting installation was completed in 2015 for $4.2M, Phase II estimated at $6-8M with funding and timing undetermined. This partnership improvement is supported by a Recommendation, 2 Goals and 5 Objectives in the 2022 PROS Plan including Recommendation 3.2 "expand partnerships and agreements with Edmonds School District ... to provide public access and opportunities for outdoor recreation". And PROS Plan Goal 3, Objectives 3.3, 3.9, 3.10 and 3.11; and Goal 9, Objective 9.4. Estimated Cost: Phase I Lighting: $1,500,000; Phase II: $6 — 8M Page 15 Packet Pg. 160 3.1.b Parks & Recreation Neighborhood Park SE 1— P2, D13 Project Summary: Acquire and develop an additional neighborhood park in the SE Edmonds area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized (see Land Acquisition Section for details) a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by 2 Recommendations, 3 Goals and 11 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Estimated Cost: $899,100 + Parkland Acquisition Planning— Neighborhood Park SE 1 (P2) $79,600 2029 Total $79,600 Construction — Neighborhood Park SE 1 (D13) $819,500 $819,500 Total Expenses $79,600 $819,500 $899,100 Real Estate Excise Tax II - Fund 125 $79,600 $79,600 Total Revenue Unsecured Funding $79,600 $0 00 $79,600 00 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 16 Packet Pg. 161 3.1.b Parks & Recreation Sierra Park — R8 81st Ave W & 190th St SW Project Summary: Replacement of the playground and fall surfacing at Sierra Park. The playground is 27 years old and is currently the smallest and most limited playground in the park system. The new playground is intended to be inclusive level design. Project Justification: These improvements are supported by 2 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.4 is to replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8, Goal 9, Objective 9.1 and Recommendation 3.1 also align with these improvements. Estimated Cost: $415,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 17 Packet Pg. 162 3.1.b Parks & Recreation Pine Street Park - D10, D11 & D12 6th and Pine Street Project Summary: Park improvements to include the addition of a small shelter with picnic tables, canopy shade trees and a paved interior connecting pathway. Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.5 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved pathway connections in Mathay Ballinger Park and Pine Street Park. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 6.2 also align with these improvements. Estimated Cost: $164,400 Planning (D10, 11, 12) $40,000 2028 2029 Total $40,000 Construction (D10) — Shelter w/Picnic Tables $59,600 $59,600 Construction (D11) — Paved Pathway $38,300 $38,300 Construction (D12) — Canopy Shade Trees $26,500 $26,500 Total Expenses $40,000 $124,400 $164,400 Real Estate Excise Tax II - Fund 125 $40,000 $124,400 $164,400 Total Revenue $40,000 1 $124,400 $164,400 Page 18 Packet Pg. 163 3.1.b Parks & Recreation Maplewood Hill Park — R12 19800 89th PI W Project Summary: Replacement of the existing playground installed in 1985. This playground is 38 years old and is the oldest in the park system. Project Justification: This improvement is supported by 2 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.4 is to replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 3.1 also align with this improvement. Estimated Cost: $347,800 Page 19 Packet Pg. 164 3.1.b Parks & Recreation Neighborhood Park SR 99 — P6 & D15 Project Summary: Design and development of an additional neighborhood park in the SR 99 area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized (see Land Acquisition Section for details) a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by 2 Recommendations, 3 Goals and 11 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Estimated Cost: $926,100 + Parkland Acquisition Planning— Neighborhood Park SR99 (P6) $82,000 $82,000 Construction — Neighborhood Park SR 99 (D15) $844,100 $844,100 Total Expenses $82,000 $844,100 $926,100 Real Estate Excise Tax II - Fund 125 $82,000 $82,000 Total Revenue Unsecured Funding $82,000 $0 00 $82,000 00 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 20 Packet Pg. 165 3.1.b Parks & Recreation Johnson Property - P5 9309 Bowdoin Way Project Summary: This project is to design a master plan for this 1-acre property donated by Shirley Johnson in 2021. The house and outbuildings were removed in 2023. The site includes historic fruit and nut trees which have all been neglected for years. The master planning process uses a combination of park system -wide goals (PROS Plan), property opportunities and constraints and community input on future design and usage for the space and provides supporting documentation for potential grants for future improvements. Project Justification: This project is supported by 1 Recommendation, 5 Goals and 11 Objectives of the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.1 — Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.7, 3.8 and 3.10; Goal 5, Objective 5.1; Goal 6, Objectives 6.1, 6.4 and 6.5; Goal 9, Objectives 9.1, 9.3 and 9.5 also align with this project. Estimated Cost: $82,000 024 Planning & Design (P5) $82,000 $82,000 Total Expenses $82,000 $82,000 Real Estate Excise Tax II - Fund 125 $82,000 $82,000 Total Revenue Unsecured Funding $82,000 $0 $82,000 $0 Page 21 Packet Pg. 166 3.1.b Parks & Recreation Parks & Facilities Maintenance Building - P1 & D2 600 3rd Avenue South, City Park Project Summary: Replacement of 40+year old Parks and Facilities Maintenance building and renovation of the yard area in City Park. Currently undersized to accommodate staff, vehicles and equipment, mechanical work spaces and employee facilities and the facility is reaching the end of its useful life. Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment storage in order to more efficiently maintain City parks and Capital facilities. The city's small equipment repair garage is used as the Park Maintenance locker room, daily meeting room, computer access (two for 17 FTEs) and work preparation space. It is insufficient for work efficiency and creates a conflicting work space of small machinery repair and gathering space. This project is supported by 1 Goals, 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 9, Objectives 9.1, 9.3 and 9.9 align with this project. Estimated Cost: $5,762,600 Planning & Design (P1) $1,125,500 $1,125,500 Construction (D2) $4,637,100 $4,637,100 Total Expenses $1,125,500 $4,637,100 $5,762,600 Real Estate Excise Tax II - Fund 125 Park Impact Fees — Fund 332-100 Bond Proceeds Operating Contribution — General Fund Park Donations Total Revenue Unsecured Funding 00 00 .00 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 22 Packet Pg. 167 3.1.b Parks & Recreation Columbarium Expansion Phase II — D8 820 15th St SW, Edmonds Memorial Cemetery Project Summary: Expansion of the Edmonds Memorial Cemetery Columbarium. Funding provided through the Cemetery Trust Fund 137 which accumulates fund balance based on Cemetery usage and revenue generated. Project Justification: As the existing columbarium continues to fill up, it is appropriate to begin planning for the Phase II expansion. The design is complete and since it is continuation of phase improvements, could be relatively simple to implement. Estimated Cost: $159,100 Page 23 Packet Pg. 168 3.1.b Parks & Recreation Waterfront Walkway Completion — Ebb Tide Section - P3 & D14 ,z- Beachfront in front of Ebb Tide Condominiums (200 Beach Place) Project Summary: This improvement would provide a continuous ADA accessible waterfront walkway from Brackett's Landing North to Marina Beach Park ensuring all individuals, including those with mobility challenges and those using wheeled carriers can safely enjoy the waterfront. The final missing piece is a constructed pathway beach side of the Ebb Tide condominiums in the easement owned by the City of Edmonds. Project Justification: To provide public ADA access along the waterfront for all individuals. Completion of the walkway would meet ADA requirements, support efforts to keep dogs off of the beaches and was recognized as a high priority by residents participating in the development of the 2022 Parks, Recreation & Open Space Plan. This project is supported by 1 Recommendation, 3 Goals and 5 Objectives in the PROS Plan. Recommendation 6.2 is to implement upgrades and improvements to park facilities to conform with the American with Disabilities Act (ADA) and ensure universal accessibility to include required parking, providing ramped entrances and site furnishings. PROS Plan Goal 3, Objective 3.8; Goal 4, Objectives 4.1, 4.2 and 4.4, Goal 6, Objective 6.7 also align with this project. Estimated Cost: $1,334,500 Planning & Design $515,000 $515,000 Construction $819,500 $819,500 Total Expenses $515,000 $819,500 $1,334,500 Real Estate Excise Tax II - Fund 125 $515,000 $515,000 Total Revenue Unsecured Funding $515,000 $515,000 ii ii Page 24 Packet Pg. 169 3.1.b Parks & Recreation Neighborhood Park SE 2 — P7, D18 Project Summary: Design and development of an additional neighborhood park in the SE Edmonds area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition (see Land Acquisition Section for details) has been authorized a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by 2 Recommendations, 3 Goals and 11 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Estimated Cost: $953,900 + Parkland Acquisition *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 25 Packet Pg. 170 3.1.b Parks & Recreation Seaview Park Restroom — R16 80th Ave W & 186th St SW Project Summary: Improvements to include renovation or replacement of the permanent restroom to provide ADA compliant facilities. Project Justification: These improvements are supported by 3 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 6 is to make improvements to existing parks as needed to ensure proper maintenance, usability and quality of park features and grounds to remove barriers and improve universal access. Recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendations 3.1 and 6.2 also align with these improvements. Estimated Cost: $417,900 Page 26 Packet Pg. 171 3.1.b Parks & Recreation Elm Street Park - D161 D17 & R14 '.Soo"..M" 7th & Elm Street Project Summary: Park enhancements to include the addition of a nature playground, small shelter with picnic tables and habitat restoration. Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.1 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park. PROS Plan Goal 6, Objective 6.5; Goal 9, Objective 9.1; and Recommendation 3.5 also align with these improvements. Estimated Cost: $440,370 Planning (R14, D16, D17) $100,000 $100,000 Construction (R14) — Habitat Restoration $56,300 $56,300 Construction (D16) — Nature Playground $199,670 $199,670 Construction (D17) — Shelter w/Picnic Tables $84,400 $84,400 Total Expenses $100,000 $340,370 $440,370 Real Estate Excise Tax II - Fund 125 $100,000 $284,070 $384,070 Total Revenue Unsecured Funding $100,000 i $284,070 ii $384,070 0i _W Page 27 Packet Pg. 172 3.1.b Parks & Recreation Yost Pool Replacement — R15 96th Ave W & Bowdoin Way, Yost Park Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for many residents and visitors. In addition to teaching youth lifesaving water safety, the pool serves as an opportunity for community members of all ages to lead healthy and active lifestyles. Funding for this project has not been identified and would likely require voter approval. Project Justification: Replacing Yost Pool is supported by 4 Recommendations, 4 Goals and 6 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 4 is to replace Yost Pool. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.7, 3.8 and 3.9; Goal 7, Objective 7.4; Goal 9, Objective 9.1 and Recommendations 3.1, 4.1, 4.2 and 6.2 also align with this replacement. Estimated Cost: $23,881,000 Planning & Construction (1115) 2028 2029 $23,881,000 Total $23,881,000 Total Expenses $23,881,000 $23,881,000 Real Estate Excise Tax II - Fund 125 Fund 332 Balance + Park Impact Fees Secured Grants Bonds Total Revenue Unsecured Funding $0 000($23,88,100011 $0 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 28 Packet Pg. 173 3.1.b Parks & Recreation Meadowdale Playfields - R3 168th ST SW, Lynnwood Project Summary: Currently identifying potential budget allocation for shared improvements and related expenditures dependent upon pending Interlocal Agreement negotiations. Project Justification: The cities of Lynnwood and Edmonds and Edmonds School District currently have an Interlocal Agreement (ILA) for Meadowdale Park for shared cost of capital improvements, renovations, and ongoing maintenance. This work is supported by 2 Recommendations, 3 Goals and 5 Objectives of the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1.2 — Expand partnerships and agreements with the Edmonds School District, Snohomish County, and other nearby jurisdictions (cities of Lynnwood, Mountlake Terrace, Woodway, and Shoreline) to improve public access and opportunities for outdoor recreation and Recommendation 6.2 - Implement upgrades and improvements to park facilities to conform with the American with Disabilities Act (ADA) and ensure universal accessibility to include required parking, providing ramped entrances and site furnishings. PROS Plan Goal 2, Objective 2.6; Goal 3, Objective 3.8, 3.10 and 3.11 and Goal 7, Objective 7.2 also align with this work. Estimated Cost: TBD, negotiations are ongoing with the City of Lynnwood. Construction (R3) TBD TBD TBD TBD TBD TBD TBD Total Expenses TBD TBD TBD TBD TBD TBD TBD Ending Fund Balance/Impact Fees - 332 TBD TBD TBD TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 TBD TBD TBD TBD TBD TBD TBD Total Revenue TBD TBD TBD TBD TBD i111TiBjDjM1J11TiBiiD6 Page 29 Packet Pg. 174 3.1.b Parks & Recreation Edmonds Marsh -Estuary Expansion & Restoration - Al, P4, D9 & D1 Edmonds Marsh - City of Edmonds Marsh, Marina Beach Park and property owned by Unocal (Chevron) Project Summary: Reconnect the Puget Sound with the Edmonds Marsh near -shore estuary by restoring the natural tidal exchange. This project will impact the existing Marina Beach Park and its proposed renovation including daylighting of Willow Creek within the park and the Edmonds Marsh. In addition, this project encompasses the possible acquisition or use of the adjacent 21-acre parcel known as the Unocal property to support a larger estuary restoration project. Once acquired, an integrated restoration plan can be developed to restore functioning conditions of the tidal wetland for salmon recovery, wildlife conservation and improved public access for recreational use, environmental education and wildlife viewing. Project Justification: The marsh estuary restoration project will allow for and provide a natural tidal exchange, allow salmon to again migrate into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of saltwater -freshwater flora and fauna and address sea level rise impacts. This project is supported by 3 Recommendations, 5 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 2.2 — Expand the Edmonds Marsh/Estuary to include the Unocal property. Develop funding strategy for purchase of the Unocal property or negotiate with the State of Washington to have the property become part of the Edmonds Marsh/Estuary. PROS Plan Goal 1, Objective 1.1; Goal 4, Objective 4.3; Goal 5, Objectives 5.1, 5.3 and 5.4; Goal 6, Objective 6.5 and 6.7; Goal 9, Objective 9.1; Recommendation 2.1 and 3.11 also align with this project. Estimated Cost: TBD Acquisition and Planning + Restoration + Marina Beach Park renovation Continued on next page. Page 30 Packet Pg. 175 3.1.b Edmonds Marsh -Estuary Expansion & Restoration— continued. . 