Loading...
BLD2018-1622 Approved Hwy 99 Edmonds - Transportation StudyTENW Transportation Engineering Northwest MEMORANDUM DATE: January 30, 2019 TO: Bertrand Hauss, PE, Transportation Engineer City of Edmond CC: Lucas Branham, Studio Meng Strazzara, Inc. OTED E 1ING FROM: Michael J. Read, PE, Principal TENW SUBJEC: 23326 Highway 99 Apartments - Traffic Impact Study TENW Project No. 3686 This memorandum summarizes the results of a traffic impact study for the proposed 23326 Highwoy 99Apc#menfs development, a proposed 192-unit apartment building in Edmonds, WA. The project proposes to provide all vehicular access via a driveway onto 2341h Street SW. This study provides a project description, overviews existing transportation conditions Project Descrllp�ion The proposed 192-unit apartment building known as 23326 Highwoy 99 Apcdments development is located at 23326 Highway 99 at the northwest quadrant of the SIR 99 and 234th Street SW Street intersection in Edmonds, WA. Site access would be provided via one new site driveway onto 234th Street SW, approximately 75 feet west of SIR 99, serving a 254-5tall parking garage. The proposed development is anticipated for completion by 202 1 . A project site vicinity map is provided in Figure I , and a project site plan is illustrated as Figure 2. The project site is located in a General Commercial zone (CG zone) within the City of Edmonds. Existing Transportation Conditions This section includes an inventory of existing roadway conditions, existing peak hour traffic volumes, intersection levels of service, nonmotorized facilities and public transportation services, and planned transportation improvements. Roadway Conditions The following paragraphs describe existing roadway conditions affecting site access, including number of lanes, shoulder types and widths and posted speed limits. Transportation Planning I Design I Traffic Impact & Operations RECEF./-I-k PO Box 65254, Edmonds, WA 98155 1 office (206) 361-7333 FEB 0 7 2019 BUILDING This document was created by an application that isn't licensed to use novaPQF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments 99 228th St Sw 230th St Sw Project Site 234th St SW 3: a) 236th St SW 238th St Sw 99 IN dt.) T E N W Figure 1 :23326 HighwW 99 Apartn-hents Project Site Vicinity Edmonds, WA %OTENW January 30, 2019 Page 2 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. dU'3Nn Auj3:iow N D 0 0 CL I Traffic Impact Study 23326 Highway 99 Apartments R. Its 7-- log 234th Street SW (Not to Scale) TENW Figure 2 23326 Highway 9S Apadn-�eents Project Site Plan Edmonds, WA VTENW January 30, 2019 Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments SIR 99 is a six7lane urban principal arterial with curbs, gutters and sidewalks on both Sides of the street with a two-way, center left -turning lane. Adjacent to the project site, the curb -to -curb pavement width is approximately 84 feet. The speed limit is posted at 45 mph. 228th Street SW is a two-lane minor arterial with curbs, gutters, sidewalks and 4- to 5-foot bicycle lanes in the vicinity of SIR 99. Along other parts of the roadway, 228th Street SW consists of 4 curbs, gutters, sidewalks, 0- to 6-foot paved shoulders, 0- to 6-foot gravel or grass shoulders, parking and/or ditches. Travel lanes are approximately 10 to 11 feet. The posted speed limit is 25 mph. 234,h Street SW is a two-lane local roadway with parking along various sections of the roadway. Adjacent to the project site, the roadway consists of approximate I I -foot travel lanes with I - to 3- foot paved shoulders on both sides of the street and open ditches on the north side of the street. The speed limit is posted at 25 mph. 2381h Street SW is a two-lane minor arterial with curbs, gutters, sidewalks with I 0-foot paved shoulders where parking is provided and 2- to 8-foot gravel or gross shoulders. The total pavement width is approximately 29 feet. The posted speed limit is 30 mph. 841h Avenue W is a two-lane collector roadway with I- to 4-foot paved Shoulders and I- to 9-foot gravel or grass shoulders. Travel lanes are approximately 10 to I I feet. The speed limit is posted at 25 mph. Existing Peak Hour Traffic Volumes Peak hour traffic volumes represent the highest hourly volume of vehicles passing through an intersection during a typical 4-6 PM weekday peak period. Peak period turning movement counts during the PM peak hour was conducted in January 2018 by 101ax Datc Solutions and TENW. Figure 3 summarizes existing PM peak period turning movements at the study intersections. Traffic counts are provided in Attachment A. Existing Intersection Levels of Service Intersection levels of service (LOS) analyses were conducted at the study intersections during the weekday PM peak hour of 2017 existing conditions. LOS refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale -from -A to F generally describes-LOS-. At signalized intersections, LOS A represents free -flow conditions -motorists experience little or no delays, and LOS F represents forced -flow conditions -motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported for signalized intersections represents the average control delay per vehicle entering the intersection. The LOS reported at stop -controlled intersections is also based on the average control delay (sec/veh) and is reported for each movement. Therefore, the reported LOS at unsignalized intersections does not represent a measure of the overall operations of the intersection. VTENW January 30, 2019 Page 4 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments January 30, 2019 %OTENW Page 5 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments LOS calculations for both signalized and stop -controlled intersections were calculated using the methodologies and procedures outlined in the 2010 Highway Cqpcci�l Manual �HCM), Special Report 209, Transportation Research Board (TRB). Table I outlines the LOS criteria for signalized and unsignalized intersections based on these methodologies. The City of Edmonds level of service standards are LOS E or better on SIR 99 north of SIR 104, LOS D or better on all arterials streets (except state routes) and LOS C or better on all collector streets. It should be noted that WSDOT has established a LOS E standard on SIR 99. PM peak hour LOS analyses are summarized in Table 2. As shown, signalized intersections and stop -controlled movements at unsignalized intersections currently operate at LOS C or better under existing conditions during the PM peak hour. Detailed LOS summary worksheets are included in Attachment B. Table I Level of Service Criteria for Intersections Signalized Intersection Unsignolized Intersection Level of Seivice Average Delay Ronge (sec) Delay Range (sec) A !� 10 !� 10 B > 10 to!� 20 > 10to!� 15 C > 20 to!� 35 > 15 to:!g 25 D > 35 to!� 55 > 25 to:5 35 E > 55 to:� 80 > 35 to:5 50 F > 80 > 50 Source: "Highway Capacity Manual", Special Report 209, Transportation Research Board, 2010. Table 2 2018 Existing PM Peak Intersection Levels of Service Study Intersection LOS Delay (sec) WC Ratio Sionalized Intersections # 1. SIR 99 / 228th Street SW B 16.4 0.81 #3. SR 99 / 238th Street SW B 12.3 0.66 Stop Controlled Intersections #2. SIR 99 / 234th Street SW EB Stop C 16.4 0.07 WB Stop C 21.0 0.08 NB Left Yield B 10.9 0.03 SB Left Yield B 14.2 0.06 #4. 84t' Ave W / 234th Street SW WB Stop B 10.9 0.05 SB Left Yield A 8.0 0.01 Source: TENW. Results based on Synchro 8 Traffic Signal Coordination Software and HCS20 IQ results using HCM 2010 control delays (seconds] and LOS. %0TENW January 30, 2019 Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments Nonmotorized Facilities and Public Transportation Services Raised adequate sidewalks are provided along SR 99. There is a Community Transit stop serving bus route 10 1 along the property frontage of SR 99 just north of 234th Street SW. Community Transit Route 10 1 provides daily service from the Mariner Park & Ride in Everett, along SR 99 to the Aurora Village Transit Center in Shoreline. Weekday service leaves the SR 99 and I 96th Street SW bus stop at about 5:35 AM to 8:40 AM and leaves the Aurora Village Transit Center from about 5:05 AM to 8:05 AM with approximate 30-minute heodways (time between consecutive arrivals). Saturday service is provided from about 6:00 AM to 1:25 PM and Sunday service is provided from about 7:00 AM to 1:35 PM depending upon the bus stop location with I - hour headways. Planned Transportation Improvements The following planned transportation improvements were identified based on the City of Edmonds 2018-2023 Ccpitcl Improvement Program: > Highway 99 at 2341h Street SW Intersection Improvements. The installation of a traffic signal is proposed at this intersection. The total project cost is estimated at $3,300,000 with funding allocated for the project from 2021 to 2023. January 30, 2019 %OTENW Page 7 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments Traffic Impact Analysis The following section describes projected future baseline traffic growth, new trips generated by the proposed development, distribution and assignment of new project trips, intersection level of service impacts, site access, safety and circulation issues, parking demand impacts, and identification of transportation mitigation to offset impacts. 2021 Baseline Traffic Volumes For the purpose of the traffic analysis, year 2021 was selected as the build -out year based upon anticipated completion of 23326 Highway 99 Apa#ments. Existing traffic volumes from 2018 were factored by 2 percent per year to estimate 2021 PM peak hour baseline traffic volumes (forecasts are provided in Attachment Q. Project Trip Generation Published trip rate equations compiled by the Institute of Transportation Engineers (ITE) Tl-ip Generclion, /& L'clition, 2017, were used to estimate daily, a.m. peak and p.m. peak hour traffic that would be generated by the proposed development assuming new Mid -Rise Multifamily Housing (ITE Land Use Code 22 1). For the traffic analysis I 92-units were assumed. As shown in Table 4, an estimated increase of approximately 1,044 daily, 65 a.m. peak hour (17 entering and 48 exiting), and 83 p.m. peak hour vehicular trips (50 entering and 33 exiting) would be generated at full build -out of the project. A detailed summary of trip generation calculations is provided in Attachment D using the web -based ITE trip generation application. Per ITE guidelines, fifted curve equations were applied where appropriate. Table 4 23326 Highway 99 Apartments - Trip Generation Summary Time Pedod In Out TOM Weekday AM Peak Hour 17 48 65 Weekday PM Peak Hour 50 33 83 Weekday Daily 522 522 1,044 Source: Trip Generation Manual, I 01h Edition, ITE, 2017 Trip Distribution To distribute trips onto the vicinity -street and the arterial network, trip distribution patterns were determined based on review of existing travel patterns, and the relative distribution of schools, employment centers, and commercial areas in the vicinity. Generally, average distribution and assignment of project trips was assumed as (distribution and PM peak hour trip assignment are illustrated in Figure 4): > 30 percent north via SIR 99; > 50 percent south via SIR 99; and > 20 percent west via 234,h Street SW. %PTENW January 30, 2019 Page 8 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments 99 228th St Sw 230th St Sw 15 10 > < 234th St Sw 10-9. W 16 25 236th St Sw 99 CO J 238th St Sw ga:,�� (IN of to Sc Figure 4 22326 Hwy 99 "'G'TENW 0- PM Peak Hour Project Tri P Ap,rtments Distribution and Assignment Edmonds, WA TraffiC IMPOCt StUdY J VTENW January 30, 2019 Page 9 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments Intersection Level of Service Impacts Estimated project intersection LOS impacts during the PM peak hour in 2021 with and without the project are summarized in Table 5. Future PM peak hour traffic volumes in 202 1 are shown in Figure 5. As shown, all study intersections or stop -controlled or yield movements at unsignalized intersections would operate at LOS C or better during the PM peak hour in 2021. Detailed LOS summary worksheets for future 2021 conditions with and without the project are included in Attachment B. Table 5 also summarizes traffic operational impacts during the AM peak hour at key study intersections along SIR 99 at the request of the City of Edmonds. As shown, all signalized intersections and stop controlled approaches operate at LOS C or better with the project in 2021. Traffic counts, traffic forecasts, and level of service summary sheets at these intersections during the AM peak hour are provided in Attachment F. Table 5 2021 Intersection Level of Service Peak Hour Impacts AM Peak Hour Without Uglect AM Peak Hour With Project Delay V/C Delay V/C Sionalized intersections I # 1. SR 99 / 228th Street SW c 20.1 0.80 c 20.1 0.81 #3. SIR 99 / 238th Street SW c 20.2 0.75 C 20.3 0.75 StoQ Controlled Intersections #2. SIR 99 / 2341h Street SW EB Stop B 13.6 0.03 c 23.9 0.17 WB Stop B 13.1 0.02 B 13.9 0.03 NB Left Yield B 13.4 0.00 B 13.6 0.03 SB Left Yield A 8.8 0.00 A 8.8 0.00 PM Peak Hour Without Protect PM Peak Hour With Project Delay V/c Delay V/c Study Intersection LOS _ (sec) Ratio LOS (sec) Ratio Sionalized Intersections #1. SIR 99 / 2281h Street SW B 17.8 0.86 #3. SR 99 / 238th Street SW B 13.2 0.71 Stop Controlled Intersections B 17.9 0.86 B 13.4 0.73 #2. SR 99 / 2341h Street SW EB Stop c 17.6 0.09 c 19.3 0.18 WB Stop c 20.1 0.08 c 22.1 0.08 NB Left Yield B 11.3 0.08 B 11.7 0.08 SB Left Yield B 11.7 0.08 B 14.6 0.07 #4. 84th Ave W / 234th Street SW WB Stop B 11.1 0.05 B 11.4 0.06 SB Left Yield A 8.1 0.01 A 8.1 0.01 #5. 234th St SW / Site Driveway EB Left Yield A 2.0 0.01 SB Stop A 9.2 0.04 Source: TENW. Results based on Synchro 8 Traffic Signal coordination Software and HCS20 10 results using HCM 2010 control delays (seconds) and LOS. UTENW January 30, 2019 W_ Page 10 This document was created by an application that isn't licensed to use novaPQF. Purchase a license to generate PDF files without this notice. 