Loading...
APPROVED BLD BLD2022-0266+Plumbing_Plan+3.1.2022_2.34.22_PM+2710147GENERAL VALVES ABBREVIATIONS GENERAL NOTES - MECHANICAL NON-STRUCTURAL MECHANICAL COMPONENT NOTES EXISTING MECHANICAL TO BE REMOVED EXISTING MECHANICAL TO REMAIN NEW MECHANICAL WORK MATCHLINE OR PROPERTY LINE ENLARGED PLAN BOUNDARY DETAIL/PLAN IDENTIFIER SECTION IDENTIFIER ELEVATION IDENTIFIER REVISION DEFINITION AREA, AREA ENCIRCLED CONTAINS CHANGES MADE SUBSEQUENT TO PREVIOUS ISSUE REVISION CALLOUT FLAG NOTE CALLOUT DEMOLITION NOTE TAG EQUIPMENT TAG MECHANICAL EQUIPMENT TAG MECHANICAL EQUIPMENT TAG NORTH ARROW LOCATION WHERE PICTURE WAS TAKEN AND DIRECTION INVERT ELEVATION OR POC ELECTRICAL PROVISIONS FOR MECHANICAL WORK LOCATION OF STARTER, DISCONNECT & CONTROLS vFD VARIABLE FREQUENCY DRIVE HT HTHEAT TRACE BETWEEN SYMBOLS OR END OF RUN ACCESS, EXCAVATION, AND BACKFILLING ACCESS DOOR (SPECIFIED OR AS SHOWN ON DWGS) r - - MECHANICAL ACCESS (SPECIFIED OR AS SHOWN ON L _ _ DWGS) PIPING PIPE ELBOW UP OR PIPE TEE UP AND DOWN PIPE ELBOW DOWN PIPE TEE UP PIPE TEE DOWN PIPE RISE PIPE CAP PIPE PLUG FLOW DIRECTION PIPE BREAK PIPE CONNECTION VALVE: GATE, BALL, BUTTERFLY (REFER TO SPECIFICATIONS) GLOBE VALVE SOLENOID VALVE CHECK VALVE BALANCING VALVE PRESSURE REDUCING VALVE REDUCED PRESSURE BACKFLOW ASSEMBLY SAFETY RELIEF VALVE TEMPERATURE/PRESSURE RELIEF VALVE DOMESTIC WATER PIPING SYSTEM — — 140 T FW TP hi DOMESTIC COLD WATER DOMESTIC HOT WATER DOMESTIC HOT WATER CIRCULATION DOMESTIC HOT WATER (TEMP. XXX°) DOMESTIC HOT WATER CIRCULATION (TEMP. XXX°) TEMPERED WATER FILTERED WATER TRAP PRIMER WATER WATER METER BASKET STRAINER HOSE BIBB/WALL HYDRANT TRAP PRIMER BOX SOIL AND WASTE WATER PIPING SYSTEM SANITARY SEWER/WASTE UNDERGROUND SANITARY SEWER/WASTE ABOVEGROUND GW GREASE WASTE IW INDIRECT WASTE CWV COMBINATION WASTE AND VENT --------- VENT PIPING 4" VTR VENT THRU ROOF ---------0 (INCLUDE SIZE) o FLOOR DRAIN/FUNNEL FLOOR DRAIN FLOOR SINK o HUB DRAIN 0 TRENCH DRAIN CO CLEANOUT WCO CLEANOUT - FREE STANDING WALL MOUNTED FCO CLEANOUT - FLUSH WITH FLOOR NATURAL GAS PIPING SYSTEM G MPG A --- �ZZ LOW PRESSURE NATURAL GAS PIPING MEDIUM PRESSURE NATURAL GAS PIPING GAS COCK PRESSURE REGULATOR PRESSURE REGULATOR WITH VENT SEISMIC GAS SHUT-OFF GAS PRESSURE REDUCING VALVE WITH VENT 0 DIAMETER, PHASE A AIR, AMPS AAV AUTOMATIC AIR VENT ABV ABOVE ADA AMERICANS WITH DISABILITIES ACT AF AIRFOIL AFF ABOVE FINISHED FLOOR AG ABOVEGROUND AHJ AUTHORITY HAVING JURISDICTION ARCH ARCHITECT ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS, INC. ASSY ASSEMBLY ATM ATMOSPHERE BF BELOW FLOOR BLW BELOW BOT BOTTOM BTUH BRITISH THERMAL UNIT PER HOUR CAP CAPACITY CO CLEANOUT, CO SENSOR CONT CONTINUE, CONTROL COTG CLEANOUT TO GRADE CW COLD WATER PIPING D DRAIN dB DECIBEL DCVA DOUBLE CHECK VALVE ASSEMBLY DDCV DOUBLE DETECTOR CHECK VALVE DEG DEGREE DFU DRAINAGE FIXTURE UNIT DI DUCTILE IRON DIA DIAMETER DIM DIMENSION DISCH DISCHARGE DN DOWN DWGS DRAWINGS DV DRAIN VALVE DWB DOMESTIC WATER BOOSTER (E) EXISTING EL ELEVATION ELEC ELECTRIC ET EXPANSION TANK EXT EXTERIOR, EXTERNAL F FAHRENHEIT, FIRE MAIN PIPING FCO FLOOR CLEANOUT FD FIRE DAMPER, FLOOR DRAIN, DRY SPRINKLER ROUTING FFD FUNNEL FLOOR DRAIN FLR FLOOR FS FLOOR SINK FT FEET, FIN TUBE FTD FOOTING DRAIN NA NOT APPLICABLE NO. NUMBER NTS NOT TO SCALE OC ON CENTER OD OUTSIDE DIMENSION OR DIAMETER ORD OVERFLOW ROOF DRAIN ORL OVERFLOW RAIN LEADER OSD OVER -FLOW STORM DRAIN P PUMP, PRESSURE, PLUMBING FIXTURE PD PRESSURE DROP, PUMPED DRAIN POC POINT OF CONNECTION PRV PRESSURE REDUCING VALVE PSIG POUNDS PER SQUARE INCH GAGE QTY QUANTITY RD ROOF DRAIN REF REFERENCE, RETURN/EXHAUST FAN RL RAIN LEADER RPBA REDUCED PRESSURE BACKFLOW ASSEMBLY RPBP REDUCED PRESSURE BACKFLOW PREVENTER SCH SCHEDULE SD STORM DRAIN PIPING SF SUPPLY FAN, SQUARE FOOT SIM SIMILAR SOV SHUTOFF VALVE SP STATIC PRESSURE SS STAINLESS STEEL, SANITARY SEWER TD TRENCH DRAIN, TEMPERATURE DIFFERENCE TEMP TEMPERATURE TYP TYPICAL 1. COORDINATE MECHANICAL WORK WITH THAT OF OTHER TRADES (ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL, AND LANDSCAPE). REFER TO ELECTRICAL, ARCHITECTURAL, STRUCTURAL, CIVIL, AND LANDSCAPE DRAWINGS AND SPECIFICATIONS. COORDINATION SHALL OCCUR PRIOR TO FABRICATION, PURCHASE, AND/OR INSTALLATION OF ALL WORK. 2. COORDINATE PLUMBING, HVAC, AND FIRE PROTECTION SYSTEMS ROUTING PRIOR TO INSTALLATION. DURING LAYOUT COORDINATION, DUCTWORK TAKES PRECEDENCE OVER PLUMBING, INCLUDING FIRE PROTECTION SYSTEMS. 