2027 2028 2029 Total Land Acquisition (Al) TBD TBD TBD TBD TBD TBD TBD Master Plan (P4) TBD TBD TBD TBD TBD TBD TBD Master Plan Implementation (D9) TBD TBD TBD TBD TBD TBD TBD Restoration (D1) -TBD TBD TBD TBD TBD TBD TBD TBD Total Expenses TBD TBD TBD TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 Real Estate Excise Tax I — Fund 126 Fund 332 Balance + Park Impact Fees Bond Proceeds Secured Grants Tree Fund 143 — Land Acquisition Park Donations Operating Contribution — General Fund Stormwater — Fund 422 Total Revenue Unsecured Funding TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBID Project Accounting #M070 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Expense estimates and funding sources changed to TBD per Council direction December 2022. Page 31 Packet Pg. 176 2024-2029 Parks Capital Improvement & Capital Facilities Plan PROGRAMS { EDMONDS PARKS, RECREATION & HUMAN SERVICES Page 32 Packet Pg. 177 3.1.b Parks & Recreation Citywide Park Improvements / Capital Replacement Program - R17 /IAF•����������������...�II.11111111111111 T �j. Project Summary: The 2022 Parks, Recreation & Open Space (PROS) plan identified a significant list of deferred park maintenance projects. With the addition of a Parks Capital Project Manager, hired in 2022 and the Job Order Contracting program, the Parks Department will continue to make progress on the numerous system -wide repairs, renovations and replacements of an aging parks infrastructure. Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs, increased City liability and decreased level of service and community satisfaction. This program is supported by 5 Recommendations, 6 Goals and 21 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) Plan. Recommendation 3.1 is to Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety. PROS Plan Goal 2, Objectives 2.1 and 2.3; Goal 3, Objectives 3.6, 3.7, 3.8 and 3.9; Goal 4, Objectives 4.1, 4.2, 4.4; Goal 5, Objective 5.1, 5.3, and 5.4; Goal 6, Objective 6.1, 6.3, 6.4, 6.5 and 6.7; Goal 9, Objective 9.1, 9.2, 9.3 and 9.9 and Recommendations 3.7, 6.2, 6.3 and 6.4 also align with this program. Estimated Cost: $2,700,000 (6-year total) 024 2025 Repair & Maintenance $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Professional Services $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total Expenses $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Real Estate Excise Tax II - Fund 125 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Total Revenue $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Unsecured Funding i i i Page 33 Packet Pg. 178 3.1.b Parks & Recreation Signage & Wayfinding — R10 . VIEW POINT PLAY STRUCTURE NATURAL AREA&DOG WALK - a PARKOPEN DAWN TO DUSK Project Summary: Update park and recreation facilities signage system -wide to include uniform and accurate trail identification information, orientation markers, safety and regulatory messaging, park hours, park rules and etiquette, interpretive information and warning signs. Project Justification: A comprehensive and consistent signage system is necessary to inform, orient and educate park users. This program is supported by 2 Recommendations, 4 Goals and 6 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) plan. Recommendation 6.5 is to develop and provide consistent graphics and citywide signage to improve communication on access, usability and "branding" of the city's park and open space system. PROS Plan Goal 2, Objectives 2.1 and 2.3; Goal 3, Objective 3.6; Goal 5, Objectives 5.3 and 5.4; Goal 9, Objective 9.1 and Recommendation 6.2 also align with this program. Estimated Cost: $75,000 Page 34 Packet Pg. 179 i D11\ • AND ILI i �. , K . „ :�T . •eel.~ �� • R t 4*6 �... � -at.1 . \ '!►�,`J•• ,;ice ` J- � l.• ICI•. .. 3.1.b Parks & Recreation Parkland Acquisition — Neighborhood Park SE 1, SR 99 & SE 2 - A2, A3 & A4 Project Summary: Acquisition of parkland that will benefit citizens and support the priorities identified in the PROS Plan. Currently, $1,100,000 is reserved for parkland and open space acquisition. These funds were accumulated from 2019 through 2023. There is no specific request to purchase a particular parcel as opportunities are somewhat limited in a mostly built -out city, but staff continues to search for, develop and negotiate opportunities. Project Justification: Parkland Acquisitions are supported by 1 Recommendation, 2 Goals and 5 Objectives (land purchase only, see previous projects for development) in the 2022 Parks, Recreation & Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 2, Objective 2.1; Goal 3, Objective 3.1, 3.2, 3.3 and 3.9 also align with the acquisition of parkland. Estimated Cost: $5,230,500 i Acquisition — Neighborhood Park SE 1 (A2) $1,500,000 $1,500,000 Acquisition — Neighborhood Park SR99 (A3) $1,545,000 $1,545,000 Acquisition — Neighborhood Park SE 2 (A4) $2,185,500 $2,185,500 Total Expenses $1,500,000 $1,545,000 $2,185,500 $5,230,500 Real Estate Excise Tax I - Fund 126 $1,300,000 $200,000 $200,000 $1,700,000 Tree Fund 143 - land acquisition - TBD Total Revenue $1,300,000 $200,000 $200,000 $1,700,000 *Project is both in Capital Improvement Program (CIP) and Capital Facilities Plan (CFP) Page 36 Packet Pg. 181 3.1.b Parks & Recreation Interurban Trail Expansion — A5 �it..: R`� 4-7V f r Jam' or I i y`f dw �_ _ file' f� 1 1 e• 24100 78`h Place West Project Summary: Acquisition of additional lands, easements