99 228th St Sw 84th Ave W 1234th St SW (I G) 149 5 '0— 22 (25J � � Ar- 6 (101 0 I Project 341 16 Site Traffic Impact Study 23326 Highway 99 Apartments SIR 99 1 28th St SW (8341 16 90 819 1 134 86 48 —0( t 72 --W 49 (1 1171 90 1 1 27 SIR 99 34 234th St Sw th St SW V-- 14 (37) 22 1,114 28 -4--0 r- 6 2 -14 r, Q S�v t (20)10 --4 0-0. 21 1,721 14 236th St Sw (33) 17 --Ikk (471 99 SIR 99 / 238th St SW (894) 238th St Sw 102 878 38 -4*-- 44 p,— 66 93 110 42 340 17 (;:3661 65--A 1 �,, r (Not to V ol�-) F . re 5 22326 Hwy 99 119 T E NW 2021 PV'Peak Hour Apartments Edmonds, WA Traffic Volume Impacts Traffic Impact Study 'PTENW January 30, 2019 Page 11 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments Parking Demand Analysis A parking impact analysis was conducted to evaluate the supply/demand generated by the proposed project. The parking impact analysis reviewed: > City of Edmonds parking requirements. > Parking demand of proposed residential development using ITE rates. City of Edmonds Parking Requirements Based upon the City of Edmonds parking standards (Edmonds Municipal Code, Section 16.60.030 (13)(1) Parking Requirements), Table 6 summarizes minimum off-street parking stalls required for residential uses. As shown, the City of Edmonds would require 174 off-street parking stalls. As the project proposes 254 stalls, it would exceed City minimum standards by 80 stalls. Table 6 23326 Highway 99 Apartments Parking Requirements Minimum Off -Street Parking Parking Component Requirements' Ske Total Residential < 700 SF = 0.75 per dwelling unit 152 Units 114 > 700 SF & < 1,100 SF = 40 Units 50 Residential 1.25 per dwelling unit Residential 1:20 for Guest Parking 192 Units 10 Total Minimum Off -Street Parking Supply Requirement 174 1 - Per City of Edmonds Municipal Code, Section 16.60.030 [B) (1) Parking Requirements. Project Parking Demand For the project, the Institute of Transportation Engineers 11cl-king Generation, 41� Edition, 2010, and transit availability were all considered to determine parking demand for the proposed 23326 Highway 99 Apaltments development. Based upon Land Use Code 221 for Low/Mid-Rise Apartment, Suburban, direct application of published rates in llorking Generation, 41h Folition, estimate the peak development parking demand at a total of 181 parking stalls (see Table 7). Due to the close proximity of a transit stop on the property frontage of SIR 99, a 10 percent reduction in parking demand for transit availability is expected. As such, on -site parking demand generated by the project is expected to be 163 peak stalls with transit adjustments. VTENW January 30, 2019 Page 12 This document was created by an application that isn't licensed to use novaPQF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments Table 7 23326 Highway 99 Apartments Off -Street Parking Demand Peak Parking Demand Component Rate or Adjustment Demand Low/Mid-Rise Apartment, Suburban Stalls = 0.92 + 4 stalls 181 (ITE LUC 221)1 per unit Total Parking Demand Using ITE Rates (Without discounts) 181 Transit Service 10% reduction in transit -18 Total Parking Demand With Adjustment 163 1 - Parldng Generation Manual, 41h Edition, ITE, 2010 and does not discount for vehicle availability factors. Site Access and Safety Issues One new site driveway for the project is proposed onto 234th Street SW, approximately 75 feet west of SR 99, meeting the minimum City intersection off -set standards. The project site driveway should be a minimum of 24 feet wide for two-way traffic. The proposed project would reconstruct frontage improvements along SR 99 and construct frontage improvements 234,h Street SW that would fully integrate with the existing non -motorized facilities along these street systems, such as new curbs, gutters, 7- to I 0-foot sidewalks, 5-foot wide streetscape zone between the travel lone and sidewalk, and sidewalk or driveway romps to meet City standards and comply with ADA requirements. The travel lone should also be widened to 12 feet on 234,h Street SW from painted centerline to face of curb. The existing bus stop on the SIR 99 property frontage would be required to meet Community Transit bus stop requirements. Field work was conducted by TENW at the site driveway onto 234th Street SW in February 201 B. The minimum stopping sight distance is 250 feet and entering sight distance is 390 feet on a 35 mph design speed (25 mph posted speed) based on guidelines set forth by the American Association of State and Highway Transportation Officials (AASHTO's) A Policy on Geometric Design of Highway and Streets (commonly referred to as the "Green Book"). Driver entering sight distance is greater than 500 feet to the west and roughly 400 feet to the east of the project site driveway onto 234th Street SW. Therefore, egress at the project site driveway onto 234th Street SW meet minimum sight distance requirements. Stop controlled movements from the project site driveway onto 234,h Street SW would operate at LOS A with queues of 1 vehicle or less during the PM peak hour with the project in 2021. Therefore, there are no level of service or queuing impacts at the project site driveway onto 234th Street SW expected. 60TENW January 30, 2019 Page 13 This document was created by an application that isn't licensed to use novaPQF. Purchase a license to generate PDF files without this notice. Traffic Impact Study 23326 Highway 99 Apartments Mitigation The proposed 23326 Highway 99 Apartments development would construct 193-units at 23326 Highway 99 on the northwest quadrant of the SIR 99 and 234th Street SW Street intersection in Edmonds, WA. The following mitigation measures may be required as part of the project development: > Proportional share contributions of approximately 2 percent (67 PM peak project volumes and about 3,035 with project traffic volumes in 2021) may be required with the installation of a traffic signal at Intersection #2 — SIR 99 and 234th Street SW planned by the City. it should be noted that the traffic signal installation improvement has been identified in the City of Edmonds 2018-2023 CapildlImprovement Program. > The project site driveway should be a minimum of 24 feet wide for two-way traffic > The proposed project would reconstruct frontage improvements along SIR 99 and construct frontage improvements 234,h Street SW that would fully integrate with the existing non - motorized facilities along these street systems, such as new curbs, gutters, 7- to I 0-foot sidewalks, 5-foot wide streetscape zone between the travel lone and sidewalk, and sidewalk or driveway romps to meet City standards and comply with ADA requirements. The travel lone should also be widened to 12 feet on 234,h Street SW from pointed centerline to face of curb. The existing bus stop on the SIR 99 property frontage would also be reconstructed to meet Community Transit bus stop requirements. Traffic Impact Fees At the currently proposed development of a I 92-unit apartment building, the estimated traffic impact fee would be approximately $785,733.12 based on current traffic impact fee rates (effective January I, n% . As the current City traffic impact fee program is based on outdated 1. trip generation assur io application of the trip generation estimates using the Trip Genelation Mgmal-101h Edition, 2017, applied on a "trip basis" determines a traffic impact fee of f-550,808.9 `ATo—cNm—e5PN_E9 based on 83 new p.m. peak hour trips. A detailed calculation is provided in If you have any questions regarding the information presented in this memo, please call me at �20606-1=73-3-3-x-]-O I -or m ikeread@tenw. com-. SOTENW January 30, 2019 Page 14 This document was created by an application that isn't licensed to use novaPQF. Purchase a license to generate PIDIF files without this notice. Attachment A Traffic Counts This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. T 0 (n C-) (D (D CD (D (n b C-) (0 (D (D Z3 (D (D T n (D 0 0 �� Fn (n -I -1 - 0 3' (D cn CD 0- E; -1 0 TABULAR SUMMARY OF TURNING MOVEMENT COUNTS Name: City of Edmonds Date: 1/18/2018 City: Edmonds, WA Project: IT Madison Apts Intersection of: 228th Street SW and SR 99 Street: 228th Street SW 228th Street SW SR 99 SR 99 Total Hour All Total Time East Bound West Bound North Bound South Bound Begins L T R L T R L T R L T R 3:00 PM 3:15 PM 3:30 PM 3:45 PM 0 0 4:00 PM 4:15 PM 11 251 14 201 2 2 13 11 31 3 25 2 111 212 7 222 7 19 38 202 32'. 2261 24 14 579 594 579 1173 4:30 PM 19 23 3 13 31 3 5 211 17 37' 207 15 584 17571 4:45 PM 15 29 4 Ill 25 3 7 179 19 30 203 18 543 2300 5:00 PM 7 15 2 23 29 4 13 226 21 29' 207 22 598 2319 5:15 PM 7 19. 2 13 22 2 101 2441 28; 167 18 546 2271 5:30 PM 11 22 3 21 33 4 14F2911 20 38; 1 209, 291 695� 2382 5:45 PM 1 20 121 3 24 421 5 9 2921 30 1 411 1891 161 683 2522 Peak Hour 1 451 1 811 1261 151 1 461 105—K 1 1361 7 Peak Hour Factor 2522 4 695 iTransportation Engineering Northwest MJR1 www.idaxdata.com PACIFIC HWY 234TH ST SW Ozzll N Peak Hour j L) LM < N a- " J 0 9 TEV: 25 0 PHF: 16 234TH ST S C4 1 N I- Two -Hour Count Summaries :3 C4 0 U234TH ST SW 13 2,796 4— 0 0.98 6 0 f* T_ U EB Ln Ln WB FNB SIB TOTAL Date: Thu, Jan 11, 2018 Count Period: 4:00 PM to 6:00 PM Peak Hour: 5:00 PIM to 6:00 PM HV W 7 A > L 0 4 0 0 0 7 PHIF 0.57 0.59 0.94 0.88 0.98 02 234TH ST SW 234TH ST SW PACIFIC HVVY PACIFIC HWY 15-min Rolling Interval Eastbound Westbound Northbound Southbound Tota I One Hour n Start UT LT TH RT LIT LT TH RT UT LT TH RT UT LT TH RT 4:00 PM 0 5 0 1 0 0 0 2 0 6 398 5 0 9 264 6 696 0 4:15 PM 0 6 0 4 0 0 0 4 0 5 383 2 0 6 275 4 689 0 4:30 PIV 0 3 0 2 0 2 2 1 0 3 395 1 0 3 242 5 659 0 4:45 PM 0 2 0 7 0 0 0 3 0 3 386 4 1 7 223 7 643 2,687 5:00 PM 0 2 0 0 0 3 0 2 0 6 381 5 0 6 299 6 710 2,701 5:115 PIVI 0 1 0 7 0 1 0 3 0 3 412 5 0 8 260 1 701 2,713 5;30 PM 0 5 0 6 0 2 0 6 0 8 432 2 0 8 231 10 710 2,764 5:45 PM 0 1 0 3 0 0 0 2 0 3 397 11 0 4 260 4 67S 2,796 Count Total 0 25 0 30 0 a 2 23 0 37 3,184 25 1 51 2,054 43 5,483 0 Peak Hour 1 0 9 0 16 1 0 6 0 13 1 0 20 1,622 13 1 0 26 1,050 21 2,796 0 Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) Start EB WB NB SB Total EB WB NIS SB Total East West North South Total 4:00 PM 0 0 8 2 10 0 0 0 0 0 0 1 0 0 1 4:15 PIVI 0 0 5 8 13 0 0 0 0 0 4 0 0 0 4 4:30 PM 0 0 7 5 12 0 0 0 0 0 1 0 0 0 1 4:45 PM 0 0 7 3 10 0 0 0 0 0 1 5 0 0 6 5:00 PM 0 0 8 5 13 0 0 0 0 0 4 0 0 0 4 5:15 PM 0 0 5 2 7 0 0 1 0 1 0 2 1 0 3 5:30 PM 0 0 7 4 11 0 0 0 0 0 0 1 0 0 1 5:45 PM 0 0 5 1 6 0 0 0 0 0 2 3 0 0 5 Count Total 0 0 52 30 82 0 0 1 0 1 12 12 1 0 25 Peak Hour 1 0 0 25 112 37 0 0 1 0 1 6 6 1 0 13 Mark Skaggs: (425) 250-0777 mark.skaggs@idaxdata.com This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. T 0 (n C-) (D (D CD (D (n b C-) (0 (D (D Z3 (D (D T n (D 0 0 �� Fn (n -I -1 - 0 3' (D cn CD 0- E; -1 0 TABULAR SUMMARY OF TURNING MOVEMENT COUNTS Name: City of Edmonds Date: 1/18/2018 City: Edmonds, WA Project: IT Madison Apts Intersection of: 238th Street SW and SR 99 Street: 238th Street Sw 238th Street SW SR 99 SR 99 Total Hour All Total Time East Bound West Bound North Bound South Bound Begins L T I R L T R L T R L T R 3:00 PM 0 3:15 PM 0 3:30 PM 0 3:45 PM 0 0 4:00 PM 10 161 7 12 is 3 241 212 5 5 216 21 546 546 4:15 PM 13 211 9 12 10 3 36 256 8 101 242 351 655 1201 4:30 PM 30 19 20. 19 10 2 31 239 7 11 228 32 648 1849 4:45 PM 19 31 12 13 10 4 30 292 4 10 219 29 673 2522 5:00 PM 14 23 10 15 71 7 35 251 3 12 210 27 614 2590 5:15 PM 20 33 13 10 10 3181 12 210 2 697 2632 5:30 PM 19 31 13 15 9 3261 81 6 206 22 680 2664 5:45 PM 1 17 15. 3681 31 6 201 gn 7541 2745 Peak Hour 881 1041 611 1 621 411 1 1341 12631 161 1 361 8 Peak Hour Factor 2745 4 754 iTransportation Engineering Northwest 959 MJR1 www.idaxdata.com 01 84TH AVE W kfa) 234TH ST SW 0�4 Date: Thu, Jan 11, 2018 N Peak Hour Count Period: 4:00 PM to 6:00 PM Peak Hour: 5:00 PMl to 6:00 PM W T_ CD Ln CD Lo U 234TH ST SW L > 21 TEV: 508 6 PHF: 0.92 0 0 n i f* < 3: — to C4 w HV %: PHIF T_ EB WB - 0.0% - 0.75 tD ce) F NB 1.2% 0.95 SB 2.1% 0.88 TOTAL 1.4% 0.92 Two -Hour Count Summaries 0 234TH ST SW 84TH AVE W 84TH AVE W 15-min Rolling Interval Start Eastbound Westbound Northbound Southbound Total One Hour UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT 4:00 PM 0 0 0 0 0 2 0 5 0 0 87 5 0 1 31 0 131 0 4:15 PM 0 0 0 0 0 2 0 4 0 0 71 5 0 2 37 0 121 0 4:30 PM 0 0 0 0 0 2 0 4 0 0 77 2 0 1 33 0 119 0 4:45 PM 0 0 0 0 0 0 0 7 0 0 71 4 0 0 30 0 112 483 5:00 PM 0 0 0 0 0 0 0 8 0 0 78 4 0 1 33 0 124 476 5:15 PM 0 0 0 0 0 11 0 3 0 0 80 3 0 3 27 0 117 472 5:30 PM 0 0 0 0 0 1 0 8 0 0 82 6 0 1 40 0 138 491 5:45 PM 0 0 0 0 0 4 0 _2 0 0 81 2 0 0 40 0 129 508 Count Total 0 0 0 0 0 12 0 41 0 0 627 31 0 9 271 0 991 0 Peak Hour 0 0 0 0 0 6 0 21 0 0 321 15 1 0 5 140 0 1 508 1 0 Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) Start EB WB NB SB Total EB WB NB SB otal East West North South Total 4:00 PM 0 0 4 1 5 0 0 0 2 2 0 0 0 0 0 4:15 PM 0 1 4 2 7 0 0 0 1 1 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 4:45 PM 0 0 1 1 2 0 0 0 0 0 1 0 0 0 1 5:00 PM 0 0 2 0 2 0 0 0 0 0 2 0 0 0 2 5:15 PM 0 0 1 2 3 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:45 PM 0 0 1 1 2 0 0 0 0 0 0 0 0 0 0 Count Total 0 1 13 7 21 0 0 0 4 4 3 0 0 0 3 Peak Hr 1 0 0 4 3 7 0 0 0 0 0 2 0 0 0 2 Mark Skaggs: (425) 250-0777 mark.skaggs@idaxdata.com This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Attachment B Intersection Level of Service Summary Sheets This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 02/24/2018 --* --I. --v f- *- 'I,- A\ t -* '* 1 4.1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SOL SBT SBR Lane Configurations Vi T. Vi il� ++ r ++ Traffic Volume (vph) 45 68 10 81 126 15 46 1053 85 136 772 75 Future Volume (vph) 45 68 10 81 126 15 46 1053 85 136 772 75 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -10% 0% -3% 0% Storage Length (ft) 150 0 0 0 200 0 300 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 I.