3. UNLESS OTHERWISE SPECIFIED, THE GENERAL CONTRACTOR (GC) SHALL BE RESPONSIBLE FOR PAINTING, CUTTING, AND PATCHING OF EXISTING FLOORS, WALLS, AND PARTITIONS IN THE EXISTING BUILDING. 4. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE METHODS/LOADS FOR HANGING PIPING/DUCTS FROM STRUCTURAL MEMBERS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE KEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF PROPERTIES AGAINST FIRE, THEFT, AND ENVIRONMENTAL CONDITIONS. PLUMBING NOTES 1. WATER HAMMER ARRESTORS: PROVIDE AT THE END OF HOT AND COLD WATER LINES SERVING TWO OR MORE FIXTURES. SIZE IN ACCORDANCE WITH PLUMBING AND DRAINAGE INSTITUTE (PDI) REQUIREMENTS. 2. REDUCED PRESSURE BACKFLOW PREVENTERS (RPBP): PROVIDE INDIRECT DRAIN PIPING FROM RPBP TO NEAREST DRAIN. INSTALL FUNNEL AT RPBP IF REQUIRED. 3. ALL DOMESTIC WATER PIPING, PIPE FITTINGS, ACCESSORIES, AND PLUMBING EQUIPMENT SHALL BE NSF 61 CERTIFIED. SCOPE / NARRATIVE OF WORK: 1. THE COMPONENT IMPORTANCE FACTOR (Ip) FOR ALL NON-STRUCTURAL COMPONENTS SHALL BE: Ip = 1.0 2. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2018 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7-05. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. 3. 2018 IBC, 1613.1, SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-05, EXCLUDING CHAPTER 14 AND APPENDIX 11A. 4. 2018 IBC, 1704.4, CONTRACTOR RESPONSIBILITY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION OF A SEISMIC -FORCE -RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR SEISMIC -RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS AND SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL INCLUDE THE FOLLOWING: A. ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS; B. ACKNOWLEDGEMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS APPROVED BY THE BUILDING OFFICIAL; C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S ORGANIZATION, THE METHOD AND FREQUENCY OF REPORTING AND THE DISTRIBUTION OF THE REPORTS; D. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) EXERCISING SUCH CONTROL AND THEIR POSITION(S) IN THE ORGANIZATION. UG UNDERGROUND TENANT IMPROVEMENT FOR BAKERY AND RELATED GOVERNING BUILDING CODES: LINO UNLESS NOTED OTHERWISE SERVICES. SPACE INCLUDES COMMERCIAL KITCHEN AND DISPLAY/SERVICE AREA. UNDERGROUND GREASE • International Building Code (IBC), 2018 Edition, and Washington INTERCEPTOR LOCATED IN KITCHEN. ELECTRIC WATER State Amendments V VENT PIPING, VOLT HEATER FOR DOMESTIC HOT WATER SERVICE. • NFPA 54, National Fuel Gas Code, 2018 Edition, and VA VALVE Washington State Amendments • International Fuel Gas Code (IFGC), 2018 Edition, and VTR VENT THRU ROOF Washington State Amendments • Uniform Plumbing Code (UPC), 2018 Edition, and Washington W WASTE, WATT, WIDE, WATER State Amendments • Washington State Energy Code (WSEC), 2018 Edition W/ WITH WC WATER CLOSET, WATER COLUMN WCO WALL CLEANOUT MECHANICAL/PLUMBING ENGINEER OF RECORD: WG WATER GAGE 1. HARGIS ENGINEERS INC WH WATER HEATER, WALL HYDRANT 1201 3RD AVE SUITE 600 WHA WATER HAMMER ARRESTOR SEATTLE, WA 98101 206.448.3376 OFFICE WM WATER METER CONTACT: BRIAN CAWLEY, PRINCIPAL WSEC WASHINGTON STATE ENERGY CODE BRIAN.CAWLEY@HARGIS.BIZ WSFU WATER SUPPLY FIXTURE UNIT WT WEIGHT GAL GALLONS APPROVEu GPF GALLONS PER FLUSH GPH GALLONS PER HOUR GPM GALLONS PER MINUTE PLANS MUST BE HB HOSE BIBB HD HEAD, HUB DRAIN ON JOB SITE HORIZ HORIZONTAL HW HOT WATER PIPING ID INDIRECT DRAIN IE INVERT ELEVATION IN. INCH IN. WG INCHES WATER COLUMN IW INDIRECT WASTE PIPING kW KILOWATT L LENGTH MAX MAXIMUM MC MECHANICAL CONTRACTOR MECH MECHANICAL MIN MINIMUM I ALL WORK SUBJECT I TO FIELD NSPECTION FOR CODE COMPLIANCE City Of Edmonds Building Department Work PLUMBING ------------------------ Address 550 MAIN ST Owner COPPERPOT BAKERY ---------------------------- Approved Date 03/18/2022 Building Official Eric/ -------------------- Permit Number --------------------- BLD2022-0266 ----------------------- DRAWING INDEX PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL P0.01 NOTES P0.02 PLUMBING CALCULATIONS P0.03 PLUMBING SCHEDULES P1.10 FOUNDATION PLUMBING PLAN P2.11 ABOVE GROUND PLUMBING PLAN P9.01 PLUMBING DETAILS AND DIAGRAMS P9.02 PLUMBING DETAILS AND DIAGRAMS P9.03 PLUMBING DETAILS AND DIAGRAMS NOT ALL SYMBOLS MAY APPEAR ON THE DRAWINGS H A R G I S 1201 third avenue, suite 600, seattle,wa 98101 206.448.3376 206.448.4450 hargis.biz P� F. c-A ro 455- V ) Z O o 2i N 2i O O CO CO Uw W Q Uj _ W w �Z0 7 VJ L Z�� c L Low REV. RELEASE PROJECT NO. DATE HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE PLUMBING LEGEND, ABBREVIATIONS, AND GENERAL NOTES SHEET NUMBER RECEIVED P0. 