and/or right-of-ways to continue the Interurban Trail, including more off -road segments. Project Justification: This Expansion is supported by 3 Recommendations, 2 Goals and 6 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) Plan. Recommendation 5 is to improve trail connections including sidewalks and bike lanes to help link destinations across the community. Recommendation 5.1 suggests the City peruse opportunities to acquire additional lands, easements and/or right of way to continue the Interurban Trail. Goal 2, Objective 2.1; Goal 3, Objective 3.1, 3.2, 3.4, 3.5 and 3.6 and Recommendations 1.1 and 5.2 also align with this expansion. Estimated Cost: $895,585 Land Acquisition — Park Facilities (A5) $895,585 $895,585 Total Expenses $895,585 $895,585 Real Estate Excise Tax I - Fund 126 Tree Fund 143 - Land Acquisition Total Revenue Unsecured Funding ($895,585) ($895,585) Page 37 Packet Pg. 182 2024-2029 Parks Capital Improvement & Capital Facilities Plan FUND DETAIL - EDMONDS PARKS, RECREATION & HUMAN SERVICES Page 38 Packet Pg. 183 Fund 332 3.1.b Costs inflated at 3% per year Fund 332 Expenditures 2023 2024 2025 2026 2027 2028 2029 6-Year Total D9 Edmonds Marsh Estuary Restoration (Master Plan Implementation) $ D1 Edmonds Marsh Estuary Restoration (Restoration) $ - R14 Elm Street Park Habitat Restoration $ 56,300 $ 56,300 D6 Mathay Ballinger Park Permanent Restrooms $ 100,000 $ - R3 Meadowdale Playfields (Renovations, City of Lynnwood ILA) $ - D13 Neighborhood Park - SE1 (Park Development) $ 819,500 $ 819,500 D15 Neighborhood Park - SR99 (Park Development) $ 844,100 $ 844,100 D18 Neighborhood Park - SE2 (Park Development) $ 869,500 $ 869,500 R15 Pool Replacement $ 23,881,000 $ 23,881,000 P1 Parks Facilities M&O Building (Design) $ 1,125,500 $ 1,125,500 D2 Parks Facilities M&O Building (Construction) $ 4,637,100 $ 4,637,100 R19 Shell Creek Restoration (Yost Park) $ 120,000 $ 120,000 D14 Waterfront Walkway (Construction) $ 819,500 $ 819,500 D20 Woodway Campus Athletic Complex - Phase I - Lighting $ 1,500,000 $ 1,500,000 Interfund Services $ 68,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 150,000 Debt Service Civic Park $1.6M (2021) 1 $ 98,000 $ 98,0001 $ 98,000 $ 98,000 $ 98,0001 $ 98,0001 $ 98,0001 $ 588,000 (C) TOTAL Fund 332 Expenditures 1 $ 266,000 1 $ 243,0001 $ 1,623,000 1 $ 2,068,000 1 $ 5,604,200 1 $ 992,5001 $24,879,800 1 $35,410,500 Fund 332 Revenue 2023 2024 2025 2026 2027 2028 2029 6-Year Total Park Impact Fees (Fund 332-100) $ 682,681 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,800,000 Investment Interest (3%) $ 6,230 $ 18,918 $ 24,795 $ 30,849 $ 37,085 $ 43,507 $ 50,122 $ 205,277 Miscellaneous Park Donations $ Bond Proceeds $ - ARPA Transfer - Shell Creek Restoration (Study) $ 120,000 $ 120,000 Unsecured Funding - Woodway Campus Athletic Complex Phase 1 $ 1,500,000 $ 1,500,000 Unsecured Grants - Marsh Estuary Restoration $ - Unsecured Grants - Elm Street Park Habitat Restoration $ 56,300 $ 56,300 Unsecured Grants - Neighborhood Park SE 1 (Development) $ 819,500 $ 819,500 Unsecured Grants - Neighborhood Park SR99 (Development) $ 844,100 $ 844,100 Unsecured Grants - Neighborhood Park SE 2 (Development) $ 869,500 $ 869,500 Unsecured Funding (Bonds, Levy, Misc.) Pool Replacement $ 23,881,000 $ 23,881,000 Unsecured Funding Park Facilities M&O Building $ 1,125,500 $ 4,637,100 $ 5,762,600 Unsecured Grants - Waterfront Walkway (Construction) $ 819,500 $ 819,500 (D) TOTAL Fund 332 Revenue $ 688,911 $ 438,918 $ 1,824,795 1 $ 2,275,849 $ 5,818,285 $ 1,213,007 $25,106,922 $36,677,777 M Q O U N O N N O N N to O CL O L a 4- 0 C O C N N N L a rn N O N 4 N O N a_ U d U N Y M a Page 39 Packet Pg. 184 Fund 332 3.1.b Fund 332 Parks Fund 6-Year Overview 2023 2024 2025 2026 2027 2028 2029 (E) Beginning Fund Balance (332 + 332-100) $ 207,683 $ 630,594 $ 826,512 $ 1,028,308 $ 1,236,157 $ 1,450,242 $ 1,670,749 (D) Revenue $ 688,911 $ 438,918 $ 1,824,795 $ 2,275,849 $ 5,818,285 $ 1,213,007 $ 25,106,922 (C) Expenditures $ 266,000 $ 243,000 $ 1,623,000 $ 2,068,000 $ 5,604,200 $ 992,500 $ 24,879,800 (G) Ending Fund Balance (E+D-C) $ 630,594 $ 826,512 $ 1,028,308 $ 1,236,157 $ 1,450,242 $ 1,670,749 $ 1,897,871 Project Type: A Acquisition P Master Planning D Development - New R Replacement/Upgrade Page 40 Packet Pg. 185 REET II Fund 125 3.1.b Costs inflated at 3% per year REET II(Fund 125)Expenditures 2024 2025 2026 2027 2028 2029 6-Year Total P4 Edmonds Marsh Estuary Restoration (Master Plan) $ - D16 Elm Street Park (Nature Playground) $ 100,000 $ 199,670 $ 299,670 D17 Elm Street Park (Shelter w/Picnic Tables) $ 84,400 $ 84,400 R2 Johnson Property (Demo & Secure Site) $ P5 lJohnson Property (Master Plan) $ 82,000 $ 82,000 R12 Maplewood Hill Park (Playground Replacement) $ 347,800 $ 347,800 D5 Mathay Ballinger Park (Paved Loop Pathway) $ D7 Mathay Ballinger Park (Shelter w/Picnic Tables) $ - D6 Mathay Ballinger Park Permanent Restrooms $ 271,300 $ 271,300 D19 Mountlake Terrace ILA (Lake Ballinger Park)* $ 200,000 $ 200,000 P2 Neighborhood Park - SE1 (Master Plan) $ 79,600 $ 79,600 P6 Neighborhood Park - SR99 (Master Plan) $ 82,000 $ 82,000 P7 Neighborhood Park - SE2 (Master Plan) $ 84,400 $ 84,400 R7 Olympic Beach Park (Restroom Upgrade) $ 20,000 $ 33,000 $ 53,000 D10 Pine Street Park (Shelter w/Picnic