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.981 0.984 0.850 0.850 At Protected 0.950 0.950 0.950 0,950 Satcl. Flow (prot) 1858 1919 0 1770 1833 0 1796 3592 1607 1770 3539 1583 FIt Permitted 0.651 0.644 0.950 0.950 Satd. Flow (perm) 1273 1919 0 1200 1833 0 1796 3592 1607 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 11 9 151 151 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1210 950 2601 1598 Travel Time (s) 27.5 21.6 59.1 36.3 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 49 75 11 89 138 16 51 1157 93 149 848 82 Shared Lane Traffic (%) Lane Group Flow (vph) 49 86 0 89 154 0 51 1157 93 149 848 82 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 0.94 0.94 0.94 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 Detector I Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex: CI+Ex CI+Ex Detector 1 Channel Detector I Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Qu eu e (s) 0.0 0.0 0.0 00 n n n n o.n 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt NA pm+pt NA Prot NA Perm Prot NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4�O 4.0 Minimum Split (s) 8.0 20.0 8.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 JT Madison Apartments 12:00 pm 02/24/2018 2018 Existing Conditions Synchro 10 Report TENW Page I This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 02/24/2018 -,* --b, N r q*- k *\ t 1* 1,0, 4v" Lane Group EBL EBT EBR A113L WBT WBR NBL NBT NBR SBL SBT SBR Total Split (s) 8.0 20.0 8.0 20.0 10.0 27.0 27.0 10.0 27.0 27.0 Total Split (%) 12.3% 30.8% 12.3% 30.8% 15.4% 41.5% 41.5% 15.4% 41.5% 41.5% Maximum Green (s) 4.0 16.0 4.0 16.0 6.0 23.0 23.0 6.0 23.0 23.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0,5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effet Green (s) 12.1 9.3 13.0 11.2 5.9 26.5 26.5 6.0 31.7 31.7 Actuated g/C Ratio 0.21 0.16 0.22 0.19 0.10 0.46 0.46 0.10 0.55 0.55 v/c Ratio 0.16 0.27 0.29 0.43 0.28 0.71 0.11 0.81 0.44 0.09 Control Delay 15.7 21.0 17.7 23.8 29.8 19.0 1.3 63.0 13.3 0.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.7 21.0 17.7 23.8 29.8 19.0 1.3 63.0 13.3 0.8 LOS B C B C C B A E B A Approach Delay 19.1 21.5 18.2 19.2 Approach LOS B C 6 B Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 58 Natural Cycle: 65 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 18.9 Intersection LOS: B Intersection Capacity Utilization 60.9% ICU Level of Service B Analysis Period (min) 15 Solits and Phases: 1: SR 99 & 228th Street SW \*01 to? -To -Ou -4 i S I be s I R 20 S 4\ 05 06 '14 07 D8 ID 5 1 27 1i 5 1 14205 JT Madison Apartments 12:00 pm 02/24/2018 2018 Existing Conditions TENW Synchro 10 Report Page 2 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. HCM 2010 Signalized Intersection Summary 1: SIR 99 & 228th Street SW 02/24/2018 ,A ---I. N .- �*-- ',- t "Ap 4 Movement EBIL EBT EBIR WBL WBT WBR NBL NBT NBR SBIL SBT SBR Lane Configurations T+ T4 ++ r I ++ Traffic Volume (veh1h) 45 68 10 81 126 15 46 1053 85 136 772 75 Future Volume (veh/h) 45 68 10 81 126 15 46 1053 85 136 772 75 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adl(kpbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hAn 1956 1956 1995 1863 1863 1900 1891 1891 1891 1863 1863 1863 Adj Flow Rate, veh/h 49 75 11 89 138 16 51 1157 93 149 848 82 Adj No. of Lanes 1 1 0 1 1 0 1 2 1 1 2 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 262 171 25 320 202 23 72 1550 693 189 1762 788 Arrive On Green 0.04 0.10 0.10 0.06 0.12 0.12 0.04 0.43 0.43 0.11 0.50 0.50 Sat Flow, veh/h 1863 1668 245 1774 1639 190 1801 3592 1607 1774 3539 1583 Grp Volume(v), veh/h 49 0 86 89 0 154 51 1157 93 149 848 82 Grp Sat Flow(s),veh/h/In 1863 0 1913 1774 0 1829 1801 1796 1607 1774 1770 1583 Q Serve(g-s), s 1.2 0.0 2.3 2.4 0.0 4.3 1.5 14.4 1.9 4.4 8.4 1.5 Cycle Q Clear(gc), s 1.2 0.0 2.3 2.4 0.0 4.3 1.5 14.4 1.9 4.4 8.4 1.5 Prop In Lane 1.00 0.13 1,00 0.10 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 262 0 196 320 0 226 72 1550 693 189 1762 788 V/C Ratio(X) 0.19 0.00 0.44 0.28 0.00 0.68 0.71 0.75 0.13 0.79 0.48 0.10 Avail Cap(c a), veh/h 330 0 574 347 0 549 203 1550 693 200 1762 788 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(l) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), stveh 20.3 0.0 22.5 19.8 0.0 22.4 25.3 12.7 9.1 23.2 8.8 7.1 Incr Delay (d2), s/veh 0.3 0.0 1.5 0.5 0.0 3.6 12.3 3.3 0.4 18.1 0.9 0.3 Initial Q Delay(0),siveh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.7 0.0 1.3 1.2 0.0 2.4 1.0 7.8 0.9 3.1 4,2 0.7 LnGrp Delay(d),sfveh 20.6 0.0 24.0 201 0.0 26.0 37.6 16.0 9.5 41.4 9.8 7.4 LnGrp LOS C C C C D 8 A D A A Approach Vol, veh/h 135 243 1301 1079 Approach Delay, s/veh 22.8 23.9 16.4 14.0 Approach LOS C C B B 2 3 4 5 6 7 8 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 9.7 27.0 7.2 9.5 6.1 30.5 6.1 10.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 23.0 4.0 16.0 6.0 23.0 A � -t.0 4on lu.0 Max Q Clear Time (g-c+ll), s 6.4 16.4 4.4 4.3 3.5 10.4 3.2 6.3 Green Ext Time (p-c), s 0.0 3.5 0.0 0.2 0.0 3.8 0.0 0.3 Intersection Summary HCM 2010 Ctrl Delay 16.4 HCM 2010 LOS B JT Madison Apartments 12:00 pm 02/24/2018 2018 Existing Conditions Synchro 10 Report TENW Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. HCM Unsignalized Intersection Capacity Analysis 2: SIR 99 & 234th Street SW 2/27/2018 -.1 --1,. ---* k *� t 4� Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SOR Lane Configurations 4- 4- ) ++T. 1 +0 Volume (veh1h) 9 o 16 6 0 13 20 1622 13 26 1050 21 Sign Control Stop Stop Free Free Grade -15% 0% -3% 3% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 098 0.98 0.98 0.98 0.98 0.98 Hourly flow rate (vph) 9 0 16 6 0 13 20 1655 13 27 1071 21 Pedestrians 7 7 6 7 Lane W"idth (ft) 12.0 12.0 12.0 12.0 Walking Speed (fYs) 4.0 4.0 4.0 4.0 Percent Blockage 1 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 1146 pX, platoon unblocked 0.95 0.95 0.95 0.95 0.95 0.95 vC, conflicting volume 1755 2858 381 2142 2862 572 1100 1675 vC1, stage 1 conf vol 1142 1142 1710 1710 vC2, stage 2 conf vol 613 1716 433 1153 vCu, unblocked vol 1597 2764 381 2006 2768 346 1100 1513 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 13 3.5 4.0 3.3 2.2 2.2 pO queue free % 95 100 97 94 100 98 97 94 cM capacity (veh/h) 189 116 617 106 128 613 627 416 Direction, Lane # EB 1 W8 1 NB I N8 2 NB3 N134 SB 1 S132 SB 3 S84 Volume Total 26 19 20 662 662 344 27 429 429 236 Volume Left 9 6 20 0 0 0 27 0 0 0 Volume Right 16 13 0 0 0 13 0 0 0 21 cSH 340 244 627 1700 1700 1700 416 1700 1700 1700 Volume to Capacity 0.07 0.08 0.03 0.39 0.39 0.20 0.06 0.25 0.25 0.14 Queue Length 95th (ft) 6 6 3 0 0 0 5 0 0 0 Control Delay (s) 16.4 21.0 10.9 0.0 0.0 0.0 14.2 0.0 0.0 0.0 Lane LOS C C B B Approach Delay (s) 16.4 21.0 0.1 0.3 Approach LOS C C Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 43.7% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 pm 2/24/2018 2018 Existing Conditions TENW Synchro 8 Report Page 1 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 02/24/2018 ,A --* --* t 41 Lane Group EBL EST EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations -T -1� tt ?f t+ r Traffic Volume (vph) 88 104 61 62 41 17 134 1263 16 36 827 96 Future Volume (vph) 88 104 61 62 41 17 134 1263 16 36 827 96 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 250 0 0 300 0 300 0 Storage Lanes 0 1 0 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.981 0.850 0.850 At Protected 0.978 0.975 0.950 0.950 Satc. Flow (prot) 0 1822 1583 0 1782 0 1770 3539 1583 1770 3539 1583 Fit Permitted 0.812 0.669 0.950 0.950 Satc. Flow (perm) 0 1513 1583 0 1222 0 1770 3539 1583 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satc. Flow (RTOR) 164 14 91 164 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1541 1387 2465 1146 Travel Time (s) 35.0 31.5 56.0 26.0 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 97 114 67 68 45 19 147 1388 18 40 909 105 Shared Lane Traffic Lane Group Flow (vph) 0 211 67 0 132 0 147 1388 18 40 909 105 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Rig ht Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector I Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex Cl+Ex Cl+Ex CI+Ex Cl+Ex CI+Ex CI+Ex CI+Ex CI+Ex Cl+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 n-,--+-, I ay (s) .1 1 Dcl. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 4 4 4 8 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 40 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 8.0 20.0 20.0 8.0 200 20.0 Total Split (s) 20.0 20.0 20.0 20.0 20.0 13.0 32.0 32.0 8.0 27.0 27.0 JT Madison Apartments 12:00 pm 02/24/2018 2018 Existing Conditions Synchro 10 Report TENW Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 02/24/2018 -A N 4- 4- k Lane Group EBL EBT EBR WBL WBT Wl _NBL N BT NBR SIBIL SBT SIBIR Total Split (%) 33.3% 33.3% 33.3% 33.3% 33.3% 21.7% 53.3% 53.3% 13.3% 45.0% 45.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 9.0 28.0 28.0 4.0 23.0 23.0 Yellow Time (s) 3.5 3.5 3,5 35 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead[Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 10 3.0 3.0 3.0 Recall Mode None None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5,0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Peclesbian Calls (#thr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 12.4 12.4 12.4 8.3 33.8 33.8 4,0 26.6 26.6 Actuated g/C Ratio 0.22 0.22 0.22 0.14 0.59 0.59 0.07 0.46 0.46 v/c Ratio 0.65 0.14 0.48 0.57 0.66 0.02 O�33 0.55 0.13 Control Delay 29.8 0.6 23,11 32.7 12.2 0.1 33.6 14.5 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.8 0.6 23.1 32.7 12.2 0.1 33.6 14.5 1.3 LOS C A C C B A C B A Approach Delay 22.7 23.1 14.0 13.9 Approach LOS C C B B Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 57.3 Natural Cycle: 60 Control Type: Actuated- Uncoordinated Maximum v/c Rafio: 0.66 Intersection Signal Delay: 15.2 Intersection LOS: B IntersectJon Capacity Utilization 61.5% ICU Level of Service B Analysis Period (min) 15 its and Phases: 3: SIR 99 & 238th Street SW JT Madison Apartments 12:00 pm 02/24/2018 2018 Existing Conditions Synchro 10 Report TENW Page 7 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. HCM 2010 Signalized Intersection Summary 3: SIR 99 & 238th Street SW 02/24/2018 �,# *- 4,- 4� t /01P 4� Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SEIR Lane Configurations +T 44 1 tt ?I I ++ Traffic Volume (veh1h) 88 104 61 62 41 17 134 1263 16 36 827 96 Future Volume (veh/h) 88 104 61 62 41 17 134 1263 16 36 827 96 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hAn 1900 1863 1863 1900 1863 1900 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 97 114 0 68 45 19 147 1388 18 40 909 105 Adj No. of Lanes 0 1 1 0 1 0 1 2 1 1 2 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0�91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 219 162 261 222 124 40 190 1985 888 61 1726 772 Arrive On Green 0.16 0.16 0.00 0.16 0.16 0.16 0.11 0.56 0.56 0.03 0.49 0.49 Sat Flow, veh/h 692 986 1583 687 755 242 1774 3539 1583 1774 3539 1583 Grp Volume(v), veh/h 211 0 0 132 0 0 147 1388 18 40 909 105 Grp Sat Flow(s),veh/h/in 1678 0 1583 1684 0 0 1774 1770 1583 1774 1770 1583 Q Serve(gs), s 2.5 0.0 0.0 0.0 0.0 0.0 4.0 14.1 0.3 1.1 8.8 1.8 Cycle Q Clear(g-c), s 5.8 0.0 0.0 3.3 0.0 0.0 4.0 14.1 0.3 1.1 8.8 1.8 Prop In Lane 0.46 1.00 0.52 0.14 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 382 0 261 387 0 0 190 1985 888 61 1726 772 VIC Ratio(X) 0.55 0.00 0,00 0.34 0.00 0.00 0.77 0.70 0.02 0.66 0.53 0.14 Avail Cap(ca), veh/h 627 0 507 616 0 0 320 1985 888 142 1726 772 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 10 Upstream Filter(l) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), sIveh 19.7 0.0 0.0 18.8 0.0 0.0 21.7 7.9 4.9 23.8 8.8 7.0 Incr Delay (Q), s/veh 1.3 0.0 0.0 0.5 0.0 0.0 6.5 2.1 0.0 11.6 1.2 0.4 Initial Q Delay(d3),stveh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 2.9 0.0 0.0 1.7 0.0 0.0 2.3 7.3 0.1 0.7 4.6 0.9 LnGrp Delay(d),sIveh 21.0 0.0 0.0 19.3 0.0 0.0 28.2 10.0 4.9 35.5 10.0 7.4 LnGrp LOS C B C B A D A A Approach Vol, veh/h 211 132 1553 1054 Approach Delay, s/veh 21.0 19.3 11.7 10.7 Approach LOS C B 8 B rimer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.7 32.0 12.2 9.4 28.4 12.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 4.0 28.0 16.0 9.0 23.0 Max Q Clear Time (g-c+ll), s 3.1 16.1 7.8 6.0 10.8 5.3 Green Ext Time (p-c), s 0.0 5.9 0.5 0.1 4.1 0.3 Intersection Summary HCM 2010 Ctrl Delay 12.3 HCM 2010 LOS B JT Madison Apartments 12:00 pm 02124/2018 2018 Existing Conditions Synchro 10 Report TENW Page 8 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 4: 84th Ave W & 234th Street SW 02/24/2018 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Y T1. -T Traffic Volume (vph) 6 21 321 15 5 140 Future Volume (vph) 6 21 321 15 5 140 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.896 0.994 Flt Protected 0.988 0.998 Satc. Flow (prot) 1682 0 1870 0 0 1859 At Permitted 0.988 0,998 Satc, Flow (perm) 1682 0 1870 0 0 1859 Link Speed (mph) 30 30 30 Link Distance (ft) 1780 479 2609 Travel Time (s) 40.5 10.9 59.3 Confl. Peds. (#/hr) 2 2 2 Peak Hour Factor 0.92 0.92 0.92 0.92 O�92 0.92 Heavy Vehicles 0% 0% 1 % 1 % 2% 2% Adj. Flow (vph) 7 23 349 16 5 152 Shared Lane Traffic (%) Lane Group Flow (vph) 30 0 365 0 0 157 Enter Blocked Intersection No No No No No No Lane AJignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.5% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 pm 02/24/2018 2018 Existing Conditions TENW Synchro 10 Report Page 9 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. HCM 2010 TWSC 4: 84th Ave W & 234th Street SW 02/24/2018 Intersection Int Delay, s/veh Movement 0.7 WBL WBR NBT NBIR SBL SBT Lane Configurations Y 1� 4 Traffic Vol, veh/h 6 21 321 15 5 140 Future Vol, veh/h 6 21 321 15 5 140 ConflicUng Peds, #Ihr 2 2 0 2 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None None Storage Length 0 Veh in Median Storage, 4 0 0 0 Grade, % 0 0 - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 1 1 2 2 Mvmt Flow 7 23 349 16 5 152 Major/Minor Minorl Majorl Major2 Conflicting Flow All 523 361 0 0 367 0 Stage 1 359 - - - - - Stage 2 164 - Critical Hdwy 6.4 62 4.12 Critical Hdwy Stg 1 5.4 - - Critical Hdwy Stg 2 5A - - Follow-up Hdwy 3.5 3.3 2.218 Pot Cap -I Maneuver 518 688 1192 Stage 1 711 - - Stage 2 870 - - Platoon blocked, % Mov Cap -I Maneuver 513 686 1190 Mov Cap-2 Maneuver 513 - - Stage 1 706 Stage 2 868 Approach WB NB SB HCM Control Delay, s 110,9 0 0.3 HCM LOS B Minor Lane/Maior Mvmt NBT NBRWBLnI SIBL SBT Capacity (veh1h) 638 1190 HCM Lane ViC Ratio 0.046 0.005 - HCM Control Delay (s) 10.9 8 0 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.1 0 - JT Madison Apartments 12:00 prn 02/24/2018 2018 Existing Conditions Synchro, 10 Report TENW Page 10 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 02/24/2018 -,* --* --.