Bond Worksheet-Approved (2)Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201E
LV King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: GRE Edmonds, LLC Date: 11/7/2019
Location: 23400 Highway 99, Edmonds, WA 98026
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
�Dw •i'G.. 6 ►, q 57J 36q x 120 70
kLL : 6 A, I (_*q , 91q
Page 1 of 9
234_King County BQW Spreadsheet-1 91025
Project No.:
Activity No.:
App #bId20181622
Building Permit
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from IRS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
I,-lg8,'7A-SO 6oN[� l
----___
F� I � �09 • �D In�sP
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11 /12/2019
Site
Improvement
Bond Quantity
Worksheet
S15 Web date: 04/03/2011
Unit
# of
Reference #
Price
Unit
Quantity Applications
Cost
EROSInNISEDIMENT CONTROL
Number
Sack#ill & compaction -embankment
ESC-1
$
6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$
80.00
Each
5
1
400
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$
95.00
CY
Ditching
ESC-4
$
9.00
CY
Excavation -bulk
ESC-5
$
2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$
1.50
LF
657
1
986
Fence, Temporary (NGPE)
ESC-7
$
1.50
LF
600
1
900
Hydroseading
ESC-8
SWDM 5.4.2.4
$
0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$
3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$
2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$
2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$
12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$
14.00
LF
70
1
980
Piping, temporary, CPP, 12"
ESC-14
$
18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$
4.00
SY
0
0
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$
45.00
CY
Rock Construction Entrance, 50'x15'x1
ESC-17
SWDM 5.4.4.1
$
1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$
3,200.00
Each
2
1
6400
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$
2,200.00
Each
1
1
2200
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$
19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$
70.00
LF
4
3
840
Seeding, by hand
ESC-22
SWDM 5.4.2.4
$
1.00
SY
Sodding, 1" deep, level ground
ESC-23
SWDM 5.4.2.5
$
8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$
10.00
SY
TESC Supervisor
ESC-25
Each
1
1
18000
Water truck, dust control
E•SC-26
SWDM 5.4.7
$
140.00
HR
WRITE -IN -ITEMS ****.(see a e 9
Temporary Settling Tank
Each
1
1
20000
Temporary Interceptor Swale
$
15.00
LF
535
1
8025
Temporary Stabilized Construction Road
$
15.00
SY
170
1
2550
Wheel Wash
$
2,500.00
Each
1
1
2500
Inlet Protection
$
250.00
Each
3
1
750
Temporary Shoring
$ 833,600.00
Each
1
1
833600
ESC SUBTOTAL:
$ 898,130.50
30%
CONTINGENCY & MOBILIZATION:
$ 269,439.15
ESC TOTAL:
$ 1,167,569.66
Page 2 of 9
COLUMN:
A
Unit
prices updated: 3/2/2015
Version: 3/2/2015
234_King County BQW Spreadsheet 191025
Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet Web date; 04/03/2015
Existing
Future Public
Private
Right -of -Way
Right of Way
Improvements
&
Drainage Facilities
Unit Price Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1 $ 6.00 CY
Backfill & Compacdon- trench
GI - 2 $ 9.00 CY
Clear/Remove Brush, by hand
GI - 3 $ 1.00 SY
Clearing/Grubbing/Tree Removal
GI-4 $ 10,000.00 Acre
1.27
Excavation - bulk
GI - 5 $ 2.00 CY
22850
12,700.00
Excavation -Trench
GI - 6 $ 5.00 CY
45,700.00
Fencing, cedar, 6' high
GI - 7 $ 20.00 LF
Fencing, chain link, vinyl coated, 6' high
GI - 8 $ 20.00 LF
1100
Fencing, chain link, gate, vinyl coated, 20'
GI-9 $ 1,400.00 Each
22,000.00
Fencing, split rail, Thigh
GI - 10 $ 15.00 LF
2
2,800.00
Fill & compact - common barrow
GI - 11 $ 25.00 CY
50
Fill & compact - gravel base
GI - 12 $ 27.00 CY
11260,00
Fill & compact - screened topsoil
GI - 13 $ 39.00 CY
Gabion, 12" deep, stone filled mesh
GI - 14 $ 65.00 SY
Gabion, 18" deep, stone filled mesh
GI - 15 $ 90.00 SY
Gabion, 36" deep, stone filled mesh
GI - 16 $ 150.00 SY
Grading, fine, by hand
GI - 17 $ 2.50 SY
Grading, fine, with grader
GI - 18 $ 2.00 SY
Monuments, 3' long
GI - 19 $ 250.00 Each
Sensitive Areas Sign
GI - 20 $ 7.00 Each
Sodding, 1" deep, sloped ground
GI - 21 $ 8.00 SY
SurvemAn , line & grade
GI - 22 $ 850.00 Day
Surve ing, lot location/lines
GI - 23 $ 1,800.00 Acre
Traffic control crew { 2 flaggers ]
GI - 24 $ 120.00 HR
1080
129,600.00
Trail, 4" chipped wood
GI - 25 $ 8.00 SY
Trail, 4" crushed cinder
GI - 26 $ 9.00 SY
Trail, 4" top course
GI - 27 $ 12.00 SY
Wail, retaining, concrete
GI - 28 $ 55.00 SF
100
Wall, rockery
GI - 29 $ 15.00 1 SF
5,500.00
Page 3 of 9
SUBTOTAL
129.600.00
89.950.00
*KCC 27A authorizes only one bond reduction. Unit prices updated: 03/02/2015Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
ROAD IMPROVEMENT
No.