Tables) $ 20,000 $ 59,600 $ 79,600 D11 Pine Street Park (Paved Connecting Pathway) $ 20,000 $ 38,300 $ 58,300 D12 Pine Street Park (Canopy Shade Trees) $ 26,500 $ 26,500 R16 Seaview Park (Restroom Replacement) $ 417,900 $ 417,900 R19 Shell Creek Restoration (Yost Park) $ 380,000 $ 380,000 R8 Sierra Park (Playground Replacement) $ 415,000 $ 415,000 P3 Waterfront Walkway Design Completion $ 515,000 $ 515,000 R11 Yost Pool Upgrades & Renovation $ 546,400 $ 546,400 R9 Yost Park (Tennis Court Resurface) $ 74,300 $ 74,300 R4 Yost Park (Trail, Bridge & Boardwalk Repairs) $ 80,000 $ 80,000 R6 Yost Park (Playground Replacement - Inclusive) $ 750,000 $ 750,000 R10 lSignage and Wayfinding $ 75,000 $ 75,000 R17 ICitywide Park Improvements / Capital Replacement Program $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,000 (C) TOTAL PARKS REET II (Fund 125) Expenditures $ 1,150,600 $ 2,266,000 $ 1,186,400 $ 882,200 $ 1,482,900 $ 734,070 $ 7,702,170 REET II(Fund 125)Revenue 2024 2025 2026 2027 2028 2029 6-Year Total Real Estate Excise Tax (REET) II - Fund 125 $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 9,500,000 (D) TOTAL PARKS REET I (Fund 126) Revenue $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 9,500,000 REET II (Fund 125) Parks Fund 6-Year Overview 2024 2025 2026 2027 2028 2029 (E) Beginning Fund Balance $ 1,222,000 $ 2,071,400 $ 1,305,400 $ 1,619,000 $ 2,236,800 $ 2,253,900 (D) Revenue $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 (C) Expenditures $ 1,150,600 $ 2,266,000 $ 1,186,400 $ 882,200 $ 1,482,900 $ 734,070 (G) Ending Fund Balance (E+D-C) $ 2,071,400 $ 1,305,400 $ 1,619,000 $ 2,236,800 $ 2,253,900 $ 3,019,830 *Project added via Council amendment in 2023 Page 41 Packet Pg. 186 REET I Fund 126 3.1.b Costs inflated at 3% per year REET I (Fund 126) Expenditures 2024 2025 2026 2027 2028 2029 6-Year Total Al Edmonds Marsh Estuary Restoration (Acquisition) $ - A5 Interurban Trail (Expansion/Acquisition) $ 895,585 $ 895,585 A2 Neighborhood Park - SE1 (Acquisition) $ 1,500,000 $ 1,500,000 A3 Neighborhood Park - SR99 (Acquisition) $ 1,545,000 $ 1,545,000 A4 Neighborhood Park - SE2 (Acquisition) $ 2,185,500 $ 2,185,500 Land Acquisition Services $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 300,000 (C) TOTAL PARKS REET I (Fund 126) Expenditures $ 1,550,000 $ 1,595,000 $ 2,235,500 $ 50,000 $ 50,000 $ 945,585 $ 6,426,085 REET I(Fund 126)Revenue 2024 2025 2026 2027 2028 2029 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,000 (D) TOTAL PARKS REET I (Fund 126) Revenue $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,000 REET I (Fund 126) Parks Fund 6-Year Overview 2024 2025 2026 2027 2028 2029 (E) Beginning Fund Balance $ 872,136 $ (477,864) $ (1,872,864) $ (3,908,364) $ (3,758,364) $ (3,608,364) (D) Revenue $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 (C) Expenditures $ 1,550,000 $ 1,595,000 $ 2,235,500 $ 50,000 $ 50,000 $ 945,585 (G) Ending Fund Balance (E+D-C) 1 $ (477,864) $ (1,872,864) $ (3,908,364) $ (3,758,364) $ (3,608,364) $ (4,353,949) CL O U 0 N 0 N 4 N O N N O M O L IL 4- 0 c O r cv .r C N O N L IL N 0 N 4 N O N a v d ur U N Y i O a N C N E t V r Q r C d E L V Page 42 Packet Pg. 187 CEMETERY Trust Fund 137 3.1.b Costs inflated at 3% per year CEMETERY Trust (Fund 137) Expenditures 2024 2025 2026 2027 2028 2029 6-Year Total D8 lColumbariurn Expansion -Phase II $ 159,100 $ 159,100 Repair & Maintenance $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 125,000 (C) TOTAL CEMETERY Trust(Fund 137) Expenditures $ 25,000 $ 184,100 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 284,100 CEMETERY Trust (Fund 137) Revenue 2024 2025 2026 2027 2028 2029 6-Year Total Cemetery Trust - Fund 137 Investment Interest (@5%) $ 62,673 $ 65,306 $ 60,117 $ 62,623 $ 65,254 $ 68,016 $ 315,972 F I Cemetery Trust - Fund 137 Sales Revenue $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 90,000 (D) TOTAL CEMETERY Trust (Fund 137) Revenue $ 77,673 $ 80,306 $ 75,117 $ 77,623 $ 80,254 $ 83,016 $ 405,972 CEMETERY Trust (Fund 137) 6-Year Overview 2024 2025 2026 2027 2028 2029 (E) Beginning Fund Balance $ 1,253,456 $ 1,306,129 $ 1,202,335 $ 1,252,452 $ 1,305,075 $ 1,360,328 (D)Revenue $ 77,673 $ 80,306 $ 75,117 $ 77,623 $ 80,254 $ 83,016 (C)Expenditures $ 25,000 $ 184,100 $ 25,000 $ 25,000 $ 25,000 $ 25,000 (G) Ending Fund Balance (E+D-C) $ 1,306,129 $ 1,202,335 $ 1,252,452 $ 1,305,075 $ 1,360,328 $ 1,418,345 CL O U N O N I* N O N N O CL O L a 4- 0 c O r cv .r C N O L a N O N Iq N O N a v CL ur U N Y i O a N C N E t V r Q r C d E L V Page 43 Packet Pg. 188 TREE Fund 143 3.1.b Costs inflated at 3% per year TREE (Fund 143)Expenditures 2024 2025 2026 2027 2028 2029 6-Year Total Park and Open Space Acquisition Program $ Tree Maintenance - Oak Tree's 5th & Main* $ (C) TOTAL TREE (Fund 143) Expenditures $ - $ - $ - $ - $ - $ - $ - TREE (Fund 143)Revenue 2024 2025 2026 2027 2028 2029 6-Year Total Tree - Fund 143 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 1,290,000 (D) TOTAL TREE (Fund 143) Revenue $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 1,290,000 TREE (Fund 143) 6-Year Overview 2024 2025 2026 2027 2028 2029 (E) Beginning Fund Balance $ 426,065 $ 641,065 $ 856,065 $ 1,071,065 $ 1,286,065 $ 1,501,065 (D) Revenue $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 $ 215,000 (C) Expenditures $ - $ - $ - $ - $ - $ - (G) Ending Fund Balance (E+D-C) $ 641,065 $ 856,065 $ 1,071,065 $ 1,286,065 $ 1,501,065 $ 1,716,065 *Added via Council Budget Amendment Dec. 2022 N C N E t V r Q r C d E L V Page 44 Packet Pg. 189 3.1.b CFP / CIP COMPARISON (2024 TO 2029) PROJECTS ADDED Type I PROJECT NAME CFP DESCRIPTION None CFP / CIP COMPARISON (2024 TO 2029) PROJECTS REMOVED Type PROJECT NAME CFP DESCRIPTION Parks Lake Ballinger Access (McAleer) IPlayground Project completion scheduled in 2023 Parks Johnson Property Demolition Demolition to be complete in 2023 Parks Playground Upgrade Program upgrades identified each year, no need for additional program CFP / CIP COMPARISON (2024 TO 2029) Type PROJECT NAME CFP CHANGE Parks Columbarium Expansion - Phase II Funded through Cemetery Trust Fund 137 - scheduled in 2025 vs. 24 Parks Elm Street Park Improvements Separated into planning in 2027 and construction in 2028 vs. 2026 Parks Interurban Trail Expansion Moved to 2029 vs. 28 Parks Johnson Property Master Plan Removed demolition, master plan scheduled in 2026 vs. 25 Parks Lake Ballinger Park Mountlake Terrace ILA ILA completed in 2023; payment due upon construction completion in 2024, carryforward Parks Maplewood Hill Park Playground replacement moved to 2027 vs. 25, significant price increase Parks Mathay Ballinger Park Improvements permanent restroom installation scheduled to take place in 2024, carryforward Parks Neighborhood Park SE1, SR99, SE2 X Master plan and construction of all three parks pushed back one year (must acquire first) Parks Olympic Beach Park Improvements Separated into planning in 2025 and construction in 2026 vs. 24 Parks Parkland Acquisition/Neighborhood Parks X JAII three bumped back one year to 2024, 2025 and 2026 Parks Pine Street Park Improvements Separated into planning in 2025 and construction in 2026 vs. 24 Parks Seaview Park Improvements Restroom replacement moved to 2028 vs. 27 Parks Shell Creek Restoration Plan carried forward to 2024; restoration in 2025 vs. 24 Parks ISignage and Wayfinding Price increase to $75K vs. $51,500 Parks IYost Park & Pool Improvements Playground replacement moved to 2025 vs. 23, significant price increase due to topography Q U rn N O N I* N O N d 0 0. 0 L a 4- 0 0 r .r c d 0 a� a` rn N O N Iq N 0 N a_ U a u_ U N Y a N C N E t 0 r Q r C d E L 0 Page 45 Packet Pg. 190 3.1.c Capital Facilities Plan (CFP) & Capital Improvement Plan (CIP) Joint Presentation City Council/Planning Board — September 19, 2023 Q Packet Pg. 191 3.1.c CIP 6-year maintenance 6-year capital projects w/fundin projects w/ sources funding sources OComponents found only in the CIP OComponents found only in the CFP O Components found in both the CIP & CFP CFP Long-range (20-year) capital project needs C 0 w L a U a LL U (n Y L 0 2 a CI) w Mod v Packet Pg. 192 3.1.c Public Works & Utilities 2024-2029 CFP Combined CFP & CIP Document • Transportation • Utilities • Water • Stormwater • Sewer • Facilities • Wastewater Treatment Plant • Comparison to previous year Packet Pg. 193 3.1.c Public Works & Utilities CFP & CIP Citywide Project Maps PWW-09 P, 1 PWT-a -PWT-17 P'A'T 24 -05 IT 44 PWT r?3 PWT 4G do[ 0 w w L a U a LL U N Y O c) a Cl) w C d E Mod v w E. t� R r Q Packet Pg. 194 N O N 4 N O N CFP & CIP Format Q 0 0 0 I r%Capital oject List o- a 2024 Bu Pro Decision Pa Budget _0 NunFacilities Project Numb Amount � TOTAL L (2024-2029) Preservation / Maintenance Projects PWT-01 Annual Street Preservation $1,600,000 $2,400,000 $1,300,000 $2,630,000 $2.630,000 $2,630,000 $13,190,000 $39,450,000 $52,64 0 Program a� PWT-03 76th Ave. W Overlay from 196th $20,000 $0 $0 $0 $0 $0 $20,000 $0 L $2 as �0 St. SW to Olympic View Dr. PWT-04 Main St. Overlay from 6th Ave. to $789,553 $0 $0 $0 $0 $0 $789,553 $0 V $78 C 3 gth Ave. tU PWT-05 Puget Dr. / OVD Signal Upgrades $0 $0 $0 $90,000 $496,000 $0 $586,000 $0 $58 0 PWT-06 Signal Upgrades - 100th Ave / $0 $0 $0 $165,000 $773,000 $0 $938,000 $0 L 0 $93 3 0 238th St. SW _ PWT-07 Main St. / 3rd Signal Upgrades $0 $0 $0 $0 $110,000 $383,000 $493,000 $0 $49 a 0 PWT-61 Olympic View Dr Overlay - 196th $0 $200,000 $1,300,000 $0 $0 $0 $1,500,000 $0 $1,50 10 SR-524 to Talbot Rd m PWT-68 88th Ave Overlay and Sidewalk $150,000 $1,350,000 $0 $0 $0 $0 $1,500,000 $0 E $1,50 10 Repair 0 r Safety / Capacity Analysis r Q a� E 5 t t� .r r Q Packet Pg. 195 3.1.c Public Works & Utilities CFP & CIP Project Sheets Annual pavement preservation program to maintain City streets Mamtains the City's pavement mfninuucture and reduces the need for larger capital mvesrment to rebuild City steers. bang 5350,000 SI50,000 5150.000 5130,000 5330,000 5130p00 51.950,000 Right of way Conitruttpn S1,a50,000 52,250,00a 51,15000a 52,SOD,000 52,SOD,pOa 52,50apW 53],500,000 Ea►e^.e Tmel $l.Eaaa6a $ir�.aaa $ijmApp 52,11210.ago S2.53q= Skliar M $39MDM Street Fund 132 -GES tat & hUti RFET Fund 125 S1100,00D 51150,00[1 565b" 5750,000 S150.— 5)S X. S31.250,000 0.E2t Fund L6 $&10,000 $)50,000 5650,000 51.000 ST5D.000 `v150,000 531.250.0a0 mnsportatbn mipxct Fels Gere Fund six —ter.. n, Fund A Federal Grams Rate Grains umecved FUMing 590a,00a 51.130,000 51.13a.0a0 51.13p0oa 516.950,000 f..di.9 aewce Ural S1.600,000 $2,2Yo,000 $1300,000 S2530,000 S2.