Loading...
REV7 APPROVED BLD2021-0846+Applicant_Response+4.5.2022_1.14.45_PM+2782889StUdIC,MENG STRAZZARA ARCHITECTURE PLANNING CONSULTING April 04, 2022 Leif Bjorback Building Official City of Edmonds Development Services Department 121 5th Ave N Edmonds, WA 98020 23400 Highway 99 — Post -Permit Revisions Original Building Permit: BLD2018-1622 Post -Permit Revisions: BLD2021-0846 Dear Mr. Bjorback: I r,1 REVISION Apr 05 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2018-1622 REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION Eriri Ca.vter BUILDING OFFICIAL Apr 25 2022 APPROVED DATE During the course of construction for the 23400 Highway 99 project, a small series changes to the approved building permit documents have taken place. These changes have been communicated with the City of Edmonds previously to either the building or planning department. This letter serves as an overview of the changes in the post -permit revision. 1. Removal of Door ST-13102 a. The building permit plans show a door separating the Stair B exit stairway and the exit passageway at the level of exit discharge. Per IBC 2015 Section 1023.3.1 Exception 2, "Separation between an interior exit stairway or ramp and the exit passageway extension shall not be required where there are no opening into the exit passageway extension". The exit passageway that connects to Stair B does not contain openings from any other spaces. Therefore, the Exception 2 noted above can be applied to this situation and Door ST-B102 is not required. Please see A312. 2. Revision to Transformer Vault Room Location a. After the building permit was issued Snohomish County Public Utility District directed the location of the transformer vault room to shift to allow required clearances from the north property line. The vault room shifted south approximately 10'-6". Please see A100. 3. Removal of Garage Door 200A a. The exterior garage door 200A, which separated the guest parking area from the exterior, was removed. Garage door 200E remains to provide secure residential parking. Please see A113 and A600. TEL 206 587 3797 FAX 206 587 0588 2001 WESTERN AVE, SUITE 200 SEATTLE, WA, USA 98121 www.studioms.com StUd IOMENG STRAZZARA Removal of corner balcony and corresponding revision to exterior wall of Unit D7 a. The balcony revisions were reviewed with the planning department. At the Unit D7, the balcony was removed and exterior framing revised to comply with land use code. Please see A102 for typical stacking condition at Unit D7. Revision of Roof Assembly Detail at 2-hr fire -wall a. The roof -to -wall assembly detail at the 2-hr fire -wall showed continuous fire -retardant - treated plywood per 2015 IBC 706.6 Exception 4.3 in the approved building permit plans. 2015 IBC 706.6 Vertical Continuity Exception 4.3 also allows for the roof to be protected with "5/8" Type X gypsum board directly beneath the underside of the roof sheathing, supported by minimum 2 in. ledgers." Detail 1/A804 was revised to reflect the allowable use of Type X gypsum board in lieu of fire -retardant -treated plywood. Please see 1/A804. Revision of Floor Assembly Detail at 2-hr fire -wall a. The approved building permit plans included a code modification request to allow fire - retardant -treated plywood to continue through the 2-hr fire -wall at the floor levels in order to maintain structural continuity of the floor diaphragm. The code modification request utilized 706.6 Exception 4.3 for the assembly detail at floors. The revised assembly utilizes the alternate use of 5/8" Type X gypsum board which is allowed to accommodate the fire -protection at the floor level. Detail 6/A804 shows the revised condition at the intersection of the 2-hr firewall section at the floor. Please see 6/A804. Respectfully, Lucas Branham, AIA Project Manager