* 4-- ',- 4% t Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T-� T. ++ r ++ r Traffic Volume (vph) 48 72 11 86 134 16 49 1117 90 144 819 90 Future Volume (vph) 48 72 11 86 134 16 49 1117 90 144 819 90 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -10% 0% -3% 0% Storage Length (ft) 150 0 0 0 200 0 300 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.980 0.984 0.850 0.850 FIt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1858 1917 0 1770 1833 0 1796 3592 1607 1770 3539 1583 FIt Permitted 0.618 0.643 0.950 0.950 Satd. Flow (perm) 1209 1917 0 1198 1833 0 1796 3592 1607 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Said. Flow (RTOR) 11 9 151 151 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1210 950 2601 1598 Travel Time (s) 27.5 21.6 59.1 36.3 Peak Hour Factor 0.91 0.91 0.91 0.91 0,91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 53 79 12 95 147 18 54 1227 99 158 900 99 Shared Lane Traffic (%) Lane Group Flow (vph) 53 91 0 95 165 0 54 1227 99 158 900 99 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 0.94 0.94 0.94 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CJ+Ex CI+Ex: CI+Ex: CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt NA pm+pt NA Prot NA Perm Prot NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 8.0 20.0 8.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 1 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 02/24/2018 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (s) 8.0 20.0 8.0 20.0 10.0 27.0 27.0 10.0 27.0 27.0 Total Split (%) 12.3% 30.8% 12.3% 30.8% 15.4% 41.5% 41.5% 15.4% 41.5% 41.5% Maximum Green (s) 4.0 16.0 4.0 16.0 6.0 23.0 23.0 6.0 23.0 23.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 12.4 9.6 13.3 11.5 5.9 26.5 26.5 6.0 31.7 31.7 Actuated g/C Ratio 0.21 0.16 0.23 0.20 0.10 0.45 0.45 0.10 0.54 0.54 v/c Ratio 0.18 0.28 0.31 0,45 0.30 0.75 0.12 0.86 0.47 0.11 Control Delay 15.8 21.1 17.8 24.0 30.5 20.8 1.5 71.5 13.9 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.8 21.1 17.8 24.0 30.5 20.8 1.5 71.5 13.9 1.4 LOS B C B C C G A E B A Approach Delay 19.1 21.8 19.8 20.7 Approach LOS C B C Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 58.3 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay: 20.3 Intersection LOS: C Intersection Capacity Utilization 63.5% ICU Level of Service B Analysis Period (min) 15 qn1itc qnri PhqcPcz- I - RP CIQ A 99Ath Rtrp.pt RW 0 1 t02 '1('0 3 -ou -4 27s La S I 120s 4\ 05 06 'A 07 08 10.6 1 AF 27s as 1 11205 JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 2 This document was created by an application that isn't licensed to use novaPIDIF. Purchase a license to generate PIDIF files without this notice. HCIVI 2010 Signalized Intersection Summary 1: SIR 99 & 228th Street SW 02/24/2018 Movement EBL EBT EBR WBL WBT WOR NBL NBT NBR SBL SBT SBR Lane Configurations T* T+ Vi ++ if I ++ r Traffic Volume (veh/h) 48 72 11 86 134 16 49 1117 90 144 819 90 Future Volume (veh/h) 48 72 11 86 134 16 49 1117 90 144 819 90 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(&-pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/hAn 1956 1956 1995 1863 1863 1900 1891 1891 1891 1863 1863 1863 Adj Flow Rate, veh/h 53 79 12 95 147 18 54 1227 99 158 900 99 AdJ No. of Lanes 1 1 0 1 1 0 1 2 1 1 2 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0,91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 263 176 27 326 211 26 74 1524 682 196 1748 782 Arrive On Green 0.04 0.11 0.11 0.06 0.13 0.13 0.04 0.42 0.42 0.11 0.49 0.49 Sat Flow, veh/h 1863 1659 252 1774 1628 199 1801 3592 1607 1774 3539 1583 Grp Volume(v), veh/h 53 0 91 95 0 165 54 1227 99 158 900 99 Grp Sat Flow(s),veh/h/In 1863 0 1911 1774 0 1828 1801 1796 1607 1774 1770 1583 Q Serve(g-s), s 1.4 0.0 2.4 2.5 0.0 4.7 1.6 16.2 2.0 4.7 9.4 1.8 Cycle Q Clear(g-c), s 1.4 0.0 2.4 2.5 0.0 4.7 1.6 16.2 2.0 4.7 9.4 1.8 Prop In Lane 1.00 0.13 1.00 0.11 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 263 0 203 326 0 236 74 1524 682 196 1748 782 V/C Ratio(X) 0.20 0.00 0.45 0.29 0.00 0.70 0.73 0.81 0.15 0.80 0.51 0.13 Avail Cap(c-a), veh/h 325 0 564 344 0 539 199 1524 682 196 1748 782 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(l) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.4 0.0 22.7 19.8 0.0 22.6 25.7 13.6 9.6 23.5 9.3 7.4 Incr Delay (d2), s/veh 0.4 0.0 1.6 0.5 0.0 3.7 12.9 4.6 0.4 21.1 1.1 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/In 0.7 0.0 1.4 1.3 0.0 2.6 1.1 9.0 1.0 3.4 4.8 0.9 LnGrp Delay(d),s/veh 20.8 0.0 24.3 20.3 0.0 26.3 38.6 18.3 10.0 44.7 10.4 7.7 LnGrp LOS C G L; U L) IS 8 D B A Approach Vol, veh1h 144 260 1380 1157 Approach Delay, s/veh 23.0 24.1 18.5 14.8 Approach LOS C C B B Timer 1 2 3 4 5 6 7 8 AssIgned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 10.0 27.0 7.5 9.8 6.2 30.8 6.2 11.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 23.0 4.0 16.0 6.0 23.0 4.0 16.0 Max Q ClearTime (g-c+ll), s 6.7 18.2 4.5 4.4 3.6 11.4 3.4 6.7 Green Ext Time (p c), s 0.0 2.9 0.0 0.2 0.0 4.0 0.0 0.4 Intersection Summary HCM 2010 Ctrl Delay 17.8 HCM 2010 LOS B JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. HCIVI Unsignalized Intersection Capacity Analysis 2: SIR 99 & 234th Street SW 2/27/2018 ,1* --1, J- -4-- k t 4/ Movement EBI- EBT EBR WBI- WBT WBR NBL NBT NBR SBIL SBT SBR Lane Configurations 4-- 4� V1 ++T. ) W., Volume (veh1h) 10 o 17 6 0 14 21 1721 14 28 1114 22 Sign Control Stop Stop F ree Free Grade -15% 0% -3% 3% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 098 0.98 0.98 Hourly flow rate (vph) 10 0 17 6 0 14 21 1756 14 29 1137 22 Pedestrians 7 7 6 7 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed fts) 4.0 4.0 4.0 4.0 Percent Blockage I 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 1146 pX, platoon unblocked D.91 0.91 0.91 0.91 0.91 0.91 vC, conflicting volume 1862 3032 403 2273 3036 607 1166 1777 vC1, stage 1 conf vol 1212 1212 1813 1813 vC2, stage 2 conf vol 650 1820 459 1223 vCu, unblocked vol 1587 2880 403 2041 2884 202 1166 1494 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 94 100 97 94 100 98 96 93 cM capacity (veh1h) 174 109 597 103 120 727 591 405 E Wr 1,1 ��n EB 1 W13 1 N1311 NB2 N133 N134 SB I S132 SB3 SB4 Volume Total 28 20 21 702 702 366 29 455 455 250 Volume Left 10 6 21 0 0 0 29 0 0 0 Volume Right 17 14 0 0 0 14 0 0 0 22 cSH 314 258 591 1700 1700 1700 405 1700 1700 1700 Volume to Capacity 0.09 0.08 0.04 0.41 0.41 0.22 0.07 0.27 0.27 0.15 Queue Length 95th (ft) 7 6 3 0 0 0 6 0 0 0 Control Delay (s) 17.6 20.1 11.3 0.0 0.0 0.0 14.6 0.0 0.0 0.0 Lane LOS C C B B Approach Delay (s) 17.6 20.1 0.1 0.4 Approach LOS C C Intersecton Summary Average Delay 0.5 Intersection Capacity Utilization 45.6% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 5:00 pm 2/24/2018 2021 Baseline Conditions Without the Project Synchro 8 Report TENW Page I This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 02/24/2018 --.* -1, N 'r 4*- k *, Lane Group E8L EBT ESR INBIL WBT VVBR -NBL NBT NBR SBL SBT SBR Lane Configurations 4 1# 4� tt ?f ++ r Traffic Volume (vph) 93 110 65 66 44 18 142 1340 17 38 878 102 Future Volume (vph) 93 110 65 66 44 18 142 1340 17 38 878 102 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 250 0 0 300 0 300 0 Storage Lanes 0 1 0 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.981 0.850 0.850 Fit Protected 0.978 0.975 0.950 0.950 Satcl. Flow (prot) 0 1822 1583 0 1782 0 1770 3539 1583 1770 3539 1583 Fit Permitted 0.805 0.639 0.950 0.950 Satc. Flow (perm) 0 1500 1583 0 1168 0 1770 3539 1583 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 164 14 91 164 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1541 1387 2465 1146 Travel Time (s) 35.0 31.5 56.0 26.0 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 102 121 71 73 48 20 156 1473 19 42 965 112 Shared Lane Traffic Lane Group Flow (vph) 0 223 71 0 141 0 156 1473 19 42 965 112 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1,00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector I Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type Cl+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector I Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 4 4 4 8 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 200 200 200 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 20.0 20.0 20.0 20.0 20.0 13.0 32.0 32.0 8.0 27.0 27.0 JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 02/24/2018 ,# , -,* j- -4-- k, 4� t 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SST SBR Total Split (%) 33.3% 33.3% 33.3% 33.3% 33.3% 21.7% 53.3% 53.3% 13.3% 45.0% 45.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 9.0 28.0 28.0 4.0 23.0 23.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 12.7 12.7 12.7 8.4 33.3 33.3 4.0 26.2 26,2 Actuated g/C Ratio 0.22 0.22 0.22 0.15 0.58 0.58 0.07 0.46 0.46 v/c Ratio 0.67 0.15 0.52 0.60 0.71 0.02 0.34 0.59 0.14 Control Delay 30.6 0.6 24.6 34.3 13.7 0.1 34.2 15.3 1.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 30.6 0.6 24.6 34.3 13.7 0.1 34,2 15.3 1.5 LOS C A C C B A C B A Approach Delay 23.4 24.6 15.4 14.7 Approach LOS C C B B Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 57.1 Natural Cycle: 60 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 16.3 Intersection LOS: B Intersection Capacity Utilization 64.1% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: SIR 99 & 238th Street SW \0 (-, I I t 0 2 --Aotc -4 8S 132s 20 S 4%05 1 � 06 *_ el 8 135 1 1127s 205 1 JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project TENW Synchro 10 Report Page 7 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. HCM 2010 Signalized Intersection Summary 3: SR 99 & 238th Street SW 02/24/2018 -A --I. N (- �4-- *-- t 41/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 e +TO ++ ?f ++ Traffic Volume (vehfh) 93 110 65 66 44 18 142 1340 17 38 878 102 Future Volume (veh/h) 93 110 65 66 44 18 142 1340 17 38 878 102 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 1863 1900 1863 1900 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 102 121 0 73 48 20 156 1473 19 42 965 112 Adj No. of Lanes 0 1 1 0 1 0 1 2 1 1 2 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0,91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 223 169 271 225 127 40 201 1965 879 63 1689 756 Arrive On Green 0.17 0.17 0.00 0.17 0.17 0.17 0.11 0.56 0.56 0.04 0.48 0.48 Sat Flow, veh/h 693 988 1583 682 740 235 1774 3539 1583 1774 3539 1583 Grp Volume(v), veh1h 223 0 0 141 0 0 156 1473 19 42 965 112 Grp Sat Flow(s),veh/h/In 1681 0 1583 1657 0 0 1774 1770 1583 1774 1770 1583 Q Serve(g-s), s 2.6 0.0 0.0 0.0 0.0 0.0 4.3 16.0 0.3 1.2 9.9 2.0 Cycle Q Clear(g-c), s 6.2 0.0 0.0 3.7 0.0 0.0 4.3 16.0 0.3 1.2 9.9 2.0 Prop In Lane 0.46 1.00 0.52 0.14 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 392 0 271 392 0 0 201 1965 879 63 1689 756 V/C Ratio(X) 0.57 0.00 0.00 0.36 0.00 0.00 0.78 0.75 0.02 0.67 0.57 0.15 Avail Cap(c a), veh/h 622 0 502 606 0 0 317 1965 879 141 1689 756 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(l) 1.00 0.00 0.00 1.00 0.00 0�00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s1veh 19.8 0.0 0.0 18.8 0.0 0.0 21.7 8.5 6.0 24.0 9.5 7.4 Incr Delay (Q), s/veh 1.3 0.0 0.0 0.6 0.0 0.0 6.3 2.7 0.0 11.7 1.4 0.4 Initial Q Delay(d3),slveh 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %de BackOfQ(50%),veh/In 3.1 0.0 0.0 1.8 0.0 0.0 2.5 8.3 0.1 0.8 5,0 1.0 LnGrp Delay(d),s/veh 21.1 0.0 0.0 19.4 0.0 0.0 28.0 11.2 5.1 35.8 10.9 7.8 LnGro LOS C B C B A D 8 A Approach Vol, veh/h 223 141 1648 1119 Approach Delay, s/veh 21.1 19.4 12.7 11.5 Approach LOS C B B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.8 32.0 12.6 9.7 28.1 12.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 4.0 28.0 16.0 9.0 23.0 16.0 Max Q Clear Time (g-c+ll), s 3.2 18.0 8.2 6.3 11.9 5.7 Green Ext Time (p c), s 0.0 5.6 0.5 0.1 4.2 0.3 Intersection Summary HCM 2010 Ctrl Delay 13.2 HCM 2010 LOS B JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 8 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 4: 84th Ave W & 234th Street SW 02/24/2018 Lane Group WBIL Vlv'BR NBT NBR SEL SBT Lane Configurations Y T. -T Traffic Volume (vph) 6 22 341 16 5 149 Future Volume (vph) 6 22 341 16 5 149 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.895 0.994 Fit Protected 0.989 0,999 Satd. Flow (prot) 1682 0 1870 0 0 1861 Fit Permitted 0.989 0.999 Satd. Flow (perm) 1682 0 1870 0 0 1861 Link Speed (mph) 30 30 30 Link Distance (ft) 1780 479 2609 Travel Time (s) 40.5 10.9 59.3 Confl. Peds. (#/hr) 2 2 2 Peak Hour Factor 0.92 0,92 092 0.92 0.92 0.92 Heavy Vehicles 0% 0% 1 % 1 % 2% 2% Adj. Flow (vph) 7 24 371 17 5 162 Shared Lane Traffic (%) Lane Group Flow (vph) 31 0 388 0 0 167 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Tu m Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersecton Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 29.6% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 9 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. HCM 2010 TWSC 4: 84th Ave W & 234th Street SW 02/24/2018 Intersection Int Delay, s/veh 0.7 em`e��Vk WBR NBT NBR SBL SBT Lane Configurations Y It *t Traffic Vol, veh/h 6 22 341 16 5 149 Future Vol, vehih 6 22 341 16 5 149 Conflicting Peds, #Jhr 2 2 0 2 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized . None None None Storage Length 0 Veh In Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 1 1 2 2 Mvmt Flow 7 24 371 17 5 162 Major/Minor Minorl Majorl Major2 Conflicting Flow All 556 384 0 0 390 0 Stage 1 382 - - - Stage 2 174 - - - - Critical Hdwy 6.4 6.2 - 4.12 Critical Hdwy Stg 1 5.4 - - - Criftal Hdwy Stg 2 5.4 - - Follow-up Hdwy 3.5 3.3 - 2.218 Pot Cap-1 Maneuver 496 668 - 1169 Stage 1 694 - Stage 2 861 - Platoon blocked, % Mov Cap-1 Maneuver 492 666 1167 Mov Cap-2 Maneuver 492 - Stage 1 689 - Stage 2 859 WB NB SB HCM Control Delay, s 11.1 0 0.3 HCM LOS B Minor Lane/Maior Mvmt NBT NBRWBLn1 SK SOT Capacity (veh1h) 619 1167 HCM Lane V/C Ratio 0.049 0.005 - HCM Control Delay (s) 11.1 8.1 0 HCM Lane LOS B A A HCM 95th %ble 0(veh) 0.2 0 - JT Madison Apartments 5:00 pm 02/24/2018 2021 Baseline Conditions Without the Project Synchro 10 Report TENW Page 10 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 02/24/2018 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi T.. T. ++ r ++ Traffic Volume (vph) 48 72 11 86 134 16 49 1127 90 144 834 90 Future Volume (vph) 48 72 11 86 134 16 49 1127 90 144 834 90 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -10% 0% -3% 0% Storage Length (ft) 150 0 0 0 200 0 300 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.980 0.984 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Said. Flow (prot) 1858 1917 0 1770 1833 0 1796 3592 1607 1770 3539 1583 Flt Permitted 0.618 0.643 0.950 0.950 Said. Flow (perm) 1209 1917 0 1198 1833 0 1796 3592 1607 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 11 9 151 151 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1210 950 2601 1598 Travel Time (s) 27.5 21.6 59.1 36.3 Peak Hour Factor 0.91 0.91 0,91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 53 79 12 95 147 18 54 1238 99 158 916 99 Shared Lane Traffic (%) Lane Group Flow (vph) 53 91 0 95 165 0 54 1238 99 158 916 99 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 0.94 0.94 0.94 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1 -GO Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 Detector I Type CI+Ex CI+Ex Cl+Ex CI+Ex CI+Ex C1+Ex: CI+Ex CI+Ex CI+Ex C1+Ex: Detector 1 Channel Detector I Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Dcteector 1 Qu ee -.