01 Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PIPING SYSTEMS MATERIAL AND INSTALLATION SCHEDULE SPEC SECTION PIPING SYSTEM INSTALLATION LOCATION PIPE SIZE (INCHES) PIPE AND PIPE FITTING MATERIAL WALL THICKNESS JOINING METHOD (NOTE 1) ACCEPTABLE VALVE TYPES 221116 POTABLE AND NON -POTABLE DOMESTIC WATER SYSTEMS UNDERGOUND 2" AND SMALLER COPPER - TYPE K, PEX SOLDERED, FLANGED BUTTERFLY, BALANCING, BALL 2-1/2" AND LARGER COPPER - TYPE K BRAZED, FLANGED BUTTERFLY, BALANCING, BALL, OS&Y, CHECK 2-1/2" AND SMALLER COPPER - TYPE K PRESS FITTINGS BUTTERFLY, BALANCING, BALL 2" AND LARGER COPPER - TYPE K, PEX GROOVED BUTTERFLY UP TO 8", BALANCING ABOVE GROUND 2" AND SMALLER COPPER - TYPE L, PEX SOLDERED, FLANGED BUTTERFLY, BALANCING, BALL 2-1/2" AND LARGER COPPER - TYPE L BRAZED, FLANGED BUTTERFLY, BALANCING, GATE, OS&Y, CHECK 2-1/2" AND SMALLER COPPER - TYPE L, PEX PRESS FITTINGS BUTTERFLY, BALANCING, BALL 2" AND LARGER COPPER - TYPE L BUTTERFLY UP TO 8", BALANCING 221300 WASTE AND VENT UNDERGROUND ALL SIZES CAST IRON HUBLESS NOT APPLICABLE ALL SIZES PVC SCHEDULE 40 SOCKET NOT APPLICABLE ABOVE GROUND 1-1/2" AND SMALLER CAST IRON HUBLESS NOT APPLICABLE GALVANIZED STEEL STANDARD OR SCHEDULE 40 SCREWED NOT APPLICABLE COPPER SOLDERED NOT APPLICABLE PVC SCHEDULE 40 SOCKET NOT APPLICABLE 2' AND LARGER CAST IRON HUBLESS NOT APPLICABLE PVC SCHEDULE 40 SOCKET NOT APPLICABLE ALL SIZES PVC SCHEDULE 40 SOCKET NOT APPLICABLE GREASE WASTE UNDERGROUND ALL SIZES CAST IRON HUBLESS NOT APPLICABLE ALL SIZES CPVC SCHEDULE 40 SOCKET NOT APPLICABLE ABOVE GROUND ALL SIZES CAST IRON HUBLESS NOT APPLICABLE ALL SIZES CPVC SCHEDULE 40 SOCKET NOT APPLICABLE 231123 NATURAL GAS PIPING UNDERGROUND (EXTERIOR TO BUILDING) ALL SIZES POLYETHYLENE (PE) SOCKET OR BUTT FUSION ABOVEGROUND 2-1/2 AND SMALLER BLACK STEEL SCHEDULE 40 SCREWED OR WELDED GAS COCK, SOLENOID, SEISMIC 3" AND LARGER BLACK STEEL SCHEDULE 40 WELDED GAS COCK, SOLENOID, SEISMIC FLEXIBLE TUBING CORRUGATED STAINLESS STEEL CONNECTION SYSTEM FLEXIBLE CONNECTOR STAINLESS STEEL SCREWED, WELDED, OR FLANGED GREASE INTERCEPTOR CALCULATIONS Reference No. 35134 Step 1: Flow rate to grease interceptor Fixture flow rate: (cu in / 231) = gal x 0.75 / 2 min = 2 min flow rate Project Name: Copper Pot Bakery DIMENSIONS 3 Comp Sink 3 Compartment Sink 21" x 21" x 14" (3) Bar Sink Bar Sink One Bowl 14" x 14" x 14" Dishwasher Undercounter (Dishwasher)N/A Espresso Floor Sink N/A Ice Machine Ice Machine (with drain) N/A Prep Sink Prep Sink One Bowl 21" x 21" x 14" Trench Drain Floor Sink N/A Total (� I CU IN FLOW RA i E 1 18,522 30 GPM 1 2,744 4.45 GPM 1 1,155 2.5 GPM 1 N/A 0.5 GPM 1 N/A 0.5 GPM 1 6,174 10 GPM 2 N/A 2 GPM 49.95 GPM Step 2: Grease Production Servings per day x Grease production value x Days between pump -outs = Grease output Number of meals served per day: 210 Grease production value: 0.035 Ibs per serving (Bakery: High / No flatware) Days between pump -outs: 30 days 210 x 0.035 x 30 = 220 Ibs of FOG Water Pipe Sizing Procedure PROJECT NAME Copper Pot Bakery PROJECT NUMBER22018 BY D.Ide DATE January 28, 2022 SOURCE 2018 Uniform Plumbing Code Site Information Street Main Size Min PSI Available Source of Information: 3 100 Mechanical Contractor Site Loss - Main to Header Water Meter PSI Loss SizeGPM PSI Loss 25 2 40 5 Backflow Valve Model/Manufacturer Size GPM PSI Loss Watts 909 2" 40 10 Available PSI 60 Bldg Cold Water Piping System levation to Highes Residual Pressure Longest Run of Pipe Total Developed Allowable Pres. Allow. PSI Loss/100 Fixture (Ft) Required (psi) (Ft) Length Drop /100ft Ft (psi/Ft) (Ft hd/Ft) 12 25 100 150 46.0 19.9 Bldg Hot Water Piping System Elevation to Highes Residual Pressure Longest Run of Pipe Total Developed Allowable Pres. Allow. PSI Loss/100 Fixture (Ft) Required (psi) (Ft) Length Drop /100ft (Ft Ft (psi/Ft) hd/Ft) 12 20 100 150 53.7 1 23.2 Pipe Sizing Chart - Cold Water, Copper Type L Pipe Size Ft/Head per 100 Ft Ft/Sec GPM Fixture Units Allowable Flush Tank Flush Valve 8" 2.0 7.0 1022.6 >8300 >8300 6" 2.8 7.0 585.4 4360 4360 4" 4.4 7.0 261.3 1428 1428 3" 6.1 7.0 148.6 630 548 21/2" 7.6 1 7.0 104.1 401 265 2" 9.7 7.0 67.5 212 100 11/2" 13.4 7.0 38.8 82 25 11/4" 16.4 7.0 27.4 47 10 V. 20.9 7.0 18.0 26 0 3/4" 28.5 7.0 10.6 14 0 1/2" 43.6 7.0 5.1 6 0 Pipe Sizing Chart - Hot Water, Copper Type L Pipe Size Ft/Head per 100 Ft Ft/Sec GPM Fixture Units Allowable 8" 1.1 5.0 730.4 5653 6" 1.5 5.0 418.2 2844 4" 2.4 5.0 186.6 851 3" 3.3 5.0 106.2 411 21/2" 4.1 1 5.0 74.4 246 2" 5.2 5.0 48.2 119 11/2" 7.2 5.0 1 27.7 48 11/4" 8.8 5.0 1 19.6 29 1" 11.2 5.0 1 12.9 17 3/4" 15.3 5.0 1 7.5 9 1/2" 23.4 5.0 1 3.6 3 TABLE C403.2.9 MINIMUM PIPE II4SULATION THICKNESS din inches)" FLUID OPERATING TEMPERATURE RANGE AND USAGE (F} INSULATION CO BUCT1VIll NOMINAL PIPE OR TUBE SIZE Inches) Conductivity Btu • inJ(h • ft2 - IF)" Meaty Rating Tom paratum, 'F f ' Ito.. 1 �� � i �� to : � d to r 8 _,8 > 330 0.32 - 0-34 2 50 4.5 5.