REV2 APPROVED BLD BLD2018-1622 GRE - EOR AcceptanceCary Kopczynski & Company
10500 NE 8th Street, Ste 800
Bellevue, WA 98004-4351
Phone: (425) 455-2144
www.ckcps.com
To: Studio Meng Strazzara
2001 Western Ave., Suite 200
Seattle, WA 98121
Phone: (206) 587-3797
via: Email
LETTER OF TRANSMITTAL
Date: 07-17-20
Job Number: 1853
Attention: Lucas Branham
Regarding: Edmonds Highway 99 Apartments
Copies I Description
1 CKC Plan Check Comments - WC3 dated 07-17-20
These are transmitted as checked below:
❑ For Approval ❑ For Review and Comment As Requested 0 For Your Use
El
Remarks:
Copy: ❑� File
❑✓ Alex Ziemba SMS
El
El
El
El
Signed: �}
Joel Kipple, PE, SE
Project Manager/Associate
If enclosures are not as noted, kindly notify us at once.
LEADERS IN BUILDABLE DESIGN
Seattle I San Francisco I Los Angeles I Chicago
5TRUCIURAL cr:C-!;v�LK.
July 17, 2020
Leif Bjorback
City of Edmonds
121 5th Ave. N
Edmonds, WA 98020
RE: Hwy 99 Edmonds Project; Plan Check Comments — WC3;
Edmonds, WA
Dear Leif:
Cary Kopczynski & Company
10500 NE 8th Street, Ste 800
Bellevue, WA 98004-4351
Phone (425) 455-2144
www.ckcps.com
PLAN REVIEW ACCEPTANCE
FOR COMPLIANCE WITH THE APPLICABLE
CONSTRUCTION CODES IDENTIFIED BELOW.
❑ BUILDING ® STRUCTURAL
❑ MECHANICAL ❑ PLUMBING
❑ ELECTRICAL ❑ ENERGY
❑ ACCESSIBILITY ❑ FIRE
PLAN REVIEW ACCEPTANCE OF DOCUMENTS
DOES NOT AUTHORIZE CONSTRUCTION TO
PROCEED IN VIOLATION OF ANY FEDERAL,
STATE, OR LOCAL REGULATIONS.
BY: DATE:07/30/2020
WEST COAS CODE CONSULTANTS, INC.
This letter is in response to the structural comments provided by you in the letter dated July 13, 2020. The
numbering of the responses below corresponds to the numbering in the correction notice letter.
S1 Please have the structural engineer of record review the submittal for conformance to the design
criteria and to verify any loading to the structure.
CKC Response: CKC has reviewed the submitted drawings for this project, and takes no
exception. The design loads are structurally acceptable, and the designs conform with
the design criteria and shell structure provided by CKC.
If you have any further questions, please feel free to contact me.
Sincerely,
Joel Ki ple, PE, SE
Associate / Project Manager
LEADERS IN BUILDABLE DESIGN
S e a t t l e I San F r a n c i s c o I L o s A n g e I e s I C h i c a g o