- �- (s) 0.0 0.0 0.0 0.0 0.0 0.0 n.n n.n n-n 0 n Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt NA pm+pt NA Prot NA Perm Prot NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 8.0 20.0 8.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 JT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 1 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 02/24/2018 -,* --1, --,* - *- k *� t /0 4 4-, Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (s) 8.0 20.0 8.0 20.0 10.0 27.0 27.0 10.0 27,0 27.0 Total Split (%) 12.3% 30.8% 12.3% 30.8% 15.4% 41.5% 41.5% 15.4% 41.5% 41.5% Maximum Green (s) 4.0 16.0 4.0 16.0 6.0 23.0 23.0 6.0 23.0 23.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 AJI-Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 12.4 9.6 13.3 11.5 5.9 26.5 26.5 6.0 31.7 31.7 Actuated g/C Ratio 0.21 0.16 0.23 0.20 0.10 0.45 0.45 0.10 0.54 0.54 v/c Ratio 0.18 0.28 0.31 0.45 0.30 0.76 0.12 0,86 0.48 0.11 Control Delay 15.8 21.1 17.8 24.0 30.5 21.0 1.5 71.5 14.0 1.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 15.8 21.1 17.8 24.0 30.5 21.0 1.5 71.5 14.0 1.4 LOS B G B C C C A E B A Approach Delay 19.1 21.8 20.0 20.7 Approach LOS B C C C Intersection Summary Area Type: Other Cycle Length: 65 Actuated Cycle Length: 583 Natural Cycle: 70 Control Type: Actuated -Uncoordinated Maximum v/c Ratio: 0.86 IntersectJon Signal Delay: 20.4 Intersection LOS: C Intersection Capacity Utilization 63.8% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: SIR 99 & 228th Street SW \00 1 02 4r,�3 -ou 5 27s s 1 M20 S � 06 07 0 S .4%05 105 127s 148 S 1 0205 JT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 2 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. HCM 2010 Signalized Intersection Summary 1: SIR 99 & 228th Street SW 02/24/2018 ,,* -0. --* - -*-- I',-- *� 4--, Movement EBL EBT EBR WBL WBT WBR NEIL NBT NBIR SIEIL SBT SBR Lane Configurations Vi T+ *i 1� ++ ?F ++ Traffic Volume (veh/h) 48 72 11 86 134 16 49 1127 90 144 834 90 Future Volume (veh/h) 48 72 11 86 134 16 49 1127 90 144 834 90 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/In 1956 1956 1995 1863 1863 1900 1891 1891 1891 1863 1863 1863 Adj Flow Rate, veh/h 53 79 12 95 147 18 54 1238 99 158 916 99 Adj No. of Lanes 1 1 0 1 1 0 1 2 1 1 2 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 263 176 27 326 211 26 74 1524 682 196 1748 782 Arrive On Green 0.04 0.11 0.11 0.06 013 0.13 0.04 0.42 0.42 0.11 0.49 0.49 Sat Flow, veh/h 1863 1659 252 1774 1628 199 1801 3592 1607 1774 3539 1583 Grp Volume(v), veh1h 53 0 91 95 0 165 54 1238 99 158 916 99 Grp Sat Flow(s),veh/h/In 1863 0 1911 1774 0 1828 1801 1796 1607 1774 1770 1583 0 Serve(g-s), s 1.4 00 2.4 2.5 0.0 4.7 1.6 16.4 2.0 4.7 9.6 1.8 Cycle Q Clear(g-c), s 1.4 00 2.4 2.5 0.0 4.7 1.6 16.4 2.0 4.7 9.6 1.8 Prop In Lane 1.00 0.13 1.00 0.11 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 263 0 203 326 0 236 74 1524 682 196 1748 782 V/C Ratio(X) 0.20 0.00 0.45 0.29 0.00 0.70 0.73 0.81 0.15 0.80 0.52 0.13 Avail Cap(c a), veh/h 325 0 564 344 0 539 199 1524 682 196 1748 782 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(l) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s1veh 20.4 0.0 22.7 19.8 0.0 22.6 25.7 13.7 9.6 23.5 9.4 7.4 Incr Delay (Q), s/veh 0.4 0.0 1.6 0.5 0.0 3.7 12.9 4.8 0.4 21.1 1.1 0.3 Initial Q Delay(Q),sNeh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Wile BackOfQ(50%),veh/In 0.7 0.0 1.4 1.3 0.0 2.6 1.1 9.1 1.0 3.4 4.9 0.9 LnGrp Delay(d),s/veh 20.8 0.0 24.3 20.3 0.0 26.3 38.6 18.5 10.0 44.7 10.5 7.7 LnGrp LOS C C C C D 8 B D B A Approach Vol, veh/h 144 260 1391 1173 Approach Delay, s/veh 23.0 24.1 18.7 14.9 Approach LOS C C B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 3 4 5 6 7 8 Phs Duration (G+Y+Rc), s 10.0 27.0 7.5 9.8 6.2 30.8 6.2 11.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 max ureen betting (Limax), s 6.0 23.0 4.0 i6.0 6.0 23.0 4.0 16.0 Max Q Clear Time (g-c+l 1), s 6.7 18.4 4.5 4.4 3.6 11.6 3.4 6.7 Green Ext Time (p-c), s 0.0 2.8 0.0 0.2 0.0 4.0 0.0 0.4 Intersection SumM=_ - HCM 2010 Ctrl Delay 17.9 H CM 2010 LOS B JT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. HCIVI Unsignalized Intersection Capacity Analysis 2: SIR 99 & 234th Street SW 2/27/2018 ---* --i -,* ,(- o-- 4-- *1 t Movement EBL EBT EBR WEIL WBT WBR NBIL NBT NBR SBL SBT SBR Lane Configurations 4� 4T. ) W. ) W. Volume (veh1h) 20 0 33 6 0 14 47 1721 14 28 1114 37 Sign Control Stop Stop Free Free Grade -15% 0% -3% 3% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Hourly flow rate (vph) 20 0 34 6 0 14 48 1756 14 29 1137 38 Pedestrians 7 7 6 7 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage 1 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 1146 pX, platoon unblocked 0.91 0.91 0.91 0.91 0.91 0,91 vC, conflicting volume 1922 3093 411 2342 3105 607 1181 1777 vC1, stage 1 conf vol 1220 1220 1866 1866 vC2, stage 2 conf vol 703 1873 476 1239 vCu, unblocked vol 1664 2952 411 2126 2965 216 1181 1505 tC, single (s) 7.5 6.5 6.9 T5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 88 100 94 93 100 98 92 93 cM capacity (veh/h) 170 96 590 89 105 714 583 403 DirecUon, Lane # EB 1 WB 1 NB 1 NB2 NB 3 1 S81 S132 SB 3 S134 Volume Total 54 20 48 702 702 366 29 455 455 265 Volume Left 20 6 48 0 0 0 29 0 0 0 Volume Right 34 14 0 0 0 14 0 0 0 38 cSH 305 230 583 1700 1700 1700 403 1700 1700 1700 Volume to Capacity 0.18 0.09 0.08 0.41 0.41 0.22 0.07 0.27 0.27 0.16 Queue Length 95th (ft) 16 7 7 0 0 0 6 0 0 0 Control Delay (s) 19.3 22.1 11.7 0.0 0.0 0.0 14.6 0.0 0.0 0.0 Lane LOS C C B B Approach Delay (s) 19.3 22.1 0.3 -ENNW" 0.3 Approach LOS C C intersect,on Summary Average Delay 0.8 Intersection Capacity Utilization 52.2% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 5:00 pm 2/24/2018 2021 With the Project Synchro 8 Report TENW Page 1 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 02/24/2018 ,,* , --* j- -*-- *,- 4\ 4/ Lane Group EBL EBT ESR WBL WBT WBR NBL NIBT NBR SBIL SBT SBR Lane Configurations -T r IT. ++ r ++ r Traffic Volume (vph) 93 110 65 66 44 18 142 1366 17 38 894 102 Future Volume (vph) 93 110 65 66 44 18 142 1366 17 38 894 102 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 250 0 0 300 0 300 0 Storage Lanes 0 1 0 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Fit 0.850 0.981 0.850 0.850 At Protected 0.978 0.975 0.950 0.950 Satd. Flow (prot) 0 1822 1583 0 1782 0 1770 3539 1583 1770 3539 1583 FIt Permitted 0.805 0.639 0.950 0.950 Satc. Flow (perm) 0 1500 1583 0 1168 0 1770 3539 1583 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 164 14 91 164 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1541 1387 2465 1146 Travel Time (s) 35.0 31.5 56.0 26.0 Peak Hour Factor 0.91 0.91 0.91 0.91 0�91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 102 121 71 73 48 20 156 1501 19 42 982 112 Shared Lane Traffic Lane Group Flow (vph) 0 223 71 0 141 0 156 1501 19 42 982 112 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 00 1.00 1.00 1.00 1.00 ,Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector I Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Cl+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 U 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector I Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 n n n n n 0 0 n 00 0.0 Turn Type Perm NA Perm Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 4 4 4 8 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 200 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 20.0 20.0 20.0 20.0 20.0 13.0 32.0 32.0 8.0 27.0 27.0 JT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro, 10 Report TENW Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 3: SIR 99 & 238th Street SW 02/24/2018 -,* N 4- k t 4rJ Lane Group EBL EBT EBR WEL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (%) 33.3% 33.3% 33.3% 33.3% 33.3% 21.7% 53.3% 53.3% 13.3% 45.0% 45.0% Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 9.0 28.0 28.0 4.0 23.0 23.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 12.7 12.7 12.7 8.4 33.3 33.3 4.0 26.2 26.2 Actuated g/C Ratio 0.22 0.22 0.22 0.15 0.58 0.58 0.07 0.46 0.46 v/c Ratio 0.67 0.15 0.52 0.60 0.73 0.02 0.34 0.61 0.14 Control Delay 30.5 0.6 24.6 34.3 14.1 0.1 34.2 15.5 1.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 30.5 0.6 24.6 34.3 14.1 0.1 34.2 15.5 1.5 LOS C A C C B A C B A Approach Delay 23.3 24.6 15.8 14.8 Approach LOS C C B B Intersection Area Type: Other Cycle Length: 60 Actuated Cycle Length: 57.1 Natural Cycle: 60 Control Type: Actuated- U n coord i nated Maximum v/c Ratio: 0.73 Intersection Signal Delay: 16.5 Intersection LOS: B Intersection Capacity Ublizabon 64.8% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 3: SIR 99 & 238th Street SW JT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 7 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. HCM 2010 Signalized Intersection Summary 3: SR 99 & 238th Street SW 02/24/2018 ,,* --1. -1* 4- *-- k 4\ 41 Movement EBL EBT EBR WBL WBT WBIR NBL NBT NBR SBL SBT SBIR Lane Configurations +T 4:4 ++ ?f ++ Traffic Volume (veh/h) 93 110 65 66 44 18 142 1366 17 38 894 102 Future Volume (veh/h) 93 110 65 66 44 18 142 1366 17 38 894 102 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(ALpbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1,00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/Mn 1900 1863 1863 1900 1863 1900 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 102 121 0 73 48 20 156 1501 19 42 982 112 Adj No. of Lanes 0 1 1 0 1 0 1 2 1 1 2 1 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 223 169 271 225 127 40 201 1965 879 63 1689 756 Arrive On Green 0.17 0.17 0.00 0.17 0.17 0.17 0.11 0.56 0.56 0.04 0.48 0.48 Sat Flow, veh/h 693 988 1583 682 740 235 1774 3539 1583 1774 3539 1583 Grp Volume(v), veh/h 223 0 0 141 G G 156 1501 19 42 982 112 Grp Sat Flow(s),veh/h/In 1681 0 1583 1657 0 0 1774 1770 1583 1774 1770 1583 Q Serve(g-s), s 2.6 0.0 0.0 0.0 0.0 0.0 4.3 16.5 0.3 1.2 10.1 2.0 Cycle Q Clear(g-c), s 6.2 0.0 0.0 3.7 0.0 0.0 4.3 16.5 0.3 1.2 10.1 2.0 Prop In Lane 0.46 1.00 0.52 0.14 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 392 0 271 392 0 0 201 1965 879 63 1689 756 V/C Ratio(X) 0.57 0.00 0.00 0.36 0.00 0.00 0.78 0.76 0.02 0.67 0.58 0.15 Avail Cap(ca), veh/h 622 0 502 606 0 0 317 1965 879 141 1689 756 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(l) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), stveh 19.8 0.0 0.0 18.8 0.0 0.0 21.7 8.7 5.0 24.0 9.5 7.4 Incr Delay (d2), s/veh 1.3 0.0 0.0 0.6 0.0 0.0 6.3 2.9 0.0 11.7 1.5 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile Back0fQ(50%),veh/In 3.1 0.0 0.0 1.8 0.0 0.0 2.5 8.7 0.1 0.8 5.3 1.0 LnGrp Delay(d),s/veh 21.1 0.0 0.0 19.4 0.0 0.0 28.0 11.5 5.1 35.8 11.0 7.8 LnGrp LOS C B C B A D B A Approach Vol, veh/h 223 141 1676 1136 Approach Delay, s/veh 21.1 19.4 13.0 11.6 Approach LOS C B B B Timer 1 2 3 4 5 6 7 8 Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.8 32.0 12.6 9.7 28.1 12.