(1 5.0 5,0 5.11 251 - 350 0,29 - 0.32 2W 3.0 4.0 4-5 4-5 4.5 20l - 250 0-27 - 0.30 150 2.5 1i 2-5 3-0 3.0 141 - 200 0.25 - 0-29 115 I:.;, 1.5 2.0 2,0 2.0 WS - 14111 1,1.21 - 029 10 l -0 LC l 1-5 1-5 J .3 44 -_ 60 0.21 - 0-27 75 0.� 0-5 Lo 1.0 I.0 <40 0.20-0.26 50 t'J.5 1-1) 1.0 1-0 IJ M. Vor pip[ng smeller lien Ili} ioebes and locatad in partitions within mndirkmedspnees- reduction of thEse thicknesses by I inch shell be permiued tbrimr th3c4mcr,s adjIl required m footnote N but not to D thickm5s Jeaa than t inl b- par irtstrlstiaer avtsidr 111C >rated €andurtirity nmgr, the rrEinrmr® tl ]ckn e M duJJ 6e determined m follow3- T = r;(II wipe: I- = mini,,.urn trl6ubLii00 tJvcE , r = acivaloutsrdcradius ufpipe, F = msill tlurkil Ill In the mlhle !oc 11pp13cahio Ill tempsrmurt and pipe srrv. ill i*sondartivity afxl(rrnate ME l ai mean rating Iran ture uodimted forthr uppLcable fluid trmperuLure 03tu - m/h - tY - 7 and k = the upper value of the conductivity range Ill in the table forthe applicable hued Imperatsuc. V. Far direct4nmed b mteng and hat water system pl re, muaa of these thwkntsses by I J?, inches J 3 R mm j shall be pear 11 i llac a e Lhickrmss adjustment required in faotreote b lint not to tbrcknesscs Icss tbm [ brcb (15 mm))- Drainage Fixture Units PROJECT NAME Copper Pot Bakery PROJECT NUMBER 22018 BY D.Ide DATE January 28, 2022 SOURCE 2018 Seattle Plumbing Code Facilty Type Public P-Number Description Fixture Type Quantity Total DFU DFU 30 Total WC-1 WATER CLOSET Water Closet, 1.6 GPF Flushometer Tank 1 4 4 FD-1 FLOOR DRAIN Floor Drain 1 2 2 LV-1 LAVATORY Lavatory, single 1 1 1 21 KITCHEN HAND SINK Lavatory, single 2 1 2 41 KITCHEN PREP SINK Kitchen Sink, domestic 1 2 2 20 THREE COMPARTMENT SINK Special Purpose Sink, 2" Trap 1 4 4 31 MOP SINK Service Sink or Mop Basin, 2" Trap 1 3 3 22 DROP-N SINK Kitchen Sink, domestic 1 2 2 FLOOR SINK Receptor, indirect waste, 16-30 GPM 2 4 8 FLOOR DRAIN Floor Drain 1 2 2 Water Supply Fixture Unit Calculations PROJECT NAME Copper Pot Bakery PROJECT NUMBER 22018 BY D.Ide DATE January 28, 2022 SOURCE 2018 Uniform Plumbing Code Total Cold Water WSFU 14 Facility Type Public Total Hot Water WSFU 14 P-Number Description Fixture Type Quantity CW WSFU HW WSFU TOTALCW WSFU TOTALHW WSFU WC-1 WATER CLOSET Water Closet, 1.6GPF Flushometer Tank 1 2.50 0.00 2.50 0.00 LV-1 LAVATORY Lavatory 1 0.75 0.75 0.75 0.75 2 ESPRESSO Hose Bibb, each additional 1 1.00 0.00 1.00 0.00 31P MOP SINK Service Sink or Mop Basin 1 2.25 2.25 2.25 2.25 77 DISHWASHER Dishwasher, domestic 1 0.00 5.00 0.00 5.00 21P KITCHEN HAND SINK Lavatory 2 0.75 0.75 1.50 1.50 41P KITCHEN PREP SINK Kitchen Sink, domestic 1 1.13 1.13 1.13 1.13 20P THREE COMPARTMENT SINK Washup, 2 sets of Faucets 1 3.00 3.00 3.00 3.00 22A DROP-N SINK Lavatory 1 0.75 0.75 0.75 0.75 39 ICE MACHINE Hose Bibb, each additional 1 1.00 0.00 1.00 0.00 Water Heater Sizing Calculation PROJECT NAME Copper Pot Bakery PROJECT NUMBER 22018 BY D. Ide DATE January 28, 2022 SOURCE 2019 ASHRAE Handbook - HVAC Applications, CH. 50 Fixture Hot Water GPH Calculation Fixture Quantity GPH per Fixture GPH Notes Basin, public lavatory 1 5 5 Dishwasher 1 36 36 Kitchen Handwash 2 5 10 Kitchen sink 1 5 5 Mop Sink 1 15 15 Three Compartment Sink 1 100 100 Drop-n Sink 1 5 5 0 0 Total GPH 176 GPH Demand Factor 0.8 Storage Capacity Factor 1 Probable Maximum Demand 140.8 GPH Required Storage Tank Capacity* 141 Gal *Caution: It is not clear if the storage tank capacity calculated above considers the ratio of usable water to storage tank capacity. Hot Water Minimum Recovery Rate for Known Tank Sizes (ASHRAE 2011 Applications, 50.11 Equation 11) Available hot water required, Minimum recovery rate, R Duration of peak hot-water Ratio of usable water to Storage capacity of heater Vt [gal] [GPH] demand, d [H] storage tank capacity, M tank, St [gal] 178 Gal 140.8 GPH 1 10.75 50 Gal Required Heater Input (ASHRAE 2011 Applications, 50.21 Equation 14) for Actual Tank Size Proposed Actual Storage Tank Temperature Rise, At ll Heater Efficiency, rl Flow rate, Qh [GPH] Minimum Heater