Unit Price
Unit
Existing
Right-of-way
Quant. Cost
Future Public
Right of Way
& Drainage Facilities
Quant. Cost
Private
Improvements
Quant. Cost
AC Grinding, 4' wide machine < 1000sy
RI-1
$ 30.00
SY
35
1,050.00
AC Grinding, 4' wide machine 1000-2000sy
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
65
2,275.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
180
2,250.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
180
3,240.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
300
555.00
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
210
Shoulder. AC, ( see AC road unit price j
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
140
5,320.00
Sidewalk, 4" thick, demolition and disposal
RI - 18
$ 32.00
SY
98
3,136.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
540
22,140.00
Sidewalk, 5" thick, demolition and disposal
RI - 20
$ 40.00
SY
217
8,680.00
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
65
32.50
Page 4 of 9
SUBTOTAL
48,678.50
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing
Future Public Private
Right-of-way
Right of Way Improvements
& Drainage Facilities
Unit Price
Unit
Quant. Cost
Quant. Cost Quant. Cost
ROAD SURFACING
No,
K' Rock = 2.5 base & 1.5" top
course 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$
3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$
14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$
18.00
SY
40 720.00
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$
28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 SY
RS - 5
$
21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY
RS - 6
$
42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SY
RS - 7
$
35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$
33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$
30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$
20.00
SY
70 1,400.00
Gravel Road, 4" rock, First 2500 SY
RS - 13
$
15.00
SY
Gravel Road, 4" rock, Qty, over 2500 SY
RS - 14
$
10.00
SY
PCC Road (Add Under Write -Ins w/Design)
RS - 15
Thickened Edge
RS - 17
$
8.60
LF
Page 5 of 9
SUBTOTAL
2,120.00
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing
Future Public
Private
Right-of-way
Right of Way
Improvements
& Drainage Facilities
Unit Price
Unit
Quant. Cost
QuanLi Cost
Quant.
Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent)
For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
$S
21.00
Sy
Bollards - fixed
D - 2
$
240.74
Each
Bollards - removable
D - 3
$
452.34
Each
* (CBs include frame and lid)
CB Type I
D - 4
$
1.500.00
Each
1 1,500.00
51
7,500.00
CB Type IL
D - 5
$
1,750.00
Each
CB Type II, 48" diameter
D - 6
$
2,300.00
Each
1 00 4
2
4,600.00
for additional depth over 4'
D - 7
$
480.00
FT
10
4,800.00
CB Type II, 54" diameter
D - 8
$
2,500.00
Each
for additional depth over 4'
D - 9
$
495.00
FT
CB Type II, 60" diameter
D - 10
$
2,800.00
Each
for additional depth over 4'
D - 11
$
600.00
FT
CB Type ll, 72" diameter
D - 12
$
3,600.00
Each
for additional depth over 4'
D - 13
$
850.00
FT
'Through -curb Inlet Framework (Add)
D - 14
$
400.00
Each
Cleanout, PVC, 4"
D - 15
$
150.00
Each
12
1,800.00
Cleanout, PVC, 6"
D - 16
$
170.00
Each
1
170.00
Cleanout, PVC, 8"
D - 17
$
200.00
Each
Culvert, PVC, 4"
D - 18
$
10.00
LF
1745
17,450.00
Culvert, PVC, 6"
D - 19
$
13.00
LF
20
260.00
Culvert, PVC, 8"
D - 20
$
15.00
LF
29
435.00
Culvert, PVC, 12"
D - 21
$
23.00
LF
6
138.00
Culvert, CMP, 8"
D - 22
$
19.00
LF
Culvert, CMP, 12"
D - 23
$
29.00
LF
Culvert, CMP, 15"
D - 24
$
35.00
LF
Culvert, CMP, 18"
D - 25
$
41.00
LF
Culvert, CMP, 24"
D - 26
$
56.00
LF
Culvert, CMP, 30"
D - 27
$
78.00
LF
Culvert, CMP, 36"
D - 28
$
130.00
LF
Culvert, CMP, 48"
D - 29
$
190.00
LF
Culvert, CMP, 60"
D - 30
$
270.00
LF
Culvert, CMP, 72"
D - 31
$
350.00
LF
Page 6 of 9
SUBTOTAL
1(Pna 6
37,153.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
No.
Unit Price
Unit
Existing
Right-of-way
Quant. Cost
Future Public
Right of Way
& Drainage Facilities
Quant. Cost
Private
Improvements
Quant. Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
,Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
-Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Joe Taflin Date: 11/7/2019
PE Registration Number: 41871 Tel. #: 425.458.7900
Firm Name: Navix Engineering
Address: 11235 SE 8th Street, Suite 150; Bellevue, WA 98004 Project No: App #bId20181622
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
(A)
(B)
(C)
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
$ 1,167,569.7 SUBSTANTIAL COMPLETION***
$ .2601 IT6S .?.W34B f
(D) $ 1 Z27_.2 ..2r
(A+B) $ 1g5J 1�, 17
(T) $1� 9g z.rs7"I
Minimum Is $2000.
T x 0.30 $ 6461256.1
Minimum is $2000.
(B+C) x
0.25 = $ 64,837. U.
Minimum is $2000.
Date:
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*`* NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kin count . o"! ermits Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
SUBTOTAL aLAJ% 15 32}pgg Al-XII I2.0
SUBTOTAL (SUM ALL PAGES): o�o�ai ,�3Q18gAed.-w
7 -
30% CONTINGENCY & MOBILIZATION: lo(I, 8toz 5gr84T55
GRAND TOTAL: p�i7 �7 5 251),-948:75,
COLUMN: B
Page 8 of 9
C
54 $ a a 3 5r
1 U.,&3'1'm
1 �Ig 7
D
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
234_King County BQW Spreadsheet_191025 Report Date: 11/12/2019