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 4.0 28.0 'i 6.0 9.0 23.0 i6.0 Max Q Clear Time (g-c+l 1), s 3.2 18.5 8.2 6.3 12.1 5.7 Green Ext Time (p-c), s 0.0 5.5 0.5 0.1 4.2 0.3 Intersection Sum H C M 2010 Ctrl Delay 13.4 HCM 2010 LOS B JT Madison Apartments 5,00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 8 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 4: 84th Ave W & 234th Street SW 02/24/2018 i- I- t 1* 10� Lane Group WBI- WBR NBT NBR SBL SBT Lane Configurations Y T�l -4 Traffic Volume (vph) 10 25 341 21 10 149 Future Volume (vph) 10 25 341 21 10 149 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Firt 0.904 0.992 Fit Protected 0.986 0,997 Satc. Flow (prot) 1694 0 1866 0 0 1857 Fit Permitted 0.986 0.997 Satd. Flow (perm) 1694 0 1866 0 0 1857 Link Speed (mph) 30 30 30 Link Distance (ft) 1691 479 2609 Travel Time (s) 38.4 10.9 59.3 Confl. Peds. (#/hr) 2 2 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles 0% 0% 1 % 1 % 2% 2% Adj. Flow (vph) 11 27 371 23 11 162 Shared Lane Traffic (%) Lane Group Flow (vph) 38 0 394 0 0 173 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 29.9% ICU Level of Service A Anal�ysis Period (min) 15 JIT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 9 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. HCM 2010 TWSC 4: 84th Ave W & 234th Street SW 02/24/2018 Intersectlon Int Delay, s/veh Movement 0.9 WBL VVBR NBT NBR SBL SBT Lane Configurations Y I). it Traffic Vol, veh/h 10 25 341 21 10 149 Future Vol, veh/h 10 25 341 21 10 149 Conflicting Peds, #/hr 2 2 0 2 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None None None Storage Length 0 - - Veh in Median Storage, # 0 - 0 0 Grade, % 0 - 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 0 1 1 2 2 Mvmt Flow 11 27 371 23 11 162 Major/Minor Minorl Majorl Major2 Conflicting Flow All 571 387 0 0 396 0 Stage 1 385 - - - - - Stage 2 186 - - Critical Hdwy 6.4 6.2 4.12 Critical Hdwy Stg 1 5.4 - - Critical Hdwy Stg 2 5.4 - - Follow-up Hdwy 3.5 3.3 2.218 Pot Cap -I Maneuver 486 665 1163 Stage 1 692 - - Stage 2 651 - - Platoon blocked, % Mov Cap-1 Maneuver 479 663 1161 Mov Cap-2 Maneuver 479 - - Stage 1 684 - Stage 2 849 - Approach WB NB SB HCM Control Delay, s 11.4 0 0.5 HCM LOS B Minor Lane/Maior tvlvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) 597 1161 HCM Lane ViC Ratio 0.064 0.009 - HCM Control Delay (s) 11.4 8.1 0 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.2 0 - JT Madison Apartments 5:00 pm 02/24/2018 2021 With the Project Synchro 10 Report TENW Page 10 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. HCM Unsignalized Intersection Capacity Analysis 5: 234th Street SW & Site Driveway 2/27/2018 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 T-� Y Volume (veh/h) 10 27 44 41 26 7 Sign Control Free Free Stop Grade -15% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 11 29 48 45 28 8 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 92 121 70 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 92 121 70 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 pO queue free % 99 97 99 cM capacity (veh1h) 1502 868 993 Direction. Lane # EB I WB I SBI Volume Total 40 92 36 Volume Left 11 0 28 Volume Right 0 45 8 cSH 1502 1700 892 Volume to Capacity 0.01 0.05 0.04 Queue Length 95th (ft) 1 0 3 Control Delay (s) 2.0 0.0 9.2 Lane LOS A A Approach Delay (s) 2.0 0.0 9.2 Approach LOS A intersection Summaq Average Delay 2.4 Intersection Capacity Utilizabon 18.6% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 5:00 pm 2124/2018 2021 With the Project Synchro 8 Report TENW Page 1 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Attachment C 202 1 Traffic Volume Forecasts This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. 0 (n C-) (D C (D CD (D (n b 0 (0 (D (D Q) Z3 (D (D T 0 n (D 0 0 �� Fn (n -I -1 — 0 (D cn CD 0- 0 C (n CD -1 0 23326 Highway 99 Apartments - Edmonds, WA 2021 Full Buildout PM Peak Hour Turning Movement Voli JiGrowth Ral Existing Yearl 201: 1 Baseline Yearl 202 2018 Existing 2021 Baseline Trip Distribution E..' W, 50 33 �3 Projec� Trips 2021 With Project M 211 1 1. zW 0: 23e 72 2,P6 — %— 01% 0..% 41 n F -0-1 42 51 0% % W% 0% 771 X 0 n ZZ% 2T1 I In 2: 1% 2� �2� 2 65 % 0% �1 72 2N 14% 0 1 20 0 .2 28 2 0% % % 0 7 10 a 25 35 31 % 11— 3� -EQ '27 27 M. W n%% W% 1,01 1, FO 17 TE— V�pd— 1WW19 Attachment D Project Trip Generation Estimates This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. Multifamily Housing (Mid -Rise) (221) Vehicle Trip Ends vs: Dwelling Units On a: Weekday Setting/Location: General Urban/Suburban Number of Studies: 27 Avg. Num. of Dwelling Units: 205 Directional Distribution: 50% entering, 50% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 5.44 1.27-12.50 2.03 Data Plot and Equation 3,000 x x 2,500 x x 2,000 x Lij x x x x 1,500 x x 1045 1,000 10" x x x XX 500 x x x X x 0 [1192 0 100 200 300 400 500 X Number of Dwelling Units X Study Site — — Fitted Curve Average Rate Fitted Curve Equation: T = 5.45(X) - 1.75 R1= 0.77 Trip Generation Manual, 1 Oth Edition 0 Institute of Transportation Engineers This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Multifamily Housing (Mid -Rise) (221) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. Setting/Location: General Urban/Suburban Number of Studies: 53 Avg. Num. of Dwelling Units: 207 Directional Distribution: 26% entering, 74% exiting Vehicle Trip Generation per Dwelling unit Average Rate Range of Rates Standard Deviation 0.36 0.06-1.61 0.19 Data Plot and Equation 301 cn LU .2L 201 10 x x x x x x X x X, x x x x x x K� x 40_0 x 6-0-0 X = Number of Dwelling Units X Study Site Fitted Curve Average Rate Fitted Curve Equation: Ln(T) = 0.98 Ln(X) - 0.98 R= 0.67 Trip Generation Manual, 10th Edition e Institute of Transportation Engineers —1 800 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Multifamily Housing (Mid -Rise) (221) Vehicle Trip Ends vs: Dwelling Units On a: Weekday, Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. Setting/Location: General Urban/Suburban Number of Studies: 60 Avg. Num. of Dwelling Units: 208 Directional Distribution: 61 % entering, 39% exiting Vehicle Trip Generation per Dwelling Unit Average Rate Range of Rates Standard Deviation 0.44 0.15-1.11 0.19 Data Plot and Equation 4C 30 '0 C LLJ 20 10 x x x x x x x XX 84 x XX x 8,3 x XXX x "X x X x I 600 800 X = Number of Dwelling Units X Study Site - Fitted Curve - - - - Average Rate Fitted Curve Equation; Ln(T) = 0.96 Ln(X) - 0.63 R1= 0.72 Trip Generation Manual, 1 Oth Edition * Institute of Transportation Engineers This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Attachment E Traffic Impact Fee Calculations This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. T 0 (n C-) (D (D CD (D (n b 0 (0 (D (D Z3 (D (D T n (D 0 0 �� Fn (n -I -1 - 0 3' (D cn CD 0- 0 C (n CD -1 0 TENW Estimate of Traffic Impact Fees 22326 Highway 99 Apartments - Edmonds, WA Proposed Uses Size Unit Fee Per Unit impact Fee Estimate jApartment - ITE Land Use Code 220 192 1 Dwelling Unit $ 4.092.36 $ 785,733-12 (City of Edmond Rates Effective as of January 1, 2019) TENW Estimate of Traffic Impact Fees 22326 Highway 99 Apartments - Edmonds, WA Proposed Uses Size Trips Fee Per Trip Trip Length Factor Impact Fee Estimate Apartment - ITE Land Use Code 221 192 83 PM Peak $ 5.530.21 1.20— $ 550.808.92 (City of Edmond Rates Effective as of January 1, 2019) Transportation Engineering Northwest, LLC Confidential Page 1 1/31/2019 Attachment F AM Peak Hour Counts & LOS Analysis This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. T 0 (n C-) (D (D CD (D (n b C-) (0 (D (D Z3 (D (D T n (D 0 0 �� Fn (n -I -1 - 0 3' (D cn CD 0- E; -1 0 TABULAR SUMMARY OF TURNING MOVEMENT COUNTS Name: City of Edmonds Date: 1/18/2018 City: Edmonds, WA Project: IT Madison Apts Intersection of: 238th Street SW and SR 99 Street: 238th Street SW 238th Street SW Sk 99 SR 99 Total Hour All Total Time East Bound West Bound North Bound South Bound Begins L T R L T R— L T R L T R 6:00 AM 0 6:15 AM 0 6:30 AM 0 6:45 AM 0 0 7:00 AM 8 13 6 61 7 1 1331 62 0 8 271 2 517 517 7:15 AM 6 10 4 11 1 0 121 85 0 7 242 51 482 999 7:30 AM 14 9 10 41 2 0 105 89 1 4 233 111 482 1481 7:45 AM 101 17 6 41 3 1 106 83 2 17 261 2 512 1993 8:00 AM 31 5 2 31 1 1 19 105 —1 5 285 7 437 1913 8:15 AM 14 23 9 4 4 1 231 1221 7 311 4 522 1953 8:30 AM 10 16 7 4 2 1 151 14�7 1 4 370 8 585 2056 8:45 AM 55 271 39 6 4 1 141 15 5- 1 1 4 3311 5J 642 2186 Peak Hour 1 821 711 571 1 171 111 ----4] 1 711 1 201 12971 241 Peak Hour Factor 2186 4 642 iTransportation Engineering Northwest MJR1 0 (n C-) (D (D CD (D (n b C-) (0 (D (D (D T n (D 0 0 �� Fn (n -I -1 - 0 3' (D cn CD 0- E; -1 0 TABULAR SUMMARY OF TURNING MOVEMENT COU14TS Name: City of Edmonds Date: 1/18/2018 City: Edmonds, WA Project: IT Madison Apts Intersection of: 228th Street SW and SR 99 Street: 228th Street SW 228th Street SW SR 99 SR 99 Total Hour All Total Time East Bound West Bound North Bound South Bound Begins L T R L T R L T R L R 6:00 AM 0 6:15 AM 0 6:30 AM 0 6:45 AM 0 0 7:00 AM 8 23 1 7 13 1 1 86 8 40 470 15 673 673 7:15 AM 7 41 2 10 17 1 4 88 14 45 444 9 682 1355 7:30 AM 8 30 2 7 14 1 6 100 10 43 435 17 673 2028 7:45 AM 15. 26 2 10 16 1 1 86, 9 47. 398 12 623 2651 8:00 AM 12 34 2 15 18 1 8 132 5 46 406 18 697 2675 8:15 7 26 1 12 22 1 1 149 8 38 438 17 720 2713 8:30 AM 12 30 "t 21 11 21 2 10 121 8 53 386 25 681 2721 8:45 AM 15-- 1 20 2 81 19, 2J 71 130, 18 43 356 16 L 636 Peak Hour 1 461 1 �� 1 461 801 1 261 1 1801 15 8-6T---7-61 Peak Hour Factor 2734 4 720 ITransporEation Engineering Northwest MJR K 0 (n C-) (D C (D CD (D (n b 0 (0 (D (D Z3 (D (D n (D 0 0 �� Fn (n -I -1 — 0 3' (D cn CID 0- 0 C (n CD -1 0 23326 Highway 99 Apts - Edmonds, WA 2021 Full Buildout AM Peak Hour Turning Movement Volurn Growth Rate 2.0% Existing Year 2018 Baseline Year 2021 2018 Existing 2021 Baseline Trip Distribution Enter Exit 17 49 66 Project Trips 2021 With Project SR99122MStSW SR 99122M St SW SR 0 1228th St SIN SR 99 1 22fth St SW SR 991228th St SIN - �2 9 4 �Llq 6 140 7 2,902 85 17 11 173 7 49 349 7 %Increase= 6,1% 0% 0% 60% C kid 0% -F-T 0 0 20 0 0 c� 194 [�9 6 140 117 2.922 85 173 7 49 349 Pm..tSh— 0.7% 82 '63 �L6 J() 2,734 6 132 329 BO 7 46 2 SIR 92 1234th St SW SRS91234thStSW SR 991234th St SW SIR 09 234th St SW 2 SR 99 234th St SW 4 1 7!-7 4 11 0 1,993 0 13 12 7 5 4 �1 11 0 1 14 5 %Increase= 61% 80% 30% 0% 80 50% 0% 14 15 -TT 0 53 39 0 18 0 2,167 53 31 5 31 Proi�Share- 24% SIR 991231fth St 3W 3 SR 89 1233th 3t SIN SR I 236th St SW SIR 99123M St SIN 3 SR 99 238th St SIN 32 ff7l 2,1e7 210 95 17 57 17 112 87 4 34 75 2,318 12 222 60 18 100 0% 0% 100% 1 % �E 0% —1 _7 0 33 0 0 ff 112 �8Z 4 34 75 2, 351 12 222 60 18 100 %Increase= 6 0% 1 72 PmlectSham= 14% TE NW Date Pnnted: 4/16/2018 Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 4/16/2018 ,A --I. -,* �*-- *-- t Lane Group EBL EBT EBR WBL WBT WEIR NBL NBT NSR SBL SBT SOR Lane Configurations T.- Vi T. V1 tt ?f ++ if Volume (vph) 46 110 7 46 80 6 26 532 39 180 1586 76 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -10% 0% -3% 0% Storage Length (ft) 150 0 0 0 200 0 300 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.991 0.989 0.850 0,860 Fit Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1858 1938 0 1770 1 B42 0 1796 3592 1607 1770 3539 1583 Fit Permitted 0.695 0.597 0.950 0.950 Satd. Flow (perm) 1359 1938 0 1112 1842 0 1796 3592 1607 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 4 4 177 123 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1210 950 2601 1598 Travel Time (s) 27.5 21.6 59.1 36.3 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 51 121 8 51 88 7 29 585 43 198 1743 84 Shared Lane Traffic (%) Lane Group Flow (vph) 51 129 0 51 95 0 29 585 43 198 1743 84 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Rig ht Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 0.94 0.94 0.94 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1.00 Tuming Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 Detector I Size(ft) 50 50 50 50 50 50 50 50 50 50 Detector I Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector I Queue (s) 0.0 0.0 U 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 D ee 1 a y (S) 0.0 0.0 0.0 0.0 n.n n.n n.o n n 0.0 o.n Turn Type pm+pt NA pm+pt NA Prot NA Perm Prot NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 40 4.0 4.0 4.0 4.0 Minimum Split (s) 8.0 20.0 8.0 20.0 8.0 200 20.0 8.0 20.0 20.0 Total Split (s) 8.0 20.0 8.0 20.0 8.0 32.0 32.0 20.0 44.0 44.0 JT Madison Apartments 12:00 prn 4/16/2018 2018 Existing Conditions Synchro 8 Report TENW Page I This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 4/16/2018 -'* --I, N r '*- k *� t I,* '* � 411f� Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (%) 10.0% 25.0% 10.0% 25.0% 10.0% 40.0% 40.0% 25.0% 55.0% 55.0% Maximum Green (s) 4.0 16.0 4.0 16.0 4.0 28.0 28.0 16.0 40.0 40.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 G.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead[Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5,0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 11.4 9.8 11.4 9.6 4.1 31.0 31.0 12.3 45.6 45.6 Actuated g/C Ratio 0.17 0.15 0.17 0.14 0.06 0.46 0.46 0.18 0.68 0.68 v/c Ratio 0.20 0.45 0.22 0.35 0.27 0.35 0.05 0.61 0.72 0.08 Control Delay 23.1 32.5 23.7 3G.6 40.6 15.6 0.1 35.3 14.6 1.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 23.1 32.5 23.7 30.6 40.6 15.6 0.1 35.3 14.6 1.1 LOS C C C C D B A D B A Approach Delay 29.8 28.2 15.7 16.1 Approach LOS C C B B Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 67 Natural Cycle: 80 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.72 Intersection Signal Delay: 17.4 Intersection LOS: B Intersection Capacity Utilization 66.4% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: SR 99 & 228th Street SW \$0 1 02 i ­�*04 20s T5__ 1 '20 S 05 06 o7 08 JT Madison Apartments 12:00 pm 4/16/2018 2018 Existing Conditions TENW Synchro 8 Report Page 2 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 2: SR 99 & 234th Street SW 4/16/2018 -A --1, N 'r -*- 4-- 4\ t 1* 4� Lane Group EBL EBT EBR WBL WBT WBR NBIL NBT NBR SBL SBT SBR Lane Configurations IT. 4. ) ++T-1 I ++1� Volume (vph) 1 0 12 7 0 4 2 565 4 1 1395 2 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -15% 0% -3% 3% Storage Length (ft) 0 0 0 0 100 0 100 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util, Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0 91 1.00 0.91 0.91 Ped Bike Factor Frt 0.875 0.951 0.999 FIt Protected 0.996 0.969 0.950 0.950 Satd. Flow (prot) 0 1780 0 0 1751 0 1796 5156 0 1760 5059 0 FIt Permitted 0.996 0.969 0.950 0.950 Satd. Flow (perm) 0 1780 0 0 1751 0 1796 5156 0 1760 5059 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 890 1269 1146 2601 Travel Time (s) 20.2 28.8 26.0 59.1 Confl. Peds. (#/hr) 7 6 6 7 6 6 7 7 Confl. Bikes (#/hr) 1 1 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles 0% 0% 0% 0% 0% 0% 2% 2% 2% 1% 1 % 1% Adj. Flow (vph) 1 0 12 7 0 4 2 577 4 1 1423 2 Shared Lane Traffic (%) Lane Group Flow (vph) 0 13 0 0 111 0 2 581 0 1 1425 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 0.91 0.91 0.91 1.00 1.00 1.00 0.98 0.98 0.98 1.02 1�02 1.02 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.1% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 prn 4/16/2018 2018 Existing Conditions Synchro 8 Report TENW Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. HCM Unsignalized Intersection Capacity Analysis 2: SIR 99 & 234th Street SW 4/16/2018 --* --I.. N t 4" Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4- 4. ) ++T. ) W. Volume (veh/h) 1 o 12 