Input, q; Capacity [gal] [MBH] 50 Gal 80 1 0.96 1 128.3 GPH 89 MBH H A R G I S 1201 third avenue, suite 600, Seattle, wa 98101 206.448.3376 • 206.448.4450 • hargis.biz WASH (t` I W .yy Ff 4 0,n ,QF45590 C s sTE -fi,�.4 W LU L.L r� Z O 0 'L V / O N MO 00 ( U/ 0 Z O LU REV. RELEASE DATE PROJECT NO. HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE PLUMBING CALCULATIONS SHEET NUMBER RECEIVED PO.02 KITCHEN EQUIPMENT ROUGH -IN SCHEDULE ITEM NUMBER QUANTITY DESCRIPTION WATER WASTE GAS VENT SIZE (IN) NOTES CW SIZE (IN) HW SIZE (IN) DIRECT WASTE SIZE (IN) INDIRECT WASTE SIZE (IN) GREASE WASTE SIZE (IN) INDIRECT GREASE WASTE SIZE (IN) SIZE (IN) CAPACITY (BTU/HR) 2 1 2-GROUP ESPRESSO 1/2 1 19 1 WATER FILTER SYSTEM 1/2 - - - 20 1 3 COMPARTMENT SINK 1-1/2 - 1-1/2 20P 2 FAUCET & SPOUT 1/2 1/2 - - 21 2 HAND SINK - - 1-1/2 - 1-1/2 PROVIDE WITH THERMOSTATIC MIXING VALVE 21 P 2 FAUCET & SPOUT 1/2 1/2 - - - - 22 2 DROPIN ICE BIN - - 1/2 - 22A 2 DROP-N SINK 1/2 1/2 1-1/2 - 31 1 MOP SINK - - 3 - - 2 31 P 1 FAUCET & SPOUT 1/2 1/2 - - - - - - 36 1 WATER HEATER 3/4 3/4 1/2 - 3/4 42,000 39 1 ICE MAKER W/ ICE BIN - UNDERCOUNTER 1/2 - 1 - - - 41 1 1 COMPARTMENT SINK - - - 1-1/2 41P 1 FAUCET & SPOUT 1/2 1/2 - - 66 1 WALK-IN FREEZER BLOWER COIL - - 3/4 PLUMBING CONTRACTOR SHALL PROVIDE DRAIN LINES TO TERMINATE AT FLOOR SINK. 67 1 WALK-IN COOLER BLOWER COIL - 3/4 PLUMBING CONTRACTOR SHALL PROVIDE DRAIN LINES TO TERMINATE AT FLOOR SINK. 77 1 DISHWASHER 1/2 - 2 82 1 DOUBLE DECK OVEN - (2)3/4 (2)50,000 PROVIDE REDUCED PRESSURE BACKFLOW DEVICE FOR CW SERVICE. PLUMBING FIXTURES MARK FIXTURE TYPE WASTE VENT CW HW SPECIFICATION NOTES (IN) (IN) (IN) (IN) HIGHLINE COMFORT HEIGHT: MODEL K-3999 WC-1 WALL -MOUNTED FLUSH TANK WATER CLOSET 4" 2" 1-1/4" - SEAT: PROFLO COMMERCIAL SEAT MODEL PFTSCOF2000WH NOTE 2 AMERICAN STANDARD, MODEL LUCERNE 0356.421, WHITE, WALL -HUNG LAVATORY, 20-1/2"x18-1/4", SINGLE CENTER FAUCET HOLE. FAUCET BY LV-1 LAV - RESTROOM WALL MOUNTED 2" 1-1/2" 1/2" 1/2" SLOAN, MODEL SF-2150-4-BAT-BDM-CP-0.5GPM-MLM-IR-FCT, CODE #3362110, 0.5 GPM, SENSOR FAUCET. NOTE 2,5 TWO-PIECE COATED CAST IRON BODY, DOUBLE DRAINAGE FLANGE, REVERSIBLE FLASHING COLLAR, WEEPHOLES, BOTTOM OUTLET, 5 INCH FD-1 FLOOR DRAIN NOTE 1 NOTE 1 - - ADJUSTABLE ROUND NICKEL BRONZE STRAINER, AND VANDAL PROOF SCREWS. COATED CAST IRON WITH 1/2 INCH THREADED INLET NOTE 4 TAPPING. JAY R SMITH FIGURE 2695. 12 INCH SQUARE TOP, POLISHED STAINLESS STEEL HALF GRATE, 8 IN DEEP 14 GAGE TYPE 304 STAINLESS STEEL RECEPTOR, NO HUB, DOME FS-1 FLOOR SINK NOTE 1 NOTE 1 BOTTOM STRAINER, FLANGE AND FLASHING CLAMP FOR ABOVE GRADE INSTALLATIONS. COATED CAST IRON WITH 1/2 INCH THREADED INLET NOTE 4 TAPPING. JAY R. SMITH FIGURE 2695. 12 IN BY 60 IN TOP, POLISHED STAINLESS STEEL FULL GRATE IN THREE SECTIONS, 6 IN DEEP 14 GAGE TYPE 304 STAINLESS STEEL RECEPTOR, TD-1 TRENCH DRAIN NOTE 1 NOTE 1 BOX PATTERN DRAIN, NO HUB, COATED CAST IRON WITH 1/2 INCH THREADED INLET TAPPING. NOTE 4 PPP MODEL PRIMETIME, 4 TO 16 OUTLETS, 3/4" INLET, 1/2"OUTLET, 120 VOLTS SINGLE PHASE. TP-1 TRAP PRIMER 1/2" - NOTE 3 GENERAL NOTES: A. PIPE SIZES LISTED MAY BE DIFFERENT THAN THE ACTUAL FIXTURE CONNECTION. PROVIDE BRANCH PIPE OF LISTED SIZE AND ALL PIPE FITTINGS AND OFFSETS REQUIRED FOR COMPLETE INSTALLATION. B. PROVIDE FINAL CONNECTIONS TO ALL FIXTURES. C. PROVIDE WALL CLEANOUTS FOR ALL SINKS AND LAVATORIES. NOTES: 1. SIZE AS NOTED ON DRAWINGS. WHERE APPLICABLE, VENT SIZE SHALL BE AS NOTED ON THE DRAWING, HALF SIZE OF WASTE OR 1-1/2", WHICHEVER IS LARGER. 2. ADA COMPLIANT WHERE INDICATED ON THE ARCHITECTURAL DRAWINGS. MOUNTING HEIGHT AS INDICATED ON ARCHITECTURAL DRAWINGS. 3. PROVIDE TRAP PRIMER ASSEMBLY WITH NUMBER OF PORTS REQUIRED TO SERVE ADJACENT DRAINS. PROVIDE WITH SHUTOFF VALVE. 4. CW CONNECTION VIA TRAP PRIMER. 5. SUPPLY HOT AND COLD WATER TO THERMOSTATIC MIXING VALVE AND EXTEND TEMPERED WATER FROM MIXING VALVE TO FAUCET. GAS FIRED WATER HEATER SCHEDULE MARK LOCATION SYSTEM SERVED MANUFACTURER / MODEL NO. TYPE TOTAL CAP (MBH) UNIFORM ENERGY FACTOR (UEF) TANK SIZE (GAL) RECOVERY AT 90F (GAUHR) INPUT (MBH) CONNECTION SIZES FLUE OUTLET (IN DIA) AIR INLET (IN DIA) PHYSICAL RELIEF VALVE (PSIG) MOUNTING / SUPPORT DETAIL / DIAGRAM REFERENCE NOTES MARK WATER (IN) GAS (IN) DRAIN (IN) DIAxH (INAN) WEIGHT (LBS) 36 KITCHEN DOMESTIC HW RHEEM / XG50TO6PV42UO VERTICAL, TANK 42 0.68 50 42.4 42 3/4 3/4 3/4 3 3 22x66 170 150 FLOOR 2/M9.02 1 36 NOTES: 1. SET AT 140"F GREASE INTERCEPTOR SCHEDULE MARK LOCATION AREA SERVED MANUFACTURER / MODEL NO. TYPE CAPACITY MAX OPERATING