®U.000 $2,630,OW S39,a50,Ofp Parks & Recreation Lake Ballinger Park/Mountlake Terrace ILA —D19 ' ! "A► Lake Ballinger Park, City of Mountlake Terrace Project Summary: Through an Interlocal Agreement with the City of Mountlake Terrace, the City of Edmonds will support the Constnmon of the planned improvements in the northwest area of Lake Ballinger Park including a park entry, pathways and access toLake Ballinger. The project is underway and payment is due upon completion of the project. Project Justification: This western boundary of the park is Edmonds dry limits and these improvements will provide better access to Lake Ballinger Park for Edmonds residents. The revenue contribution supports me construction of the improvements which will benefit the Crty of Edmonds. This project is supported by the 2022 Parks, Recreate n antl Open Space (PROS) Plan including 3 Recommendations. 1 Goal and 3 Objectives. Recommendation 12 Expand partnerships and agreements with other nearby jurisdictions. Recommendation 3.6 Explore optronsfor access to Lake Ballinger with the Cny of Mountlake Terrace to include possible joint development and Consideration of o fishing pier. Recommendation 52 Repair and improve or extend trails and boardwalks to allow improved public access to natural areosfor nature/wildlrfe viewing, hiking and outdoor experience. PROS Goal 3, Objec 3.2, 3.6 and 3.11. Estimated Cost: $200,000 Construction 1019)—IIA 5200.000 5200,000 ToolF vc $200,000 $200000 Real Ertate Excise Tax ll-Nadl 125 5200,000 5200,000 Total Revenue $200,000 $200,000 1t U Packet Pg. 196 3.1.c Public Works & Utilities —Transportation 2024 Pavement Preservation Projects • 2024 Pavement Preservation Program ($1.5M) • Construction - 6 Lane Miles • 2025 Pavement Preservation Program ($100K) • Design 2024; Construction 2025 • Main St. Overlay 6t" Ave — 9t" Ave ($790k) • 2024 Construction • $750K Federal Grant • 11 New ADA Ramps • 88tn Ave Overlay &Sidewalk Repair ($150K) • Design 2024 • 76th Ave Overlay Close-out ($20k) 0) N O N 4 N O N d y O O_ O a 0 c 0 C N d L a -� o a U ® N Y 0 a M C U �r fC ?� Q w C V R r-. a� Q Packet Pg. 197 3.1.c Public Works & Utilities —Transportation 2024 Safety &Capacity Projects • Hwy 99 Revitalization/Gateway ($114K) • Hwy 99 Stage 3 2441"St-238t"St ($1.2M) • Hwy 99 Stage 4 224thSt-220t"St ($1.2M) • 76th Ave/220th St Intersection ($1.OM) • SR-104 Adaptive System ($186K) • Traffic Signal Upgrades ($30K) Packet Pg. 198 3.1.c N O N 4 N CN Public Works & Utilities —Transportation 1 0 0 0- 0 2024 Active Transportation Projects & Planning 0 .o CO • Transportation Plan Update($170K) • 84t" Ave Walkway 238t" St — 234t" St ($88K) c • Citywide Bicycle Improvements($15K) L w • Elm Way Walkway($10K) a a • Traffic Calming Program($100K) a • Pedestrian Safety Program ($80K) Y -- E t U N y.a Q w C V R r.+ a� Q Packet Pg. 199 3.1.c Public Works & Utilities — Utilities 2024 Water Utility • 2024 Replacement Program ($3.3M) • Construction 2024 • 41000 ft of Watermain Replacement • 2025 Replacement Program ($426K) • Design 2024; Construction 2025 • Yost & Seaview Reservoir Final Design ($850K) • $3.5M-$4M rehabilitation cost for each Reservoir • 2025-26 Construction • Waterline Overlays ($225K) o..` y U Packet Pg. 200 3.1.c Public Works & Utilities — Utilities 2024 Stormwater Utility • Storm &Surface Water Comp Plan ($35OK) • Perrinville Creek Basin Projects • Lower Perrinville Creek Restoration ($730K) • Perrinville Creek Flow Mgmt ($100K) • Perrinville Creek Basin Update ($594K) • Edmonds Marsh Water Quality Impr ($90K) • Lake Ballinger Floodplain Purchase ($120K) • 2024 Replacement Program ($1.3M) • Stormwater Overlays ($315K) • 2025 Replacement Program ($324K) 0) N O N 4 N O N d y O O_ O L a 4- 0 0 N d L a O IL a_ U a U- U Packet Pg. 201 3.1.c Public Works & Utilities — Utilities 2024 Sewer Utility • 2024 Replacement Program($2.OM) • 800 ft of Sewerline Replacement • 2025 Replacement Program($363K) • Cured in -place pipe rehabilitation ($522K) • 41000 ft of sewer CIPP rehab • Sewerline Overlays($60K) 2024 WWTP • WWTP Clarifier 1 Rehabilitation ($350K) • Vacuum Filter Replacement ($187K) • Nuvoda Pre -Design ($300K) • Joint Sealant ($60K) 0) N O N 4 N O N d y O O_ O a O _ 0 N a O a U a U_ U Packet Pg. 202 3.1.c Public Works & Utilities — Facilities • Boys & Girls Club • Cemetery Building • Historic Museum • Library • City Hall • Meadowdale Club House • Fishing Pier • Old Public Works • Frances Anderson Center • Parks Maintenance Bldg • Fire Station 16 • Fire Station 17 • Fire Station 20 • Historic Log Cabin • Public Safety • Public Works O&M • Wade James Theater • Yost Pool House 0) N O N 4 N O N Q 0 0 0- 0 L a 4- 0 0 WdrT� 0 U a U M E s v a yv N y.d Q C Q E 13 t c.> ca Q Packet Pg. 203 3.1.c CIP/CFP Schedule July • City staff begins development of capital budgets August • Submit proposed Capital budget to Finance • Prepare draft CFP and CIP September • Joint Presentation City Council/Planning Board (September 19tn) • Planning Board Public Hearing (September 27tn) October • City Council Public Hearing (October 3rd) • City Council Discussion (October 17th) • City Council Discussion/Approval (October 24tn) November • Adopt CFP w/ Budget into the Comprehensive Plan (November 21st) N O N 4 N O N y O O_ O L a O c O CU N d a O M w a U a LL U Packet Pg. 204 3.1.c Questions rr Q Packet Pg. 205