7 0 4 2 565 4 1 1395 2 Sign Control Stop Stop Free Free Grade -15% 0% -3% 3% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Hourly flow rate (vph) 1 0 12 7 0 4 2 577 4 1 1423 2 Pedestrians 7 7 6 7 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage I 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 1146 pX, platoon unblocked vC, conflicting volume 1641 2025 489 1084 2024 208 1433 588 vC1, stage I conf vol 1434 1434 590 590 vC2, stage 2 conf vol 207 592 495 1435 vCu, unblocked vol 1641 2025 489 1084 2024 208 1433 588 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3,5 4.0 3.3 2.2 2.2 pO queue free % 99 100 98 98 100 99 100 100 cM capacity (veh/h) 140 187 526 369 183 795 467 985 Direction, Lane # EB 1 WB 1 NB I NB 2 NB 3 N134 SB 1 SB 2 SB 3 S134 Volume Total 13 11 2 231 231 119 1 569 569 287 Volume Left 1 7 2 0 0 0 1 0 0 0 Volume Right 12 4 0 0 0 4 0 0 0 2 cSH 434 458 467 1700 1700 1700 985 1700 1700 1700 Volume to Capacity 0.03 0.02 0.00 0.14 0.14 0.07 0.00 0,33 0.33 0.17 Queue Length 95th (ft) 2 2 0 0 0 0 0 0 0 0 Control Delay (s) 13.6 13.1 12.7 0.0 0.0 0.0 8.7 0.0 0.0 0.0 Lane LOS B B B A Approach Delay (s) 13.6 13.1 0.0 0.0 Approach LOS B B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 39.1% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 prn 4/16/2018 2018 Existing Conditions Synchro 8 Report TENW Page 4 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 4/16/2018 'j, --I. N i- d+- *-- A\ Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBIL SBT SBR Lane Configurations 4 r 4. ++ r ++ Volume (vph) 82 71 57 17 11 4 71 529 3 20 1297 24 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 250 0 0 300 0 300 0 Storage Lanes 0 1 0 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.985 0.850 0.850 FIt Protected 0.974 0.974 0.950 0.950 Satd. Flow (prot) 0 1814 1583 0 1787 0 1770 3539 1583 1770 3539 1583 Flt Permitted 0.814 0.804 0.950 0.950 Satd. Flow (perm) 0 1516 1583 0 1475 0 1770 3539 1583 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 91 4 91 91 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1541 1387 2465 1146 Travel Time (s) 35.0 31.5 56.0 26.0 Peak Hour Factor 0.91 0.91 0.91 0.91 U1 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 90 78 63 19 12 4 78 581 3 22 1425 26 Shared Lane Traffic (%) Lane Group Flow (vph) 0 168 63 0 35 0 78 581 3 22 1425 26 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 T urn T y p c Perm N A Pem Perm N A Prot NA Ppr.m Pmt N A Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 4 4 4 8 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 20.0 20.0 20.0 20.0 20.0 8.0 32.0 32.0 8.0 32.0 32.0 Total Split (%) 33.3% 33.3% 33.3% 33.3% 33.3% 13.3% 53.3% 53.3% 13.3% 53.3% 53.30/c JT Madison Apartments 12:00 prn 4/16/2018 2018 Existing Conditions Synchro 8 Report TENW Page 5 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 4/16/2018 -,* --* N f- *-- *-- *% t i.* 4.4, Lane Group EBL EBT EBR WIBL WBT WIBR NBL NBT NIBR SBL SBT SBR Maximum Green (s) 16.0 16.0 16.0 16.0 16.0 4.0 28.0 28.0 4.0 28.0 28.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11,0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 11.0 11.0 10.8 4.0 37.3 37.3 4,0 32.6 32.6 Actuated g/C Ratio 0.20 0.20 0.20 0.07 0.68 0.68 0.07 0,60 0.60 v/c Ratio 0.55 0.16 0.12 0.60 0.24 0.00 0.17 0.67 0.03 Control Delay 26.7 3.7 16.8 48.9 5.9 0.0 28.8 13.6 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 26.7 3.7 16.8 48.9 5.9 0.0 28.8 13.6 0.0 LOS C A B D A A C B A Approach Delay 20.4 16.8 10.9 13.6 Approach LOS C B B B Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 54.5 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.67 Intersection Signal Delay: 13.6 Intersecfion LOS: B Intersection Capacity Utilization 60.0% ICU Level of Service B Analysis Period (min) 15 Sclits and Phases: 3: SIR 99 & 238th Street SW \001 t" 0 2 --*c-4 32 !; I 20s 0 5 o6 08 1 32 H20 S JT Madison Apartments 12:00 prn 4/16/2018 2018 Existing Conditions Synchro 8 Report TENW Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. Lanes, Volumes, Timings 1: SIR 99 & 228th Street SW 4/16/2018 -A --1, -,* 'r ,-- 4-- *� Lane Grouo EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SIBR Lane Configurations *i T. Vi T. ++ iN I ++ Volume (vph) 49 117 7 49 85 6 28 565 41 191 1683 81 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -10% 0% -3% 0% Storage Length (ft) 150 0 0 0 200 0 300 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane LIU Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.991 0.989 0.850 0.850 At Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1858 1938 0 1770 1842 0 1796 3592 1607 1770 3539 1583 FIt Permitted 0.677 0.551 0,950 0.950 Satc. Flow (perm) 1324 1938 0 1026 1842 0 1796 3592 1607 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satc. Flow (RTOR) 3 4 158 109 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1210 950 2601 1598 Travel Time (s) 27.5 21.6 59.1 36.3 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 54 129 8 54 93 7 31 621 45 210 1849 89 Shared Lane Traffic (%) Lane Group Flow (vph) 54 137 0 54 100 0 31 621 45 210 1849 89 Enter Blocked Intersection No No No No No No No No No No No No Lane AJignment Left Left Right Left Left Right Left Left Right Left Left Rght Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 0.94 0.94 0.94 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Dletector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type pm+pt NA pm+pt NA Prot NA Perm Prot NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 40 4.0 Minimum Split (s) 8.0 20.0 8.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 8.0 20.0 8.0 20.0 8.0 40.0 40.0 22.0 54.0 54.0 JT Madison Apartments 12:00 pm 4/16/2018 2021 Baseline Conditions Synchro 8 Report TENW Page I This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 4/16/2018 -,* --I. N 1- 4,-- - *% t 1* 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBIL SBT SBR Total Split (%) 8.9% 22.2% 8.9% 22.2% 8.9% 44.4% 44.4% 24.4% 60.0% 60.0% Maximum Green (s) 4.0 16.0 4.0 16.0 4.0 36.0 36.0 18.0 50.0 50,0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5,0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#Ihr) 0 0 0 0 0 0 Act Effct Green (s) 13.1 10.9 13.1 10.9 4.1 37.7 37.7 14.2 51.6 51.6 Actuated g/C Ratio 0.16 0.14 0.16 0.14 0.05 0.47 0.47 0.18 0.65 0.65 v/c Ratio 0.22 0.51 0.26 0.39 0.34 0.36 0.05 0.66 0.80 0.08 Control Delay 28.3 39.3 29.4 36.0 50.5 15.9 0.1 42.4 17.0 1.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 28.3 39.3 29.4 36.0 50.5 1H 0.1 42.4 17.0 1.6 LOS C D C D D B A D B A Approach Delay 36.2 33.7 16.5 18.8 Approach LOS D C B B Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 79.4 Natural Cycle: 90 Control Type: Semi Act-Uncoord Maximum v/c Rafio: 0.80 Intersection Signal Delay: 20.1 Intersection LOS: C Intersection Capacity Utilization 73.1% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: SIR 99 & 228th Street SW 11* 0 1 t02 'Or-o -3 '1110 -4 22s I 1140S ss 120s 06 07 0 JT Madison Apartments 12:00 pm 4/16/2018 2021 Baseline Conditions Synchro 8 Report TENW Page 2 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. Lanes, Volumes, Timings 2: SR 99 & 234th Street SW 4/16/2018 ,,* N j- -*-- 4,- -*\ t 4/ Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations $. 4. Vi + +T. W. Volume (vph) 1 o 13 7 0 4 2 600 4 1 1480 2 Ideal Flow (vphpi) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -15% 0% -3% 3% Storage Length (ft) 0 0 0 0 100 0 100 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 0.91 Ped Bike Factor Frt 0.875 0.951 0.999 Flt Protected 0,996 0.969 0.950 0.950 Satd. Flow (prot) 0 1780 0 0 1751 0 1796 5156 0 1760 5059 0 FIt Permitted 0.996 0.969 0.950 0.950 Satd. Flow (perm) 0 1780 0 0 1751 0 1796 5156 0 1760 5059 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 890 1269 1146 2601 Travel Time (s) 20.2 28.8 26.0 59.1 Confl. Peds. (#Ihr) 7 6 6 7 6 6 7 7 Confl. Bikes (#/hr) 1 1 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles 0% 0% 0% 0% 0% 0% 2% 2% 2% 1% 1 % 1 % Adj. Flow (vph) 1 0 13 7 0 4 2 612 4 1 1510 2 Shared Lane Traffic (%) Lane Group Flow (vph) 0 14 0 0 11 0 2 616 0 1 1512 0 Enter Blocked Intersection No No No No No No No No No No No No Lane AJignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor 0.91 0.91 o.91 1.00 1.00 1.00 0.98 0.98 0.98 1.02 1.02 1.02 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 40.7% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 pm 4/16/2018 2021 Baseline Conditions Synchro 8 Report TENW Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. HCM Unsignalized Intersection Capacity Analysis 2: SIR 99 & 234th Street SW 4/16/2018 ,A --I.. �%, e- -*-- k t -* 1* 41 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4-- 4. Vi + +T. I ++,� Volume (veh/h) I o 13 7 0 4 2 600 4 1 1480 2 Sign Control Stop Stop Free Free Grade -15% 0% -3% 3% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 098 0.98 0.98 0.98 0.98 0.98 Hourly flow rate (vph) 1 0 13 7 0 4 2 612 4 1 1510 2 Pedestrians 7 7 6 7 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft1s) 4.0 4.0 4.0 4.0 Percent Blockage I 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 1146 pX, platoon unblocked vC, conflicting volume 1740 2148 517 1150 2147 220 1519 623 vC1, stage 1 conf vol 1520 1520 625 625 vC2, stage 2 conf vol 219 627 525 1521 vCu, unblocked vol 1740 2148 517 1150 2147 220 1519 623 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 99 100 97 98 100 99 100 100 cM capacity (veh/h) 124 170 504 349 166 781 433 955 Direction, Lane # EB 1 WB 1 NB 1 N132 N133 NB4 SB 1 SB2 SB3 SB4 Volume Total 14 11 2 245 245 127 1 604 604 304 Volume Left 1 7 2 0 0 0 1 0 0 0 Volume Right 13 4 0 0 0 4 0 0 0 2 cSH 413 437 433 1700 1700 1700 955 1700 1700 1700 Volume to Capacity 0.03 0.03 0.00 0.14 0.14 0.07 0.00 0.36 0.36 0.18 Queue Length 95th (ft) 3 2 0 0 0 0 0 0 0 0 Control Delay (s) 14.0 13.5 13.4 0.0 0.0 0.0 8.8 0.0 0.0 0.0 Lane LOS B B B A Approach Delay (s) 14.0 13.5 0.0 0.0 Approach LOS B B Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 40.7% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 pm 4/16/2018 2021 Baseline Conditions Synchro 8 Report TENW Page 4 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 4/16/2018 ,,* __1, --,* j- -*- k 4VJ Lane Group EBIL EBT EBR WBL WBT WBR NBL NBT NBR SBIL SBT SBR Lane Configurations 4 4- ++ iN I ++ Volume (vph) 87 75 60 18 12 4 75 561 4 21 1376 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 250 0 0 300 0 300 0 Storage Lanes 0 1 0 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0,850 0.985 0.850 0.850 Fit Protected 0.974 0.974 0.950 0.950 Satd. Flow (prot) 0 1814 1583 0 1787 0 1770 3539 1583 1770 3539 1583 Fit Permitted 0.833 0.715 0,950 0.950 Satd. Flow (perm) 0 1552 1583 0 1312 0 1770 3539 1583 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd, Flow (RTOR) 66 4 36 65 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1541 1387 2465 1146 Travel Time (s) 35.0 31.5 56.0 26.0 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 96 82 66 20 13 4 82 616 4 23 1512 27 Shared Lane Traffic Lane Group Flow (vph) 0 178 66 0 37 0 82 616 4 23 1512 27 Enter Blocked Intersecton No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk VVidth(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 C Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 5C Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex Cl+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Fj Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 OX Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 O.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 OX Turn Type Perm NA Perm Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 2 Detector Phase 4 4 4 8 8 5 2 2 1 6 E Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 35.0 35.0 35.0 35.0 35.0 19.0 105.0 105.0 10.0 96.0 96.0 Total Split (%) 23.3% 23.3% 23.3% 23.3% 23.3% 12.7% 70.0% 70.0% 6.7% 64.0% 64.00/c JT Madison Apartments 12:00 prn 4/16/2018 2021 Baseline Conditions Synchro 8 Report TENW Page 5 This document was created by an application that isn't licensed to use novaPIDIF. Purchase a license to generate PIDIF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 4/16/2018 --.* --,, --* i- *- 4-- -*� t 4-, Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 31.0 31.0 31.0 31.0 31.0 15.0 101.0 101.0 6.0 92.0 92.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3,0 3.0 Recall Mode None None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11�0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 21.1 21.1 21.1 11.4 102.9 102.9 5.9 93.3 93.3 Actuated g/C Ratio 0.15 0.15 0.15 0.08 0.75 0.75 0.04 0.68 0.68 v/c Ratio 0.75 0.22 0.18 0.57 0.23 0.00 0.31 0.63 0.02 Control Delay 75.6 12.7 48.3 77.4 6.6 0.0 78.0 15.3 0.0 Queue Delay 0.0 0.0 0.0 0.0 0�0 0.0 0.0 0.0 0.0 Total Delay 75.6 12.7 48.3 77.4 6.6 0.0 78.0 15.3 0.0 LOS E B D E A A E B A Approach Delay 58.6 48.3 14.9 16.0 Approach LOS E D B B Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 137.8 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.75 Intersection Signal Delay: 20.2 Intersection LOS: C Intersection Capacity Utilization 63.1% ICU Level of Service B Analysis Period (min) 15 Solits and Phases: 3: SIR 99 & 238th Street SW 11901 t o --Ob4 TO S 1 105S 35S 4%05 1 `4 o 6 08 19S 1 196S 35 s JT Madison Apartments 12:00 pm 4/16/2018 2021 Baseline Conditions TENW Synchro 8 Report Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW . 4/16/2018 --V -*- 4" 4\ t 4/ ,A ,(- Lane Group EBL EBT EBR WBI- WBT WBR NBL NBT NBIR SBL SBT SBR Lane Configurations T. V, ++ ++ Volume (vph) 49 117 7 49 85 6 28 580 41 191 1688 81 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -10% 0% -3% 0% Storage Length (ft) 150 0 0 0 200 0 300 0 Storage Lanes 1 0 1 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1,00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.991 0.989 0.850 0.850 FIt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1858 1938 0 1770 1842 0 1796 3592 1607 1770 3539 1583 FIt Permitted 0.677 0.551 0.950 0,950 Satcl. Flow (perm) 1324 1938 0 1026 1842 0 1796 3592 1607 1770 3539 1583 Right Tu nn on Red Yes Yes Yes Yes Satc. Flow (RTOR) 3 4 158 109 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1210 950 2601 1598 Travel Time (s) 27.5 21.6 59.1 36.3 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 54 129 8 54 93 7 31 637 45 210 1855 89 Shared Lane Traffic (%) Lane Group Flow (vph) 54 137 0 54 100 0 31 637 45 210 1855 89 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Pight Left Left Right Median Width(ft) 12 12 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 0.94 0.94 0.94 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 Detector I Position(ft) 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 Detector 1 Type CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Cl+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 nptpr.tnr I F)P.Iqv W 00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type 1 1-1 pm+pt NA pm+pt NA Prot NA Perm Prot NA Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 2 6 Detector Phase 7 4 3 8 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 8.0 20.0 8.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 8.0 20.0 8.0 20.0 8.0 40.0 40.0 22.0 54.0 54.0 JT Madison Apartments 12:00 pm 4/16/2018 2021 with Project Conditions Synchro 8 Report TENW Page 1 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 1: SR 99 & 228th Street SW 4/16/2018 --.* --*� N i- *- 4�- *% t 1,0, 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Split (%) 6.9% 22.2% 8.9% 22.2% 8.9% 44.4% 44.4% 24.4% 60.0% 60.00/c Maximum Green (s) 4.0 16.0 4.0 16.0 4.0 36.0 36.0 18.0 50.0 50.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 H Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead[Lag Lead Lag Lead Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 13.1 10.9 13.1 10.9 4.1 37.7 37.7 14.2 51.6 51.6 Actuated g/C Ratio 0.16 0.14 0.16 0.14 0.05 0.47 0.47 0.18 0.65 0.65 v/c Ratio 0.22 0.51 0.26 0.39 0.34 0.37 0.05 0.66 0.81 0.08 Control Delay 28.3 39.3 29.4 36.0 50.5 16.1 0.1 42.4 17.1 1.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 28.3 39.3 29.4 36.0 50.5 16.1 0.1 42.4 17.1 1.6 LOS C D C D D 6 A D B A Approach Delay 36.2 33.7 16.5 18.9 Approach LOS D C B B Area Type: Other Cycle Length: 90 Actuated Cycle Length: 79.4 Natural Cycle: 90 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.81 Intersection Signal Delay: 20.1 Intersection LOS: C Intersection Capacity Utilization 73.2% ICU Level of Service D Anaiysis t-enoo kmin) io Solits and Phases: 1: SIR 99 & 228th Street SW 0 1 0 f�o 3 _41ko -1 22s 1 1140S 8 20s 05 06 o7 08 35 1,1545 V �SITO 5 JT Madison Apartments 12:00 pm 4/16/2018 2021 with Project Conditions Synchro 8 Report TENW Page 2 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 2: SR 99 & 234th Street SW 4/16/2018 ,A __1. N r -*- k -*\ 411 Lane Group EBL EBT EBR WBL WBT WBR NBL NST NBR SBL S13T SBR Lane Configurations 4-- -1� ) ++T.. ) W.- Volume (vph) 15 0 24 7 0 4 11 600 4 1 1480 7 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -15% 0% -3% 3% Storage Length (ft) 0 0 0 0 100 0 100 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.91 0.91 1.00 0.91 0.91 Ped Bike Factor Firt 0.917 0.951 0.999 0,999 Fit Protected 0,981 0.969 0.950 0.950 Satd. Flow (prot) 0 1837 0 0 1751 0 1796 5156 0 1760 5054 0 Fit Permifted 0.981 0.969 0.950 0.950 Satcl. Flow (perm) 0 1837 0 0 1751 0 1796 5156 0 1760 5054 0 Link Speed (mph) 30 30 30 30 Link Distance (ft) 890 1269 1146 2601 Travel Time (s) 20.2 28.8 26.0 59.1 Confl. Peds. (#thr) 7 6 6 7 6 6 7 7 Confl. Bikes (#/hr) 1 1 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles 0% 0% 0% 0% 0% 0% 2% 2% 2% 1 % 1 % 1% Adj. Flow (vph) 15 0 24 7 0 4 11 612 4 1 1510 7 Shared Lane Traffic (%) Lane Group Flow (vph) 0 39 0 0 11 0 11 616 0 1 1517 0 Enter Blocked Intersection No No No No No No No No No No No No Lane AJignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Yes Headway Factor o.91 o.91 0.91 1.00 1.00 1.00 0.98 0.98 0.98 1.02 1.02 1.02 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Stop Stop Free Free In!erseden Samm Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 40.8% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 prin 4/16/2018 2021 with Project Conditions Synchro 8 Report TENW Page 3 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PIDIF files without this notice. HCM Unsignalized Intersection Capacity Analysis 2: SIR 99 & 234th Street SW 4/16/2018 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBIL SBT SBR Lane Configurations 4-� IT., t tT,.- ) ttIl Volume (veh[h) 15 0 24 7 0 4 11 600 4 1 1480 7 Sign Control Stop Stop Free Free Grade -15% 0% -3% 3% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 098 0.98 0.98 Hourly flow rate (vph) 15 0 24 7 0 4 11 612 4 1 1510 7 Pedestrians 7 7 6 7 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage 1 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream signal (ft) 1146 pX, platoon unblocked vC, conflicting volume 1760 2169 520 1180 2170 220 1524 623 vC1, stage 1 conf vol 1523 1523 644 644 vC2, stage 2 conf voll 238 646 536 1526 vCu, unblocked vol 1760 2169 520 1180 2170 220 1524 623 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 pO queue free % 88 100 95 98 100 99 97 100 cM capacity (veh/h) 123 169 502 330 157 781 431 955 Direction, Lane # E8 I WB 1 NB 1 NB 2 NB3 N134 S13 1 S132 SB 3 S134 Volume Total 40 11 11 245 245 127 1 604 604 309 Volume Left 15 7 11 0 0 0 1 0 0 0 Volume Right 24 4 0 0 0 4 0 0 0 7 cSH 230 417 431 1700 1700 1700 955 1700 1700 1700 Volume to Capacity 0.17 0.03 0.03 0.14 0.14 0.07 0.00 0.36 0.36 0.18 Queue Length 95th (ft) 15 2 2 0 0 0 0 0 0 0 Control Delay (s) 23.9 13.9 13.6 0.0 0.0 0.0 8.8 0.0 0.0 0.0 Lane LOS C B B A Approach Delay (s) 23.9 13.9 0.2 0.0 Approach LOS C B Intersection Summary Average Delay 0.6 Intersect.ion Capacity Utilization 40.8% ICU Level of Service A Analysis Period (min) 15 JT Madison Apartments 12:00 prn 4/16/2018 2021 with Project Conditions Synchro 8 Report TENW Page 4 This document was created by an application that isn't licensed to use novaPIDIF. Purchase a license to generate PIDIF files without this notice. Lanes, Volumes, Timings 3: SIR 99 & 238th Street SW 4/16/2018 ,A --1, --,* 'r .6--- *,,- *% 4v-, Lane Group EBL EBT EBR V%JBL WBT WEIR NBL NBT NBR SBL SST SBR Lane Configurations 4 P 4- ++ if I ++ Volume (vph) 87 75 60 18 12 4 75 570 4 21 1400 25 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 250 0 0 300 0 300 0 Storage Lanes 0 1 0 0 1 1 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.985 0.850 0.850 FIt Protected 0.974 0.974 0.950 0.950 Satd. Flow (prot) 0 1814 1583 0 1787 0 1770 3539 1583 1770 3539 1583 FIt Permitted 0.833 0.715 0.950 0.950 Satd. Flow (perm) 0 1552 1583 0 1312 0 1770 3539 1583 1770 3539 1583 Right Turn on Red Yes Yes Yes Yes Satd, Flow (RTOR) 66 4 36 65 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1541 1387 2465 1146 Travel Time (s) 35.0 31.5 56.0 26.0 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 96 82 66 20 13 4 82 626 4 23 1538 27 Shared Lane Traffic Lane Group Flow (vph) 0 178 66 0 37 0 82 626 4 23 1538 27 Enter Blocked Intersecfion No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Yes Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 1 1 1 1 1 1 1 1 1 1 Detector Template Leading Detector (ft) 50 50 50 50 50 50 50 50 50 50 50 Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 50 50 50 50 50 50 50 50 50 50 50 Detector I Type CI+Ex CI+Ex: Cl+Ex CI+Ex CI+Ex Cl+Ex CI+Ex CI+Ex CI+Ex CI+Ex CI+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm Perm NA Prot NA Perm Prot NA Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 2 6 Detector Phase 4 4 4 8 a 5 2 2 1 6 6 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Minimum Split (s) 20.0 20.0 20.0 20.0 20.0 8.0 20.0 20.0 8.0 20.0 20.0 Total Split (s) 35.0 35.0 35.0 35.0 35.0 19.0 105.0 105.0 10.0 96.0 96.0 Total Split (%) 23.3% 23.3% 23.3% 23.3% 23.3% 12.7% 70.0% 70.0% 6.7% 64.0% 64.0% JT Madison Apartments 12:00 prn 4/16/2018 2021 with Project Conditions Synchro 8 Report TENW Page 5 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. Lanes, Volumes, Timings 3: SR 99 & 238th Street SW 4/16/2018 -,* N i- *- k *� t t* 41 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Maximum Green (s) 31.0 31.0 31.0 31.0 31.0 15.0 101.0 101.0 6.0 92.0 92.0 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All -Red Time (s) 0.5 0,5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lead/Lag Lead Lag Lag Lead Lag Lag Lead -Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None None Max Max None Max Max Walk Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 rlash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 Act Effct Green (s) 21.1 21.1 21.1 11.4 102.9 102.9 5.9 93.3 93.3 Actuated g/C Ratio 0.15 0.15 0.15 0.08 0.75 0.75 0.04 0,68 0.68 v/c Ratio 0.75 0.22 0.18 0.57 0.24 0.00 0.31 0.64 0.02 Control Delay 75.6 12.7 48.3 77.4 6.7 0.0 78.0 15,6 0.0 Queue Delay 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 75.6 12.7 48.3 77.4 6.7 0.0 78.0 15.6 0.0 LOS E B D E A A E B A Approach Delay 58.6 48.3 14.8 16.2 Approach LOS E D B B Intersection Summary Area Type: Other Cycle Length: 150 Actuated Cycle Length: 137.8 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.75 Intersection Signal Delay: 20.3 Intersection LOS: C Intersection Capacity Utilization 63.7% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: SR 99 & 238th Street SW 11V 0 1 to2 70-S loss 35s 0 5 06 08 19S I_lb6 S 35S JT Madison Apartments 12:00 pm 4/16/2018 2021 with Project Conditions Synchro 8 Report TENW Page 6 This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. stud'OMENG ARCHITECTURE C PLANN�NG , ONSULT NG STRAZZARA 14 March 2019 Brad Shipley City of Edmonds Department of Construction and Inspections 121 5th Ave North Edmonds, WA 98020 RE: Truck Turning Clearances 23400 Highway 99 (File No. PILN 20180060) Dear Mr. Shipley: This letter is to address the garbage truck maneuvering on the 23400 Highway 99 site. Due to the existing steep slope topography of 234th St SW and the location of new water service vaults, the garbage truck reversal cannot be accommodated within the confines of the property. In order to provide a surface for the garbage trucks to maneuver onsite, a N-S oriented retaining wall is required. Per Edmonds City Code and Community Development Code 21.90.020 Setback and 21.90.150 Structure, retaining walls within a required setback must be no taller than three feet in height. A N-S retaining wall would need to be greater than three feet in height and therefore is not allowed per Edmonds City Code and Community Development Code. Furthermore, two water service vaults are located in the area east of the driveway. Per Olympic View, vaults cannot be located in areas with traffic as the vaults are not designed to support the weight of vehicles. The followiing statement is from Michael Read, Principal at Transportation Engineering NorthWest, regarding the sight distance of truck turning. The sight distance for the vehicles coming from Highway 99 is approximately I 10 LF for SB right turn movements and in excess of 500 feet for NB left turn movements if the truck can reverse within the property and exit via a standard movement. Since this maneuver isn't feasible due to the reasons listed below, the truck will need to reverse into the 234th ROW The sight distance of this maneuver is approximately 180 LF for SB right turn movements and in excess of 500 feet for NB left turn movements if the truck reverses into the 234th Street ROW. In order to maximize sight distance, all vertical elements (cabinet/ utility box, vegetation ... ) east of the driveway will be below 3.5'in order to not obstruct driver entering sight distance of the driveway and immediate proximity. TEL 206 587 3797 FAX 206 587 0588 2001 WESTERN AVE, SUITE 200 SEATTLE, WA, USA 98121 www.studioms.com This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. studOMENG STRAZZARA Due to the reasons stated above, garbage truck reversal must occur into the 234th St SW Right -of -Way. Per the attached diagrams, all truck reversal movement is limited to 234th St SW and will not extend into Highway 99. Sincerely, Lucas Branham Architect, AIA This document was created by an application that isn't licensed to use novaPDF. Purchase a license to generate PDF files without this notice. -9oijou siql inoql!m s9b JGd ejejoueb ol asueoil e E)seqojnd ,:I(]deAOU asn ol posugo.11 J,usi leql uo!leoi.Idde ue Aq pele9jo sem luewnoop siq_L 432+_ .31 430 m 0 424 m ED X\,,< ___ m ", �;_ I co 'o U) rFi--- G) Z 0 '10 FF __Z7 0 N"IX HIGHWAY 99 APARTMENTS EXHIBT SITE I CIVIL EDMONDS, WA 01/31/2019 112351s,e' 6th stmet t: 425.453.9501 -IN EXHIBIT SCALE: 1- - 20' .ulte 50 f. 425.453.8208 TRUCK PULLING bellewe, wo 98004 www.navi . xeng.com -9oijou siql inoql!m s9b JGd ejejoueb ol asueoil e E)seqojnd ,:I(]deAOU asn ol posugo.11 J,usi leql uo!leoi.Idde ue Aq pele9jo sem luewnoop siq_L m >59— co Crn,_ wwm [B ool" so m cm" n N"IX HIGHWAY 99 APARTMENTS EXHIBT SITE I CIVIL EDMONDS, WA 01/31/2019 112351s.e' 5th stmet t: 425.453.9501 —OUT EXHIBIT SCALE: 1- - 20' .ulte 50 f. 425.453.8208TRUCK BACKING bellewe, wo 98004 www.navi . xeng.com 0 0- 0 (n 0 CD C: 3 CD 0 (D (n CD (n b 0 (0 CD CD M_ =3 CD CD CD n M --a CD cn M 0 0 cn 0 0 CD (n (D 0- 0 C En (D =3 0 110 LF from we �o 110 LF of sight distance from west -most southbound lane to garbage truck entering 234th St SW Sight distance obstruction: ul g co r jjLBuildi:ngcor;ner 234th St SW Sight distance in excess of 500 LF for middle turning lane on Highway 99 Sight distance obstruction: Sign � IL; tv A, I W 0 (3) z -r— < t= 0 N 04 00 CV) 0 CO 0 z 0< z � 3: P 0 - X W cr) W 0 z 0 cr < 3:W 0 LL 0 25 50 100 SCALE: 1 inch 50 ft. T 0 (n C-) (D C (D CD (D (n b 0 (0 (D (D Z3 (D (D T n (D 0 0 �� Fn (n -I -1 — 0 3' (D cn CD 0- C (n (D -1 0 1810 LF of sight is di -t' nce from wes�t-most southbound lane to garbage truck entering 234th St SW v Sight distance obstruction: Building cornerl Wt M.1 qjM Sight distance in excess of 500 LF for middle turning p lane on Highway 99 1% V + t distance truction: Sign N, Xt W 0 0) U9 z -r— < 0 N 04 X 00 W W CO) 0 CO 4 Val 6M z 0 2 Q 0 W 0 Q)z Z 0 < 3:W M 0 M W i U) 0 25 50 100 co �d Lo SCALE: 1 inch 50 ft.