TEMP ("F) PIPE PHYSICAL COVER NOTES MARK FLOW (GPM) GREASE (LBS) SOLIDS (GAL) LIQUID (GALS) INLET (DIA) DISCH (DIA) VENT (DIA) LxWxH (INANAN) WEIGHT (LBS) QTY. / SIZE (DIA) RATING (LBS) 63 WASHING/PREP AREA KITCHEN SCHIER / GB-3 HYDROMECH 50 270 2 40 150 4 4 2 37x28x21 69 1 / 22" 1000 1,2 63 NOTES: 1. VENT NOT REQUIRED UNLESS PER LOCAL CODE. 2. PROVIDE WITH PUMPOUT PORT CONNECTION. SEE PLANS FOR PUMP OUT PORT LOCATION. H A R G I S 1201 third avenue, suite 600, seattle,wa 98101 206.448.3376 - 206.448.4450 - hargis.biz F___ O w O U j"' _f WASH ) 1 4% 9F5590 /STE ��C3 W Z O o 2i CAI G 0 0 ~ co Uw W Q LU _ WCnU) �Z0 rI- �/ / Z Q Z_05 O n �Lnw REV. RELEASE PROJECT NO DATE HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE PLUMBING SCHEDULES SHEET NUMBER RECEIVED PO-03 Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET NOTES: 1. SEE TYPICAL PLUMBING DETAILS IN P9.0 SERIES. 2. SLOPE ALL WASTE PIPING AT A MINIMUM OF 1/4" PER FOOT UNLESS OTHERWISE NOTED. 3. SEE SHEET P0.01 FOR ADDITIONAL GENERAL NOTES RELATED TO PLUMBING. 4. WORK SHALL BE LOCATED TO AVOID CONFLICTS WITH OTHER TRADES. PROVIDE ADEQUATE CLEARANCE FOR ARCHITECTURAL DESIGN, PROPER OPERATION AND SERVICING OF EQUIPMENT. 5. SEE PLUMBING FIXTURE SCHEDULE, SHEET P0.03 FOR INDIVIDUAL PLUMBING FIXTURE CONNECTIONS. 6. FIELD VERIFY ALL UTILITY POINTS OF CONNECTION PRIOR TO STARTING WORK. 7. PROVIDE WALL CLEANOUT BELOW EACH LAVATORY AND SINK. 8. REFER TO ARCHITECTURAL INTERIOR FOR MOUNTING HEIGHTS OF ADA PLUMBING FIXTURES. 9. SHUTOFF VALVE LOCATIONS ARE SHOWN DIAGRAMMATICALLY. LOCATE AT ACCESSIBLE LOCATIONS AS SPECIFIED. NOT ALL SHUTOFFS ARE SHOWN, REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 10. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS FOR FLOOR DRAIN DIMENSIONS IN RESTROOMS AND FLOOR SLOPING. r- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -I Hot water supply lines shall comply with table C403.3.1 I I I � -------------------------------- --------------------------------- I AbLt U4104.J.1 PIPING VOLUME AND MAXIMUM PIPING LENGTHS NOMINAL PIPE SIZE (inches) VOLUME (liquid ounces per foot length) MAXIMUM PIPING LENGTH (feet) Public lavatory faucets Other fixtures and appliances 114 0.33 6 50 5J16 0.5 4 50 318 0.75 3 50 112 1.5 2 43 518 2 1 32 314 3 0.5 21 718 4 0.5 16 1 5 0.5 13 11/4 8 0.5 8 1112 11 0.5 6 2 or larger 18 0.5 4 H A R G I S 1201 third avenue, suite 600, seattle, wa 98101 206.448.3376 • 206.448.4450 • hargis.biz WAS.' 0,n 45590 W LU L.L V J Z 75 C) L0 L0 i V J 0 Z O 75 n LU REV. RELEASE PROJECT NO. DATE - HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE FOUNDATION PLUMBING PLAN 1 FOUNDATION PLUMBING PLAN FK N P1.10 SCALE: 1/4" = V-0" SHEET NUMBER RECEIVED P 1.10 Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET NOTES: 1. SEE TYPICAL PLUMBING DETAILS IN P9.0 SERIES. 2. SLOPE ALL WASTE PIPING AT A MINIMUM OF 1/4" PER FOOT UNLESS OTHERWISE NOTED. 3. SEE SHEET P0.01 FOR ADDITIONAL GENERAL NOTES RELATED TO PLUMBING. 4. WORK SHALL BE LOCATED TO AVOID CONFLICTS WITH OTHER TRADES. PROVIDE ADEQUATE CLEARANCE FOR ARCHITECTURAL DESIGN, PROPER OPERATION AND SERVICING OF EQUIPMENT. 5. SEE PLUMBING FIXTURE SCHEDULE, SHEET P0.03 FOR INDIVIDUAL PLUMBING FIXTURE CONNECTIONS. 6. FIELD VERIFY ALL UTILITY POINTS OF CONNECTION PRIOR TO STARTING WORK. 7. PROVIDE WALL CLEANOUT BELOW EACH LAVATORY AND SINK. 8. REFER TO ARCHITECTURAL INTERIOR FOR MOUNTING HEIGHTS OF ADA PLUMBING FIXTURES. 9. SHUTOFF VALVE LOCATIONS ARE SHOWN DIAGRAMMATICALLY. LOCATE AT ACCESSIBLE LOCATIONS AS SPECIFIED. NOT ALL SHUTOFFS ARE SHOWN, REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 10. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS FOR FLOOR DRAIN DIMENSIONS IN RESTROOMS AND FLOOR SLOPING. FLAG NOTES: ROUTE INDIRECT DRAIN FROM KITCHEN FIXTURE TO ADJACENT FLOOR SINK. 2� ROUTE HW FULL SIZE IN WALL AND LOOP TO WITHIN 6" OF LAVATORY STOPS TO MEET WSEC REQUIREMENTS. DAYLIGHT 3/4" CONDENSATE DRAIN TO FLOOR SINK AT 2" ABOVE THE FLOOR SINK FLOOD RIM. PROVIDE REDUCED PRESSURE BACKFLOW PREVENTOR UPSTREAM OF CW DROP TO WATER FILTER. ROUTE CW FROM WATER FILTER TO ADJACENT FIXTURES. SEE KITCHEN FIXTURE SCHEDULE FOR RUN OUT SIZES. PROVIDE REDUCED PRESSURE BACKFLOW PREVENTOR UPSTREAM OF FIXTURE CONNECTION. PROVIDE ANSUL GAS SHUTOFF VALVE. INSTALL IN ACCESSIBLE LOCATION BELOW CEILING. ------------------------------------------------------------------------------- iter supply lines shall comply with table I 3.1 -------------------------- --------------------------------------� PIPING VOLUME AND MAXIMUM PIPING LENGTHS 'IPE SIZE 9s) VOLUME (liquid ounces per foot length MAXIMUM PIPING LENGTH (feet) Public lavatory faucets Other fixtures and appliances 0-33 6 50 3 0.5 4 50 0-75 3 50 1.5 2 43 2 1 32 3 0.5 21 4 0.5 16 5 0.5 13 8 0.5 8 11 0.5 6 rger 18 0.5 4 1 ABOVE GROUND PLUMBING PLAN N P2.10 SCALE: 1/4" = V-0" H A R G I S 1201 third avenue, suite 600, seattle, wa 98101 206.448.3376 • 206.448.4450 • hargis.biz LU LU V J W LU v! v! 0 Z 0 LU REV. RELEASE PROJECT NO. DATE - HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE ABOVE GROUND PLUMBING PLAN SHEET NUMBER RECEIVED Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT P2.1 0 n i - 3/4"G (42 MBH) c \ i 4S, 3/4"G \ ` . (50 MBH) . , (42, 5, 6N� � T ' � o N M ' EN gN (50 MBH) SHEET NOTES: 1. CONTRACTOR SHALL VERIFY SERVICE PRESSURE AND USE LOW PRESSURE CHART ON THIS SHEET FOR GAS PIPE SIZING FOR 7-11" WC, OR THE MEDIUM PRESSURE CHART FOR 2 PSI ACCORDINGLY. 2. PROVIDE AN ACCESSIBLE GAS SHUT-OFF VALVE INSTALLED WITHIN 6' OF ALL GAS APPLIANCES. 3. FOR PRESSURE REGULATORS INSTALLED OUTDOORS AND THOSE INSTALLED INDOORS SERVING APPLIANCES EXCEEDING 1100 MBH, PIPE VENT FULL SIZE AND TERMINATE WITH WEATHERPROOF VENT CAP OR 180 DEGREE FITTING WITH SCREEN. OVERSIZE VENT PIPES FOR INSTALLATIONS GREATER THAN 2 STORIES IN HEIGHT PER MANUFACTURER'S RECOMMENDATIONS. 3/4"MPG (142 MBH) 31ZING BASED ON 2018 IFGC 402.4 LOW PRESSURE GAS: 6' W.C. PRESSURE DROP / MEDIUM PRESSURE GAS: 1.0 PSI PRESSURE DROP LARGEST GAS LOAD = DOUBLE DECK OVEN LONGEST RUN: 25' MPG + 45' G NOTE: DISTANCE SHOWN ARE FOR PERMITTING ONLY. MECHANICAL CONTRACTOR SHALL DIMENSION & PROVIDE SIZING PER FIELD AND SITE PLANS. Medium Pressure Gas Pipe Sizing PROJECT NAME Copper Pot Bakery PROJECT NUMBER 22018 BY D.Ide DATE February 3, 2022 SOURCE Source: 2012 IFGC 402.4 Pressure at gas Meter Outlet (psi) 2 Minimum pressure at equip. (psi) 1 Specific Gravity of Gas 0.6094 Superexpansibility Factor 0.9992 Max. Pipe Capacity (CFH) Pipe Length (ft) Nominal Pi a Dimater in Actual I.D. in 0.5 0.75 1 1.25 1.5 2 2.5 3 4 0.622 0.824 1.049 1.38 1.61 2.067 2.469 3.068 4.026 50 669 1,400 2,638 5,419 8,12; 15,650 24,953 44,132 90,064 Low Pressure Gas Pipe Sizing PROJECT NAME Copper Pot Bakery PROJECT NUMBER 22018 BY D.Ide DATE February 3, 2022 SOURCE Source: 2012 IFGC 402.4 Pressure at gas Meter Outlet (in W.C.) 11 Minimum pressure at equip. (in W.C.) 7 Specific Gravity of Gas 0.6094 Max. Pipe Capacity (CFH) Pipe Length (ft) 0.5 0.75 1 1.25 1.5 2 2.5 3 4 6 0.622 0.824 1.049 1.38 1.61 2.067 2.469 3.068 4.026 6.065 50 1 223 467 1 880 1 1,808 1 2,710 1 5,222 1 8,326 14,724 30,049 88,10( 3AS SERVICE METER BY PSE TOTAL LOAD MIN. 100 MBH GAS COCK (TYP) H A R G I S 1201 third avenue, suite 600, seattle,wa 98101 206.448.3376 • 206.448.4450 • hargis.biz ` y F. ce ; O4 WAS; f ��T 9FGts 90 r j U) Z O o N G c) O 00 Uw 00 wQ w� LLI U) Cn Z_ 0 V) < 7 Z Z_7� � O 0 2Low REV. RELEASE DATE 7Ci61MOY90tLea HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE GAS RISER DIAGRAM GAS RISER DIAGRAM SCALE: NONE SHEET NUMBER RECEIVED Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT P8.01 ADJUSTAI DEPRE WHERE SLOPE TRAF CLAMPING RING NON -SHRINK GROUT FINISHED FLOOR WATERPROOF MEMBRANE DRAIN PIPE (SIZE PER PLAN) DETAIL - FLOOR DRAIN IN CONCRETE FLOOR SCALE: NONE FINISHED COUNTER TEMPERED WATER THERMOSTATIC MIXING VALVE (SET TO 110°F OUTLET TEMPERATURE) HW SUPPLY WITH LOOSE KEY STOP FINISHED FLOOR NOTES: 1. PROVIDE UNDER -SINK PROTECTION FOR ACCESSIBLE FIXTURES. FAUCET FIXTURE SUPPLY RISER (TYP) CW SUPPLY WITH LOOSE KEY STOP TAILPIECE AND P-TRAP (OFFSET TAILPIECE/P-TRAP AS SPECIFIED) DETAIL - LOCAL THERMOSTATIC MIXING VALVE SCALE: NONE PIPE HANGER AS I"" SPECIFICATIONS. INSULATION AS SF ON PLANS & NOTE SPECIFICATIONS. PIPE AS SHOWN C PLANS & NOTED 11' SPECIFICATIONS. DETAIL - INSULATED PIPE HANGER SCALE: NONE 2" V IN WALL. SEE DWGS FOR CONT (TYP) ro INTERIOR BELOW FLOOR GREASE INTERCEPTOR L 4" W TO FIXTURES. - SEE DWGS FOR - CONT - INTERNAL FLOW CONTROL MIN 6" THICK COMPACTED SAND OVER UNDISTURBED EARTH NOTES: 1. INSTALL GREASE INTERCEPTOR PER AHJ REQUIREMENTS. DETAIL - GREASE INTERCEPTOR SCALE: NONE THREADED ROD; \TTACH TO STRUCTURE. RIGID INSULATION NSERTS PER SPECS. �ALV. METAL SHIELD, AS DOTED IN SPECS., 3ETWEEN HANGER & ,NSULATION, UP TO CENTERLINE OF PIPE. — CLEAR ACCESS FOR SERVICING GREASE INTERCEPTOR —3" FCO FOR SAMPLE STATION — PIPE SLEEVE AND SEALANT, SEE SLEEVE THROUGH FLOOR DETAIL r2" V IN WALL (TYP) :—FINISHED FLOOR 4" W TO SANITARY SEWER SYSTEM. SEE DWGS FOR CONT — ADD EXTENSION AS REQUIRED FOR INVERT NON -FIRE RATED CONCRETE FLOOR RISER CLAMP (TYP) RESILIENT SEALANT ON EACH END OF SLEEVE PIPE SLEEVE (TYP) METAL DEC'—y PIPE INSULATION WHERE SPECIFIED - PIPE THROUGH FLOOR FLOC RECE AIR C PLUM TRAF PIPE 0 0 / 1" / 1/4' TO 1/2" GAP CEILING SPACE NON -FIRE RATED FLOOR FIRE RATED CONCRETE FLOOR PIPE THROUGH FLOOR PIPE INSULATION WHERE SPECIFIED 1 /2" ESCUTCHEON PLATE WHERE PIPE IS EXPOSED (TYP) FIRESTOPPING ON EACH END OF CEILING SPACE SLEEVE (TYP) FIRE AND SMOKE RATED FLOOR NOTES: 1. EXTEND INSULATION CONTINUOUS THROUGH SLEEVE FOR COLD PIPES. 2. SLEEVE NOT REQUIRED FOR EXISTING CONCRETE FLOORS. DETAIL - PIPE SLEEVE THROUGH CONCRETE FLOOR SCALE: NONE 1"Inlnr/'�T 1A/A OTr DETAIL - INDIRECT WASTE DRAIN SCALE: NONE SEE DWGS ZE AND CONT LEEVE AND NT. SEE 'E THROUGH Z DETAIL V ITARY �.."R SYSTEM. SEE DWGS FOR SIZE AND CONT H A R G I S 1201 third avenue, suite 600, seattle, wa 98101 206.448.3376 206.448.4450 hargis.biz �04 was;:ryJ�t- 1 s FGlSTEwc<) Cn Z O � o N 0 w � U wQ w�� wv)� �zo �Qz z�� Q uo �Low REV. RELEASE DATE PROJECT NO. - HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE PLUMBING DETAILS AND DIAGRAMS SHEET NUMBER RECEIVED Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT P9.01 12" MIN 24" MAX 8" MIN 8'' VANDAL -RESISTANT VENT CAP VENT PIPE OPEN TO ATMOSPHERE COUNTERFLASHING. SEALANT 01:L`VJICIO 01101 DEKTITE FLEXIBLE RUBBER BOOT FLASHING LEAD FLASHING SKIRT COMPOSITE BASE FLASHING ROOF AND INSULATION. SEE ARCH DWGS VENT PIPE FROM INTERIOR VENT SYSTEM, SEE DWGS FOR SIZE AND CONT NOTES: 1. PROVIDE DEKTITE FLASHING FOR METAL ROOFS. DETAIL SHOWS LEAD FLASHING FOR COMPOSITE MEMBRANE ROOFS. 2. DETAIL SHOWS PLUMBING VENT THROUGH ROOF PENETRATION. DETAIL ALSO APPLIES TO NATURAL GAS PIPING, LIQUEFIED PETROLEUM PIPING, AND SIMILAR PIPING THROUGH ROOF PENETRATIONS. DETAIL - PLUMBING VENT THROUGH ROOF PENETRATION SCALE: NONE ROOF AND INSULATION, SEE ARCH DWGS UNION OR FLANGE (TYP) VENTLESS GAS PRESSURE REGULATOR GAS COCK (NORMALLY AS REQUIRED FOR OPEN, TYP) MEDIUM PRESSURE GAS — — — — — — — — — — — — — — — — — GAS MAIN. SEE DWGS KITCHEN CHASE FOR SIZE AND CONT CEILING -- — — — — — — — — — — — — —— --- ROUTE ALONG WALL --7\ 1/4" PRESSURE GAGE TAP WITH CAP AND SOV FLEXIBLE CONNECTOR 4" MIN FULL SIZE DIRT _ LEG WITH CAP KITCHEN FIXTURE INCREASER AS 4" MIN REQUIRED FINISHED FLOOR LOW PRESSURE GAS SUPPLY SIDE VIEW FRONT VIEW NOTES: 1. GAS VENT THROUGH ROOF SHALL BE A MINIMUM OF 10'-0" AWAY FROM OUTSIDE AIR INTAKES. 2. SUPPORT PIPING PER MANUFACTURER'S RECOMMENDATIONS. 3. PROVIDE REGULATOR FOR EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS AND WHERE SHOWN ON DWGS. 4. KITCHEN GAS FIRED EQUIPMENT SHOWN; ROOFTOP EQUIPMENT CONNECTION SIMILAR. DETAIL - GAS FIRED EQUIPMENT CONNECTION SCALE: NONE HWC HW, CW AND HWC PIPES. SEE DWGS HW FOR SIZE AND CONT (TYP) EXPANSION TANK SEISMICALLY BRACED TO WALL STRUCTURE COMBUSTION AIR DUCT. SEE DWGS AND NOTE 5 GAS PIPE. SEE DWGS 1 FLUE GAS VENT DUCT. SEE DWGS AND NOTE 4 GAS COCK AND FLEXIBLE CONNECTION 6" LONG FULL SIZE DIRT LEG (TYP) WATERTIGHT DRAIN PAN, 4" HIGH LIP, 3" LARGER THAN WATER HEATER FOOTPRINT ALL AROUND FINISHED FLOOR` HOUSEKEEPING PAD. SEE DETAIL THERMOSTATIC MIXING VALVE. 3/4" LJJ I HEAT TRAP, 12" MINIMUM, 18" MAXIMUM VACUUM RELIEF VALVE. INSTALL ABOVE WATER HEATER 1 TEMPERATURE AND PRESSURE SAFETY RELIEF VALVE PIPE FULL SIZE DISCHARGE TO FLOOR RECEPTOR WITH I� AIR GAP. SEE DWGS cD GAS WATER HEATER, SEISMICALLY BRACED TO WALL STRUCTURE d a UNION (TYP) SHUTOFF VALVE (TYP) THERMOMETER (TYP) AQUASTAT CIRCULATION PUMP CHECK VALVE IN HORIZONTAL POSITION (TYP) NOTES: 1. SEE DRAWINGS FOR PIPE SIZES AND CONTINUATION. 2. VALVES, SENSORS, PUMPS, EXPANSION TANK, AND SIMILAR ITEMS SHALL BE ACCESSIBLE FOR MAINTENANCE/INSPECTION PER MANUFACTURERS RECOMMENDATIONS AND AHJ REQUIREMENTS. 3. AQUASTAT SET TO START PUMP IF TEMP FALLS BELOW 110°F (ADJ). SET DEADBAND AT 3°F (ADJ). 4. INSTALL FLUE GAS VENT AND COMBUSTION AIR DUCTS AND TERMINATIONS AS SHOWN ON DRAWINGS PER MANUFACTURERS RECOMMENDATIONS. DIAGRAM - FLOOR MOUNTED CONDENSING GAS WATER HEATER SCALE: NONE H A R G I S 1201 third avenue, suite 600, seattle, wa 98101 206.448.3376 • 206.448.4450 • hargis.biz F___ O w O U V ) Z O o N 0 01-00 Uw wQ LU _ W Cn Cn 0�Z 0 V) < 7 L Z�0 0 Low REV. RELEASE PROJECT NO. DATE - HARGIS PROJECT NO. 22018 DRAWN BY DI CHECKED BY BFC APPROVED BY BFC SHEET TITLE PLUMBING DETAILS AND DIAGRAMS SHEET NUMBER RECEIVED Mar 01 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT P9.02